VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: MT532 Observer: Analysts, Data Project type: TEST Obs filename: mt532crd.* Date/Day: 2005AUG09/221 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Sonja Mendoza. FD writing on Mk5 disk NRAO-063, bank B. LA writing on Mk5 disk NRAO-055, bank A. PT Mk5 offline. KP writing on Mk5 disk NRAO-019, bank B. MK writing on Mk5 disk NRAO-129, bank A. Vclock, GPS delta and UT1-UTC time checks okay, except for PT (timing off probably due to power problems). 0621 Begin observation. 0621-0751 *PT Loss of commercial power. COM 100 90 0621-0751 *OV 1cm receiver 15K stage warm (at 38.5K). 16660 8 7 0621-0751 *MK 4cm receiver 15K stage warm (43.4K). 16659 8 7 0621-0751 *LA 6cm LCP TSYS two times normal. 16398 4 3 0621-0751 *HN 90cm LCP data bad. 16339 4 3 0621-0751 *KP 13cm left FET #1 voltage our of range 16646 4 3 Please check data. 0628 Readbacks ok. 0644 Readbacks ok. 0700 Readbacks ok. 0716 %OV Bad readback track 30, drive 1. All other readbacks ok. 0725 Readbacks ok. 0741 Readbacks ok. 0751 End. Downtime Summary: Total downtime : 113 min Percentage downtime of observing: 12.6% Average downtime per hour : 7.5 min Total scheduled observing time (# Antennas): 900 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.