VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: MT431 Observer: Analysts, Data Project type: TEST Obs filename: mt431crd.* Date/Day: 2004AUG06/219 Ants Scheduled: SC HN NL FD LA PT KP OV =UT-Time===Comment===============================================MF#===%AD==AMD= 0611 Begin file VCLOCK check ok. SC at -0.053 UT1-UTC check ok (-0.46) GPS delta < 10 us Operator: T. Perreault 0611-0742 BR, MK not observing: scheduled maintenance SCH 0620 Readback check ok 0636 Readback check ok 0652 Readback check ok 0708 Readback check ok 0716 Readback check ok 0732 Readback check ok 0742 End. Downtime Summary: Total downtime : 0 min Percentage downtime of observing: 0.0% Average downtime per hour : 0.0 min Total scheduled observing time (# Antennas): 728 min (8) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.