VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC128E Observer: M. Claussen Project type: VLBA Obs filename: bc128ecrd.* Date/Day: 2003AUG05/217 Ants Used: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Paul Dyer. VCLOCK and GPS Delta check ok. UT1-UTC checks ok. Web cam weather: FD, OV, BR : Mostly clear. MK : Partly cloudy. SC : Dark HN, NL, LA, PT, KP : Mostly cloudy. 2346 Begin at all sites. All antennas on source. 2350 All readbacks ok. *OV WEA: Wind gusts > 35 mph. 0000 Date is 2003AUG06/218. 0033-0034 *PT Autostowed. Power glitch. COM 100 1 0840-0845 *PT Autostowed. Power glitch. COM 100 5 0142 All readbacks ok. 0155 *HN WEA: Raining. 0156 *LA WEA: Wind gusts > 35mph. 0303 *MK WEA: Raining. 0341 %OV Bad readback on drive 1, track 24. All others ok. 0454 *SC WEA: Raining. 0541 All readbacks ok. 0546 End. Downtime Summary: Total downtime : 6 min Percentage downtime of observing: 0.2% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 3600 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.