VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BH107E Observer: S. Horiuchi Project type: VLBA Obs filename: bh107ecrd.* Date/Day: 2003AUG31/243 Ants Used: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Jim Ogle. VCLOCK and gps delta check okay. 0935 Begin. 1011 %OV bad readbacks, all tracks. May be a read-only 12284 problem due to the low data rate. Other sites okay. 1030-1031 *HN autostowed, commercial power glitch. Repointed. COM 100 1 1038 %OV bad readbacks, all tracks again. Other sites 12284 okay. 1045 %OV bad readbacks, all tracks. Other sites okay. 12284 1112 Readbacks okay at all sites. 1147 Readbacks okay. 1214-1216 %FD FRM reset itself, being flagged for position FRM 100 2 errors though it is actually in the correct position. 1221 Readbacks okay. 1248 %OV bad readbacks, all tracks again. This appears 12284 to be happening on the reverse passes only. Other sites okay. 1303 SC reports light scattered low clouds. 1323 Readbacks okay at all sites, even OV though it's a reverse pass. 1329 &MK techs paged, site will run out of tape soon. Oncall says they are out fishing and only reachable by pager. Given their local time (3:30am) I don't know how likely it is that they will even notice a page in time to reach the site before the end of the observation. My calculations when the observation started indicated that they had enough tape to make it through but it looks like the system counted pass 13 as full before it should have been full. 1345 New operator Cyrus M Reed. 1357 All readbacks OK. 1409-1806 *MK is out of tape. Given the travel time to the SW 100 237 site and local time at MK, the techs can't make it to the site before the end of the observation - will not do another callout. 1424 All readbacks OK (none @ KP). 1459 All readbacks OK. 1526 All readbacks OK. 1533 All readbacks OK. 1541-1545 *PT autostowed due to power outage. COM 100 4 1600 %OV bad readbacks: Drive 1, ALL tracks. 12284 All other readbacks OK (all sites). 1630 SC,HN readbacks OK. 1635 All readbacks OK (none @ SC,HN). 1702 All readbacks OK. 1709 All readbacks OK (none @ SC). 1731 All readbacks OK (none @ SC). 1738 All readbacks OK (none @ SC). 1800 %MK: Tony called to check in on the site - oncall is incorrect, the techs were at home. Will be fixed when Tony gets on site later today. Weather is bad due to the approaching tropical storm - travel to the site is difficult. 1806 End. Downtime Summary: Total downtime : 244 min Percentage downtime of observing: 4.8% Average downtime per hour : 2.9 min Total scheduled observing time (# Antennas): 5110 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.