COVER INFORMATION Station: VLBA_MK (Code Mk ) Experiment: VLBA/VLTI Obs. of AH Sco Exp. Code: BB246d Schedule Version: 2.00 Processed by SCHED version: 6.05 June 2006 PI: Dave Boboltz Address: USNO 3450 Massachusetts Ave., NW Washington, DC 20392-5420, USA Phone: 202-762-1488 EMAIL: dboboltz@usno.navy.mil Fax: 202-762-1514 Phone during observation: 202-762-1488 Observing mode: Notes: RCP/LCP. 7mm VLBA 5hr track Schedule for VLBA_MK (Code Mk ) Page 2 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- Next scan frequencies: 42813.83 42813.83 43115.31 43115.31 Next BBC frequencies: 613.83 613.83 915.31 915.31 Next scan bandwidths: 8.00 8.00 8.00 8.00 00 27 29 J1650-2943 11 49 39 2.2 122.8 -5.0 D -65.7 0 1 1 0 00 27 29 00 28 28 --- 11 50 39 2.4 122.9 -5.0 H -65.5 0 F 1 1 00 27 47 00 29 28 J1650-2943 11 51 39 2.6 123.0 -5.0 H -65.4 54 1 1 1 00 29 28 00 30 28 --- 11 52 39 2.8 123.1 -5.0 H -65.3 0 F 1 2 00 29 46 00 31 28 J1650-2943 11 53 39 3.0 123.1 -5.0 H -65.1 54 1 1 2 00 31 28 00 32 28 --- 11 54 39 3.2 123.2 -4.9 H -65.0 0 F 1 3 00 31 46 00 33 28 J1650-2943 11 55 39 3.4 123.3 -4.9 -64.9 54 1 1 3 00 33 28 00 34 27 --- 11 56 39 3.6 123.4 -4.9 -64.8 60 F 1 4 00 33 46 00 35 27 J1650-2943 11 57 39 3.8 123.5 -4.9 -64.6 54 1 1 4 00 35 27 00 36 27 --- 11 58 39 4.0 123.6 -4.9 -64.5 60 F 1 5 00 35 45 00 37 27 J1650-2943 11 59 39 4.2 123.7 -4.9 -64.4 54 1 1 5 00 37 27 00 38 27 --- 12 00 39 4.4 123.8 -4.8 -64.2 60 F 1 6 00 37 45 00 39 27 J1650-2943 12 01 39 4.5 123.9 -4.8 -64.1 54 1 1 6 00 39 27 00 40 26 --- 12 02 39 4.7 124.0 -4.8 -64.0 60 F 1 7 00 39 45 00 41 26 J1650-2943 12 03 39 4.9 124.1 -4.8 -63.8 54 1 1 7 00 41 26 00 42 26 --- 12 04 39 5.1 124.2 -4.8 -63.7 60 F 1 8 00 41 44 00 43 26 J1650-2943 12 05 39 5.3 124.3 -4.8 -63.6 54 1 1 8 00 43 26 00 44 26 --- 12 06 39 5.5 124.4 -4.7 -63.4 60 F 1 9 00 43 44 00 45 26 J1650-2943 12 07 39 5.7 124.5 -4.7 -63.3 54 1 1 9 00 45 26 00 46 25 --- 12 08 39 5.9 124.6 -4.7 -63.2 60 F 1 10 00 45 44 00 47 25 J1650-2943 12 09 39 6.1 124.7 -4.7 -63.0 54 1 1 10 00 47 25 00 48 25 --- 12 10 39 6.3 124.8 -4.7 -62.9 60 F 1 11 00 47 43 00 49 25 J1650-2943 12 11 39 6.5 124.9 -4.7 -62.8 54 1 1 11 00 49 25 00 50 25 --- 12 12 39 6.7 125.0 -4.6 -62.6 60 F 1 12 00 49 43 00 51 25 J1650-2943 12 13 39 6.9 125.1 -4.6 -62.5 54 1 1 12 00 51 25 00 52 24 --- 12 14 39 7.1 125.2 -4.6 -62.4 60 F 1 13 00 51 43 Schedule for VLBA_MK (Code Mk ) Page 3 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 00 53 24 J1650-2943 12 15 39 7.3 125.3 -4.6 -62.2 54 1 1 13 00 53 24 00 54 24 --- 12 16 39 7.4 125.4 -4.6 -62.1 60 F 1 14 00 53 42 00 54 24 AHSCO 12 16 39 2.3 125.7 -4.9 H -64.7 -16 1 1 14 00 54 24 00 55 24 --- 12 17 39 2.5 125.8 -4.9 H -64.6 0 F 1 14 00 54 24 00 57 24 NRAO530 12 19 39 6.1 106.3 -5.2 -68.0 101 1 1 14 00 57 24 01 02 23 --- 12 24 39 7.2 106.8 -5.1 -67.7 299 F 1 19 00 57 42 01 02 23 J1713-2658 12 24 39 5.8 121.4 -4.8 -64.3 -16 1 1 19 01 02 23 01 03 23 --- 12 25 39 6.0 121.5 -4.8 -64.2 44 F 1 20 01 02 23 01 03 23 AHSCO 12 25 39 4.0 126.5 -4.8 H -63.5 -10 1 1 20 01 03 23 01 04 23 --- 12 26 39 4.2 126.6 -4.8 H -63.3 0 F 1 21 01 03 23 01 04 23 J1713-2658 12 26 39 6.2 121.6 -4.8 -64.1 -10 1 1 21 01 04 23 01 05 22 --- 12 27 39 6.4 121.7 -4.8 -63.9 50 F 1 22 01 04 23 01 05 22 AHSCO 12 27 39 4.4 126.7 -4.7 -63.2 -10 1 1 22 01 05 22 01 06 22 --- 12 28 39 4.6 126.8 -4.7 -63.0 50 F 1 23 01 05 22 01 06 22 J1713-2658 12 28 39 6.6 121.8 -4.8 -63.8 -10 1 1 23 01 06 22 01 07 22 --- 12 29 39 6.8 121.9 -4.7 -63.7 50 F 1 24 01 06 22 01 07 22 AHSCO 12 29 39 4.8 126.9 -4.7 -62.9 -10 1 1 24 01 07 22 01 08 22 --- 12 30 39 5.0 127.0 -4.7 -62.8 50 F 1 25 01 07 22 01 08 22 J1713-2658 12 30 39 7.0 122.0 -4.7 -63.6 -10 1 1 25 01 08 22 01 09 22 --- 12 31 39 7.2 122.1 -4.7 -63.4 50 F 1 26 01 08 22 01 09 22 AHSCO 12 31 39 5.2 127.1 -4.7 -62.6 -10 1 1 26 01 09 22 01 10 22 --- 12 32 39 5.4 127.2 -4.7 -62.5 50 F 1 27 01 09 22 01 10 22 J1713-2658 12 32 39 7.4 122.2 -4.7 -63.3 -10 1 1 27 01 10 22 01 11 21 --- 12 33 39 7.6 122.3 -4.7 -63.2 50 F 1 28 01 10 22 01 11 21 AHSCO 12 33 39 5.6 127.3 -4.6 -62.3 -10 1 1 28 01 11 21 01 12 21 --- 12 34 39 5.7 127.4 -4.6 -62.2 50 F 1 29 01 11 21 01 12 21 J1713-2658 12 34 39 7.8 122.4 -4.7 -63.1 -10 1 1 29 01 12 21 01 13 21 --- 12 35 39 8.0 122.5 -4.6 -62.9 50 F 1 30 01 12 21 Schedule for VLBA_MK (Code Mk ) Page 4 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 01 13 21 AHSCO 12 35 39 5.9 127.5 -4.6 -62.0 -10 1 1 30 01 13 21 01 14 21 --- 12 36 39 6.1 127.6 -4.6 -61.9 50 F 1 31 01 13 21 01 14 21 J1713-2658 12 36 39 8.2 122.6 -4.6 -62.8 -10 1 1 31 01 14 21 01 15 21 --- 12 37 39 8.4 122.7 -4.6 -62.7 50 F 1 32 01 14 21 01 15 21 AHSCO 12 37 39 6.3 127.7 -4.6 -61.8 -10 1 1 32 01 15 21 01 16 21 --- 12 38 39 6.5 127.8 -4.6 -61.6 50 F 1 33 01 15 21 01 16 21 J1713-2658 12 38 39 8.6 122.8 -4.6 -62.5 -10 1 1 33 01 16 21 01 17 20 --- 12 39 39 8.8 122.9 -4.6 -62.4 50 F 1 34 01 16 21 01 17 20 AHSCO 12 39 39 6.7 127.9 -4.5 -61.5 -10 1 1 34 01 17 20 01 18 20 --- 12 40 39 6.9 128.0 -4.5 -61.3 50 F 1 35 01 17 20 01 18 20 J1713-2658 12 40 39 9.0 123.0 -4.6 -62.3 -10 1 1 35 01 18 20 01 19 20 --- 12 41 39 9.2 123.1 -4.5 -62.2 50 F 1 36 01 18 20 01 19 20 AHSCO 12 41 39 7.0 128.1 -4.5 -61.2 -10 1 1 36 01 19 20 01 20 20 --- 12 42 39 7.2 128.2 -4.5 -61.0 50 F 1 37 01 19 20 01 20 20 J1713-2658 12 42 39 9.4 123.2 -4.5 -62.0 -10 1 1 37 01 20 20 01 21 20 --- 12 43 39 9.5 123.3 -4.5 -61.9 50 F 1 38 01 20 20 01 21 20 AHSCO 12 43 39 7.4 128.3 -4.5 -60.9 -10 1 1 38 01 21 20 01 22 20 --- 12 44 39 7.6 128.4 -4.5 -60.7 50 F 1 39 01 21 20 01 22 20 J1713-2658 12 44 39 9.7 123.5 -4.5 -61.8 -10 1 1 39 01 22 20 01 23 19 --- 12 45 39 9.9 123.6 -4.5 -61.6 50 F 1 40 01 22 20 01 23 19 AHSCO 12 45 39 7.8 128.5 -4.4 -60.6 -10 1 1 40 01 23 19 01 24 19 --- 12 46 39 8.0 128.6 -4.4 -60.4 50 F 1 41 01 23 19 01 24 19 J1713-2658 12 46 39 10.1 123.7 -4.5 -61.5 -10 1 1 41 01 24 19 01 25 19 --- 12 47 39 10.3 123.8 -4.4 -61.4 49 F 1 41 01 24 19 01 25 19 AHSCO 12 47 39 8.1 128.7 -4.4 -60.3 -10 1 1 41 01 25 19 01 26 19 --- 12 48 39 8.3 128.9 -4.4 -60.1 49 F 1 42 01 25 19 01 26 19 J1713-2658 12 48 39 10.5 123.9 -4.4 -61.2 -10 1 1 42 01 26 19 01 27 19 --- 12 49 39 10.7 124.0 -4.4 -61.1 49 F 1 43 01 26 19 Schedule for VLBA_MK (Code Mk ) Page 5 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 01 27 19 AHSCO 12 49 39 8.5 129.0 -4.4 -60.0 -10 1 1 43 01 27 19 01 28 19 --- 12 50 39 8.7 129.1 -4.4 -59.8 49 F 1 44 01 27 19 01 28 19 J1713-2658 12 50 39 10.9 124.1 -4.4 -61.0 -10 1 1 44 01 28 19 01 29 18 --- 12 51 39 11.1 124.2 -4.4 -60.8 49 F 1 45 01 28 19 01 29 18 AHSCO 12 51 39 8.9 129.2 -4.3 -59.7 -10 1 1 45 01 29 18 01 30 18 --- 12 52 39 9.1 129.3 -4.3 -59.5 49 F 1 46 01 29 18 01 30 18 J1713-2658 12 52 39 11.3 124.3 -4.4 -60.7 -10 1 1 46 01 30 18 01 31 18 --- 12 53 39 11.5 124.4 -4.3 -60.6 49 F 1 47 01 30 18 01 31 18 AHSCO 12 53 39 9.2 129.4 -4.3 -59.4 -11 1 1 47 01 31 18 01 32 18 --- 12 54 39 9.4 129.5 -4.3 -59.2 49 F 1 48 01 31 18 01 32 18 J1713-2658 12 54 39 11.7 124.6 -4.3 -60.4 -11 1 1 48 01 32 18 01 33 18 --- 12 55 39 11.9 124.7 -4.3 -60.3 49 F 1 49 01 32 18 01 33 18 AHSCO 12 55 39 9.6 129.6 -4.3 -59.1 -11 1 1 49 01 33 18 01 34 18 --- 12 56 39 9.8 129.7 -4.3 -58.9 49 F 1 50 01 33 18 01 34 18 J1713-2658 12 56 39 12.1 124.8 -4.3 -60.1 -11 1 1 50 01 34 18 01 35 17 --- 12 57 39 12.3 124.9 -4.3 -60.0 49 F 1 51 01 34 18 01 35 17 AHSCO 12 57 39 10.0 129.8 -4.2 -58.8 -11 1 1 51 01 35 17 01 36 17 --- 12 58 39 10.1 129.9 -4.2 -58.6 49 F 1 52 01 35 17 01 36 17 J1713-2658 12 58 39 12.5 125.0 -4.3 -59.9 -11 1 1 52 01 36 17 01 37 17 --- 12 59 39 12.7 125.1 -4.2 -59.7 49 F 1 53 01 36 17 01 37 17 AHSCO 12 59 39 10.3 130.1 -4.2 -58.5 -11 1 1 53 01 37 17 01 38 17 --- 13 00 39 10.5 130.2 -4.2 -58.3 49 F 1 54 01 37 17 01 38 17 J1713-2658 13 00 39 12.9 125.2 -4.2 -59.6 -11 1 1 54 01 38 17 01 39 17 --- 13 01 39 13.0 125.4 -4.2 -59.5 49 F 1 55 01 38 17 01 39 17 AHSCO 13 01 39 10.7 130.3 -4.2 -58.2 -11 1 1 55 01 39 17 01 40 17 --- 13 02 39 10.9 130.4 -4.2 -58.0 49 F 1 56 01 39 17 01 40 17 J1713-2658 13 02 39 13.2 125.5 -4.2 -59.3 -11 1 1 56 01 40 17 01 41 16 --- 13 03 39 13.4 125.6 -4.2 -59.2 49 F 1 57 01 40 17 Schedule for VLBA_MK (Code Mk ) Page 6 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 01 41 16 AHSCO 13 03 39 11.0 130.5 -4.1 -57.9 -11 1 1 57 01 41 16 01 42 16 --- 13 04 39 11.2 130.6 -4.1 -57.7 49 F 1 58 01 41 16 01 42 16 J1713-2658 13 04 39 13.6 125.7 -4.2 -59.0 -11 1 1 58 01 42 16 01 43 16 --- 13 05 39 13.8 125.8 -4.1 -58.9 49 F 1 59 01 42 16 01 43 16 AHSCO 13 05 39 11.4 130.7 -4.1 -57.5 -11 1 1 59 01 43 16 01 44 16 --- 13 06 39 11.6 130.9 -4.1 -57.4 49 F 1 60 01 43 16 01 44 16 J1713-2658 13 06 39 14.0 125.9 -4.1 -58.7 -11 1 1 60 01 44 16 01 45 16 --- 13 07 39 14.2 126.1 -4.1 -58.6 49 F 1 61 01 44 16 01 45 16 AHSCO 13 07 39 11.8 131.0 -4.1 -57.2 -11 1 1 61 01 45 16 01 46 16 --- 13 08 39 11.9 131.1 -4.1 -57.1 49 F 1 62 01 45 16 01 46 16 J1713-2658 13 08 39 14.4 126.2 -4.1 -58.5 -11 1 1 62 01 46 16 01 47 15 --- 13 09 39 14.6 126.3 -4.1 -58.3 49 F 1 63 01 46 16 01 47 15 AHSCO 13 09 39 12.1 131.2 -4.0 -56.9 -11 1 1 63 01 47 15 01 48 15 --- 13 10 39 12.3 131.3 -4.0 -56.8 49 F 1 64 01 47 15 01 48 15 J1713-2658 13 10 39 14.8 126.4 -4.1 -58.2 -11 1 1 64 01 48 15 01 49 15 --- 13 11 39 14.9 126.5 -4.0 -58.0 49 F 1 65 01 48 15 01 49 15 AHSCO 13 11 39 12.5 131.4 -4.0 -56.6 -11 1 1 65 01 49 15 01 50 15 --- 13 12 39 12.6 131.6 -4.0 -56.4 49 F 1 66 01 49 15 01 50 15 J1713-2658 13 12 39 15.1 126.7 -4.0 -57.9 -11 1 1 66 01 50 15 01 51 15 --- 13 13 39 15.3 126.8 -4.0 -57.7 49 F 1 67 01 50 15 01 51 15 AHSCO 13 13 39 12.8 131.7 -4.0 -56.3 -11 1 1 67 01 51 15 01 52 15 --- 13 14 39 13.0 131.8 -4.0 -56.1 49 F 1 68 01 51 15 01 52 15 J1713-2658 13 14 39 15.5 126.9 -4.0 -57.6 -11 1 1 68 01 52 15 01 53 14 --- 13 15 39 15.7 127.0 -4.0 -57.4 49 F 1 69 01 52 15 01 53 14 AHSCO 13 15 39 13.2 131.9 -3.9 -56.0 -11 1 1 69 01 53 14 01 54 14 --- 13 16 39 13.3 132.0 -3.9 -55.8 49 F 1 69 01 53 14 01 56 14 NRAO530 13 18 39 19.2 112.4 -4.2 -63.3 101 1 1 69 01 56 14 02 01 13 --- 13 23 39 20.3 112.9 -4.2 -62.8 299 F 1 74 01 56 32 Schedule for VLBA_MK (Code Mk ) Page 7 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 02 01 13 J1713-2658 13 23 39 17.2 128.1 -3.8 -56.3 -16 1 1 74 02 01 13 02 02 13 --- 13 24 39 17.4 128.2 -3.8 -56.1 44 F 1 75 02 01 13 02 02 13 AHSCO 13 24 39 14.7 133.0 -3.8 -54.5 -11 1 1 75 02 02 13 02 03 13 --- 13 25 39 14.9 133.2 -3.8 -54.3 49 F 1 76 02 02 13 02 03 13 J1713-2658 13 25 39 17.6 128.3 -3.8 -55.9 -11 1 1 76 02 03 13 02 04 13 --- 13 26 39 17.7 128.4 -3.8 -55.8 49 F 1 77 02 03 13 02 04 13 AHSCO 13 26 39 15.1 133.3 -3.8 -54.1 -11 1 1 77 02 04 13 02 05 13 --- 13 27 39 15.2 133.4 -3.7 -54.0 48 F 1 78 02 04 13 02 05 13 J1713-2658 13 27 39 17.9 128.6 -3.8 -55.6 -11 1 1 78 02 05 13 02 06 12 --- 13 28 39 18.1 128.7 -3.8 -55.5 48 F 1 79 02 05 13 02 06 12 AHSCO 13 28 39 15.4 133.6 -3.7 -53.8 -11 1 1 79 02 06 12 02 07 12 --- 13 29 39 15.6 133.7 -3.7 -53.6 48 F 1 80 02 06 12 02 07 12 J1713-2658 13 29 39 18.3 128.8 -3.7 -55.3 -11 1 1 80 02 07 12 02 08 12 --- 13 30 39 18.5 129.0 -3.7 -55.2 48 F 1 81 02 07 12 02 08 12 AHSCO 13 30 39 15.8 133.8 -3.7 -53.5 -11 1 1 81 02 08 12 02 09 12 --- 13 31 39 15.9 133.9 -3.7 -53.3 48 F 1 82 02 08 12 02 09 12 J1713-2658 13 31 39 18.7 129.1 -3.7 -55.0 -11 1 1 82 02 09 12 02 10 12 --- 13 32 39 18.8 129.2 -3.7 -54.9 48 F 1 83 02 09 12 02 10 12 AHSCO 13 32 39 16.1 134.1 -3.7 -53.1 -12 1 1 83 02 10 12 02 11 12 --- 13 33 39 16.3 134.2 -3.6 -53.0 48 F 1 84 02 10 12 02 11 12 J1713-2658 13 33 39 19.0 129.4 -3.7 -54.7 -12 1 1 84 02 11 12 02 12 11 --- 13 34 39 19.2 129.5 -3.7 -54.5 48 F 1 85 02 11 12 02 12 11 AHSCO 13 34 39 16.4 134.3 -3.6 -52.8 -12 1 1 85 02 12 11 02 13 11 --- 13 35 39 16.6 134.5 -3.6 -52.6 48 F 1 86 02 12 11 02 13 11 J1713-2658 13 35 39 19.4 129.7 -3.6 -54.4 -12 1 1 86 02 13 11 02 14 11 --- 13 36 39 19.6 129.8 -3.6 -54.2 48 F 1 87 02 13 11 02 14 11 AHSCO 13 36 39 16.8 134.6 -3.6 -52.4 -12 1 1 87 02 14 11 02 15 11 --- 13 37 39 16.9 134.7 -3.6 -52.3 48 F 1 88 02 14 11 Schedule for VLBA_MK (Code Mk ) Page 8 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 02 15 11 J1713-2658 13 37 39 19.8 129.9 -3.6 -54.1 -12 1 1 88 02 15 11 02 16 11 --- 13 38 39 19.9 130.1 -3.6 -53.9 48 F 1 89 02 15 11 02 16 11 AHSCO 13 38 39 17.1 134.9 -3.6 -52.1 -12 1 1 89 02 16 11 02 17 11 --- 13 39 39 17.3 135.0 -3.5 -51.9 48 F 1 90 02 16 11 02 17 11 J1713-2658 13 39 39 20.1 130.2 -3.6 -53.7 -12 1 1 90 02 17 11 02 18 10 --- 13 40 39 20.3 130.3 -3.6 -53.6 48 F 1 91 02 17 11 02 18 10 AHSCO 13 40 39 17.4 135.1 -3.5 -51.8 -12 1 1 91 02 18 10 02 19 10 --- 13 41 39 17.6 135.3 -3.5 -51.6 48 F 1 92 02 18 10 02 19 10 J1713-2658 13 41 39 20.5 130.5 -3.5 -53.4 -12 1 1 92 02 19 10 02 20 10 --- 13 42 39 20.6 130.6 -3.5 -53.3 48 F 1 93 02 19 10 02 20 10 AHSCO 13 42 39 17.8 135.4 -3.5 -51.4 -12 1 1 93 02 20 10 02 21 10 --- 13 43 39 17.9 135.6 -3.5 -51.2 48 F 1 94 02 20 10 02 21 10 J1713-2658 13 43 39 20.8 130.8 -3.5 -53.1 -12 1 1 94 02 21 10 02 22 10 --- 13 44 39 21.0 130.9 -3.5 -52.9 48 F 1 95 02 21 10 02 22 10 AHSCO 13 44 39 18.1 135.7 -3.5 -51.1 -12 1 1 95 02 22 10 02 23 10 --- 13 45 39 18.3 135.8 -3.4 -50.9 48 F 1 96 02 22 10 02 23 10 J1713-2658 13 45 39 21.2 131.1 -3.5 -52.8 -12 1 1 96 02 23 10 02 24 09 --- 13 46 39 21.4 131.2 -3.5 -52.6 48 F 1 97 02 23 10 02 24 09 AHSCO 13 46 39 18.4 136.0 -3.4 -50.7 -12 1 1 97 02 24 09 02 25 09 --- 13 47 39 18.6 136.1 -3.4 -50.5 48 F 1 97 02 24 09 02 25 09 J1713-2658 13 47 39 21.5 131.4 -3.4 -52.4 -12 1 1 97 02 25 09 02 26 09 --- 13 48 39 21.7 131.5 -3.4 -52.3 48 F 1 98 02 25 09 02 26 09 AHSCO 13 48 39 18.7 136.3 -3.4 -50.3 -12 1 1 98 02 26 09 02 27 09 --- 13 49 39 18.9 136.4 -3.4 -50.2 48 F 1 99 02 26 09 02 27 09 J1713-2658 13 49 39 21.9 131.6 -3.4 -52.1 -12 1 1 99 02 27 09 02 28 09 --- 13 50 39 22.1 131.8 -3.4 -51.9 48 F 1 100 02 27 09 02 28 09 AHSCO 13 50 39 19.1 136.6 -3.4 -50.0 -12 1 1 100 02 28 09 02 29 09 --- 13 51 39 19.2 136.7 -3.3 -49.8 48 F 1 101 02 28 09 Schedule for VLBA_MK (Code Mk ) Page 9 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 02 29 09 J1713-2658 13 51 39 22.2 131.9 -3.4 -51.8 -12 1 1 101 02 29 09 02 30 08 --- 13 52 39 22.4 132.1 -3.4 -51.6 48 F 1 102 02 29 09 02 30 08 AHSCO 13 52 39 19.4 136.8 -3.3 -49.6 -12 1 1 102 02 30 08 02 31 08 --- 13 53 39 19.6 137.0 -3.3 -49.4 48 F 1 103 02 30 08 02 31 08 J1713-2658 13 53 39 22.6 132.2 -3.3 -51.4 -12 1 1 103 02 31 08 02 32 08 --- 13 54 39 22.8 132.4 -3.3 -51.2 48 F 1 104 02 31 08 02 32 08 AHSCO 13 54 39 19.7 137.1 -3.3 -49.2 -12 1 1 104 02 32 08 02 33 08 --- 13 55 39 19.9 137.3 -3.3 -49.1 48 F 1 105 02 32 08 02 33 08 J1713-2658 13 55 39 22.9 132.5 -3.3 -51.1 -12 1 1 105 02 33 08 02 34 08 --- 13 56 39 23.1 132.7 -3.3 -50.9 48 F 1 106 02 33 08 02 34 08 AHSCO 13 56 39 20.0 137.4 -3.3 -48.9 -12 1 1 106 02 34 08 02 35 08 --- 13 57 39 20.2 137.6 -3.2 -48.7 48 F 1 107 02 34 08 02 35 08 J1713-2658 13 57 39 23.3 132.9 -3.3 -50.7 -12 1 1 107 02 35 08 02 36 07 --- 13 58 39 23.5 133.0 -3.3 -50.5 48 F 1 108 02 35 08 02 36 07 AHSCO 13 58 39 20.4 137.7 -3.2 -48.5 -12 1 1 108 02 36 07 02 37 07 --- 13 59 39 20.5 137.9 -3.2 -48.3 48 F 1 109 02 36 07 02 37 07 J1713-2658 13 59 39 23.6 133.2 -3.2 -50.4 -12 1 1 109 02 37 07 02 38 07 --- 14 00 39 23.8 133.3 -3.2 -50.2 48 F 1 110 02 37 07 02 38 07 AHSCO 14 00 39 20.7 138.0 -3.2 -48.1 -12 1 1 110 02 38 07 02 39 07 --- 14 01 39 20.8 138.2 -3.2 -48.0 48 F 1 111 02 38 07 02 39 07 J1713-2658 14 01 39 24.0 133.5 -3.2 -50.0 -12 1 1 111 02 39 07 02 40 07 --- 14 02 39 24.1 133.6 -3.2 -49.8 48 F 1 112 02 39 07 02 40 07 AHSCO 14 02 39 21.0 138.3 -3.2 -47.8 -12 1 1 112 02 40 07 02 41 07 --- 14 03 39 21.1 138.5 -3.1 -47.6 48 F 1 113 02 40 07 02 41 07 J1713-2658 14 03 39 24.3 133.8 -3.2 -49.7 -12 1 1 113 02 41 07 02 42 06 --- 14 04 39 24.5 133.9 -3.2 -49.5 47 F 1 114 02 41 07 02 42 06 AHSCO 14 04 39 21.3 138.6 -3.1 -47.4 -12 1 1 114 02 42 06 02 43 06 --- 14 05 39 21.4 138.8 -3.1 -47.2 47 F 1 115 02 42 06 Schedule for VLBA_MK (Code Mk ) Page 10 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 02 43 06 J1713-2658 14 05 39 24.6 134.1 -3.1 -49.3 -12 1 1 115 02 43 06 02 44 06 --- 14 06 39 24.8 134.3 -3.1 -49.1 47 F 1 116 02 43 06 02 44 06 AHSCO 14 06 39 21.6 138.9 -3.1 -47.0 -12 1 1 116 02 44 06 02 45 06 --- 14 07 39 21.8 139.1 -3.1 -46.8 47 F 1 117 02 44 06 02 45 06 J1713-2658 14 07 39 25.0 134.4 -3.1 -48.9 -12 1 1 117 02 45 06 02 46 06 --- 14 08 39 25.2 134.6 -3.1 -48.8 47 F 1 118 02 45 06 02 46 06 AHSCO 14 08 39 21.9 139.3 -3.1 -46.6 -12 1 1 118 02 46 06 02 47 06 --- 14 09 39 22.1 139.4 -3.0 -46.4 47 F 1 119 02 46 06 02 47 06 J1713-2658 14 09 39 25.3 134.8 -3.1 -48.6 -13 1 1 119 02 47 06 02 48 05 --- 14 10 39 25.5 134.9 -3.1 -48.4 47 F 1 120 02 47 06 02 48 05 AHSCO 14 10 39 22.2 139.6 -3.0 -46.2 -13 1 1 120 02 48 05 02 49 05 --- 14 11 39 22.4 139.7 -3.0 -46.0 47 F 1 121 02 48 05 02 49 05 J1713-2658 14 11 39 25.7 135.1 -3.0 -48.2 -13 1 1 121 02 49 05 02 50 05 --- 14 12 39 25.8 135.2 -3.0 -48.0 47 F 1 122 02 49 05 02 50 05 AHSCO 14 12 39 22.5 139.9 -3.0 -45.9 -13 1 1 122 02 50 05 02 51 05 --- 14 13 39 22.7 140.0 -3.0 -45.7 47 F 1 123 02 50 05 02 51 05 J1713-2658 14 13 39 26.0 135.4 -3.0 -47.8 -13 1 1 123 02 51 05 02 52 05 --- 14 14 39 26.1 135.6 -3.0 -47.7 47 F 1 124 02 51 05 02 52 05 AHSCO 14 14 39 22.8 140.2 -3.0 -45.5 -13 1 1 124 02 52 05 02 53 05 --- 14 15 39 23.0 140.4 -2.9 -45.3 47 F 1 124 02 52 05 02 55 04 NRAO530 14 17 39 31.7 120.3 -3.3 -56.5 96 1 1 124 02 55 04 03 00 04 --- 14 22 39 32.7 121.1 -3.2 -55.8 299 F 1 129 02 55 22 03 00 04 J1713-2658 14 22 39 27.5 136.9 -2.9 -46.1 -17 1 1 129 03 00 04 03 01 03 --- 14 23 39 27.6 137.1 -2.8 -45.9 43 F 1 130 03 00 04 03 01 03 AHSCO 14 23 39 24.2 141.7 -2.8 -43.7 -13 1 1 130 03 01 03 03 02 03 --- 14 24 39 24.3 141.8 -2.8 -43.5 47 F 1 131 03 01 03 03 02 03 J1713-2658 14 24 39 27.8 137.3 -2.8 -45.7 -13 1 1 131 03 02 03 03 03 03 --- 14 25 39 27.9 137.5 -2.8 -45.5 47 F 1 132 03 02 03 Schedule for VLBA_MK (Code Mk ) Page 11 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 03 03 03 AHSCO 14 25 39 24.4 142.0 -2.8 -43.3 -13 1 1 132 03 03 03 03 04 03 --- 14 26 39 24.6 142.2 -2.8 -43.1 47 F 1 133 03 03 03 03 04 03 J1713-2658 14 26 39 28.1 137.6 -2.8 -45.3 -13 1 1 133 03 04 03 03 05 03 --- 14 27 39 28.2 137.8 -2.8 -45.2 47 F 1 134 03 04 03 03 05 03 AHSCO 14 27 39 24.7 142.4 -2.7 -42.9 -13 1 1 134 03 05 03 03 06 03 --- 14 28 39 24.9 142.5 -2.7 -42.6 47 F 1 135 03 05 03 03 06 03 J1713-2658 14 28 39 28.4 138.0 -2.8 -45.0 -13 1 1 135 03 06 03 03 07 02 --- 14 29 39 28.6 138.2 -2.7 -44.8 47 F 1 136 03 06 03 03 07 02 AHSCO 14 29 39 25.0 142.7 -2.7 -42.4 -13 1 1 136 03 07 02 03 08 02 --- 14 30 39 25.2 142.9 -2.7 -42.2 47 F 1 137 03 07 02 03 08 02 J1713-2658 14 30 39 28.7 138.4 -2.7 -44.6 -13 1 1 137 03 08 02 03 09 02 --- 14 31 39 28.9 138.5 -2.7 -44.4 47 F 1 138 03 08 02 03 09 02 AHSCO 14 31 39 25.3 143.0 -2.7 -42.0 -13 1 1 138 03 09 02 03 10 02 --- 14 32 39 25.4 143.2 -2.7 -41.8 47 F 1 139 03 09 02 03 10 02 J1713-2658 14 32 39 29.0 138.7 -2.7 -44.2 -13 1 1 139 03 10 02 03 11 02 --- 14 33 39 29.2 138.9 -2.7 -43.9 47 F 1 140 03 10 02 03 11 02 AHSCO 14 33 39 25.6 143.4 -2.6 -41.6 -13 1 1 140 03 11 02 03 12 02 --- 14 34 39 25.7 143.6 -2.6 -41.4 47 F 1 141 03 11 02 03 12 02 J1713-2658 14 34 39 29.3 139.1 -2.7 -43.7 -13 1 1 141 03 12 02 03 13 01 --- 14 35 39 29.5 139.3 -2.6 -43.5 47 F 1 142 03 12 02 03 13 01 AHSCO 14 35 39 25.9 143.7 -2.6 -41.2 -13 1 1 142 03 13 01 03 14 01 --- 14 36 39 26.0 143.9 -2.6 -41.0 47 F 1 143 03 13 01 03 14 01 J1713-2658 14 36 39 29.6 139.5 -2.6 -43.3 -13 1 1 143 03 14 01 03 15 01 --- 14 37 39 29.8 139.6 -2.6 -43.1 47 F 1 144 03 14 01 03 15 01 AHSCO 14 37 39 26.1 144.1 -2.6 -40.8 -13 1 1 144 03 15 01 03 16 01 --- 14 38 39 26.3 144.3 -2.6 -40.6 47 F 1 145 03 15 01 03 16 01 J1713-2658 14 38 39 30.0 139.8 -2.6 -42.9 -13 1 1 145 03 16 01 03 17 01 --- 14 39 39 30.1 140.0 -2.6 -42.7 46 F 1 146 03 16 01 Schedule for VLBA_MK (Code Mk ) Page 12 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 03 17 01 AHSCO 14 39 39 26.4 144.5 -2.5 -40.3 -13 1 1 146 03 17 01 03 18 01 --- 14 40 39 26.6 144.6 -2.5 -40.1 46 F 1 147 03 17 01 03 18 01 J1713-2658 14 40 39 30.3 140.2 -2.6 -42.5 -13 1 1 147 03 18 01 03 19 00 --- 14 41 39 30.4 140.4 -2.5 -42.3 46 F 1 148 03 18 01 03 19 00 AHSCO 14 41 39 26.7 144.8 -2.5 -39.9 -13 1 1 148 03 19 00 03 20 00 --- 14 42 39 26.8 145.0 -2.5 -39.7 46 F 1 149 03 19 00 03 20 00 J1713-2658 14 42 39 30.6 140.6 -2.5 -42.1 -13 1 1 149 03 20 00 03 21 00 --- 14 43 39 30.7 140.8 -2.5 -41.9 46 F 1 150 03 20 00 03 21 00 AHSCO 14 43 39 27.0 145.2 -2.5 -39.5 -13 1 1 150 03 21 00 03 22 00 --- 14 44 39 27.1 145.4 -2.5 -39.3 46 F 1 151 03 21 00 03 22 00 J1713-2658 14 44 39 30.9 141.0 -2.5 -41.7 -14 1 1 151 03 22 00 03 23 00 --- 14 45 39 31.0 141.2 -2.5 -41.4 46 F 1 152 03 22 00 03 23 00 AHSCO 14 45 39 27.2 145.6 -2.4 -39.0 -14 1 1 152 03 23 00 03 24 00 --- 14 46 39 27.4 145.7 -2.4 -38.8 46 F 1 152 03 23 00 03 24 00 J1713-2658 14 46 39 31.1 141.4 -2.5 -41.2 -14 1 1 152 03 24 00 03 24 59 --- 14 47 39 31.3 141.6 -2.4 -41.0 46 F 1 153 03 24 00 03 24 59 AHSCO 14 47 39 27.5 145.9 -2.4 -38.6 -14 1 1 153 03 24 59 03 25 59 --- 14 48 39 27.6 146.1 -2.4 -38.4 46 F 1 154 03 24 59 03 25 59 J1713-2658 14 48 39 31.4 141.8 -2.4 -40.8 -14 1 1 154 03 25 59 03 26 59 --- 14 49 39 31.6 142.0 -2.4 -40.6 46 F 1 155 03 25 59 03 26 59 AHSCO 14 49 39 27.8 146.3 -2.4 -38.2 -14 1 1 155 03 26 59 03 27 59 --- 14 50 39 27.9 146.5 -2.4 -37.9 46 F 1 156 03 26 59 03 27 59 J1713-2658 14 50 39 31.7 142.2 -2.4 -40.4 -14 1 1 156 03 27 59 03 28 59 --- 14 51 39 31.9 142.4 -2.4 -40.1 46 F 1 157 03 27 59 03 28 59 AHSCO 14 51 39 28.0 146.7 -2.3 -37.7 -14 1 1 157 03 28 59 03 29 59 --- 14 52 39 28.1 146.9 -2.3 -37.5 46 F 1 158 03 28 59 03 29 59 J1713-2658 14 52 39 32.0 142.6 -2.4 -39.9 -14 1 1 158 03 29 59 03 30 58 --- 14 53 39 32.2 142.8 -2.3 -39.7 46 F 1 159 03 29 59 Schedule for VLBA_MK (Code Mk ) Page 13 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 03 30 58 AHSCO 14 53 39 28.3 147.1 -2.3 -37.3 -14 1 1 159 03 30 58 03 31 58 --- 14 54 39 28.4 147.2 -2.3 -37.1 46 F 1 160 03 30 58 03 31 58 J1713-2658 14 54 39 32.3 143.0 -2.3 -39.5 -14 1 1 160 03 31 58 03 32 58 --- 14 55 39 32.4 143.2 -2.3 -39.3 46 F 1 161 03 31 58 03 32 58 AHSCO 14 55 39 28.5 147.4 -2.3 -36.8 -14 1 1 161 03 32 58 03 33 58 --- 14 56 39 28.7 147.6 -2.3 -36.6 46 F 1 162 03 32 58 03 33 58 J1713-2658 14 56 39 32.6 143.4 -2.3 -39.0 -14 1 1 162 03 33 58 03 34 58 --- 14 57 39 32.7 143.6 -2.3 -38.8 46 F 1 163 03 33 58 03 34 58 AHSCO 14 57 39 28.8 147.8 -2.2 -36.4 -14 1 1 163 03 34 58 03 35 58 --- 14 58 39 28.9 148.0 -2.2 -36.1 46 F 1 164 03 34 58 03 35 58 J1713-2658 14 58 39 32.9 143.8 -2.3 -38.6 -14 1 1 164 03 35 58 03 36 57 --- 14 59 39 33.0 144.0 -2.2 -38.4 46 F 1 165 03 35 58 03 36 57 AHSCO 14 59 39 29.0 148.2 -2.2 -35.9 -14 1 1 165 03 36 57 03 37 57 --- 15 00 39 29.2 148.4 -2.2 -35.7 46 F 1 166 03 36 57 03 37 57 J1713-2658 15 00 39 33.1 144.2 -2.2 -38.1 -14 1 1 166 03 37 57 03 38 57 --- 15 01 39 33.3 144.4 -2.2 -37.9 46 F 1 167 03 37 57 03 38 57 AHSCO 15 01 39 29.3 148.6 -2.2 -35.5 -14 1 1 167 03 38 57 03 39 57 --- 15 02 39 29.4 148.8 -2.2 -35.2 46 F 1 168 03 38 57 03 39 57 J1713-2658 15 02 39 33.4 144.6 -2.2 -37.7 -14 1 1 168 03 39 57 03 40 57 --- 15 03 39 33.5 144.8 -2.2 -37.4 46 F 1 169 03 39 57 03 40 57 AHSCO 15 03 39 29.5 149.0 -2.1 -35.0 -14 1 1 169 03 40 57 03 41 57 --- 15 04 39 29.6 149.2 -2.1 -34.8 46 F 1 170 03 40 57 03 41 57 J1713-2658 15 04 39 33.7 145.1 -2.2 -37.2 -14 1 1 170 03 41 57 03 42 56 --- 15 05 39 33.8 145.3 -2.1 -37.0 46 F 1 171 03 41 57 03 42 56 AHSCO 15 05 39 29.8 149.4 -2.1 -34.5 -14 1 1 171 03 42 56 03 43 56 --- 15 06 39 29.9 149.6 -2.1 -34.3 46 F 1 172 03 42 56 03 43 56 J1713-2658 15 06 39 33.9 145.5 -2.1 -36.8 -14 1 1 172 03 43 56 03 44 56 --- 15 07 39 34.1 145.7 -2.1 -36.5 46 F 1 173 03 43 56 Schedule for VLBA_MK (Code Mk ) Page 14 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 03 44 56 AHSCO 15 07 39 30.0 149.8 -2.1 -34.1 -14 1 1 173 03 44 56 03 45 56 --- 15 08 39 30.1 150.0 -2.1 -33.8 46 F 1 174 03 44 56 03 45 56 J1713-2658 15 08 39 34.2 145.9 -2.1 -36.3 -14 1 1 174 03 45 56 03 46 56 --- 15 09 39 34.3 146.1 -2.1 -36.0 46 F 1 175 03 45 56 03 46 56 AHSCO 15 09 39 30.2 150.2 -2.0 -33.6 -14 1 1 175 03 46 56 03 47 56 --- 15 10 39 30.3 150.4 -2.0 -33.4 46 F 1 176 03 46 56 03 47 56 J1713-2658 15 10 39 34.5 146.3 -2.1 -35.8 -14 1 1 176 03 47 56 03 48 55 --- 15 11 39 34.6 146.6 -2.0 -35.6 46 F 1 177 03 47 56 03 48 55 AHSCO 15 11 39 30.5 150.6 -2.0 -33.1 -14 1 1 177 03 48 55 03 49 55 --- 15 12 39 30.6 150.8 -2.0 -32.9 46 F 1 178 03 48 55 03 49 55 J1713-2658 15 12 39 34.7 146.8 -2.0 -35.3 -14 1 1 178 03 49 55 03 50 55 --- 15 13 39 34.9 147.0 -2.0 -35.1 46 F 1 179 03 49 55 03 50 55 AHSCO 15 13 39 30.7 151.0 -2.0 -32.6 -14 1 1 179 03 50 55 03 51 55 --- 15 14 39 30.8 151.2 -2.0 -32.4 45 F 1 179 03 50 55 03 53 55 NRAO530 15 16 39 42.9 131.6 -2.3 -46.3 89 1 1 179 03 53 55 03 58 54 --- 15 21 39 43.8 132.8 -2.2 -45.2 299 F 1 184 03 54 13 03 58 54 J1713-2658 15 21 39 35.9 148.8 -1.9 -33.1 -22 1 1 184 03 58 54 03 59 54 --- 15 22 39 36.0 149.1 -1.9 -32.9 38 F 1 185 03 58 54 03 59 54 AHSCO 15 22 39 31.7 152.9 -1.8 -30.5 -15 1 1 185 03 59 54 04 00 54 --- 15 23 39 31.8 153.1 -1.8 -30.2 45 F 1 186 03 59 54 04 00 54 J1713-2658 15 23 39 36.1 149.3 -1.8 -32.6 -15 1 1 186 04 00 54 04 01 53 --- 15 24 39 36.2 149.5 -1.8 -32.4 45 F 1 187 04 00 54 04 01 53 AHSCO 15 24 39 31.9 153.4 -1.8 -30.0 -15 1 1 187 04 01 53 04 02 53 --- 15 25 39 32.0 153.6 -1.8 -29.7 45 F 1 188 04 01 53 04 02 53 J1713-2658 15 25 39 36.3 149.7 -1.8 -32.1 -15 1 1 188 04 02 53 04 03 53 --- 15 26 39 36.5 150.0 -1.8 -31.9 45 F 1 189 04 02 53 04 03 53 AHSCO 15 26 39 32.1 153.8 -1.8 -29.5 -15 1 1 189 04 03 53 04 04 53 --- 15 27 39 32.2 154.0 -1.7 -29.2 45 F 1 190 04 03 53 Schedule for VLBA_MK (Code Mk ) Page 15 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 04 04 53 J1713-2658 15 27 39 36.6 150.2 -1.8 -31.6 -15 1 1 190 04 04 53 04 05 53 --- 15 28 39 36.7 150.5 -1.8 -31.4 45 F 1 191 04 04 53 04 05 53 AHSCO 15 28 39 32.3 154.2 -1.7 -29.0 -15 1 1 191 04 05 53 04 06 53 --- 15 29 39 32.4 154.4 -1.7 -28.7 45 F 1 192 04 05 53 04 06 53 J1713-2658 15 29 39 36.8 150.7 -1.7 -31.1 -15 1 1 192 04 06 53 04 07 52 --- 15 30 39 36.9 150.9 -1.7 -30.9 45 F 1 193 04 06 53 04 07 52 AHSCO 15 30 39 32.5 154.7 -1.7 -28.5 -15 1 1 193 04 07 52 04 08 52 --- 15 31 39 32.6 154.9 -1.7 -28.2 45 F 1 194 04 07 52 04 08 52 J1713-2658 15 31 39 37.0 151.2 -1.7 -30.6 -15 1 1 194 04 08 52 04 09 52 --- 15 32 39 37.2 151.4 -1.7 -30.3 45 F 1 195 04 08 52 04 09 52 AHSCO 15 32 39 32.7 155.1 -1.7 -28.0 -15 1 1 195 04 09 52 04 10 52 --- 15 33 39 32.8 155.3 -1.6 -27.7 45 F 1 196 04 09 52 04 10 52 J1713-2658 15 33 39 37.3 151.7 -1.7 -30.1 -15 1 1 196 04 10 52 04 11 52 --- 15 34 39 37.4 151.9 -1.7 -29.8 45 F 1 197 04 10 52 04 11 52 AHSCO 15 34 39 32.9 155.5 -1.6 -27.4 -15 1 1 197 04 11 52 04 12 52 --- 15 35 39 33.0 155.8 -1.6 -27.2 45 F 1 198 04 11 52 04 12 52 J1713-2658 15 35 39 37.5 152.1 -1.6 -29.6 -15 1 1 198 04 12 52 04 13 51 --- 15 36 39 37.6 152.4 -1.6 -29.3 45 F 1 199 04 12 52 04 13 51 AHSCO 15 36 39 33.1 156.0 -1.6 -26.9 -15 1 1 199 04 13 51 04 14 51 --- 15 37 39 33.2 156.2 -1.6 -26.7 45 F 1 200 04 13 51 04 14 51 J1713-2658 15 37 39 37.7 152.6 -1.6 -29.0 -15 1 1 200 04 14 51 04 15 51 --- 15 38 39 37.8 152.9 -1.6 -28.8 45 F 1 201 04 14 51 04 15 51 AHSCO 15 38 39 33.3 156.4 -1.6 -26.4 -15 1 1 201 04 15 51 04 16 51 --- 15 39 39 33.4 156.7 -1.5 -26.2 45 F 1 202 04 15 51 04 16 51 J1713-2658 15 39 39 37.9 153.1 -1.6 -28.5 -15 1 1 202 04 16 51 04 17 51 --- 15 40 39 38.0 153.4 -1.6 -28.2 45 F 1 203 04 16 51 04 17 51 AHSCO 15 40 39 33.5 156.9 -1.5 -25.9 -15 1 1 203 04 17 51 04 18 51 --- 15 41 39 33.6 157.1 -1.5 -25.6 45 F 1 204 04 17 51 Schedule for VLBA_MK (Code Mk ) Page 16 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 04 18 51 J1713-2658 15 41 39 38.1 153.6 -1.5 -28.0 -15 1 1 204 04 18 51 04 19 50 --- 15 42 39 38.2 153.9 -1.5 -27.7 45 F 1 205 04 18 51 04 19 50 AHSCO 15 42 39 33.7 157.4 -1.5 -25.4 -15 1 1 205 04 19 50 04 20 50 --- 15 43 39 33.8 157.6 -1.5 -25.1 45 F 1 206 04 19 50 04 20 50 J1713-2658 15 43 39 38.3 154.1 -1.5 -27.4 -15 1 1 206 04 20 50 04 21 50 --- 15 44 39 38.4 154.4 -1.5 -27.2 45 F 1 207 04 20 50 04 21 50 AHSCO 15 44 39 33.8 157.8 -1.5 -24.9 -15 1 1 207 04 21 50 04 22 50 --- 15 45 39 33.9 158.0 -1.4 -24.6 45 F 1 207 04 21 50 04 22 50 J1713-2658 15 45 39 38.5 154.6 -1.5 -26.9 -15 1 1 207 04 22 50 04 23 50 --- 15 46 39 38.6 154.9 -1.5 -26.6 45 F 1 208 04 22 50 04 23 50 AHSCO 15 46 39 34.0 158.3 -1.4 -24.3 -15 1 1 208 04 23 50 04 24 50 --- 15 47 39 34.1 158.5 -1.4 -24.1 45 F 1 209 04 23 50 04 24 50 J1713-2658 15 47 39 38.7 155.1 -1.4 -26.4 -15 1 1 209 04 24 50 04 25 49 --- 15 48 39 38.8 155.4 -1.4 -26.1 45 F 1 210 04 24 50 04 25 49 AHSCO 15 48 39 34.2 158.7 -1.4 -23.8 -15 1 1 210 04 25 49 04 26 49 --- 15 49 39 34.3 159.0 -1.4 -23.5 45 F 1 211 04 25 49 04 26 49 J1713-2658 15 49 39 38.9 155.7 -1.4 -25.8 -15 1 1 211 04 26 49 04 27 49 --- 15 50 39 39.0 155.9 -1.4 -25.5 45 F 1 212 04 26 49 04 27 49 AHSCO 15 50 39 34.4 159.2 -1.4 -23.3 -15 1 1 212 04 27 49 04 28 49 --- 15 51 39 34.4 159.5 -1.3 -23.0 44 F 1 213 04 27 49 04 28 49 J1713-2658 15 51 39 39.1 156.2 -1.4 -25.2 -15 1 1 213 04 28 49 04 29 49 --- 15 52 39 39.2 156.4 -1.4 -25.0 44 F 1 214 04 28 49 04 29 49 AHSCO 15 52 39 34.5 159.7 -1.3 -22.7 -15 1 1 214 04 29 49 04 30 49 --- 15 53 39 34.6 159.9 -1.3 -22.5 44 F 1 215 04 29 49 04 30 49 J1713-2658 15 53 39 39.3 156.7 -1.3 -24.7 -15 1 1 215 04 30 49 04 31 48 --- 15 54 39 39.4 157.0 -1.3 -24.4 44 F 1 216 04 30 49 04 31 48 AHSCO 15 54 39 34.7 160.2 -1.3 -22.2 -15 1 1 216 04 31 48 04 32 48 --- 15 55 39 34.8 160.4 -1.3 -21.9 44 F 1 217 04 31 48 Schedule for VLBA_MK (Code Mk ) Page 17 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 04 32 48 J1713-2658 15 55 39 39.5 157.2 -1.3 -24.1 -15 1 1 217 04 32 48 04 33 48 --- 15 56 39 39.6 157.5 -1.3 -23.9 44 F 1 218 04 32 48 04 33 48 AHSCO 15 56 39 34.8 160.6 -1.3 -21.7 -15 1 1 218 04 33 48 04 34 48 --- 15 57 39 34.9 160.9 -1.2 -21.4 44 F 1 219 04 33 48 04 34 48 J1713-2658 15 57 39 39.7 157.7 -1.3 -23.6 -16 1 1 219 04 34 48 04 35 48 --- 15 58 39 39.8 158.0 -1.3 -23.3 44 F 1 220 04 34 48 04 35 48 AHSCO 15 58 39 35.0 161.1 -1.2 -21.1 -16 1 1 220 04 35 48 04 36 48 --- 15 59 39 35.1 161.4 -1.2 -20.9 44 F 1 221 04 35 48 04 36 48 J1713-2658 15 59 39 39.9 158.3 -1.2 -23.0 -16 1 1 221 04 36 48 04 37 47 --- 16 00 39 39.9 158.5 -1.2 -22.7 44 F 1 222 04 36 48 04 37 47 AHSCO 16 00 39 35.2 161.6 -1.2 -20.6 -16 1 1 222 04 37 47 04 38 47 --- 16 01 39 35.2 161.8 -1.2 -20.3 44 F 1 223 04 37 47 04 38 47 J1713-2658 16 01 39 40.0 158.8 -1.2 -22.4 -16 1 1 223 04 38 47 04 39 47 --- 16 02 39 40.1 159.1 -1.2 -22.1 44 F 1 224 04 38 47 04 39 47 AHSCO 16 02 39 35.3 162.1 -1.2 -20.0 -16 1 1 224 04 39 47 04 40 47 --- 16 03 39 35.4 162.3 -1.1 -19.8 44 F 1 225 04 39 47 04 40 47 J1713-2658 16 03 39 40.2 159.4 -1.2 -21.9 -16 1 1 225 04 40 47 04 41 47 --- 16 04 39 40.3 159.6 -1.2 -21.6 44 F 1 226 04 40 47 04 41 47 AHSCO 16 04 39 35.4 162.6 -1.1 -19.5 -16 1 1 226 04 41 47 04 42 47 --- 16 05 39 35.5 162.8 -1.1 -19.2 44 F 1 227 04 41 47 04 42 47 J1713-2658 16 05 39 40.4 159.9 -1.1 -21.3 -16 1 1 227 04 42 47 04 43 46 --- 16 06 39 40.4 160.2 -1.1 -21.0 44 F 1 228 04 42 47 04 43 46 AHSCO 16 06 39 35.6 163.1 -1.1 -18.9 -16 1 1 228 04 43 46 04 44 46 --- 16 07 39 35.6 163.3 -1.1 -18.7 44 F 1 229 04 43 46 04 44 46 J1713-2658 16 07 39 40.5 160.4 -1.1 -20.7 -16 1 1 229 04 44 46 04 45 46 --- 16 08 39 40.6 160.7 -1.1 -20.4 44 F 1 230 04 44 46 04 45 46 AHSCO 16 08 39 35.7 163.6 -1.1 -18.4 -16 1 1 230 04 45 46 04 46 46 --- 16 09 39 35.8 163.8 -1.0 -18.1 44 F 1 231 04 45 46 Schedule for VLBA_MK (Code Mk ) Page 18 VLBA/VLTI Obs. of AH Sco UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sat 18 Aug 2007 Day 230 --- 04 46 46 J1713-2658 16 09 39 40.7 161.0 -1.1 -20.1 -16 1 1 231 04 46 46 04 47 46 --- 16 10 39 40.8 161.3 -1.1 -19.8 44 F 1 232 04 46 46 04 47 46 AHSCO 16 10 39 35.8 164.0 -1.0 -17.8 -16 1 1 232 04 47 46 04 48 46 --- 16 11 39 35.9 164.3 -1.0 -17.5 44 F 1 233 04 47 46 04 48 46 J1713-2658 16 11 39 40.8 161.5 -1.0 -19.5 -16 1 1 233 04 48 46 04 49 45 --- 16 12 39 40.9 161.8 -1.0 -19.2 44 F 1 234 04 48 46 04 49 45 AHSCO 16 12 39 36.0 164.5 -1.0 -17.3 -16 1 1 234 04 49 45 04 50 45 --- 16 13 39 36.0 164.8 -1.0 -17.0 44 F 1 235 04 49 45 04 52 45 NRAO530 16 15 39 51.9 148.2 -1.3 -30.6 82 1 1 235 04 52 45 04 57 44 --- 16 20 39 52.5 150.0 -1.2 -28.9 299 F 1 239 04 53 03 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: bb246.set Matches group v7mm_b8 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 10 Station: VLBA_MK Total bit rate: 128 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 4 Speedup factor: 1.00 Disk used to record data. 1st LO= 42200.00 42200.00 42200.00 42200.00 Net SB= U U U U Pol. = RCP LCP RCP LCP BBC = 1 2 3 4 BBC SB= U U U U IF = A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.4 11.6 The following frequency sets based on this setup were used. Frequency Set: 10 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 42813.83 42813.83 43115.31 43115.31 BBC fr= 613.83 613.83 915.31 915.31 Bandwd= 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 OFF OFF OFF OFF PCALXB2= M1 M2 M3 M4 OFF OFF OFF OFF PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: track1= 2, 10, 18, 26 barrel=roll_off SOURCE LIST -- VLBA/VLTI Obs. of AH Sco Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * NRAO530 17 30 13.535188 * 17 33 02.705786 17 33 29.650244 0.00 -13 02 45.83976 *-13 04 49.54823 -13 05 13.60269 0.00 From catalog imbedded in main SCHED input file. Doppler based on other sources. 0.499 scan hours, 21.691 baseline hours above horizon. * J1650-2943 16 47 29.477805 * 16 50 39.544127 16 51 09.509027 0.00 -29 38 41.69521 *-29 43 46.95461 -29 44 44.69776 0.00 From catalog imbedded in main SCHED input file. Doppler based on other sources. 0.432 scan hours, 12.536 baseline hours above horizon. * J1713-2658 17 10 24.259603 * 17 13 31.275584 17 14 00.914852 0.00 -26 55 23.97615 *-26 58 52.52684 -26 59 34.19813 0.00 From catalog imbedded in main SCHED input file. Doppler based on other sources. 1.729 scan hours, 51.569 baseline hours above horizon. * AHSCO 17 08 02.018391 * 17 11 17.020100 17 11 47.907435 0.00 -32 15 52.31920 *-32 19 30.72800 -32 20 15.61102 0.00 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: 1.70 1.70 1.70 1.70 2.161 scan hours, 57.755 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) NRAO530 118.1 J1650-2943 110.0 J1713-2658 114.9 AHSCO 114.5 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg