VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BU023D Observer: Ulvestad, J.S. Project type: VLBA Obs filename: bu023dcrd.* Date/Day: 2003AUG21/233 Ants Used: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Dave Pierce. VCLOCK and GPS Delta check okay. UT1-UTC: -0.35 0516 File begins, except at MK. 0522-0523 *FD Command position at zero, issued a reobs. FRM 100 1 0530 New operator: T. Perreault 0558 MK joins 0558 Readback check ok 0812 FD bad readback drive 1 track 30; All other sites ok 0916 Readback check ok 0935 Readback check ok 1038 Readback check ok 1051 Readback check ok 1119 SC wea: light scattered low clouds, no precipitation 1154 Readback check ok 1226 HN wea: clear, no precipitation 1230 Webcam weather checks: SC : cloudy HN, NL, FD, LA, PT : clear OV : webcam not updating (last image 8/20 @ 1623 PDT) 1258 Readback check ok 1335 New operator is Paul Dyer. 1443 All readbacks ok. 1447-1450 *PT Autostowed. Power glitch. COM 100 3 1500 OV WEA: Overcast, dry. 1502 KP WEA: Scattered high and low clouds. Dry. 1504-1511 *PT Autostowed. Power glitch. COM 100 7 1516 End. Downtime Summary: Total downtime : 11 min Percentage downtime of observing: 0.2% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 6000 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.