VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BM193A Observer: E. Momjian Project type: VLBA Obs filename: bm193acrd.* Date/Day: 2003AUG31/243 Ants Used: SC HN NL FD LA PT KP OV BR MK Y GB =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Jim Ogle. %Raining at FD. VCLOCK and gps delta check okay. 0230 Begin at all sites except OV, BR and MK. 0230-0232 *VLBA sites did not start on time due to an overlap SCH 700 14 in the schedule with the previous observation, I had to reboot the site computers to get them to load up this schedule instead of continuing to run the previous observation. 0232 Begin at OV and BR. MK starts later. 0232-0233 *PT autostowed, commercial power glitch. COM 100 1 0337 %Raining at PT. 0424-0427 *PT autostowed, power glitch. COM 100 3 0430 Readbacks okay. 0446-0448 *PT autostowed again. COM 100 2 0453 Begin at MK. 0520-0528 *PT autostowed, power glitch again. COM 100 8 0616-0624 *PT autostowed again. COM 100 8 0627 Readbacks okay. 0654-0657 *PT autostowed. COM 100 3 0700 End. Downtime Summary: Total downtime : 39 min Percentage downtime of observing: 1.3% Average downtime per hour : 0.8 min Total scheduled observing time (# Antennas): 2970 min (11) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.