VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BW067B Observer: R.C. Walker Project type: VLBA Obs filename: BW067bcrd.* Date/Day: 2003AUG02/214 Ants Used: SC HN NL FD LA KP OV BR MK Y =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Paul Dyer. 1300 Begin at all stations. 1303 All antennas on source and FRMs are locked in the correct position. Prior project ran up to 1300, so it took a few extra minutes to get started. 1305 %Y Bad readback on drive 1, track 04. 1345 New operator Cyrus M Reed. 1415 WEA: SC,LA Partly cloudy. (25%,30%) WEA: NL,FD,KP,OV,BR Clear skies. WEA: HN Unknown (webcam not updating). WEA: MK Unknown (night). 1419 *OV bad readbacks: Drive 2, Tracks 11,13,15,17. *Y bad readback: Drive 1, Track 04. All other readbacks OK (all sites). 1505-1507 *KP autostowed due to power glitch. COM 100 2 1536 *Y bad readbacks: Drive 1, ALL Tracks. All other readbacks OK (all sites). 1644 *Y bad readbacks: Drive 1, ALL Tracks. All other readbacks OK (all sites). 1652 End. Downtime Summary: Total downtime : 2 min Percentage downtime of observing: 0.1% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 2320 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.