SUMMARY FILE FOR PROJECT: BW069F COVER INFORMATION: Experiment: VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Exp. Code: BW069F Start Day 241 is Sat 28 Aug 2004 MJD 53245 Schedule Version: 1.00 Processed by SCHED version: Release of 18 Sept. 2003 PI: Kaj Wiik / VSOP Group Address: Institute of Space and Astronautical Science 3-1-1 Yoshinodai, Sagamihara Kanagawa 229-8510 JAPAN Phone: +81-42-759-8346 EMAIL: kaj.wiik@iki.fi Fax: +81-422-759-8485 Phone during observation: +81-42-759-8346 Observing mode: Continuum Notes: No cover letter provided. CORRELATION REQUESTS (Defaults in parentheses): Correlator (Required if recording): SOCORRO Correlator average time (2 sec): 2.000 sec. Alternate average time (for spacecraft). 0.000 sec. Spectral channels per baseband (16): 16 Number of antennas to be correlated: 10 Polarization (ON): ON Correlator weighting function (UNIFORM): UNIFORM Distribution tape (DAT): DAT Source positions from: STANDARD Shipping address for correlator output: Kaj Wiik, ISAS / VSOP Group 3-1-1 Yoshinodai, Sagamihara Kanagawa 229-8510, JAPAN Correlator Notes: DERIVED INFORMATION FOR CORRELATION: Elapsed time for project: 9.00 hours. Total time in scheduled scans: 8.23 hours. Total time in recording scans: 7.48 hours. Total number of baseline hours: 374.57 (Recording scans only) Projected maximum data output rate from the correlator: 56.3 kbytes/sec if processed in one pass. Projected correlator output data set size: 1380.8 Mbytes NOTE: Above numbers assume the same correlator parameters are used for all data. STATIONS USED IN SCHEDULE: Station Code Latitude Longitude Elevation X Y Z VLBA_HN Hn 42.93361 71.98658 296. 1446375.13 -4447939.65 4322306.12 VLBA_NL Nl 41.77142 91.57414 222. -130872.24 -4762317.12 4226851.04 VLBA_FD Fd 30.63503 103.94482 1606. -1324009.12 -5332181.97 3231962.47 VLBA_LA La 35.77512 106.24560 1962. -1449752.35 -4975298.59 3709123.93 VLBA_PT Pt 34.30102 108.11919 2365. -1640953.70 -5014816.03 3575411.88 VLBA_KP Kp 31.95630 111.61242 1902. -1995678.62 -5037317.71 3357328.13 VLBA_OV Ov 37.23165 118.27705 1196. -2409150.10 -4478573.23 3838617.39 VLBA_MK Mk 19.80138 155.45550 3763. -5464074.96 -2495249.12 2148296.84 VLBA_BR Br 48.13122 119.68328 250. -2112064.97 -3705356.51 4726813.79 VLBA_SC Sc 17.75658 64.58363 -15. 2607848.52 -5488069.68 1932739.53 BASELINE LENGTHS (km) Hn Nl Fd La Pt Kp Ov Mk Br Sc Hn 0 1611 3105 3006 3226 3623 3885 7502 3657 2853 Nl 1611 0 1654 1432 1663 2075 2328 6156 2300 3645 Fd 3105 1654 0 608 564 744 1508 5134 2345 4143 La 3006 1432 608 0 236 652 1088 4970 1757 4458 Pt 3226 1663 564 236 0 417 973 4795 1806 4579 Kp 3623 2075 744 652 417 0 845 4466 1913 4839 Ov 3885 2328 1508 1088 973 845 0 4015 1214 5460 Mk 7502 6156 5134 4970 4795 4466 4015 0 4398 8611 Br 3657 2300 2345 1757 1806 1913 1214 4398 0 5767 Sc 2853 3645 4143 4458 4579 4839 5460 8611 5767 0 RECORDING SYSTEM INFORMATION: TAPES - Stations potentially recording on tape. (See setup details later for times per pass.) Station Drives Head pos Tape len Density Start position Auto Auto Recorder (ft) Driv Head indx Aloc Reverse VLBA_HN 2 14 17600 High 1 1 Yes Yes VLBA VLBA_NL 2 14 17600 High 1 1 Yes Yes VLBA VLBA_FD 2 14 17600 High 1 1 Yes Yes VLBA VLBA_LA 2 14 17600 High 1 1 Yes Yes VLBA VLBA_PT 2 14 17600 High 1 1 Yes Yes VLBA VLBA_KP 2 14 17600 High 1 1 Yes Yes VLBA VLBA_OV 2 14 17600 High 1 1 Yes Yes VLBA VLBA_MK 2 14 17600 High 1 1 Yes Yes VLBA VLBA_BR 2 14 17600 High 1 1 Yes Yes VLBA VLBA_SC 2 14 17600 High 1 1 Yes Yes VLBA EXPERIMENT SUMMARY: Number of input scans: 133 Number of scans scheduled: 133 Number of stations: 10 Number of sources input: 8 Number of setup files used: 7 Station summaries (tape stations): Station Control Scans Scan Hours Tape hours Tapes Passes Readbacks VLBA_HN VLBA 133 8.23 7.60 2 21 13 VLBA_NL VLBA 133 8.23 7.60 2 21 13 VLBA_FD VLBA 133 8.23 7.60 2 21 13 VLBA_LA VLBA 133 8.23 7.60 2 21 13 VLBA_PT VLBA 133 8.23 7.60 2 21 13 VLBA_KP VLBA 133 8.23 7.60 2 21 13 VLBA_OV VLBA 133 8.23 7.60 2 21 13 VLBA_MK VLBA 112 7.02 6.40 2 18 17 VLBA_BR VLBA 101 6.78 6.42 2 18 36 VLBA_SC VLBA 94 6.37 6.02 2 17 34 Station summaries (disk stations): Station Control Scans Scan Hours Record hrs Gbytes Note: Tapes started before scan start time 842 times. See PRESTART and MINPAUSE. They may have been kept running through short scan gaps. The number can be large because each station/scan combination counts. Setup file: 3mm Matches group v3mm_ff in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 1 Station: VLBA Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 85500.00 85500.00 85500.00 85500.00 85500.00 85500.00 85500.00 85500.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 3mm omit 3mm VLBA Synth= 12.9 15.4 12.1 The following frequency sets based on this setup were used. Frequency Set: 4 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 86233.49 86233.49 86241.49 86241.49 86249.49 86249.49 86257.49 86257.49 BBC fr= 733.49 733.49 741.49 741.49 749.49 749.49 757.49 757.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 10 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 86233.49 86233.49 86241.49 86241.49 86249.49 86249.49 86257.49 86257.49 BBC fr= 733.49 733.49 741.49 741.49 749.49 749.49 757.49 757.49 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto Setup file: 7mm Matches group v7mm_c8 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 2 Station: VLBA Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = A C A C A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.6 11.6 The following frequency sets based on this setup were used. Frequency Set: 1 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43117.02 43117.02 43125.02 43125.02 43133.02 43133.02 43141.02 43141.02 BBC fr= 717.02 717.02 725.02 725.02 733.02 733.02 741.02 741.02 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 Frequency Set: 2 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43114.02 43114.02 43122.02 43122.02 43130.02 43130.02 43138.02 43138.02 BBC fr= 714.02 714.02 722.02 722.02 730.02 730.02 738.02 738.02 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 3 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 BBC fr= 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 9 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 BBC fr= 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 Frequency Set: 16 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43108.45 43108.45 43116.45 43116.45 43124.45 43124.45 43132.45 43132.45 BBC fr= 708.45 708.45 716.45 716.45 724.45 724.45 732.45 732.45 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 Frequency Set: 18 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43110.38 43110.38 43118.38 43118.38 43126.38 43126.38 43134.38 43134.38 BBC fr= 710.38 710.38 718.38 718.38 726.38 726.38 734.38 734.38 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 Frequency Set: 19 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43107.38 43107.38 43115.38 43115.38 43123.38 43123.38 43131.38 43131.38 BBC fr= 707.38 707.38 715.38 715.38 723.38 723.38 731.38 731.38 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 20 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 43112.32 43112.32 43120.32 43120.32 43128.32 43128.32 43136.32 43136.32 BBC fr= 712.32 712.32 720.32 720.32 728.32 728.32 736.32 736.32 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto Setup file: 1cm Matches group v1cm_b3 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 3 Station: VLBA Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 21500.00 21500.00 21500.00 21500.00 21500.00 21500.00 21500.00 21500.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 1cm omit 1cm VLBA Synth= 9.1 15.4 12.4 The following frequency sets based on this setup were used. Frequency Set: 6 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 22219.49 22219.49 22227.49 22227.49 22235.49 22235.49 22243.49 22243.49 BBC fr= 719.49 719.49 727.49 727.49 735.49 735.49 743.49 743.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 13 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 22219.49 22219.49 22227.49 22227.49 22235.49 22235.49 22243.49 22243.49 BBC fr= 719.49 719.49 727.49 727.49 735.49 735.49 743.49 743.49 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto Setup file: 2cm Matches group v2cm_d3 in /home/filehost/cwalker/sched/catalogs/freq.dat Fourth 2cm filter Setup group: 4 Station: VLBA Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 14600.00 14600.00 14600.00 14600.00 14600.00 14600.00 14600.00 14600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 2cm omit 2cm VLBA Synth= 14.6 10.9 10.9 The following frequency sets based on this setup were used. Frequency Set: 8 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 15269.49 15269.49 15277.49 15277.49 15285.49 15285.49 15293.49 15293.49 BBC fr= 669.49 669.49 677.49 677.49 685.49 685.49 693.49 693.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 15 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 15269.49 15269.49 15277.49 15277.49 15285.49 15285.49 15293.49 15293.49 BBC fr= 669.49 669.49 677.49 677.49 685.49 685.49 693.49 693.49 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto Setup file: 4cm Matches group v4cm_3 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 5 Station: VLBA Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 5 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 8399.49 8399.49 8407.49 8407.49 8415.49 8415.49 8423.49 8423.49 BBC fr= 799.49 799.49 807.49 807.49 815.49 815.49 823.49 823.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 11 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 8399.49 8399.49 8407.49 8407.49 8415.49 8415.49 8423.49 8423.49 BBC fr= 799.49 799.49 807.49 807.49 815.49 815.49 823.49 823.49 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto Setup file: 6cm Matches group v6cm_2 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 4100.00 4100.00 4100.00 4100.00 4100.00 4100.00 4100.00 4100.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = A C A C A C A C VLBA FE= 6cm omit 6cm omit VLBA Synth= 15.4 4.1 15.4 The following frequency sets based on this setup were used. Frequency Set: 7 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 4974.49 4974.49 4982.49 4982.49 4990.49 4990.49 4998.49 4998.49 BBC fr= 874.49 874.49 882.49 882.49 890.49 890.49 898.49 898.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 Frequency Set: 14 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 4974.49 4974.49 4982.49 4982.49 4990.49 4990.49 4998.49 4998.49 BBC fr= 874.49 874.49 882.49 882.49 890.49 890.49 898.49 898.49 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto Setup file: 13cm Matches group v13cm_2 in /home/filehost/cwalker/sched/catalogs/freq.dat LA,NL only 2200-2400 Setup group: 7 Station: VLBA Total bit rate: 256 Format: VLBA1:2 Bits per sample: 2 Sample rate: 16.000 Number of channels: 8 Passes/head pos: 1 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 3100.00 3100.00 3100.00 3100.00 3100.00 3100.00 3100.00 3100.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= L L L L L L L L IF = A C A C A C A C VLBA FE= 13cm omit 13cm omit VLBA Synth= 15.4 3.1 15.4 The following frequency sets based on this setup were used. Frequency Set: 12 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 2279.49 2279.49 2287.49 2287.49 2295.49 2295.49 2303.49 2303.49 BBC fr= 820.51 820.51 812.51 812.51 804.51 804.51 796.51 796.51 Bandwd= 2.000 2.000 2.000 2.000 2.000 2.000 2.000 2.000 Frequency Set: 17 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 2 LO sum= 2279.49 2279.49 2287.49 2287.49 2295.49 2295.49 2303.49 2303.49 BBC fr= 820.51 820.51 812.51 812.51 804.51 804.51 796.51 796.51 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 S5 S6 S7 S8 PCALXB2= M1 M2 M3 M4 M5 M6 M7 M8 PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Pulse cal detection set: 2 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_auto SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 06:45:09 P-RAQR P 31 32 40 34 35 35 27 10 18 --- 241 06:46:09 7mm N 0 0 0 0 0 0 0 0 0 --- 241 06:46:13 P-RAQR - 31 32 40 34 35 35 28 10 18 53 241 06:47:13 - - 0 0 0 0 0 0 0 0 0 0 241 06:48:27 3C454.3 - 57 64 74 68 69 68 61 33 52 61 241 06:53:26 - - 16 4 0 0 0 1 1 22 0 26 241 06:53:31 3C454.3 - 56 64 74 69 69 69 62 34 --- --- 241 06:58:30 3mm - 0 0 0 0 0 0 0 0 --- --- 241 06:58:34 3C454.3 - 55 64 75 69 70 70 62 35 53 58 241 07:03:34 4cm - 0 0 0 0 0 0 0 0 301 300 241 07:03:38 3C454.3 - 55 64 75 69 70 71 63 37 54 57 241 07:08:37 1cm - 0 0 0 0 0 0 0 0 0 0 241 07:08:42 3C454.3 - 54 63 75 70 71 71 64 38 54 56 241 07:13:41 6cm - 0 0 0 0 0 0 0 0 0 0 241 07:13:46 3C454.3 - 53 63 75 70 71 72 64 39 55 54 241 07:18:45 2cm - 0 0 0 0 0 0 0 0 0 0 241 07:19:58 P-RAQR P 29 33 42 37 38 39 31 17 --- --- 241 07:20:58 7mm N 21 8 1 1 0 0 0 22 --- --- 241 07:21:59 0235+164 P 57 45 37 35 33 31 25 ---D 24 74 241 07:26:58 - - 0 8 7 10 10 11 14 --- 126 66 241 07:27:02 0235+164 P 57 46 38 36 34 32 26 ---D --- --- 241 07:32:01 3mm - 0 0 0 0 0 0 0 --- --- --- 241 07:32:06 0235+164 P 58 47 39 37 36 33 27 ---D 26 76 241 07:37:05 4cm - 0 0 0 0 0 0 0 --- 300 300 241 07:37:10 0235+164 P 58 47 40 38 37 34 28 ---D 27 77 241 07:42:09 13cm - 0 0 0 0 0 0 0 --- 0 0 241 07:42:13 0235+164 P 59 48 41 39 38 35 29 ---D 28 79 241 07:47:12 1cm - 0 0 0 0 0 0 0 --- 0 0 241 07:47:17 0235+164 P 60 49 43 40 39 36 30 ---D 28 80 241 07:52:16 6cm - 0 0 0 0 0 0 0 --- 0 0 241 07:52:21 0235+164 P 60 50 44 41 40 37 31 ---D 29 81 241 07:57:20 2cm - 0 0 0 0 0 0 0 --- 0 0 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 07:58:35 P-RAQR P 26 32 44 39 40 42 35 26 --- --- 241 07:59:34 7mm N 0 21 16 20 20 21 25 2235 --- --- 241 08:00:47 3C454.3 P 46 58 73 69 71 74 69 50 58 43 241 08:05:47 - N 28 15 9 6 5 2 0 19 147 83 241 08:05:51 3C454.3 P 45 58 72 69 71 74 69 51 --- --- 241 08:10:50 3mm N 0 0 0 0 0 0 0 0 --- --- 241 08:10:55 3C454.3 P 44 57 72 69 71 74 69 52 58 41 241 08:15:54 4cm N 0 0 0 0 0 0 0 0 301 300 241 08:15:59 3C454.3 P 43 56 71 68 70 73 69 54 58 40 241 08:20:58 1cm N 0 0 0 0 0 0 0 0 0 0 241 08:21:02 3C454.3 P 42 55 70 68 70 73 69 55 58 38 241 08:26:02 6cm N 0 0 0 0 0 0 0 0 0 0 241 08:26:06 3C454.3 P 41 55 69 67 69 73 69 56 58 37 241 08:31:05 2cm N 0 0 0 0 0 0 0 0 0 0 241 08:33:05 P-OCETI P 44 41 44 39 38 38 30 4 --- --- 241 08:34:05 7mm N 64 59 46 56 54 45 36 6 --- --- 241 08:34:49 0235+164 - 63 57 53 49 48 46 40 6 36 88 241 08:39:18 - - 0 8 20 17 19 22 19 25 167 113 241 08:39:23 0235+164 - 63 57 54 50 49 47 41 7 --- --- 241 08:43:52 3mm - 0 0 0 0 0 0 0 0 --- --- 241 08:43:56 0235+164 - 64 58 55 51 50 48 41 8 38 86 241 08:48:26 4cm - 0 0 0 0 0 0 0 0 271 267 241 08:48:30 0235+164 - 64 58 56 52 51 49 42 9 38 85 241 08:52:59 13cm - 0 0 0 0 0 0 0 0 0 0 241 08:53:04 0235+164 - 64 59 56 53 52 50 43 10 39 84 241 08:57:33 1cm - 0 0 0 0 0 0 0 0 0 0 241 08:57:38 0235+164 - 64 60 57 54 53 51 44 11 40 83 241 09:02:07 6cm - 0 0 0 0 0 0 0 0 0 0 241 09:02:12 0235+164 - 64 60 58 55 54 52 45 12 41 82 241 09:06:41 2cm - 0 0 0 0 0 0 0 0 0 0 241 09:07:27 P-OCETI P 44 44 49 44 44 43 36 12 --- --- 241 09:08:27 7mm N 0 6 19 16 18 21 19 26 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 09:09:16 0420-014 - 41 32 28 25 24 22 15 ---D 11 65 241 09:12:16 7mm - 16 19 2 5 3 0 2 --- 89 65 241 09:12:20 0420-014 - 41 32 29 25 24 22 16 ---D --- --- 241 09:15:20 3mm - 0 0 0 0 0 0 0 --- --- --- 241 09:15:24 0420-014 - 41 33 30 26 25 23 16 ---D 12 66 241 09:18:23 4cm - 0 0 0 0 0 0 0 --- 182 182 241 09:18:28 0420-014 - 42 33 30 26 26 24 17 ---D 13 67 241 09:21:27 1cm - 0 0 0 0 0 0 0 --- 0 0 241 09:21:32 0420-014 - 42 34 31 27 26 24 17 ---D 13 67 241 09:24:31 6cm - 0 0 0 0 0 0 0 --- 0 0 241 09:24:36 0420-014 - 42 34 31 28 27 25 18 ---D 14 67 241 09:27:35 2cm - 0 0 0 0 0 0 0 --- 0 0 241 09:29:01 0235+164 - 63 63 64 59 59 57 50 18 45 76 241 09:33:51 7mm - 39 23 17 17 17 16 17 1216 19 0 241 09:33:55 0235+164 - 63 63 65 60 60 58 51 20 --- --- 241 09:38:44 3mm - 0 0 0 0 0 0 0 0 --- --- 241 09:38:49 0235+164 - 62 64 66 61 61 59 52 21 46 73 241 09:43:38 4cm - 0 0 0 0 0 0 0 0 291 290 241 09:43:42 0235+164 - 62 64 66 62 62 60 53 22 47 72 241 09:48:32 13cm - 0 0 0 0 0 0 0 0 0 0 241 09:48:36 0235+164 - 62 64 67 63 62 61 54 23 47 71 241 09:53:25 1cm - 0 0 0 0 0 0 0 0 0 0 241 09:53:30 0235+164 - 61 64 68 63 63 62 55 24 48 70 241 09:58:19 6cm - 0 0 0 0 0 0 0 0 0 0 241 09:58:24 0235+164 - 61 65 69 64 64 63 55 25 49 69 241 10:03:13 2cm - 0 0 0 0 0 0 0 0 0 0 241 10:05:12 P-RAQR P 10 22 37 33 35 39 36 48 --- --- 241 10:06:12 7mm N 13 28 47 50 55 56 62 70 --- --- 241 10:07:21 3C454.3 - 23 38 50 50 52 56 58 80 52 13 241 10:10:20 - - 36 31 34 29 29 29 18 0 181 134 241 10:10:25 3C454.3 - 23 37 49 50 52 55 58 80 --- --- 241 10:13:24 3mm - 0 0 0 0 0 0 0 0 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 10:13:29 3C454.3 - 22 36 48 49 51 54 57 81 51 12 241 10:16:28 4cm - 0 0 0 0 0 0 0 0 182 181 241 10:16:33 3C454.3 - 21 36 48 48 50 54 57 82 51 11 241 10:19:32 1cm - 0 0 0 0 0 0 0 0 0 0 241 10:19:37 3C454.3 - 21 35 47 48 50 53 56 82 50 11 241 10:22:37 6cm - 0 0 0 0 0 0 0 0 0 0 241 10:22:41 3C454.3 - 20 35 46 47 49 53 56 83 50 10 241 10:25:41 2cm - 0 0 0 0 0 0 0 0 0 0 241 10:28:07 P-IKTAU P 58 57 57 53 53 51 44 13 --- --- 241 10:29:07 7mm N 63 67 46 53 51 47 55 0 --- --- 241 10:29:51 0235+164 - 57 65 74 68 69 68 61 33 52 61 241 10:37:10 - - 14 14 6 8 6 4 5 0 185 141 241 10:37:15 0235+164 - 56 65 74 69 70 69 62 34 --- --- 241 10:44:33 3mm - 0 0 0 0 0 0 0 0 --- --- 241 10:44:38 0235+164 - 55 64 75 70 70 71 63 36 54 58 241 10:51:57 4cm - 0 0 0 0 0 0 0 0 440 438 241 10:52:01 0235+164 - 54 64 76 70 71 72 64 38 55 56 241 10:59:20 13cm - 0 0 0 0 0 0 0 0 0 0 241 10:59:25 0235+164 - 53 63 76 71 72 72 65 39 55 54 241 11:06:43 1cm - 0 0 0 0 0 0 0 0 0 0 241 11:06:48 0235+164 - 52 63 76 71 72 73 66 41 56 52 241 11:14:07 6cm - 0 0 0 0 0 0 0 0 0 0 241 11:14:11 0235+164 - 51 62 76 71 72 74 67 43 57 51 241 11:21:30 2cm - 0 0 0 0 0 0 0 0 0 0 241 11:22:36 0420-014 - 45 46 52 46 47 46 39 15 31 64 241 11:25:35 7mm - 29 28 12 11 8 4 2 0 7 25 241 11:25:40 0420-014 - 45 46 52 47 47 47 39 16 --- --- 241 11:28:39 3mm - 0 0 0 0 0 0 0 0 --- --- 241 11:28:44 0420-014 - 45 46 52 47 47 47 40 16 31 63 241 11:31:43 4cm - 0 0 0 0 0 0 0 0 182 182 241 11:31:48 0420-014 - 44 46 53 48 48 48 40 17 32 63 241 11:34:47 1cm - 0 0 0 0 0 0 0 0 0 0 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 11:34:52 0420-014 - 44 46 53 48 48 48 41 18 32 62 241 11:37:51 6cm - 0 0 0 0 0 0 0 0 0 0 241 11:37:56 0420-014 - 44 47 54 48 49 49 41 18 32 62 241 11:40:55 2cm - 0 0 0 0 0 0 0 0 0 0 241 11:42:55 P-IKTAU P 53 60 69 63 64 64 56 31 --- --- 241 11:43:55 7mm N 95 88 84 84 84 84 84 90 --- --- 241 11:44:41 0235+164 - 46 59 74 70 72 75 69 50 58 43 241 11:49:10 - - 22 15 0 9 8 8 15 2 169 184 241 11:49:15 0235+164 - 45 58 73 69 71 74 69 51 --- --- 241 11:53:44 3mm - 0 0 0 0 0 0 0 0 --- --- 241 11:53:49 0235+164 - 45 57 72 69 71 74 69 52 58 41 241 11:58:18 4cm - 0 0 0 0 0 0 0 0 271 270 241 11:58:22 0235+164 - 44 57 72 69 71 74 69 53 58 40 241 12:02:52 13cm - 0 0 0 0 0 0 0 0 0 0 241 12:02:56 0235+164 - 43 56 71 68 70 74 69 54 58 39 241 12:07:26 1cm - 0 0 0 0 0 0 0 0 0 0 241 12:07:30 0235+164 - 42 55 70 68 70 73 69 55 59 38 241 12:11:59 6cm - 0 0 0 0 0 0 0 0 0 0 241 12:12:04 0235+164 - 41 55 70 67 69 73 69 57 59 37 241 12:16:33 2cm - 0 0 0 0 0 0 0 0 0 0 241 12:17:39 0420-014 - 41 47 57 52 52 53 46 28 36 54 241 12:20:38 7mm - 32 27 14 22 21 20 14 0 16 24 241 12:20:43 0420-014 - 41 47 57 52 53 54 46 28 --- --- 241 12:23:42 3mm - 0 0 0 0 0 0 0 0 --- --- 241 12:23:47 0420-014 - 40 47 57 52 53 54 47 29 37 53 241 12:26:46 4cm - 0 0 0 0 0 0 0 0 182 181 241 12:26:51 0420-014 - 40 47 58 52 53 54 47 30 37 52 241 12:29:50 1cm - 0 0 0 0 0 0 0 0 0 0 241 12:29:55 0420-014 - 40 46 58 52 53 55 47 30 37 51 241 12:32:54 6cm - 0 0 0 0 0 0 0 0 0 0 241 12:32:59 0420-014 - 39 46 58 52 53 55 48 31 38 51 241 12:35:58 2cm - 0 0 0 0 0 0 0 0 0 0 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 12:36:34 P-IKTAU P 46 57 70 66 67 69 63 43 --- --- 241 12:37:33 7mm N 16 9 4 3 2 1 0 6 --- --- 241 12:37:38 P-IKTAU - 46 56 70 66 67 69 63 44 52 48 241 12:38:38 - - 0 0 0 0 0 0 0 0 65 78 241 12:39:22 0235+164 - 37 51 65 63 65 69 68 63 58 30 241 12:43:51 - - 20 18 5 8 6 1 8 0 17 4 241 12:43:56 0235+164 - 36 50 64 63 65 68 68 64 --- --- 241 12:48:25 3mm - 0 0 0 0 0 0 0 0 --- --- 241 12:48:29 0235+164 - 35 49 63 62 64 68 67 65 57 28 241 12:52:59 4cm - 0 0 0 0 0 0 0 0 271 270 241 12:53:03 0235+164 - 34t 48t 62t 61t 63t 67t 67t 66 57 27 241 12:57:32 13cm - 0t 0t 0t 0t 0t 0t 0t 0 0 0 241 12:57:37 0235+164 - 33 47 61 60 62 66 66 67 57 26 241 13:02:06 1cm - 0 0 0 0 0 0 0 0 0 0 241 13:02:11 0235+164 - 32 47 60 60 62 65 66 68 57 25 241 13:06:40 6cm - 0 0 0 0 0 0 0 0 0 0 241 13:06:44 0235+164 - 32 46 59 59 61 65 65 69 56 24 241 13:11:14 2cm - 0 0 0 0 0 0 0 0 0 0 241 13:13:13 P-IKTAU P 40 52 67 64 66 69 64 52 --- --- 241 13:14:13 7mm N 95 96 90 89 88 84 85 77 --- --- 241 13:14:46 0420-014 - 34 44 58 53 54 57 51 41 40 41 241 13:17:46 - - 16 10 8 5 4 3 0 4 174 170 241 13:17:50 0420-014 - 34 44 57 53 54 57 51 41 --- --- 241 13:20:50 3mm - 0 0 0 0 0 0 0 0 --- --- 241 13:20:54 0420-014 - 33 43 57 53 54 57 51 42 40 40 241 13:23:54 4cm - 0 0 0 0 0 0 0 0 182 181 241 13:23:58 0420-014 - 33 43 57 52 54 57 51 43 40 39 241 13:26:58 1cm - 0 0 0 0 0 0 0 0 0 0 241 13:27:02 0420-014 - 32 43 57 52 54 57 51 43 40 39 241 13:30:02 6cm - 0 0 0 0 0 0 0 0 0 0 241 13:30:06 0420-014 - 32 42 57 52 54 57 51 44 40 38 241 13:33:06 2cm - 0 0 0 0 0 0 0 0 0 0 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 13:34:32 P-RLEO P 44 31 23 21 19 16 11 ---D --- --- 241 13:35:32 7mm N 7 9 8 12 11 0 1 --- --- --- 241 13:36:09 OJ287 - 59 47 38 37 35 32 27 ---D 27 74 241 13:39:09 - - 1 0 0 0 0 0 0 --- 121 61 241 13:39:13 OJ287 - 60 48 39 37 36 33 28 ---D --- --- 241 13:42:13 3mm - 0 0 0 0 0 0 0 --- --- --- 241 13:42:17 OJ287 - 60 48 40 38 36 33 28 ---D 28 75 241 13:45:17 4cm - 0 0 0 0 0 0 0 --- 182 181 241 13:45:21 OJ287 - 60 49 40 38 37 34 29 ---D 28 76 241 13:48:21 1cm - 0 0 0 0 0 0 0 --- 0 0 241 13:48:25 OJ287 - 61 49 41 39 37 34 29 ---D 29 76 241 13:51:25 6cm - 0 0 0 0 0 0 0 --- 0 0 241 13:51:29 OJ287 - 61 50 42 40 38 35 30 ---D 29 77 241 13:54:29 2cm - 0 0 0 0 0 0 0 --- 0 0 241 13:56:11 P-IKTAU P 33 46 61 59 61 65 63 62 --- --- 241 13:57:11 7mm N 18 12 0 9 8 8 20 1344 --- --- 241 13:57:55 0235+164 - 22 37 49 49 51 55 57 81 51t 12t 241 14:02:24 - - 17 19 14 19 18 16 13 0 112t 68t 241 14:02:28 0235+164 - 21 36 48 48 50 54 57 82 --- --- 241 14:06:58 3mm - 0 0 0 0 0 0 0 0 --- --- 241 14:07:02 0235+164 - 21 35 47 47 49 53 56 83 50 10 241 14:11:31 4cm - 0 0 0 0 0 0 0 0 271 270 241 14:11:36 0235+164 - 20 34 46 47 48 52 55 84 50 9 241 14:16:05 13cm - 0 0 0 0 0 0 0 0 0 0 241 14:16:10 0235+164 - 19 33 45 46 47 51 54 85t 49 8 241 14:20:39 1cm - 0 0 0 0 0 0 0 0t 0 0 241 14:20:44 0235+164 - 18 32 44 45 47 50 53 86 49 7 241 14:25:14 6cm - 0 0 0 0 0 0 0 0 1 0 241 14:25:19 0235+164 - 17 32 43 44 46 49 53 86 48 6 241 14:29:48 2cm - 1 1 1 1 1 1 1 0 1 1 241 14:31:48 P-IKTAU P 26 40 54 53 55 59 59 70 --- --- 241 14:32:48 7mm N 94 94 89 93 92 92 94 75 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 14:33:37 0420-014 - 22 35 50 47 49 53 50 57 40 23 241 14:36:37 7mm - 33 32 28 30 29 28 25 17 195 0 241 14:36:41 0420-014 - 22 34 49 47 49 52 50 58 --- --- 241 14:39:41 3mm - 0 0 0 0 0 0 0 0 --- --- 241 14:39:45 0420-014 - 21 34 49 46 48 52 50 58 40 22 241 14:42:44 4cm - 0 0 0 0 0 0 0 0 182 181 241 14:42:49 0420-014 - 20 34 48 46 48 52 49 59 39 21 241 14:45:48 1cm - 0 0 0 0 0 0 0 0 0 0 241 14:45:53 0420-014 - 20 33 48 45 48 51 49 59 39 20 241 14:48:53 6cm - 0 0 0 0 0 0 0 0 0 0 241 14:48:57 0420-014 - 19 33 47 45 47 51 49 60 39 20 241 14:51:57 2cm - 0 0 0 0 0 0 0 0 0 0 241 14:53:27 P-RLEO P 55 45 40 37 36 33 27 ---D --- --- 241 14:54:27 7mm N 13 10 0 6 5 4 12 --- --- --- 241 14:55:04 OJ287 - 67 60 55 52 51 49 43 8 40 87 241 14:58:03 - - 7 1 0 0 0 0 0 77 118 46 241 14:58:08 OJ287 - 67 61 56 53 52 49 43 9 --- --- 241 15:01:07 3mm - 0 0 0 0 0 0 0 0 --- --- 241 15:01:12 OJ287 - 67 61 57 54 52 50 44 10 41 85 241 15:04:11 4cm - 0 0 0 0 0 0 0 0 182 179 241 15:04:16 OJ287 - 67 61 57 54 53 51 44 10 41 85 241 15:07:15 1cm - 0 0 0 0 0 0 0 0 0 0 241 15:07:20 OJ287 - 67 62 58 55 54 51 45 11 42 84 241 15:10:19 6cm - 0 0 0 0 0 0 0 0 0 0 241 15:10:24 OJ287 - 67 62 59 55 54 52 46 12 42 83 241 15:13:23 2cm - 0 0 0 0 0 0 0 0 0 0 241 15:15:42 P-IKTAU P 18 33 45 45 47 51 53 79 --- --- 241 15:16:42 7mm N 35 54 32 40 38 34 44 0 --- --- 241 15:18:07 0235+164 - 8 22 31 33 35 38 43 79 40 ---D 241 15:22:06 - - 58 57 51 54 54 53 58 0 185 --- 241 15:22:10 0235+164 - 7 21 30 32 34 37 42 78 --- --- 241 15:26:10 3mm - 0 0 0 0 0 0 0 0 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Start elevation, flag (D=>Down, H=>Below Horizon, t=>Tape Change.) Bottom item is: Seconds antenna is on source before scan start. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 15:26:14 0235+164 - 6 20 30 32 33 36 41 77 39 ---D 241 15:30:14 4cm - 0 0 0 0 0 0 0 0 241 --- 241 15:30:18 0235+164 - 6 19 29 31 32 35 40 76 38 ---D 241 15:34:17 13cm - 0 0 0 0 0 0 0 0 0 --- 241 15:34:22 0235+164 - 5 19 28 30 31 34 39 75 38 ---D 241 15:38:21 1cm - 0 0 0 0 0 0 0 0 0 --- 241 15:38:26 0235+164 - 4 18 27 29 31 34 39 74 37 ---D 241 15:42:25 6cm - 0 0 0 0 0 0 0 0 0 --- 241 15:42:30 0235+164 - 3H 17 26 28 30 33 38 73 36 ---D 241 15:46:29 2cm - 0 0 0 0 0 0 0 0 0 --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 06:45:09 P-RAQR P 60 60 60 60 60 60 60 60 60 --- 241 06:46:09 7mm N 0 0 0 0 0 0 0 0 0 --- 241 06:46:13 P-RAQR - 60 60 60 60 60 60 60 60 60 60 241 06:47:13 - - 4 4 4 4 4 4 4 5 4 81 241 06:48:27 3C454.3 - 299 299 299 299 299 299 299 299 299 299 241 06:53:26 - - 57 70 74 74 74 72 72 52 74 47 241 06:53:31 3C454.3 - 299 299 299 299 299 299 299 299 --- --- 241 06:58:30 3mm - 4 4 5 4 4 4 4 5 --- --- 241 06:58:34 3C454.3 - 299 299 299 299 299 299 299 299 299 299 241 07:03:34 4cm - 4 4 5 5 5 4 4 5 7 8 241 07:03:38 3C454.3 - 299 299 299 299 299 299 299 299 299 299 241 07:08:37 1cm - 4 4 5 5 5 4 4 5 4 5 241 07:08:42 3C454.3 - 299 299 299 299 299 299 299 299 299 299 241 07:13:41 6cm - 4 4 5 5 5 5 4 5 4 5 241 07:13:46 3C454.3 - 299 299 299 299 299 299 299 299 299 299 241 07:18:45 2cm - 4 4 5 5 5 5 4 5 4 5 241 07:19:58 P-RAQR P 60 60 60 60 60 60 60 60 --- --- 241 07:20:58 7mm N 52 65 72 73 73 73 73 51 --- --- 241 07:21:59 0235+164 P 299 299 299 299 299 299 299 --- 299 299 241 07:26:58 - - 61 52 54 51 51 50 47 --- 68 127 241 07:27:02 0235+164 P 299 299 299 299 299 299 299 --- --- --- 241 07:32:01 3mm - 4 4 5 4 4 5 4 --- --- --- 241 07:32:06 0235+164 P 299 299 299 299 299 299 299 --- 299 299 241 07:37:05 4cm - 4 4 5 4 4 5 4 --- 8 8 241 07:37:10 0235+164 P 299 299 299 299 299 299 299 --- 299 299 241 07:42:09 13cm - 4 4 5 4 4 5 4 --- 4 5 241 07:42:13 0235+164 P 299 299 299 299 299 299 299 --- 299 299 241 07:47:12 1cm - 4 4 5 4 4 5 4 --- 4 5 241 07:47:17 0235+164 P 299 299 299 299 299 299 299 --- 299 299 241 07:52:16 6cm - 4 4 5 4 4 5 4 --- 4 5 241 07:52:21 0235+164 P 299 299 299 299 299 299 299 --- 299 299 241 07:57:20 2cm - 4 4 5 4 4 5 4 --- 4 5 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 07:58:35 P-RAQR P 60 60 60 60 60 60 60 60 --- --- 241 07:59:34 7mm N 75 53 58 55 55 54 50 22 --- --- 241 08:00:47 3C454.3 P 299 299 299 299 299 299 299 299 299 299 241 08:05:47 - N 45 58 64 67 69 71 73 54 61 125 241 08:05:51 3C454.3 P 299 299 299 299 299 299 299 299 --- --- 241 08:10:50 3mm N 4 4 5 5 5 5 5 5 --- --- 241 08:10:55 3C454.3 P 299 299 299 299 299 299 299 299 299 299 241 08:15:54 4cm N 4 4 5 4 5 5 5 5 8 8 241 08:15:59 3C454.3 P 299 299 299 299 299 299 299 299 299 299 241 08:20:58 1cm N 4 4 4 4 5 5 5 5 4 5 241 08:21:02 3C454.3 P 299 299 299 299 299 299 299 299 299 299 241 08:26:02 6cm N 4 4 4 4 5 5 5 5 4 5 241 08:26:06 3C454.3 P 299 299 299 299 299 299 299 299 299 299 241 08:31:05 2cm N 4 4 4 4 4 5 5 5 4 5 241 08:33:05 P-OCETI P 60 60 60 60 60 60 60 60 --- --- 241 08:34:05 7mm N 56 61 73 64 66 75 83 113 --- --- 241 08:34:49 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 08:39:18 - - 44 36 24 27 25 23 25 19 57 110 241 08:39:23 0235+164 - 269 269 269 269 269 269 269 269 --- --- 241 08:43:52 3mm - 4 4 5 4 4 5 4 5 --- --- 241 08:43:56 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 08:48:26 4cm - 4 4 4 4 4 5 4 5 7 11 241 08:48:30 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 08:52:59 13cm - 4 4 4 4 4 5 4 5 4 5 241 08:53:04 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 08:57:33 1cm - 4 4 4 4 4 4 4 5 4 5 241 08:57:38 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 09:02:07 6cm - 4 4 4 4 4 4 4 5 4 5 241 09:02:12 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 09:06:41 2cm - 4 4 4 4 4 4 4 5 4 5 241 09:07:27 P-OCETI P 60 60 60 60 60 60 60 60 --- --- 241 09:08:27 7mm N 46 40 27 30 28 25 26 20 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 09:09:16 0420-014 - 180 180 180 180 180 180 180 --- 180 180 241 09:12:16 7mm - 34 30 47 44 46 49 48 --- 66 90 241 09:12:20 0420-014 - 180 180 180 180 180 180 180 --- --- --- 241 09:15:20 3mm - 4 4 4 4 4 4 4 --- --- --- 241 09:15:24 0420-014 - 180 180 180 180 180 180 180 --- 180 180 241 09:18:23 4cm - 4 4 4 4 4 4 4 --- 7 7 241 09:18:28 0420-014 - 180 180 180 180 180 180 180 --- 180 180 241 09:21:27 1cm - 4 4 4 4 4 4 4 --- 4 4 241 09:21:32 0420-014 - 180 180 180 180 180 180 180 --- 180 180 241 09:24:31 6cm - 4 4 4 4 4 4 4 --- 4 4 241 09:24:36 0420-014 - 180 180 180 180 180 180 180 --- 180 180 241 09:27:35 2cm - 4 4 4 4 4 4 4 --- 4 4 241 09:29:01 0235+164 - 289 289 289 289 289 289 289 289 289 289 241 09:33:51 7mm - 47 62 69 69 69 69 69 19 67 86 241 09:33:55 0235+164 - 289 289 289 289 289 289 289 289 --- --- 241 09:38:44 3mm - 4 4 4 4 4 4 4 5 --- --- 241 09:38:49 0235+164 - 289 289 289 289 289 289 289 289 289 289 241 09:43:38 4cm - 4 4 4 4 4 4 4 5 7 8 241 09:43:42 0235+164 - 289 289 289 289 289 289 289 289 289 289 241 09:48:32 13cm - 4 4 4 4 4 4 4 5 4 5 241 09:48:36 0235+164 - 289 289 289 289 289 289 289 289 289 289 241 09:53:25 1cm - 4 4 4 4 4 4 4 5 4 5 241 09:53:30 0235+164 - 289 289 289 289 289 289 289 289 289 289 241 09:58:19 6cm - 4 4 4 4 4 4 4 5 4 5 241 09:58:24 0235+164 - 289 289 289 289 289 289 289 289 289 289 241 10:03:13 2cm - 4 4 4 4 4 4 4 5 4 5 241 10:05:12 P-RAQR P 60 60 60 60 60 60 60 60 --- --- 241 10:06:12 7mm N 107 92 72 69 65 63 57 50 --- --- 241 10:07:21 3C454.3 - 180 180 180 180 180 180 180 180 180 180 241 10:10:20 - - 33 38 35 40 40 40 51 69 68 114 241 10:10:25 3C454.3 - 180 180 180 180 180 180 180 180 --- --- 241 10:13:24 3mm - 4 4 5 4 4 4 4 5 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 10:13:29 3C454.3 - 180 180 180 180 180 180 180 180 180 180 241 10:16:28 4cm - 4 4 5 4 4 4 4 5 6 7 241 10:16:33 3C454.3 - 180 180 180 180 180 180 180 180 180 180 241 10:19:32 1cm - 4 4 5 4 4 4 4 5 4 5 241 10:19:37 3C454.3 - 180 180 180 180 180 180 180 180 180 180 241 10:22:37 6cm - 4 4 5 4 4 4 4 5 4 5 241 10:22:41 3C454.3 - 180 180 180 180 180 180 180 180 180 180 241 10:25:41 2cm - 4 4 5 4 4 5 4 5 4 5 241 10:28:07 P-IKTAU P 60 60 60 60 60 60 60 60 --- --- 241 10:29:07 7mm N 83 80 100 93 96 100 92 147 --- --- 241 10:29:51 0235+164 - 439 439 439 439 439 439 439 439 439 439 241 10:37:10 - - 30 30 38 36 38 40 39 44 66 110 241 10:37:15 0235+164 - 439 439 439 439 439 439 439 439 --- --- 241 10:44:33 3mm - 4 4 5 5 4 4 4 5 --- --- 241 10:44:38 0235+164 - 439 439 439 439 439 439 439 439 439 439 241 10:51:57 4cm - 4 4 5 5 5 4 4 5 8 10 241 10:52:01 0235+164 - 439 439 439 439 439 439 439 439 439 439 241 10:59:20 13cm - 4 4 5 5 5 5 4 5 4 5 241 10:59:25 0235+164 - 439 439 439 439 439 439 439 439 439 439 241 11:06:43 1cm - 4 4 5 5 5 5 4 5 4 5 241 11:06:48 0235+164 - 439 439 439 439 439 439 439 439 439 439 241 11:14:07 6cm - 4 4 5 5 5 5 4 5 4 5 241 11:14:11 0235+164 - 439 439 439 439 439 439 439 439 439 439 241 11:21:30 2cm - 4 4 5 5 5 5 4 5 4 5 241 11:22:36 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 11:25:35 7mm - 37 38 54 55 57 62 63 66 59 41 241 11:25:40 0420-014 - 180 180 180 180 180 180 180 180 --- --- 241 11:28:39 3mm - 4 4 4 4 4 4 4 5 --- --- 241 11:28:44 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 11:31:43 4cm - 4 4 4 4 4 4 4 5 6 7 241 11:31:48 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 11:34:47 1cm - 4 4 4 4 4 4 4 5 4 4 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 11:34:52 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 11:37:51 6cm - 4 4 4 4 4 4 4 5 4 4 241 11:37:56 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 11:40:55 2cm - 4 4 4 4 4 4 4 5 4 4 241 11:42:55 P-IKTAU P 60 60 60 60 60 60 60 60 --- --- 241 11:43:55 7mm N 24 32 36 36 36 36 36 29 --- --- 241 11:44:41 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 11:49:10 - - 24 31 46 37 38 38 31 44 57 42 241 11:49:15 0235+164 - 269 269 269 269 269 269 269 269 --- --- 241 11:53:44 3mm - 4 4 5 5 5 5 5 5 --- --- 241 11:53:49 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 11:58:18 4cm - 4 4 5 5 5 5 5 5 7 8 241 11:58:22 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 12:02:52 13cm - 4 4 4 4 5 5 5 5 4 5 241 12:02:56 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 12:07:26 1cm - 4 4 4 4 5 5 5 5 4 5 241 12:07:30 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 12:11:59 6cm - 4 4 4 4 4 5 5 5 4 5 241 12:12:04 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 12:16:33 2cm - 4 4 4 4 4 5 5 5 4 5 241 12:17:39 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 12:20:38 7mm - 34 38 52 44 45 46 52 66 50 42 241 12:20:43 0420-014 - 180 180 180 180 180 180 180 180 --- --- 241 12:23:42 3mm - 4 4 4 4 4 4 4 5 --- --- 241 12:23:47 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 12:26:46 4cm - 4 4 4 4 4 4 4 5 6 7 241 12:26:51 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 12:29:50 1cm - 4 4 4 4 4 4 4 5 4 5 241 12:29:55 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 12:32:54 6cm - 4 4 4 4 4 4 4 5 4 5 241 12:32:59 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 12:35:58 2cm - 4 4 4 4 4 4 4 5 4 5 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 12:36:34 P-IKTAU P 60 60 60 60 60 60 60 60 --- --- 241 12:37:33 7mm N 20 27 31 32 33 34 35 29 --- --- 241 12:37:38 P-IKTAU - 60 60 60 60 60 60 60 60 60 60 241 12:38:38 - - 4 4 5 4 5 5 4 5 35 21 241 12:39:22 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 12:43:51 - - 24 26 39 36 38 43 36 44 27 40 241 12:43:56 0235+164 - 269 269 269 269 269 269 269 269 --- --- 241 12:48:25 3mm - 4 4 4 4 4 4 4 5 --- --- 241 12:48:29 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 12:52:59 4cm - 4 4 4 4 4 4 4 5 7 8 241 12:53:03 0235+164 - 269t 269t 269t 269t 269t 269t 269t 269 269 269 241 12:57:32 13cm - 4t 4t 4t 4t 4t 4t 4t 5 4 5 241 12:57:37 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 13:02:06 1cm - 4 4 4 4 4 4 4 5 4 5 241 13:02:11 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 13:06:40 6cm - 4 4 4 4 4 4 4 5 4 5 241 13:06:44 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 13:11:14 2cm - 4 4 4 4 4 4 4 5 4 5 241 13:13:13 P-IKTAU P 60 60 60 60 60 60 60 60 --- --- 241 13:14:13 7mm N 24 23 30 30 32 36 35 43 --- --- 241 13:14:46 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 13:17:46 - - 17 23 25 28 29 30 33 29 38 43 241 13:17:50 0420-014 - 180 180 180 180 180 180 180 180 --- --- 241 13:20:50 3mm - 4 4 4 4 4 4 4 5 --- --- 241 13:20:54 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 13:23:54 4cm - 4 4 4 4 4 4 4 5 6 7 241 13:23:58 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 13:26:58 1cm - 4 4 4 4 4 4 4 5 4 5 241 13:27:02 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 13:30:02 6cm - 4 4 4 4 4 4 4 5 4 5 241 13:30:06 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 13:33:06 2cm - 4 4 4 4 4 4 4 5 4 5 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 13:34:32 P-RLEO P 60 60 60 60 60 60 60 --- --- --- 241 13:35:32 7mm N 80 78 79 75 75 87 86 --- --- --- 241 13:36:09 OJ287 - 180 180 180 180 180 180 180 --- 180 180 241 13:39:09 - - 35 37 37 37 37 37 37 --- 62 123 241 13:39:13 OJ287 - 180 180 180 180 180 180 180 --- --- --- 241 13:42:13 3mm - 4 4 5 4 4 5 4 --- --- --- 241 13:42:17 OJ287 - 180 180 180 180 180 180 180 --- 180 180 241 13:45:17 4cm - 4 4 5 4 4 5 4 --- 7 7 241 13:45:21 OJ287 - 180 180 180 180 180 180 180 --- 180 180 241 13:48:21 1cm - 4 4 5 4 4 5 4 --- 4 5 241 13:48:25 OJ287 - 180 180 180 180 180 180 180 --- 180 180 241 13:51:25 6cm - 4 4 5 4 4 5 4 --- 4 5 241 13:51:29 OJ287 - 180 180 180 180 180 180 180 --- 180 180 241 13:54:29 2cm - 4 4 5 4 4 5 4 --- 4 5 241 13:56:11 P-IKTAU P 60 60 60 60 60 60 60 60 --- --- 241 13:57:11 7mm N 84 90 102 93 94 94 82 41 --- --- 241 13:57:55 0235+164 - 269 269 269 269 269 269 269 269 269t 269t 241 14:02:24 - - 26 25 30 25 26 28 31 44 94t 138t 241 14:02:28 0235+164 - 269 269 269 269 269 269 269 269 --- --- 241 14:06:58 3mm - 4 4 5 4 4 4 4 5 --- --- 241 14:07:02 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 14:11:31 4cm - 4 4 5 4 4 5 4 5 7 8 241 14:11:36 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 14:16:05 13cm - 4 4 5 4 5 5 4 5 4 5 241 14:16:10 0235+164 - 269 269 269 269 269 269 269 269t 269 269 241 14:20:39 1cm - 4 4 5 5 5 5 4 5t 4 5 241 14:20:44 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 14:25:14 6cm - 4 4 5 5 5 5 4 5 4 5 241 14:25:19 0235+164 - 269 269 269 269 269 269 269 269 269 269 241 14:29:48 2cm - 4 5 5 5 5 5 4 5 4 5 241 14:31:48 P-IKTAU P 60 60 60 60 60 60 60 60 --- --- 241 14:32:48 7mm N 26 25 31 27 27 28 26 45 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 14:33:37 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 14:36:37 7mm - 16 17 21 20 21 22 24 32 34 229 241 14:36:41 0420-014 - 180 180 180 180 180 180 180 180 --- --- 241 14:39:41 3mm - 4 4 4 4 4 4 4 4 --- --- 241 14:39:45 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 14:42:44 4cm - 4 4 4 4 4 4 4 4 6 7 241 14:42:49 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 14:45:48 1cm - 4 4 4 4 4 4 4 4 4 5 241 14:45:53 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 14:48:53 6cm - 4 4 4 4 4 4 4 4 4 5 241 14:48:57 0420-014 - 180 180 180 180 180 180 180 180 180 180 241 14:51:57 2cm - 4 4 4 4 4 4 4 4 4 5 241 14:53:27 P-RLEO P 60 60 60 60 60 60 60 --- --- --- 241 14:54:27 7mm N 77 81 90 85 85 86 78 --- --- --- 241 14:55:04 OJ287 - 180 180 180 180 180 180 180 180 180 180 241 14:58:03 - - 30 36 37 37 37 37 37 110 69 142 241 14:58:08 OJ287 - 180 180 180 180 180 180 180 180 --- --- 241 15:01:07 3mm - 4 4 5 4 4 5 4 5 --- --- 241 15:01:12 OJ287 - 180 180 180 180 180 180 180 180 180 180 241 15:04:11 4cm - 4 4 5 4 4 5 4 5 7 10 241 15:04:16 OJ287 - 180 180 180 180 180 180 180 180 180 180 241 15:07:15 1cm - 4 4 5 4 5 5 4 5 4 5 241 15:07:20 OJ287 - 180 180 180 180 180 180 180 180 180 180 241 15:10:19 6cm - 4 4 5 4 4 5 4 5 4 5 241 15:10:24 OJ287 - 180 180 180 180 180 180 180 180 180 180 241 15:13:23 2cm - 4 4 5 4 4 5 4 5 4 5 241 15:15:42 P-IKTAU P 60 60 60 60 60 60 60 60 --- --- 241 15:16:42 7mm N 104 85 107 99 101 105 95 139 --- --- 241 15:18:07 0235+164 - 239 239 239 239 239 239 239 239 239 --- 241 15:22:06 - - 27 27 33 30 31 32 27 84 98 --- 241 15:22:10 0235+164 - 239 239 239 239 239 239 239 239 --- --- 241 15:26:10 3mm - 4 4 5 4 4 5 4 5 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds antenna is on source during scan. Bottom item is: Slew time in seconds from previous source. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 15:26:14 0235+164 - 239 239 239 239 239 239 239 239 239 --- 241 15:30:14 4cm - 4 4 5 4 4 5 4 5 7 --- 241 15:30:18 0235+164 - 239 239 239 239 239 239 239 239 239 --- 241 15:34:17 13cm - 4 4 5 4 4 5 4 5 4 --- 241 15:34:22 0235+164 - 239 239 239 239 239 239 239 239 239 --- 241 15:38:21 1cm - 4 4 5 4 4 5 4 5 4 --- 241 15:38:26 0235+164 - 0 239 239 239 239 239 239 239 239 --- 241 15:42:25 6cm - 4 4 5 4 4 5 4 5 4 --- 241 15:42:30 0235+164 - 0 239 239 239 239 239 239 239 239 --- 241 15:46:29 2cm - 4 4 5 4 4 5 4 5 4 --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 06:45:09 P-RAQR P 0 0 0 0 0 0 0 0 0 --- 241 06:46:09 7mm N 9 -8 -25 -24 -26 -31 -32 -66 -25 --- 241 06:46:13 P-RAQR - 0 0 0 0 0 0 0 0 0 0 241 06:47:13 - - 9 -8 -24 -23 -26 -30 -32 -66 -25 29 241 06:48:27 3C454.3 - 0 0 0 0 0 0 0 0 0 0 241 06:53:26 - - 32 7 -27 -24 -30 -40 -39 -77 -27 82 241 06:53:31 3C454.3 - 5 5 5 5 5 5 5 5 --- --- 241 06:58:30 3mm - 33 9 -23 -22 -27 -38 -38 -77 --- --- 241 06:58:34 3C454.3 - 5 5 5 5 5 5 5 5 0 0 241 07:03:34 4cm - 34 11 -20 -19 -25 -36 -37 -77 -25 82 241 07:03:38 3C454.3 - 5 5 5 5 5 5 5 5 5 5 241 07:08:37 1cm - 35 13 -16 -16 -22 -33 -35 -77 -23 82 241 07:08:42 3C454.3 - 5 5 5 5 5 5 5 5 5 5 241 07:13:41 6cm - 36 15 -12 -14 -19 -31 -33 -77 -22 82 241 07:13:46 3C454.3 - 5 5 5 5 5 5 5 5 5 5 241 07:18:45 2cm - 37 17 -8 -11 -16 -28 -32 -77 -21 82 241 07:19:58 P-RAQR P 0 0 0 0 0 0 0 0 --- --- 241 07:20:58 7mm N 16 -1 -15 -16 -18 -23 -25 -63 --- --- 241 07:21:59 0235+164 P 0 0 0 0 0 0 0 --- 0 0 241 07:26:58 - - -33 -47 -64 -58 -60 -62 -56 --- -44 -84 241 07:27:02 0235+164 P 4 4 4 4 4 4 4 --- --- --- 241 07:32:01 3mm - -32 -46 -64 -58 -59 -62 -56 --- --- --- 241 07:32:06 0235+164 P 4 4 4 4 4 4 4 --- 0 0 241 07:37:05 4cm - -31 -46 -64 -57 -59 -62 -56 --- -44 -83 241 07:37:10 0235+164 P 5 5 5 5 5 5 5 --- 5 5 241 07:42:09 13cm - -29 -45 -64 -57 -59 -62 -56 --- -44 -83 241 07:42:13 0235+164 P 5 5 5 5 5 5 5 --- 5 5 241 07:47:12 1cm - -28 -45 -64 -57 -59 -62 -56 --- -44 -83 241 07:47:17 0235+164 P 5 5 5 5 5 5 5 --- 5 5 241 07:52:16 6cm - -27 -44 -63 -57 -59 -62 -56 --- -44 -82 241 07:52:21 0235+164 P 5 5 5 5 5 5 5 --- 5 5 241 07:57:20 2cm - -25 -43 -63 -57 -59 -62 -56 --- -44 -81 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 07:58:35 P-RAQR P 0 0 0 0 0 0 0 0 --- --- 241 07:59:34 7mm N 23 8 -4 -6 -8 -13 -17 -59 --- --- 241 08:00:47 3C454.3 P 0 0 0 0 0 0 0 0 0 0 241 08:05:47 - N 44 32 30 17 14 6 -10 -78 -8 81 241 08:05:51 3C454.3 P 0 0 0 0 0 0 0 0 --- --- 241 08:10:50 3mm N 45 33 33 20 17 10 -8 -78 --- --- 241 08:10:55 3C454.3 P 0 0 0 0 0 0 0 0 0 0 241 08:15:54 4cm N 45 34 35 22 20 14 -5 -78 -5 80 241 08:15:59 3C454.3 P 0 0 0 0 0 0 0 0 0 0 241 08:20:58 1cm N 46 36 38 25 23 17 -2 -78 -3 80 241 08:21:02 3C454.3 P 0 0 0 0 0 0 0 0 0 0 241 08:26:02 6cm N 46 37 40 27 26 21 1 -78 -1 80 241 08:26:06 3C454.3 P 0 0 0 0 0 0 0 0 0 0 241 08:31:05 2cm N 46 38 42 29 28 24 4 -78 0 80 241 08:33:05 P-OCETI P 0 0 0 0 0 0 0 0 --- --- 241 08:34:05 7mm N -2 -21 -41 -38 -40 -45 -43 -70 --- --- 241 08:34:49 0235+164 - 0 0 0 0 0 0 0 0 0 0 241 08:39:18 - - -10 -36 -61 -54 -57 -61 -55 -71 -42 48 241 08:39:23 0235+164 - 4 4 4 4 4 4 4 4 --- --- 241 08:43:52 3mm - -8 -35 -61 -53 -56 -61 -55 -71 --- --- 241 08:43:56 0235+164 - 4 4 4 4 4 4 4 4 0 0 241 08:48:26 4cm - -6 -34 -60 -53 -56 -60 -55 -72 -41 71 241 08:48:30 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 08:52:59 13cm - -4 -33 -60 -52 -56 -60 -54 -72 -41 75 241 08:53:04 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 08:57:33 1cm - -3 -31 -59 -52 -55 -60 -54 -72 -41 78 241 08:57:38 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 09:02:07 6cm - -1 -30 -59 -51 -55 -60 -54 -72 -40 79 241 09:02:12 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 09:06:41 2cm - 1 -29 -58 -51 -54 -59 -54 -73 -40 81 241 09:07:27 P-OCETI P 0 0 0 0 0 0 0 0 --- --- 241 09:08:27 7mm N 7 -13 -34 -31 -34 -39 -38 -69 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 09:09:16 0420-014 - 0 0 0 0 0 0 0 --- 0 0 241 09:12:16 7mm - -23 -37 -54 -49 -51 -55 -51 --- -40 -39 241 09:12:20 0420-014 - 4 4 4 4 4 4 4 --- --- --- 241 09:15:20 3mm - -22 -37 -53 -49 -51 -54 -51 --- --- --- 241 09:15:24 0420-014 - 4 4 4 4 4 4 4 --- 0 0 241 09:18:23 4cm - -22 -36 -53 -49 -51 -54 -50 --- -40 -36 241 09:18:28 0420-014 - 4 4 4 4 4 4 4 --- 4 4 241 09:21:27 1cm - -21 -36 -53 -48 -51 -54 -50 --- -40 -35 241 09:21:32 0420-014 - 4 4 4 4 4 4 4 --- 4 4 241 09:24:31 6cm - -20 -35 -53 -48 -50 -54 -50 --- -40 -34 241 09:24:36 0420-014 - 4 4 4 4 4 4 4 --- 4 4 241 09:27:35 2cm - -20 -35 -52 -48 -50 -54 -50 --- -39 -32 241 09:29:01 0235+164 - 0 0 0 0 0 0 0 0 0 0 241 09:33:51 7mm - 12 -20 -53 -46 -50 -56 -51 -74 -37 83 241 09:33:55 0235+164 - 4 4 4 4 4 4 4 4 --- --- 241 09:38:44 3mm - 14 -18 -52 -45 -49 -56 -51 -74 --- --- 241 09:38:49 0235+164 - 4 4 4 4 4 4 4 4 0 0 241 09:43:38 4cm - 16 -16 -51 -44 -48 -55 -50 -75 -36 84 241 09:43:42 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 09:48:32 13cm - 18 -14 -50 -43 -47 -54 -49 -75 -35 84 241 09:48:36 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 09:53:25 1cm - 19 -12 -48 -41 -46 -53 -49 -75 -35 84 241 09:53:30 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 09:58:19 6cm - 21 -10 -47 -40 -45 -52 -48 -75 -34 84 241 09:58:24 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 10:03:13 2cm - 23 -8 -45 -38 -43 -51 -47 -76 -33 84 241 10:05:12 P-RAQR P 0 0 0 0 0 0 0 0 --- --- 241 10:06:12 7mm N 40 32 31 25 24 23 14 -34 --- --- 241 10:07:21 3C454.3 - 0 0 0 0 0 0 0 0 0 0 241 10:10:20 - - 50 49 61 53 54 56 43 -68 28 75 241 10:10:25 3C454.3 - 4 4 4 4 4 4 4 4 --- --- 241 10:13:24 3mm - 50 49 62 53 55 57 44 -67 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 10:13:29 3C454.3 - 4 4 4 4 4 4 4 4 0 0 241 10:16:28 4cm - 50 50 62 54 55 57 45 -65 29 75 241 10:16:33 3C454.3 - 5 5 5 5 5 5 5 5 5 5 241 10:19:32 1cm - 50 50 62 54 55 58 45 -63 30 75 241 10:19:37 3C454.3 - 5 5 5 5 5 5 5 5 5 5 241 10:22:37 6cm - 50 50 62 54 56 58 46 -61 30 74 241 10:22:41 3C454.3 - 5 5 5 5 5 5 5 5 5 5 241 10:25:41 2cm - 50 50 62 54 56 58 46 -58 31 74 241 10:28:07 P-IKTAU P 0 0 0 0 0 0 0 0 --- --- 241 10:29:07 7mm N 5 -22 -49 -44 -47 -53 -49 -72 --- --- 241 10:29:51 0235+164 - 0 0 0 0 0 0 0 0 0 0 241 10:37:10 - - 32 6 -29 -26 -32 -42 -41 -77 -28 83 241 10:37:15 0235+164 - 5 5 5 5 5 5 5 5 --- --- 241 10:44:33 3mm - 33 9 -24 -22 -28 -39 -39 -77 --- --- 241 10:44:38 0235+164 - 5 5 5 5 5 5 5 5 0 0 241 10:51:57 4cm - 35 12 -19 -18 -24 -36 -37 -77 -24 83 241 10:52:01 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 10:59:20 13cm - 37 15 -13 -14 -20 -32 -34 -78 -23 83 241 10:59:25 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 11:06:43 1cm - 38 18 -6 -10 -16 -28 -32 -78 -21 83 241 11:06:48 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 11:14:07 6cm - 39 20 0 -6 -11 -23 -29 -78 -19 82 241 11:14:11 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 11:21:30 2cm - 40 23 7 -1 -6 -18 -26 -78 -17 82 241 11:22:36 0420-014 - 0 0 0 0 0 0 0 0 0 0 241 11:25:35 7mm - 10 -11 -32 -29 -32 -38 -37 -69 -28 41 241 11:25:40 0420-014 - 4 4 4 4 4 4 4 4 --- --- 241 11:28:39 3mm - 11 -10 -31 -28 -32 -37 -37 -69 --- --- 241 11:28:44 0420-014 - 4 4 4 4 4 4 4 4 0 0 241 11:31:43 4cm - 12 -9 -30 -28 -31 -36 -36 -69 -28 43 241 11:31:48 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 11:34:47 1cm - 12 -8 -29 -27 -30 -36 -36 -69 -27 44 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 11:34:52 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 11:37:51 6cm - 13 -7 -28 -26 -29 -35 -35 -69 -27 45 241 11:37:56 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 11:40:55 2cm - 14 -6 -27 -25 -29 -34 -35 -69 -26 46 241 11:42:55 P-IKTAU P 0 0 0 0 0 0 0 0 --- --- 241 11:43:55 7mm N 28 4 -23 -22 -27 -35 -36 -74 --- --- 241 11:44:41 0235+164 - 0 0 0 0 0 0 0 0 0 0 241 11:49:10 - - 44 32 30 17 14 6 -11 -79 -8 81 241 11:49:15 0235+164 - 5 5 5 5 5 5 5 5 --- --- 241 11:53:44 3mm - 45 33 33 20 17 10 -8 -79 --- --- 241 11:53:49 0235+164 - 5 5 5 5 5 5 5 5 0 0 241 11:58:18 4cm - 45 35 36 22 20 13 -6 -79 -5 81 241 11:58:22 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 12:02:52 13cm - 46 36 38 24 22 16 -3 -79 -4 81 241 12:02:56 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 12:07:26 1cm - 46 37 40 27 25 20 0 -79 -2 80 241 12:07:30 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 12:11:59 6cm - 46 38 42 29 27 23 2 -79 -1 80 241 12:12:04 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 12:16:33 2cm - 47 39 44 31 30 26 5 -79 1 80 241 12:17:39 0420-014 - 0 0 0 0 0 0 0 0 0 0 241 12:20:38 7mm - 23 4 -13 -14 -17 -23 -26 -67 -20 57 241 12:20:43 0420-014 - 4 4 4 4 4 4 4 4 --- --- 241 12:23:42 3mm - 23 5 -12 -13 -16 -22 -26 -67 --- --- 241 12:23:47 0420-014 - 4 4 4 4 4 4 4 4 0 0 241 12:26:46 4cm - 24 6 -11 -12 -15 -21 -25 -66 -19 58 241 12:26:51 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 12:29:50 1cm - 25 7 -10 -11 -14 -20 -24 -66 -18 58 241 12:29:55 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 12:32:54 6cm - 25 8 -8 -10 -13 -19 -23 -66 -18 59 241 12:32:59 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 12:35:58 2cm - 26 9 -7 -9 -12 -18 -22 -66 -17 59 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 12:36:34 P-IKTAU P 0 0 0 0 0 0 0 0 --- --- 241 12:37:33 7mm N 38 22 10 3 -1 -9 -18 -73 --- --- 241 12:37:38 P-IKTAU - 0 0 0 0 0 0 0 0 0 0 241 12:38:38 - - 38 22 11 4 0 -9 -18 -73 -13 76 241 12:39:22 0235+164 - 0 0 0 0 0 0 0 0 0 0 241 12:43:51 - - 48 43 52 40 40 40 19 -79 9 79 241 12:43:56 0235+164 - 5 5 5 5 5 5 5 5 --- --- 241 12:48:25 3mm - 49 44 53 41 42 42 21 -79 --- --- 241 12:48:29 0235+164 - 5 5 5 5 5 5 5 5 0 0 241 12:52:59 4cm - 49 44 54 43 43 43 23 -79 12 78 241 12:53:03 0235+164 - 5t 5t 5t 5t 5t 5t 5t 5 5 5 241 12:57:32 13cm - 49t 45t 55t 44t 45t 45t 25t -79 14 78 241 12:57:37 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 13:02:06 1cm - 49 45 56 45 46 46 27 -78 15 78 241 13:02:11 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 13:06:40 6cm - 49 46 57 46 47 48 29 -78 16 78 241 13:06:44 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 13:11:14 2cm - 49 46 57 47 48 49 31 -78 17 78 241 13:13:13 P-IKTAU P 0 0 0 0 0 0 0 0 --- --- 241 13:14:13 7mm N 42 32 30 20 18 13 -2 -72 --- --- 241 13:14:46 0420-014 - 0 0 0 0 0 0 0 0 0 0 241 13:17:46 - - 33 19 10 5 3 -3 -11 -62 -8 65 241 13:17:50 0420-014 - 4 4 4 4 4 4 4 4 --- --- 241 13:20:50 3mm - 33 20 11 6 4 -1 -10 -62 --- --- 241 13:20:54 0420-014 - 4 4 4 4 4 4 4 4 0 0 241 13:23:54 4cm - 34 20 12 7 5 0 -9 -62 -7 65 241 13:23:58 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 13:26:58 1cm - 34 21 13 8 6 1 -8 -61 -7 66 241 13:27:02 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 13:30:02 6cm - 35 22 14 9 7 2 -7 -61 -6 66 241 13:30:06 0420-014 - 4 4 4 4 4 4 4 4 4 4 241 13:33:06 2cm - 35 22 15 10 8 3 -6 -60 -5 66 SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 13:34:32 P-RLEO P 0 0 0 0 0 0 0 --- --- --- 241 13:35:32 7mm N -39 -48 -61 -56 -57 -60 -54 --- --- --- 241 13:36:09 OJ287 - 0 0 0 0 0 0 0 --- 0 0 241 13:39:09 - - -37 -50 -66 -60 -62 -64 -58 --- -45 -95 241 13:39:13 OJ287 - 4 4 4 4 4 4 4 --- --- --- 241 13:42:13 3mm - -36 -49 -66 -60 -62 -64 -58 --- --- --- 241 13:42:17 OJ287 - 4 4 4 4 4 4 4 --- 0 0 241 13:45:17 4cm - -35 -49 -66 -60 -62 -64 -58 --- -45 -96 241 13:45:21 OJ287 - 4 4 4 4 4 4 4 --- 4 4 241 13:48:21 1cm - -34 -49 -66 -60 -62 -64 -58 --- -45 -97 241 13:48:25 OJ287 - 4 4 4 4 4 4 4 --- 4 4 241 13:51:25 6cm - -34 -49 -66 -60 -62 -64 -58 --- -45 -98 241 13:51:29 OJ287 - 4 4 4 4 4 4 4 --- 4 4 241 13:54:29 2cm - -33 -48 -66 -60 -62 -64 -58 --- -45 -98 241 13:56:11 P-IKTAU P 0 0 0 0 0 0 0 0 --- --- 241 13:57:11 7mm N 46 40 45 35 35 33 17 -69 --- --- 241 13:57:55 0235+164 - 0 0 0 0 0 0 0 0 0t 0t 241 14:02:24 - - 50 50 62 54 55 58 45 -67 29t 75t 241 14:02:28 0235+164 - 5 5 5 5 5 5 5 5 --- --- 241 14:06:58 3mm - 50 50 63 54 56 58 46 -65 --- --- 241 14:07:02 0235+164 - 5 5 5 5 5 5 5 5 0 0 241 14:11:31 4cm - 50 50 63 55 56 59 47 -61 31 74 241 14:11:36 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 14:16:05 13cm - 50 50 63 55 57 59 48 -56 32 74 241 14:16:10 0235+164 - 5 5 5 5 5 5 5 5t 5 5 241 14:20:39 1cm - 50 51 63 55 57 59 48 -50t 33 74 241 14:20:44 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 14:25:14 6cm - 49 51 63 56 57 60 49 -40 33 73 241 14:25:19 0235+164 - 5 5 5 5 5 5 5 5 5 5 241 14:29:48 2cm - 49 51 63 56 58 60 50 -27 34 73 241 14:31:48 P-IKTAU P 0 0 0 0 0 0 0 0 --- --- 241 14:32:48 7mm N 48 44 53 43 44 44 30 -63 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 14:33:37 0420-014 - 0 0 0 0 0 0 0 0 0 0 241 14:36:37 7mm - 42 34 35 28 28 26 14 -49 9 70 241 14:36:41 0420-014 - 4 4 4 4 4 4 4 4 --- --- 241 14:39:41 3mm - 42 35 36 29 28 27 15 -48 --- --- 241 14:39:45 0420-014 - 4 4 4 4 4 4 4 4 0 0 241 14:42:44 4cm - 42 35 37 30 29 27 16 -47 10 70 241 14:42:49 0420-014 - 5 5 5 5 5 5 5 5 5 5 241 14:45:48 1cm - 43 35 38 30 30 28 17 -46 11 70 241 14:45:53 0420-014 - 5 5 5 5 5 5 5 5 5 5 241 14:48:53 6cm - 43 36 38 31 31 29 18 -45 11 70 241 14:48:57 0420-014 - 5 5 5 5 5 5 5 5 5 5 241 14:51:57 2cm - 43 36 39 32 31 30 19 -44 12 71 241 14:53:27 P-RLEO P 0 0 0 0 0 0 0 --- --- --- 241 14:54:27 7mm N -24 -41 -59 -54 -56 -59 -54 --- --- --- 241 14:55:04 OJ287 - 0 0 0 0 0 0 0 0 0 0 241 14:58:03 - - -9 -38 -65 -57 -60 -64 -57 -72 -43 133 241 14:58:08 OJ287 - 4 4 4 4 4 4 4 4 --- --- 241 15:01:07 3mm - -8 -37 -65 -57 -60 -64 -57 -72 --- --- 241 15:01:12 OJ287 - 4 4 4 4 4 4 4 4 0 0 241 15:04:11 4cm - -6 -37 -64 -56 -59 -64 -57 -72 -43 120 241 15:04:16 OJ287 - 5 5 5 5 5 5 5 5 5 5 241 15:07:15 1cm - -5 -36 -64 -56 -59 -64 -57 -73 -43 116 241 15:07:20 OJ287 - 5 5 5 5 5 5 5 5 5 5 241 15:10:19 6cm - -3 -35 -64 -56 -59 -64 -57 -73 -43 113 241 15:10:24 OJ287 - 5 5 5 5 5 5 5 5 5 5 241 15:13:23 2cm - -2 -34 -64 -56 -59 -63 -57 -73 -42 110 241 15:15:42 P-IKTAU P 0 0 0 0 0 0 0 0 --- --- 241 15:16:42 7mm N 48 47 58 50 51 53 41 -41 --- --- 241 15:18:07 0235+164 - 0 0 0 0 0 0 0 0 0 --- 241 15:22:06 - - 47 51 64 58 59 62 54 72 40 --- 241 15:22:10 0235+164 - 4 4 4 4 4 4 4 4 --- --- 241 15:26:10 3mm - 47 51 64 58 59 62 55 73 --- --- SUMMARY for experiment BW069F VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Top item is: Seconds tape starts before scan start time. Bottom item is: Start paralactic angle. TYPE top: -=> normal scan, P=>Pointing or Ta; bottom: -=>recording, N=>not recording. Day 241 is Sat 28 Aug 2004 MJD 53245 DAY START UT SOURCE TYPE STATIONS t => tape change STOP UT Hn Nl Fd La Pt Kp Ov Mk Br Sc 241 15:26:14 0235+164 - 4 4 4 4 4 4 4 4 0 --- 241 15:30:14 4cm - 47 51 64 58 60 62 55 74 41 --- 241 15:30:18 0235+164 - 4 4 4 4 4 4 4 4 4 --- 241 15:34:17 13cm - 47 51 64 58 60 62 55 75 41 --- 241 15:34:22 0235+164 - 4 4 4 4 4 4 4 4 4 --- 241 15:38:21 1cm - 47 51 64 58 60 62 55 76 41 --- 241 15:38:26 0235+164 - 4 4 4 4 4 4 4 4 4 --- 241 15:42:25 6cm - 46 51 64 58 60 62 55 76 42 --- 241 15:42:30 0235+164 - 4 4 4 4 4 4 4 4 4 --- 241 15:46:29 2cm - 46 51 64 58 60 62 55 77 42 --- Automatic tape allocation requested for sites using VLBA control files and having 2 or more drives. SCHED cannot predict tape changes. Number of tapes used at each autoaloc station: Station Tapes VLBA_HN 1.49 VLBA_NL 1.49 VLBA_FD 1.49 VLBA_LA 1.49 VLBA_PT 1.49 VLBA_KP 1.49 VLBA_OV 1.49 VLBA_MK 1.25 VLBA_BR 1.26 VLBA_SC 1.18 ESTIMATED TAPE TIMES (With autoallocation): Times are approximate and assume project starts at the beginning of a tape. Times can be affected by actual tape length. Tape change may occur during scan preceeding indicated time. Tape start time. Tape end time. Station Day Time Day Time (UT) (UT) VLBA_HN 241 06:46:13 241 12:52:59 VLBA_HN 241 12:53:03 241 15:46:29 VLBA_NL 241 06:46:13 241 12:52:59 VLBA_NL 241 12:53:03 241 15:46:29 VLBA_FD 241 06:46:13 241 12:52:59 VLBA_FD 241 12:53:03 241 15:46:29 VLBA_LA 241 06:46:13 241 12:52:59 VLBA_LA 241 12:53:03 241 15:46:29 VLBA_PT 241 06:46:13 241 12:52:59 VLBA_PT 241 12:53:03 241 15:46:29 VLBA_KP 241 06:46:13 241 12:52:59 VLBA_KP 241 12:53:03 241 15:46:29 VLBA_OV 241 06:46:13 241 12:52:59 VLBA_OV 241 12:53:03 241 15:46:29 VLBA_MK 241 06:46:13 241 14:16:05 VLBA_MK 241 14:16:10 241 15:46:29 VLBA_BR 241 06:46:13 241 13:54:29 VLBA_BR 241 13:57:55 241 15:46:29 VLBA_SC 241 06:46:13 241 13:54:29 VLBA_SC 241 13:57:55 241 15:13:23 SOURCE LIST -- VLBA/XMM-Newton/WEBT monitoring of blazar AO 0235+16 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Source Source position (RA/Dec) (B1950) (J2000) (Date) * P-IKTAU 03 50 43.603662 * 03 53 28.710000 03 53 43.613363 SIO-IKTAU 11 15 31.94775 * 11 24 22.60000 11 25 19.92469 IKTAU From catalog imbedded in main SCHED input file. SEST pos & vel. Doppler based on LSR frame and radio definition. Velocities: 35.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 * P-OCETI 02 16 49.081525 * 02 19 20.793000 02 19 35.053601 OCETI -03 12 22.72592 *-02 58 37.00000 -02 57 10.49148 From catalog imbedded in main SCHED input file. Baudry position, SEST spectrum Doppler based on LSR frame and radio definition. Velocities: 45.00 45.00 45.00 45.00 45.00 45.00 45.00 45.00 * P-RAQR 23 41 14.264681 * 23 43 49.440000 23 44 04.708105 SIO-RAQR -15 33 43.43682 *-15 17 04.10000 -15 15 25.95302 RAQR From catalog imbedded in main SCHED input file. sest Doppler based on LSR frame and radio definition. Velocities: -22.00 -22.00 -22.00 -22.00 -22.00 -22.00 -22.00 -22.00 * P-RLEO 09 44 52.219425 * 09 47 33.490000 09 47 46.759968 SIO-RLEO 11 39 40.09214 * 11 25 43.99000 11 24 39.67033 RLEO From catalog imbedded in main SCHED input file. baudry pos, sest vel. Doppler based on LSR frame and radio definition. Velocities: 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 J0238+1636 02 35 52.630215 * 02 38 38.930107 02 38 54.296824 * 0235+164 16 24 04.01629 * 16 36 59.27471 16 38 15.64597 J0238+16 /home/filehost/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report J0423-0120 04 20 43.539850 * 04 23 15.800727 04 23 29.439625 * 0420-014 -01 27 28.70002 *-01 20 33.06531 -01 19 41.28105 J0423-01 /home/filehost/cwalker/sched/catalogs/sources.vlba ICRF - Ext.1 Source - 1998 IERS Annual Report J0854+2006 08 51 57.250612 * 08 54 48.874924 08 55 03.133018 0851+202 20 17 58.41743 * 20 06 30.64088 20 05 38.79323 J0854+20 /home/filehost/cwalker/sched/catalogs/sources.vlba * OJ287 ICRF - Ext.1 Source - 1998 IERS Annual Report J2253+1608 22 51 29.519733 * 22 53 57.747932 22 54 12.202503 2251+158 15 52 54.34806 * 16 08 53.56089 16 10 23.81978 * 3C454.3 /home/filehost/cwalker/sched/catalogs/sources.vlba J2253+16 ICRF - Ext.1 Source - 1998 IERS Annual Report The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) P-IKTAU 96.7 P-OCETI 122.4 P-RAQR 160.8 P-RLEO 10.4 0235+164 113.0 0420-014 91.6 OJ287 25.1 3C454.3 153.6 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg Source separations in degrees for pairs closer than 15.00 degrees. P-IKTAU J0423-0120 14.7403 J2000 coordinates formatted for possible transfer to the correlator data base: name = 'P-IKTAU' ra = 03h53m28.710000s dec = 11d24'22.60000" name = 'P-OCETI' ra = 02h19m20.793000s dec = -02d58'37.00000" name = 'P-RAQR' ra = 23h43m49.440000s dec = -15d17'04.10000" name = 'P-RLEO' ra = 09h47m33.490000s dec = 11d25'43.99000" name = '0235+164' ra = 02h38m38.930107s dec = 16d36'59.27471" name = '0420-014' ra = 04h23m15.800727s dec = -01d20'33.06531" name = 'OJ287' ra = 08h54m48.874924s dec = 20d06'30.64088" name = '3C454.3' ra = 22h53m57.747932s dec = 16d08'53.56089" Code versions: Release version: Release of 18 Sept. 2003 Version of sched code: 5.22 Version of VEX standard: 1.50 Version of VEX code: 0.79 Version of plot code: 1.05 Version of ephemeris code: 1.01 Version of PGPLOT: v5.2.0