COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines Exp. Code: BS160C Schedule Version: 4.10 Processed by SCHED version: 6.05 June 2006 PI: Zhi-Qiang Shen Address: Shanghai Astronomical Observatory Chinese Academy of Sciences 80 Nandan Road Shanghai 200030, P.R.China Phone: +86-21-64386191 ext 221 EMAIL: zshen@shao.ac.cn Fax: +86-21-64384618 Phone during observation: +86-21-64386191 ext 221 Observing mode: VLBA 256-8-2 at 7mm LCP Notes: IF frequency setup is for the bandwidth synthesis acorss ~301 MHz between IF1 and IF8 total recording time of ~8hr at 256 Mbps note the new position for VX Sgr Schedule for VLBA_PT (Code Pt ) Page 2 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 19 Aug 2007 Day 231 --- Next scan frequencies: 42814.11 42830.86 42872.74 42939.73 43031.85 43082.10 43107.22 43115.60 Next BBC frequencies: 614.11 630.86 672.74 739.73 831.85 882.10 907.22 915.60 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 23 20 46 J1512-0905 14 00 00 43.2 154.8 -1.2 -20.9 0 1 1 0 23 20 46 23 25 46 --- 14 05 00 43.7 156.4 -1.1 -19.6 299 F 1 10 23 21 04 23 27 48 J0157+7442 14 07 02 19.1 0.6-11.9 -1.9 12 1 1 10 23 27 48 23 28 47 --- 14 08 02 19.1 0.7-11.8 -2.1 60 F 1 12 23 28 06 23 30 06 J0808+4950 14 09 21 25.5 -45.6 6.0 66.2 41 1 1 12 23 30 06 23 31 05 --- 14 10 21 25.3 -45.5 6.0 66.1 60 F 1 14 23 30 24 23 33 39 J1625+4134 14 12 54 62.9 64.5 -2.2 -94.6 72 1 1 14 23 33 39 23 34 38 --- 14 13 54 63.1 64.5 -2.2 -94.8 60 F 1 15 23 33 57 23 36 42 J0841+7053 14 15 58 34.3 -23.2 5.6 83.3 59 1 1 15 23 36 42 23 37 42 --- 14 16 58 34.2 -23.2 5.6 83.1 60 F 1 17 23 37 00 23 38 51 J1748+7005 14 18 08 44.5 22.3 -3.5 -113.1 33 1 1 17 23 38 51 23 39 51 --- 14 19 08 44.6 22.2 -3.5 -113.4 60 F 1 19 23 39 09 23 41 32 J0948+4039 14 20 49 37.1 -61.8 4.5 73.6 39 1 1 19 23 41 32 23 42 32 --- 14 21 49 36.9 -61.7 4.5 73.5 60 F 1 21 23 41 50 23 44 33 J1638+5720 14 23 51 57.7 34.1 -2.2 -121.0 51 1 1 21 23 44 33 23 45 33 --- 14 24 51 57.9 33.9 -2.2 -121.3 60 F 1 23 23 44 51 23 47 18 J1642+3948 14 26 36 62.4 68.4 -2.3 -90.6 76 1 1 23 23 47 18 23 48 18 --- 14 27 36 62.6 68.4 -2.3 -90.7 60 F 1 25 23 47 36 23 50 19 J1740+5211 14 29 37 51.8 47.2 -3.2 -98.6 93 1 1 25 23 50 19 23 51 18 --- 14 30 37 51.9 47.2 -3.2 -98.9 60 F 1 27 23 50 37 23 53 51 J1229+0203 14 33 10 46.7 228.5 2.1 38.3 26 1 1 27 23 53 51 23 54 51 --- 14 34 10 46.6 228.8 2.1 38.5 60 F 1 29 23 54 09 23 56 52 J1824+5651 14 36 12 45.9 401.2 -3.8 -95.6 1 1 1 29 23 56 52 23 57 52 --- 14 37 12 46.0 401.2 -3.8 -95.9 60 F 1 31 23 57 10 Schedule for VLBA_PT (Code Pt ) Page 3 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Start: Sun 19 Aug 2007 Day 231 -- Stop: Mon 20 Aug 2007 Day 232 --- 23 59 12 J2202+4216 14 38 32 9.2 404.3 -7.4 -51.3 0 1 1 31 23 59 12 00 00 12 --- 14 39 32 9.3 404.4 -7.4 -51.5 60 F 1 33 23 59 30 00 01 52 J1642+6856 14 41 12 51.5 376.9 -2.0 -138.1 10 1 1 33 00 01 52 00 02 52 --- 14 42 12 51.5 376.8 -2.0 -138.4 60 F 1 35 00 02 10 00 04 58 J1337-1257 14 44 19 40.2 201.3 1.1 17.9 3 1 1 35 00 04 58 00 05 58 --- 14 45 19 40.1 201.6 1.1 18.2 60 F 1 37 00 05 16 00 07 16 J1733-1304 14 46 37 28.2 132.6 -2.8 -38.6 26 1 1 37 00 07 16 00 08 16 --- 14 47 37 28.4 132.9 -2.8 -38.4 60 F 1 39 00 07 34 00 09 43 J1058+0133 14 49 04 27.3 251.6 3.8 51.6 2 1 1 39 00 09 43 00 10 42 --- 14 50 04 27.1 251.8 3.9 51.7 60 F 1 41 00 10 01 00 11 34 J1256-0547 14 50 56 41.6 219.6 1.9 31.9 16 1 1 41 00 11 34 00 12 34 --- 14 51 56 41.5 219.8 1.9 32.1 60 F 1 42 00 11 52 00 12 34 VX_SGR 14 51 56 16.7 133.0 -3.3 -40.7 -64 1 1 42 Stopped 00 14 33 --- 14 53 56 17.0 133.4 -3.2 -40.4 56 S 1 46 00 14 33 VX_SGR 14 53 56 17.0 133.4 -3.2 -40.4 -4 1 1 46 Stopped 00 16 33 --- 14 55 56 17.3 133.8 -3.2 -40.1 116 S 1 50 00 16 33 VX_SGR 14 55 56 17.3 133.8 -3.2 -40.1 -4 1 1 50 00 16 33 00 17 33 --- 14 56 56 17.4 133.9 -3.2 -40.0 56 F 1 52 00 16 51 00 17 33 J1733-1304 14 56 56 29.8 134.9 -2.6 -36.9 -31 1 1 52 00 17 33 00 18 33 --- 14 57 56 29.9 135.1 -2.6 -36.8 29 F 1 54 00 17 33 00 18 33 VX_SGR 14 57 56 17.6 134.1 -3.2 -39.8 -31 1 1 54 00 18 33 00 19 33 --- 14 58 56 17.7 134.3 -3.2 -39.7 29 F 1 56 00 18 33 00 19 33 J1733-1304 14 58 56 30.1 135.4 -2.6 -36.6 -31 1 1 56 00 19 33 00 20 32 --- 14 59 56 30.2 135.6 -2.6 -36.4 29 F 1 58 00 19 33 00 20 32 VX_SGR 14 59 56 17.9 134.5 -3.1 -39.5 -31 1 1 58 00 20 32 00 21 32 --- 15 00 56 18.0 134.7 -3.1 -39.4 29 F 1 60 00 20 32 00 21 32 J1733-1304 15 00 56 30.3 135.8 -2.5 -36.2 -31 1 1 60 00 21 32 00 22 32 --- 15 01 56 30.5 136.0 -2.5 -36.1 29 F 1 62 00 21 32 Schedule for VLBA_PT (Code Pt ) Page 4 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 00 22 32 VX_SGR 15 01 56 18.2 134.9 -3.1 -39.2 -31 1 1 62 00 22 32 00 23 32 --- 15 02 56 18.3 135.1 -3.1 -39.1 29 F 1 64 00 22 32 00 23 32 J1733-1304 15 02 56 30.6 136.3 -2.5 -35.9 -31 1 1 64 00 23 32 00 24 32 --- 15 03 56 30.8 136.5 -2.5 -35.7 29 F 1 66 00 23 32 00 24 32 VX_SGR 15 03 56 18.5 135.3 -3.1 -38.9 -31 1 1 66 00 24 32 00 25 32 --- 15 04 56 18.6 135.5 -3.1 -38.8 29 F 1 68 00 24 32 00 25 32 J1733-1304 15 04 56 30.9 136.7 -2.5 -35.5 -31 1 1 68 00 25 32 00 26 31 --- 15 05 56 31.1 137.0 -2.5 -35.4 29 F 1 69 00 25 32 00 26 31 VX_SGR 15 05 56 18.7 135.6 -3.0 -38.6 -31 1 1 69 00 26 31 00 27 31 --- 15 06 56 18.9 135.8 -3.0 -38.4 29 F 1 71 00 26 31 00 27 31 J1733-1304 15 06 56 31.2 137.2 -2.4 -35.2 -31 1 1 71 00 27 31 00 28 31 --- 15 07 56 31.3 137.4 -2.4 -35.0 29 F 1 73 00 27 31 00 28 31 VX_SGR 15 07 56 19.0 136.0 -3.0 -38.3 -31 1 1 73 00 28 31 00 29 31 --- 15 08 56 19.2 136.2 -3.0 -38.1 29 F 1 75 00 28 31 00 29 31 J1733-1304 15 08 56 31.5 137.7 -2.4 -34.8 -31 1 1 75 00 29 31 00 30 31 --- 15 09 56 31.6 137.9 -2.4 -34.7 29 F 1 77 00 29 31 00 30 31 VX_SGR 15 09 56 19.3 136.4 -3.0 -38.0 -31 1 1 77 00 30 31 00 31 31 --- 15 10 56 19.5 136.6 -3.0 -37.8 29 F 1 79 00 30 31 00 31 31 J1733-1304 15 10 56 31.8 138.1 -2.4 -34.5 -31 1 1 79 00 31 31 00 32 30 --- 15 11 56 31.9 138.4 -2.4 -34.3 29 F 1 81 00 31 31 00 32 30 VX_SGR 15 11 56 19.6 136.8 -2.9 -37.7 -31 1 1 81 00 32 30 00 33 30 --- 15 12 56 19.7 137.0 -2.9 -37.5 29 F 1 83 00 32 30 00 33 30 J1733-1304 15 12 56 32.0 138.6 -2.3 -34.1 -31 1 1 83 00 33 30 00 34 30 --- 15 13 56 32.2 138.8 -2.3 -33.9 29 F 1 85 00 33 30 00 34 30 VX_SGR 15 13 56 19.9 137.2 -2.9 -37.3 -31 1 1 85 00 34 30 00 35 30 --- 15 14 56 20.0 137.4 -2.9 -37.2 29 F 1 87 00 34 30 00 35 30 J1733-1304 15 14 56 32.3 139.1 -2.3 -33.7 -31 1 1 87 00 35 30 00 36 30 --- 15 15 56 32.4 139.3 -2.3 -33.6 29 F 1 89 00 35 30 Schedule for VLBA_PT (Code Pt ) Page 5 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 00 36 30 VX_SGR 15 15 56 20.2 137.6 -2.9 -37.0 -31 1 1 89 00 36 30 00 37 30 --- 15 16 56 20.3 137.8 -2.9 -36.8 29 F 1 91 00 36 30 00 37 30 J1733-1304 15 16 56 32.6 139.6 -2.3 -33.4 -31 1 1 91 00 37 30 00 38 29 --- 15 17 56 32.7 139.8 -2.3 -33.2 29 F 1 93 00 37 30 00 38 29 VX_SGR 15 17 56 20.4 138.0 -2.8 -36.7 -31 1 1 93 00 38 29 00 39 29 --- 15 18 56 20.6 138.2 -2.8 -36.5 29 F 1 95 00 38 29 00 39 29 J1733-1304 15 18 56 32.8 140.0 -2.2 -33.0 -31 1 1 95 00 39 29 00 40 29 --- 15 19 56 33.0 140.3 -2.2 -32.8 29 F 1 97 00 39 29 00 40 29 VX_SGR 15 19 56 20.7 138.4 -2.8 -36.4 -31 1 1 97 00 40 29 00 41 29 --- 15 20 56 20.9 138.6 -2.8 -36.2 29 F 1 98 00 40 29 00 41 29 J1733-1304 15 20 56 33.1 140.5 -2.2 -32.6 -30 1 1 98 00 41 29 00 42 29 --- 15 21 56 33.2 140.8 -2.2 -32.4 29 F 1 100 00 41 29 00 42 29 VX_SGR 15 21 56 21.0 138.8 -2.8 -36.0 -30 1 1 100 00 42 29 00 43 29 --- 15 22 56 21.1 139.0 -2.8 -35.9 29 F 1 102 00 42 29 00 43 29 J1733-1304 15 22 56 33.4 141.0 -2.2 -32.2 -30 1 1 102 00 43 29 00 44 29 --- 15 23 56 33.5 141.3 -2.2 -32.0 29 F 1 104 00 43 29 00 44 29 VX_SGR 15 23 56 21.3 139.2 -2.7 -35.7 -30 1 1 104 00 44 29 00 45 28 --- 15 24 56 21.4 139.4 -2.7 -35.5 29 F 1 106 00 44 29 00 45 28 J1733-1304 15 24 56 33.6 141.5 -2.1 -31.9 -30 1 1 106 00 45 28 00 46 28 --- 15 25 56 33.8 141.8 -2.1 -31.7 29 F 1 108 00 45 28 00 46 28 VX_SGR 15 25 56 21.5 139.6 -2.7 -35.3 -30 1 1 108 00 46 28 00 47 28 --- 15 26 56 21.7 139.8 -2.7 -35.2 29 F 1 110 00 46 28 00 47 28 J1733-1304 15 26 56 33.9 142.0 -2.1 -31.5 -30 1 1 110 00 47 28 00 48 28 --- 15 27 56 34.0 142.3 -2.1 -31.3 29 F 1 112 00 47 28 00 48 28 VX_SGR 15 27 56 21.8 140.0 -2.7 -35.0 -30 1 1 112 00 48 28 00 49 28 --- 15 28 56 21.9 140.2 -2.7 -34.8 29 F 1 114 00 48 28 00 49 28 J1733-1304 15 28 56 34.1 142.5 -2.1 -31.1 -30 1 1 114 00 49 28 00 50 28 --- 15 29 56 34.3 142.8 -2.1 -30.9 29 F 1 116 00 49 28 Schedule for VLBA_PT (Code Pt ) Page 6 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 00 50 28 VX_SGR 15 29 56 22.1 140.4 -2.6 -34.7 -30 1 1 116 00 50 28 00 51 27 --- 15 30 56 22.2 140.6 -2.6 -34.5 29 F 1 118 00 50 28 00 51 27 J1733-1304 15 30 56 34.4 143.0 -2.0 -30.7 -30 1 1 118 00 51 27 00 52 27 --- 15 31 56 34.5 143.3 -2.0 -30.5 29 F 1 120 00 51 27 00 52 27 VX_SGR 15 31 56 22.3 140.8 -2.6 -34.3 -30 1 1 120 00 52 27 00 53 27 --- 15 32 56 22.5 141.0 -2.6 -34.2 29 F 1 122 00 52 27 00 53 27 VX_SGR 15 32 56 22.5 141.0 -2.6 -34.2 -4 1 1 122 Stopped 00 55 27 --- 15 34 56 22.7 141.4 -2.6 -33.8 116 S 1 125 00 55 27 VX_SGR 15 34 56 22.7 141.4 -2.6 -33.8 -4 1 1 125 Stopped 00 57 26 --- 15 36 56 23.0 141.9 -2.5 -33.5 116 S 1 129 00 57 26 VX_SGR 15 36 56 23.0 141.9 -2.5 -33.5 -4 1 1 129 00 57 26 00 59 26 --- 15 38 56 23.2 142.3 -2.5 -33.1 116 F 1 133 00 57 44 00 59 26 VX_SGR 15 38 56 23.2 142.3 -2.5 -33.1 -4 1 1 133 00 59 26 00 59 56 --- 15 39 26 23.3 142.4 -2.5 -33.0 26 F 1 134 00 59 26 00 59 56 J1808-2124 15 39 26 24.0 141.9 -2.5 -33.2 -7 1 1 134 00 59 56 01 00 16 --- 15 39 46 24.0 142.0 -2.5 -33.1 13 F 1 135 00 59 56 01 00 16 VX_SGR 15 39 46 23.3 142.4 -2.5 -32.9 -7 1 1 135 01 00 16 01 00 46 --- 15 40 16 23.4 142.6 -2.5 -32.9 23 F 1 136 01 00 16 01 00 46 J1811-2055 15 40 16 24.1 141.1 -2.5 -33.7 -7 1 1 136 01 00 46 01 01 06 --- 15 40 36 24.1 141.2 -2.5 -33.7 13 F 1 136 01 00 46 01 01 06 VX_SGR 15 40 36 23.4 142.6 -2.5 -32.8 -7 1 1 136 01 01 06 01 01 36 --- 15 41 06 23.5 142.7 -2.5 -32.7 23 F 1 137 01 01 06 01 01 36 J1807-2506 15 41 06 21.1 144.5 -2.5 -32.0 -11 1 1 137 01 01 36 01 02 01 --- 15 41 31 21.2 144.6 -2.4 -31.9 14 F 1 138 01 01 36 01 02 01 VX_SGR 15 41 31 23.5 142.8 -2.5 -32.6 -11 1 1 138 01 02 01 01 02 31 --- 15 42 01 23.6 142.9 -2.4 -32.5 19 F 1 139 01 02 01 01 02 31 J1808-2124 15 42 01 24.3 142.4 -2.4 -32.7 -7 1 1 139 01 02 31 01 02 50 --- 15 42 21 24.3 142.5 -2.4 -32.7 13 F 1 140 01 02 31 Schedule for VLBA_PT (Code Pt ) Page 7 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 02 50 VX_SGR 15 42 21 23.7 143.0 -2.4 -32.5 -7 1 1 140 01 02 50 01 03 20 --- 15 42 51 23.7 143.1 -2.4 -32.4 23 F 1 141 01 02 50 01 03 20 J1811-2055 15 42 51 24.4 141.7 -2.5 -33.3 -7 1 1 141 01 03 20 01 03 40 --- 15 43 11 24.5 141.7 -2.5 -33.2 13 F 1 141 01 03 20 01 03 40 VX_SGR 15 43 11 23.8 143.2 -2.4 -32.3 -7 1 1 141 01 03 40 01 04 10 --- 15 43 41 23.8 143.3 -2.4 -32.2 23 F 1 142 01 03 40 01 04 10 J1807-2506 15 43 41 21.4 145.0 -2.4 -31.5 -11 1 1 142 01 04 10 01 04 35 --- 15 44 06 21.5 145.1 -2.4 -31.5 14 F 1 143 01 04 10 01 04 35 VX_SGR 15 44 06 23.9 143.4 -2.4 -32.2 -11 1 1 143 01 04 35 01 05 05 --- 15 44 36 23.9 143.5 -2.4 -32.1 19 F 1 144 01 04 35 01 05 05 J1808-2124 15 44 36 24.6 143.0 -2.4 -32.3 -7 1 1 144 01 05 05 01 05 25 --- 15 44 56 24.7 143.1 -2.4 -32.2 13 F 1 145 01 05 05 01 05 25 VX_SGR 15 44 56 24.0 143.6 -2.4 -32.0 -7 1 1 145 01 05 25 01 05 55 --- 15 45 26 24.0 143.7 -2.4 -31.9 23 F 1 146 01 05 25 01 05 55 J1811-2055 15 45 26 24.8 142.2 -2.4 -32.8 -7 1 1 146 01 05 55 01 06 15 --- 15 45 46 24.8 142.3 -2.4 -32.7 13 F 1 146 01 05 55 01 06 15 VX_SGR 15 45 46 24.1 143.7 -2.4 -31.9 -7 1 1 146 01 06 15 01 06 45 --- 15 46 16 24.1 143.8 -2.4 -31.8 23 F 1 147 01 06 15 01 06 45 J1807-2506 15 46 16 21.7 145.5 -2.4 -31.1 -11 1 1 147 01 06 45 01 07 10 --- 15 46 41 21.8 145.6 -2.4 -31.0 14 F 1 148 01 06 45 01 07 10 VX_SGR 15 46 41 24.2 143.9 -2.4 -31.7 -11 1 1 148 01 07 10 01 07 40 --- 15 47 11 24.2 144.0 -2.4 -31.6 19 F 1 149 01 07 10 01 07 40 J1808-2124 15 47 11 24.9 143.6 -2.4 -31.8 -7 1 1 149 01 07 40 01 08 00 --- 15 47 31 25.0 143.6 -2.4 -31.7 13 F 1 150 01 07 40 01 08 00 VX_SGR 15 47 31 24.3 144.1 -2.4 -31.5 -7 1 1 150 01 08 00 01 08 30 --- 15 48 01 24.3 144.2 -2.3 -31.5 23 F 1 151 01 08 00 01 08 30 J1811-2055 15 48 01 25.1 142.8 -2.4 -32.3 -7 1 1 151 01 08 30 01 08 50 --- 15 48 21 25.1 142.9 -2.4 -32.3 13 F 1 151 01 08 30 Schedule for VLBA_PT (Code Pt ) Page 8 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 08 50 VX_SGR 15 48 21 24.4 144.3 -2.3 -31.4 -7 1 1 151 01 08 50 01 09 19 --- 15 48 51 24.4 144.4 -2.3 -31.3 22 F 1 152 01 08 50 01 09 19 J1807-2506 15 48 51 22.0 146.1 -2.3 -30.6 -11 1 1 152 01 09 19 01 09 44 --- 15 49 16 22.1 146.2 -2.3 -30.5 14 F 1 153 01 09 19 01 09 44 VX_SGR 15 49 16 24.5 144.5 -2.3 -31.2 -11 1 1 153 01 09 44 01 10 14 --- 15 49 46 24.6 144.6 -2.3 -31.1 19 F 1 154 01 09 44 01 10 14 J1808-2124 15 49 46 25.2 144.1 -2.3 -31.3 -7 1 1 154 01 10 14 01 10 34 --- 15 50 06 25.3 144.2 -2.3 -31.3 13 F 1 155 01 10 14 01 10 34 VX_SGR 15 50 06 24.6 144.7 -2.3 -31.1 -7 1 1 155 01 10 34 01 11 04 --- 15 50 36 24.7 144.8 -2.3 -31.0 23 F 1 156 01 10 34 01 11 04 J1811-2055 15 50 36 25.4 143.4 -2.3 -31.9 -7 1 1 156 01 11 04 01 11 24 --- 15 50 56 25.4 143.4 -2.3 -31.8 12 F 1 156 01 11 04 01 11 24 VX_SGR 15 50 56 24.7 144.9 -2.3 -30.9 -7 1 1 156 01 11 24 01 11 54 --- 15 51 26 24.8 145.0 -2.3 -30.8 22 F 1 157 01 11 24 01 11 54 J1807-2506 15 51 26 22.3 146.6 -2.3 -30.1 -11 1 1 157 01 11 54 01 12 19 --- 15 51 51 22.4 146.7 -2.3 -30.0 14 F 1 158 01 11 54 01 12 19 VX_SGR 15 51 51 24.8 145.1 -2.3 -30.7 -11 1 1 158 01 12 19 01 12 49 --- 15 52 21 24.9 145.2 -2.3 -30.7 19 F 1 159 01 12 19 01 12 49 J1808-2124 15 52 21 25.6 144.7 -2.3 -30.9 -7 1 1 159 01 12 49 01 13 09 --- 15 52 41 25.6 144.8 -2.3 -30.8 13 F 1 160 01 12 49 01 13 09 VX_SGR 15 52 41 24.9 145.2 -2.3 -30.6 -7 1 1 160 01 13 09 01 13 39 --- 15 53 11 25.0 145.3 -2.3 -30.5 23 F 1 161 01 13 09 01 13 39 J1811-2055 15 53 11 25.7 143.9 -2.3 -31.4 -7 1 1 161 01 13 39 01 13 59 --- 15 53 31 25.8 144.0 -2.3 -31.3 12 F 1 161 01 13 39 01 13 59 VX_SGR 15 53 31 25.0 145.4 -2.3 -30.4 -7 1 1 161 01 13 59 01 14 29 --- 15 54 01 25.1 145.5 -2.2 -30.3 22 F 1 162 01 13 59 01 14 29 J1807-2506 15 54 01 22.6 147.2 -2.2 -29.6 -11 1 1 162 01 14 29 01 14 54 --- 15 54 26 22.7 147.3 -2.2 -29.6 14 F 1 163 01 14 29 Schedule for VLBA_PT (Code Pt ) Page 9 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 14 54 VX_SGR 15 54 26 25.1 145.6 -2.2 -30.3 -11 1 1 163 01 14 54 01 15 23 --- 15 54 56 25.2 145.7 -2.2 -30.2 19 F 1 164 01 14 54 01 15 23 J1808-2124 15 54 56 25.9 145.3 -2.2 -30.4 -7 1 1 164 01 15 23 01 15 43 --- 15 55 16 25.9 145.3 -2.2 -30.3 13 F 1 165 01 15 23 01 15 43 VX_SGR 15 55 16 25.2 145.8 -2.2 -30.1 -7 1 1 165 01 15 43 01 16 13 --- 15 55 46 25.3 145.9 -2.2 -30.0 23 F 1 166 01 15 43 01 16 13 J1811-2055 15 55 46 26.0 144.5 -2.3 -30.9 -8 1 1 166 01 16 13 01 16 33 --- 15 56 06 26.1 144.6 -2.3 -30.8 12 F 1 166 01 16 13 01 16 33 VX_SGR 15 56 06 25.3 146.0 -2.2 -29.9 -8 1 1 166 01 16 33 01 17 03 --- 15 56 36 25.4 146.1 -2.2 -29.9 22 F 1 167 01 16 33 01 17 03 J1807-2506 15 56 36 22.9 147.7 -2.2 -29.1 -11 1 1 167 01 17 03 01 17 28 --- 15 57 01 22.9 147.8 -2.2 -29.1 14 F 1 168 01 17 03 01 17 28 VX_SGR 15 57 01 25.4 146.2 -2.2 -29.8 -11 1 1 168 01 17 28 01 17 58 --- 15 57 31 25.5 146.3 -2.2 -29.7 19 F 1 169 01 17 28 01 17 58 J1808-2124 15 57 31 26.2 145.8 -2.2 -29.9 -7 1 1 169 01 17 58 01 18 18 --- 15 57 51 26.2 145.9 -2.2 -29.8 13 F 1 170 01 17 58 01 18 18 VX_SGR 15 57 51 25.5 146.4 -2.2 -29.6 -7 1 1 170 01 18 18 01 18 48 --- 15 58 21 25.6 146.5 -2.2 -29.5 23 F 1 171 01 18 18 01 18 48 J1811-2055 15 58 21 26.3 145.1 -2.2 -30.4 -8 1 1 171 01 18 48 01 19 08 --- 15 58 41 26.4 145.2 -2.2 -30.3 12 F 1 171 01 18 48 01 19 08 VX_SGR 15 58 41 25.6 146.6 -2.2 -29.5 -8 1 1 171 01 19 08 01 19 38 --- 15 59 11 25.7 146.7 -2.2 -29.4 22 F 1 172 01 19 08 01 19 38 J1807-2506 15 59 11 23.2 148.3 -2.1 -28.7 -11 1 1 172 01 19 38 01 20 03 --- 15 59 36 23.2 148.4 -2.1 -28.6 14 F 1 173 01 19 38 01 20 03 VX_SGR 15 59 36 25.7 146.8 -2.1 -29.3 -11 1 1 173 01 20 03 01 20 33 --- 16 00 06 25.8 146.9 -2.1 -29.2 19 F 1 174 01 20 03 01 20 33 J1808-2124 16 00 06 26.5 146.4 -2.1 -29.4 -7 1 1 174 01 20 33 01 20 53 --- 16 00 26 26.5 146.5 -2.1 -29.3 13 F 1 175 01 20 33 Schedule for VLBA_PT (Code Pt ) Page 10 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 20 53 VX_SGR 16 00 26 25.8 147.0 -2.1 -29.1 -7 1 1 175 01 20 53 01 21 22 --- 16 00 56 25.9 147.1 -2.1 -29.0 23 F 1 176 01 20 53 01 21 22 J1811-2055 16 00 56 26.6 145.7 -2.2 -29.9 -8 1 1 176 01 21 22 01 21 42 --- 16 01 16 26.7 145.7 -2.2 -29.9 12 F 1 176 01 21 22 01 21 42 VX_SGR 16 01 16 25.9 147.1 -2.1 -29.0 -8 1 1 176 01 21 42 01 22 12 --- 16 01 46 25.9 147.3 -2.1 -28.9 22 F 1 177 01 21 42 01 22 12 J1807-2506 16 01 46 23.5 148.9 -2.1 -28.2 -11 1 1 177 01 22 12 01 22 37 --- 16 02 11 23.5 148.9 -2.1 -28.1 14 F 1 178 01 22 12 01 22 37 VX_SGR 16 02 11 26.0 147.3 -2.1 -28.8 -11 1 1 178 01 22 37 01 23 07 --- 16 02 41 26.0 147.5 -2.1 -28.7 19 F 1 179 01 22 37 01 23 07 J1808-2124 16 02 41 26.8 147.0 -2.1 -28.9 -7 1 1 179 01 23 07 01 23 27 --- 16 03 01 26.8 147.1 -2.1 -28.8 13 F 1 180 01 23 07 01 23 27 VX_SGR 16 03 01 26.1 147.5 -2.1 -28.6 -7 1 1 180 01 23 27 01 23 57 --- 16 03 31 26.1 147.7 -2.1 -28.5 23 F 1 181 01 23 27 01 23 57 J1811-2055 16 03 31 26.9 146.3 -2.1 -29.4 -8 1 1 181 01 23 57 01 24 17 --- 16 03 51 27.0 146.3 -2.1 -29.4 12 F 1 181 01 23 57 01 24 17 VX_SGR 16 03 51 26.2 147.7 -2.1 -28.5 -8 1 1 181 01 24 17 01 24 47 --- 16 04 21 26.2 147.8 -2.1 -28.4 22 F 1 182 01 24 17 01 24 47 J1807-2506 16 04 21 23.7 149.4 -2.1 -27.7 -11 1 1 182 01 24 47 01 25 12 --- 16 04 46 23.8 149.5 -2.1 -27.6 14 F 1 183 01 24 47 01 25 12 VX_SGR 16 04 46 26.3 147.9 -2.1 -28.3 -11 1 1 183 01 25 12 01 25 42 --- 16 05 16 26.3 148.0 -2.1 -28.2 19 F 1 184 01 25 12 01 25 42 J1808-2124 16 05 16 27.0 147.6 -2.1 -28.4 -7 1 1 184 01 25 42 01 26 02 --- 16 05 36 27.1 147.7 -2.0 -28.3 13 F 1 185 01 25 42 01 26 02 VX_SGR 16 05 36 26.4 148.1 -2.0 -28.1 -7 1 1 185 01 26 02 01 26 32 --- 16 06 06 26.4 148.2 -2.0 -28.0 23 F 1 186 01 26 02 01 26 32 J1811-2055 16 06 06 27.2 146.8 -2.1 -28.9 -8 1 1 186 01 26 32 01 26 52 --- 16 06 26 27.3 146.9 -2.1 -28.9 12 F 1 186 01 26 32 Schedule for VLBA_PT (Code Pt ) Page 11 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 26 52 VX_SGR 16 06 26 26.5 148.3 -2.0 -28.0 -8 1 1 186 01 26 52 01 27 21 --- 16 06 56 26.5 148.4 -2.0 -27.9 22 F 1 187 01 26 52 01 27 21 J1807-2506 16 06 56 24.0 150.0 -2.0 -27.2 -11 1 1 187 01 27 21 01 27 46 --- 16 07 21 24.0 150.1 -2.0 -27.1 14 F 1 188 01 27 21 01 27 46 VX_SGR 16 07 21 26.6 148.5 -2.0 -27.8 -11 1 1 188 01 27 46 01 28 16 --- 16 07 51 26.6 148.6 -2.0 -27.7 19 F 1 189 01 27 46 01 28 16 J1808-2124 16 07 51 27.3 148.2 -2.0 -27.9 -7 1 1 189 01 28 16 01 28 36 --- 16 08 11 27.4 148.3 -2.0 -27.8 13 F 1 190 01 28 16 01 28 36 VX_SGR 16 08 11 26.6 148.7 -2.0 -27.6 -7 1 1 190 01 28 36 01 29 06 --- 16 08 41 26.7 148.8 -2.0 -27.5 23 F 1 191 01 28 36 01 29 06 J1811-2055 16 08 41 27.5 147.4 -2.0 -28.4 -8 1 1 191 01 29 06 01 29 26 --- 16 09 01 27.6 147.5 -2.0 -28.4 12 F 1 191 01 29 06 01 29 26 VX_SGR 16 09 01 26.7 148.9 -2.0 -27.4 -8 1 1 191 01 29 26 01 29 56 --- 16 09 31 26.8 149.0 -2.0 -27.3 22 F 1 192 01 29 26 01 29 56 J1807-2506 16 09 31 24.3 150.6 -2.0 -26.6 -11 1 1 192 01 29 56 01 30 21 --- 16 09 56 24.3 150.6 -2.0 -26.6 14 F 1 193 01 29 56 01 30 21 VX_SGR 16 09 56 26.8 149.1 -2.0 -27.3 -11 1 1 193 01 30 21 01 30 51 --- 16 10 26 26.9 149.2 -2.0 -27.2 19 F 1 194 01 30 21 01 30 51 J1808-2124 16 10 26 27.6 148.8 -2.0 -27.4 -7 1 1 194 01 30 51 01 31 11 --- 16 10 46 27.6 148.9 -2.0 -27.3 13 F 1 195 01 30 51 01 31 11 VX_SGR 16 10 46 26.9 149.3 -2.0 -27.1 -7 1 1 195 01 31 11 01 31 41 --- 16 11 16 27.0 149.4 -2.0 -27.0 23 F 1 196 01 31 11 01 31 41 J1811-2055 16 11 16 27.8 148.0 -2.0 -27.9 -8 1 1 196 01 31 41 01 32 01 --- 16 11 36 27.8 148.1 -2.0 -27.8 12 F 1 196 01 31 41 01 32 01 VX_SGR 16 11 36 27.0 149.5 -1.9 -26.9 -8 1 1 196 01 32 01 01 32 31 --- 16 12 06 27.1 149.6 -1.9 -26.8 22 F 1 197 01 32 01 01 32 31 J1807-2506 16 12 06 24.5 151.1 -1.9 -26.1 -11 1 1 197 01 32 31 01 32 56 --- 16 12 31 24.6 151.2 -1.9 -26.0 14 F 1 198 01 32 31 Schedule for VLBA_PT (Code Pt ) Page 12 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 32 56 VX_SGR 16 12 31 27.1 149.7 -1.9 -26.7 -11 1 1 198 01 32 56 01 33 25 --- 16 13 01 27.2 149.8 -1.9 -26.6 19 F 1 199 01 32 56 01 33 25 J1808-2124 16 13 01 27.9 149.4 -1.9 -26.8 -7 1 1 199 01 33 25 01 33 45 --- 16 13 21 27.9 149.5 -1.9 -26.8 13 F 1 200 01 33 25 01 33 45 VX_SGR 16 13 21 27.2 149.9 -1.9 -26.6 -7 1 1 200 01 33 45 01 34 15 --- 16 13 51 27.2 150.0 -1.9 -26.5 23 F 1 201 01 33 45 01 34 15 J1811-2055 16 13 51 28.1 148.6 -2.0 -27.4 -8 1 1 201 01 34 15 01 34 35 --- 16 14 11 28.1 148.7 -2.0 -27.3 12 F 1 201 01 34 15 01 34 35 VX_SGR 16 14 11 27.3 150.1 -1.9 -26.4 -8 1 1 201 01 34 35 01 35 05 --- 16 14 41 27.3 150.2 -1.9 -26.3 22 F 1 202 01 34 35 01 35 05 J1807-2506 16 14 41 24.8 151.7 -1.9 -25.6 -11 1 1 202 01 35 05 01 35 30 --- 16 15 06 24.8 151.8 -1.9 -25.5 14 F 1 203 01 35 05 01 35 30 VX_SGR 16 15 06 27.4 150.3 -1.9 -26.2 -11 1 1 203 Stopped 01 37 30 --- 16 17 06 27.6 150.8 -1.9 -25.8 109 S 1 207 01 37 30 VX_SGR 16 17 06 27.6 150.8 -1.9 -25.8 -4 1 1 207 Stopped 01 39 29 --- 16 19 06 27.8 151.3 -1.8 -25.4 116 S 1 211 01 39 29 VX_SGR 16 19 06 27.8 151.3 -1.8 -25.4 -4 1 1 211 01 39 29 01 40 29 --- 16 20 06 27.9 151.5 -1.8 -25.2 56 F 1 213 01 39 47 01 40 29 J1733-1304 16 20 06 39.5 156.6 -1.2 -19.7 -29 1 1 213 01 40 29 01 41 29 --- 16 21 06 39.6 156.9 -1.2 -19.5 31 F 1 215 01 40 29 01 41 29 VX_SGR 16 21 06 28.0 151.7 -1.8 -25.0 -29 1 1 215 01 41 29 01 42 29 --- 16 22 06 28.1 152.0 -1.8 -24.8 31 F 1 216 01 41 29 01 42 29 J1733-1304 16 22 06 39.7 157.2 -1.2 -19.2 -29 1 1 216 01 42 29 01 43 29 --- 16 23 06 39.7 157.5 -1.2 -19.0 31 F 1 218 01 42 29 01 43 29 VX_SGR 16 23 06 28.2 152.2 -1.8 -24.6 -29 1 1 218 01 43 29 01 44 29 --- 16 24 06 28.3 152.4 -1.7 -24.4 31 F 1 220 01 43 29 01 44 29 J1733-1304 16 24 06 39.8 157.8 -1.2 -18.7 -29 1 1 220 01 44 29 01 45 28 --- 16 25 06 39.9 158.1 -1.1 -18.5 31 F 1 222 01 44 29 Schedule for VLBA_PT (Code Pt ) Page 13 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 45 28 VX_SGR 16 25 06 28.4 152.7 -1.7 -24.2 -29 1 1 222 01 45 28 01 46 28 --- 16 26 06 28.5 152.9 -1.7 -24.0 31 F 1 224 01 45 28 01 46 28 J1733-1304 16 26 06 40.0 158.4 -1.1 -18.2 -29 1 1 224 01 46 28 01 47 28 --- 16 27 06 40.1 158.7 -1.1 -18.0 31 F 1 226 01 46 28 01 47 28 VX_SGR 16 27 06 28.5 153.2 -1.7 -23.8 -29 1 1 226 01 47 28 01 48 28 --- 16 28 06 28.6 153.4 -1.7 -23.5 31 F 1 228 01 47 28 01 48 28 J1733-1304 16 28 06 40.1 159.0 -1.1 -17.7 -29 1 1 228 01 48 28 01 49 28 --- 16 29 06 40.2 159.3 -1.1 -17.5 31 F 1 230 01 48 28 01 49 28 VX_SGR 16 29 06 28.7 153.6 -1.7 -23.3 -29 1 1 230 01 49 28 01 50 28 --- 16 30 06 28.8 153.9 -1.6 -23.1 31 F 1 232 01 49 28 01 50 28 J1733-1304 16 30 06 40.3 159.6 -1.1 -17.2 -29 1 1 232 01 50 28 01 51 28 --- 16 31 06 40.3 159.9 -1.0 -16.9 31 F 1 234 01 50 28 01 51 28 VX_SGR 16 31 06 28.9 154.1 -1.6 -22.9 -29 1 1 234 01 51 28 01 52 27 --- 16 32 06 29.0 154.4 -1.6 -22.7 31 F 1 236 01 51 28 01 52 27 J1733-1304 16 32 06 40.4 160.2 -1.0 -16.7 -29 1 1 236 01 52 27 01 53 27 --- 16 33 06 40.5 160.5 -1.0 -16.4 31 F 1 238 01 52 27 01 53 27 VX_SGR 16 33 06 29.1 154.6 -1.6 -22.5 -29 1 1 238 01 53 27 01 54 27 --- 16 34 06 29.2 154.9 -1.6 -22.3 31 F 1 240 01 53 27 01 54 27 J1733-1304 16 34 06 40.6 160.8 -1.0 -16.2 -29 1 1 240 01 54 27 01 55 27 --- 16 35 06 40.6 161.1 -1.0 -15.9 31 F 1 242 01 54 27 01 55 27 VX_SGR 16 35 06 29.3 155.1 -1.6 -22.1 -29 1 1 242 01 55 27 01 56 27 --- 16 36 06 29.4 155.4 -1.5 -21.8 31 F 1 244 01 55 27 01 56 27 J1733-1304 16 36 06 40.7 161.4 -1.0 -15.7 -29 1 1 244 01 56 27 01 57 27 --- 16 37 06 40.8 161.7 -0.9 -15.4 31 F 1 245 01 56 27 01 57 27 VX_SGR 16 37 06 29.4 155.6 -1.5 -21.6 -29 1 1 245 01 57 27 01 58 26 --- 16 38 06 29.5 155.9 -1.5 -21.4 31 F 1 247 01 57 27 01 58 26 J1733-1304 16 38 06 40.8 162.1 -0.9 -15.1 -29 1 1 247 01 58 26 01 59 26 --- 16 39 06 40.9 162.4 -0.9 -14.9 31 F 1 249 01 58 26 Schedule for VLBA_PT (Code Pt ) Page 14 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 59 26 VX_SGR 16 39 06 29.6 156.1 -1.5 -21.2 -29 1 1 249 01 59 26 02 00 26 --- 16 40 06 29.7 156.4 -1.5 -21.0 31 F 1 251 01 59 26 02 00 26 J1733-1304 16 40 06 40.9 162.7 -0.9 -14.6 -29 1 1 251 02 00 26 02 01 26 --- 16 41 06 41.0 163.0 -0.9 -14.4 31 F 1 253 02 00 26 02 01 26 VX_SGR 16 41 06 29.8 156.6 -1.5 -20.8 -28 1 1 253 02 01 26 02 02 26 --- 16 42 06 29.9 156.8 -1.4 -20.5 31 F 1 255 02 01 26 02 02 26 J1733-1304 16 42 06 41.1 163.3 -0.9 -14.1 -28 1 1 255 02 02 26 02 03 26 --- 16 43 06 41.1 163.6 -0.8 -13.8 31 F 1 257 02 02 26 02 03 26 VX_SGR 16 43 06 29.9 157.1 -1.4 -20.3 -28 1 1 257 02 03 26 02 04 25 --- 16 44 06 30.0 157.4 -1.4 -20.1 31 F 1 259 02 03 26 02 04 25 J1733-1304 16 44 06 41.2 163.9 -0.8 -13.6 -28 1 1 259 02 04 25 02 05 25 --- 16 45 06 41.2 164.2 -0.8 -13.3 32 F 1 261 02 04 25 02 05 25 VX_SGR 16 45 06 30.1 157.6 -1.4 -19.9 -28 1 1 261 02 05 25 02 06 25 --- 16 46 06 30.2 157.9 -1.4 -19.7 32 F 1 263 02 05 25 02 06 25 J1733-1304 16 46 06 41.3 164.6 -0.8 -13.0 -28 1 1 263 02 06 25 02 07 25 --- 16 47 06 41.3 164.9 -0.8 -12.8 32 F 1 265 02 06 25 02 07 25 VX_SGR 16 47 06 30.2 158.1 -1.4 -19.4 -28 1 1 265 02 07 25 02 08 25 --- 16 48 06 30.3 158.4 -1.3 -19.2 32 F 1 267 02 07 25 02 08 25 J1733-1304 16 48 06 41.4 165.2 -0.8 -12.5 -28 1 1 267 02 08 25 02 09 25 --- 16 49 06 41.5 165.5 -0.7 -12.2 32 F 1 269 02 08 25 02 09 25 VX_SGR 16 49 06 30.4 158.6 -1.3 -19.0 -28 1 1 269 02 09 25 02 10 24 --- 16 50 06 30.5 158.9 -1.3 -18.8 32 F 1 271 02 09 25 02 10 24 J1733-1304 16 50 06 41.5 165.8 -0.7 -12.0 -28 1 1 271 02 10 24 02 11 24 --- 16 51 06 41.6 166.1 -0.7 -11.7 32 F 1 272 02 10 24 02 11 24 VX_SGR 16 51 06 30.6 159.1 -1.3 -18.5 -28 1 1 272 02 11 24 02 12 24 --- 16 52 06 30.6 159.4 -1.3 -18.3 32 F 1 274 02 11 24 02 12 24 J1733-1304 16 52 06 41.6 166.5 -0.7 -11.4 -28 1 1 274 02 12 24 02 13 24 --- 16 53 06 41.6 166.8 -0.7 -11.2 32 F 1 276 02 12 24 Schedule for VLBA_PT (Code Pt ) Page 15 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 13 24 VX_SGR 16 53 06 30.7 159.6 -1.3 -18.1 -28 1 1 276 02 13 24 02 14 24 --- 16 54 06 30.8 159.9 -1.2 -17.9 32 F 1 278 02 13 24 02 14 24 J1733-1304 16 54 06 41.7 167.1 -0.7 -10.9 -28 1 1 278 02 14 24 02 15 24 --- 16 55 06 41.7 167.4 -0.6 -10.6 32 F 1 280 02 14 24 02 15 24 VX_SGR 16 55 06 30.8 160.1 -1.2 -17.6 -28 1 1 280 02 15 24 02 16 23 --- 16 56 06 30.9 160.4 -1.2 -17.4 32 F 1 282 02 15 24 02 16 23 J1733-1304 16 56 06 41.8 167.7 -0.6 -10.4 -28 1 1 282 02 16 23 02 17 23 --- 16 57 06 41.8 168.1 -0.6 -10.1 32 F 1 284 02 16 23 02 17 23 VX_SGR 16 57 06 31.0 160.7 -1.2 -17.2 -28 1 1 284 02 17 23 02 18 23 --- 16 58 06 31.0 160.9 -1.2 -17.0 32 F 1 286 02 17 23 02 18 23 J1733-1304 16 58 06 41.9 168.4 -0.6 -9.8 -28 1 1 286 02 18 23 02 19 23 --- 16 59 06 41.9 168.7 -0.6 -9.6 32 F 1 288 02 18 23 02 19 23 VX_SGR 16 59 06 31.1 161.2 -1.2 -16.7 -28 1 1 288 02 19 23 02 20 23 --- 17 00 06 31.2 161.4 -1.1 -16.5 32 F 1 290 02 19 23 02 20 23 J1733-1304 17 00 06 42.0 169.0 -0.6 -9.3 -28 1 1 290 02 20 23 02 21 23 --- 17 01 06 42.0 169.4 -0.5 -9.0 32 F 1 292 02 20 23 02 21 23 VX_SGR 17 01 06 31.2 161.7 -1.1 -16.3 -27 1 1 292 02 21 23 02 22 22 --- 17 02 06 31.3 162.0 -1.1 -16.0 32 F 1 294 02 21 23 02 22 22 VX_SGR 17 02 06 31.3 162.0 -1.1 -16.0 -4 1 1 294 Stopped 02 24 22 --- 17 04 06 31.4 162.5 -1.1 -15.6 116 S 1 298 02 24 22 VX_SGR 17 04 06 31.4 162.5 -1.1 -15.6 -4 1 1 298 Stopped 02 26 22 --- 17 06 06 31.6 163.0 -1.0 -15.1 116 S 1 301 02 26 22 VX_SGR 17 06 06 31.6 163.0 -1.0 -15.1 -4 1 1 301 02 26 22 02 28 21 --- 17 08 06 31.7 163.5 -1.0 -14.7 116 F 1 305 02 26 40 02 28 21 VX_SGR 17 08 06 31.7 163.5 -1.0 -14.7 -4 1 1 305 02 28 21 02 28 51 --- 17 08 36 31.7 163.7 -1.0 -14.5 26 F 1 306 02 28 21 02 28 51 J1808-2124 17 08 36 32.5 163.4 -1.0 -14.7 -8 1 1 306 02 28 51 02 29 11 --- 17 08 56 32.5 163.5 -1.0 -14.6 12 F 1 307 02 28 51 Schedule for VLBA_PT (Code Pt ) Page 16 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 29 11 VX_SGR 17 08 56 31.7 163.7 -1.0 -14.5 -8 1 1 307 02 29 11 02 29 41 --- 17 09 26 31.8 163.9 -1.0 -14.3 22 F 1 308 02 29 11 02 29 41 J1811-2055 17 09 26 32.8 162.7 -1.0 -15.3 -8 1 1 308 02 29 41 02 30 01 --- 17 09 46 32.9 162.8 -1.0 -15.2 12 F 1 308 02 29 41 02 30 01 VX_SGR 17 09 46 31.8 164.0 -1.0 -14.3 -8 1 1 308 02 30 01 02 30 31 --- 17 10 16 31.8 164.1 -1.0 -14.2 22 F 1 309 02 30 01 02 30 31 J1807-2506 17 10 16 29.0 165.0 -1.0 -13.7 -12 1 1 309 02 30 31 02 30 56 --- 17 10 41 29.0 165.1 -1.0 -13.6 13 F 1 310 02 30 31 02 30 56 VX_SGR 17 10 41 31.8 164.2 -1.0 -14.1 -12 1 1 310 02 30 56 02 31 26 --- 17 11 11 31.9 164.3 -1.0 -13.9 18 F 1 311 02 30 56 02 31 26 J1808-2124 17 11 11 32.6 164.1 -1.0 -14.1 -8 1 1 311 02 31 26 02 31 46 --- 17 11 31 32.7 164.2 -1.0 -14.0 12 F 1 312 02 31 26 02 31 46 VX_SGR 17 11 31 31.9 164.4 -1.0 -13.9 -8 1 1 312 02 31 46 02 32 16 --- 17 12 01 31.9 164.6 -0.9 -13.7 22 F 1 313 02 31 46 02 32 16 J1811-2055 17 12 01 33.0 163.4 -1.0 -14.7 -8 1 1 313 02 32 16 02 32 36 --- 17 12 21 33.0 163.5 -1.0 -14.6 12 F 1 313 02 32 16 02 32 36 VX_SGR 17 12 21 31.9 164.6 -0.9 -13.7 -8 1 1 313 02 32 36 02 33 06 --- 17 12 51 31.9 164.8 -0.9 -13.5 22 F 1 314 02 32 36 02 33 06 J1807-2506 17 12 51 29.2 165.6 -0.9 -13.1 -12 1 1 314 02 33 06 02 33 31 --- 17 13 16 29.2 165.8 -0.9 -13.0 13 F 1 315 02 33 06 02 33 31 VX_SGR 17 13 16 32.0 164.9 -0.9 -13.5 -12 1 1 315 02 33 31 02 34 01 --- 17 13 46 32.0 165.0 -0.9 -13.3 18 F 1 316 02 33 31 02 34 01 J1808-2124 17 13 46 32.8 164.8 -0.9 -13.5 -8 1 1 316 02 34 01 02 34 20 --- 17 14 06 32.8 164.9 -0.9 -13.4 12 F 1 317 02 34 01 02 34 20 VX_SGR 17 14 06 32.0 165.1 -0.9 -13.3 -8 1 1 317 02 34 20 02 34 50 --- 17 14 36 32.0 165.2 -0.9 -13.1 22 F 1 318 02 34 20 02 34 50 J1811-2055 17 14 36 33.1 164.1 -0.9 -14.1 -8 1 1 318 02 34 50 02 35 10 --- 17 14 56 33.2 164.2 -0.9 -14.0 12 F 1 318 02 34 50 Schedule for VLBA_PT (Code Pt ) Page 17 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 35 10 VX_SGR 17 14 56 32.1 165.3 -0.9 -13.1 -8 1 1 318 02 35 10 02 35 40 --- 17 15 26 32.1 165.5 -0.9 -12.9 22 F 1 319 02 35 10 02 35 40 J1807-2506 17 15 26 29.3 166.3 -0.9 -12.5 -12 1 1 319 02 35 40 02 36 05 --- 17 15 51 29.3 166.4 -0.9 -12.4 13 F 1 320 02 35 40 02 36 05 VX_SGR 17 15 51 32.1 165.6 -0.9 -12.8 -12 1 1 320 02 36 05 02 36 35 --- 17 16 21 32.1 165.7 -0.9 -12.7 18 F 1 321 02 36 05 02 36 35 J1808-2124 17 16 21 32.9 165.5 -0.9 -12.9 -8 1 1 321 02 36 35 02 36 55 --- 17 16 41 32.9 165.6 -0.9 -12.8 12 F 1 322 02 36 35 02 36 55 VX_SGR 17 16 41 32.1 165.8 -0.9 -12.6 -8 1 1 322 02 36 55 02 37 25 --- 17 17 11 32.2 165.9 -0.9 -12.5 22 F 1 323 02 36 55 02 37 25 J1811-2055 17 17 11 33.3 164.8 -0.9 -13.4 -8 1 1 323 02 37 25 02 37 45 --- 17 17 31 33.3 164.9 -0.9 -13.4 12 F 1 323 02 37 25 02 37 45 VX_SGR 17 17 31 32.2 166.0 -0.9 -12.4 -8 1 1 323 02 37 45 02 38 15 --- 17 18 01 32.2 166.2 -0.8 -12.3 22 F 1 324 02 37 45 02 38 15 J1807-2506 17 18 01 29.4 167.0 -0.8 -11.9 -12 1 1 324 02 38 15 02 38 40 --- 17 18 26 29.4 167.1 -0.8 -11.8 13 F 1 325 02 38 15 02 38 40 VX_SGR 17 18 26 32.2 166.3 -0.8 -12.2 -12 1 1 325 02 38 40 02 39 10 --- 17 18 56 32.3 166.4 -0.8 -12.1 18 F 1 326 02 38 40 02 39 10 J1808-2124 17 18 56 33.0 166.2 -0.8 -12.2 -8 1 1 326 02 39 10 02 39 30 --- 17 19 16 33.1 166.3 -0.8 -12.2 12 F 1 327 02 39 10 02 39 30 VX_SGR 17 19 16 32.3 166.5 -0.8 -12.0 -8 1 1 327 02 39 30 02 40 00 --- 17 19 46 32.3 166.6 -0.8 -11.9 22 F 1 328 02 39 30 02 40 00 J1811-2055 17 19 46 33.4 165.5 -0.9 -12.8 -8 1 1 328 02 40 00 02 40 19 --- 17 20 06 33.4 165.6 -0.9 -12.7 12 F 1 328 02 40 00 02 40 19 VX_SGR 17 20 06 32.3 166.7 -0.8 -11.8 -8 1 1 328 02 40 19 02 40 49 --- 17 20 36 32.3 166.8 -0.8 -11.7 22 F 1 329 02 40 19 02 40 49 J1807-2506 17 20 36 29.5 167.6 -0.8 -11.3 -12 1 1 329 02 40 49 02 41 14 --- 17 21 01 29.5 167.7 -0.8 -11.2 13 F 1 330 02 40 49 Schedule for VLBA_PT (Code Pt ) Page 18 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 41 14 VX_SGR 17 21 01 32.4 167.0 -0.8 -11.6 -12 1 1 330 02 41 14 02 41 44 --- 17 21 31 32.4 167.1 -0.8 -11.5 18 F 1 331 02 41 14 02 41 44 J1808-2124 17 21 31 33.2 166.9 -0.8 -11.6 -8 1 1 331 02 41 44 02 42 04 --- 17 21 51 33.2 167.0 -0.8 -11.5 12 F 1 332 02 41 44 02 42 04 VX_SGR 17 21 51 32.4 167.2 -0.8 -11.4 -8 1 1 332 02 42 04 02 42 34 --- 17 22 21 32.4 167.3 -0.8 -11.3 22 F 1 333 02 42 04 02 42 34 J1811-2055 17 22 21 33.6 166.2 -0.8 -12.2 -8 1 1 333 02 42 34 02 42 54 --- 17 22 41 33.6 166.3 -0.8 -12.1 12 F 1 333 02 42 34 02 42 54 VX_SGR 17 22 41 32.4 167.4 -0.8 -11.2 -8 1 1 333 02 42 54 02 43 24 --- 17 23 11 32.5 167.5 -0.8 -11.1 22 F 1 334 02 42 54 02 43 24 J1807-2506 17 23 11 29.6 168.3 -0.7 -10.7 -12 1 1 334 02 43 24 02 43 49 --- 17 23 36 29.7 168.4 -0.7 -10.6 13 F 1 335 02 43 24 02 43 49 VX_SGR 17 23 36 32.5 167.7 -0.7 -11.0 -12 1 1 335 02 43 49 02 44 19 --- 17 24 06 32.5 167.8 -0.7 -10.9 18 F 1 336 02 43 49 02 44 19 J1808-2124 17 24 06 33.3 167.6 -0.7 -11.0 -8 1 1 336 02 44 19 02 44 39 --- 17 24 26 33.3 167.7 -0.7 -10.9 12 F 1 337 02 44 19 02 44 39 VX_SGR 17 24 26 32.5 167.9 -0.7 -10.8 -8 1 1 337 02 44 39 02 45 09 --- 17 24 56 32.5 168.0 -0.7 -10.7 22 F 1 338 02 44 39 02 45 09 J1811-2055 17 24 56 33.7 166.9 -0.8 -11.6 -8 1 1 338 02 45 09 02 45 29 --- 17 25 16 33.7 167.0 -0.8 -11.5 12 F 1 338 02 45 09 02 45 29 VX_SGR 17 25 16 32.5 168.1 -0.7 -10.6 -8 1 1 338 02 45 29 02 45 59 --- 17 25 46 32.6 168.2 -0.7 -10.5 22 F 1 339 02 45 29 02 45 59 J1807-2506 17 25 46 29.7 168.9 -0.7 -10.1 -12 1 1 339 02 45 59 02 46 23 --- 17 26 11 29.8 169.0 -0.7 -10.0 13 F 1 340 02 45 59 02 46 23 VX_SGR 17 26 11 32.6 168.3 -0.7 -10.4 -12 1 1 340 02 46 23 02 46 53 --- 17 26 41 32.6 168.5 -0.7 -10.3 18 F 1 341 02 46 23 02 46 53 J1808-2124 17 26 41 33.4 168.3 -0.7 -10.4 -8 1 1 341 02 46 53 02 47 13 --- 17 27 01 33.4 168.4 -0.7 -10.3 12 F 1 342 02 46 53 Schedule for VLBA_PT (Code Pt ) Page 19 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 47 13 VX_SGR 17 27 01 32.6 168.6 -0.7 -10.2 -8 1 1 342 02 47 13 02 47 43 --- 17 27 31 32.6 168.7 -0.7 -10.1 22 F 1 343 02 47 13 02 47 43 J1811-2055 17 27 31 33.8 167.6 -0.7 -11.0 -8 1 1 343 02 47 43 02 48 03 --- 17 27 51 33.8 167.7 -0.7 -10.9 12 F 1 343 02 47 43 02 48 03 VX_SGR 17 27 51 32.7 168.8 -0.7 -10.0 -8 1 1 343 02 48 03 02 48 33 --- 17 28 21 32.7 168.9 -0.7 -9.9 22 F 1 344 02 48 03 02 48 33 J1807-2506 17 28 21 29.8 169.6 -0.7 -9.5 -12 1 1 344 02 48 33 02 48 58 --- 17 28 46 29.9 169.7 -0.7 -9.4 13 F 1 345 02 48 33 02 48 58 VX_SGR 17 28 46 32.7 169.0 -0.7 -9.8 -12 1 1 345 02 48 58 02 49 28 --- 17 29 16 32.7 169.2 -0.7 -9.6 18 F 1 346 02 48 58 02 49 28 J1808-2124 17 29 16 33.5 169.0 -0.7 -9.7 -8 1 1 346 02 49 28 02 49 48 --- 17 29 36 33.5 169.1 -0.6 -9.7 12 F 1 347 02 49 28 02 49 48 VX_SGR 17 29 36 32.7 169.3 -0.6 -9.6 -8 1 1 347 02 49 48 02 50 18 --- 17 30 06 32.7 169.4 -0.6 -9.4 22 F 1 348 02 49 48 02 50 18 J1811-2055 17 30 06 33.9 168.3 -0.7 -10.3 -8 1 1 348 02 50 18 02 50 38 --- 17 30 26 33.9 168.4 -0.7 -10.2 12 F 1 348 02 50 18 02 50 38 VX_SGR 17 30 26 32.8 169.5 -0.6 -9.4 -8 1 1 348 02 50 38 02 51 08 --- 17 30 56 32.8 169.6 -0.6 -9.2 22 F 1 349 02 50 38 02 51 08 J1807-2506 17 30 56 29.9 170.3 -0.6 -8.9 -12 1 1 349 02 51 08 02 51 33 --- 17 31 21 30.0 170.4 -0.6 -8.8 13 F 1 350 02 51 08 02 51 33 VX_SGR 17 31 21 32.8 169.7 -0.6 -9.1 -12 1 1 350 02 51 33 02 52 03 --- 17 31 51 32.8 169.9 -0.6 -9.0 18 F 1 351 02 51 33 02 52 03 J1808-2124 17 31 51 33.6 169.7 -0.6 -9.1 -8 1 1 351 02 52 03 02 52 22 --- 17 32 11 33.6 169.8 -0.6 -9.0 12 F 1 352 02 52 03 02 52 22 VX_SGR 17 32 11 32.8 170.0 -0.6 -8.9 -8 1 1 352 02 52 22 02 52 52 --- 17 32 41 32.8 170.1 -0.6 -8.8 22 F 1 353 02 52 22 02 52 52 J1811-2055 17 32 41 34.0 169.0 -0.6 -9.7 -8 1 1 353 02 52 52 02 53 12 --- 17 33 01 34.0 169.1 -0.6 -9.6 12 F 1 353 02 52 52 Schedule for VLBA_PT (Code Pt ) Page 20 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 53 12 VX_SGR 17 33 01 32.8 170.2 -0.6 -8.7 -8 1 1 353 02 53 12 02 53 42 --- 17 33 31 32.9 170.3 -0.6 -8.6 22 F 1 354 02 53 12 02 53 42 J1807-2506 17 33 31 30.0 170.9 -0.6 -8.3 -12 1 1 354 02 53 42 02 54 07 --- 17 33 56 30.0 171.0 -0.6 -8.2 13 F 1 355 02 53 42 02 54 07 VX_SGR 17 33 56 32.9 170.5 -0.6 -8.5 -12 1 1 355 02 54 07 02 54 37 --- 17 34 26 32.9 170.6 -0.6 -8.4 18 F 1 356 02 54 07 02 54 37 J1808-2124 17 34 26 33.7 170.4 -0.6 -8.5 -8 1 1 356 02 54 37 02 54 57 --- 17 34 46 33.7 170.5 -0.6 -8.4 12 F 1 357 02 54 37 02 54 57 VX_SGR 17 34 46 32.9 170.7 -0.6 -8.3 -8 1 1 357 02 54 57 02 55 27 --- 17 35 16 32.9 170.8 -0.6 -8.2 22 F 1 358 02 54 57 02 55 27 J1811-2055 17 35 16 34.1 169.7 -0.6 -9.1 -8 1 1 358 02 55 27 02 55 47 --- 17 35 36 34.1 169.8 -0.6 -9.0 12 F 1 358 02 55 27 02 55 47 VX_SGR 17 35 36 32.9 170.9 -0.5 -8.1 -8 1 1 358 02 55 47 02 56 17 --- 17 36 06 33.0 171.0 -0.5 -8.0 22 F 1 359 02 55 47 02 56 17 J1807-2506 17 36 06 30.1 171.6 -0.5 -7.7 -12 1 1 359 02 56 17 02 56 42 --- 17 36 31 30.1 171.7 -0.5 -7.6 13 F 1 360 02 56 17 02 56 42 VX_SGR 17 36 31 33.0 171.2 -0.5 -7.9 -12 1 1 360 02 56 42 02 57 12 --- 17 37 01 33.0 171.3 -0.5 -7.8 18 F 1 361 02 56 42 02 57 12 J1808-2124 17 37 01 33.8 171.1 -0.5 -7.8 -8 1 1 361 02 57 12 02 57 32 --- 17 37 21 33.8 171.2 -0.5 -7.8 12 F 1 362 02 57 12 02 57 32 VX_SGR 17 37 21 33.0 171.4 -0.5 -7.7 -8 1 1 362 02 57 32 02 58 02 --- 17 37 51 33.0 171.5 -0.5 -7.6 22 F 1 363 02 57 32 02 58 02 J1811-2055 17 37 51 34.2 170.5 -0.6 -8.4 -8 1 1 363 02 58 02 02 58 22 --- 17 38 11 34.2 170.6 -0.6 -8.3 12 F 1 363 02 58 02 02 58 22 VX_SGR 17 38 11 33.0 171.6 -0.5 -7.5 -8 1 1 363 02 58 22 02 58 51 --- 17 38 41 33.0 171.7 -0.5 -7.4 22 F 1 364 02 58 22 02 58 51 J1807-2506 17 38 41 30.2 172.3 -0.5 -7.0 -12 1 1 364 02 58 51 02 59 16 --- 17 39 06 30.2 172.4 -0.5 -6.9 13 F 1 365 02 58 51 Schedule for VLBA_PT (Code Pt ) Page 21 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 59 16 VX_SGR 17 39 06 33.0 171.9 -0.5 -7.3 -12 1 1 365 02 59 16 02 59 46 --- 17 39 36 33.1 172.0 -0.5 -7.1 18 F 1 366 02 59 16 02 59 46 J1808-2124 17 39 36 33.9 171.9 -0.5 -7.2 -8 1 1 366 02 59 46 03 00 06 --- 17 39 56 33.9 172.0 -0.5 -7.1 12 F 1 367 02 59 46 03 00 06 VX_SGR 17 39 56 33.1 172.1 -0.5 -7.1 -8 1 1 367 03 00 06 03 00 36 --- 17 40 26 33.1 172.2 -0.5 -6.9 22 F 1 368 03 00 06 03 00 36 J1811-2055 17 40 26 34.3 171.2 -0.5 -7.8 -8 1 1 368 03 00 36 03 00 56 --- 17 40 46 34.3 171.3 -0.5 -7.7 12 F 1 368 03 00 36 03 00 56 VX_SGR 17 40 46 33.1 172.3 -0.5 -6.8 -8 1 1 368 03 00 56 03 01 26 --- 17 41 16 33.1 172.5 -0.5 -6.7 22 F 1 369 03 00 56 03 01 26 J1807-2506 17 41 16 30.2 172.9 -0.4 -6.4 -12 1 1 369 03 01 26 03 01 51 --- 17 41 41 30.3 173.1 -0.4 -6.3 13 F 1 370 03 01 26 03 01 51 VX_SGR 17 41 41 33.1 172.6 -0.4 -6.6 -12 1 1 370 03 01 51 03 02 21 --- 17 42 11 33.1 172.7 -0.4 -6.5 18 F 1 371 03 01 51 03 02 21 J1808-2124 17 42 11 33.9 172.6 -0.4 -6.6 -8 1 1 371 03 02 21 03 02 41 --- 17 42 31 33.9 172.7 -0.4 -6.5 12 F 1 372 03 02 21 03 02 41 VX_SGR 17 42 31 33.1 172.8 -0.4 -6.4 -8 1 1 372 03 02 41 03 03 11 --- 17 43 01 33.1 172.9 -0.4 -6.3 22 F 1 373 03 02 41 03 03 11 J1811-2055 17 43 01 34.4 171.9 -0.5 -7.1 -8 1 1 373 03 03 11 03 03 31 --- 17 43 21 34.4 172.0 -0.5 -7.1 12 F 1 373 03 03 11 03 03 31 VX_SGR 17 43 21 33.2 173.0 -0.4 -6.2 -8 1 1 373 03 03 31 03 04 01 --- 17 43 51 33.2 173.2 -0.4 -6.1 21 F 1 374 03 03 31 03 04 01 J1807-2506 17 43 51 30.3 173.6 -0.4 -5.8 -12 1 1 374 03 04 01 03 04 26 --- 17 44 16 30.3 173.7 -0.4 -5.7 13 F 1 375 03 04 01 03 06 26 J0157+7442 17 46 17 25.2 14.1 -8.2 -49.9 8 1 1 375 03 06 26 03 07 26 --- 17 47 17 25.2 14.2 -8.2 -50.2 60 F 1 377 03 06 44 03 10 29 J2253+1608 17 50 20 20.4 83.9 -5.1 -58.8 130 1 1 377 03 10 29 03 11 29 --- 17 51 20 20.6 84.0 -5.1 -58.8 60 F 1 379 03 10 47 Schedule for VLBA_PT (Code Pt ) Page 22 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 03 13 47 J1638+5720 17 53 39 63.7 -23.1 1.3 143.0 46 1 1 379 03 13 47 03 14 47 --- 17 54 39 63.6 -23.4 1.3 142.6 60 F 1 381 03 14 05 03 15 21 J1748+7005 17 55 13 54.2 -1.0 0.1 177.6 10 1 1 381 03 15 21 03 16 21 --- 17 56 13 54.2 -1.1 0.1 177.3 60 F 1 383 03 15 39 03 17 03 J1740+5211 17 56 55 71.9 -8.0 0.3 169.3 0 1 1 383 03 17 03 03 18 03 --- 17 57 55 71.8 -8.4 0.3 168.6 60 F 1 385 03 17 21 03 19 42 J2202+4216 17 59 35 42.6 61.3 -4.1 -78.6 35 1 1 385 03 19 42 03 20 42 --- 18 00 35 42.8 61.4 -4.0 -78.7 60 F 1 387 03 20 00 03 22 03 J1642+6856 18 01 56 53.6 -11.9 1.3 151.6 26 1 1 387 03 22 03 03 23 03 --- 18 02 56 53.6 -12.1 1.3 151.3 60 F 1 389 03 22 21 03 26 03 J1337-1257 18 05 57 10.8 245.9 4.5 50.7 3 1 1 389 03 26 03 03 27 03 --- 18 06 57 10.7 246.1 4.5 50.8 60 F 1 391 03 26 21 03 29 07 J2354+4553 18 09 01 26.1 410.7 -5.8 -66.7 8 1 1 391 03 29 07 03 30 06 --- 18 10 01 26.3 410.7 -5.7 -66.8 60 F 1 392 03 29 25 03 32 22 J1512-0905 18 12 17 29.3 232.9 3.0 41.8 11 1 1 392 03 32 22 03 33 22 --- 18 13 17 29.2 233.1 3.0 42.0 60 F 1 394 03 32 40 03 35 18 J0019+7327 18 15 13 32.4 379.6 -6.1 -77.9 12 1 1 394 03 35 18 03 36 18 --- 18 16 13 32.4 379.7 -6.1 -78.1 60 F 1 396 03 35 36 03 38 55 J1924-2914 18 18 51 24.6 164.1 -1.1 -15.1 7 1 1 396 03 38 55 03 39 55 --- 18 19 51 24.6 164.3 -1.1 -14.8 60 F 1 398 03 39 13 03 41 51 J0136+4751 18 21 47 13.8 40.8 -7.3 -53.6 28 1 1 398 03 41 51 03 42 51 --- 18 22 47 13.9 40.9 -7.2 -53.7 60 F 1 400 03 42 09 03 44 34 J1806+6949 18 24 31 54.4 -2.6 0.3 173.7 17 1 1 400 03 44 34 03 45 34 --- 18 25 31 54.4 -2.8 0.3 173.4 60 F 1 402 03 44 52 03 47 39 J2225-0457 18 27 37 21.6 112.4 -4.0 -50.0 42 1 1 402 03 47 39 03 48 39 --- 18 28 37 21.8 112.6 -4.0 -50.0 60 F 1 404 03 47 57 03 48 39 J1924-2914 18 28 37 25.1 166.3 -0.9 -12.9 -42 1 1 404 03 48 39 03 51 38 --- 18 31 37 25.2 167.0 -0.9 -12.3 138 F 1 410 03 48 39 Schedule for VLBA_PT (Code Pt ) Page 23 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 03 51 38 VX_SGR 18 31 37 33.2 186.4 0.4 5.7 -22 1 1 410 Stopped 03 53 38 --- 18 33 37 33.2 186.9 0.4 6.2 98 S 1 414 03 53 38 VX_SGR 18 33 37 33.2 186.9 0.4 6.2 -4 1 1 414 Stopped 03 55 38 --- 18 35 37 33.1 187.5 0.5 6.7 116 S 1 418 03 55 38 VX_SGR 18 35 37 33.1 187.5 0.5 6.7 -4 1 1 418 03 55 38 03 57 37 --- 18 37 37 33.1 188.0 0.5 7.2 116 F 1 421 03 55 56 03 57 37 VX_SGR 18 37 37 33.1 188.0 0.5 7.2 -4 1 1 421 03 57 37 03 58 07 --- 18 38 07 33.0 188.2 0.5 7.3 26 F 1 422 03 57 37 03 58 07 J1808-2124 18 38 07 33.8 188.3 0.5 7.3 -8 1 1 422 03 58 07 03 58 27 --- 18 38 27 33.8 188.4 0.5 7.4 12 F 1 423 03 58 07 03 58 27 VX_SGR 18 38 27 33.0 188.3 0.5 7.4 -8 1 1 423 03 58 27 03 58 57 --- 18 38 57 33.0 188.4 0.5 7.5 22 F 1 424 03 58 27 03 58 57 J1811-2055 18 38 57 34.4 187.7 0.5 6.8 -9 1 1 424 03 58 57 03 59 17 --- 18 39 17 34.4 187.8 0.5 6.9 11 F 1 425 03 58 57 03 59 17 VX_SGR 18 39 17 33.0 188.5 0.5 7.6 -9 1 1 425 03 59 17 03 59 47 --- 18 39 47 33.0 188.6 0.5 7.7 21 F 1 426 03 59 17 03 59 47 J1807-2506 18 39 47 30.1 188.3 0.5 7.5 -12 1 1 426 03 59 47 04 00 12 --- 18 40 12 30.1 188.4 0.5 7.6 13 F 1 426 03 59 47 04 00 12 VX_SGR 18 40 12 33.0 188.7 0.5 7.8 -12 1 1 426 04 00 12 04 00 42 --- 18 40 42 33.0 188.9 0.5 7.9 18 F 1 427 04 00 12 04 00 42 J1808-2124 18 40 42 33.8 189.0 0.5 8.0 -8 1 1 427 04 00 42 04 01 02 --- 18 41 02 33.8 189.1 0.5 8.1 12 F 1 428 04 00 42 04 01 02 VX_SGR 18 41 02 32.9 189.0 0.5 8.0 -8 1 1 428 04 01 02 04 01 32 --- 18 41 32 32.9 189.1 0.5 8.1 22 F 1 429 04 01 02 04 01 32 J1811-2055 18 41 32 34.3 188.5 0.5 7.5 -9 1 1 429 04 01 32 04 01 52 --- 18 41 52 34.3 188.6 0.5 7.6 11 F 1 430 04 01 32 04 01 52 VX_SGR 18 41 52 32.9 189.2 0.6 8.2 -9 1 1 430 04 01 52 04 02 22 --- 18 42 22 32.9 189.3 0.6 8.3 21 F 1 431 04 01 52 Schedule for VLBA_PT (Code Pt ) Page 24 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 02 22 J1807-2506 18 42 22 30.0 188.9 0.6 8.2 -12 1 1 431 04 02 22 04 02 47 --- 18 42 47 30.0 189.1 0.6 8.3 13 F 1 431 04 02 22 04 02 47 VX_SGR 18 42 47 32.9 189.4 0.6 8.4 -12 1 1 431 04 02 47 04 03 17 --- 18 43 17 32.9 189.6 0.6 8.5 18 F 1 432 04 02 47 04 03 17 J1808-2124 18 43 17 33.7 189.7 0.6 8.6 -8 1 1 432 04 03 17 04 03 36 --- 18 43 37 33.7 189.8 0.6 8.7 12 F 1 433 04 03 17 04 03 36 VX_SGR 18 43 37 32.9 189.7 0.6 8.6 -8 1 1 433 04 03 36 04 04 06 --- 18 44 07 32.8 189.8 0.6 8.7 22 F 1 434 04 03 36 04 04 06 J1811-2055 18 44 07 34.2 189.2 0.5 8.1 -9 1 1 434 04 04 06 04 04 26 --- 18 44 27 34.2 189.3 0.5 8.2 11 F 1 435 04 04 06 04 04 26 VX_SGR 18 44 27 32.8 189.9 0.6 8.8 -9 1 1 435 04 04 26 04 04 56 --- 18 44 57 32.8 190.0 0.6 8.9 21 F 1 436 04 04 26 04 04 56 J1807-2506 18 44 57 30.0 189.6 0.6 8.8 -12 1 1 436 04 04 56 04 05 21 --- 18 45 22 29.9 189.7 0.6 8.9 13 F 1 436 04 04 56 04 05 21 VX_SGR 18 45 22 32.8 190.1 0.6 9.0 -12 1 1 436 04 05 21 04 05 51 --- 18 45 52 32.8 190.3 0.6 9.2 18 F 1 437 04 05 21 04 05 51 J1808-2124 18 45 52 33.6 190.4 0.6 9.2 -8 1 1 437 04 05 51 04 06 11 --- 18 46 12 33.6 190.5 0.6 9.3 12 F 1 438 04 05 51 04 06 11 VX_SGR 18 46 12 32.8 190.4 0.6 9.2 -8 1 1 438 04 06 11 04 06 41 --- 18 46 42 32.8 190.5 0.6 9.4 22 F 1 439 04 06 11 04 06 41 J1811-2055 18 46 42 34.2 189.9 0.6 8.8 -9 1 1 439 04 06 41 04 07 01 --- 18 47 02 34.1 190.0 0.6 8.8 11 F 1 440 04 06 41 04 07 01 VX_SGR 18 47 02 32.7 190.6 0.6 9.4 -9 1 1 440 04 07 01 04 07 31 --- 18 47 32 32.7 190.7 0.6 9.6 21 F 1 441 04 07 01 04 07 31 J1807-2506 18 47 32 29.9 190.3 0.7 9.4 -12 1 1 441 04 07 31 04 07 56 --- 18 47 57 29.8 190.4 0.7 9.5 13 F 1 441 04 07 31 04 07 56 VX_SGR 18 47 57 32.7 190.8 0.7 9.7 -12 1 1 441 04 07 56 04 08 26 --- 18 48 27 32.7 191.0 0.7 9.8 18 F 1 442 04 07 56 Schedule for VLBA_PT (Code Pt ) Page 25 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 08 26 J1808-2124 18 48 27 33.5 191.1 0.7 9.9 -8 1 1 442 04 08 26 04 08 46 --- 18 48 47 33.5 191.2 0.7 9.9 12 F 1 443 04 08 26 04 08 46 VX_SGR 18 48 47 32.7 191.1 0.7 9.9 -8 1 1 443 04 08 46 04 09 16 --- 18 49 17 32.7 191.2 0.7 10.0 22 F 1 444 04 08 46 04 09 16 J1811-2055 18 49 17 34.1 190.6 0.6 9.4 -9 1 1 444 04 09 16 04 09 35 --- 18 49 37 34.0 190.7 0.6 9.5 11 F 1 445 04 09 16 04 09 35 VX_SGR 18 49 37 32.6 191.3 0.7 10.1 -9 1 1 445 04 09 35 04 10 05 --- 18 50 07 32.6 191.4 0.7 10.2 21 F 1 446 04 09 35 04 10 05 J1807-2506 18 50 07 29.8 190.9 0.7 10.0 -12 1 1 446 04 10 05 04 10 30 --- 18 50 32 29.7 191.0 0.7 10.1 13 F 1 446 04 10 05 04 10 30 VX_SGR 18 50 32 32.6 191.5 0.7 10.3 -12 1 1 446 04 10 30 04 11 00 --- 18 51 02 32.6 191.7 0.7 10.4 18 F 1 447 04 10 30 04 11 00 J1808-2124 18 51 02 33.4 191.8 0.7 10.5 -8 1 1 447 04 11 00 04 11 20 --- 18 51 22 33.4 191.9 0.7 10.6 12 F 1 448 04 11 00 04 11 20 VX_SGR 18 51 22 32.6 191.8 0.7 10.5 -8 1 1 448 04 11 20 04 11 50 --- 18 51 52 32.5 191.9 0.7 10.6 22 F 1 449 04 11 20 04 11 50 J1811-2055 18 51 52 34.0 191.4 0.7 10.0 -9 1 1 449 04 11 50 04 12 10 --- 18 52 12 33.9 191.4 0.7 10.1 11 F 1 450 04 11 50 04 12 10 VX_SGR 18 52 12 32.5 192.0 0.7 10.7 -9 1 1 450 04 12 10 04 12 40 --- 18 52 42 32.5 192.1 0.7 10.8 21 F 1 451 04 12 10 04 12 40 J1807-2506 18 52 42 29.7 191.6 0.7 10.6 -12 1 1 451 04 12 40 04 13 05 --- 18 53 07 29.6 191.7 0.7 10.7 13 F 1 451 04 12 40 04 13 05 VX_SGR 18 53 07 32.5 192.2 0.7 10.9 -12 1 1 451 04 13 05 04 13 35 --- 18 53 37 32.5 192.4 0.8 11.0 18 F 1 452 04 13 05 04 13 35 J1808-2124 18 53 37 33.3 192.5 0.8 11.1 -8 1 1 452 04 13 35 04 13 55 --- 18 53 57 33.3 192.6 0.8 11.2 12 F 1 453 04 13 35 04 13 55 VX_SGR 18 53 57 32.5 192.5 0.8 11.1 -8 1 1 453 04 13 55 04 14 25 --- 18 54 27 32.4 192.6 0.8 11.2 22 F 1 454 04 13 55 Schedule for VLBA_PT (Code Pt ) Page 26 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 14 25 J1811-2055 18 54 27 33.8 192.1 0.7 10.7 -9 1 1 454 04 14 25 04 14 45 --- 18 54 47 33.8 192.2 0.7 10.7 11 F 1 455 04 14 25 04 14 45 VX_SGR 18 54 47 32.4 192.7 0.8 11.3 -9 1 1 455 04 14 45 04 15 15 --- 18 55 17 32.4 192.8 0.8 11.4 21 F 1 455 04 14 45 04 15 15 J1807-2506 18 55 17 29.5 192.3 0.8 11.2 -12 1 1 455 04 15 15 04 15 39 --- 18 55 42 29.5 192.4 0.8 11.3 13 F 1 456 04 15 15 04 15 39 VX_SGR 18 55 42 32.4 192.9 0.8 11.5 -12 1 1 456 04 15 39 04 16 09 --- 18 56 12 32.4 193.1 0.8 11.6 18 F 1 457 04 15 39 04 16 09 J1808-2124 18 56 12 33.1 193.3 0.8 11.7 -8 1 1 457 04 16 09 04 16 29 --- 18 56 32 33.1 193.3 0.8 11.8 12 F 1 458 04 16 09 04 16 29 VX_SGR 18 56 32 32.3 193.2 0.8 11.7 -8 1 1 458 04 16 29 04 16 59 --- 18 57 02 32.3 193.3 0.8 11.8 22 F 1 459 04 16 29 04 16 59 J1811-2055 18 57 02 33.7 192.8 0.8 11.3 -9 1 1 459 04 16 59 04 17 19 --- 18 57 22 33.7 192.9 0.8 11.4 11 F 1 460 04 16 59 04 17 19 VX_SGR 18 57 22 32.3 193.4 0.8 11.9 -9 1 1 460 04 17 19 04 17 49 --- 18 57 52 32.3 193.5 0.8 12.0 21 F 1 460 04 17 19 04 17 49 J1807-2506 18 57 52 29.4 192.9 0.8 11.8 -12 1 1 460 04 17 49 04 18 14 --- 18 58 17 29.4 193.0 0.8 11.9 13 F 1 461 04 17 49 04 18 14 VX_SGR 18 58 17 32.3 193.6 0.8 12.1 -12 1 1 461 04 18 14 04 18 44 --- 18 58 47 32.2 193.8 0.8 12.3 18 F 1 462 04 18 14 04 18 44 J1808-2124 18 58 47 33.0 194.0 0.8 12.4 -8 1 1 462 04 18 44 04 19 04 --- 18 59 07 33.0 194.0 0.8 12.4 12 F 1 463 04 18 44 04 19 04 VX_SGR 18 59 07 32.2 193.9 0.8 12.3 -8 1 1 463 04 19 04 04 19 34 --- 18 59 37 32.2 194.0 0.9 12.5 22 F 1 464 04 19 04 04 19 34 J1811-2055 18 59 37 33.6 193.5 0.8 11.9 -9 1 1 464 04 19 34 04 19 54 --- 18 59 57 33.6 193.6 0.8 12.0 11 F 1 465 04 19 34 04 19 54 VX_SGR 18 59 57 32.2 194.1 0.9 12.5 -9 1 1 465 04 19 54 04 20 24 --- 19 00 27 32.1 194.2 0.9 12.7 21 F 1 465 04 19 54 Schedule for VLBA_PT (Code Pt ) Page 27 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 20 24 J1807-2506 19 00 27 29.3 193.6 0.9 12.4 -12 1 1 465 04 20 24 04 20 49 --- 19 00 52 29.3 193.7 0.9 12.5 13 F 1 466 04 20 24 04 20 49 VX_SGR 19 00 52 32.1 194.3 0.9 12.7 -12 1 1 466 04 20 49 04 21 19 --- 19 01 22 32.1 194.5 0.9 12.9 18 F 1 467 04 20 49 04 21 19 J1808-2124 19 01 22 32.9 194.7 0.9 13.0 -8 1 1 467 04 21 19 04 21 38 --- 19 01 42 32.9 194.7 0.9 13.1 12 F 1 468 04 21 19 04 21 38 VX_SGR 19 01 42 32.1 194.5 0.9 12.9 -8 1 1 468 04 21 38 04 22 08 --- 19 02 12 32.1 194.7 0.9 13.1 22 F 1 469 04 21 38 04 22 08 J1811-2055 19 02 12 33.5 194.2 0.8 12.5 -9 1 1 469 04 22 08 04 22 28 --- 19 02 32 33.5 194.3 0.8 12.6 11 F 1 469 04 22 08 04 22 28 VX_SGR 19 02 32 32.0 194.8 0.9 13.1 -9 1 1 469 04 22 28 04 22 58 --- 19 03 02 32.0 194.9 0.9 13.3 21 F 1 470 04 22 28 04 22 58 J1807-2506 19 03 02 29.2 194.2 0.9 13.0 -12 1 1 470 04 22 58 04 23 23 --- 19 03 27 29.2 194.3 0.9 13.1 13 F 1 471 04 22 58 04 23 23 VX_SGR 19 03 27 32.0 195.0 0.9 13.4 -12 1 1 471 04 23 23 04 23 53 --- 19 03 57 32.0 195.1 0.9 13.5 18 F 1 472 04 23 23 04 23 53 J1808-2124 19 03 57 32.8 195.4 0.9 13.6 -8 1 1 472 04 23 53 04 24 13 --- 19 04 17 32.7 195.4 0.9 13.7 12 F 1 473 04 23 53 04 24 13 VX_SGR 19 04 17 31.9 195.2 0.9 13.6 -8 1 1 473 04 24 13 04 24 43 --- 19 04 47 31.9 195.4 0.9 13.7 22 F 1 474 04 24 13 04 24 43 J1811-2055 19 04 47 33.4 194.9 0.9 13.1 -9 1 1 474 04 24 43 04 25 03 --- 19 05 07 33.3 195.0 0.9 13.2 11 F 1 474 04 24 43 04 25 03 VX_SGR 19 05 07 31.9 195.4 0.9 13.8 -9 1 1 474 04 25 03 04 25 33 --- 19 05 37 31.9 195.6 1.0 13.9 21 F 1 475 04 25 03 04 25 33 J1807-2506 19 05 37 29.0 194.9 1.0 13.6 -12 1 1 475 04 25 33 04 25 58 --- 19 06 02 29.0 195.0 1.0 13.6 13 F 1 476 04 25 33 04 25 58 VX_SGR 19 06 02 31.8 195.7 1.0 14.0 -12 1 1 476 04 25 58 04 26 28 --- 19 06 32 31.8 195.8 1.0 14.1 18 F 1 477 04 25 58 Schedule for VLBA_PT (Code Pt ) Page 28 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 26 28 J1808-2124 19 06 32 32.6 196.0 1.0 14.2 -8 1 1 477 04 26 28 04 26 48 --- 19 06 52 32.6 196.1 1.0 14.3 12 F 1 478 04 26 28 04 26 48 VX_SGR 19 06 52 31.8 195.9 1.0 14.2 -8 1 1 478 04 26 48 04 27 18 --- 19 07 22 31.8 196.0 1.0 14.3 22 F 1 479 04 26 48 04 27 18 J1811-2055 19 07 22 33.2 195.6 0.9 13.8 -9 1 1 479 04 27 18 04 27 38 --- 19 07 42 33.2 195.7 0.9 13.8 11 F 1 479 04 27 18 04 27 38 VX_SGR 19 07 42 31.8 196.1 1.0 14.4 -9 1 1 479 04 27 38 04 28 07 --- 19 08 12 31.7 196.3 1.0 14.5 21 F 1 480 04 27 38 04 28 07 J1807-2506 19 08 12 28.9 195.5 1.0 14.1 -12 1 1 480 04 28 07 04 28 32 --- 19 08 37 28.9 195.6 1.0 14.2 13 F 1 481 04 28 07 04 28 32 VX_SGR 19 08 37 31.7 196.4 1.0 14.6 -12 1 1 481 04 28 32 04 29 02 --- 19 09 07 31.7 196.5 1.0 14.7 18 F 1 482 04 28 32 04 29 02 J1808-2124 19 09 07 32.5 196.7 1.0 14.8 -8 1 1 482 04 29 02 04 29 22 --- 19 09 27 32.4 196.8 1.0 14.9 12 F 1 483 04 29 02 04 29 22 VX_SGR 19 09 27 31.7 196.6 1.0 14.8 -8 1 1 483 04 29 22 04 29 52 --- 19 09 57 31.6 196.7 1.0 14.9 22 F 1 484 04 29 22 04 29 52 J1811-2055 19 09 57 33.1 196.3 1.0 14.4 -9 1 1 484 04 29 52 04 30 12 --- 19 10 17 33.0 196.4 1.0 14.5 11 F 1 484 04 29 52 04 30 12 VX_SGR 19 10 17 31.6 196.8 1.0 15.0 -9 1 1 484 04 30 12 04 30 42 --- 19 10 47 31.6 196.9 1.0 15.1 21 F 1 485 04 30 12 04 30 42 J1807-2506 19 10 47 28.8 196.2 1.0 14.7 -12 1 1 485 04 30 42 04 31 07 --- 19 11 12 28.7 196.3 1.1 14.8 13 F 1 486 04 30 42 04 31 07 VX_SGR 19 11 12 31.5 197.1 1.0 15.2 -12 1 1 486 04 31 07 04 31 37 --- 19 11 42 31.5 197.2 1.1 15.3 18 F 1 487 04 31 07 04 31 37 J1808-2124 19 11 42 32.3 197.4 1.1 15.4 -8 1 1 487 04 31 37 04 31 57 --- 19 12 02 32.3 197.5 1.1 15.5 12 F 1 488 04 31 37 04 31 57 VX_SGR 19 12 02 31.5 197.3 1.1 15.4 -8 1 1 488 04 31 57 04 32 27 --- 19 12 32 31.5 197.4 1.1 15.5 22 F 1 489 04 31 57 Schedule for VLBA_PT (Code Pt ) Page 29 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 32 27 J1811-2055 19 12 32 32.9 197.0 1.0 15.0 -9 1 1 489 04 32 27 04 32 47 --- 19 12 52 32.9 197.1 1.0 15.1 11 F 1 489 04 32 27 04 32 47 VX_SGR 19 12 52 31.4 197.5 1.1 15.6 -9 1 1 489 04 32 47 04 33 17 --- 19 13 22 31.4 197.6 1.1 15.7 21 F 1 490 04 32 47 04 33 17 J1807-2506 19 13 22 28.6 196.8 1.1 15.3 -12 1 1 490 04 33 17 04 33 42 --- 19 13 47 28.6 196.9 1.1 15.4 13 F 1 491 04 33 17 04 33 42 VX_SGR 19 13 47 31.4 197.7 1.1 15.8 -12 1 1 491 Stopped 04 35 41 --- 19 15 47 31.3 198.2 1.1 16.2 108 S 1 495 04 35 41 VX_SGR 19 15 47 31.3 198.2 1.1 16.2 -4 1 1 495 Stopped 04 37 41 --- 19 17 47 31.1 198.8 1.2 16.7 116 S 1 499 04 37 41 VX_SGR 19 17 47 31.1 198.8 1.2 16.7 -4 1 1 499 04 37 41 04 38 41 --- 19 18 47 31.1 199.0 1.2 16.9 56 F 1 501 04 37 59 04 38 41 J1733-1304 19 18 47 36.4 212.5 1.8 27.1 -17 1 1 501 04 38 41 04 39 41 --- 19 19 47 36.3 212.7 1.8 27.3 43 F 1 503 04 38 41 04 39 41 VX_SGR 19 19 47 31.0 199.3 1.2 17.1 -17 1 1 503 04 39 41 04 40 40 --- 19 20 47 30.9 199.5 1.2 17.4 43 F 1 505 04 39 41 04 40 40 J1733-1304 19 20 47 36.2 213.0 1.8 27.5 -17 1 1 505 04 40 40 04 41 40 --- 19 21 47 36.1 213.3 1.8 27.7 43 F 1 507 04 40 40 04 41 40 VX_SGR 19 21 47 30.9 199.8 1.2 17.6 -16 1 1 507 04 41 40 04 42 40 --- 19 22 47 30.8 200.1 1.2 17.8 43 F 1 509 04 41 40 04 42 40 J1733-1304 19 22 47 36.0 213.5 1.8 27.9 -16 1 1 509 04 42 40 04 43 40 --- 19 23 47 35.8 213.8 1.8 28.1 43 F 1 511 04 42 40 04 43 40 VX_SGR 19 23 47 30.7 200.3 1.3 18.0 -16 1 1 511 04 43 40 04 44 40 --- 19 24 47 30.6 200.6 1.3 18.3 44 F 1 512 04 43 40 04 44 40 J1733-1304 19 24 47 35.7 214.1 1.9 28.4 -16 1 1 512 04 44 40 04 45 40 --- 19 25 47 35.6 214.3 1.9 28.6 44 F 1 514 04 44 40 04 45 40 VX_SGR 19 25 47 30.6 200.8 1.3 18.5 -16 1 1 514 04 45 40 04 46 39 --- 19 26 47 30.5 201.1 1.3 18.7 44 F 1 516 04 45 40 Schedule for VLBA_PT (Code Pt ) Page 30 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 46 39 J1733-1304 19 26 47 35.5 214.6 1.9 28.8 -16 1 1 516 04 46 39 04 47 39 --- 19 27 47 35.4 214.8 1.9 29.0 44 F 1 518 04 46 39 04 47 39 VX_SGR 19 27 47 30.4 201.3 1.3 18.9 -16 1 1 518 04 47 39 04 48 39 --- 19 28 47 30.3 201.6 1.3 19.2 44 F 1 520 04 47 39 04 48 39 J1733-1304 19 28 47 35.3 215.1 1.9 29.2 -16 1 1 520 04 48 39 04 49 39 --- 19 29 47 35.1 215.4 1.9 29.4 44 F 1 522 04 48 39 04 49 39 VX_SGR 19 29 47 30.3 201.8 1.4 19.4 -16 1 1 522 04 49 39 04 50 39 --- 19 30 47 30.2 202.1 1.4 19.6 44 F 1 524 04 49 39 04 50 39 J1733-1304 19 30 47 35.0 215.6 2.0 29.6 -16 1 1 524 04 50 39 04 51 39 --- 19 31 47 34.9 215.9 2.0 29.8 44 F 1 526 04 50 39 04 51 39 VX_SGR 19 31 47 30.1 202.3 1.4 19.8 -16 1 1 526 04 51 39 04 52 38 --- 19 32 47 30.0 202.6 1.4 20.0 44 F 1 528 04 51 39 04 52 38 J1733-1304 19 32 47 34.8 216.1 2.0 30.0 -16 1 1 528 04 52 38 04 53 38 --- 19 33 47 34.7 216.4 2.0 30.2 44 F 1 530 04 52 38 04 53 38 VX_SGR 19 33 47 30.0 202.8 1.4 20.3 -15 1 1 530 04 53 38 04 54 38 --- 19 34 47 29.9 203.1 1.4 20.5 44 F 1 532 04 53 38 04 54 38 J1733-1304 19 34 47 34.5 216.7 2.0 30.4 -15 1 1 532 04 54 38 04 55 38 --- 19 35 47 34.4 216.9 2.0 30.6 45 F 1 534 04 54 38 04 55 38 VX_SGR 19 35 47 29.8 203.3 1.5 20.7 -15 1 1 534 04 55 38 04 56 38 --- 19 36 47 29.7 203.6 1.5 20.9 45 F 1 536 04 55 38 04 56 38 J1733-1304 19 36 47 34.3 217.2 2.1 30.8 -15 1 1 536 04 56 38 04 57 38 --- 19 37 47 34.2 217.4 2.1 31.0 45 F 1 538 04 56 38 04 57 38 VX_SGR 19 37 47 29.6 203.8 1.5 21.1 -15 1 1 538 04 57 38 04 58 37 --- 19 38 47 29.5 204.1 1.5 21.4 45 F 1 539 04 57 38 04 58 37 J1733-1304 19 38 47 34.0 217.7 2.1 31.2 -15 1 1 539 04 58 37 04 59 37 --- 19 39 47 33.9 217.9 2.1 31.4 45 F 1 541 04 58 37 04 59 37 VX_SGR 19 39 47 29.5 204.3 1.5 21.6 -15 1 1 541 04 59 37 05 00 37 --- 19 40 47 29.4 204.6 1.5 21.8 45 F 1 543 04 59 37 Schedule for VLBA_PT (Code Pt ) Page 31 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 00 37 J1733-1304 19 40 47 33.8 218.2 2.1 31.6 -15 1 1 543 05 00 37 05 01 37 --- 19 41 47 33.7 218.4 2.1 31.8 45 F 1 545 05 00 37 05 01 37 VX_SGR 19 41 47 29.3 204.8 1.6 22.0 -15 1 1 545 05 01 37 05 02 37 --- 19 42 47 29.2 205.1 1.6 22.2 45 F 1 547 05 01 37 05 02 37 J1733-1304 19 42 47 33.5 218.7 2.2 32.0 -15 1 1 547 05 02 37 05 03 37 --- 19 43 47 33.4 218.9 2.2 32.2 45 F 1 549 05 02 37 05 03 37 VX_SGR 19 43 47 29.1 205.3 1.6 22.4 -15 1 1 549 05 03 37 05 04 36 --- 19 44 47 29.0 205.6 1.6 22.6 45 F 1 551 05 03 37 05 04 36 J1733-1304 19 44 47 33.3 219.2 2.2 32.4 -15 1 1 551 05 04 36 05 05 36 --- 19 45 47 33.1 219.4 2.2 32.6 45 F 1 553 05 04 36 05 05 36 VX_SGR 19 45 47 28.9 205.8 1.6 22.9 -15 1 1 553 05 05 36 05 06 36 --- 19 46 47 28.8 206.1 1.6 23.1 45 F 1 555 05 05 36 05 06 36 J1733-1304 19 46 47 33.0 219.6 2.2 32.8 -15 1 1 555 05 06 36 05 07 36 --- 19 47 47 32.9 219.9 2.2 32.9 45 F 1 557 05 06 36 05 07 36 VX_SGR 19 47 47 28.8 206.3 1.7 23.3 -15 1 1 557 05 07 36 05 08 36 --- 19 48 47 28.7 206.5 1.7 23.5 45 F 1 559 05 07 36 05 08 36 J1733-1304 19 48 47 32.7 220.1 2.3 33.1 -15 1 1 559 05 08 36 05 09 36 --- 19 49 47 32.6 220.4 2.3 33.3 45 F 1 561 05 08 36 05 09 36 VX_SGR 19 49 47 28.6 206.8 1.7 23.7 -15 1 1 561 05 09 36 05 10 35 --- 19 50 47 28.5 207.0 1.7 23.9 45 F 1 563 05 09 36 05 10 35 J1733-1304 19 50 47 32.5 220.6 2.3 33.5 -15 1 1 563 05 10 35 05 11 35 --- 19 51 47 32.3 220.9 2.3 33.7 45 F 1 565 05 10 35 05 11 35 VX_SGR 19 51 47 28.4 207.3 1.7 24.1 -15 1 1 565 05 11 35 05 12 35 --- 19 52 47 28.3 207.5 1.7 24.3 45 F 1 566 05 11 35 05 12 35 J1733-1304 19 52 47 32.2 221.1 2.3 33.9 -15 1 1 566 05 12 35 05 13 35 --- 19 53 47 32.1 221.3 2.3 34.1 45 F 1 568 05 12 35 05 13 35 VX_SGR 19 53 47 28.2 207.7 1.8 24.5 -15 1 1 568 05 13 35 05 14 35 --- 19 54 47 28.1 208.0 1.8 24.7 45 F 1 570 05 13 35 Schedule for VLBA_PT (Code Pt ) Page 32 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 14 35 J1733-1304 19 54 47 31.9 221.6 2.4 34.2 -15 1 1 570 05 14 35 05 15 35 --- 19 55 47 31.8 221.8 2.4 34.4 45 F 1 572 05 14 35 05 15 35 VX_SGR 19 55 47 28.0 208.2 1.8 25.0 -15 1 1 572 05 15 35 05 16 34 --- 19 56 47 27.9 208.5 1.8 25.2 45 F 1 574 05 15 35 05 16 34 J1733-1304 19 56 47 31.7 222.0 2.4 34.6 -15 1 1 574 05 16 34 05 17 34 --- 19 57 47 31.5 222.3 2.4 34.8 45 F 1 576 05 16 34 05 17 34 VX_SGR 19 57 47 27.8 208.7 1.8 25.4 -15 1 1 576 05 17 34 05 18 34 --- 19 58 47 27.7 208.9 1.8 25.6 45 F 1 578 05 17 34 05 18 34 J1733-1304 19 58 47 31.4 222.5 2.4 35.0 -15 1 1 578 05 18 34 05 19 34 --- 19 59 47 31.2 222.7 2.4 35.1 45 F 1 580 05 18 34 05 19 34 VX_SGR 19 59 47 27.6 209.2 1.9 25.8 -15 1 1 580 05 19 34 05 20 34 --- 20 00 47 27.5 209.4 1.9 26.0 45 F 1 582 05 19 34 05 20 34 VX_SGR 20 00 47 27.5 209.4 1.9 26.0 -4 1 1 582 Stopped 05 22 33 --- 20 02 47 27.3 209.9 1.9 26.4 116 S 1 586 05 22 33 VX_SGR 20 02 47 27.3 209.9 1.9 26.4 -4 1 1 586 Stopped 05 24 33 --- 20 04 47 27.1 210.3 1.9 26.8 116 S 1 590 05 24 33 VX_SGR 20 04 47 27.1 210.3 1.9 26.8 -4 1 1 590 05 24 33 05 26 33 --- 20 06 47 26.9 210.8 2.0 27.2 116 F 1 593 05 24 51 05 26 33 VX_SGR 20 06 47 26.9 210.8 2.0 27.2 -4 1 1 593 05 26 33 05 27 03 --- 20 07 17 26.8 210.9 2.0 27.3 26 F 1 594 05 26 33 05 27 03 J1808-2124 20 07 17 27.5 211.3 2.0 27.5 -7 1 1 594 05 27 03 05 27 23 --- 20 07 37 27.5 211.4 2.0 27.5 13 F 1 595 05 27 03 05 27 23 VX_SGR 20 07 37 26.8 211.0 2.0 27.3 -7 1 1 595 05 27 23 05 27 53 --- 20 08 07 26.7 211.1 2.0 27.4 23 F 1 596 05 27 23 05 27 53 J1811-2055 20 08 07 28.2 211.1 1.9 27.2 -9 1 1 596 05 27 53 05 28 13 --- 20 08 27 28.2 211.1 1.9 27.2 11 F 1 597 05 27 53 05 28 13 VX_SGR 20 08 27 26.7 211.2 2.0 27.5 -9 1 1 597 05 28 13 05 28 42 --- 20 08 57 26.6 211.3 2.0 27.6 21 F 1 598 05 28 13 Schedule for VLBA_PT (Code Pt ) Page 33 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 28 42 J1807-2506 20 08 57 24.0 209.9 2.0 27.1 -11 1 1 598 05 28 42 05 29 07 --- 20 09 22 24.0 210.0 2.0 27.1 14 F 1 598 05 28 42 05 29 07 VX_SGR 20 09 22 26.6 211.4 2.0 27.7 -11 1 1 598 05 29 07 05 29 37 --- 20 09 52 26.5 211.5 2.0 27.8 19 F 1 599 05 29 07 05 29 37 J1808-2124 20 09 52 27.3 211.9 2.0 28.0 -7 1 1 599 05 29 37 05 29 57 --- 20 10 12 27.2 212.0 2.0 28.0 13 F 1 600 05 29 37 05 29 57 VX_SGR 20 10 12 26.5 211.6 2.0 27.9 -7 1 1 600 05 29 57 05 30 27 --- 20 10 42 26.5 211.7 2.0 28.0 23 F 1 601 05 29 57 05 30 27 J1811-2055 20 10 42 27.9 211.7 2.0 27.7 -9 1 1 601 05 30 27 05 30 47 --- 20 11 02 27.9 211.8 2.0 27.7 11 F 1 602 05 30 27 05 30 47 VX_SGR 20 11 02 26.4 211.8 2.0 28.0 -9 1 1 602 05 30 47 05 31 17 --- 20 11 32 26.4 211.9 2.0 28.1 21 F 1 603 05 30 47 05 31 17 J1807-2506 20 11 32 23.8 210.5 2.1 27.6 -11 1 1 603 05 31 17 05 31 42 --- 20 11 57 23.7 210.6 2.1 27.6 14 F 1 603 05 31 17 05 31 42 VX_SGR 20 11 57 26.3 212.0 2.1 28.2 -11 1 1 603 05 31 42 05 32 12 --- 20 12 27 26.3 212.1 2.1 28.3 19 F 1 604 05 31 42 05 32 12 J1808-2124 20 12 27 27.0 212.5 2.1 28.5 -7 1 1 604 05 32 12 05 32 32 --- 20 12 47 26.9 212.6 2.1 28.5 13 F 1 605 05 32 12 05 32 32 VX_SGR 20 12 47 26.2 212.2 2.1 28.4 -7 1 1 605 05 32 32 05 33 02 --- 20 13 17 26.2 212.3 2.1 28.5 23 F 1 606 05 32 32 05 33 02 J1811-2055 20 13 17 27.7 212.3 2.0 28.2 -9 1 1 606 05 33 02 05 33 22 --- 20 13 37 27.6 212.4 2.0 28.2 11 F 1 607 05 33 02 05 33 22 VX_SGR 20 13 37 26.1 212.4 2.1 28.5 -9 1 1 607 05 33 22 05 33 52 --- 20 14 07 26.1 212.5 2.1 28.6 21 F 1 608 05 33 22 05 33 52 J1807-2506 20 14 07 23.5 211.0 2.1 28.1 -11 1 1 608 05 33 52 05 34 17 --- 20 14 32 23.5 211.1 2.1 28.1 14 F 1 608 05 33 52 05 34 17 VX_SGR 20 14 32 26.0 212.6 2.1 28.7 -11 1 1 608 05 34 17 05 34 46 --- 20 15 02 26.0 212.7 2.1 28.8 19 F 1 609 05 34 17 Schedule for VLBA_PT (Code Pt ) Page 34 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 34 46 J1808-2124 20 15 02 26.7 213.1 2.1 29.0 -7 1 1 609 05 34 46 05 35 06 --- 20 15 22 26.7 213.2 2.1 29.1 13 F 1 610 05 34 46 05 35 06 VX_SGR 20 15 22 25.9 212.7 2.1 28.9 -7 1 1 610 05 35 06 05 35 36 --- 20 15 52 25.9 212.9 2.1 29.0 23 F 1 611 05 35 06 05 35 36 J1811-2055 20 15 52 27.4 212.9 2.1 28.7 -9 1 1 611 05 35 36 05 35 56 --- 20 16 12 27.3 213.0 2.1 28.8 11 F 1 612 05 35 36 05 35 56 VX_SGR 20 16 12 25.8 212.9 2.1 29.0 -9 1 1 612 05 35 56 05 36 26 --- 20 16 42 25.8 213.0 2.1 29.1 21 F 1 613 05 35 56 05 36 26 J1807-2506 20 16 42 23.2 211.6 2.1 28.6 -11 1 1 613 05 36 26 05 36 51 --- 20 17 07 23.2 211.7 2.1 28.6 14 F 1 613 05 36 26 05 36 51 VX_SGR 20 17 07 25.7 213.1 2.1 29.2 -11 1 1 613 05 36 51 05 37 21 --- 20 17 37 25.7 213.3 2.2 29.3 19 F 1 614 05 36 51 05 37 21 J1808-2124 20 17 37 26.4 213.7 2.2 29.5 -7 1 1 614 05 37 21 05 37 41 --- 20 17 57 26.4 213.8 2.2 29.5 13 F 1 615 05 37 21 05 37 41 VX_SGR 20 17 57 25.7 213.3 2.2 29.4 -7 1 1 615 05 37 41 05 38 11 --- 20 18 27 25.6 213.4 2.2 29.5 23 F 1 616 05 37 41 05 38 11 J1811-2055 20 18 27 27.1 213.5 2.1 29.2 -9 1 1 616 05 38 11 05 38 31 --- 20 18 47 27.0 213.5 2.1 29.3 11 F 1 617 05 38 11 05 38 31 VX_SGR 20 18 47 25.6 213.5 2.2 29.5 -9 1 1 617 05 38 31 05 39 01 --- 20 19 17 25.5 213.6 2.2 29.6 21 F 1 618 05 38 31 05 39 01 J1807-2506 20 19 17 22.9 212.2 2.2 29.1 -11 1 1 618 05 39 01 05 39 26 --- 20 19 42 22.9 212.3 2.2 29.1 14 F 1 618 05 39 01 05 39 26 VX_SGR 20 19 42 25.5 213.7 2.2 29.7 -11 1 1 618 05 39 26 05 39 56 --- 20 20 12 25.4 213.8 2.2 29.8 19 F 1 619 05 39 26 05 39 56 J1808-2124 20 20 12 26.1 214.3 2.2 30.0 -7 1 1 619 05 39 56 05 40 16 --- 20 20 32 26.1 214.3 2.2 30.0 13 F 1 620 05 39 56 05 40 16 VX_SGR 20 20 32 25.4 213.9 2.2 29.9 -7 1 1 620 05 40 16 05 40 45 --- 20 21 02 25.3 214.0 2.2 29.9 23 F 1 621 05 40 16 Schedule for VLBA_PT (Code Pt ) Page 35 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 40 45 J1811-2055 20 21 02 26.8 214.1 2.2 29.7 -9 1 1 621 05 40 45 05 41 05 --- 20 21 22 26.7 214.1 2.2 29.8 11 F 1 622 05 40 45 05 41 05 VX_SGR 20 21 22 25.3 214.1 2.2 30.0 -9 1 1 622 05 41 05 05 41 35 --- 20 21 52 25.2 214.2 2.2 30.1 21 F 1 623 05 41 05 05 41 35 J1807-2506 20 21 52 22.7 212.7 2.2 29.5 -11 1 1 623 05 41 35 05 42 00 --- 20 22 17 22.6 212.8 2.2 29.6 14 F 1 623 05 41 35 05 42 00 VX_SGR 20 22 17 25.2 214.3 2.2 30.2 -11 1 1 623 05 42 00 05 42 30 --- 20 22 47 25.1 214.4 2.2 30.3 19 F 1 624 05 42 00 05 42 30 J1808-2124 20 22 47 25.8 214.8 2.2 30.5 -7 1 1 624 05 42 30 05 42 50 --- 20 23 07 25.8 214.9 2.2 30.5 13 F 1 625 05 42 30 05 42 50 VX_SGR 20 23 07 25.1 214.5 2.2 30.3 -7 1 1 625 05 42 50 05 43 20 --- 20 23 37 25.0 214.6 2.3 30.4 23 F 1 626 05 42 50 05 43 20 J1811-2055 20 23 37 26.5 214.6 2.2 30.2 -9 1 1 626 05 43 20 05 43 40 --- 20 23 57 26.4 214.7 2.2 30.2 11 F 1 627 05 43 20 05 43 40 VX_SGR 20 23 57 25.0 214.7 2.3 30.5 -9 1 1 627 05 43 40 05 44 10 --- 20 24 27 24.9 214.8 2.3 30.6 21 F 1 628 05 43 40 05 44 10 J1807-2506 20 24 27 22.4 213.3 2.3 30.0 -11 1 1 628 05 44 10 05 44 35 --- 20 24 52 22.3 213.4 2.3 30.1 14 F 1 628 05 44 10 05 44 35 VX_SGR 20 24 52 24.9 214.9 2.3 30.7 -11 1 1 628 05 44 35 05 45 05 --- 20 25 22 24.8 215.0 2.3 30.8 19 F 1 629 05 44 35 05 45 05 J1808-2124 20 25 22 25.5 215.4 2.3 31.0 -7 1 1 629 05 45 05 05 45 25 --- 20 25 42 25.5 215.5 2.3 31.0 13 F 1 630 05 45 05 05 45 25 VX_SGR 20 25 42 24.8 215.0 2.3 30.8 -7 1 1 630 05 45 25 05 45 55 --- 20 26 12 24.7 215.2 2.3 30.9 23 F 1 631 05 45 25 05 45 55 J1811-2055 20 26 12 26.2 215.2 2.2 30.7 -9 1 1 631 05 45 55 05 46 15 --- 20 26 32 26.1 215.3 2.2 30.7 11 F 1 632 05 45 55 05 46 15 VX_SGR 20 26 32 24.7 215.2 2.3 31.0 -9 1 1 632 05 46 15 05 46 45 --- 20 27 02 24.6 215.3 2.3 31.1 21 F 1 633 05 46 15 Schedule for VLBA_PT (Code Pt ) Page 36 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 46 45 J1807-2506 20 27 02 22.1 213.8 2.3 30.5 -11 1 1 633 05 46 45 05 47 09 --- 20 27 27 22.0 213.9 2.3 30.6 14 F 1 633 05 46 45 05 47 09 VX_SGR 20 27 27 24.5 215.4 2.3 31.2 -11 1 1 633 05 47 09 05 47 39 --- 20 27 57 24.5 215.5 2.3 31.2 19 F 1 634 05 47 09 05 47 39 J1808-2124 20 27 57 25.2 216.0 2.3 31.4 -7 1 1 634 05 47 39 05 47 59 --- 20 28 17 25.1 216.1 2.3 31.5 13 F 1 635 05 47 39 05 47 59 VX_SGR 20 28 17 24.4 215.6 2.3 31.3 -7 1 1 635 05 47 59 05 48 29 --- 20 28 47 24.4 215.7 2.3 31.4 23 F 1 636 05 47 59 05 48 29 J1811-2055 20 28 47 25.9 215.8 2.3 31.2 -9 1 1 636 05 48 29 05 48 49 --- 20 29 07 25.8 215.9 2.3 31.2 11 F 1 637 05 48 29 05 48 49 VX_SGR 20 29 07 24.3 215.8 2.3 31.5 -9 1 1 637 05 48 49 05 49 19 --- 20 29 37 24.3 215.9 2.4 31.5 21 F 1 638 05 48 49 05 49 19 J1807-2506 20 29 37 21.8 214.4 2.4 31.0 -11 1 1 638 05 49 19 05 49 44 --- 20 30 02 21.7 214.4 2.4 31.1 14 F 1 638 05 49 19 05 49 44 VX_SGR 20 30 02 24.2 216.0 2.4 31.6 -11 1 1 638 05 49 44 05 50 14 --- 20 30 32 24.2 216.1 2.4 31.7 19 F 1 639 05 49 44 05 50 14 J1808-2124 20 30 32 24.9 216.6 2.4 31.9 -7 1 1 639 05 50 14 05 50 34 --- 20 30 52 24.8 216.6 2.4 32.0 13 F 1 640 05 50 14 05 50 34 VX_SGR 20 30 52 24.1 216.2 2.4 31.8 -7 1 1 640 05 50 34 05 51 04 --- 20 31 22 24.1 216.3 2.4 31.9 23 F 1 641 05 50 34 05 51 04 J1811-2055 20 31 22 25.6 216.4 2.3 31.6 -9 1 1 641 05 51 04 05 51 24 --- 20 31 42 25.5 216.4 2.3 31.7 11 F 1 642 05 51 04 05 51 24 VX_SGR 20 31 42 24.0 216.3 2.4 31.9 -9 1 1 642 05 51 24 05 51 54 --- 20 32 12 24.0 216.5 2.4 32.0 21 F 1 643 05 51 24 05 51 54 J1807-2506 20 32 12 21.5 214.9 2.4 31.5 -11 1 1 643 05 51 54 05 52 19 --- 20 32 37 21.4 215.0 2.4 31.5 14 F 1 643 05 51 54 05 52 19 VX_SGR 20 32 37 23.9 216.5 2.4 32.1 -11 1 1 643 05 52 19 05 52 49 --- 20 33 07 23.9 216.7 2.4 32.2 19 F 1 644 05 52 19 Schedule for VLBA_PT (Code Pt ) Page 37 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 52 49 J1808-2124 20 33 07 24.5 217.1 2.4 32.4 -7 1 1 644 05 52 49 05 53 08 --- 20 33 27 24.5 217.2 2.4 32.4 13 F 1 645 05 52 49 05 53 08 VX_SGR 20 33 27 23.8 216.7 2.4 32.2 -7 1 1 645 05 53 08 05 53 38 --- 20 33 57 23.8 216.8 2.4 32.3 23 F 1 646 05 53 08 05 53 38 J1811-2055 20 33 57 25.2 216.9 2.4 32.1 -9 1 1 646 05 53 38 05 53 58 --- 20 34 17 25.2 217.0 2.4 32.2 11 F 1 647 05 53 38 05 53 58 VX_SGR 20 34 17 23.7 216.9 2.4 32.4 -9 1 1 647 05 53 58 05 54 28 --- 20 34 47 23.6 217.0 2.4 32.5 21 F 1 648 05 53 58 05 54 28 J1807-2506 20 34 47 21.2 215.4 2.4 31.9 -11 1 1 648 05 54 28 05 54 53 --- 20 35 12 21.1 215.5 2.5 32.0 14 F 1 648 05 54 28 05 54 53 VX_SGR 20 35 12 23.6 217.1 2.4 32.6 -11 1 1 648 05 54 53 05 55 23 --- 20 35 42 23.5 217.2 2.5 32.7 19 F 1 649 05 54 53 05 55 23 J1808-2124 20 35 42 24.2 217.7 2.5 32.8 -7 1 1 649 05 55 23 05 55 43 --- 20 36 02 24.2 217.7 2.5 32.9 13 F 1 650 05 55 23 05 55 43 VX_SGR 20 36 02 23.5 217.3 2.5 32.7 -7 1 1 650 05 55 43 05 56 13 --- 20 36 32 23.4 217.4 2.5 32.8 23 F 1 651 05 55 43 05 56 13 J1811-2055 20 36 32 24.9 217.5 2.4 32.6 -9 1 1 651 05 56 13 05 56 33 --- 20 36 52 24.9 217.6 2.4 32.6 11 F 1 652 05 56 13 05 56 33 VX_SGR 20 36 52 23.4 217.4 2.5 32.9 -9 1 1 652 05 56 33 05 57 03 --- 20 37 22 23.3 217.6 2.5 33.0 21 F 1 653 05 56 33 05 57 03 J1807-2506 20 37 22 20.9 216.0 2.5 32.4 -11 1 1 653 05 57 03 05 57 28 --- 20 37 47 20.8 216.0 2.5 32.5 14 F 1 653 05 57 03 05 57 28 VX_SGR 20 37 47 23.3 217.6 2.5 33.0 -11 1 1 653 05 57 28 05 57 58 --- 20 38 17 23.2 217.7 2.5 33.1 19 F 1 654 05 57 28 05 57 58 J1808-2124 20 38 17 23.9 218.2 2.5 33.3 -7 1 1 654 05 57 58 05 58 18 --- 20 38 37 23.9 218.3 2.5 33.4 13 F 1 655 05 57 58 05 58 18 VX_SGR 20 38 37 23.2 217.8 2.5 33.2 -7 1 1 655 05 58 18 05 58 48 --- 20 39 07 23.1 217.9 2.5 33.3 23 F 1 656 05 58 18 Schedule for VLBA_PT (Code Pt ) Page 38 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 58 48 J1811-2055 20 39 07 24.6 218.1 2.5 33.0 -9 1 1 656 05 58 48 05 59 07 --- 20 39 27 24.5 218.1 2.5 33.1 11 F 1 657 05 58 48 05 59 07 VX_SGR 20 39 27 23.1 218.0 2.5 33.3 -9 1 1 657 05 59 07 05 59 37 --- 20 39 57 23.0 218.1 2.5 33.4 21 F 1 658 05 59 07 05 59 37 J1807-2506 20 39 57 20.5 216.5 2.5 32.8 -11 1 1 658 05 59 37 06 00 02 --- 20 40 22 20.5 216.6 2.5 32.9 14 F 1 658 05 59 37 06 00 02 VX_SGR 20 40 22 22.9 218.2 2.5 33.5 -11 1 1 658 06 00 02 06 00 32 --- 20 40 52 22.9 218.3 2.5 33.6 19 F 1 659 06 00 02 06 00 32 J1808-2124 20 40 52 23.6 218.8 2.5 33.8 -7 1 1 659 06 00 32 06 00 52 --- 20 41 12 23.5 218.8 2.5 33.8 13 F 1 660 06 00 32 06 00 52 VX_SGR 20 41 12 22.8 218.4 2.5 33.6 -7 1 1 660 06 00 52 06 01 22 --- 20 41 42 22.8 218.5 2.6 33.7 23 F 1 661 06 00 52 06 01 22 J1811-2055 20 41 42 24.3 218.6 2.5 33.5 -9 1 1 661 06 01 22 06 01 42 --- 20 42 02 24.2 218.7 2.5 33.6 11 F 1 662 06 01 22 06 01 42 VX_SGR 20 42 02 22.7 218.5 2.6 33.8 -9 1 1 662 06 01 42 06 02 12 --- 20 42 32 22.7 218.6 2.6 33.9 21 F 1 662 06 01 42 06 02 12 J1807-2506 20 42 32 20.2 217.0 2.6 33.3 -11 1 1 662 06 02 12 06 02 37 --- 20 42 57 20.2 217.1 2.6 33.4