From observe@nrao.eduWed Aug 17 14:13:31 2005 Date: Wed, 17 Aug 2005 09:04:35 +0000 From: VLA Operations To: vlbiobs@nrao.edu, amiodusz@nrao.edu Subject: 2005-08-17_0629_BM233I.txt [The following text is in the "ISO-8859-1" character set] [Your display is set for the "US-ASCII" character set] [Some characters may be displayed incorrectly] ************************************************************************ Filename: 2005-08-17_0629_BM233I Program: BM233I Subarray(s): 2 Observer(s): A. Mioduszewski Operator(s): Sam Gilmore Date: 08/17/2005 Configuration: C User #: 600 Decommissioned: 18 Source File(s): 317M233 VLBI Ref. Ant: 10 Observing Mode: Single Dish VLBI Antenna Pad: CE4 Email Address: vlbiobs@nrao.edu, amiodusz@nrao.edu API (Atmospheric Phase Interferometer) information can be found at: http://www.vla.nrao.edu/astro/guides/api/ Adobe PDF version of this log is located at: http://www.vla.nrao.edu/operators/logs/ Visibility data is updated each day at IAT/UT midnight and is available from the online archive at: http://e2e.nrao.edu/archive/ ** Weather Information ** Time (IAT) Dew Pt Temp Wind Bar. Press API 17Aug 06:29 10.5 16.3 W at 0.6 m/s 793.5 4.9 17Aug 07:59:13 9.9 15.7 SW at 1.8 m/s 793.4 19.9 17Aug 08:39:51 10.0 14.0 SE at 1.1 m/s 793.3 6.2 Operator comments for the above weather entries 17Aug 06:29 Sky cover 40%. Mixed clouds. 17Aug 07:59:13 Sky cover 20%. Stratiform clouds. 17Aug 08:39:51 Sky cover 20%. Stratiform clouds. ** Visibility Tape Information ** Tape # Time of Final Record: DM0048 ** Monitor Tape Information ** Tape # File # Time of Final Record: N21431 1 Total # of antennas used = 1 ** Operator Comments ** START TIME END TIME FORM # #ANTS DOWNTIME (in minutes) 17Aug 6:29:44 Starting program BM233I. 17Aug 6:33:10 On source J1912+0518 with all available antennas. 17Aug 6:29:44 The band(s) used is(are) U 17Aug 6:29:44 File started late due to errors in the antennas file. After this was corrected the file was started. A hundred thousand apologies for this error. 17Aug 6:51:00 Inspected the VLB instrumentation. No problems found. 17Aug 7:24:00 Inspected the VLB instrumentation. No problems found. 17Aug 8:36:00 Inspected the VLB instrumentation. No problems found. End Time Total Program Time % Downtime Total Downtime (in minutes) (in minutes) 08/17/05 09:00:42 151.0 0.0% 0.0