COVER INFORMATION Station: VLBA_BR (Code Br ) Experiment: Proper motions in the Virgo Cluster Exp. Code: BB258A Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA 256-8-2 1.3cm Notes: Schedule for VLBA_BR (Code Br ) Page 2 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- Next scan frequencies: 23020.49 23045.49 23107.99 23207.99 23370.49 23420.49 23457.99 23470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 00 05 17 0231+132 06 43 45 28.0 258.6 4.2 42.3 0 1 1 0 00 04 57 00 06 17 --- 06 44 45 27.8 258.8 4.2 42.3 60 F 1 3 00 05 15 Source only 1.9 degrees from the Sun. 00 10 09 0339-014 06 48 37 25.5 234.3 3.1 32.8 209 1 1 3 00 09 49 00 11 08 --- 06 49 37 25.4 234.6 3.2 33.0 60 F 1 5 00 10 07 00 12 21 0530+133 06 50 49 51.7 212.2 1.3 21.4 14 1 1 5 00 12 01 00 13 20 --- 06 51 49 51.6 212.5 1.3 21.7 60 F 1 8 00 12 19 00 14 47 0646+445 06 53 15 86.6 198.3 0.1 17.2 10 1 1 8 00 14 27 00 15 46 --- 06 54 15 86.5 201.1 0.1 19.8 60 F 1 10 00 14 45 00 17 32 0753+535 06 56 01 79.3 52.2 -1.0 -116.5 0 1 1 10 00 17 12 00 18 31 --- 06 57 01 79.4 51.9 -0.9 -117.1 60 F 1 13 00 17 30 00 19 13 0818+422 06 57 42 74.7 104.5 -1.4 -61.0 0 1 1 13 00 18 53 00 20 12 --- 06 58 42 74.8 104.9 -1.3 -60.8 60 F 1 15 00 19 11 00 23 42 0854+200 07 02 12 53.9 131.0 -1.9 -32.4 162 1 1 15 00 23 22 00 24 42 --- 07 03 12 54.0 131.3 -1.9 -32.2 60 F 1 18 00 23 40 00 26 10 0958+472 07 04 40 61.1 74.9 -2.9 -72.1 44 1 1 18 00 25 50 00 27 10 --- 07 05 40 61.3 75.0 -2.9 -72.2 60 F 1 21 00 26 08 00 28 22 1058+811 07 06 52 52.2 12.2 -3.9 -112.5 24 1 1 21 00 28 02 00 29 21 --- 07 07 52 52.2 12.2 -3.9 -112.8 60 F 1 23 00 28 20 00 32 11 1104+381 07 10 43 47.2 80.9 -3.9 -57.0 118 1 1 23 00 31 51 00 33 11 --- 07 11 43 47.4 81.1 -3.9 -57.0 60 F 1 26 00 32 09 00 33 33 1146+395 07 12 05 41.5 72.7 -4.6 -56.2 4 1 1 26 00 33 11 00 34 33 --- 07 13 05 41.7 72.9 -4.6 -56.3 60 F 1 28 00 33 11 Schedule for VLBA_BR (Code Br ) Page 3 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 00 35 42 1222+041 07 14 14 11.7 96.8 -5.1 -41.6 3 1 1 28 00 35 22 00 36 42 --- 07 15 14 11.8 97.0 -5.1 -41.6 60 F 1 31 00 35 40 00 38 09 1357+764 07 16 42 44.2 18.4 -6.7 -66.3 16 1 1 31 00 37 49 00 39 09 --- 07 17 42 44.2 18.5 -6.7 -66.5 60 F 1 34 00 38 07 00 40 02 1638+572 07 18 35 20.5 21.8 -9.3 -27.3 0 1 1 34 00 39 42 00 41 02 --- 07 19 35 20.6 21.9 -9.3 -27.5 60 F 1 36 00 40 00 00 41 23 1746+622 07 19 56 22.1 11.4-10.4 -16.6 8 1 1 36 00 41 02 00 42 23 --- 07 20 56 22.2 11.6-10.4 -16.8 60 F 1 39 00 41 02 00 42 59 1800+782 07 21 32 37.2 5.0-10.6 -16.9 0 1 1 39 00 42 39 00 43 58 --- 07 22 32 37.2 5.1-10.6 -17.1 60 F 1 41 00 42 57 00 44 36 0019+732 07 23 10 41.5 -21.4 7.0 59.1 14 1 1 41 00 44 16 00 45 36 --- 07 24 10 41.4 -21.4 7.1 58.8 60 F 1 44 00 44 34 00 46 19 0136+475 07 24 53 35.2 -55.1 5.8 54.7 15 1 1 44 00 45 59 00 47 19 --- 07 25 53 35.1 -54.9 5.8 54.6 60 F 1 46 00 46 17 00 51 01 0238+163 07 29 35 23.9 268.6 4.8 44.1 0 1 1 46 00 50 41 00 52 01 --- 07 30 35 23.7 268.8 4.9 44.1 60 F 1 49 00 50 59 Source only 1.8 degrees from the Sun. 00 53 43 0555+394 07 32 18 70.9 253.1 1.6 56.3 1 1 1 49 00 53 23 00 54 42 --- 07 33 18 70.7 253.5 1.6 56.4 60 F 1 52 00 53 41 Next scan frequencies: 23789.49 23789.49 23797.49 23797.49 23805.49 23805.49 23813.49 23813.49 Next BBC frequencies: 789.49 789.49 797.49 797.49 805.49 805.49 813.49 813.49 00 54 42 M87 07 33 18 19.5 93.1 -5.0 -43.0 -113 1 1 52 00 54 42 00 57 22 --- 07 35 58 19.9 93.7 -4.9 -43.0 47 F 1 57 00 55 15 00 57 22 M89 07 35 58 19.2 92.6 -5.0 -43.1 -7 1 1 57 00 57 22 00 58 02 --- 07 36 38 19.3 92.7 -5.0 -43.1 33 F 1 58 00 57 22 00 58 02 M87 07 36 38 20.0 93.8 -4.9 -43.0 -7 1 1 58 00 58 02 00 58 42 --- 07 37 18 20.1 93.9 -4.9 -43.0 33 F 1 59 00 58 02 Schedule for VLBA_BR (Code Br ) Page 4 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 00 58 42 M58 07 37 18 18.6 93.0 -5.0 -42.9 -9 1 1 59 00 58 42 00 59 22 --- 07 37 58 18.7 93.1 -5.0 -42.9 31 F 1 61 00 58 42 00 59 22 M87 07 37 58 20.3 94.0 -4.9 -43.0 -9 1 1 61 00 59 22 01 00 01 --- 07 38 38 20.4 94.2 -4.9 -43.0 31 F 1 62 00 59 22 01 00 01 M89 07 38 38 19.7 93.1 -5.0 -43.1 -7 1 1 62 01 00 01 01 00 41 --- 07 39 18 19.8 93.2 -4.9 -43.0 33 F 1 63 01 00 01 01 00 41 M87 07 39 18 20.5 94.3 -4.9 -42.9 -7 1 1 63 01 00 41 01 01 21 --- 07 39 58 20.6 94.4 -4.9 -42.9 33 F 1 64 01 00 41 01 01 21 M58 07 39 58 19.0 93.5 -5.0 -42.9 -9 1 1 64 01 01 21 01 02 01 --- 07 40 38 19.1 93.6 -5.0 -42.9 31 F 1 66 01 01 21 01 02 01 M87 07 40 38 20.7 94.5 -4.8 -42.9 -9 1 1 66 01 02 01 01 02 41 --- 07 41 18 20.8 94.7 -4.8 -42.9 31 F 1 67 01 02 01 01 02 41 M89 07 41 18 20.1 93.6 -4.9 -43.0 -7 1 1 67 01 02 41 01 03 21 --- 07 41 58 20.2 93.8 -4.9 -43.0 33 F 1 68 01 02 41 01 03 21 M87 07 41 58 20.9 94.8 -4.8 -42.9 -7 1 1 68 01 03 21 01 04 01 --- 07 42 38 21.0 94.9 -4.8 -42.9 33 F 1 70 01 03 21 01 04 01 M58 07 42 38 19.5 94.0 -4.9 -42.8 -9 1 1 70 01 04 01 01 04 41 --- 07 43 18 19.6 94.2 -4.9 -42.8 31 F 1 71 01 04 01 01 04 41 M87 07 43 18 21.1 95.1 -4.8 -42.9 -9 1 1 71 01 04 41 01 05 21 --- 07 43 58 21.3 95.2 -4.8 -42.9 31 F 1 72 01 04 41 01 05 21 M89 07 43 58 20.6 94.1 -4.9 -43.0 -7 1 1 72 01 05 21 01 06 00 --- 07 44 38 20.7 94.3 -4.9 -43.0 33 F 1 73 01 05 21 01 06 00 M87 07 44 38 21.4 95.3 -4.8 -42.9 -7 1 1 73 01 06 00 01 06 40 --- 07 45 18 21.5 95.4 -4.8 -42.9 33 F 1 75 01 06 00 01 06 40 M58 07 45 18 19.9 94.5 -4.9 -42.8 -9 1 1 75 01 06 40 01 07 20 --- 07 45 58 20.0 94.7 -4.9 -42.8 31 F 1 76 01 06 40 01 07 20 M87 07 45 58 21.6 95.6 -4.8 -42.8 -9 1 1 76 01 07 20 01 08 00 --- 07 46 38 21.7 95.7 -4.7 -42.8 31 F 1 77 01 07 20 Schedule for VLBA_BR (Code Br ) Page 5 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 08 00 M89 07 46 38 21.0 94.6 -4.8 -43.0 -7 1 1 77 01 08 00 01 08 40 --- 07 47 18 21.1 94.8 -4.8 -42.9 33 F 1 79 01 08 00 01 08 40 M87 07 47 18 21.8 95.8 -4.7 -42.8 -7 1 1 79 01 08 40 01 09 20 --- 07 47 58 21.9 96.0 -4.7 -42.8 33 F 1 80 01 08 40 01 09 20 M58 07 47 58 20.4 95.0 -4.8 -42.8 -9 1 1 80 01 09 20 01 10 00 --- 07 48 38 20.5 95.2 -4.8 -42.8 31 F 1 81 01 09 20 01 10 00 M87 07 48 38 22.0 96.1 -4.7 -42.8 -9 1 1 81 01 10 00 01 10 40 --- 07 49 18 22.1 96.2 -4.7 -42.8 31 F 1 82 01 10 00 01 10 40 M89 07 49 18 21.5 95.2 -4.8 -42.9 -7 1 1 82 01 10 40 01 11 20 --- 07 49 58 21.6 95.3 -4.8 -42.9 33 F 1 84 01 10 40 01 11 20 M87 07 49 58 22.3 96.3 -4.7 -42.8 -7 1 1 84 01 11 20 01 12 00 --- 07 50 38 22.4 96.5 -4.7 -42.8 33 F 1 85 01 11 20 01 12 00 M58 07 50 38 20.8 95.6 -4.8 -42.7 -9 1 1 85 01 12 00 01 12 39 --- 07 51 18 20.9 95.7 -4.8 -42.7 31 F 1 86 01 12 00 01 12 39 M87 07 51 18 22.5 96.6 -4.7 -42.7 -9 1 1 86 01 12 39 01 13 19 --- 07 51 58 22.6 96.7 -4.7 -42.7 31 F 1 88 01 12 39 01 13 19 M89 07 51 58 21.9 95.7 -4.7 -42.9 -7 1 1 88 01 13 19 01 13 59 --- 07 52 38 22.0 95.8 -4.7 -42.9 33 F 1 89 01 13 19 01 13 59 M87 07 52 38 22.7 96.9 -4.6 -42.7 -7 1 1 89 01 13 59 01 14 39 --- 07 53 18 22.8 97.0 -4.6 -42.7 33 F 1 90 01 13 59 01 14 39 M58 07 53 18 21.2 96.1 -4.7 -42.7 -9 1 1 90 01 14 39 01 15 19 --- 07 53 58 21.3 96.2 -4.7 -42.7 31 F 1 91 01 14 39 01 15 19 M87 07 53 58 22.9 97.1 -4.6 -42.7 -9 1 1 91 01 15 19 01 15 59 --- 07 54 38 23.0 97.2 -4.6 -42.7 31 F 1 93 01 15 19 01 15 59 M89 07 54 38 22.3 96.2 -4.7 -42.8 -7 1 1 93 01 15 59 01 16 39 --- 07 55 18 22.5 96.3 -4.7 -42.8 33 F 1 94 01 15 59 01 16 39 M87 07 55 18 23.1 97.4 -4.6 -42.7 -7 1 1 94 01 16 39 01 17 19 --- 07 55 58 23.2 97.5 -4.6 -42.6 33 F 1 95 01 16 39 Schedule for VLBA_BR (Code Br ) Page 6 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 17 19 M58 07 55 58 21.7 96.6 -4.7 -42.6 -9 1 1 95 01 17 19 01 17 59 --- 07 56 38 21.8 96.7 -4.7 -42.6 31 F 1 97 01 17 19 01 17 59 M87 07 56 38 23.4 97.6 -4.6 -42.6 -9 1 1 97 01 17 59 01 18 38 --- 07 57 18 23.5 97.8 -4.6 -42.6 31 F 1 98 01 17 59 01 18 38 M89 07 57 18 22.8 96.7 -4.6 -42.8 -7 1 1 98 01 18 38 01 19 18 --- 07 57 58 22.9 96.8 -4.6 -42.7 33 F 1 99 01 18 38 01 19 18 M87 07 57 58 23.6 97.9 -4.6 -42.6 -7 1 1 99 01 19 18 01 19 58 --- 07 58 38 23.7 98.0 -4.5 -42.6 33 F 1 100 01 19 18 01 19 58 M58 07 58 38 22.1 97.1 -4.7 -42.6 -9 1 1 100 01 19 58 01 20 38 --- 07 59 18 22.2 97.2 -4.6 -42.6 31 F 1 102 01 19 58 01 20 38 M87 07 59 18 23.8 98.2 -4.5 -42.6 -9 1 1 102 01 20 38 01 21 18 --- 07 59 58 23.9 98.3 -4.5 -42.5 31 F 1 103 01 20 38 01 21 18 M89 07 59 58 23.2 97.2 -4.6 -42.7 -7 1 1 103 01 21 18 01 21 58 --- 08 00 38 23.3 97.4 -4.6 -42.7 33 F 1 104 01 21 18 01 21 58 M87 08 00 38 24.0 98.4 -4.5 -42.5 -7 1 1 104 01 21 58 01 22 38 --- 08 01 18 24.1 98.6 -4.5 -42.5 33 F 1 106 01 21 58 01 22 38 M58 08 01 18 22.6 97.6 -4.6 -42.5 -9 1 1 106 01 22 38 01 23 18 --- 08 01 58 22.7 97.8 -4.6 -42.5 31 F 1 107 01 22 38 01 23 18 M87 08 01 58 24.2 98.7 -4.5 -42.5 -9 1 1 107 01 23 18 01 23 58 --- 08 02 38 24.3 98.8 -4.5 -42.5 31 F 1 108 01 23 18 01 23 58 M89 08 02 38 23.7 97.7 -4.6 -42.6 -7 1 1 108 01 23 58 01 24 37 --- 08 03 18 23.8 97.9 -4.5 -42.6 33 F 1 109 01 23 58 01 24 37 M87 08 03 18 24.5 99.0 -4.5 -42.4 -7 1 1 109 01 24 37 01 25 17 --- 08 03 58 24.6 99.1 -4.5 -42.4 33 F 1 111 01 24 37 01 25 17 M58 08 03 58 23.0 98.1 -4.6 -42.4 -9 1 1 111 01 25 17 01 25 57 --- 08 04 38 23.1 98.3 -4.6 -42.4 31 F 1 112 01 25 17 01 25 57 M87 08 04 38 24.7 99.2 -4.4 -42.4 -9 1 1 112 01 25 57 01 26 37 --- 08 05 18 24.8 99.3 -4.4 -42.4 31 F 1 113 01 25 57 Schedule for VLBA_BR (Code Br ) Page 7 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 26 37 M89 08 05 18 24.1 98.3 -4.5 -42.6 -7 1 1 113 01 26 37 01 27 17 --- 08 05 58 24.2 98.4 -4.5 -42.6 33 F 1 115 01 26 37 01 27 17 M87 08 05 58 24.9 99.5 -4.4 -42.4 -7 1 1 115 01 27 17 01 27 57 --- 08 06 38 25.0 99.6 -4.4 -42.3 33 F 1 116 01 27 17 01 27 57 M58 08 06 38 23.4 98.7 -4.5 -42.4 -9 1 1 116 01 27 57 01 28 37 --- 08 07 18 23.6 98.8 -4.5 -42.4 31 F 1 117 01 27 57 01 28 37 M87 08 07 18 25.1 99.7 -4.4 -42.3 -9 1 1 117 01 28 37 01 29 17 --- 08 07 58 25.2 99.9 -4.4 -42.3 31 F 1 118 01 28 37 01 29 17 M89 08 07 58 24.5 98.8 -4.5 -42.5 -7 1 1 118 01 29 17 01 29 57 --- 08 08 38 24.7 98.9 -4.5 -42.5 33 F 1 120 01 29 17 01 29 57 M87 08 08 38 25.3 100.0 -4.4 -42.3 -7 1 1 120 01 29 57 01 30 36 --- 08 09 18 25.4 100.1 -4.4 -42.3 33 F 1 121 01 29 57 01 30 36 M58 08 09 18 23.9 99.2 -4.5 -42.3 -9 1 1 121 01 30 36 01 31 16 --- 08 09 58 24.0 99.3 -4.5 -42.3 31 F 1 122 01 30 36 01 31 16 M87 08 09 58 25.6 100.3 -4.4 -42.2 -9 1 1 122 01 31 16 01 31 56 --- 08 10 38 25.7 100.4 -4.3 -42.2 31 F 1 124 01 31 16 01 31 56 M89 08 10 38 25.0 99.3 -4.4 -42.4 -7 1 1 124 01 31 56 01 32 36 --- 08 11 18 25.1 99.5 -4.4 -42.4 33 F 1 125 01 31 56 01 32 36 M87 08 11 18 25.8 100.5 -4.3 -42.2 -7 1 1 125 01 32 36 01 33 16 --- 08 11 58 25.9 100.7 -4.3 -42.2 33 F 1 126 01 32 36 01 33 16 M58 08 11 58 24.3 99.7 -4.4 -42.2 -9 1 1 126 01 33 16 01 33 56 --- 08 12 38 24.4 99.9 -4.4 -42.2 31 F 1 128 01 33 16 01 33 56 M87 08 12 38 26.0 100.8 -4.3 -42.2 -9 1 1 128 01 33 56 01 34 36 --- 08 13 18 26.1 100.9 -4.3 -42.1 31 F 1 129 01 33 56 01 34 36 M89 08 13 18 25.4 99.9 -4.4 -42.3 -7 1 1 129 01 34 36 01 35 16 --- 08 13 58 25.5 100.0 -4.4 -42.3 33 F 1 130 01 34 36 01 35 16 M87 08 13 58 26.2 101.1 -4.3 -42.1 -7 1 1 130 01 35 16 01 35 56 --- 08 14 38 26.3 101.2 -4.3 -42.1 33 F 1 131 01 35 16 Schedule for VLBA_BR (Code Br ) Page 8 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 35 56 M58 08 14 38 24.8 100.3 -4.4 -42.1 -9 1 1 131 01 35 56 01 36 35 --- 08 15 18 24.9 100.4 -4.4 -42.1 31 F 1 133 01 35 56 01 36 35 M87 08 15 18 26.4 101.4 -4.3 -42.1 -9 1 1 133 01 36 35 01 37 15 --- 08 15 58 26.5 101.5 -4.3 -42.0 31 F 1 134 01 36 35 01 37 15 M89 08 15 58 25.9 100.4 -4.3 -42.3 -7 1 1 134 01 37 15 01 37 55 --- 08 16 38 26.0 100.5 -4.3 -42.2 33 F 1 135 01 37 15 01 37 55 M87 08 16 38 26.6 101.6 -4.2 -42.0 -7 1 1 135 01 37 55 01 38 35 --- 08 17 18 26.8 101.8 -4.2 -42.0 33 F 1 137 01 37 55 01 38 35 M58 08 17 18 25.2 100.8 -4.3 -42.0 -9 1 1 137 01 38 35 01 39 15 --- 08 17 58 25.3 100.9 -4.3 -42.0 31 F 1 138 01 38 35 01 39 15 M87 08 17 58 26.9 101.9 -4.2 -42.0 -9 1 1 138 01 39 15 01 39 55 --- 08 18 38 27.0 102.0 -4.2 -41.9 31 F 1 139 01 39 15 01 39 55 M89 08 18 38 26.3 100.9 -4.3 -42.2 -7 1 1 139 01 39 55 01 40 35 --- 08 19 18 26.4 101.1 -4.3 -42.1 33 F 1 140 01 39 55 01 40 35 M87 08 19 18 27.1 102.2 -4.2 -41.9 -7 1 1 140 01 40 35 01 41 15 --- 08 19 58 27.2 102.3 -4.2 -41.9 33 F 1 142 01 40 35 01 41 15 M58 08 19 58 25.6 101.3 -4.3 -41.9 -9 1 1 142 01 41 15 01 41 55 --- 08 20 38 25.7 101.5 -4.3 -41.9 31 F 1 143 01 41 15 01 41 55 M87 08 20 38 27.3 102.4 -4.2 -41.8 -9 1 1 143 01 41 55 01 42 34 --- 08 21 18 27.4 102.6 -4.2 -41.8 31 F 1 144 01 41 55 01 42 34 M89 08 21 18 26.7 101.5 -4.2 -42.1 -7 1 1 144 01 42 34 01 43 14 --- 08 21 58 26.8 101.6 -4.2 -42.0 33 F 1 146 01 42 34 01 43 14 M87 08 21 58 27.5 102.7 -4.2 -41.8 -7 1 1 146 01 43 14 01 43 54 --- 08 22 38 27.6 102.8 -4.1 -41.8 33 F 1 147 01 43 14 01 43 54 M58 08 22 38 26.1 101.9 -4.3 -41.9 -9 1 1 147 01 43 54 01 44 34 --- 08 23 18 26.2 102.0 -4.2 -41.8 31 F 1 148 01 43 54 01 44 34 M87 08 23 18 27.7 103.0 -4.1 -41.7 -9 1 1 148 01 44 34 01 45 14 --- 08 23 58 27.8 103.1 -4.1 -41.7 31 F 1 149 01 44 34 Schedule for VLBA_BR (Code Br ) Page 9 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 45 14 M89 08 23 58 27.2 102.0 -4.2 -42.0 -7 1 1 149 01 45 14 01 45 54 --- 08 24 38 27.3 102.1 -4.2 -41.9 33 F 1 151 01 45 14 01 45 54 M87 08 24 38 27.9 103.3 -4.1 -41.7 -7 1 1 151 01 45 54 01 46 34 --- 08 25 18 28.1 103.4 -4.1 -41.7 33 F 1 152 01 45 54 01 46 34 M58 08 25 18 26.5 102.4 -4.2 -41.7 -9 1 1 152 01 46 34 01 47 14 --- 08 25 58 26.6 102.5 -4.2 -41.7 31 F 1 153 01 46 34 01 47 14 M87 08 25 58 28.2 103.5 -4.1 -41.6 -9 1 1 153 01 47 14 01 47 54 --- 08 26 38 28.3 103.7 -4.1 -41.6 31 F 1 155 01 47 14 01 47 54 M89 08 26 38 27.6 102.6 -4.2 -41.9 -7 1 1 155 01 47 54 01 48 34 --- 08 27 18 27.7 102.7 -4.1 -41.8 33 F 1 156 01 47 54 01 48 34 M87 08 27 18 28.4 103.8 -4.1 -41.6 -7 1 1 156 01 48 34 01 49 13 --- 08 27 58 28.5 104.0 -4.1 -41.5 33 F 1 157 01 48 34 01 49 13 M58 08 27 58 26.9 103.0 -4.2 -41.6 -9 1 1 157 01 49 13 01 49 53 --- 08 28 38 27.0 103.1 -4.2 -41.6 31 F 1 158 01 49 13 01 49 53 M87 08 28 38 28.6 104.1 -4.0 -41.5 -9 1 1 158 01 49 53 01 50 33 --- 08 29 18 28.7 104.2 -4.0 -41.5 31 F 1 160 01 49 53 01 50 33 M89 08 29 18 28.0 103.1 -4.1 -41.7 -7 1 1 160 01 50 33 01 51 13 --- 08 29 58 28.2 103.2 -4.1 -41.7 33 F 1 161 01 50 33 01 51 13 M87 08 29 58 28.8 104.4 -4.0 -41.4 -7 1 1 161 01 51 13 01 51 53 --- 08 30 38 28.9 104.5 -4.0 -41.4 33 F 1 162 01 51 13 01 51 53 M58 08 30 38 27.4 103.5 -4.1 -41.5 -9 1 1 162 01 51 53 01 52 33 --- 08 31 18 27.5 103.6 -4.1 -41.5 31 F 1 164 01 51 53 01 52 33 M87 08 31 18 29.0 104.6 -4.0 -41.4 -9 1 1 164 01 52 33 01 53 13 --- 08 31 58 29.1 104.8 -4.0 -41.3 31 F 1 165 01 52 33 01 53 13 M89 08 31 58 28.5 103.7 -4.1 -41.6 -7 1 1 165 01 53 13 01 53 53 --- 08 32 38 28.6 103.8 -4.1 -41.6 33 F 1 166 01 53 13 01 53 53 M87 08 32 38 29.2 104.9 -4.0 -41.3 -7 1 1 166 01 53 53 01 54 33 --- 08 33 18 29.4 105.1 -4.0 -41.3 33 F 1 167 01 53 53 Schedule for VLBA_BR (Code Br ) Page 10 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 01 54 33 M58 08 33 18 27.8 104.1 -4.1 -41.4 -9 1 1 167 01 54 33 01 55 12 --- 08 33 58 27.9 104.2 -4.1 -41.4 31 F 1 169 01 54 33 01 55 12 M87 08 33 58 29.5 105.2 -4.0 -41.2 -9 1 1 169 01 55 12 01 55 52 --- 08 34 38 29.6 105.3 -3.9 -41.2 31 F 1 170 01 55 12 01 55 52 M89 08 34 38 28.9 104.2 -4.0 -41.5 -7 1 1 170 01 55 52 01 56 32 --- 08 35 18 29.0 104.3 -4.0 -41.5 33 F 1 171 01 55 52 01 56 32 M87 08 35 18 29.7 105.5 -3.9 -41.2 -7 1 1 171 01 56 32 01 57 12 --- 08 35 58 29.8 105.6 -3.9 -41.1 33 F 1 173 01 56 32 01 57 12 M58 08 35 58 28.2 104.6 -4.0 -41.3 -9 1 1 173 01 57 12 01 57 52 --- 08 36 38 28.3 104.8 -4.0 -41.2 31 F 1 174 01 57 12 01 57 52 M87 08 36 38 29.9 105.8 -3.9 -41.1 -9 1 1 174 01 57 52 01 58 32 --- 08 37 18 30.0 105.9 -3.9 -41.1 31 F 1 175 01 57 52 01 58 32 M89 08 37 18 29.3 104.8 -4.0 -41.4 -7 1 1 175 01 58 32 01 59 12 --- 08 37 58 29.4 104.9 -4.0 -41.3 33 F 1 176 01 58 32 01 59 12 M87 08 37 58 30.1 106.1 -3.9 -41.0 -7 1 1 176 01 59 12 01 59 52 --- 08 38 38 30.2 106.2 -3.9 -41.0 33 F 1 178 01 59 12 01 59 52 M58 08 38 38 28.7 105.2 -4.0 -41.1 -9 1 1 178 01 59 52 02 00 32 --- 08 39 18 28.8 105.3 -4.0 -41.1 31 F 1 179 01 59 52 02 00 32 M87 08 39 18 30.3 106.3 -3.9 -41.0 -9 1 1 179 02 00 32 02 01 11 --- 08 39 58 30.4 106.5 -3.9 -40.9 31 F 1 180 02 00 32 02 01 11 M89 08 39 58 29.8 105.3 -3.9 -41.2 -7 1 1 180 02 01 11 02 01 51 --- 08 40 38 29.9 105.5 -3.9 -41.2 33 F 1 182 02 01 11 02 01 51 M87 08 40 38 30.5 106.6 -3.8 -40.9 -7 1 1 182 02 01 51 02 02 31 --- 08 41 18 30.6 106.8 -3.8 -40.9 33 F 1 183 02 01 51 02 02 31 M58 08 41 18 29.1 105.7 -3.9 -41.0 -9 1 1 183 02 02 31 02 03 11 --- 08 41 58 29.2 105.9 -3.9 -41.0 31 F 1 184 02 02 31 02 03 11 M87 08 41 58 30.7 106.9 -3.8 -40.8 -9 1 1 184 02 03 11 02 03 51 --- 08 42 38 30.8 107.1 -3.8 -40.8 31 F 1 185 02 03 11 Schedule for VLBA_BR (Code Br ) Page 11 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 03 51 M89 08 42 38 30.2 105.9 -3.9 -41.1 -7 1 1 185 02 03 51 02 04 31 --- 08 43 18 30.3 106.0 -3.9 -41.1 33 F 1 187 02 03 51 02 04 31 M87 08 43 18 31.0 107.2 -3.8 -40.7 -7 1 1 187 02 04 31 02 05 11 --- 08 43 58 31.1 107.3 -3.8 -40.7 33 F 1 188 02 04 31 02 05 11 M58 08 43 58 29.5 106.3 -3.9 -40.9 -9 1 1 188 02 05 11 02 05 51 --- 08 44 38 29.6 106.4 -3.9 -40.8 31 F 1 189 02 05 11 02 05 51 M87 08 44 38 31.2 107.5 -3.8 -40.7 -9 1 1 189 02 05 51 02 06 31 --- 08 45 18 31.3 107.6 -3.8 -40.6 31 F 1 191 02 05 51 02 06 31 M89 08 45 18 30.6 106.5 -3.8 -41.0 -7 1 1 191 02 06 31 02 07 10 --- 08 45 58 30.7 106.6 -3.8 -40.9 33 F 1 192 02 06 31 02 07 10 M87 08 45 58 31.4 107.8 -3.8 -40.6 -7 1 1 192 02 07 10 02 07 50 --- 08 46 38 31.5 107.9 -3.7 -40.5 33 F 1 193 02 07 10 02 07 50 M58 08 46 38 29.9 106.9 -3.9 -40.7 -9 1 1 193 02 07 50 02 08 30 --- 08 47 18 30.1 107.0 -3.8 -40.7 31 F 1 194 02 07 50 02 08 30 M87 08 47 18 31.6 108.1 -3.7 -40.5 -9 1 1 194 02 08 30 02 09 10 --- 08 47 58 31.7 108.2 -3.7 -40.5 31 F 1 196 02 08 30 02 09 10 M89 08 47 58 31.1 107.0 -3.8 -40.8 -7 1 1 196 02 09 10 02 09 50 --- 08 48 38 31.2 107.2 -3.8 -40.8 33 F 1 197 02 09 10 02 09 50 M87 08 48 38 31.8 108.4 -3.7 -40.4 -7 1 1 197 02 09 50 02 10 30 --- 08 49 18 31.9 108.5 -3.7 -40.4 33 F 1 198 02 09 50 02 10 30 M58 08 49 18 30.4 107.4 -3.8 -40.6 -9 1 1 198 02 10 30 02 11 10 --- 08 49 58 30.5 107.6 -3.8 -40.5 31 F 1 200 02 10 30 02 11 10 M87 08 49 58 32.0 108.7 -3.7 -40.3 -9 1 1 200 02 11 10 02 11 50 --- 08 50 38 32.1 108.8 -3.7 -40.3 31 F 1 201 02 11 10 02 11 50 M89 08 50 38 31.5 107.6 -3.8 -40.7 -7 1 1 201 02 11 50 02 12 30 --- 08 51 18 31.6 107.8 -3.7 -40.6 33 F 1 202 02 11 50 02 12 30 M87 08 51 18 32.2 108.9 -3.7 -40.3 -7 1 1 202 02 12 30 02 13 09 --- 08 51 58 32.3 109.1 -3.7 -40.2 33 F 1 203 02 12 30 Schedule for VLBA_BR (Code Br ) Page 12 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 13 09 M58 08 51 58 30.8 108.0 -3.8 -40.4 -9 1 1 203 02 13 09 02 13 49 --- 08 52 38 30.9 108.2 -3.8 -40.4 31 F 1 205 02 13 09 02 13 49 M87 08 52 38 32.4 109.2 -3.6 -40.2 -9 1 1 205 02 13 49 02 14 29 --- 08 53 18 32.5 109.4 -3.6 -40.1 31 F 1 206 02 13 49 02 14 29 M89 08 53 18 31.9 108.2 -3.7 -40.5 -7 1 1 206 02 14 29 02 15 09 --- 08 53 58 32.0 108.3 -3.7 -40.5 33 F 1 207 02 14 29 02 15 09 M87 08 53 58 32.6 109.5 -3.6 -40.1 -7 1 1 207 02 15 09 02 15 49 --- 08 54 38 32.7 109.7 -3.6 -40.0 33 F 1 209 02 15 09 02 15 49 M58 08 54 38 31.2 108.6 -3.7 -40.3 -9 1 1 209 02 15 49 02 16 29 --- 08 55 18 31.3 108.7 -3.7 -40.2 31 F 1 210 02 15 49 02 16 29 M87 08 55 18 32.9 109.8 -3.6 -40.0 -9 1 1 210 02 16 29 02 17 09 --- 08 55 58 33.0 110.0 -3.6 -39.9 31 F 1 211 02 16 29 Next scan frequencies: 8405.49 8405.49 8413.49 8413.49 8421.49 8421.49 8429.49 8429.49 Next BBC frequencies: 805.49 805.49 813.49 813.49 821.49 821.49 829.49 829.49 02 17 09 M87 08 55 58 33.0 110.0 -3.6 -39.9 -4 1 1 211 02 17 09 02 17 49 --- 08 56 38 33.1 110.1 -3.6 -39.9 36 F 1 212 02 17 09 02 17 49 M89 08 56 38 32.4 108.9 -3.7 -40.3 -7 1 1 212 02 17 49 02 18 29 --- 08 57 18 32.5 109.1 -3.6 -40.2 33 F 1 214 02 17 49 02 18 29 M87 08 57 18 33.2 110.3 -3.6 -39.9 -7 1 1 214 02 18 29 02 19 08 --- 08 57 58 33.3 110.4 -3.6 -39.8 33 F 1 215 02 18 29 02 19 08 M58 08 57 58 31.7 109.3 -3.7 -40.0 -9 1 1 215 02 19 08 02 19 48 --- 08 58 38 31.9 109.5 -3.7 -40.0 31 F 1 216 02 19 08 02 19 48 M87 08 58 38 33.4 110.6 -3.5 -39.8 -9 1 1 216 02 19 48 02 20 28 --- 08 59 18 33.5 110.7 -3.5 -39.7 31 F 1 218 02 19 48 02 20 28 M89 08 59 18 32.8 109.5 -3.6 -40.1 -7 1 1 218 02 20 28 02 21 08 --- 08 59 58 33.0 109.7 -3.6 -40.1 33 F 1 219 02 20 28 02 21 08 M87 08 59 58 33.6 110.9 -3.5 -39.7 -7 1 1 219 02 21 08 02 21 48 --- 09 00 38 33.7 111.0 -3.5 -39.6 33 F 1 220 02 21 08 Schedule for VLBA_BR (Code Br ) Page 13 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 21 48 M58 09 00 38 32.2 109.9 -3.6 -39.9 -9 1 1 220 02 21 48 02 22 28 --- 09 01 18 32.3 110.1 -3.6 -39.8 31 F 1 221 02 21 48 02 22 28 M87 09 01 18 33.8 111.2 -3.5 -39.6 -9 1 1 221 02 22 28 02 23 08 --- 09 01 58 33.9 111.3 -3.5 -39.5 31 F 1 223 02 22 28 02 23 08 M89 09 01 58 33.3 110.1 -3.6 -39.9 -7 1 1 223 02 23 08 02 23 48 --- 09 02 38 33.4 110.3 -3.6 -39.9 33 F 1 224 02 23 08 02 23 48 M87 09 02 38 34.0 111.5 -3.5 -39.5 -7 1 1 224 02 23 48 02 24 28 --- 09 03 18 34.1 111.6 -3.5 -39.4 33 F 1 225 02 23 48 02 24 28 M58 09 03 18 32.6 110.5 -3.6 -39.7 -9 1 1 225 02 24 28 02 25 07 --- 09 03 58 32.7 110.7 -3.6 -39.6 31 F 1 227 02 24 28 02 25 07 M87 09 03 58 34.2 111.8 -3.5 -39.4 -9 1 1 227 02 25 07 02 25 47 --- 09 04 38 34.3 111.9 -3.4 -39.3 31 F 1 228 02 25 07 02 25 47 M89 09 04 38 33.7 110.7 -3.5 -39.8 -7 1 1 228 02 25 47 02 26 27 --- 09 05 18 33.8 110.9 -3.5 -39.7 33 F 1 229 02 25 47 02 26 27 M87 09 05 18 34.4 112.1 -3.4 -39.3 -7 1 1 229 02 26 27 02 27 07 --- 09 05 58 34.5 112.2 -3.4 -39.2 33 F 1 230 02 26 27 02 27 07 M58 09 05 58 33.0 111.1 -3.5 -39.5 -9 1 1 230 02 27 07 02 27 47 --- 09 06 38 33.1 111.3 -3.5 -39.4 31 F 1 232 02 27 07 02 27 47 M87 09 06 38 34.6 112.4 -3.4 -39.2 -9 1 1 232 02 27 47 02 28 27 --- 09 07 18 34.7 112.5 -3.4 -39.1 31 F 1 233 02 27 47 02 28 27 M89 09 07 18 34.1 111.3 -3.5 -39.6 -7 1 1 233 02 28 27 02 29 07 --- 09 07 58 34.2 111.5 -3.5 -39.5 33 F 1 234 02 28 27 02 29 07 M87 09 07 58 34.8 112.7 -3.4 -39.1 -7 1 1 234 02 29 07 02 29 47 --- 09 08 38 34.9 112.9 -3.4 -39.0 33 F 1 236 02 29 07 02 29 47 M58 09 08 38 33.4 111.7 -3.5 -39.3 -9 1 1 236 02 29 47 02 30 27 --- 09 09 18 33.5 111.9 -3.5 -39.3 31 F 1 237 02 29 47 02 30 27 M87 09 09 18 35.0 113.0 -3.4 -39.0 -9 1 1 237 02 30 27 02 31 07 --- 09 09 58 35.1 113.2 -3.4 -38.9 31 F 1 238 02 30 27 Schedule for VLBA_BR (Code Br ) Page 14 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 31 07 M89 09 09 58 34.5 111.9 -3.4 -39.4 -7 1 1 238 02 31 07 02 31 46 --- 09 10 38 34.6 112.1 -3.4 -39.3 33 F 1 239 02 31 07 02 31 46 M87 09 10 38 35.2 113.3 -3.3 -38.9 -7 1 1 239 02 31 46 02 32 26 --- 09 11 18 35.3 113.5 -3.3 -38.8 33 F 1 241 02 31 46 02 32 26 M58 09 11 18 33.8 112.3 -3.4 -39.1 -9 1 1 241 02 32 26 02 33 06 --- 09 11 58 33.9 112.5 -3.4 -39.0 31 F 1 242 02 32 26 02 33 06 M87 09 11 58 35.4 113.6 -3.3 -38.8 -9 1 1 242 02 33 06 02 33 46 --- 09 12 38 35.5 113.8 -3.3 -38.7 31 F 1 243 02 33 06 02 33 46 M89 09 12 38 34.9 112.5 -3.4 -39.2 -7 1 1 243 02 33 46 02 34 26 --- 09 13 18 35.0 112.7 -3.4 -39.1 33 F 1 245 02 33 46 02 34 26 M87 09 13 18 35.6 113.9 -3.3 -38.6 -7 1 1 245 02 34 26 02 35 06 --- 09 13 58 35.7 114.1 -3.3 -38.6 33 F 1 246 02 34 26 02 35 06 M58 09 13 58 34.2 112.9 -3.4 -38.9 -9 1 1 246 02 35 06 02 35 46 --- 09 14 38 34.3 113.1 -3.4 -38.8 31 F 1 247 02 35 06 02 35 46 M87 09 14 38 35.8 114.3 -3.3 -38.5 -9 1 1 247 02 35 46 02 36 26 --- 09 15 18 35.9 114.4 -3.3 -38.5 31 F 1 248 02 35 46 02 36 26 M89 09 15 18 35.3 113.2 -3.3 -38.9 -7 1 1 248 02 36 26 02 37 06 --- 09 15 58 35.4 113.3 -3.3 -38.9 33 F 1 250 02 36 26 02 37 06 M87 09 15 58 36.0 114.6 -3.3 -38.4 -7 1 1 250 02 37 06 02 37 45 --- 09 16 38 36.1 114.7 -3.2 -38.4 33 F 1 251 02 37 06 02 37 45 M58 09 16 38 34.6 113.5 -3.4 -38.7 -9 1 1 251 02 37 45 02 38 25 --- 09 17 18 34.7 113.7 -3.3 -38.6 31 F 1 252 02 37 45 02 38 25 M87 09 17 18 36.2 114.9 -3.2 -38.3 -9 1 1 252 02 38 25 02 39 05 --- 09 17 58 36.3 115.0 -3.2 -38.2 31 F 1 254 02 38 25 02 39 05 M89 09 17 58 35.7 113.8 -3.3 -38.7 -7 1 1 254 02 39 05 02 39 45 --- 09 18 38 35.8 113.9 -3.3 -38.7 33 F 1 255 02 39 05 02 39 45 M87 09 18 38 36.4 115.2 -3.2 -38.2 -7 1 1 255 02 39 45 02 40 25 --- 09 19 18 36.5 115.4 -3.2 -38.1 33 F 1 256 02 39 45 Schedule for VLBA_BR (Code Br ) Page 15 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 40 25 M58 09 19 18 35.1 114.2 -3.3 -38.5 -9 1 1 256 02 40 25 02 41 05 --- 09 19 58 35.2 114.3 -3.3 -38.4 31 F 1 257 02 40 25 02 41 05 M87 09 19 58 36.6 115.5 -3.2 -38.1 -9 1 1 257 02 41 05 02 41 45 --- 09 20 38 36.7 115.7 -3.2 -38.0 31 F 1 259 02 41 05 02 41 45 M89 09 20 38 36.1 114.4 -3.3 -38.5 -7 1 1 259 02 41 45 02 42 25 --- 09 21 18 36.2 114.6 -3.2 -38.4 33 F 1 260 02 41 45 02 42 25 M87 09 21 18 36.8 115.8 -3.2 -37.9 -7 1 1 260 02 42 25 02 43 05 --- 09 21 58 36.9 116.0 -3.2 -37.9 33 F 1 261 02 42 25 02 43 05 M58 09 21 58 35.5 114.8 -3.3 -38.2 -9 1 1 261 02 43 05 02 43 44 --- 09 22 38 35.6 115.0 -3.3 -38.2 31 F 1 263 02 43 05 02 43 44 M87 09 22 38 37.0 116.2 -3.1 -37.8 -9 1 1 263 02 43 44 02 44 24 --- 09 23 18 37.1 116.3 -3.1 -37.8 31 F 1 264 02 43 44 Next scan frequencies: 23789.49 23789.49 23797.49 23797.49 23805.49 23805.49 23813.49 23813.49 Next BBC frequencies: 789.49 789.49 797.49 797.49 805.49 805.49 813.49 813.49 02 44 24 M87 09 23 18 37.1 116.3 -3.1 -37.8 -4 1 1 264 02 44 24 02 45 04 --- 09 23 58 37.2 116.5 -3.1 -37.7 36 F 1 265 02 44 24 02 45 04 M89 09 23 58 36.7 115.2 -3.2 -38.2 -7 1 1 265 02 45 04 02 45 44 --- 09 24 38 36.8 115.4 -3.2 -38.2 33 F 1 266 02 45 04 02 45 44 M87 09 24 38 37.3 116.7 -3.1 -37.6 -7 1 1 266 02 45 44 02 46 24 --- 09 25 18 37.4 116.8 -3.1 -37.6 33 F 1 268 02 45 44 02 46 24 M58 09 25 18 36.0 115.6 -3.2 -37.9 -9 1 1 268 02 46 24 02 47 04 --- 09 25 58 36.1 115.7 -3.2 -37.9 31 F 1 269 02 46 24 02 47 04 M87 09 25 58 37.5 117.0 -3.1 -37.5 -9 1 1 269 02 47 04 02 47 44 --- 09 26 38 37.6 117.1 -3.1 -37.4 31 F 1 270 02 47 04 02 47 44 M89 09 26 38 37.1 115.8 -3.2 -38.0 -7 1 1 270 02 47 44 02 48 24 --- 09 27 18 37.2 116.0 -3.1 -37.9 33 F 1 272 02 47 44 02 48 24 M87 09 27 18 37.7 117.3 -3.1 -37.4 -7 1 1 272 02 48 24 02 49 04 --- 09 27 58 37.8 117.5 -3.1 -37.3 33 F 1 273 02 48 24 Schedule for VLBA_BR (Code Br ) Page 16 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 49 04 M58 09 27 58 36.4 116.2 -3.2 -37.7 -9 1 1 273 02 49 04 02 49 43 --- 09 28 38 36.5 116.4 -3.2 -37.6 31 F 1 274 02 49 04 02 49 43 M87 09 28 38 37.9 117.6 -3.0 -37.3 -9 1 1 274 02 49 43 02 50 23 --- 09 29 18 38.0 117.8 -3.0 -37.2 31 F 1 275 02 49 43 02 50 23 M89 09 29 18 37.5 116.5 -3.1 -37.7 -7 1 1 275 02 50 23 02 51 03 --- 09 29 58 37.6 116.6 -3.1 -37.7 33 F 1 277 02 50 23 02 51 03 M87 09 29 58 38.1 118.0 -3.0 -37.1 -7 1 1 277 02 51 03 02 51 43 --- 09 30 38 38.2 118.1 -3.0 -37.1 33 F 1 278 02 51 03 02 51 43 M58 09 30 38 36.8 116.9 -3.1 -37.5 -9 1 1 278 02 51 43 02 52 23 --- 09 31 18 36.9 117.0 -3.1 -37.4 31 F 1 279 02 51 43 02 52 23 M87 09 31 18 38.3 118.3 -3.0 -37.0 -9 1 1 279 02 52 23 02 53 03 --- 09 31 58 38.4 118.5 -3.0 -36.9 31 F 1 281 02 52 23 02 53 03 M89 09 31 58 37.9 117.1 -3.1 -37.5 -7 1 1 281 02 53 03 02 53 43 --- 09 32 38 37.9 117.3 -3.1 -37.4 33 F 1 282 02 53 03 02 53 43 M87 09 32 38 38.5 118.6 -3.0 -36.8 -7 1 1 282 02 53 43 02 54 23 --- 09 33 18 38.6 118.8 -3.0 -36.8 33 F 1 283 02 53 43 02 54 23 M58 09 33 18 37.2 117.5 -3.1 -37.2 -9 1 1 283 02 54 23 02 55 03 --- 09 33 58 37.3 117.7 -3.1 -37.1 31 F 1 284 02 54 23 02 55 03 M87 09 33 58 38.7 119.0 -3.0 -36.7 -9 1 1 284 02 55 03 02 55 42 --- 09 34 38 38.8 119.1 -2.9 -36.6 31 F 1 286 02 55 03 02 55 42 M89 09 34 38 38.2 117.8 -3.0 -37.2 -7 1 1 286 02 55 42 02 56 22 --- 09 35 18 38.3 118.0 -3.0 -37.1 33 F 1 287 02 55 42 02 56 22 M87 09 35 18 38.9 119.3 -2.9 -36.6 -7 1 1 287 02 56 22 02 57 02 --- 09 35 58 39.0 119.5 -2.9 -36.5 33 F 1 288 02 56 22 02 57 02 M58 09 35 58 37.5 118.2 -3.0 -36.9 -9 1 1 288 02 57 02 02 57 42 --- 09 36 38 37.6 118.3 -3.0 -36.9 31 F 1 290 02 57 02 02 57 42 M87 09 36 38 39.1 119.6 -2.9 -36.4 -9 1 1 290 02 57 42 02 58 22 --- 09 37 18 39.2 119.8 -2.9 -36.4 31 F 1 291 02 57 42 Schedule for VLBA_BR (Code Br ) Page 17 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 02 58 22 M89 09 37 18 38.6 118.5 -3.0 -36.9 -7 1 1 291 02 58 22 02 59 02 --- 09 37 58 38.7 118.6 -3.0 -36.9 33 F 1 292 02 58 22 02 59 02 M87 09 37 58 39.3 120.0 -2.9 -36.3 -7 1 1 292 02 59 02 02 59 42 --- 09 38 38 39.4 120.1 -2.9 -36.2 33 F 1 293 02 59 02 02 59 42 M58 09 38 38 37.9 118.8 -3.0 -36.7 -9 1 1 293 02 59 42 03 00 22 --- 09 39 18 38.0 119.0 -3.0 -36.6 31 F 1 295 02 59 42 03 00 22 M87 09 39 18 39.5 120.3 -2.9 -36.1 -9 1 1 295 03 00 22 03 01 02 --- 09 39 58 39.6 120.5 -2.9 -36.1 31 F 1 296 03 00 22 03 01 02 M89 09 39 58 39.0 119.1 -2.9 -36.7 -7 1 1 296 03 01 02 03 01 41 --- 09 40 38 39.1 119.3 -2.9 -36.6 33 F 1 297 03 01 02 03 01 41 M87 09 40 38 39.7 120.6 -2.8 -36.0 -7 1 1 297 03 01 41 03 02 21 --- 09 41 18 39.8 120.8 -2.8 -35.9 33 F 1 299 03 01 41 03 02 21 M58 09 41 18 38.3 119.5 -2.9 -36.4 -9 1 1 299 03 02 21 03 03 01 --- 09 41 58 38.4 119.7 -2.9 -36.3 31 F 1 300 03 02 21 03 03 01 M87 09 41 58 39.9 121.0 -2.8 -35.9 -9 1 1 300 03 03 01 03 03 41 --- 09 42 38 40.0 121.2 -2.8 -35.8 31 F 1 301 03 03 01 03 03 41 M89 09 42 38 39.4 119.8 -2.9 -36.4 -7 1 1 301 03 03 41 03 04 21 --- 09 43 18 39.5 120.0 -2.9 -36.3 33 F 1 302 03 03 41 03 04 21 M87 09 43 18 40.1 121.3 -2.8 -35.7 -7 1 1 302 03 04 21 03 05 01 --- 09 43 58 40.2 121.5 -2.8 -35.6 33 F 1 304 03 04 21 03 05 01 M58 09 43 58 38.7 120.2 -2.9 -36.1 -9 1 1 304 03 05 01 03 05 41 --- 09 44 38 38.8 120.3 -2.9 -36.0 31 F 1 305 03 05 01 03 05 41 M87 09 44 38 40.3 121.7 -2.8 -35.5 -9 1 1 305 03 05 41 03 06 21 --- 09 45 18 40.4 121.9 -2.8 -35.5 31 F 1 306 03 05 41 03 06 21 M89 09 45 18 39.8 120.5 -2.8 -36.1 -7 1 1 306 03 06 21 03 07 01 --- 09 45 58 39.9 120.7 -2.8 -36.0 33 F 1 308 03 06 21 03 07 01 M87 09 45 58 40.5 122.0 -2.8 -35.4 -7 1 1 308 03 07 01 03 07 41 --- 09 46 38 40.5 122.2 -2.7 -35.3 33 F 1 309 03 07 01 Schedule for VLBA_BR (Code Br ) Page 18 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 07 41 M58 09 46 38 39.1 120.9 -2.9 -35.8 -9 1 1 309 03 07 41 03 08 20 --- 09 47 18 39.2 121.0 -2.8 -35.7 31 F 1 310 03 07 41 03 08 20 M87 09 47 18 40.6 122.4 -2.7 -35.2 -9 1 1 310 03 08 20 03 09 00 --- 09 47 58 40.7 122.6 -2.7 -35.2 31 F 1 312 03 08 20 03 09 00 M89 09 47 58 40.2 121.2 -2.8 -35.8 -7 1 1 312 03 09 00 03 09 40 --- 09 48 38 40.3 121.3 -2.8 -35.7 33 F 1 313 03 09 00 03 09 40 M87 09 48 38 40.8 122.7 -2.7 -35.1 -7 1 1 313 03 09 40 03 10 20 --- 09 49 18 40.9 122.9 -2.7 -35.0 33 F 1 314 03 09 40 03 10 20 M58 09 49 18 39.5 121.5 -2.8 -35.5 -9 1 1 314 03 10 20 03 11 00 --- 09 49 58 39.6 121.7 -2.8 -35.4 31 F 1 315 03 10 20 03 11 00 M87 09 49 58 41.0 123.1 -2.7 -34.9 -9 1 1 315 03 11 00 03 11 40 --- 09 50 38 41.1 123.3 -2.7 -34.8 31 F 1 317 03 11 00 03 11 40 M89 09 50 38 40.6 121.9 -2.8 -35.5 -7 1 1 317 03 11 40 03 12 20 --- 09 51 18 40.7 122.0 -2.7 -35.4 33 F 1 318 03 11 40 03 12 20 M87 09 51 18 41.2 123.4 -2.7 -34.8 -7 1 1 318 03 12 20 03 13 00 --- 09 51 58 41.3 123.6 -2.7 -34.7 33 F 1 319 03 12 20 03 13 00 M58 09 51 58 39.9 122.2 -2.8 -35.2 -9 1 1 319 03 13 00 03 13 40 --- 09 52 38 39.9 122.4 -2.8 -35.1 31 F 1 321 03 13 00 03 13 40 M87 09 52 38 41.4 123.8 -2.6 -34.6 -9 1 1 321 03 13 40 03 14 19 --- 09 53 18 41.5 124.0 -2.6 -34.5 31 F 1 322 03 13 40 03 14 19 M89 09 53 18 40.9 122.6 -2.7 -35.2 -7 1 1 322 03 14 19 03 14 59 --- 09 53 58 41.0 122.7 -2.7 -35.1 33 F 1 323 03 14 19 03 14 59 M87 09 53 58 41.6 124.2 -2.6 -34.4 -7 1 1 323 03 14 59 03 15 39 --- 09 54 38 41.7 124.3 -2.6 -34.3 33 F 1 324 03 14 59 03 15 39 M58 09 54 38 40.2 122.9 -2.7 -34.9 -9 1 1 324 03 15 39 03 16 19 --- 09 55 18 40.3 123.1 -2.7 -34.8 31 F 1 326 03 15 39 03 16 19 M87 09 55 18 41.8 124.5 -2.6 -34.3 -9 1 1 326 03 16 19 03 16 59 --- 09 55 58 41.8 124.7 -2.6 -34.2 31 F 1 327 03 16 19 Schedule for VLBA_BR (Code Br ) Page 19 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 16 59 M89 09 55 58 41.3 123.3 -2.7 -34.9 -7 1 1 327 03 16 59 03 17 39 --- 09 56 38 41.4 123.4 -2.7 -34.8 33 F 1 328 03 16 59 03 17 39 M87 09 56 38 41.9 124.9 -2.6 -34.1 -7 1 1 328 03 17 39 03 18 19 --- 09 57 18 42.0 125.1 -2.6 -34.0 33 F 1 330 03 17 39 03 18 19 M58 09 57 18 40.6 123.6 -2.7 -34.6 -9 1 1 330 03 18 19 03 18 59 --- 09 57 58 40.7 123.8 -2.7 -34.5 31 F 1 331 03 18 19 03 18 59 M87 09 57 58 42.1 125.2 -2.6 -33.9 -9 1 1 331 03 18 59 03 19 39 --- 09 58 38 42.2 125.4 -2.5 -33.8 31 F 1 332 03 18 59 03 19 39 M89 09 58 38 41.7 124.0 -2.6 -34.5 -7 1 1 332 03 19 39 03 20 18 --- 09 59 18 41.8 124.2 -2.6 -34.4 33 F 1 333 03 19 39 03 20 18 M87 09 59 18 42.3 125.6 -2.5 -33.7 -7 1 1 333 03 20 18 03 20 58 --- 09 59 58 42.4 125.8 -2.5 -33.7 33 F 1 335 03 20 18 03 20 58 M58 09 59 58 41.0 124.3 -2.6 -34.3 -9 1 1 335 03 20 58 03 21 38 --- 10 00 38 41.1 124.5 -2.6 -34.2 31 F 1 336 03 20 58 03 21 38 M87 10 00 38 42.5 126.0 -2.5 -33.6 -9 1 1 336 03 21 38 03 22 18 --- 10 01 18 42.6 126.2 -2.5 -33.5 31 F 1 337 03 21 38 03 22 18 M89 10 01 18 42.0 124.7 -2.6 -34.2 -7 1 1 337 03 22 18 03 22 58 --- 10 01 58 42.1 124.9 -2.6 -34.1 33 F 1 339 03 22 18 03 22 58 M87 10 01 58 42.7 126.3 -2.5 -33.4 -7 1 1 339 03 22 58 03 23 38 --- 10 02 38 42.7 126.5 -2.5 -33.3 33 F 1 340 03 22 58 03 23 38 M58 10 02 38 41.3 125.1 -2.6 -33.9 -9 1 1 340 03 23 38 03 24 18 --- 10 03 18 41.4 125.2 -2.6 -33.8 31 F 1 341 03 23 38 03 24 18 M87 10 03 18 42.8 126.7 -2.5 -33.2 -9 1 1 341 03 24 18 03 24 58 --- 10 03 58 42.9 126.9 -2.5 -33.1 31 F 1 342 03 24 18 03 24 58 M89 10 03 58 42.4 125.4 -2.5 -33.9 -7 1 1 342 03 24 58 03 25 38 --- 10 04 38 42.5 125.6 -2.5 -33.8 33 F 1 344 03 24 58 03 25 38 M87 10 04 38 43.0 127.1 -2.4 -33.0 -7 1 1 344 03 25 38 03 26 17 --- 10 05 18 43.1 127.3 -2.4 -32.9 33 F 1 345 03 25 38 Schedule for VLBA_BR (Code Br ) Page 20 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 26 17 M58 10 05 18 41.7 125.8 -2.5 -33.6 -9 1 1 345 03 26 17 03 26 57 --- 10 05 58 41.8 126.0 -2.5 -33.5 31 F 1 346 03 26 17 03 26 57 M87 10 05 58 43.2 127.5 -2.4 -32.8 -9 1 1 346 03 26 57 03 27 37 --- 10 06 38 43.3 127.6 -2.4 -32.7 31 F 1 348 03 26 57 03 27 37 M89 10 06 38 42.8 126.2 -2.5 -33.5 -7 1 1 348 03 27 37 03 28 17 --- 10 07 18 42.9 126.4 -2.5 -33.4 33 F 1 349 03 27 37 03 28 17 M87 10 07 18 43.4 127.8 -2.4 -32.7 -7 1 1 349 03 28 17 03 28 57 --- 10 07 58 43.5 128.0 -2.4 -32.6 33 F 1 350 03 28 17 03 28 57 M58 10 07 58 42.1 126.5 -2.5 -33.2 -9 1 1 350 03 28 57 03 29 37 --- 10 08 38 42.1 126.7 -2.5 -33.1 31 F 1 351 03 28 57 03 29 37 M87 10 08 38 43.5 128.2 -2.4 -32.5 -9 1 1 351 03 29 37 03 30 17 --- 10 09 18 43.6 128.4 -2.4 -32.4 31 F 1 353 03 29 37 03 30 17 M89 10 09 18 43.1 126.9 -2.4 -33.1 -7 1 1 353 03 30 17 03 30 57 --- 10 09 58 43.2 127.1 -2.4 -33.0 33 F 1 354 03 30 17 03 30 57 M87 10 09 58 43.7 128.6 -2.4 -32.3 -7 1 1 354 03 30 57 03 31 37 --- 10 10 38 43.8 128.8 -2.3 -32.2 33 F 1 355 03 30 57 03 31 37 M58 10 10 38 42.4 127.3 -2.5 -32.9 -9 1 1 355 03 31 37 03 32 16 --- 10 11 18 42.5 127.4 -2.4 -32.8 31 F 1 357 03 31 37 03 32 16 M87 10 11 18 43.9 129.0 -2.3 -32.1 -9 1 1 357 03 32 16 03 32 56 --- 10 11 58 44.0 129.2 -2.3 -32.0 31 F 1 358 03 32 16 03 32 56 M89 10 11 58 43.5 127.7 -2.4 -32.8 -7 1 1 358 03 32 56 03 33 36 --- 10 12 38 43.6 127.9 -2.4 -32.7 33 F 1 359 03 32 56 03 33 36 M87 10 12 38 44.1 129.4 -2.3 -31.9 -7 1 1 359 03 33 36 03 34 16 --- 10 13 18 44.2 129.6 -2.3 -31.8 33 F 1 360 03 33 36 03 34 16 M58 10 13 18 42.8 128.0 -2.4 -32.5 -9 1 1 360 03 34 16 03 34 56 --- 10 13 58 42.9 128.2 -2.4 -32.4 31 F 1 362 03 34 16 03 34 56 M87 10 13 58 44.2 129.7 -2.3 -31.7 -9 1 1 362 03 34 56 03 35 36 --- 10 14 38 44.3 129.9 -2.3 -31.6 31 F 1 363 03 34 56 Schedule for VLBA_BR (Code Br ) Page 21 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 35 36 M89 10 14 38 43.8 128.4 -2.4 -32.4 -7 1 1 363 03 35 36 03 36 16 --- 10 15 18 43.9 128.6 -2.3 -32.3 33 F 1 364 03 35 36 03 36 16 M87 10 15 18 44.4 130.1 -2.3 -31.5 -7 1 1 364 03 36 16 03 36 56 --- 10 15 58 44.5 130.3 -2.3 -31.4 33 F 1 366 03 36 16 03 36 56 M58 10 15 58 43.1 128.8 -2.4 -32.1 -9 1 1 366 03 36 56 03 37 36 --- 10 16 38 43.2 128.9 -2.4 -32.0 31 F 1 367 03 36 56 03 37 36 M87 10 16 38 44.6 130.5 -2.2 -31.3 -9 1 1 367 03 37 36 03 38 15 --- 10 17 18 44.7 130.7 -2.2 -31.2 31 F 1 368 03 37 36 03 38 15 M89 10 17 18 44.2 129.2 -2.3 -32.0 -7 1 1 368 03 38 15 03 38 55 --- 10 17 58 44.3 129.4 -2.3 -31.9 33 F 1 369 03 38 15 03 38 55 M87 10 17 58 44.7 130.9 -2.2 -31.1 -7 1 1 369 03 38 55 03 39 35 --- 10 18 38 44.8 131.1 -2.2 -31.0 33 F 1 371 03 38 55 03 39 35 M58 10 18 38 43.5 129.5 -2.3 -31.7 -9 1 1 371 03 39 35 03 40 15 --- 10 19 18 43.5 129.7 -2.3 -31.6 31 F 1 372 03 39 35 03 40 15 M87 10 19 18 44.9 131.3 -2.2 -30.9 -9 1 1 372 03 40 15 03 40 55 --- 10 19 58 45.0 131.5 -2.2 -30.8 31 F 1 373 03 40 15 03 40 55 M89 10 19 58 44.5 130.0 -2.3 -31.6 -7 1 1 373 03 40 55 03 41 35 --- 10 20 38 44.6 130.2 -2.3 -31.5 33 F 1 375 03 40 55 03 41 35 M87 10 20 38 45.1 131.7 -2.2 -30.7 -7 1 1 375 03 41 35 03 42 15 --- 10 21 18 45.2 131.9 -2.2 -30.6 33 F 1 376 03 41 35 03 42 15 M58 10 21 18 43.8 130.3 -2.3 -31.3 -9 1 1 376 03 42 15 03 42 55 --- 10 21 58 43.9 130.5 -2.3 -31.2 31 F 1 377 03 42 15 03 42 55 M87 10 21 58 45.2 132.1 -2.2 -30.5 -9 1 1 377 03 42 55 03 43 35 --- 10 22 38 45.3 132.3 -2.1 -30.4 31 F 1 378 03 42 55 03 43 35 M89 10 22 38 44.9 130.7 -2.2 -31.2 -7 1 1 378 03 43 35 03 44 14 --- 10 23 18 44.9 130.9 -2.2 -31.1 33 F 1 380 03 43 35 03 44 14 M87 10 23 18 45.4 132.5 -2.1 -30.2 -7 1 1 380 03 44 14 03 44 54 --- 10 23 58 45.5 132.7 -2.1 -30.1 33 F 1 381 03 44 14 Schedule for VLBA_BR (Code Br ) Page 22 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 44 54 M58 10 23 58 44.1 131.1 -2.2 -30.9 -9 1 1 381 03 44 54 03 45 34 --- 10 24 38 44.2 131.3 -2.2 -30.8 31 F 1 382 03 44 54 03 45 34 M87 10 24 38 45.6 132.9 -2.1 -30.0 -9 1 1 382 03 45 34 03 46 14 --- 10 25 18 45.7 133.1 -2.1 -29.9 31 F 1 384 03 45 34 03 46 14 M89 10 25 18 45.2 131.5 -2.2 -30.8 -7 1 1 384 03 46 14 03 46 54 --- 10 25 58 45.3 131.7 -2.2 -30.7 33 F 1 385 03 46 14 03 46 54 M87 10 25 58 45.7 133.3 -2.1 -29.8 -7 1 1 385 03 46 54 03 47 34 --- 10 26 38 45.8 133.5 -2.1 -29.7 33 F 1 386 03 46 54 03 47 34 M58 10 26 38 44.5 131.8 -2.2 -30.5 -9 1 1 386 03 47 34 03 48 14 --- 10 27 18 44.6 132.0 -2.2 -30.4 31 F 1 387 03 47 34 03 48 14 M87 10 27 18 45.9 133.7 -2.1 -29.6 -9 1 1 387 03 48 14 03 48 54 --- 10 27 58 46.0 133.9 -2.1 -29.5 31 F 1 389 03 48 14 03 48 54 M89 10 27 58 45.5 132.3 -2.1 -30.4 -7 1 1 389 03 48 54 03 49 34 --- 10 28 38 45.6 132.5 -2.1 -30.3 33 F 1 390 03 48 54 03 49 34 M87 10 28 38 46.1 134.1 -2.0 -29.4 -7 1 1 390 03 49 34 03 50 14 --- 10 29 18 46.1 134.3 -2.0 -29.3 33 F 1 391 03 49 34 03 50 14 M58 10 29 18 44.8 132.6 -2.1 -30.1 -9 1 1 391 03 50 14 03 50 53 --- 10 29 58 44.9 132.8 -2.1 -30.0 31 F 1 393 03 50 14 03 50 53 M87 10 29 58 46.2 134.5 -2.0 -29.1 -9 1 1 393 03 50 53 03 51 33 --- 10 30 38 46.3 134.7 -2.0 -29.0 31 F 1 394 03 50 53 03 51 33 M89 10 30 38 45.9 133.1 -2.1 -29.9 -7 1 1 394 03 51 33 03 52 13 --- 10 31 18 45.9 133.3 -2.1 -29.8 33 F 1 395 03 51 33 03 52 13 M87 10 31 18 46.4 134.9 -2.0 -28.9 -7 1 1 395 03 52 13 03 52 53 --- 10 31 58 46.5 135.1 -2.0 -28.8 33 F 1 396 03 52 13 03 52 53 M58 10 31 58 45.1 133.4 -2.1 -29.7 -9 1 1 396 03 52 53 03 53 33 --- 10 32 38 45.2 133.6 -2.1 -29.6 31 F 1 398 03 52 53 03 53 33 M87 10 32 38 46.5 135.4 -2.0 -28.7 -9 1 1 398 03 53 33 03 54 13 --- 10 33 18 46.6 135.6 -2.0 -28.6 31 F 1 399 03 53 33 Schedule for VLBA_BR (Code Br ) Page 23 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 03 54 13 M89 10 33 18 46.2 133.9 -2.0 -29.5 -7 1 1 399 03 54 13 03 54 53 --- 10 33 58 46.3 134.2 -2.0 -29.4 33 F 1 400 03 54 13 03 54 53 M87 10 33 58 46.7 135.8 -2.0 -28.5 -7 1 1 400 03 54 53 03 55 33 --- 10 34 38 46.8 136.0 -1.9 -28.3 33 F 1 402 03 54 53 03 55 33 M58 10 34 38 45.4 134.2 -2.1 -29.2 -9 1 1 402 03 55 33 03 56 13 --- 10 35 18 45.5 134.4 -2.0 -29.1 31 F 1 403 03 55 33 03 56 13 M87 10 35 18 46.8 136.2 -1.9 -28.2 -9 1 1 403 03 56 13 03 56 52 --- 10 35 58 46.9 136.4 -1.9 -28.1 31 F 1 404 03 56 13 03 56 52 M89 10 35 58 46.5 134.8 -2.0 -29.0 -7 1 1 404 03 56 52 03 57 32 --- 10 36 38 46.6 135.0 -2.0 -28.9 33 F 1 405 03 56 52 03 57 32 M87 10 36 38 47.0 136.6 -1.9 -28.0 -7 1 1 405 03 57 32 03 58 12 --- 10 37 18 47.1 136.8 -1.9 -27.9 33 F 1 407 03 57 32 03 58 12 M58 10 37 18 45.8 135.1 -2.0 -28.8 -9 1 1 407 03 58 12 03 58 52 --- 10 37 58 45.8 135.3 -2.0 -28.7 31 F 1 408 03 58 12 03 58 52 M87 10 37 58 47.1 137.0 -1.9 -27.8 -9 1 1 408 03 58 52 03 59 32 --- 10 38 38 47.2 137.2 -1.9 -27.6 31 F 1 409 03 58 52 03 59 32 M89 10 38 38 46.8 135.6 -2.0 -28.6 -7 1 1 409 03 59 32 04 00 12 --- 10 39 18 46.9 135.8 -1.9 -28.5 33 F 1 411 03 59 32 04 00 12 M87 10 39 18 47.3 137.5 -1.9 -27.5 -7 1 1 411 04 00 12 04 00 52 --- 10 39 58 47.4 137.7 -1.9 -27.4 33 F 1 412 04 00 12 04 00 52 M58 10 39 58 46.1 135.9 -2.0 -28.3 -9 1 1 412 04 00 52 04 01 32 --- 10 40 38 46.2 136.1 -2.0 -28.2 31 F 1 413 04 00 52 04 01 32 M87 10 40 38 47.4 137.9 -1.8 -27.3 -9 1 1 413 04 01 32 04 02 12 --- 10 41 18 47.5 138.1 -1.8 -27.1 31 F 1 414 04 01 32 04 02 12 M89 10 41 18 47.1 136.4 -1.9 -28.1 -7 1 1 414 04 02 12 04 02 51 --- 10 41 58 47.2 136.7 -1.9 -28.0 33 F 1 416 04 02 12 04 02 51 M87 10 41 58 47.6 138.3 -1.8 -27.0 -7 1 1 416 04 02 51 04 03 31 --- 10 42 38 47.7 138.5 -1.8 -26.9 33 F 1 417 04 02 51 Schedule for VLBA_BR (Code Br ) Page 24 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 03 31 M58 10 42 38 46.4 136.7 -1.9 -27.9 -9 1 1 417 04 03 31 04 04 11 --- 10 43 18 46.5 136.9 -1.9 -27.7 31 F 1 418 04 03 31 04 04 11 M87 10 43 18 47.7 138.7 -1.8 -26.8 -9 1 1 418 04 04 11 04 04 51 --- 10 43 58 47.8 139.0 -1.8 -26.7 31 F 1 420 04 04 11 Next scan frequencies: 8405.49 8405.49 8413.49 8413.49 8421.49 8421.49 8429.49 8429.49 Next BBC frequencies: 805.49 805.49 813.49 813.49 821.49 821.49 829.49 829.49 04 04 51 M87 10 43 58 47.8 139.0 -1.8 -26.7 -4 1 1 420 04 04 51 04 05 31 --- 10 44 38 47.9 139.2 -1.8 -26.5 36 F 1 421 04 04 51 04 05 31 M89 10 44 38 47.5 137.5 -1.9 -27.5 -7 1 1 421 04 05 31 04 06 11 --- 10 45 18 47.6 137.7 -1.8 -27.4 33 F 1 422 04 05 31 04 06 11 M87 10 45 18 48.0 139.4 -1.8 -26.4 -7 1 1 422 04 06 11 04 06 51 --- 10 45 58 48.0 139.6 -1.8 -26.3 33 F 1 423 04 06 11 04 06 51 M58 10 45 58 46.8 137.8 -1.9 -27.3 -9 1 1 423 04 06 51 04 07 31 --- 10 46 38 46.8 138.0 -1.9 -27.2 31 F 1 425 04 06 51 04 07 31 M87 10 46 38 48.1 139.8 -1.7 -26.1 -9 1 1 425 04 07 31 04 08 11 --- 10 47 18 48.2 140.1 -1.7 -26.0 31 F 1 426 04 07 31 04 08 11 M89 10 47 18 47.8 138.4 -1.8 -27.0 -7 1 1 426 04 08 11 04 08 50 --- 10 47 58 47.9 138.6 -1.8 -26.9 33 F 1 427 04 08 11 04 08 50 M87 10 47 58 48.2 140.3 -1.7 -25.9 -7 1 1 427 04 08 50 04 09 30 --- 10 48 38 48.3 140.5 -1.7 -25.8 33 F 1 429 04 08 50 04 09 30 M58 10 48 38 47.1 138.6 -1.8 -26.8 -9 1 1 429 04 09 30 04 10 10 --- 10 49 18 47.1 138.8 -1.8 -26.7 31 F 1 430 04 09 30 04 10 10 M87 10 49 18 48.4 140.7 -1.7 -25.6 -9 1 1 430 04 10 10 04 10 50 --- 10 49 58 48.5 140.9 -1.7 -25.5 31 F 1 431 04 10 10 04 10 50 M89 10 49 58 48.1 139.2 -1.8 -26.5 -7 1 1 431 04 10 50 04 11 30 --- 10 50 38 48.2 139.4 -1.8 -26.4 33 F 1 432 04 10 50 04 11 30 M87 10 50 38 48.5 141.2 -1.7 -25.4 -7 1 1 432 04 11 30 04 12 10 --- 10 51 18 48.6 141.4 -1.7 -25.2 33 F 1 434 04 11 30 Schedule for VLBA_BR (Code Br ) Page 25 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 12 10 M58 10 51 18 47.4 139.5 -1.8 -26.3 -8 1 1 434 04 12 10 04 12 50 --- 10 51 58 47.4 139.7 -1.8 -26.2 31 F 1 435 04 12 10 04 12 50 M87 10 51 58 48.7 141.6 -1.7 -25.1 -8 1 1 435 04 12 50 04 13 30 --- 10 52 38 48.7 141.8 -1.6 -25.0 31 F 1 436 04 12 50 04 13 30 M89 10 52 38 48.4 140.1 -1.7 -26.0 -7 1 1 436 04 13 30 04 14 10 --- 10 53 18 48.5 140.3 -1.7 -25.9 33 F 1 438 04 13 30 04 14 10 M87 10 53 18 48.8 142.0 -1.6 -24.8 -7 1 1 438 04 14 10 04 14 49 --- 10 53 58 48.9 142.3 -1.6 -24.7 33 F 1 439 04 14 10 04 14 49 M58 10 53 58 47.6 140.3 -1.7 -25.8 -8 1 1 439 04 14 49 04 15 29 --- 10 54 38 47.7 140.6 -1.7 -25.7 31 F 1 440 04 14 49 04 15 29 M87 10 54 38 48.9 142.5 -1.6 -24.6 -8 1 1 440 04 15 29 04 16 09 --- 10 55 18 49.0 142.7 -1.6 -24.4 31 F 1 441 04 15 29 04 16 09 M89 10 55 18 48.7 141.0 -1.7 -25.5 -7 1 1 441 04 16 09 04 16 49 --- 10 55 58 48.7 141.2 -1.7 -25.4 33 F 1 443 04 16 09 04 16 49 M87 10 55 58 49.1 142.9 -1.6 -24.3 -7 1 1 443 04 16 49 04 17 29 --- 10 56 38 49.1 143.2 -1.6 -24.2 33 F 1 444 04 16 49 04 17 29 M58 10 56 38 47.9 141.2 -1.7 -25.3 -8 1 1 444 04 17 29 04 18 09 --- 10 57 18 48.0 141.4 -1.7 -25.1 31 F 1 445 04 17 29 04 18 09 M87 10 57 18 49.2 143.4 -1.6 -24.0 -8 1 1 445 04 18 09 04 18 49 --- 10 57 58 49.3 143.6 -1.6 -23.9 31 F 1 447 04 18 09 04 18 49 M89 10 57 58 48.9 141.9 -1.6 -25.0 -7 1 1 447 04 18 49 04 19 29 --- 10 58 38 49.0 142.1 -1.6 -24.8 33 F 1 448 04 18 49 04 19 29 M87 10 58 38 49.3 143.9 -1.5 -23.8 -7 1 1 448 04 19 29 04 20 09 --- 10 59 18 49.4 144.1 -1.5 -23.6 33 F 1 449 04 19 29 04 20 09 M58 10 59 18 48.2 142.1 -1.6 -24.8 -8 1 1 449 04 20 09 04 20 48 --- 10 59 58 48.3 142.3 -1.6 -24.6 31 F 1 450 04 20 09 04 20 48 M87 10 59 58 49.5 144.3 -1.5 -23.5 -8 1 1 450 04 20 48 04 21 28 --- 11 00 38 49.5 144.5 -1.5 -23.3 31 F 1 452 04 20 48 Schedule for VLBA_BR (Code Br ) Page 26 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 21 28 M89 11 00 38 49.2 142.8 -1.6 -24.4 -7 1 1 452 04 21 28 04 22 08 --- 11 01 18 49.3 143.0 -1.6 -24.3 33 F 1 453 04 21 28 04 22 08 M87 11 01 18 49.6 144.8 -1.5 -23.2 -7 1 1 453 04 22 08 04 22 48 --- 11 01 58 49.7 145.0 -1.5 -23.1 33 F 1 454 04 22 08 04 22 48 M58 11 01 58 48.5 143.0 -1.6 -24.2 -8 1 1 454 04 22 48 04 23 28 --- 11 02 38 48.5 143.2 -1.6 -24.1 31 F 1 456 04 22 48 04 23 28 M87 11 02 38 49.7 145.2 -1.5 -22.9 -8 1 1 456 04 23 28 04 24 08 --- 11 03 18 49.8 145.5 -1.5 -22.8 31 F 1 457 04 23 28 04 24 08 M89 11 03 18 49.5 143.7 -1.5 -23.9 -7 1 1 457 04 24 08 04 24 48 --- 11 03 58 49.5 143.9 -1.5 -23.7 33 F 1 458 04 24 08 04 24 48 M87 11 03 58 49.9 145.7 -1.5 -22.6 -7 1 1 458 04 24 48 04 25 28 --- 11 04 38 49.9 145.9 -1.4 -22.5 33 F 1 459 04 24 48 04 25 28 M58 11 04 38 48.7 143.9 -1.6 -23.7 -8 1 1 459 04 25 28 04 26 08 --- 11 05 18 48.8 144.1 -1.5 -23.5 32 F 1 461 04 25 28 04 26 08 M87 11 05 18 50.0 146.2 -1.4 -22.4 -8 1 1 461 04 26 08 04 26 48 --- 11 05 58 50.0 146.4 -1.4 -22.2 32 F 1 462 04 26 08 04 26 48 M89 11 05 58 49.7 144.6 -1.5 -23.3 -7 1 1 462 04 26 48 04 27 27 --- 11 06 38 49.8 144.9 -1.5 -23.2 33 F 1 463 04 26 48 04 27 27 M87 11 06 38 50.1 146.6 -1.4 -22.1 -7 1 1 463 04 27 27 04 28 07 --- 11 07 18 50.2 146.9 -1.4 -21.9 33 F 1 465 04 27 27 04 28 07 M58 11 07 18 49.0 144.8 -1.5 -23.1 -8 1 1 465 04 28 07 04 28 47 --- 11 07 58 49.1 145.0 -1.5 -23.0 32 F 1 466 04 28 07 04 28 47 M87 11 07 58 50.2 147.1 -1.4 -21.8 -8 1 1 466 04 28 47 04 29 27 --- 11 08 38 50.3 147.4 -1.4 -21.6 32 F 1 467 04 28 47 04 29 27 M89 11 08 38 50.0 145.5 -1.5 -22.8 -7 1 1 467 04 29 27 04 30 07 --- 11 09 18 50.1 145.8 -1.4 -22.6 33 F 1 468 04 29 27 04 30 07 M87 11 09 18 50.3 147.6 -1.4 -21.5 -7 1 1 468 04 30 07 04 30 47 --- 11 09 58 50.4 147.8 -1.4 -21.3 33 F 1 470 04 30 07 Schedule for VLBA_BR (Code Br ) Page 27 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 04 30 47 M58 11 09 58 49.2 145.7 -1.5 -22.6 -8 1 1 470 04 30 47 04 31 27 --- 11 10 38 49.3 146.0 -1.5 -22.4 32 F 1 471 04 30 47 04 31 27 M87 11 10 38 50.5 148.1 -1.3 -21.2 -8 1 1 471 04 31 27 04 32 07 --- 11 11 18 50.5 148.3 -1.3 -21.0 32 F 1 472 04 31 27 Next scan frequencies: 23020.49 23045.49 23107.99 23207.99 23370.49 23420.49 23457.99 23470.49 Next BBC frequencies: 520.49 545.49 607.99 707.99 870.49 920.49 957.99 970.49 04 34 12 1800+782 11 13 24 44.6 16.0 -6.8 -66.7 32 1 1 472 04 33 52 04 35 12 --- 11 14 24 44.7 16.0 -6.8 -66.9 60 F 1 475 04 34 10 04 36 44 0646+445 11 15 55 45.1 -67.8 4.5 60.7 30 1 1 475 04 36 24 04 37 44 --- 11 16 55 45.0 -67.7 4.5 60.6 60 F 1 477 04 36 42 04 41 30 0700+170 11 20 43 29.2 263.2 4.3 43.9 0 1 1 477 04 41 10 04 42 30 --- 11 21 43 29.1 263.4 4.4 43.9 60 F 1 480 04 41 28 04 46 17 0730-114 11 25 31 10.9 238.4 3.9 35.5 185 1 1 480 04 45 57 04 47 17 --- 11 26 31 10.7 238.6 3.9 35.6 60 F 1 483 04 46 15 04 48 55 0753+535 11 28 09 56.6 300.4 3.6 77.5 0 1 1 483 04 48 35 04 49 55 --- 11 29 09 56.5 300.5 3.6 77.3 60 F 1 485 04 48 53 04 50 25 0818+422 11 29 39 56.5 278.3 3.2 63.4 9 1 1 485 04 50 05 04 51 25 --- 11 30 39 56.3 278.4 3.2 63.3 60 F 1 488 04 50 23 04 51 55 0824+555 11 31 09 61.0 303.0 3.1 85.6 8 1 1 488 04 51 35 04 52 55 --- 11 32 09 60.8 303.0 3.1 85.4 60 F 1 490 04 51 53 04 53 33 0958+472 11 32 47 74.3 276.1 1.6 78.6 5 1 1 490 04 53 13 04 54 33 --- 11 33 47 74.1 276.2 1.6 78.5 60 F 1 493 04 53 31 04 55 29 1048+714 11 34 44 65.9 351.3 0.8 161.2 0 1 1 493 04 55 09 04 56 29 --- 11 35 44 65.8 351.1 0.8 160.8 60 F 1 496 04 55 27 04 59 09 1127-185 11 38 24 22.8 182.8 0.2 2.0 42 1 1 496 04 58 49 05 00 09 --- 11 39 24 22.8 183.0 0.2 2.2 60 F 1 498 04 59 07 05 02 12 1146+395 11 41 28 81.7 172.0 -0.1 -6.9 0 1 1 498 05 01 52 05 03 12 --- 11 42 28 81.8 173.3 -0.1 -5.8 60 F 1 501 05 02 10 Schedule for VLBA_BR (Code Br ) Page 28 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 05 26 1159+291 11 44 43 70.8 169.8 -0.3 -7.8 106 1 1 501 05 05 06 05 06 26 --- 11 45 43 70.9 170.5 -0.2 -7.3 60 F 1 503 05 05 24 05 07 23 1222+041 11 46 40 45.4 167.1 -0.6 -8.6 0 1 1 503 05 07 03 05 08 23 --- 11 47 40 45.4 167.5 -0.6 -8.4 60 F 1 506 05 07 21 05 09 55 1310+322 11 49 12 67.9 128.3 -1.4 -38.3 41 1 1 506 05 09 35 05 10 55 --- 11 50 12 68.0 128.8 -1.3 -38.0 60 F 1 508 05 09 53 05 12 38 1357+764 11 51 55 58.8 13.5 -2.1 -137.6 20 1 1 508 05 12 18 05 13 38 --- 11 52 55 58.9 13.4 -2.1 -137.9 60 F 1 511 05 12 36 05 16 15 1550+052 11 55 33 24.4 110.6 -3.9 -38.9 82 1 1 511 05 15 55 05 17 15 --- 11 56 33 24.6 110.8 -3.9 -38.8 60 F 1 514 05 16 13 05 19 02 1638+572 11 58 21 48.6 50.1 -4.7 -71.5 53 1 1 514 05 18 42 05 20 02 --- 11 59 21 48.7 50.2 -4.7 -71.6 60 F 1 516 05 19 00 05 20 28 1740+521 11 59 47 38.5 51.3 -5.7 -58.2 0 1 1 516 05 20 02 05 21 28 --- 12 00 47 38.6 51.4 -5.7 -58.3 60 F 1 519 05 20 02 05 24 03 1751+093 12 03 23 9.1 85.6 -5.8 -42.5 90 1 1 519 05 23 43 05 25 03 --- 12 04 23 9.2 85.8 -5.8 -42.5 60 F 1 521 05 24 01 Next scan frequencies: 23789.49 23789.49 23797.49 23797.49 23805.49 23805.49 23813.49 23813.49 Next BBC frequencies: 789.49 789.49 797.49 797.49 805.49 805.49 813.49 813.49 05 25 03 M87 12 04 23 53.8 168.8 -0.4 -7.6 -95 1 1 521 05 25 03 05 27 43 --- 12 07 03 53.9 169.9 -0.4 -6.9 64 F 1 527 05 25 36 05 27 43 M89 12 07 03 53.9 167.9 -0.5 -8.2 -7 1 1 527 05 27 43 05 28 23 --- 12 07 43 53.9 168.2 -0.5 -8.0 33 F 1 528 05 27 43 05 28 23 M87 12 07 43 53.9 170.2 -0.4 -6.7 -7 1 1 528 05 28 23 05 29 03 --- 12 08 23 53.9 170.5 -0.4 -6.5 33 F 1 529 05 28 23 05 29 03 M58 12 08 23 53.1 167.8 -0.5 -8.3 -8 1 1 529 05 29 03 05 29 42 --- 12 09 03 53.1 168.1 -0.5 -8.1 32 F 1 530 05 29 03 05 29 42 M87 12 09 03 53.9 170.8 -0.4 -6.3 -8 1 1 530 05 29 42 05 30 22 --- 12 09 43 53.9 171.0 -0.4 -6.1 32 F 1 532 05 29 42 Schedule for VLBA_BR (Code Br ) Page 29 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 30 22 M89 12 09 43 54.0 169.0 -0.4 -7.5 -7 1 1 532 05 30 22 05 31 02 --- 12 10 23 54.0 169.3 -0.4 -7.3 33 F 1 533 05 30 22 05 31 02 M87 12 10 23 53.9 171.3 -0.3 -5.9 -7 1 1 533 05 31 02 05 31 42 --- 12 11 03 54.0 171.6 -0.3 -5.7 33 F 1 534 05 31 02 05 31 42 M58 12 11 03 53.2 168.9 -0.5 -7.6 -8 1 1 534 05 31 42 05 32 22 --- 12 11 43 53.2 169.1 -0.4 -7.4 32 F 1 536 05 31 42 05 32 22 M87 12 11 43 54.0 171.9 -0.3 -5.6 -8 1 1 536 05 32 22 05 33 02 --- 12 12 23 54.0 172.1 -0.3 -5.4 32 F 1 537 05 32 22 05 33 02 M89 12 12 23 54.0 170.1 -0.4 -6.7 -7 1 1 537 05 33 02 05 33 42 --- 12 13 03 54.1 170.4 -0.4 -6.6 33 F 1 538 05 33 02 05 33 42 M87 12 13 03 54.0 172.4 -0.3 -5.2 -7 1 1 538 05 33 42 05 34 22 --- 12 13 43 54.0 172.7 -0.3 -5.0 33 F 1 539 05 33 42 05 34 22 M58 12 13 43 53.3 170.0 -0.4 -6.8 -8 1 1 539 05 34 22 05 35 02 --- 12 14 23 53.3 170.2 -0.4 -6.6 32 F 1 541 05 34 22 05 35 02 M87 12 14 23 54.0 173.0 -0.3 -4.8 -8 1 1 541 05 35 02 05 35 41 --- 12 15 03 54.1 173.2 -0.3 -4.6 32 F 1 542 05 35 02 05 35 41 M89 12 15 03 54.1 171.2 -0.4 -6.0 -7 1 1 542 05 35 41 05 36 21 --- 12 15 43 54.1 171.5 -0.3 -5.8 33 F 1 543 05 35 41 05 36 21 M87 12 15 43 54.1 173.5 -0.3 -4.4 -7 1 1 543 05 36 21 05 37 01 --- 12 16 23 54.1 173.8 -0.2 -4.2 33 F 1 545 05 36 21 05 37 01 M58 12 16 23 53.4 171.0 -0.4 -6.1 -8 1 1 545 05 37 01 05 37 41 --- 12 17 03 53.4 171.3 -0.4 -5.9 32 F 1 546 05 37 01 05 37 41 M87 12 17 03 54.1 174.1 -0.2 -4.0 -8 1 1 546 05 37 41 05 38 21 --- 12 17 43 54.1 174.3 -0.2 -3.9 32 F 1 547 05 37 41 05 38 21 M89 12 17 43 54.2 172.3 -0.3 -5.2 -7 1 1 547 05 38 21 05 39 01 --- 12 18 23 54.2 172.6 -0.3 -5.1 33 F 1 549 05 38 21 05 39 01 M87 12 18 23 54.1 174.6 -0.2 -3.7 -7 1 1 549 05 39 01 05 39 41 --- 12 19 03 54.1 174.9 -0.2 -3.5 33 F 1 550 05 39 01 Schedule for VLBA_BR (Code Br ) Page 30 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 39 41 M58 12 19 03 53.4 172.1 -0.3 -5.4 -8 1 1 550 05 39 41 05 40 21 --- 12 19 43 53.4 172.4 -0.3 -5.2 32 F 1 551 05 39 41 05 40 21 M87 12 19 43 54.1 175.2 -0.2 -3.3 -8 1 1 551 05 40 21 05 41 01 --- 12 20 23 54.1 175.5 -0.2 -3.1 32 F 1 552 05 40 21 05 41 01 M89 12 20 23 54.2 173.4 -0.3 -4.5 -7 1 1 552 05 41 01 05 41 41 --- 12 21 03 54.2 173.7 -0.3 -4.3 33 F 1 554 05 41 01 05 41 41 M87 12 21 03 54.1 175.7 -0.2 -2.9 -7 1 1 554 05 41 41 05 42 20 --- 12 21 43 54.2 176.0 -0.2 -2.7 33 F 1 555 05 41 41 05 42 20 M58 12 21 43 53.5 173.2 -0.3 -4.6 -8 1 1 555 05 42 20 05 43 00 --- 12 22 23 53.5 173.5 -0.3 -4.4 32 F 1 556 05 42 20 05 43 00 M87 12 22 23 54.2 176.3 -0.1 -2.5 -8 1 1 556 05 43 00 05 43 40 --- 12 23 03 54.2 176.6 -0.1 -2.3 32 F 1 558 05 43 00 05 43 40 M89 12 23 03 54.3 174.5 -0.2 -3.7 -7 1 1 558 05 43 40 05 44 20 --- 12 23 43 54.3 174.8 -0.2 -3.5 33 F 1 559 05 43 40 05 44 20 M87 12 23 43 54.2 176.8 -0.1 -2.2 -7 1 1 559 05 44 20 05 45 00 --- 12 24 23 54.2 177.1 -0.1 -2.0 33 F 1 560 05 44 20 05 45 00 M58 12 24 23 53.5 174.3 -0.2 -3.9 -8 1 1 560 05 45 00 05 45 40 --- 12 25 03 53.5 174.6 -0.2 -3.7 32 F 1 561 05 45 00 05 45 40 M87 12 25 03 54.2 177.4 -0.1 -1.8 -8 1 1 561 05 45 40 05 46 20 --- 12 25 43 54.2 177.7 -0.1 -1.6 32 F 1 563 05 45 40 05 46 20 M89 12 25 43 54.3 175.6 -0.2 -3.0 -7 1 1 563 05 46 20 05 47 00 --- 12 26 23 54.3 175.9 -0.2 -2.8 33 F 1 564 05 46 20 05 47 00 M87 12 26 23 54.2 178.0 -0.1 -1.4 -7 1 1 564 05 47 00 05 47 40 --- 12 27 03 54.2 178.2 -0.1 -1.2 33 F 1 565 05 47 00 05 47 40 M58 12 27 03 53.6 175.4 -0.2 -3.1 -8 1 1 565 05 47 40 05 48 19 --- 12 27 43 53.6 175.7 -0.2 -2.9 32 F 1 567 05 47 40 05 48 19 M87 12 27 43 54.2 178.5 -0.1 -1.0 -8 1 1 567 05 48 19 05 48 59 --- 12 28 23 54.2 178.8 0.0 -0.8 32 F 1 568 05 48 19 Schedule for VLBA_BR (Code Br ) Page 31 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 48 59 M89 12 28 23 54.3 176.8 -0.1 -2.2 -7 1 1 568 05 48 59 05 49 39 --- 12 29 03 54.3 177.0 -0.1 -2.0 33 F 1 569 05 48 59 05 49 39 M87 12 29 03 54.2 179.1 0.0 -0.6 -7 1 1 569 05 49 39 05 50 19 --- 12 29 43 54.2 179.3 0.0 -0.4 33 F 1 570 05 49 39 05 50 19 M58 12 29 43 53.6 176.5 -0.1 -2.4 -8 1 1 570 05 50 19 05 50 59 --- 12 30 23 53.6 176.8 -0.1 -2.2 32 F 1 572 05 50 19 05 50 59 M87 12 30 23 54.2 179.6 0.0 -0.3 -8 1 1 572 05 50 59 05 51 39 --- 12 31 03 54.2 179.9 0.0 -0.1 32 F 1 573 05 50 59 05 51 39 M89 12 31 03 54.4 177.9 -0.1 -1.5 -7 1 1 573 05 51 39 05 52 19 --- 12 31 43 54.4 178.2 -0.1 -1.3 33 F 1 574 05 51 39 05 52 19 M87 12 31 43 54.2 180.2 0.0 0.1 -7 1 1 574 05 52 19 05 52 59 --- 12 32 23 54.2 180.5 0.0 0.3 33 F 1 576 05 52 19 05 52 59 M58 12 32 23 53.6 177.6 -0.1 -1.6 -8 1 1 576 05 52 59 05 53 39 --- 12 33 03 53.6 177.9 -0.1 -1.4 32 F 1 577 05 52 59 05 53 39 M87 12 33 03 54.2 180.7 0.0 0.5 -8 1 1 577 05 53 39 05 54 18 --- 12 33 43 54.2 181.0 0.0 0.7 32 F 1 578 05 53 39 05 54 18 M89 12 33 43 54.4 179.0 0.0 -0.7 -7 1 1 578 05 54 18 05 54 58 --- 12 34 23 54.4 179.3 0.0 -0.5 33 F 1 579 05 54 18 05 54 58 M87 12 34 23 54.2 181.3 0.1 0.9 -7 1 1 579 05 54 58 05 55 38 --- 12 35 03 54.2 181.6 0.1 1.1 33 F 1 581 05 54 58 05 55 38 M58 12 35 03 53.6 178.7 -0.1 -0.9 -8 1 1 581 05 55 38 05 56 18 --- 12 35 43 53.6 179.0 0.0 -0.7 32 F 1 582 05 55 38 05 56 18 M87 12 35 43 54.2 181.9 0.1 1.3 -8 1 1 582 05 56 18 05 56 58 --- 12 36 23 54.2 182.1 0.1 1.5 32 F 1 583 05 56 18 05 56 58 M89 12 36 23 54.4 180.1 0.0 0.1 -7 1 1 583 05 56 58 05 57 38 --- 12 37 03 54.4 180.4 0.0 0.3 33 F 1 585 05 56 58 05 57 38 M87 12 37 03 54.2 182.4 0.1 1.6 -7 1 1 585 05 57 38 05 58 18 --- 12 37 43 54.2 182.7 0.1 1.8 33 F 1 586 05 57 38 Schedule for VLBA_BR (Code Br ) Page 32 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 05 58 18 M58 12 37 43 53.6 179.8 0.0 -0.1 -8 1 1 586 05 58 18 05 58 58 --- 12 38 23 53.6 180.1 0.0 0.1 32 F 1 587 05 58 18 05 58 58 M87 12 38 23 54.2 183.0 0.1 2.0 -8 1 1 587 05 58 58 05 59 38 --- 12 39 03 54.2 183.2 0.1 2.2 32 F 1 588 05 58 58 05 59 38 M89 12 39 03 54.4 181.2 0.0 0.8 -7 1 1 588 05 59 38 06 00 17 --- 12 39 43 54.4 181.5 0.1 1.0 33 F 1 590 05 59 38 06 00 17 M87 12 39 43 54.2 183.5 0.1 2.4 -7 1 1 590 06 00 17 06 00 57 --- 12 40 23 54.2 183.8 0.2 2.6 33 F 1 591 06 00 17 06 00 57 M58 12 40 23 53.6 180.9 0.0 0.6 -8 1 1 591 06 00 57 06 01 37 --- 12 41 03 53.6 181.2 0.0 0.8 32 F 1 592 06 00 57 06 01 37 M87 12 41 03 54.2 184.1 0.2 2.8 -8 1 1 592 06 01 37 06 02 17 --- 12 41 43 54.1 184.4 0.2 3.0 32 F 1 594 06 01 37 06 02 17 M89 12 41 43 54.4 182.3 0.1 1.6 -7 1 1 594 06 02 17 06 02 57 --- 12 42 23 54.4 182.6 0.1 1.8 33 F 1 595 06 02 17 06 02 57 M87 12 42 23 54.1 184.6 0.2 3.2 -7 1 1 595 06 02 57 06 03 37 --- 12 43 03 54.1 184.9 0.2 3.4 33 F 1 596 06 02 57 06 03 37 M58 12 43 03 53.6 182.0 0.1 1.4 -8 1 1 596 06 03 37 06 04 17 --- 12 43 43 53.6 182.3 0.1 1.6 32 F 1 597 06 03 37 06 04 17 M87 12 43 43 54.1 185.2 0.2 3.5 -8 1 1 597 06 04 17 06 04 57 --- 12 44 23 54.1 185.5 0.2 3.7 32 F 1 599 06 04 17 06 04 57 M89 12 44 23 54.3 183.5 0.1 2.4 -7 1 1 599 06 04 57 06 05 37 --- 12 45 03 54.3 183.7 0.1 2.6 33 F 1 600 06 04 57 06 05 37 M87 12 45 03 54.1 185.7 0.2 3.9 -7 1 1 600 06 05 37 06 06 16 --- 12 45 43 54.1 186.0 0.2 4.1 33 F 1 601 06 05 37 06 06 16 M58 12 45 43 53.6 183.1 0.1 2.1 -8 1 1 601 06 06 16 06 06 56 --- 12 46 23 53.6 183.4 0.1 2.3 32 F 1 603 06 06 16 06 06 56 M87 12 46 23 54.1 186.3 0.3 4.3 -8 1 1 603 06 06 56 06 07 36 --- 12 47 03 54.1 186.6 0.3 4.5 32 F 1 604 06 06 56 Schedule for VLBA_BR (Code Br ) Page 33 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 07 36 M89 12 47 03 54.3 184.6 0.2 3.1 -7 1 1 604 06 07 36 06 08 16 --- 12 47 43 54.3 184.9 0.2 3.3 33 F 1 605 06 07 36 06 08 16 M87 12 47 43 54.0 186.8 0.3 4.7 -7 1 1 605 06 08 16 06 08 56 --- 12 48 23 54.0 187.1 0.3 4.9 33 F 1 606 06 08 16 06 08 56 M58 12 48 23 53.6 184.2 0.2 2.9 -8 1 1 606 06 08 56 06 09 36 --- 12 49 03 53.6 184.5 0.2 3.1 32 F 1 608 06 08 56 06 09 36 M87 12 49 03 54.0 187.4 0.3 5.0 -8 1 1 608 06 09 36 06 10 16 --- 12 49 43 54.0 187.7 0.3 5.2 32 F 1 609 06 09 36 06 10 16 M89 12 49 43 54.3 185.7 0.2 3.9 -7 1 1 609 06 10 16 06 10 56 --- 12 50 23 54.3 186.0 0.2 4.1 33 F 1 610 06 10 16 06 10 56 M87 12 50 23 54.0 188.0 0.3 5.4 -7 1 1 610 06 10 56 06 11 36 --- 12 51 03 54.0 188.2 0.3 5.6 33 F 1 612 06 10 56 06 11 36 M58 12 51 03 53.5 185.3 0.2 3.6 -8 1 1 612 06 11 36 06 12 15 --- 12 51 43 53.5 185.6 0.2 3.8 32 F 1 613 06 11 36 06 12 15 M87 12 51 43 54.0 188.5 0.3 5.8 -8 1 1 613 06 12 15 06 12 55 --- 12 52 23 53.9 188.8 0.4 6.0 32 F 1 614 06 12 15 06 12 55 M89 12 52 23 54.2 186.8 0.3 4.6 -7 1 1 614 06 12 55 06 13 35 --- 12 53 03 54.2 187.1 0.3 4.8 33 F 1 615 06 12 55 06 13 35 M87 12 53 03 53.9 189.1 0.4 6.2 -7 1 1 615 06 13 35 06 14 15 --- 12 53 43 53.9 189.3 0.4 6.4 33 F 1 617 06 13 35 06 14 15 M58 12 53 43 53.5 186.4 0.3 4.4 -8 1 1 617 06 14 15 06 14 55 --- 12 54 23 53.5 186.7 0.3 4.5 32 F 1 618 06 14 15 06 14 55 M87 12 54 23 53.9 189.6 0.4 6.5 -8 1 1 618 06 14 55 06 15 35 --- 12 55 03 53.9 189.9 0.4 6.7 32 F 1 619 06 14 55 06 15 35 M89 12 55 03 54.2 187.9 0.3 5.4 -7 1 1 619 06 15 35 06 16 15 --- 12 55 43 54.1 188.2 0.3 5.6 33 F 1 621 06 15 35 06 16 15 M87 12 55 43 53.9 190.2 0.4 6.9 -7 1 1 621 06 16 15 06 16 55 --- 12 56 23 53.8 190.4 0.4 7.1 33 F 1 622 06 16 15 Schedule for VLBA_BR (Code Br ) Page 34 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 16 55 M58 12 56 23 53.4 187.5 0.3 5.1 -8 1 1 622 06 16 55 06 17 35 --- 12 57 03 53.4 187.8 0.3 5.3 32 F 1 623 06 16 55 06 17 35 M87 12 57 03 53.8 190.7 0.4 7.3 -8 1 1 623 06 17 35 06 18 15 --- 12 57 43 53.8 191.0 0.4 7.5 32 F 1 624 06 17 35 06 18 15 M89 12 57 43 54.1 189.0 0.4 6.1 -7 1 1 624 06 18 15 06 18 54 --- 12 58 23 54.1 189.3 0.4 6.3 33 F 1 626 06 18 15 06 18 54 M87 12 58 23 53.8 191.2 0.5 7.7 -7 1 1 626 06 18 54 06 19 34 --- 12 59 03 53.7 191.5 0.5 7.8 33 F 1 627 06 18 54 06 19 34 M58 12 59 03 53.4 188.6 0.3 5.8 -8 1 1 627 06 19 34 06 20 14 --- 12 59 43 53.4 188.9 0.4 6.0 32 F 1 628 06 19 34 06 20 14 M87 12 59 43 53.7 191.8 0.5 8.0 -8 1 1 628 06 20 14 06 20 54 --- 13 00 23 53.7 192.1 0.5 8.2 32 F 1 630 06 20 14 06 20 54 M89 13 00 23 54.0 190.1 0.4 6.9 -7 1 1 630 06 20 54 06 21 34 --- 13 01 03 54.0 190.4 0.4 7.1 33 F 1 631 06 20 54 06 21 34 M87 13 01 03 53.7 192.3 0.5 8.4 -7 1 1 631 06 21 34 06 22 14 --- 13 01 43 53.7 192.6 0.5 8.6 33 F 1 632 06 21 34 06 22 14 M58 13 01 43 53.3 189.7 0.4 6.6 -8 1 1 632 06 22 14 06 22 54 --- 13 02 23 53.3 189.9 0.4 6.8 32 F 1 633 06 22 14 06 22 54 M87 13 02 23 53.6 192.9 0.5 8.8 -8 1 1 633 06 22 54 06 23 34 --- 13 03 03 53.6 193.2 0.5 8.9 32 F 1 635 06 22 54 06 23 34 M89 13 03 03 53.9 191.2 0.4 7.6 -7 1 1 635 06 23 34 06 24 14 --- 13 03 43 53.9 191.5 0.5 7.8 33 F 1 636 06 23 34 06 24 14 M87 13 03 43 53.6 193.4 0.5 9.1 -7 1 1 636 06 24 14 06 24 53 --- 13 04 23 53.6 193.7 0.6 9.3 33 F 1 637 06 24 14 06 24 53 M58 13 04 23 53.2 190.8 0.4 7.3 -8 1 1 637 06 24 53 06 25 33 --- 13 05 03 53.2 191.0 0.4 7.5 32 F 1 639 06 24 53 06 25 33 M87 13 05 03 53.5 194.0 0.6 9.5 -8 1 1 639 06 25 33 06 26 13 --- 13 05 43 53.5 194.2 0.6 9.7 32 F 1 640 06 25 33 Schedule for VLBA_BR (Code Br ) Page 35 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 26 13 M89 13 05 43 53.8 192.3 0.5 8.4 -7 1 1 640 06 26 13 06 26 53 --- 13 06 23 53.8 192.6 0.5 8.6 33 F 1 641 06 26 13 06 26 53 M87 13 06 23 53.5 194.5 0.6 9.9 -7 1 1 641 06 26 53 06 27 33 --- 13 07 03 53.4 194.8 0.6 10.0 33 F 1 642 06 26 53 06 27 33 M58 13 07 03 53.1 191.8 0.5 8.0 -8 1 1 642 06 27 33 06 28 13 --- 13 07 43 53.1 192.1 0.5 8.2 32 F 1 644 06 27 33 06 28 13 M87 13 07 43 53.4 195.0 0.6 10.2 -8 1 1 644 06 28 13 06 28 53 --- 13 08 23 53.4 195.3 0.6 10.4 32 F 1 645 06 28 13 06 28 53 M89 13 08 23 53.7 193.4 0.5 9.1 -7 1 1 645 06 28 53 06 29 33 --- 13 09 03 53.7 193.7 0.5 9.3 33 F 1 646 06 28 53 06 29 33 M87 13 09 03 53.4 195.6 0.6 10.6 -7 1 1 646 06 29 33 06 30 13 --- 13 09 43 53.3 195.8 0.6 10.8 33 F 1 648 06 29 33 06 30 13 M58 13 09 43 53.0 192.9 0.5 8.8 -8 1 1 648 06 30 13 06 30 52 --- 13 10 23 53.0 193.2 0.5 8.9 32 F 1 649 06 30 13 06 30 52 M87 13 10 23 53.3 196.1 0.7 10.9 -8 1 1 649 06 30 52 06 31 32 --- 13 11 03 53.3 196.4 0.7 11.1 32 F 1 650 06 30 52 06 31 32 M89 13 11 03 53.6 194.5 0.6 9.8 -7 1 1 650 06 31 32 06 32 12 --- 13 11 43 53.6 194.8 0.6 10.0 33 F 1 651 06 31 32 06 32 12 M87 13 11 43 53.2 196.6 0.7 11.3 -7 1 1 651 06 32 12 06 32 52 --- 13 12 23 53.2 196.9 0.7 11.5 33 F 1 653 06 32 12 06 32 52 M58 13 12 23 52.9 194.0 0.6 9.5 -8 1 1 653 06 32 52 06 33 32 --- 13 13 03 52.9 194.2 0.6 9.7 32 F 1 654 06 32 52 06 33 32 M87 13 13 03 53.2 197.2 0.7 11.6 -8 1 1 654 06 33 32 06 34 12 --- 13 13 43 53.1 197.4 0.7 11.8 32 F 1 655 06 33 32 06 34 12 M89 13 13 43 53.5 195.6 0.6 10.6 -7 1 1 655 06 34 12 06 34 52 --- 13 14 23 53.5 195.8 0.6 10.7 33 F 1 657 06 34 12 06 34 52 M87 13 14 23 53.1 197.7 0.7 12.0 -7 1 1 657 06 34 52 06 35 32 --- 13 15 03 53.1 198.0 0.7 12.2 33 F 1 658 06 34 52 Schedule for VLBA_BR (Code Br ) Page 36 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 35 32 M58 13 15 03 52.8 195.0 0.6 10.2 -8 1 1 658 06 35 32 06 36 12 --- 13 15 43 52.8 195.3 0.6 10.4 32 F 1 659 06 35 32 06 36 12 M87 13 15 43 53.0 198.2 0.7 12.3 -8 1 1 659 06 36 12 06 36 51 --- 13 16 23 53.0 198.5 0.8 12.5 32 F 1 660 06 36 12 06 36 51 M89 13 16 23 53.4 196.6 0.7 11.3 -7 1 1 660 06 36 51 06 37 31 --- 13 17 03 53.4 196.9 0.7 11.5 33 F 1 662 06 36 51 06 37 31 M87 13 17 03 53.0 198.8 0.8 12.7 -7 1 1 662 06 37 31 06 38 11 --- 13 17 43 52.9 199.0 0.8 12.9 33 F 1 663 06 37 31 06 38 11 M58 13 17 43 52.7 196.1 0.7 10.9 -8 1 1 663 06 38 11 06 38 51 --- 13 18 23 52.7 196.4 0.7 11.1 32 F 1 664 06 38 11 06 38 51 M87 13 18 23 52.9 199.3 0.8 13.0 -8 1 1 664 06 38 51 06 39 31 --- 13 19 03 52.9 199.6 0.8 13.2 32 F 1 666 06 38 51 06 39 31 M89 13 19 03 53.3 197.7 0.7 12.0 -7 1 1 666 06 39 31 06 40 11 --- 13 19 43 53.2 198.0 0.7 12.2 33 F 1 667 06 39 31 06 40 11 M87 13 19 43 52.8 199.8 0.8 13.4 -7 1 1 667 06 40 11 06 40 51 --- 13 20 23 52.8 200.1 0.8 13.6 33 F 1 668 06 40 11 06 40 51 M58 13 20 23 52.6 197.2 0.7 11.6 -8 1 1 668 06 40 51 06 41 31 --- 13 21 03 52.6 197.4 0.7 11.8 32 F 1 669 06 40 51 06 41 31 M87 13 21 03 52.7 200.3 0.8 13.7 -8 1 1 669 06 41 31 06 42 11 --- 13 21 43 52.7 200.6 0.8 13.9 32 F 1 671 06 41 31 06 42 11 M89 13 21 43 53.1 198.8 0.8 12.7 -7 1 1 671 06 42 11 06 42 50 --- 13 22 23 53.1 199.0 0.8 12.9 33 F 1 672 06 42 11 06 42 50 M87 13 22 23 52.7 200.9 0.9 14.1 -7 1 1 672 06 42 50 06 43 30 --- 13 23 03 52.6 201.1 0.9 14.3 33 F 1 673 06 42 50 06 43 30 M58 13 23 03 52.4 198.2 0.7 12.3 -8 1 1 673 06 43 30 06 44 10 --- 13 23 43 52.4 198.5 0.8 12.5 32 F 1 675 06 43 30 06 44 10 M87 13 23 43 52.6 201.4 0.9 14.4 -8 1 1 675 06 44 10 06 44 50 --- 13 24 23 52.5 201.6 0.9 14.6 32 F 1 676 06 44 10 Schedule for VLBA_BR (Code Br ) Page 37 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 44 50 M89 13 24 23 53.0 199.8 0.8 13.4 -7 1 1 676 06 44 50 06 45 30 --- 13 25 03 52.9 200.1 0.8 13.6 33 F 1 677 06 44 50 06 45 30 M87 13 25 03 52.5 201.9 0.9 14.8 -7 1 1 677 06 45 30 06 46 10 --- 13 25 43 52.5 202.2 0.9 14.9 33 F 1 678 06 45 30 06 46 10 M58 13 25 43 52.3 199.3 0.8 13.0 -8 1 1 678 06 46 10 06 46 50 --- 13 26 23 52.3 199.5 0.8 13.2 32 F 1 680 06 46 10 06 46 50 M87 13 26 23 52.4 202.4 0.9 15.1 -8 1 1 680 06 46 50 06 47 30 --- 13 27 03 52.4 202.7 0.9 15.3 32 F 1 681 06 46 50 Next scan frequencies: 8405.49 8405.49 8413.49 8413.49 8421.49 8421.49 8429.49 8429.49 Next BBC frequencies: 805.49 805.49 813.49 813.49 821.49 821.49 829.49 829.49 06 47 30 M87 13 27 03 52.4 202.7 0.9 15.3 -4 1 1 681 06 47 30 06 48 10 --- 13 27 43 52.3 202.9 0.9 15.4 36 F 1 682 06 47 30 06 48 10 M89 13 27 43 52.8 201.1 0.9 14.3 -7 1 1 682 06 48 10 06 48 49 --- 13 28 23 52.7 201.4 0.9 14.4 33 F 1 684 06 48 10 06 48 49 M87 13 28 23 52.3 203.2 1.0 15.6 -7 1 1 684 06 48 49 06 49 29 --- 13 29 03 52.2 203.4 1.0 15.8 33 F 1 685 06 48 49 06 49 29 M58 13 29 03 52.1 200.5 0.8 13.8 -8 1 1 685 06 49 29 06 50 09 --- 13 29 43 52.1 200.8 0.9 14.0 32 F 1 686 06 49 29 06 50 09 M87 13 29 43 52.2 203.7 1.0 15.9 -8 1 1 686 06 50 09 06 50 49 --- 13 30 23 52.1 204.0 1.0 16.1 32 F 1 687 06 50 09 06 50 49 M89 13 30 23 52.6 202.2 0.9 14.9 -7 1 1 687 06 50 49 06 51 29 --- 13 31 03 52.6 202.4 0.9 15.1 33 F 1 689 06 50 49 06 51 29 M87 13 31 03 52.1 204.2 1.0 16.3 -7 1 1 689 06 51 29 06 52 09 --- 13 31 43 52.1 204.5 1.0 16.4 33 F 1 690 06 51 29 06 52 09 M58 13 31 43 52.0 201.6 0.9 14.5 -8 1 1 690 06 52 09 06 52 49 --- 13 32 23 51.9 201.8 0.9 14.7 32 F 1 691 06 52 09 06 52 49 M87 13 32 23 52.0 204.7 1.0 16.6 -8 1 1 691 06 52 49 06 53 29 --- 13 33 03 52.0 205.0 1.0 16.8 32 F 1 693 06 52 49 Schedule for VLBA_BR (Code Br ) Page 38 Proper motions in the Virgo Cluster UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 1 May 2008 Day 122 --- 06 53 29 M89 13 33 03 52.5 203.2 0.9 15.6 -7 1 1 693 06 53 29 06 54 09 --- 13 33 43 52.4 203.5 1.0 15.8 33 F 1 694 06 53 29 06 54 09 M87 13 33 43 51.9 205.2 1.0 16.9 -7 1 1 694 06 54 09 06 54 48 --- 13 34 23 51.9 205.5 1.1 17.1 33 F 1 695 06 54 09 06 54 48 M58 13 34 23 51.8 202.6 0.9 15.2 -8 1 1 695 06 54 48 06 55 28 --- 13 35 03 51.7 202.9 0.9 15.4 32 F 1 696 06 54 48 06 55 28 M87 13 35 03 51.8 205.7 1.1 17.3 -8 1 1 696 06 55 28 06 56 08 --- 13 35 43 51.8 206.0 1.1 17.4 32 F 1 698 06 55 28 06 56 08 M89 13 35 43 52.3 204.2 1.0 16.3 -7 1 1 698 06 56 08 06 56 48 --- 13 36 23 52.2 204.5 1.0 16.5 33 F 1 699 06 56 08 06 56 48 M87 13 36 23 51.7 206.2 1.1 17.6 -7 1 1 699 06 56 48 06 57 28 --- 13 37 03 51.7 206.5 1.1 17.7 33 F 1 700 06 56 48 06 57 28 M58 13 37 03 51.6 203.6 1.0 15.8 -8 1 1 700 06 57 28 06 58 08 --- 13 37 43 51.6 203.9 1.0 16.0 32 F 1 702 06 57 28 06 58 08 M87 13 37 43 51.6 206.7 1.1 17.9 -8 1 1 702 06 58 08 06 58 48 --- 13 38 23 51.6 207.0 1.1 18.1 32 F 1 703 06 58 08 06 58 48 M89 13 38 23 52.1 205.2 1.0 16.9 -7 1 1 703 06 58 48 06 59 28 --- 13 39 03 52.0 205.5 1.0 17.1 33 F 1 704 06 58 48 06 59 28 M87 13 39 03 51.5 207.2 1.1 18.2 -7 1 1 704 06 59 28 07 00 08 --- 13 39 43 51.5 207.5 1.1 18.4 33 F 1 705 06 59 28 07 00 08 M58 13 39 43 51.4 204.6 1.0 16.5 -8 1 1 705 07 00 08 07 00 48 --- 13 40 23 51.4 204.9 1.0 16.7 32 F 1 707 07 00 08 07 00 48 M87 13 40 23 51.4 207.7 1.2 18.5 -8 1 1 707 07 00 48 07 01 27 --- 13 41 03 51.4 208.0 1.2 18.7 32 F 1 708 07 00 48 07 01 27 M89 13 41 03 51.9 206.2 1.1 17.6 -7 1 1 708 07 01 27 07 02 07 --- 13 41 43 51.8 206.5 1.1 17.8 33 F 1 709 07 01 27 07 02 07 M87 13 41 43 51.3 208.2 1.2 18.8 -7 1 1