COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines Exp. Code: BS160C Schedule Version: 4.10 Processed by SCHED version: 6.05 June 2006 PI: Zhi-Qiang Shen Address: Shanghai Astronomical Observatory Chinese Academy of Sciences 80 Nandan Road Shanghai 200030, P.R.China Phone: +86-21-64386191 ext 221 EMAIL: zshen@shao.ac.cn Fax: +86-21-64384618 Phone during observation: +86-21-64386191 ext 221 Observing mode: VLBA 256-8-2 at 7mm LCP Notes: IF frequency setup is for the bandwidth synthesis acorss ~301 MHz between IF1 and IF8 total recording time of ~8hr at 256 Mbps note the new position for VX Sgr Schedule for VLBA_KP (Code Kp ) Page 2 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 19 Aug 2007 Day 231 --- Next scan frequencies: 42814.11 42830.86 42872.74 42939.73 43031.85 43082.10 43107.22 43115.60 Next BBC frequencies: 614.11 630.86 672.74 739.73 831.85 882.10 907.22 915.60 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 23 20 46 J1512-0905 13 46 02 43.9 149.4 -1.5 -26.0 0 1 1 0 23 20 46 23 25 46 --- 13 51 02 44.5 150.9 -1.4 -24.7 299 F 1 10 23 21 04 23 27 48 J0157+7442 13 53 04 16.7 -0.4 11.9 1.2 15 1 1 10 23 27 48 23 28 47 --- 13 54 04 16.7 -0.3 11.9 0.9 60 F 1 12 23 28 06 23 30 06 J0808+4950 13 55 22 25.9 -45.7 5.8 70.4 42 1 1 12 23 30 06 23 31 05 --- 13 56 22 25.8 -45.7 5.8 70.2 60 F 1 14 23 30 24 23 33 39 J1625+4134 13 58 56 59.2 61.3 -2.5 -96.1 76 1 1 14 23 33 39 23 34 38 --- 13 59 56 59.4 61.2 -2.4 -96.3 60 F 1 15 23 33 57 23 36 42 J0841+7053 14 02 00 33.3 -22.7 5.3 87.7 62 1 1 15 23 36 42 23 37 42 --- 14 03 00 33.2 -22.7 5.3 87.5 60 F 1 17 23 37 00 23 38 51 J1748+7005 14 04 09 41.2 22.1 -3.7 -110.6 34 1 1 17 23 38 51 23 39 51 --- 14 05 09 41.3 22.0 -3.7 -110.9 60 F 1 19 23 39 09 23 41 32 J0948+4039 14 06 51 38.6 -61.0 4.3 78.0 40 1 1 19 23 41 32 23 42 32 --- 14 07 51 38.4 -61.0 4.3 77.9 60 F 1 21 23 41 50 23 44 33 J1638+5720 14 09 52 54.2 33.8 -2.5 -119.0 52 1 1 21 23 44 33 23 45 33 --- 14 10 52 54.3 33.7 -2.5 -119.3 60 F 1 23 23 44 51 23 47 18 J1642+3948 14 12 37 58.7 64.8 -2.5 -92.6 78 1 1 23 23 47 18 23 48 18 --- 14 13 37 58.9 64.8 -2.5 -92.7 60 F 1 25 23 47 36 23 50 19 J1740+5211 14 15 39 48.0 45.7 -3.4 -98.1 93 1 1 25 23 50 19 23 51 18 --- 14 16 39 48.2 45.6 -3.4 -98.4 60 F 1 27 23 50 37 23 53 51 J1229+0203 14 19 12 50.5 226.3 1.8 37.9 26 1 1 27 23 53 51 23 54 51 --- 14 20 12 50.3 226.6 1.8 38.1 60 F 1 29 23 54 09 23 56 52 J1824+5651 14 22 13 42.2 400.0 -4.0 -94.7 0 1 1 29 23 56 52 23 57 52 --- 14 23 13 42.3 399.9 -4.0 -94.9 60 F 1 31 23 57 10 Schedule for VLBA_KP (Code Kp ) Page 3 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Start: Sun 19 Aug 2007 Day 231 -- Stop: Mon 20 Aug 2007 Day 232 --- 23 59 12 J2202+4216 14 24 33 5.4 402.5 -7.6 -50.8 0 1 1 31 23 59 12 00 00 12 --- 14 25 33 5.6 402.6 -7.6 -50.9 60 F 1 33 23 59 30 00 01 52 J1642+6856 14 27 14 48.4 377.5 -2.2 -134.8 9 1 1 33 00 01 52 00 02 52 --- 14 28 14 48.4 377.4 -2.2 -135.1 60 F 1 35 00 02 10 00 04 58 J1337-1257 14 30 20 43.3 197.6 0.9 15.3 0 1 1 35 00 04 58 00 05 58 --- 14 31 20 43.3 198.0 0.9 15.6 60 F 1 37 00 05 16 00 07 16 J1733-1304 14 32 39 27.5 128.8 -3.0 -42.8 26 1 1 37 00 07 16 00 08 16 --- 14 33 39 27.7 129.0 -3.0 -42.6 60 F 1 39 00 07 34 00 09 43 J1058+0133 14 35 06 30.8 250.4 3.6 53.1 0 1 1 39 00 09 43 00 10 42 --- 14 36 06 30.6 250.6 3.6 53.2 60 F 1 41 00 10 01 00 11 34 J1256-0547 14 36 57 45.3 216.8 1.7 30.8 16 1 1 41 00 11 34 00 12 34 --- 14 37 57 45.2 217.2 1.7 31.0 60 F 1 42 00 11 52 00 12 34 VX_SGR 14 37 57 16.0 130.0 -3.5 -44.6 -64 1 1 42 Stopped 00 14 33 --- 14 39 57 16.4 130.4 -3.5 -44.3 55 S 1 46 00 14 33 VX_SGR 14 39 57 16.4 130.4 -3.5 -44.3 -4 1 1 46 Stopped 00 16 33 --- 14 41 57 16.7 130.7 -3.4 -44.0 116 S 1 50 00 16 33 VX_SGR 14 41 57 16.7 130.7 -3.4 -44.0 -4 1 1 50 00 16 33 00 17 33 --- 14 42 57 16.8 130.9 -3.4 -43.9 56 F 1 52 00 16 51 00 17 33 J1733-1304 14 42 57 29.2 130.9 -2.8 -41.2 -31 1 1 52 00 17 33 00 18 33 --- 14 43 57 29.4 131.1 -2.8 -41.0 29 F 1 54 00 17 33 00 18 33 VX_SGR 14 43 57 17.0 131.1 -3.4 -43.7 -31 1 1 54 00 18 33 00 19 33 --- 14 44 57 17.2 131.2 -3.4 -43.6 29 F 1 56 00 18 33 00 19 33 J1733-1304 14 44 57 29.5 131.3 -2.8 -40.9 -31 1 1 56 00 19 33 00 20 32 --- 14 45 57 29.7 131.5 -2.8 -40.7 29 F 1 58 00 19 33 00 20 32 VX_SGR 14 45 57 17.3 131.4 -3.4 -43.4 -31 1 1 58 00 20 32 00 21 32 --- 14 46 57 17.5 131.6 -3.4 -43.3 29 F 1 60 00 20 32 00 21 32 J1733-1304 14 46 57 29.9 131.7 -2.8 -40.5 -31 1 1 60 00 21 32 00 22 32 --- 14 47 57 30.0 132.0 -2.8 -40.4 29 F 1 62 00 21 32 Schedule for VLBA_KP (Code Kp ) Page 4 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 00 22 32 VX_SGR 14 47 57 17.6 131.8 -3.3 -43.1 -31 1 1 62 00 22 32 00 23 32 --- 14 48 57 17.8 132.0 -3.3 -43.0 29 F 1 64 00 22 32 00 23 32 J1733-1304 14 48 57 30.2 132.2 -2.7 -40.2 -31 1 1 64 00 23 32 00 24 32 --- 14 49 57 30.3 132.4 -2.7 -40.0 29 F 1 66 00 23 32 00 24 32 VX_SGR 14 49 57 18.0 132.1 -3.3 -42.8 -31 1 1 66 00 24 32 00 25 32 --- 14 50 57 18.1 132.3 -3.3 -42.7 29 F 1 68 00 24 32 00 25 32 J1733-1304 14 50 57 30.5 132.6 -2.7 -39.9 -31 1 1 68 00 25 32 00 26 31 --- 14 51 57 30.6 132.8 -2.7 -39.7 29 F 1 69 00 25 32 00 26 31 VX_SGR 14 51 57 18.3 132.5 -3.3 -42.5 -31 1 1 69 00 26 31 00 27 31 --- 14 52 57 18.4 132.7 -3.3 -42.4 29 F 1 71 00 26 31 00 27 31 J1733-1304 14 52 57 30.8 133.0 -2.7 -39.5 -31 1 1 71 00 27 31 00 28 31 --- 14 53 57 31.0 133.3 -2.7 -39.4 29 F 1 73 00 27 31 00 28 31 VX_SGR 14 53 57 18.6 132.9 -3.2 -42.2 -31 1 1 73 00 28 31 00 29 31 --- 14 54 57 18.7 133.0 -3.2 -42.1 29 F 1 75 00 28 31 00 29 31 J1733-1304 14 54 57 31.1 133.5 -2.6 -39.2 -31 1 1 75 00 29 31 00 30 31 --- 14 55 57 31.3 133.7 -2.6 -39.0 29 F 1 77 00 29 31 00 30 31 VX_SGR 14 55 57 18.9 133.2 -3.2 -41.9 -31 1 1 77 00 30 31 00 31 31 --- 14 56 57 19.0 133.4 -3.2 -41.8 29 F 1 79 00 30 31 00 31 31 J1733-1304 14 56 57 31.4 133.9 -2.6 -38.9 -31 1 1 79 00 31 31 00 32 30 --- 14 57 57 31.6 134.1 -2.6 -38.7 29 F 1 81 00 31 31 00 32 30 VX_SGR 14 57 57 19.2 133.6 -3.2 -41.6 -31 1 1 81 00 32 30 00 33 30 --- 14 58 57 19.4 133.8 -3.2 -41.4 29 F 1 83 00 32 30 00 33 30 J1733-1304 14 58 57 31.7 134.4 -2.6 -38.5 -31 1 1 83 00 33 30 00 34 30 --- 14 59 57 31.9 134.6 -2.6 -38.3 29 F 1 85 00 33 30 00 34 30 VX_SGR 14 59 57 19.5 133.9 -3.1 -41.3 -31 1 1 85 00 34 30 00 35 30 --- 15 00 57 19.7 134.1 -3.1 -41.1 29 F 1 87 00 34 30 00 35 30 J1733-1304 15 00 57 32.0 134.8 -2.5 -38.2 -31 1 1 87 00 35 30 00 36 30 --- 15 01 57 32.2 135.0 -2.5 -38.0 29 F 1 89 00 35 30 Schedule for VLBA_KP (Code Kp ) Page 5 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 00 36 30 VX_SGR 15 01 57 19.8 134.3 -3.1 -41.0 -31 1 1 89 00 36 30 00 37 30 --- 15 02 57 20.0 134.5 -3.1 -40.8 29 F 1 91 00 36 30 00 37 30 J1733-1304 15 02 57 32.3 135.3 -2.5 -37.8 -31 1 1 91 00 37 30 00 38 29 --- 15 03 57 32.5 135.5 -2.5 -37.6 29 F 1 93 00 37 30 00 38 29 VX_SGR 15 03 57 20.1 134.7 -3.1 -40.7 -31 1 1 93 00 38 29 00 39 29 --- 15 04 57 20.3 134.9 -3.1 -40.5 29 F 1 95 00 38 29 00 39 29 J1733-1304 15 04 57 32.6 135.7 -2.5 -37.5 -31 1 1 95 00 39 29 00 40 29 --- 15 05 57 32.8 136.0 -2.5 -37.3 29 F 1 97 00 39 29 00 40 29 VX_SGR 15 05 57 20.4 135.1 -3.0 -40.3 -31 1 1 97 00 40 29 00 41 29 --- 15 06 57 20.6 135.3 -3.0 -40.2 29 F 1 98 00 40 29 00 41 29 J1733-1304 15 06 57 32.9 136.2 -2.4 -37.1 -31 1 1 98 00 41 29 00 42 29 --- 15 07 57 33.1 136.4 -2.4 -36.9 29 F 1 100 00 41 29 00 42 29 VX_SGR 15 07 57 20.7 135.4 -3.0 -40.0 -31 1 1 100 00 42 29 00 43 29 --- 15 08 57 20.9 135.6 -3.0 -39.9 29 F 1 102 00 42 29 00 43 29 J1733-1304 15 08 57 33.2 136.7 -2.4 -36.7 -31 1 1 102 00 43 29 00 44 29 --- 15 09 57 33.3 136.9 -2.4 -36.5 29 F 1 104 00 43 29 00 44 29 VX_SGR 15 09 57 21.0 135.8 -3.0 -39.7 -31 1 1 104 00 44 29 00 45 28 --- 15 10 57 21.2 136.0 -3.0 -39.5 29 F 1 106 00 44 29 00 45 28 J1733-1304 15 10 57 33.5 137.1 -2.4 -36.4 -31 1 1 106 00 45 28 00 46 28 --- 15 11 57 33.6 137.4 -2.4 -36.2 29 F 1 108 00 45 28 00 46 28 VX_SGR 15 11 57 21.3 136.2 -2.9 -39.4 -31 1 1 108 00 46 28 00 47 28 --- 15 12 57 21.5 136.4 -2.9 -39.2 29 F 1 110 00 46 28 00 47 28 J1733-1304 15 12 57 33.8 137.6 -2.3 -36.0 -31 1 1 110 00 47 28 00 48 28 --- 15 13 57 33.9 137.8 -2.3 -35.8 29 F 1 112 00 47 28 00 48 28 VX_SGR 15 13 57 21.6 136.6 -2.9 -39.0 -31 1 1 112 00 48 28 00 49 28 --- 15 14 57 21.7 136.8 -2.9 -38.9 29 F 1 114 00 48 28 00 49 28 J1733-1304 15 14 57 34.1 138.1 -2.3 -35.6 -31 1 1 114 00 49 28 00 50 28 --- 15 15 57 34.2 138.3 -2.3 -35.4 29 F 1 116 00 49 28 Schedule for VLBA_KP (Code Kp ) Page 6 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 00 50 28 VX_SGR 15 15 57 21.9 137.0 -2.9 -38.7 -31 1 1 116 00 50 28 00 51 27 --- 15 16 57 22.0 137.2 -2.9 -38.5 29 F 1 118 00 50 28 00 51 27 J1733-1304 15 16 57 34.3 138.5 -2.3 -35.2 -31 1 1 118 00 51 27 00 52 27 --- 15 17 57 34.5 138.8 -2.3 -35.0 29 F 1 120 00 51 27 00 52 27 VX_SGR 15 17 57 22.2 137.4 -2.8 -38.4 -31 1 1 120 00 52 27 00 53 27 --- 15 18 57 22.3 137.6 -2.8 -38.2 29 F 1 122 00 52 27 00 53 27 VX_SGR 15 18 57 22.3 137.6 -2.8 -38.2 -4 1 1 122 Stopped 00 55 27 --- 15 20 57 22.6 138.0 -2.8 -37.9 116 S 1 125 00 55 27 VX_SGR 15 20 57 22.6 138.0 -2.8 -37.9 -4 1 1 125 Stopped 00 57 26 --- 15 22 57 22.9 138.4 -2.8 -37.5 116 S 1 129 00 57 26 VX_SGR 15 22 57 22.9 138.4 -2.8 -37.5 -4 1 1 129 00 57 26 00 59 26 --- 15 24 57 23.2 138.8 -2.7 -37.2 116 F 1 133 00 57 44 00 59 26 VX_SGR 15 24 57 23.2 138.8 -2.7 -37.2 -4 1 1 133 00 59 26 00 59 56 --- 15 25 27 23.2 138.9 -2.7 -37.1 26 F 1 134 00 59 26 00 59 56 J1808-2124 15 25 27 23.9 138.3 -2.7 -37.3 -7 1 1 134 00 59 56 01 00 16 --- 15 25 47 23.9 138.4 -2.7 -37.3 13 F 1 135 00 59 56 01 00 16 VX_SGR 15 25 47 23.3 138.9 -2.7 -37.0 -7 1 1 135 01 00 16 01 00 46 --- 15 26 17 23.4 139.0 -2.7 -36.9 23 F 1 136 01 00 16 01 00 46 J1811-2055 15 26 17 24.0 137.5 -2.8 -37.8 -7 1 1 136 01 00 46 01 01 06 --- 15 26 37 24.0 137.6 -2.7 -37.8 13 F 1 136 01 00 46 01 01 06 VX_SGR 15 26 37 23.4 139.1 -2.7 -36.9 -7 1 1 136 01 01 06 01 01 36 --- 15 27 07 23.5 139.2 -2.7 -36.8 23 F 1 137 01 01 06 01 01 36 J1807-2506 15 27 07 21.2 141.1 -2.7 -36.0 -11 1 1 137 01 01 36 01 02 01 --- 15 27 32 21.3 141.2 -2.7 -36.0 14 F 1 138 01 01 36 01 02 01 VX_SGR 15 27 32 23.5 139.3 -2.7 -36.7 -11 1 1 138 01 02 01 01 02 31 --- 15 28 02 23.6 139.4 -2.7 -36.6 19 F 1 139 01 02 01 01 02 31 J1808-2124 15 28 02 24.2 138.8 -2.7 -36.9 -7 1 1 139 01 02 31 01 02 50 --- 15 28 22 24.3 138.9 -2.7 -36.8 13 F 1 140 01 02 31 Schedule for VLBA_KP (Code Kp ) Page 7 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 02 50 VX_SGR 15 28 22 23.6 139.4 -2.7 -36.6 -7 1 1 140 01 02 50 01 03 20 --- 15 28 52 23.7 139.5 -2.7 -36.5 23 F 1 141 01 02 50 01 03 20 J1811-2055 15 28 52 24.3 138.1 -2.7 -37.4 -7 1 1 141 01 03 20 01 03 40 --- 15 29 12 24.4 138.1 -2.7 -37.3 13 F 1 141 01 03 20 01 03 40 VX_SGR 15 29 12 23.8 139.6 -2.7 -36.4 -7 1 1 141 01 03 40 01 04 10 --- 15 29 42 23.8 139.7 -2.6 -36.3 23 F 1 142 01 03 40 01 04 10 J1807-2506 15 29 42 21.5 141.6 -2.6 -35.6 -11 1 1 142 01 04 10 01 04 35 --- 15 30 07 21.6 141.7 -2.6 -35.5 14 F 1 143 01 04 10 01 04 35 VX_SGR 15 30 07 23.9 139.8 -2.6 -36.3 -11 1 1 143 01 04 35 01 05 05 --- 15 30 37 24.0 139.9 -2.6 -36.2 19 F 1 144 01 04 35 01 05 05 J1808-2124 15 30 37 24.6 139.4 -2.6 -36.4 -7 1 1 144 01 05 05 01 05 25 --- 15 30 57 24.6 139.4 -2.6 -36.3 13 F 1 145 01 05 05 01 05 25 VX_SGR 15 30 57 24.0 140.0 -2.6 -36.1 -7 1 1 145 01 05 25 01 05 55 --- 15 31 27 24.1 140.1 -2.6 -36.0 23 F 1 146 01 05 25 01 05 55 J1811-2055 15 31 27 24.7 138.6 -2.7 -36.9 -7 1 1 146 01 05 55 01 06 15 --- 15 31 47 24.7 138.7 -2.7 -36.9 13 F 1 146 01 05 55 01 06 15 VX_SGR 15 31 47 24.1 140.1 -2.6 -36.0 -7 1 1 146 01 06 15 01 06 45 --- 15 32 17 24.2 140.2 -2.6 -35.9 23 F 1 147 01 06 15 01 06 45 J1807-2506 15 32 17 21.9 142.1 -2.6 -35.1 -11 1 1 147 01 06 45 01 07 10 --- 15 32 42 21.9 142.2 -2.6 -35.0 14 F 1 148 01 06 45 01 07 10 VX_SGR 15 32 42 24.2 140.3 -2.6 -35.8 -11 1 1 148 01 07 10 01 07 40 --- 15 33 12 24.3 140.4 -2.6 -35.7 19 F 1 149 01 07 10 01 07 40 J1808-2124 15 33 12 25.0 139.9 -2.6 -35.9 -7 1 1 149 01 07 40 01 08 00 --- 15 33 32 25.0 140.0 -2.6 -35.9 13 F 1 150 01 07 40 01 08 00 VX_SGR 15 33 32 24.4 140.5 -2.6 -35.7 -7 1 1 150 01 08 00 01 08 30 --- 15 34 02 24.4 140.6 -2.6 -35.6 23 F 1 151 01 08 00 01 08 30 J1811-2055 15 34 02 25.1 139.1 -2.6 -36.5 -7 1 1 151 01 08 30 01 08 50 --- 15 34 22 25.1 139.2 -2.6 -36.4 13 F 1 151 01 08 30 Schedule for VLBA_KP (Code Kp ) Page 8 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 08 50 VX_SGR 15 34 22 24.5 140.7 -2.6 -35.5 -7 1 1 151 01 08 50 01 09 19 --- 15 34 52 24.5 140.8 -2.6 -35.4 23 F 1 152 01 08 50 01 09 19 J1807-2506 15 34 52 22.2 142.7 -2.6 -34.6 -11 1 1 152 01 09 19 01 09 44 --- 15 35 17 22.3 142.7 -2.5 -34.6 14 F 1 153 01 09 19 01 09 44 VX_SGR 15 35 17 24.6 140.9 -2.6 -35.3 -11 1 1 153 01 09 44 01 10 14 --- 15 35 47 24.7 141.0 -2.5 -35.3 19 F 1 154 01 09 44 01 10 14 J1808-2124 15 35 47 25.3 140.4 -2.5 -35.5 -7 1 1 154 01 10 14 01 10 34 --- 15 36 07 25.4 140.5 -2.5 -35.4 13 F 1 155 01 10 14 01 10 34 VX_SGR 15 36 07 24.7 141.0 -2.5 -35.2 -7 1 1 155 01 10 34 01 11 04 --- 15 36 37 24.8 141.1 -2.5 -35.1 23 F 1 156 01 10 34 01 11 04 J1811-2055 15 36 37 25.4 139.7 -2.6 -36.0 -7 1 1 156 01 11 04 01 11 24 --- 15 36 57 25.5 139.7 -2.6 -35.9 13 F 1 156 01 11 04 01 11 24 VX_SGR 15 36 57 24.8 141.2 -2.5 -35.0 -7 1 1 156 01 11 24 01 11 54 --- 15 37 27 24.9 141.3 -2.5 -34.9 23 F 1 157 01 11 24 01 11 54 J1807-2506 15 37 27 22.5 143.2 -2.5 -34.2 -11 1 1 157 01 11 54 01 12 19 --- 15 37 52 22.6 143.3 -2.5 -34.1 14 F 1 158 01 11 54 01 12 19 VX_SGR 15 37 52 24.9 141.4 -2.5 -34.9 -11 1 1 158 01 12 19 01 12 49 --- 15 38 22 25.0 141.5 -2.5 -34.8 19 F 1 159 01 12 19 01 12 49 J1808-2124 15 38 22 25.7 141.0 -2.5 -35.0 -7 1 1 159 01 12 49 01 13 09 --- 15 38 42 25.7 141.1 -2.5 -34.9 13 F 1 160 01 12 49 01 13 09 VX_SGR 15 38 42 25.0 141.6 -2.5 -34.7 -7 1 1 160 01 13 09 01 13 39 --- 15 39 12 25.1 141.7 -2.5 -34.6 23 F 1 161 01 13 09 01 13 39 J1811-2055 15 39 12 25.8 140.2 -2.5 -35.5 -7 1 1 161 01 13 39 01 13 59 --- 15 39 32 25.8 140.3 -2.5 -35.5 13 F 1 161 01 13 39 01 13 59 VX_SGR 15 39 32 25.1 141.8 -2.5 -34.6 -7 1 1 161 01 13 59 01 14 29 --- 15 40 02 25.2 141.9 -2.5 -34.5 23 F 1 162 01 13 59 01 14 29 J1807-2506 15 40 02 22.9 143.7 -2.5 -33.7 -11 1 1 162 01 14 29 01 14 54 --- 15 40 27 22.9 143.8 -2.5 -33.6 14 F 1 163 01 14 29 Schedule for VLBA_KP (Code Kp ) Page 9 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 14 54 VX_SGR 15 40 27 25.3 141.9 -2.5 -34.4 -11 1 1 163 01 14 54 01 15 23 --- 15 40 57 25.3 142.1 -2.5 -34.3 19 F 1 164 01 14 54 01 15 23 J1808-2124 15 40 57 26.0 141.5 -2.5 -34.5 -7 1 1 164 01 15 23 01 15 43 --- 15 41 17 26.0 141.6 -2.5 -34.5 13 F 1 165 01 15 23 01 15 43 VX_SGR 15 41 17 25.4 142.1 -2.5 -34.2 -7 1 1 165 01 15 43 01 16 13 --- 15 41 47 25.4 142.2 -2.4 -34.2 23 F 1 166 01 15 43 01 16 13 J1811-2055 15 41 47 26.1 140.8 -2.5 -35.1 -7 1 1 166 01 16 13 01 16 33 --- 15 42 07 26.2 140.8 -2.5 -35.0 13 F 1 166 01 16 13 01 16 33 VX_SGR 15 42 07 25.5 142.3 -2.4 -34.1 -7 1 1 166 01 16 33 01 17 03 --- 15 42 37 25.6 142.4 -2.4 -34.0 23 F 1 167 01 16 33 01 17 03 J1807-2506 15 42 37 23.2 144.2 -2.4 -33.2 -11 1 1 167 01 17 03 01 17 28 --- 15 43 02 23.2 144.3 -2.4 -33.1 14 F 1 168 01 17 03 01 17 28 VX_SGR 15 43 02 25.6 142.5 -2.4 -33.9 -11 1 1 168 01 17 28 01 17 58 --- 15 43 32 25.7 142.6 -2.4 -33.8 19 F 1 169 01 17 28 01 17 58 J1808-2124 15 43 32 26.3 142.1 -2.4 -34.1 -7 1 1 169 01 17 58 01 18 18 --- 15 43 52 26.4 142.2 -2.4 -34.0 13 F 1 170 01 17 58 01 18 18 VX_SGR 15 43 52 25.7 142.7 -2.4 -33.8 -7 1 1 170 01 18 18 01 18 48 --- 15 44 22 25.8 142.8 -2.4 -33.7 23 F 1 171 01 18 18 01 18 48 J1811-2055 15 44 22 26.5 141.3 -2.5 -34.6 -7 1 1 171 01 18 48 01 19 08 --- 15 44 42 26.5 141.4 -2.4 -34.5 13 F 1 171 01 18 48 01 19 08 VX_SGR 15 44 42 25.8 142.9 -2.4 -33.6 -7 1 1 171 01 19 08 01 19 38 --- 15 45 12 25.9 143.0 -2.4 -33.5 23 F 1 172 01 19 08 01 19 38 J1807-2506 15 45 12 23.5 144.8 -2.4 -32.7 -11 1 1 172 01 19 38 01 20 03 --- 15 45 37 23.6 144.9 -2.4 -32.6 14 F 1 173 01 19 38 01 20 03 VX_SGR 15 45 37 25.9 143.0 -2.4 -33.4 -11 1 1 173 01 20 03 01 20 33 --- 15 46 07 26.0 143.2 -2.4 -33.3 19 F 1 174 01 20 03 01 20 33 J1808-2124 15 46 07 26.7 142.6 -2.4 -33.6 -7 1 1 174 01 20 33 01 20 53 --- 15 46 27 26.7 142.7 -2.4 -33.5 13 F 1 175 01 20 33 Schedule for VLBA_KP (Code Kp ) Page 10 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 20 53 VX_SGR 15 46 27 26.0 143.2 -2.4 -33.3 -7 1 1 175 01 20 53 01 21 22 --- 15 46 57 26.1 143.3 -2.4 -33.2 23 F 1 176 01 20 53 01 21 22 J1811-2055 15 46 57 26.8 141.9 -2.4 -34.1 -7 1 1 176 01 21 22 01 21 42 --- 15 47 17 26.8 141.9 -2.4 -34.1 13 F 1 176 01 21 22 01 21 42 VX_SGR 15 47 17 26.1 143.4 -2.4 -33.1 -7 1 1 176 01 21 42 01 22 12 --- 15 47 47 26.2 143.5 -2.3 -33.0 23 F 1 177 01 21 42 01 22 12 J1807-2506 15 47 47 23.8 145.3 -2.3 -32.2 -11 1 1 177 01 22 12 01 22 37 --- 15 48 12 23.9 145.4 -2.3 -32.1 14 F 1 178 01 22 12 01 22 37 VX_SGR 15 48 12 26.3 143.6 -2.3 -32.9 -11 1 1 178 01 22 37 01 23 07 --- 15 48 42 26.3 143.7 -2.3 -32.8 19 F 1 179 01 22 37 01 23 07 J1808-2124 15 48 42 27.0 143.2 -2.3 -33.1 -7 1 1 179 01 23 07 01 23 27 --- 15 49 02 27.0 143.3 -2.3 -33.0 13 F 1 180 01 23 07 01 23 27 VX_SGR 15 49 02 26.4 143.8 -2.3 -32.8 -7 1 1 180 01 23 27 01 23 57 --- 15 49 32 26.4 143.9 -2.3 -32.7 23 F 1 181 01 23 27 01 23 57 J1811-2055 15 49 32 27.1 142.4 -2.4 -33.6 -7 1 1 181 01 23 57 01 24 17 --- 15 49 52 27.2 142.5 -2.4 -33.6 13 F 1 181 01 23 57 01 24 17 VX_SGR 15 49 52 26.5 144.0 -2.3 -32.6 -7 1 1 181 01 24 17 01 24 47 --- 15 50 22 26.5 144.1 -2.3 -32.5 23 F 1 182 01 24 17 01 24 47 J1807-2506 15 50 22 24.1 145.9 -2.3 -31.7 -11 1 1 182 01 24 47 01 25 12 --- 15 50 47 24.2 145.9 -2.3 -31.7 14 F 1 183 01 24 47 01 25 12 VX_SGR 15 50 47 26.6 144.2 -2.3 -32.5 -11 1 1 183 01 25 12 01 25 42 --- 15 51 17 26.6 144.3 -2.3 -32.4 19 F 1 184 01 25 12 01 25 42 J1808-2124 15 51 17 27.3 143.8 -2.3 -32.6 -7 1 1 184 01 25 42 01 26 02 --- 15 51 37 27.4 143.9 -2.3 -32.5 13 F 1 185 01 25 42 01 26 02 VX_SGR 15 51 37 26.7 144.3 -2.3 -32.3 -7 1 1 185 01 26 02 01 26 32 --- 15 52 07 26.8 144.5 -2.3 -32.2 23 F 1 186 01 26 02 01 26 32 J1811-2055 15 52 07 27.5 143.0 -2.3 -33.1 -7 1 1 186 01 26 32 01 26 52 --- 15 52 27 27.5 143.1 -2.3 -33.1 13 F 1 186 01 26 32 Schedule for VLBA_KP (Code Kp ) Page 11 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 26 52 VX_SGR 15 52 27 26.8 144.5 -2.3 -32.1 -7 1 1 186 01 26 52 01 27 21 --- 15 52 57 26.9 144.6 -2.3 -32.0 23 F 1 187 01 26 52 01 27 21 J1807-2506 15 52 57 24.4 146.4 -2.3 -31.2 -11 1 1 187 01 27 21 01 27 46 --- 15 53 22 24.5 146.5 -2.2 -31.2 14 F 1 188 01 27 21 01 27 46 VX_SGR 15 53 22 26.9 144.7 -2.3 -32.0 -11 1 1 188 01 27 46 01 28 16 --- 15 53 52 27.0 144.8 -2.2 -31.9 19 F 1 189 01 27 46 01 28 16 J1808-2124 15 53 52 27.6 144.3 -2.2 -32.1 -7 1 1 189 01 28 16 01 28 36 --- 15 54 12 27.7 144.4 -2.2 -32.0 13 F 1 190 01 28 16 01 28 36 VX_SGR 15 54 12 27.0 144.9 -2.2 -31.8 -7 1 1 190 01 28 36 01 29 06 --- 15 54 42 27.1 145.0 -2.2 -31.7 23 F 1 191 01 28 36 01 29 06 J1811-2055 15 54 42 27.8 143.6 -2.3 -32.6 -7 1 1 191 01 29 06 01 29 26 --- 15 55 02 27.8 143.6 -2.3 -32.6 13 F 1 191 01 29 06 01 29 26 VX_SGR 15 55 02 27.1 145.1 -2.2 -31.6 -7 1 1 191 01 29 26 01 29 56 --- 15 55 32 27.2 145.2 -2.2 -31.5 22 F 1 192 01 29 26 01 29 56 J1807-2506 15 55 32 24.7 147.0 -2.2 -30.7 -11 1 1 192 01 29 56 01 30 21 --- 15 55 57 24.8 147.0 -2.2 -30.6 14 F 1 193 01 29 56 01 30 21 VX_SGR 15 55 57 27.2 145.3 -2.2 -31.4 -11 1 1 193 01 30 21 01 30 51 --- 15 56 27 27.3 145.4 -2.2 -31.3 19 F 1 194 01 30 21 01 30 51 J1808-2124 15 56 27 28.0 144.9 -2.2 -31.6 -7 1 1 194 01 30 51 01 31 11 --- 15 56 47 28.0 145.0 -2.2 -31.5 13 F 1 195 01 30 51 01 31 11 VX_SGR 15 56 47 27.3 145.5 -2.2 -31.3 -7 1 1 195 01 31 11 01 31 41 --- 15 57 17 27.4 145.6 -2.2 -31.2 23 F 1 196 01 31 11 01 31 41 J1811-2055 15 57 17 28.1 144.1 -2.2 -32.1 -7 1 1 196 01 31 41 01 32 01 --- 15 57 37 28.2 144.2 -2.2 -32.1 13 F 1 196 01 31 41 01 32 01 VX_SGR 15 57 37 27.4 145.7 -2.2 -31.1 -7 1 1 196 01 32 01 01 32 31 --- 15 58 07 27.5 145.8 -2.2 -31.0 22 F 1 197 01 32 01 01 32 31 J1807-2506 15 58 07 25.0 147.5 -2.2 -30.2 -11 1 1 197 01 32 31 01 32 56 --- 15 58 32 25.1 147.6 -2.2 -30.1 14 F 1 198 01 32 31 Schedule for VLBA_KP (Code Kp ) Page 12 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 32 56 VX_SGR 15 58 32 27.5 145.9 -2.2 -30.9 -11 1 1 198 01 32 56 01 33 25 --- 15 59 02 27.6 146.0 -2.2 -30.8 19 F 1 199 01 32 56 01 33 25 J1808-2124 15 59 02 28.3 145.5 -2.2 -31.1 -7 1 1 199 01 33 25 01 33 45 --- 15 59 22 28.3 145.6 -2.2 -31.0 13 F 1 200 01 33 25 01 33 45 VX_SGR 15 59 22 27.6 146.1 -2.2 -30.8 -7 1 1 200 01 33 45 01 34 15 --- 15 59 52 27.7 146.2 -2.1 -30.7 23 F 1 201 01 33 45 01 34 15 J1811-2055 15 59 52 28.4 144.7 -2.2 -31.6 -7 1 1 201 01 34 15 01 34 35 --- 16 00 12 28.5 144.8 -2.2 -31.6 12 F 1 201 01 34 15 01 34 35 VX_SGR 16 00 12 27.7 146.3 -2.1 -30.6 -7 1 1 201 01 34 35 01 35 05 --- 16 00 42 27.8 146.4 -2.1 -30.5 22 F 1 202 01 34 35 01 35 05 J1807-2506 16 00 42 25.3 148.1 -2.1 -29.7 -11 1 1 202 01 35 05 01 35 30 --- 16 01 07 25.4 148.2 -2.1 -29.6 14 F 1 203 01 35 05 01 35 30 VX_SGR 16 01 07 27.8 146.5 -2.1 -30.4 -11 1 1 203 Stopped 01 37 30 --- 16 03 07 28.1 146.9 -2.1 -30.0 109 S 1 207 01 37 30 VX_SGR 16 03 07 28.1 146.9 -2.1 -30.0 -4 1 1 207 Stopped 01 39 29 --- 16 05 07 28.3 147.4 -2.1 -29.6 116 S 1 211 01 39 29 VX_SGR 16 05 07 28.3 147.4 -2.1 -29.6 -4 1 1 211 01 39 29 01 40 29 --- 16 06 07 28.4 147.6 -2.0 -29.4 56 F 1 213 01 39 47 01 40 29 J1733-1304 16 06 07 40.3 151.6 -1.5 -24.5 -30 1 1 213 01 40 29 01 41 29 --- 16 07 07 40.4 151.9 -1.4 -24.2 30 F 1 215 01 40 29 01 41 29 VX_SGR 16 07 07 28.5 147.8 -2.0 -29.2 -30 1 1 215 01 41 29 01 42 29 --- 16 08 07 28.6 148.1 -2.0 -29.0 30 F 1 216 01 41 29 01 42 29 J1733-1304 16 08 07 40.5 152.2 -1.4 -24.0 -30 1 1 216 01 42 29 01 43 29 --- 16 09 07 40.6 152.5 -1.4 -23.7 30 F 1 218 01 42 29 01 43 29 VX_SGR 16 09 07 28.7 148.3 -2.0 -28.8 -30 1 1 218 01 43 29 01 44 29 --- 16 10 07 28.9 148.5 -2.0 -28.6 30 F 1 220 01 43 29 01 44 29 J1733-1304 16 10 07 40.7 152.8 -1.4 -23.5 -30 1 1 220 01 44 29 01 45 28 --- 16 11 07 40.8 153.1 -1.4 -23.2 30 F 1 222 01 44 29 Schedule for VLBA_KP (Code Kp ) Page 13 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 45 28 VX_SGR 16 11 07 29.0 148.8 -2.0 -28.4 -30 1 1 222 01 45 28 01 46 28 --- 16 12 07 29.1 149.0 -1.9 -28.2 30 F 1 224 01 45 28 01 46 28 J1733-1304 16 12 07 40.9 153.4 -1.4 -23.0 -30 1 1 224 01 46 28 01 47 28 --- 16 13 07 41.0 153.7 -1.3 -22.7 30 F 1 226 01 46 28 01 47 28 VX_SGR 16 13 07 29.2 149.2 -1.9 -28.0 -30 1 1 226 01 47 28 01 48 28 --- 16 14 07 29.3 149.5 -1.9 -27.8 30 F 1 228 01 47 28 01 48 28 J1733-1304 16 14 07 41.1 154.0 -1.3 -22.5 -30 1 1 228 01 48 28 01 49 28 --- 16 15 07 41.2 154.3 -1.3 -22.2 30 F 1 230 01 48 28 01 49 28 VX_SGR 16 15 07 29.4 149.7 -1.9 -27.6 -30 1 1 230 01 49 28 01 50 28 --- 16 16 07 29.5 149.9 -1.9 -27.3 30 F 1 232 01 49 28 01 50 28 J1733-1304 16 16 07 41.3 154.6 -1.3 -22.0 -30 1 1 232 01 50 28 01 51 28 --- 16 17 07 41.4 154.9 -1.3 -21.7 30 F 1 234 01 50 28 01 51 28 VX_SGR 16 17 07 29.6 150.2 -1.9 -27.1 -30 1 1 234 01 51 28 01 52 27 --- 16 18 07 29.7 150.4 -1.8 -26.9 30 F 1 236 01 51 28 01 52 27 J1733-1304 16 18 07 41.5 155.2 -1.3 -21.5 -30 1 1 236 01 52 27 01 53 27 --- 16 19 07 41.6 155.5 -1.2 -21.2 30 F 1 238 01 52 27 01 53 27 VX_SGR 16 19 07 29.8 150.6 -1.8 -26.7 -29 1 1 238 01 53 27 01 54 27 --- 16 20 07 29.9 150.9 -1.8 -26.5 30 F 1 240 01 53 27 01 54 27 J1733-1304 16 20 07 41.7 155.8 -1.2 -20.9 -29 1 1 240 01 54 27 01 55 27 --- 16 21 07 41.7 156.1 -1.2 -20.7 30 F 1 242 01 54 27 01 55 27 VX_SGR 16 21 07 30.0 151.1 -1.8 -26.3 -29 1 1 242 01 55 27 01 56 27 --- 16 22 07 30.1 151.4 -1.8 -26.1 30 F 1 244 01 55 27 01 56 27 J1733-1304 16 22 07 41.8 156.4 -1.2 -20.4 -29 1 1 244 01 56 27 01 57 27 --- 16 23 07 41.9 156.7 -1.2 -20.2 30 F 1 245 01 56 27 01 57 27 VX_SGR 16 23 07 30.2 151.6 -1.8 -25.8 -29 1 1 245 01 57 27 01 58 26 --- 16 24 07 30.3 151.8 -1.7 -25.6 30 F 1 247 01 57 27 01 58 26 J1733-1304 16 24 07 42.0 157.0 -1.2 -19.9 -29 1 1 247 01 58 26 01 59 26 --- 16 25 07 42.1 157.3 -1.1 -19.6 31 F 1 249 01 58 26 Schedule for VLBA_KP (Code Kp ) Page 14 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 01 59 26 VX_SGR 16 25 07 30.4 152.1 -1.7 -25.4 -29 1 1 249 01 59 26 02 00 26 --- 16 26 07 30.5 152.3 -1.7 -25.2 31 F 1 251 01 59 26 02 00 26 J1733-1304 16 26 07 42.2 157.6 -1.1 -19.4 -29 1 1 251 02 00 26 02 01 26 --- 16 27 07 42.2 157.9 -1.1 -19.1 31 F 1 253 02 00 26 02 01 26 VX_SGR 16 27 07 30.6 152.6 -1.7 -25.0 -29 1 1 253 02 01 26 02 02 26 --- 16 28 07 30.7 152.8 -1.7 -24.8 31 F 1 255 02 01 26 02 02 26 J1733-1304 16 28 07 42.3 158.2 -1.1 -18.8 -29 1 1 255 02 02 26 02 03 26 --- 16 29 07 42.4 158.6 -1.1 -18.6 31 F 1 257 02 02 26 02 03 26 VX_SGR 16 29 07 30.8 153.1 -1.7 -24.5 -29 1 1 257 02 03 26 02 04 25 --- 16 30 07 30.9 153.3 -1.6 -24.3 31 F 1 259 02 03 26 02 04 25 J1733-1304 16 30 07 42.5 158.9 -1.1 -18.3 -29 1 1 259 02 04 25 02 05 25 --- 16 31 07 42.5 159.2 -1.0 -18.0 31 F 1 261 02 04 25 02 05 25 VX_SGR 16 31 07 31.0 153.5 -1.6 -24.1 -29 1 1 261 02 05 25 02 06 25 --- 16 32 07 31.1 153.8 -1.6 -23.9 31 F 1 263 02 05 25 02 06 25 J1733-1304 16 32 07 42.6 159.5 -1.0 -17.8 -29 1 1 263 02 06 25 02 07 25 --- 16 33 07 42.7 159.8 -1.0 -17.5 31 F 1 265 02 06 25 02 07 25 VX_SGR 16 33 07 31.2 154.0 -1.6 -23.7 -29 1 1 265 02 07 25 02 08 25 --- 16 34 07 31.3 154.3 -1.6 -23.4 31 F 1 267 02 07 25 02 08 25 J1733-1304 16 34 07 42.8 160.1 -1.0 -17.2 -29 1 1 267 02 08 25 02 09 25 --- 16 35 07 42.8 160.4 -1.0 -16.9 31 F 1 269 02 08 25 02 09 25 VX_SGR 16 35 07 31.4 154.5 -1.6 -23.2 -29 1 1 269 02 09 25 02 10 24 --- 16 36 07 31.5 154.8 -1.5 -23.0 31 F 1 271 02 09 25 02 10 24 J1733-1304 16 36 07 42.9 160.8 -1.0 -16.7 -29 1 1 271 02 10 24 02 11 24 --- 16 37 07 43.0 161.1 -0.9 -16.4 31 F 1 272 02 10 24 02 11 24 VX_SGR 16 37 07 31.6 155.0 -1.5 -22.8 -29 1 1 272 02 11 24 02 12 24 --- 16 38 07 31.7 155.3 -1.5 -22.5 31 F 1 274 02 11 24 02 12 24 J1733-1304 16 38 07 43.0 161.4 -0.9 -16.1 -29 1 1 274 02 12 24 02 13 24 --- 16 39 07 43.1 161.7 -0.9 -15.9 31 F 1 276 02 12 24 Schedule for VLBA_KP (Code Kp ) Page 15 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 13 24 VX_SGR 16 39 07 31.7 155.5 -1.5 -22.3 -29 1 1 276 02 13 24 02 14 24 --- 16 40 07 31.8 155.8 -1.5 -22.1 31 F 1 278 02 13 24 02 14 24 J1733-1304 16 40 07 43.2 162.0 -0.9 -15.6 -29 1 1 278 02 14 24 02 15 24 --- 16 41 07 43.2 162.4 -0.9 -15.3 31 F 1 280 02 14 24 02 15 24 VX_SGR 16 41 07 31.9 156.0 -1.5 -21.8 -29 1 1 280 02 15 24 02 16 23 --- 16 42 07 32.0 156.3 -1.4 -21.6 31 F 1 282 02 15 24 02 16 23 J1733-1304 16 42 07 43.3 162.7 -0.9 -15.0 -29 1 1 282 02 16 23 02 17 23 --- 16 43 07 43.4 163.0 -0.8 -14.7 31 F 1 284 02 16 23 02 17 23 VX_SGR 16 43 07 32.1 156.6 -1.4 -21.4 -29 1 1 284 02 17 23 02 18 23 --- 16 44 07 32.2 156.8 -1.4 -21.2 31 F 1 286 02 17 23 02 18 23 J1733-1304 16 44 07 43.4 163.3 -0.8 -14.5 -29 1 1 286 02 18 23 02 19 23 --- 16 45 07 43.5 163.7 -0.8 -14.2 31 F 1 288 02 18 23 02 19 23 VX_SGR 16 45 07 32.3 157.1 -1.4 -20.9 -28 1 1 288 02 19 23 02 20 23 --- 16 46 07 32.3 157.3 -1.4 -20.7 31 F 1 290 02 19 23 02 20 23 J1733-1304 16 46 07 43.5 164.0 -0.8 -13.9 -28 1 1 290 02 20 23 02 21 23 --- 16 47 07 43.6 164.3 -0.8 -13.6 31 F 1 292 02 20 23 02 21 23 VX_SGR 16 47 07 32.4 157.6 -1.4 -20.5 -28 1 1 292 02 21 23 02 22 22 --- 16 48 07 32.5 157.8 -1.3 -20.2 31 F 1 294 02 21 23 02 22 22 VX_SGR 16 48 07 32.5 157.8 -1.3 -20.2 -4 1 1 294 Stopped 02 24 22 --- 16 50 07 32.7 158.3 -1.3 -19.8 116 S 1 298 02 24 22 VX_SGR 16 50 07 32.7 158.3 -1.3 -19.8 -4 1 1 298 Stopped 02 26 22 --- 16 52 07 32.8 158.9 -1.3 -19.3 116 S 1 301 02 26 22 VX_SGR 16 52 07 32.8 158.9 -1.3 -19.3 -4 1 1 301 02 26 22 02 28 21 --- 16 54 07 33.0 159.4 -1.2 -18.8 116 F 1 305 02 26 40 02 28 21 VX_SGR 16 54 07 33.0 159.4 -1.2 -18.8 -4 1 1 305 02 28 21 02 28 51 --- 16 54 37 33.0 159.5 -1.2 -18.7 26 F 1 306 02 28 21 02 28 51 J1808-2124 16 54 37 33.8 159.2 -1.2 -18.9 -7 1 1 306 02 28 51 02 29 11 --- 16 54 57 33.8 159.3 -1.2 -18.8 12 F 1 307 02 28 51 Schedule for VLBA_KP (Code Kp ) Page 16 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 29 11 VX_SGR 16 54 57 33.0 159.6 -1.2 -18.6 -7 1 1 307 02 29 11 02 29 41 --- 16 55 27 33.1 159.7 -1.2 -18.5 22 F 1 308 02 29 11 02 29 41 J1811-2055 16 55 27 34.1 158.4 -1.3 -19.5 -8 1 1 308 02 29 41 02 30 01 --- 16 55 47 34.1 158.5 -1.3 -19.4 12 F 1 308 02 29 41 02 30 01 VX_SGR 16 55 47 33.1 159.8 -1.2 -18.4 -8 1 1 308 02 30 01 02 30 31 --- 16 56 17 33.1 160.0 -1.2 -18.3 22 F 1 309 02 30 01 02 30 31 J1807-2506 16 56 17 30.4 161.1 -1.2 -17.7 -11 1 1 309 02 30 31 02 30 56 --- 16 56 42 30.4 161.2 -1.2 -17.6 14 F 1 310 02 30 31 02 30 56 VX_SGR 16 56 42 33.2 160.1 -1.2 -18.2 -11 1 1 310 02 30 56 02 31 26 --- 16 57 12 33.2 160.2 -1.2 -18.1 18 F 1 311 02 30 56 02 31 26 J1808-2124 16 57 12 34.0 159.9 -1.2 -18.3 -8 1 1 311 02 31 26 02 31 46 --- 16 57 32 34.0 160.0 -1.2 -18.2 12 F 1 312 02 31 26 02 31 46 VX_SGR 16 57 32 33.2 160.3 -1.2 -18.0 -8 1 1 312 02 31 46 02 32 16 --- 16 58 02 33.3 160.4 -1.2 -17.9 22 F 1 313 02 31 46 02 32 16 J1811-2055 16 58 02 34.3 159.1 -1.2 -18.9 -8 1 1 313 02 32 16 02 32 36 --- 16 58 22 34.3 159.2 -1.2 -18.8 12 F 1 313 02 32 16 02 32 36 VX_SGR 16 58 22 33.3 160.5 -1.2 -17.8 -8 1 1 313 02 32 36 02 33 06 --- 16 58 52 33.3 160.6 -1.2 -17.7 22 F 1 314 02 32 36 02 33 06 J1807-2506 16 58 52 30.6 161.7 -1.2 -17.1 -11 1 1 314 02 33 06 02 33 31 --- 16 59 17 30.6 161.9 -1.1 -17.0 13 F 1 315 02 33 06 02 33 31 VX_SGR 16 59 17 33.3 160.7 -1.2 -17.6 -11 1 1 315 02 33 31 02 34 01 --- 16 59 47 33.4 160.9 -1.1 -17.5 18 F 1 316 02 33 31 02 34 01 J1808-2124 16 59 47 34.1 160.6 -1.1 -17.6 -8 1 1 316 02 34 01 02 34 20 --- 17 00 07 34.2 160.7 -1.1 -17.6 12 F 1 317 02 34 01 02 34 20 VX_SGR 17 00 07 33.4 161.0 -1.1 -17.4 -8 1 1 317 02 34 20 02 34 50 --- 17 00 37 33.4 161.1 -1.1 -17.3 22 F 1 318 02 34 20 02 34 50 J1811-2055 17 00 37 34.5 159.8 -1.2 -18.3 -8 1 1 318 02 34 50 02 35 10 --- 17 00 57 34.5 159.9 -1.2 -18.2 12 F 1 318 02 34 50 Schedule for VLBA_KP (Code Kp ) Page 17 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 35 10 VX_SGR 17 00 57 33.5 161.2 -1.1 -17.2 -8 1 1 318 02 35 10 02 35 40 --- 17 01 27 33.5 161.3 -1.1 -17.1 22 F 1 319 02 35 10 02 35 40 J1807-2506 17 01 27 30.8 162.4 -1.1 -16.5 -11 1 1 319 02 35 40 02 36 05 --- 17 01 52 30.8 162.5 -1.1 -16.4 13 F 1 320 02 35 40 02 36 05 VX_SGR 17 01 52 33.5 161.4 -1.1 -17.0 -11 1 1 320 02 36 05 02 36 35 --- 17 02 22 33.6 161.6 -1.1 -16.9 18 F 1 321 02 36 05 02 36 35 J1808-2124 17 02 22 34.3 161.3 -1.1 -17.0 -8 1 1 321 02 36 35 02 36 55 --- 17 02 42 34.3 161.4 -1.1 -16.9 12 F 1 322 02 36 35 02 36 55 VX_SGR 17 02 42 33.6 161.6 -1.1 -16.8 -8 1 1 322 02 36 55 02 37 25 --- 17 03 12 33.6 161.8 -1.1 -16.7 22 F 1 323 02 36 55 02 37 25 J1811-2055 17 03 12 34.6 160.5 -1.1 -17.6 -8 1 1 323 02 37 25 02 37 45 --- 17 03 32 34.7 160.6 -1.1 -17.6 12 F 1 323 02 37 25 02 37 45 VX_SGR 17 03 32 33.6 161.9 -1.1 -16.6 -8 1 1 323 02 37 45 02 38 15 --- 17 04 02 33.7 162.0 -1.1 -16.4 22 F 1 324 02 37 45 02 38 15 J1807-2506 17 04 02 30.9 163.1 -1.1 -15.9 -11 1 1 324 02 38 15 02 38 40 --- 17 04 27 30.9 163.2 -1.1 -15.8 13 F 1 325 02 38 15 02 38 40 VX_SGR 17 04 27 33.7 162.1 -1.1 -16.3 -11 1 1 325 02 38 40 02 39 10 --- 17 04 57 33.7 162.2 -1.1 -16.2 18 F 1 326 02 38 40 02 39 10 J1808-2124 17 04 57 34.5 162.0 -1.1 -16.4 -8 1 1 326 02 39 10 02 39 30 --- 17 05 17 34.5 162.1 -1.1 -16.3 12 F 1 327 02 39 10 02 39 30 VX_SGR 17 05 17 33.7 162.3 -1.1 -16.1 -8 1 1 327 02 39 30 02 40 00 --- 17 05 47 33.8 162.5 -1.0 -16.0 22 F 1 328 02 39 30 02 40 00 J1811-2055 17 05 47 34.8 161.2 -1.1 -17.0 -8 1 1 328 02 40 00 02 40 19 --- 17 06 07 34.9 161.3 -1.1 -16.9 12 F 1 328 02 40 00 02 40 19 VX_SGR 17 06 07 33.8 162.6 -1.0 -15.9 -8 1 1 328 02 40 19 02 40 49 --- 17 06 37 33.8 162.7 -1.0 -15.8 22 F 1 329 02 40 19 02 40 49 J1807-2506 17 06 37 31.1 163.7 -1.0 -15.2 -12 1 1 329 02 40 49 02 41 14 --- 17 07 02 31.1 163.8 -1.0 -15.1 13 F 1 330 02 40 49 Schedule for VLBA_KP (Code Kp ) Page 18 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 41 14 VX_SGR 17 07 02 33.9 162.8 -1.0 -15.7 -12 1 1 330 02 41 14 02 41 44 --- 17 07 32 33.9 162.9 -1.0 -15.6 18 F 1 331 02 41 14 02 41 44 J1808-2124 17 07 32 34.7 162.7 -1.0 -15.8 -8 1 1 331 02 41 44 02 42 04 --- 17 07 52 34.7 162.8 -1.0 -15.7 12 F 1 332 02 41 44 02 42 04 VX_SGR 17 07 52 33.9 163.0 -1.0 -15.5 -8 1 1 332 02 42 04 02 42 34 --- 17 08 22 33.9 163.2 -1.0 -15.4 22 F 1 333 02 42 04 02 42 34 J1811-2055 17 08 22 35.0 161.9 -1.1 -16.4 -8 1 1 333 02 42 34 02 42 54 --- 17 08 42 35.0 162.0 -1.0 -16.3 12 F 1 333 02 42 34 02 42 54 VX_SGR 17 08 42 34.0 163.3 -1.0 -15.3 -8 1 1 333 02 42 54 02 43 24 --- 17 09 12 34.0 163.4 -1.0 -15.2 22 F 1 334 02 42 54 02 43 24 J1807-2506 17 09 12 31.2 164.4 -1.0 -14.6 -12 1 1 334 02 43 24 02 43 49 --- 17 09 37 31.2 164.5 -1.0 -14.5 13 F 1 335 02 43 24 02 43 49 VX_SGR 17 09 37 34.0 163.5 -1.0 -15.1 -12 1 1 335 02 43 49 02 44 19 --- 17 10 07 34.0 163.6 -1.0 -15.0 18 F 1 336 02 43 49 02 44 19 J1808-2124 17 10 07 34.8 163.4 -1.0 -15.1 -8 1 1 336 02 44 19 02 44 39 --- 17 10 27 34.8 163.5 -1.0 -15.0 12 F 1 337 02 44 19 02 44 39 VX_SGR 17 10 27 34.1 163.7 -1.0 -14.9 -8 1 1 337 02 44 39 02 45 09 --- 17 10 57 34.1 163.9 -1.0 -14.8 22 F 1 338 02 44 39 02 45 09 J1811-2055 17 10 57 35.2 162.6 -1.0 -15.7 -8 1 1 338 02 45 09 02 45 29 --- 17 11 17 35.2 162.7 -1.0 -15.7 12 F 1 338 02 45 09 02 45 29 VX_SGR 17 11 17 34.1 164.0 -1.0 -14.7 -8 1 1 338 02 45 29 02 45 59 --- 17 11 47 34.1 164.1 -0.9 -14.6 22 F 1 339 02 45 29 02 45 59 J1807-2506 17 11 47 31.4 165.0 -0.9 -14.0 -12 1 1 339 02 45 59 02 46 23 --- 17 12 12 31.4 165.1 -0.9 -13.9 13 F 1 340 02 45 59 02 46 23 VX_SGR 17 12 12 34.2 164.2 -0.9 -14.5 -12 1 1 340 02 46 23 02 46 53 --- 17 12 42 34.2 164.3 -0.9 -14.3 18 F 1 341 02 46 23 02 46 53 J1808-2124 17 12 42 35.0 164.1 -0.9 -14.5 -8 1 1 341 02 46 53 02 47 13 --- 17 13 02 35.0 164.2 -0.9 -14.4 12 F 1 342 02 46 53 Schedule for VLBA_KP (Code Kp ) Page 19 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 47 13 VX_SGR 17 13 02 34.2 164.4 -0.9 -14.2 -8 1 1 342 02 47 13 02 47 43 --- 17 13 32 34.2 164.6 -0.9 -14.1 22 F 1 343 02 47 13 02 47 43 J1811-2055 17 13 32 35.3 163.3 -1.0 -15.1 -8 1 1 343 02 47 43 02 48 03 --- 17 13 52 35.4 163.4 -1.0 -15.0 12 F 1 343 02 47 43 02 48 03 VX_SGR 17 13 52 34.3 164.7 -0.9 -14.0 -8 1 1 343 02 48 03 02 48 33 --- 17 14 22 34.3 164.8 -0.9 -13.9 22 F 1 344 02 48 03 02 48 33 J1807-2506 17 14 22 31.5 165.7 -0.9 -13.4 -12 1 1 344 02 48 33 02 48 58 --- 17 14 47 31.5 165.8 -0.9 -13.3 13 F 1 345 02 48 33 02 48 58 VX_SGR 17 14 47 34.3 164.9 -0.9 -13.8 -12 1 1 345 02 48 58 02 49 28 --- 17 15 17 34.3 165.0 -0.9 -13.7 18 F 1 346 02 48 58 02 49 28 J1808-2124 17 15 17 35.1 164.8 -0.9 -13.8 -8 1 1 346 02 49 28 02 49 48 --- 17 15 37 35.1 164.9 -0.9 -13.8 12 F 1 347 02 49 28 02 49 48 VX_SGR 17 15 37 34.4 165.1 -0.9 -13.6 -8 1 1 347 02 49 48 02 50 18 --- 17 16 07 34.4 165.3 -0.9 -13.5 22 F 1 348 02 49 48 02 50 18 J1811-2055 17 16 07 35.5 164.0 -0.9 -14.5 -8 1 1 348 02 50 18 02 50 38 --- 17 16 27 35.5 164.1 -0.9 -14.4 12 F 1 348 02 50 18 02 50 38 VX_SGR 17 16 27 34.4 165.4 -0.9 -13.4 -8 1 1 348 02 50 38 02 51 08 --- 17 16 57 34.4 165.5 -0.9 -13.3 22 F 1 349 02 50 38 02 51 08 J1807-2506 17 16 57 31.6 166.4 -0.9 -12.8 -12 1 1 349 02 51 08 02 51 33 --- 17 17 22 31.7 166.5 -0.8 -12.7 13 F 1 350 02 51 08 02 51 33 VX_SGR 17 17 22 34.5 165.6 -0.9 -13.2 -12 1 1 350 02 51 33 02 52 03 --- 17 17 52 34.5 165.7 -0.8 -13.0 18 F 1 351 02 51 33 02 52 03 J1808-2124 17 17 52 35.3 165.5 -0.8 -13.2 -8 1 1 351 02 52 03 02 52 22 --- 17 18 12 35.3 165.6 -0.8 -13.1 12 F 1 352 02 52 03 02 52 22 VX_SGR 17 18 12 34.5 165.8 -0.8 -13.0 -8 1 1 352 02 52 22 02 52 52 --- 17 18 42 34.5 166.0 -0.8 -12.8 22 F 1 353 02 52 22 02 52 52 J1811-2055 17 18 42 35.6 164.8 -0.9 -13.8 -8 1 1 353 02 52 52 02 53 12 --- 17 19 02 35.6 164.9 -0.9 -13.7 12 F 1 353 02 52 52 Schedule for VLBA_KP (Code Kp ) Page 20 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 53 12 VX_SGR 17 19 02 34.5 166.1 -0.8 -12.8 -8 1 1 353 02 53 12 02 53 42 --- 17 19 32 34.6 166.2 -0.8 -12.6 22 F 1 354 02 53 12 02 53 42 J1807-2506 17 19 32 31.8 167.0 -0.8 -12.1 -12 1 1 354 02 53 42 02 54 07 --- 17 19 57 31.8 167.1 -0.8 -12.0 13 F 1 355 02 53 42 02 54 07 VX_SGR 17 19 57 34.6 166.3 -0.8 -12.5 -12 1 1 355 02 54 07 02 54 37 --- 17 20 27 34.6 166.4 -0.8 -12.4 18 F 1 356 02 54 07 02 54 37 J1808-2124 17 20 27 35.4 166.2 -0.8 -12.5 -8 1 1 356 02 54 37 02 54 57 --- 17 20 47 35.4 166.3 -0.8 -12.5 12 F 1 357 02 54 37 02 54 57 VX_SGR 17 20 47 34.6 166.5 -0.8 -12.3 -8 1 1 357 02 54 57 02 55 27 --- 17 21 17 34.7 166.7 -0.8 -12.2 22 F 1 358 02 54 57 02 55 27 J1811-2055 17 21 17 35.8 165.5 -0.8 -13.2 -8 1 1 358 02 55 27 02 55 47 --- 17 21 37 35.8 165.6 -0.8 -13.1 12 F 1 358 02 55 27 02 55 47 VX_SGR 17 21 37 34.7 166.8 -0.8 -12.1 -8 1 1 358 02 55 47 02 56 17 --- 17 22 07 34.7 166.9 -0.8 -12.0 22 F 1 359 02 55 47 02 56 17 J1807-2506 17 22 07 31.9 167.7 -0.8 -11.5 -12 1 1 359 02 56 17 02 56 42 --- 17 22 32 31.9 167.8 -0.8 -11.4 13 F 1 360 02 56 17 02 56 42 VX_SGR 17 22 32 34.7 167.0 -0.8 -11.9 -12 1 1 360 02 56 42 02 57 12 --- 17 23 02 34.7 167.2 -0.8 -11.8 18 F 1 361 02 56 42 02 57 12 J1808-2124 17 23 02 35.5 166.9 -0.8 -11.9 -8 1 1 361 02 57 12 02 57 32 --- 17 23 22 35.5 167.0 -0.8 -11.8 12 F 1 362 02 57 12 02 57 32 VX_SGR 17 23 22 34.8 167.3 -0.8 -11.7 -8 1 1 362 02 57 32 02 58 02 --- 17 23 52 34.8 167.4 -0.7 -11.5 22 F 1 363 02 57 32 02 58 02 J1811-2055 17 23 52 35.9 166.2 -0.8 -12.5 -8 1 1 363 02 58 02 02 58 22 --- 17 24 12 35.9 166.3 -0.8 -12.4 12 F 1 363 02 58 02 02 58 22 VX_SGR 17 24 12 34.8 167.5 -0.7 -11.5 -8 1 1 363 02 58 22 02 58 51 --- 17 24 42 34.8 167.6 -0.7 -11.3 22 F 1 364 02 58 22 02 58 51 J1807-2506 17 24 42 32.0 168.4 -0.7 -10.9 -12 1 1 364 02 58 51 02 59 16 --- 17 25 07 32.0 168.5 -0.7 -10.8 13 F 1 365 02 58 51 Schedule for VLBA_KP (Code Kp ) Page 21 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 02 59 16 VX_SGR 17 25 07 34.8 167.7 -0.7 -11.2 -12 1 1 365 02 59 16 02 59 46 --- 17 25 37 34.9 167.9 -0.7 -11.1 18 F 1 366 02 59 16 02 59 46 J1808-2124 17 25 37 35.6 167.7 -0.7 -11.2 -8 1 1 366 02 59 46 03 00 06 --- 17 25 57 35.7 167.8 -0.7 -11.1 12 F 1 367 02 59 46 03 00 06 VX_SGR 17 25 57 34.9 168.0 -0.7 -11.0 -8 1 1 367 03 00 06 03 00 36 --- 17 26 27 34.9 168.1 -0.7 -10.9 22 F 1 368 03 00 06 03 00 36 J1811-2055 17 26 27 36.0 166.9 -0.8 -11.8 -8 1 1 368 03 00 36 03 00 56 --- 17 26 47 36.0 167.0 -0.7 -11.8 12 F 1 368 03 00 36 03 00 56 VX_SGR 17 26 47 34.9 168.2 -0.7 -10.8 -8 1 1 368 03 00 56 03 01 26 --- 17 27 17 34.9 168.3 -0.7 -10.7 22 F 1 369 03 00 56 03 01 26 J1807-2506 17 27 17 32.1 169.1 -0.7 -10.2 -12 1 1 369 03 01 26 03 01 51 --- 17 27 42 32.1 169.2 -0.7 -10.1 13 F 1 370 03 01 26 03 01 51 VX_SGR 17 27 42 34.9 168.5 -0.7 -10.6 -12 1 1 370 03 01 51 03 02 21 --- 17 28 12 35.0 168.6 -0.7 -10.4 18 F 1 371 03 01 51 03 02 21 J1808-2124 17 28 12 35.8 168.4 -0.7 -10.6 -8 1 1 371 03 02 21 03 02 41 --- 17 28 32 35.8 168.5 -0.7 -10.5 12 F 1 372 03 02 21 03 02 41 VX_SGR 17 28 32 35.0 168.7 -0.7 -10.4 -8 1 1 372 03 02 41 03 03 11 --- 17 29 02 35.0 168.8 -0.7 -10.2 22 F 1 373 03 02 41 03 03 11 J1811-2055 17 29 02 36.2 167.7 -0.7 -11.2 -8 1 1 373 03 03 11 03 03 31 --- 17 29 22 36.2 167.8 -0.7 -11.1 12 F 1 373 03 03 11 03 03 31 VX_SGR 17 29 22 35.0 168.9 -0.7 -10.1 -8 1 1 373 03 03 31 03 04 01 --- 17 29 52 35.0 169.1 -0.6 -10.0 22 F 1 374 03 03 31 03 04 01 J1807-2506 17 29 52 32.2 169.7 -0.6 -9.6 -12 1 1 374 03 04 01 03 04 26 --- 17 30 17 32.2 169.9 -0.6 -9.5 13 F 1 375 03 04 01 03 06 26 J0157+7442 17 32 19 22.2 13.2 -8.4 -47.4 10 1 1 375 03 06 26 03 07 26 --- 17 33 19 22.3 13.3 -8.4 -47.7 60 F 1 377 03 06 44 03 10 29 J2253+1608 17 36 22 17.2 81.3 -5.3 -60.9 131 1 1 377 03 10 29 03 11 29 --- 17 37 22 17.4 81.5 -5.3 -60.9 60 F 1 379 03 10 47 Schedule for VLBA_KP (Code Kp ) Page 22 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 03 13 47 J1638+5720 17 39 40 62.5 -18.0 1.0 150.9 42 1 1 379 03 13 47 03 14 47 --- 17 40 40 62.5 -18.3 1.0 150.5 60 F 1 381 03 14 05 03 15 21 J1748+7005 17 41 15 51.8 1.0 -0.1 -177.5 7 1 1 381 03 15 21 03 16 21 --- 17 42 15 51.8 0.9 -0.1 -177.9 60 F 1 383 03 15 39 03 17 03 J1740+5211 17 42 57 69.8 -0.9 0.0 178.7 0 1 1 383 03 17 03 03 18 03 --- 17 43 57 69.8 -1.4 0.1 178.1 60 F 1 385 03 17 21 03 19 42 J2202+4216 17 45 37 38.9 58.9 -4.3 -79.3 32 1 1 385 03 19 42 03 20 42 --- 17 46 37 39.1 59.0 -4.3 -79.5 60 F 1 387 03 20 00 03 22 03 J1642+6856 17 47 58 51.8 -9.5 1.1 157.1 29 1 1 387 03 22 03 03 23 03 --- 17 48 58 51.8 -9.6 1.1 156.8 60 F 1 389 03 22 21 03 26 03 J1337-1257 17 51 59 14.5 244.2 4.2 51.6 6 1 1 389 03 26 03 03 27 03 --- 17 52 59 14.3 244.4 4.2 51.7 60 F 1 391 03 26 21 03 29 07 J2354+4553 17 55 03 22.4 408.8 -6.0 -66.6 8 1 1 391 03 29 07 03 30 06 --- 17 56 03 22.6 408.9 -6.0 -66.7 60 F 1 392 03 29 25 03 32 22 J1512-0905 17 58 19 33.1 231.0 2.8 41.9 11 1 1 392 03 32 22 03 33 22 --- 17 59 19 32.9 231.2 2.8 42.1 60 F 1 394 03 32 40 03 35 18 J0019+7327 18 01 15 29.2 378.9 -6.3 -75.6 11 1 1 394 03 35 18 03 36 18 --- 18 02 15 29.2 378.9 -6.3 -75.8 60 F 1 396 03 35 36 03 38 55 J1924-2914 18 04 52 25.9 160.5 -1.3 -18.9 5 1 1 396 03 38 55 03 39 55 --- 18 05 52 26.0 160.7 -1.3 -18.7 60 F 1 398 03 39 13 03 41 51 J0136+4751 18 07 49 10.1 39.0 -7.5 -52.8 29 1 1 398 03 41 51 03 42 51 --- 18 08 49 10.3 39.1 -7.5 -53.0 60 F 1 400 03 42 09 03 44 34 J1806+6949 18 10 33 52.1 -0.5 0.1 178.7 14 1 1 400 03 44 34 03 45 34 --- 18 11 33 52.1 -0.7 0.1 178.4 60 F 1 402 03 44 52 03 47 39 J2225-0457 18 13 38 19.7 109.3 -4.2 -53.5 45 1 1 402 03 47 39 03 48 39 --- 18 14 38 19.9 109.4 -4.2 -53.4 60 F 1 404 03 47 57 03 48 39 J1924-2914 18 14 38 26.6 162.8 -1.2 -16.7 -42 1 1 404 03 48 39 03 51 38 --- 18 17 38 26.7 163.5 -1.1 -16.1 138 F 1 410 03 48 39 Schedule for VLBA_KP (Code Kp ) Page 23 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 03 51 38 VX_SGR 18 17 38 35.8 182.6 0.2 2.4 -24 1 1 410 Stopped 03 53 38 --- 18 19 38 35.8 183.2 0.2 2.9 96 S 1 414 03 53 38 VX_SGR 18 19 38 35.8 183.2 0.2 2.9 -4 1 1 414 Stopped 03 55 38 --- 18 21 38 35.7 183.7 0.2 3.4 116 S 1 418 03 55 38 VX_SGR 18 21 38 35.7 183.7 0.2 3.4 -4 1 1 418 03 55 38 03 57 37 --- 18 23 38 35.7 184.3 0.3 3.9 116 F 1 421 03 55 56 03 57 37 VX_SGR 18 23 38 35.7 184.3 0.3 3.9 -4 1 1 421 03 57 37 03 58 07 --- 18 24 08 35.7 184.4 0.3 4.1 26 F 1 422 03 57 37 03 58 07 J1808-2124 18 24 08 36.5 184.5 0.3 4.1 -8 1 1 422 03 58 07 03 58 27 --- 18 24 28 36.5 184.6 0.3 4.2 12 F 1 423 03 58 07 03 58 27 VX_SGR 18 24 28 35.7 184.5 0.3 4.2 -8 1 1 423 03 58 27 03 58 57 --- 18 24 58 35.7 184.7 0.3 4.3 22 F 1 424 03 58 27 03 58 57 J1811-2055 18 24 58 37.0 183.9 0.2 3.6 -9 1 1 424 03 58 57 03 59 17 --- 18 25 18 37.0 184.0 0.2 3.6 11 F 1 425 03 58 57 03 59 17 VX_SGR 18 25 18 35.7 184.8 0.3 4.4 -9 1 1 425 03 59 17 03 59 47 --- 18 25 48 35.7 184.9 0.3 4.5 21 F 1 426 03 59 17 03 59 47 J1807-2506 18 25 48 32.8 184.7 0.3 4.4 -12 1 1 426 03 59 47 04 00 12 --- 18 26 13 32.8 184.9 0.3 4.6 13 F 1 426 03 59 47 04 00 12 VX_SGR 18 26 13 35.7 185.0 0.3 4.6 -12 1 1 426 04 00 12 04 00 42 --- 18 26 43 35.6 185.2 0.3 4.7 18 F 1 427 04 00 12 04 00 42 J1808-2124 18 26 43 36.5 185.2 0.3 4.8 -8 1 1 427 04 00 42 04 01 02 --- 18 27 03 36.4 185.3 0.3 4.9 12 F 1 428 04 00 42 04 01 02 VX_SGR 18 27 03 35.6 185.3 0.3 4.8 -8 1 1 428 04 01 02 04 01 32 --- 18 27 33 35.6 185.4 0.3 5.0 22 F 1 429 04 01 02 04 01 32 J1811-2055 18 27 33 37.0 184.7 0.3 4.2 -9 1 1 429 04 01 32 04 01 52 --- 18 27 53 37.0 184.8 0.3 4.3 11 F 1 430 04 01 32 04 01 52 VX_SGR 18 27 53 35.6 185.5 0.3 5.0 -9 1 1 430 04 01 52 04 02 22 --- 18 28 23 35.6 185.6 0.3 5.2 21 F 1 431 04 01 52 Schedule for VLBA_KP (Code Kp ) Page 24 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 02 22 J1807-2506 18 28 23 32.7 185.4 0.3 5.1 -12 1 1 431 04 02 22 04 02 47 --- 18 28 48 32.7 185.6 0.3 5.2 13 F 1 431 04 02 22 04 02 47 VX_SGR 18 28 48 35.6 185.8 0.3 5.3 -12 1 1 431 04 02 47 04 03 17 --- 18 29 18 35.6 185.9 0.3 5.4 18 F 1 432 04 02 47 04 03 17 J1808-2124 18 29 18 36.4 186.0 0.3 5.5 -8 1 1 432 04 03 17 04 03 36 --- 18 29 38 36.4 186.1 0.4 5.5 12 F 1 433 04 03 17 04 03 36 VX_SGR 18 29 38 35.6 186.0 0.4 5.5 -8 1 1 433 04 03 36 04 04 06 --- 18 30 08 35.6 186.1 0.4 5.6 22 F 1 434 04 03 36 04 04 06 J1811-2055 18 30 08 36.9 185.4 0.3 4.9 -9 1 1 434 04 04 06 04 04 26 --- 18 30 28 36.9 185.5 0.3 5.0 11 F 1 435 04 04 06 04 04 26 VX_SGR 18 30 28 35.6 186.2 0.4 5.7 -9 1 1 435 04 04 26 04 04 56 --- 18 30 58 35.6 186.4 0.4 5.8 21 F 1 436 04 04 26 04 04 56 J1807-2506 18 30 58 32.7 186.1 0.4 5.7 -12 1 1 436 04 04 56 04 05 21 --- 18 31 23 32.7 186.2 0.4 5.8 13 F 1 436 04 04 56 04 05 21 VX_SGR 18 31 23 35.5 186.5 0.4 6.0 -12 1 1 436 04 05 21 04 05 51 --- 18 31 53 35.5 186.6 0.4 6.1 18 F 1 437 04 05 21 04 05 51 J1808-2124 18 31 53 36.3 186.7 0.4 6.1 -8 1 1 437 04 05 51 04 06 11 --- 18 32 13 36.3 186.8 0.4 6.2 12 F 1 438 04 05 51 04 06 11 VX_SGR 18 32 13 35.5 186.7 0.4 6.2 -8 1 1 438 04 06 11 04 06 41 --- 18 32 43 35.5 186.9 0.4 6.3 22 F 1 439 04 06 11 04 06 41 J1811-2055 18 32 43 36.9 186.2 0.4 5.6 -9 1 1 439 04 06 41 04 07 01 --- 18 33 03 36.9 186.3 0.4 5.7 11 F 1 440 04 06 41 04 07 01 VX_SGR 18 33 03 35.5 187.0 0.4 6.4 -9 1 1 440 04 07 01 04 07 31 --- 18 33 33 35.5 187.1 0.4 6.5 21 F 1 441 04 07 01 04 07 31 J1807-2506 18 33 33 32.6 186.8 0.4 6.4 -12 1 1 441 04 07 31 04 07 56 --- 18 33 58 32.6 186.9 0.4 6.5 13 F 1 441 04 07 31 04 07 56 VX_SGR 18 33 58 35.5 187.2 0.4 6.6 -12 1 1 441 04 07 56 04 08 26 --- 18 34 28 35.5 187.4 0.4 6.8 18 F 1 442 04 07 56 Schedule for VLBA_KP (Code Kp ) Page 25 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 08 26 J1808-2124 18 34 28 36.3 187.5 0.4 6.8 -8 1 1 442 04 08 26 04 08 46 --- 18 34 48 36.3 187.6 0.4 6.9 12 F 1 443 04 08 26 04 08 46 VX_SGR 18 34 48 35.5 187.5 0.4 6.8 -8 1 1 443 04 08 46 04 09 16 --- 18 35 18 35.4 187.6 0.4 7.0 22 F 1 444 04 08 46 04 09 16 J1811-2055 18 35 18 36.8 186.9 0.4 6.3 -9 1 1 444 04 09 16 04 09 35 --- 18 35 38 36.8 187.0 0.4 6.4 11 F 1 445 04 09 16 04 09 35 VX_SGR 18 35 38 35.4 187.7 0.5 7.1 -9 1 1 445 04 09 35 04 10 05 --- 18 36 08 35.4 187.8 0.5 7.2 21 F 1 446 04 09 35 04 10 05 J1807-2506 18 36 08 32.5 187.5 0.5 7.0 -12 1 1 446 04 10 05 04 10 30 --- 18 36 33 32.5 187.6 0.5 7.1 13 F 1 446 04 10 05 04 10 30 VX_SGR 18 36 33 35.4 188.0 0.5 7.3 -12 1 1 446 04 10 30 04 11 00 --- 18 37 03 35.4 188.1 0.5 7.4 18 F 1 447 04 10 30 04 11 00 J1808-2124 18 37 03 36.2 188.2 0.5 7.5 -8 1 1 447 04 11 00 04 11 20 --- 18 37 23 36.2 188.3 0.5 7.6 12 F 1 448 04 11 00 04 11 20 VX_SGR 18 37 23 35.4 188.2 0.5 7.5 -8 1 1 448 04 11 20 04 11 50 --- 18 37 53 35.4 188.3 0.5 7.6 22 F 1 449 04 11 20 04 11 50 J1811-2055 18 37 53 36.8 187.7 0.4 7.0 -9 1 1 449 04 11 50 04 12 10 --- 18 38 13 36.7 187.8 0.4 7.1 11 F 1 450 04 11 50 04 12 10 VX_SGR 18 38 13 35.4 188.4 0.5 7.7 -9 1 1 450 04 12 10 04 12 40 --- 18 38 43 35.3 188.6 0.5 7.8 21 F 1 451 04 12 10 04 12 40 J1807-2506 18 38 43 32.5 188.2 0.5 7.7 -12 1 1 451 04 12 40 04 13 05 --- 18 39 08 32.5 188.3 0.5 7.8 13 F 1 451 04 12 40 04 13 05 VX_SGR 18 39 08 35.3 188.7 0.5 8.0 -12 1 1 451 04 13 05 04 13 35 --- 18 39 38 35.3 188.8 0.5 8.1 18 F 1 452 04 13 05 04 13 35 J1808-2124 18 39 38 36.1 189.0 0.5 8.2 -8 1 1 452 04 13 35 04 13 55 --- 18 39 58 36.1 189.0 0.5 8.2 12 F 1 453 04 13 35 04 13 55 VX_SGR 18 39 58 35.3 188.9 0.5 8.2 -8 1 1 453 04 13 55 04 14 25 --- 18 40 28 35.3 189.1 0.5 8.3 22 F 1 454 04 13 55 Schedule for VLBA_KP (Code Kp ) Page 26 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 14 25 J1811-2055 18 40 28 36.7 188.4 0.5 7.6 -9 1 1 454 04 14 25 04 14 45 --- 18 40 48 36.7 188.5 0.5 7.7 11 F 1 455 04 14 25 04 14 45 VX_SGR 18 40 48 35.3 189.2 0.5 8.4 -9 1 1 455 04 14 45 04 15 15 --- 18 41 18 35.3 189.3 0.5 8.5 21 F 1 455 04 14 45 04 15 15 J1807-2506 18 41 18 32.4 188.9 0.6 8.3 -12 1 1 455 04 15 15 04 15 39 --- 18 41 43 32.4 189.0 0.6 8.4 13 F 1 456 04 15 15 04 15 39 VX_SGR 18 41 43 35.2 189.4 0.6 8.6 -12 1 1 456 04 15 39 04 16 09 --- 18 42 13 35.2 189.5 0.6 8.7 18 F 1 457 04 15 39 04 16 09 J1808-2124 18 42 13 36.0 189.7 0.6 8.8 -8 1 1 457 04 16 09 04 16 29 --- 18 42 33 36.0 189.8 0.6 8.9 12 F 1 458 04 16 09 04 16 29 VX_SGR 18 42 33 35.2 189.6 0.6 8.8 -8 1 1 458 04 16 29 04 16 59 --- 18 43 03 35.2 189.8 0.6 9.0 22 F 1 459 04 16 29 04 16 59 J1811-2055 18 43 03 36.6 189.2 0.5 8.3 -9 1 1 459 04 16 59 04 17 19 --- 18 43 23 36.6 189.3 0.5 8.4 11 F 1 460 04 16 59 04 17 19 VX_SGR 18 43 23 35.2 189.9 0.6 9.0 -9 1 1 460 04 17 19 04 17 49 --- 18 43 53 35.2 190.0 0.6 9.2 21 F 1 460 04 17 19 04 17 49 J1807-2506 18 43 53 32.3 189.6 0.6 9.0 -12 1 1 460 04 17 49 04 18 14 --- 18 44 18 32.3 189.7 0.6 9.1 13 F 1 461 04 17 49 04 18 14 VX_SGR 18 44 18 35.1 190.1 0.6 9.3 -12 1 1 461 04 18 14 04 18 44 --- 18 44 48 35.1 190.3 0.6 9.4 18 F 1 462 04 18 14 04 18 44 J1808-2124 18 44 48 35.9 190.4 0.6 9.5 -8 1 1 462 04 18 44 04 19 04 --- 18 45 08 35.9 190.5 0.6 9.6 12 F 1 463 04 18 44 04 19 04 VX_SGR 18 45 08 35.1 190.4 0.6 9.5 -8 1 1 463 04 19 04 04 19 34 --- 18 45 38 35.1 190.5 0.6 9.6 22 F 1 464 04 19 04 04 19 34 J1811-2055 18 45 38 36.5 189.9 0.6 9.0 -9 1 1 464 04 19 34 04 19 54 --- 18 45 58 36.5 190.0 0.6 9.1 11 F 1 465 04 19 34 04 19 54 VX_SGR 18 45 58 35.1 190.6 0.6 9.7 -9 1 1 465 04 19 54 04 20 24 --- 18 46 28 35.1 190.7 0.6 9.8 21 F 1 465 04 19 54 Schedule for VLBA_KP (Code Kp ) Page 27 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 20 24 J1807-2506 18 46 28 32.2 190.3 0.6 9.6 -12 1 1 465 04 20 24 04 20 49 --- 18 46 53 32.2 190.4 0.6 9.7 13 F 1 466 04 20 24 04 20 49 VX_SGR 18 46 53 35.0 190.9 0.6 9.9 -12 1 1 466 04 20 49 04 21 19 --- 18 47 23 35.0 191.0 0.6 10.1 18 F 1 467 04 20 49 04 21 19 J1808-2124 18 47 23 35.8 191.2 0.6 10.2 -8 1 1 467 04 21 19 04 21 38 --- 18 47 43 35.8 191.2 0.7 10.2 12 F 1 468 04 21 19 04 21 38 VX_SGR 18 47 43 35.0 191.1 0.7 10.1 -8 1 1 468 04 21 38 04 22 08 --- 18 48 13 35.0 191.2 0.7 10.3 22 F 1 469 04 21 38 04 22 08 J1811-2055 18 48 13 36.4 190.6 0.6 9.7 -9 1 1 469 04 22 08 04 22 28 --- 18 48 33 36.4 190.7 0.6 9.7 11 F 1 469 04 22 08 04 22 28 VX_SGR 18 48 33 35.0 191.3 0.7 10.4 -9 1 1 469 04 22 28 04 22 58 --- 18 49 03 35.0 191.5 0.7 10.5 21 F 1 470 04 22 28 04 22 58 J1807-2506 18 49 03 32.1 190.9 0.7 10.2 -12 1 1 470 04 22 58 04 23 23 --- 18 49 28 32.1 191.0 0.7 10.3 13 F 1 471 04 22 58 04 23 23 VX_SGR 18 49 28 34.9 191.6 0.7 10.6 -12 1 1 471 04 23 23 04 23 53 --- 18 49 58 34.9 191.7 0.7 10.7 18 F 1 472 04 23 23 04 23 53 J1808-2124 18 49 58 35.7 191.9 0.7 10.8 -8 1 1 472 04 23 53 04 24 13 --- 18 50 18 35.7 192.0 0.7 10.9 12 F 1 473 04 23 53 04 24 13 VX_SGR 18 50 18 34.9 191.8 0.7 10.8 -8 1 1 473 04 24 13 04 24 43 --- 18 50 48 34.9 191.9 0.7 10.9 22 F 1 474 04 24 13 04 24 43 J1811-2055 18 50 48 36.3 191.4 0.7 10.3 -9 1 1 474 04 24 43 04 25 03 --- 18 51 08 36.3 191.5 0.7 10.4 11 F 1 474 04 24 43 04 25 03 VX_SGR 18 51 08 34.9 192.0 0.7 11.0 -9 1 1 474 04 25 03 04 25 33 --- 18 51 38 34.8 192.2 0.7 11.1 21 F 1 475 04 25 03 04 25 33 J1807-2506 18 51 38 32.0 191.6 0.7 10.9 -12 1 1 475 04 25 33 04 25 58 --- 18 52 03 32.0 191.7 0.7 11.0 13 F 1 476 04 25 33 04 25 58 VX_SGR 18 52 03 34.8 192.3 0.7 11.2 -12 1 1 476 04 25 58 04 26 28 --- 18 52 33 34.8 192.4 0.7 11.4 18 F 1 477 04 25 58 Schedule for VLBA_KP (Code Kp ) Page 28 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 26 28 J1808-2124 18 52 33 35.6 192.6 0.7 11.5 -8 1 1 477 04 26 28 04 26 48 --- 18 52 53 35.6 192.7 0.7 11.6 12 F 1 478 04 26 28 04 26 48 VX_SGR 18 52 53 34.8 192.5 0.7 11.5 -8 1 1 478 04 26 48 04 27 18 --- 18 53 23 34.8 192.7 0.7 11.6 22 F 1 479 04 26 48 04 27 18 J1811-2055 18 53 23 36.2 192.1 0.7 11.0 -9 1 1 479 04 27 18 04 27 38 --- 18 53 43 36.2 192.2 0.7 11.1 11 F 1 479 04 27 18 04 27 38 VX_SGR 18 53 43 34.8 192.7 0.8 11.7 -9 1 1 479 04 27 38 04 28 07 --- 18 54 13 34.7 192.9 0.8 11.8 21 F 1 480 04 27 38 04 28 07 J1807-2506 18 54 13 31.9 192.3 0.8 11.5 -12 1 1 480 04 28 07 04 28 32 --- 18 54 38 31.9 192.4 0.8 11.6 13 F 1 481 04 28 07 04 28 32 VX_SGR 18 54 38 34.7 193.0 0.8 11.9 -12 1 1 481 04 28 32 04 29 02 --- 18 55 08 34.7 193.1 0.8 12.0 18 F 1 482 04 28 32 04 29 02 J1808-2124 18 55 08 35.5 193.3 0.8 12.1 -8 1 1 482 04 29 02 04 29 22 --- 18 55 28 35.5 193.4 0.8 12.2 12 F 1 483 04 29 02 04 29 22 VX_SGR 18 55 28 34.7 193.2 0.8 12.1 -8 1 1 483 04 29 22 04 29 52 --- 18 55 58 34.6 193.4 0.8 12.2 22 F 1 484 04 29 22 04 29 52 J1811-2055 18 55 58 36.1 192.8 0.7 11.7 -9 1 1 484 04 29 52 04 30 12 --- 18 56 18 36.1 192.9 0.7 11.7 11 F 1 484 04 29 52 04 30 12 VX_SGR 18 56 18 34.6 193.5 0.8 12.3 -9 1 1 484 04 30 12 04 30 42 --- 18 56 48 34.6 193.6 0.8 12.4 21 F 1 485 04 30 12 04 30 42 J1807-2506 18 56 48 31.8 193.0 0.8 12.1 -12 1 1 485 04 30 42 04 31 07 --- 18 57 13 31.7 193.1 0.8 12.2 13 F 1 486 04 30 42 04 31 07 VX_SGR 18 57 13 34.6 193.7 0.8 12.5 -12 1 1 486 04 31 07 04 31 37 --- 18 57 43 34.6 193.8 0.8 12.7 18 F 1 487 04 31 07 04 31 37 J1808-2124 18 57 43 35.4 194.1 0.8 12.8 -8 1 1 487 04 31 37 04 31 57 --- 18 58 03 35.3 194.1 0.8 12.9 12 F 1 488 04 31 37 04 31 57 VX_SGR 18 58 03 34.5 193.9 0.8 12.8 -8 1 1 488 04 31 57 04 32 27 --- 18 58 33 34.5 194.1 0.8 12.9 22 F 1 489 04 31 57 Schedule for VLBA_KP (Code Kp ) Page 29 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 32 27 J1811-2055 18 58 33 35.9 193.6 0.8 12.3 -9 1 1 489 04 32 27 04 32 47 --- 18 58 53 35.9 193.7 0.8 12.4 11 F 1 489 04 32 27 04 32 47 VX_SGR 18 58 53 34.5 194.2 0.8 13.0 -9 1 1 489 04 32 47 04 33 17 --- 18 59 23 34.5 194.3 0.8 13.1 21 F 1 490 04 32 47 04 33 17 J1807-2506 18 59 23 31.6 193.6 0.9 12.8 -12 1 1 490 04 33 17 04 33 42 --- 18 59 48 31.6 193.7 0.9 12.9 13 F 1 491 04 33 17 04 33 42 VX_SGR 18 59 48 34.4 194.4 0.9 13.2 -12 1 1 491 Stopped 04 35 41 --- 19 01 48 34.3 195.0 0.9 13.7 108 S 1 495 04 35 41 VX_SGR 19 01 48 34.3 195.0 0.9 13.7 -4 1 1 495 Stopped 04 37 41 --- 19 03 48 34.2 195.5 0.9 14.2 116 S 1 499 04 37 41 VX_SGR 19 03 48 34.2 195.5 0.9 14.2 -4 1 1 499 04 37 41 04 38 41 --- 19 04 48 34.2 195.8 0.9 14.4 56 F 1 501 04 37 59 04 38 41 J1733-1304 19 04 48 39.9 209.5 1.5 25.4 -18 1 1 501 04 38 41 04 39 41 --- 19 05 48 39.8 209.8 1.5 25.7 42 F 1 503 04 38 41 04 39 41 VX_SGR 19 05 48 34.1 196.0 1.0 14.7 -17 1 1 503 04 39 41 04 40 40 --- 19 06 48 34.1 196.3 1.0 14.9 42 F 1 505 04 39 41 04 40 40 J1733-1304 19 06 48 39.7 210.1 1.6 25.9 -17 1 1 505 04 40 40 04 41 40 --- 19 07 48 39.6 210.4 1.6 26.1 43 F 1 507 04 40 40 04 41 40 VX_SGR 19 07 48 34.0 196.6 1.0 15.2 -17 1 1 507 04 41 40 04 42 40 --- 19 08 48 33.9 196.9 1.0 15.4 43 F 1 509 04 41 40 04 42 40 J1733-1304 19 08 48 39.5 210.7 1.6 26.4 -17 1 1 509 04 42 40 04 43 40 --- 19 09 48 39.4 210.9 1.6 26.6 43 F 1 511 04 42 40 04 43 40 VX_SGR 19 09 48 33.9 197.1 1.0 15.7 -17 1 1 511 04 43 40 04 44 40 --- 19 10 48 33.8 197.4 1.0 15.9 43 F 1 512 04 43 40 04 44 40 J1733-1304 19 10 48 39.3 211.2 1.6 26.8 -17 1 1 512 04 44 40 04 45 40 --- 19 11 48 39.2 211.5 1.6 27.1 43 F 1 514 04 44 40 04 45 40 VX_SGR 19 11 48 33.7 197.7 1.1 16.1 -17 1 1 514 04 45 40 04 46 39 --- 19 12 48 33.7 197.9 1.1 16.4 43 F 1 516 04 45 40 Schedule for VLBA_KP (Code Kp ) Page 30 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 04 46 39 J1733-1304 19 12 48 39.1 211.8 1.7 27.3 -17 1 1 516 04 46 39 04 47 39 --- 19 13 48 39.0 212.1 1.7 27.5 43 F 1 518 04 46 39 04 47 39 VX_SGR 19 13 48 33.6 198.2 1.1 16.6 -17 1 1 518 04 47 39 04 48 39 --- 19 14 48 33.5 198.5 1.1 16.9 43 F 1 520 04 47 39 04 48 39 J1733-1304 19 14 48 38.8 212.3 1.7 27.8 -17 1 1 520 04 48 39 04 49 39 --- 19 15 48 38.7 212.6 1.7 28.0 43 F 1 522 04 48 39 04 49 39 VX_SGR 19 15 48 33.5 198.7 1.1 17.1 -16 1 1 522 04 49 39 04 50 39 --- 19 16 48 33.4 199.0 1.1 17.4 43 F 1 524 04 49 39 04 50 39 J1733-1304 19 16 48 38.6 212.9 1.7 28.2 -16 1 1 524 04 50 39 04 51 39 --- 19 17 48 38.5 213.2 1.7 28.5 43 F 1 526 04 50 39 04 51 39 VX_SGR 19 17 48 33.3 199.3 1.2 17.6 -16 1 1 526 04 51 39 04 52 38 --- 19 18 48 33.3 199.5 1.2 17.8 44 F 1 528 04 51 39 04 52 38 J1733-1304 19 18 48 38.4 213.4 1.8 28.7 -16 1 1 528 04 52 38 04 53 38 --- 19 19 48 38.3 213.7 1.8 28.9 44 F 1 530 04 52 38 04 53 38 VX_SGR 19 19 48 33.2 199.8 1.2 18.1 -16 1 1 530 04 53 38 04 54 38 --- 19 20 48 33.1 200.0 1.2 18.3 44 F 1 532 04 53 38 04 54 38 J1733-1304 19 20 48 38.1 214.0 1.8 29.1 -16 1 1 532 04 54 38 04 55 38 --- 19 21 48 38.0 214.3 1.8 29.4 44 F 1 534 04 54 38 04 55 38 VX_SGR 19 21 48 33.1 200.3 1.2 18.5 -16 1 1 534 04 55 38 04 56 38 --- 19 22 48 33.0 200.6 1.2 18.8 44 F 1 536 04 55 38 04 56 38 J1733-1304 19 22 48 37.9 214.5 1.8 29.6 -16 1 1 536 04 56 38 04 57 38 --- 19 23 48 37.8 214.8 1.8 29.8 44 F 1 538 04 56 38 04 57 38 VX_SGR 19 23 48 32.9 200.8 1.3 19.0 -16 1 1 538 04 57 38 04 58 37 --- 19 24 48 32.8 201.1 1.3 19.3 44 F 1 539 04 57 38 04 58 37 J1733-1304 19 24 48 37.7 215.1 1.9 30.0 -16 1 1 539 04 58 37 04 59 37 --- 19 25 48 37.5 215.3 1.9 30.2 44 F 1 541 04 58 37 04 59 37 VX_SGR 19 25 48 32.8 201.3 1.3 19.5 -16 1 1 541 04 59 37 05 00 37 --- 19 26 48 32.7 201.6 1.3 19.7 44 F 1 543 04 59 37 Schedule for VLBA_KP (Code Kp ) Page 31 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 00 37 J1733-1304 19 26 48 37.4 215.6 1.9 30.5 -15 1 1 543 05 00 37 05 01 37 --- 19 27 48 37.3 215.8 1.9 30.7 44 F 1 545 05 00 37 05 01 37 VX_SGR 19 27 48 32.6 201.9 1.3 20.0 -15 1 1 545 05 01 37 05 02 37 --- 19 28 48 32.5 202.1 1.3 20.2 44 F 1 547 05 01 37 05 02 37 J1733-1304 19 28 48 37.2 216.1 1.9 30.9 -15 1 1 547 05 02 37 05 03 37 --- 19 29 48 37.0 216.4 1.9 31.1 45 F 1 549 05 02 37 05 03 37 VX_SGR 19 29 48 32.4 202.4 1.4 20.4 -15 1 1 549 05 03 37 05 04 36 --- 19 30 48 32.4 202.6 1.4 20.7 45 F 1 551 05 03 37 05 04 36 J1733-1304 19 30 48 36.9 216.6 2.0 31.3 -15 1 1 551 05 04 36 05 05 36 --- 19 31 48 36.8 216.9 2.0 31.5 45 F 1 553 05 04 36 05 05 36 VX_SGR 19 31 48 32.3 202.9 1.4 20.9 -15 1 1 553 05 05 36 05 06 36 --- 19 32 48 32.2 203.1 1.4 21.1 45 F 1 555 05 05 36 05 06 36 J1733-1304 19 32 48 36.7 217.2 2.0 31.7 -15 1 1 555 05 06 36 05 07 36 --- 19 33 48 36.5 217.4 2.0 32.0 45 F 1 557 05 06 36 05 07 36 VX_SGR 19 33 48 32.1 203.4 1.4 21.3 -15 1 1 557 05 07 36 05 08 36 --- 19 34 48 32.0 203.7 1.4 21.6 44 F 1 559 05 07 36 05 08 36 J1733-1304 19 34 48 36.4 217.7 2.0 32.2 -15 1 1 559 05 08 36 05 09 36 --- 19 35 48 36.3 217.9 2.0 32.4 44 F 1 561 05 08 36 05 09 36 VX_SGR 19 35 48 31.9 203.9 1.5 21.8 -15 1 1 561 05 09 36 05 10 35 --- 19 36 48 31.9 204.2 1.5 22.0 44 F 1 563 05 09 36 05 10 35 J1733-1304 19 36 48 36.1 218.2 2.1 32.6 -15 1 1 563 05 10 35 05 11 35 --- 19 37 48 36.0 218.4 2.1 32.8 44 F 1 565 05 10 35 05 11 35 VX_SGR 19 37 48 31.8 204.4 1.5 22.3 -15 1 1 565 05 11 35 05 12 35 --- 19 38 48 31.7 204.7 1.5 22.5 44 F 1 566 05 11 35 05 12 35 J1733-1304 19 38 48 35.9 218.7 2.1 33.0 -15 1 1 566 05 12 35 05 13 35 --- 19 39 48 35.7 218.9 2.1 33.2 44 F 1 568 05 12 35 05 13 35 VX_SGR 19 39 48 31.6 204.9 1.5 22.7 -15 1 1 568 05 13 35 05 14 35 --- 19 40 48 31.5 205.2 1.5 22.9 44 F 1 570 05 13 35 Schedule for VLBA_KP (Code Kp ) Page 32 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 14 35 J1733-1304 19 40 48 35.6 219.2 2.1 33.4 -15 1 1 570 05 14 35 05 15 35 --- 19 41 48 35.5 219.4 2.1 33.6 44 F 1 572 05 14 35 05 15 35 VX_SGR 19 41 48 31.4 205.4 1.6 23.2 -15 1 1 572 05 15 35 05 16 34 --- 19 42 48 31.3 205.7 1.6 23.4 44 F 1 574 05 15 35 05 16 34 J1733-1304 19 42 48 35.3 219.7 2.2 33.8 -15 1 1 574 05 16 34 05 17 34 --- 19 43 48 35.2 219.9 2.2 34.0 44 F 1 576 05 16 34 05 17 34 VX_SGR 19 43 48 31.2 205.9 1.6 23.6 -15 1 1 576 05 17 34 05 18 34 --- 19 44 48 31.1 206.2 1.6 23.8 44 F 1 578 05 17 34 05 18 34 J1733-1304 19 44 48 35.1 220.2 2.2 34.2 -15 1 1 578 05 18 34 05 19 34 --- 19 45 48 34.9 220.4 2.2 34.4 44 F 1 580 05 18 34 05 19 34 VX_SGR 19 45 48 31.0 206.4 1.6 24.1 -15 1 1 580 05 19 34 05 20 34 --- 19 46 48 30.9 206.7 1.6 24.3 44 F 1 582 05 19 34 05 20 34 VX_SGR 19 46 48 30.9 206.7 1.6 24.3 -4 1 1 582 Stopped 05 22 33 --- 19 48 48 30.7 207.1 1.7 24.7 116 S 1 586 05 22 33 VX_SGR 19 48 48 30.7 207.1 1.7 24.7 -4 1 1 586 Stopped 05 24 33 --- 19 50 48 30.6 207.6 1.7 25.2 116 S 1 590 05 24 33 VX_SGR 19 50 48 30.6 207.6 1.7 25.2 -4 1 1 590 05 24 33 05 26 33 --- 19 52 48 30.4 208.1 1.7 25.6 116 F 1 593 05 24 51 05 26 33 VX_SGR 19 52 48 30.4 208.1 1.7 25.6 -4 1 1 593 05 26 33 05 27 03 --- 19 53 18 30.3 208.2 1.7 25.7 26 F 1 594 05 26 33 05 27 03 J1808-2124 19 53 18 31.0 208.6 1.7 25.9 -7 1 1 594 05 27 03 05 27 23 --- 19 53 38 31.0 208.7 1.8 26.0 13 F 1 595 05 27 03 05 27 23 VX_SGR 19 53 38 30.3 208.3 1.8 25.8 -7 1 1 595 05 27 23 05 27 53 --- 19 54 08 30.2 208.4 1.8 25.9 22 F 1 596 05 27 23 05 27 53 J1811-2055 19 54 08 31.7 208.4 1.7 25.6 -9 1 1 596 05 27 53 05 28 13 --- 19 54 28 31.7 208.4 1.7 25.6 11 F 1 597 05 27 53 05 28 13 VX_SGR 19 54 28 30.2 208.5 1.8 26.0 -9 1 1 597 05 28 13 05 28 42 --- 19 54 58 30.1 208.6 1.8 26.1 21 F 1 598 05 28 13 Schedule for VLBA_KP (Code Kp ) Page 33 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 28 42 J1807-2506 19 54 58 27.5 207.3 1.8 25.5 -11 1 1 598 05 28 42 05 29 07 --- 19 55 23 27.5 207.4 1.8 25.5 14 F 1 598 05 28 42 05 29 07 VX_SGR 19 55 23 30.1 208.7 1.8 26.2 -11 1 1 598 05 29 07 05 29 37 --- 19 55 53 30.0 208.9 1.8 26.3 19 F 1 599 05 29 07 05 29 37 J1808-2124 19 55 53 30.8 209.3 1.8 26.5 -7 1 1 599 05 29 37 05 29 57 --- 19 56 13 30.7 209.4 1.8 26.5 13 F 1 600 05 29 37 05 29 57 VX_SGR 19 56 13 30.0 208.9 1.8 26.3 -7 1 1 600 05 29 57 05 30 27 --- 19 56 43 30.0 209.1 1.8 26.4 22 F 1 601 05 29 57 05 30 27 J1811-2055 19 56 43 31.4 209.0 1.8 26.1 -9 1 1 601 05 30 27 05 30 47 --- 19 57 03 31.4 209.1 1.8 26.2 11 F 1 602 05 30 27 05 30 47 VX_SGR 19 57 03 29.9 209.1 1.8 26.5 -9 1 1 602 05 30 47 05 31 17 --- 19 57 33 29.9 209.3 1.8 26.6 21 F 1 603 05 30 47 05 31 17 J1807-2506 19 57 33 27.2 207.9 1.8 26.0 -11 1 1 603 05 31 17 05 31 42 --- 19 57 58 27.2 208.0 1.8 26.1 14 F 1 603 05 31 17 05 31 42 VX_SGR 19 57 58 29.8 209.4 1.8 26.7 -11 1 1 603 05 31 42 05 32 12 --- 19 58 28 29.8 209.5 1.8 26.8 19 F 1 604 05 31 42 05 32 12 J1808-2124 19 58 28 30.5 209.9 1.8 27.0 -7 1 1 604 05 32 12 05 32 32 --- 19 58 48 30.5 210.0 1.8 27.1 13 F 1 605 05 32 12 05 32 32 VX_SGR 19 58 48 29.7 209.6 1.8 26.9 -7 1 1 605 05 32 32 05 33 02 --- 19 59 18 29.7 209.7 1.8 27.0 23 F 1 606 05 32 32 05 33 02 J1811-2055 19 59 18 31.2 209.6 1.8 26.7 -9 1 1 606 05 33 02 05 33 22 --- 19 59 38 31.1 209.7 1.8 26.8 11 F 1 607 05 33 02 05 33 22 VX_SGR 19 59 38 29.7 209.8 1.9 27.1 -9 1 1 607 05 33 22 05 33 52 --- 20 00 08 29.6 209.9 1.9 27.2 21 F 1 608 05 33 22 05 33 52 J1807-2506 20 00 08 27.0 208.5 1.9 26.5 -11 1 1 608 05 33 52 05 34 17 --- 20 00 33 26.9 208.6 1.9 26.6 14 F 1 608 05 33 52 05 34 17 VX_SGR 20 00 33 29.6 210.0 1.9 27.3 -11 1 1 608 05 34 17 05 34 46 --- 20 01 03 29.5 210.1 1.9 27.4 19 F 1 609 05 34 17 Schedule for VLBA_KP (Code Kp ) Page 34 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 34 46 J1808-2124 20 01 03 30.2 210.5 1.9 27.6 -7 1 1 609 05 34 46 05 35 06 --- 20 01 23 30.2 210.6 1.9 27.6 13 F 1 610 05 34 46 05 35 06 VX_SGR 20 01 23 29.5 210.2 1.9 27.4 -7 1 1 610 05 35 06 05 35 36 --- 20 01 53 29.4 210.3 1.9 27.5 23 F 1 611 05 35 06 05 35 36 J1811-2055 20 01 53 30.9 210.3 1.8 27.2 -9 1 1 611 05 35 36 05 35 56 --- 20 02 13 30.9 210.3 1.8 27.3 11 F 1 612 05 35 36 05 35 56 VX_SGR 20 02 13 29.4 210.4 1.9 27.6 -9 1 1 612 05 35 56 05 36 26 --- 20 02 43 29.3 210.5 1.9 27.7 21 F 1 613 05 35 56 05 36 26 J1807-2506 20 02 43 26.7 209.1 1.9 27.1 -11 1 1 613 05 36 26 05 36 51 --- 20 03 08 26.7 209.2 1.9 27.2 14 F 1 613 05 36 26 05 36 51 VX_SGR 20 03 08 29.3 210.6 1.9 27.8 -11 1 1 613 05 36 51 05 37 21 --- 20 03 38 29.2 210.7 1.9 27.9 19 F 1 614 05 36 51 05 37 21 J1808-2124 20 03 38 29.9 211.1 1.9 28.1 -7 1 1 614 05 37 21 05 37 41 --- 20 03 58 29.9 211.2 1.9 28.2 13 F 1 615 05 37 21 05 37 41 VX_SGR 20 03 58 29.2 210.8 1.9 28.0 -7 1 1 615 05 37 41 05 38 11 --- 20 04 28 29.1 210.9 1.9 28.1 23 F 1 616 05 37 41 05 38 11 J1811-2055 20 04 28 30.6 210.9 1.9 27.8 -9 1 1 616 05 38 11 05 38 31 --- 20 04 48 30.6 211.0 1.9 27.9 11 F 1 617 05 38 11 05 38 31 VX_SGR 20 04 48 29.1 211.0 1.9 28.1 -9 1 1 617 05 38 31 05 39 01 --- 20 05 18 29.0 211.1 1.9 28.2 21 F 1 618 05 38 31 05 39 01 J1807-2506 20 05 18 26.5 209.7 2.0 27.6 -11 1 1 618 05 39 01 05 39 26 --- 20 05 43 26.4 209.7 2.0 27.7 14 F 1 618 05 39 01 05 39 26 VX_SGR 20 05 43 29.0 211.2 2.0 28.3 -11 1 1 618 05 39 26 05 39 56 --- 20 06 13 28.9 211.3 2.0 28.4 19 F 1 619 05 39 26 05 39 56 J1808-2124 20 06 13 29.7 211.7 2.0 28.6 -7 1 1 619 05 39 56 05 40 16 --- 20 06 33 29.6 211.8 2.0 28.7 13 F 1 620 05 39 56 05 40 16 VX_SGR 20 06 33 28.9 211.4 2.0 28.5 -7 1 1 620 05 40 16 05 40 45 --- 20 07 03 28.9 211.5 2.0 28.6 23 F 1 621 05 40 16 Schedule for VLBA_KP (Code Kp ) Page 35 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 40 45 J1811-2055 20 07 03 30.3 211.5 1.9 28.3 -9 1 1 621 05 40 45 05 41 05 --- 20 07 23 30.3 211.6 1.9 28.4 11 F 1 622 05 40 45 05 41 05 VX_SGR 20 07 23 28.8 211.6 2.0 28.7 -9 1 1 622 05 41 05 05 41 35 --- 20 07 53 28.8 211.7 2.0 28.8 21 F 1 623 05 41 05 05 41 35 J1807-2506 20 07 53 26.2 210.2 2.0 28.1 -11 1 1 623 05 41 35 05 42 00 --- 20 08 18 26.1 210.3 2.0 28.2 14 F 1 623 05 41 35 05 42 00 VX_SGR 20 08 18 28.7 211.8 2.0 28.9 -11 1 1 623 05 42 00 05 42 30 --- 20 08 48 28.7 211.9 2.0 29.0 19 F 1 624 05 42 00 05 42 30 J1808-2124 20 08 48 29.4 212.3 2.0 29.2 -7 1 1 624 05 42 30 05 42 50 --- 20 09 08 29.3 212.4 2.0 29.2 13 F 1 625 05 42 30 05 42 50 VX_SGR 20 09 08 28.6 212.0 2.0 29.0 -7 1 1 625 05 42 50 05 43 20 --- 20 09 38 28.6 212.1 2.0 29.1 23 F 1 626 05 42 50 05 43 20 J1811-2055 20 09 38 30.0 212.1 2.0 28.9 -9 1 1 626 05 43 20 05 43 40 --- 20 09 58 30.0 212.2 2.0 28.9 11 F 1 627 05 43 20 05 43 40 VX_SGR 20 09 58 28.5 212.2 2.0 29.2 -9 1 1 627 05 43 40 05 44 10 --- 20 10 28 28.5 212.3 2.0 29.3 21 F 1 628 05 43 40 05 44 10 J1807-2506 20 10 28 25.9 210.8 2.0 28.7 -11 1 1 628 05 44 10 05 44 35 --- 20 10 53 25.9 210.9 2.0 28.8 14 F 1 628 05 44 10 05 44 35 VX_SGR 20 10 53 28.4 212.4 2.0 29.4 -11 1 1 628 05 44 35 05 45 05 --- 20 11 23 28.4 212.5 2.0 29.5 19 F 1 629 05 44 35 05 45 05 J1808-2124 20 11 23 29.1 212.9 2.0 29.7 -7 1 1 629 05 45 05 05 45 25 --- 20 11 43 29.0 213.0 2.1 29.8 13 F 1 630 05 45 05 05 45 25 VX_SGR 20 11 43 28.3 212.6 2.1 29.6 -7 1 1 630 05 45 25 05 45 55 --- 20 12 13 28.3 212.7 2.1 29.7 23 F 1 631 05 45 25 05 45 55 J1811-2055 20 12 13 29.8 212.7 2.0 29.4 -9 1 1 631 05 45 55 05 46 15 --- 20 12 33 29.7 212.8 2.0 29.5 11 F 1 632 05 45 55 05 46 15 VX_SGR 20 12 33 28.2 212.8 2.1 29.7 -9 1 1 632 05 46 15 05 46 45 --- 20 13 03 28.2 212.9 2.1 29.8 21 F 1 633 05 46 15 Schedule for VLBA_KP (Code Kp ) Page 36 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 46 45 J1807-2506 20 13 03 25.6 211.4 2.1 29.2 -11 1 1 633 05 46 45 05 47 09 --- 20 13 28 25.6 211.5 2.1 29.3 14 F 1 633 05 46 45 05 47 09 VX_SGR 20 13 28 28.1 213.0 2.1 29.9 -11 1 1 633 05 47 09 05 47 39 --- 20 13 58 28.1 213.1 2.1 30.0 19 F 1 634 05 47 09 05 47 39 J1808-2124 20 13 58 28.8 213.5 2.1 30.2 -7 1 1 634 05 47 39 05 47 59 --- 20 14 18 28.7 213.6 2.1 30.3 13 F 1 635 05 47 39 05 47 59 VX_SGR 20 14 18 28.0 213.2 2.1 30.1 -7 1 1 635 05 47 59 05 48 29 --- 20 14 48 28.0 213.3 2.1 30.2 23 F 1 636 05 47 59 05 48 29 J1811-2055 20 14 48 29.5 213.3 2.1 29.9 -9 1 1 636 05 48 29 05 48 49 --- 20 15 08 29.4 213.4 2.1 30.0 11 F 1 637 05 48 29 05 48 49 VX_SGR 20 15 08 27.9 213.3 2.1 30.3 -9 1 1 637 05 48 49 05 49 19 --- 20 15 38 27.9 213.5 2.1 30.4 21 F 1 638 05 48 49 05 49 19 J1807-2506 20 15 38 25.3 211.9 2.1 29.7 -11 1 1 638 05 49 19 05 49 44 --- 20 16 03 25.3 212.0 2.1 29.8 14 F 1 638 05 49 19 05 49 44 VX_SGR 20 16 03 27.8 213.6 2.1 30.4 -11 1 1 638 05 49 44 05 50 14 --- 20 16 33 27.8 213.7 2.1 30.5 19 F 1 639 05 49 44 05 50 14 J1808-2124 20 16 33 28.5 214.1 2.1 30.8 -7 1 1 639 05 50 14 05 50 34 --- 20 16 53 28.4 214.2 2.1 30.8 13 F 1 640 05 50 14 05 50 34 VX_SGR 20 16 53 27.7 213.7 2.1 30.6 -7 1 1 640 05 50 34 05 51 04 --- 20 17 23 27.7 213.9 2.1 30.7 23 F 1 641 05 50 34 05 51 04 J1811-2055 20 17 23 29.2 213.9 2.1 30.5 -9 1 1 641 05 51 04 05 51 24 --- 20 17 43 29.1 214.0 2.1 30.5 11 F 1 642 05 51 04 05 51 24 VX_SGR 20 17 43 27.6 213.9 2.2 30.8 -9 1 1 642 05 51 24 05 51 54 --- 20 18 13 27.6 214.0 2.2 30.9 21 F 1 643 05 51 24 05 51 54 J1807-2506 20 18 13 25.0 212.5 2.2 30.2 -11 1 1 643 05 51 54 05 52 19 --- 20 18 38 25.0 212.6 2.2 30.3 14 F 1 643 05 51 54 05 52 19 VX_SGR 20 18 38 27.5 214.1 2.2 31.0 -11 1 1 643 05 52 19 05 52 49 --- 20 19 08 27.5 214.2 2.2 31.1 19 F 1 644 05 52 19 Schedule for VLBA_KP (Code Kp ) Page 37 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 52 49 J1808-2124 20 19 08 28.2 214.7 2.2 31.3 -7 1 1 644 05 52 49 05 53 08 --- 20 19 28 28.1 214.8 2.2 31.3 13 F 1 645 05 52 49 05 53 08 VX_SGR 20 19 28 27.4 214.3 2.2 31.1 -7 1 1 645 05 53 08 05 53 38 --- 20 19 58 27.4 214.4 2.2 31.2 23 F 1 646 05 53 08 05 53 38 J1811-2055 20 19 58 28.8 214.5 2.1 31.0 -9 1 1 646 05 53 38 05 53 58 --- 20 20 18 28.8 214.6 2.1 31.0 11 F 1 647 05 53 38 05 53 58 VX_SGR 20 20 18 27.3 214.5 2.2 31.3 -9 1 1 647 05 53 58 05 54 28 --- 20 20 48 27.3 214.6 2.2 31.4 21 F 1 648 05 53 58 05 54 28 J1807-2506 20 20 48 24.7 213.0 2.2 30.7 -11 1 1 648 05 54 28 05 54 53 --- 20 21 13 24.7 213.1 2.2 30.8 14 F 1 648 05 54 28 05 54 53 VX_SGR 20 21 13 27.2 214.7 2.2 31.5 -11 1 1 648 05 54 53 05 55 23 --- 20 21 43 27.2 214.8 2.2 31.6 19 F 1 649 05 54 53 05 55 23 J1808-2124 20 21 43 27.8 215.3 2.2 31.8 -7 1 1 649 05 55 23 05 55 43 --- 20 22 03 27.8 215.4 2.2 31.8 13 F 1 650 05 55 23 05 55 43 VX_SGR 20 22 03 27.1 214.9 2.2 31.6 -7 1 1 650 05 55 43 05 56 13 --- 20 22 33 27.0 215.0 2.2 31.7 23 F 1 651 05 55 43 05 56 13 J1811-2055 20 22 33 28.5 215.1 2.2 31.5 -9 1 1 651 05 56 13 05 56 33 --- 20 22 53 28.5 215.2 2.2 31.6 11 F 1 652 05 56 13 05 56 33 VX_SGR 20 22 53 27.0 215.1 2.2 31.8 -9 1 1 652 05 56 33 05 57 03 --- 20 23 23 26.9 215.2 2.2 31.9 21 F 1 653 05 56 33 05 57 03 J1807-2506 20 23 23 24.4 213.6 2.3 31.2 -11 1 1 653 05 57 03 05 57 28 --- 20 23 48 24.4 213.7 2.3 31.3 14 F 1 653 05 57 03 05 57 28 VX_SGR 20 23 48 26.9 215.3 2.3 32.0 -11 1 1 653 05 57 28 05 57 58 --- 20 24 18 26.8 215.4 2.3 32.1 19 F 1 654 05 57 28 05 57 58 J1808-2124 20 24 18 27.5 215.9 2.3 32.3 -7 1 1 654 05 57 58 05 58 18 --- 20 24 38 27.5 215.9 2.3 32.3 13 F 1 655 05 57 58 05 58 18 VX_SGR 20 24 38 26.8 215.5 2.3 32.1 -7 1 1 655 05 58 18 05 58 48 --- 20 25 08 26.7 215.6 2.3 32.2 23 F 1 656 05 58 18 Schedule for VLBA_KP (Code Kp ) Page 38 BS160: Simultaneous VLBA Observations of Three 7mm SiO Lines UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 20 Aug 2007 Day 232 --- 05 58 48 J1811-2055 20 25 08 28.2 215.7 2.2 32.0 -9 1 1 656 05 58 48 05 59 07 --- 20 25 28 28.2 215.8 2.2 32.1 11 F 1 657 05 58 48 05 59 07 VX_SGR 20 25 28 26.7 215.6 2.3 32.3 -9 1 1 657 05 59 07 05 59 37 --- 20 25 58 26.6 215.8 2.3 32.4 21 F 1 658 05 59 07 05 59 37 J1807-2506 20 25 58 24.1 214.1 2.3 31.7 -11 1 1 658 05 59 37 06 00 02 --- 20 26 23 24.1 214.2 2.3 31.8 14 F 1 658 05 59 37 06 00 02 VX_SGR 20 26 23 26.6 215.8 2.3 32.5 -11 1 1 658 06 00 02 06 00 32 --- 20 26 53 26.5 216.0 2.3 32.6 19 F 1 659 06 00 02 06 00 32 J1808-2124 20 26 53 27.2 216.4 2.3 32.8 -7 1 1 659 06 00 32 06 00 52 --- 20 27 13 27.2 216.5 2.3 32.8 13 F 1 660 06 00 32 06 00 52 VX_SGR 20 27 13 26.5 216.0 2.3 32.6 -7 1 1 660 06 00 52 06 01 22 --- 20 27 43 26.4 216.1 2.3 32.7 23 F 1 661 06 00 52 06 01 22 J1811-2055 20 27 43 27.9 216.3 2.3 32.5 -9 1 1 661 06 01 22 06 01 42 --- 20 28 03 27.9 216.3 2.3 32.6 11 F 1 662 06 01 22 06 01 42 VX_SGR 20 28 03 26.4 216.2 2.3 32.8 -9 1 1 662 06 01 42 06 02 12 --- 20 28 33 26.3 216.3 2.3 32.9 21 F 1 662 06 01 42 06 02 12 J1807-2506 20 28 33 23.8 214.7 2.3 32.2 -11 1 1 662 06 02 12 06 02 37 --- 20 28 58 23.8 214.8 2.3 32.3