COVER INFORMATION Station: VLBA_BR (Code Br ) Experiment: Phase Reference test at K-band Exp. Code: tp022a Schedule Version: 1.00 Processed by SCHED version: Release of 02 July 2002 PI: Mark Claussen Address: National Radio Astronomy Observatory P. O. Box O Socorro, New Mexico, 87801 U.S.A. Phone: 505 835 7284 EMAIL: mclausse@aoc.nrao.edu Fax: 505 835 7027 Phone during observation: 505 835 7284 Observing mode: K-band VLBA non-standard correlator setup Notes: We have 4 bbcs, 2 with 16 MHz bandwidth and 2 with 4 MHz Schedule for VLBA_BR (Code Br ) Page 2 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- Next scan frequencies: 22236.66 22236.66 22213.08 22213.08 Next BBC frequencies: 736.66 736.66 713.08 713.08 Next scan bandwidths: 4.00 4.00 16.00 16.00 10 15 00 J0555+3948 23 54 49 27.9 60.3 -6.1 -49.0 0 1 1 0 Stopped 10 17 00 =0552+398 23 56 50 28.1 60.6 -6.0 -49.2 120 S 1 0 10 17 00 J0555+3948 23 56 50 28.1 60.6 -6.0 -49.2 -6 1 1 0 10 17 00 10 22 00 =0552+398 00 01 51 28.9 61.3 -6.0 -49.7 294 F 1 4000 10 22 33 J0552+1913 00 02 24 15.3 78.1 -5.9 -43.8 0 1 1 4000 10 22 33 10 23 33 =0549+192 00 03 24 15.5 78.3 -5.9 -43.8 60 F 1 4800 10 23 40 UORI 00 03 31 16.1 77.6 -5.9 -44.0 0 1 1 4800 10 23 33 10 24 40 --- 00 04 31 16.3 77.7 -5.9 -44.0 60 F 1 5697 10 24 48 J0552+1913 00 04 39 15.7 78.5 -5.8 -43.8 0 1 1 5697 10 24 40 10 25 48 =0549+192 00 05 39 15.9 78.7 -5.8 -43.9 60 F 1 6593 10 25 55 UORI 00 05 46 16.5 77.9 -5.8 -44.1 0 1 1 6593 10 25 48 10 26 55 --- 00 06 46 16.6 78.1 -5.8 -44.1 60 F 1 7490 10 27 02 J0552+1913 00 06 53 16.1 78.9 -5.8 -43.9 0 1 1 7490 10 26 55 10 28 02 =0549+192 00 07 54 16.2 79.1 -5.8 -44.0 60 F 1 8386 10 28 09 UORI 00 08 01 16.8 78.3 -5.8 -44.1 0 1 1 8386 10 28 02 10 29 09 --- 00 09 01 17.0 78.5 -5.8 -44.2 60 F 1 9283 10 29 17 J0552+1913 00 09 08 16.4 79.3 -5.8 -44.0 0 1 1 9283 10 29 09 10 30 17 =0549+192 00 10 08 16.6 79.5 -5.8 -44.0 60 F 1 10180 10 30 24 UORI 00 10 16 17.2 78.7 -5.8 -44.2 0 1 1 10180 10 30 17 10 31 24 --- 00 11 16 17.4 78.9 -5.7 -44.3 60 F 1 11077 10 31 31 J0552+1913 00 11 23 16.8 79.7 -5.7 -44.1 0 1 1 11077 10 31 24 10 32 31 =0549+192 00 12 23 17.0 79.9 -5.7 -44.1 60 F 1 11974 10 32 38 UORI 00 12 31 17.6 79.1 -5.7 -44.3 0 1 1 11974 10 32 31 10 33 38 --- 00 13 31 17.7 79.3 -5.7 -44.3 60 F 1 12871 10 33 46 J0552+1913 00 13 38 17.2 80.1 -5.7 -44.1 0 1 1 12871 10 33 38 10 34 46 =0549+192 00 14 38 17.3 80.3 -5.7 -44.2 60 F 1 13768 Schedule for VLBA_BR (Code Br ) Page 3 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 10 34 53 UORI 00 14 46 18.0 79.5 -5.7 -44.4 0 1 1 13768 10 34 46 10 35 53 --- 00 15 46 18.1 79.7 -5.7 -44.4 60 F 1 14666 10 36 00 J0552+1913 00 15 53 17.5 80.5 -5.7 -44.2 0 1 1 14666 10 35 53 10 37 00 =0549+192 00 16 53 17.7 80.7 -5.6 -44.2 60 F 1 15563 10 37 08 UORI 00 17 01 18.3 79.9 -5.6 -44.4 0 1 1 15563 10 37 00 10 38 08 --- 00 18 01 18.5 80.1 -5.6 -44.5 60 F 1 16461 10 38 15 J0552+1913 00 18 08 17.9 80.9 -5.6 -44.3 0 1 1 16461 10 38 08 10 39 15 =0549+192 00 19 08 18.1 81.1 -5.6 -44.3 60 F 1 17359 10 39 22 UORI 00 19 16 18.7 80.3 -5.6 -44.5 0 1 2 17359 10 39 15 10 40 22 --- 00 20 16 18.9 80.5 -5.6 -44.5 60 R 1 16461 10 40 30 J0552+1913 00 20 23 18.3 81.3 -5.6 -44.3 0 1 2 16461 10 40 22 10 41 30 =0549+192 00 21 23 18.4 81.5 -5.6 -44.4 60 R 1 15563 10 41 37 UORI 00 21 31 19.1 80.7 -5.6 -44.6 0 1 2 15563 10 41 30 10 42 37 --- 00 22 31 19.2 80.9 -5.6 -44.6 60 R 1 14664 10 42 45 J0552+1913 00 22 38 18.6 81.7 -5.5 -44.4 0 1 2 14664 10 42 37 10 43 45 =0549+192 00 23 39 18.8 81.9 -5.5 -44.4 60 R 1 13766 10 43 52 UORI 00 23 46 19.4 81.1 -5.5 -44.6 0 1 2 13766 10 43 45 10 44 52 --- 00 24 46 19.6 81.3 -5.5 -44.7 60 R 1 12867 10 44 59 J0552+1913 00 24 54 19.0 82.1 -5.5 -44.4 0 1 2 12867 10 44 52 10 45 59 =0549+192 00 25 54 19.2 82.3 -5.5 -44.5 60 R 1 11968 10 46 07 UORI 00 26 01 19.8 81.5 -5.5 -44.7 0 1 2 11968 10 45 59 10 47 07 --- 00 27 01 20.0 81.7 -5.5 -44.7 60 R 1 11069 10 47 14 J0552+1913 00 27 09 19.4 82.5 -5.5 -44.5 0 1 2 11069 10 47 07 10 48 14 =0549+192 00 28 09 19.6 82.7 -5.5 -44.5 60 R 1 10170 10 48 22 UORI 00 28 17 20.2 81.9 -5.5 -44.7 0 1 2 10170 10 48 14 10 49 22 --- 00 29 17 20.3 82.1 -5.4 -44.8 60 R 1 9270 10 49 29 J0552+1913 00 29 24 19.8 82.9 -5.4 -44.5 0 1 2 9270 10 49 22 10 50 29 =0549+192 00 30 24 19.9 83.1 -5.4 -44.6 60 R 1 8370 Schedule for VLBA_BR (Code Br ) Page 4 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 10 50 37 UORI 00 30 32 20.6 82.3 -5.4 -44.8 0 1 2 8370 10 50 29 10 51 37 --- 00 31 32 20.7 82.5 -5.4 -44.8 60 R 1 7471 10 51 44 J0552+1913 00 31 40 20.1 83.3 -5.4 -44.6 0 1 2 7471 10 51 37 10 52 44 =0549+192 00 32 40 20.3 83.5 -5.4 -44.6 60 R 1 6571 10 52 52 UORI 00 32 47 20.9 82.7 -5.4 -44.9 0 1 2 6571 10 52 44 10 53 52 --- 00 33 47 21.1 82.9 -5.4 -44.9 60 R 1 5670 10 53 59 J0552+1913 00 33 55 20.5 83.7 -5.4 -44.6 0 1 2 5670 10 53 52 10 54 59 =0549+192 00 34 55 20.7 83.9 -5.3 -44.7 60 R 1 4770 10 55 07 UORI 00 35 03 21.3 83.1 -5.3 -44.9 0 1 2 4770 10 54 59 10 56 07 --- 00 36 03 21.5 83.3 -5.3 -44.9 60 R 1 3869 10 56 14 J0552+1913 00 36 10 20.9 84.1 -5.3 -44.7 0 1 2 3869 10 56 07 10 57 14 =0549+192 00 37 11 21.1 84.3 -5.3 -44.7 60 R 1 2968 10 57 22 UORI 00 37 18 21.7 83.5 -5.3 -45.0 0 1 2 2968 10 57 14 10 58 22 --- 00 38 18 21.8 83.7 -5.3 -45.0 60 R 1 2067 10 58 30 J0552+1913 00 38 26 21.3 84.5 -5.3 -44.7 0 1 2 2067 10 58 22 10 59 30 =0549+192 00 39 26 21.4 84.7 -5.3 -44.7 60 R 1 1166 10 59 37 UORI 00 39 34 22.0 83.9 -5.3 -45.0 0 1 2 1166 10 59 30 11 00 37 --- 00 40 34 22.2 84.1 -5.3 -45.0 60 R 1 264 11 00 45 J0552+1913 00 40 42 21.6 84.9 -5.2 -44.8 0 1 1 264 11 00 37 11 01 45 =0549+192 00 41 42 21.8 85.1 -5.2 -44.8 60 F 2 1166 11 01 52 UORI 00 41 49 22.4 84.3 -5.2 -45.0 0 1 1 1166 11 01 45 11 02 52 --- 00 42 50 22.6 84.5 -5.2 -45.1 60 F 2 2068 11 03 00 J0552+1913 00 42 57 22.0 85.3 -5.2 -44.8 1 1 1 2068 11 02 52 11 04 00 =0549+192 00 43 57 22.2 85.5 -5.2 -44.8 60 F 2 2970 11 04 08 UORI 00 44 05 22.8 84.7 -5.2 -45.1 0 1 1 2970 11 04 00 11 05 08 --- 00 45 05 23.0 84.9 -5.2 -45.1 60 F 2 3873 11 05 15 J0552+1913 00 45 13 22.4 85.7 -5.2 -44.8 1 1 1 3873 11 05 08 11 06 15 =0549+192 00 46 13 22.6 85.9 -5.2 -44.8 60 F 2 4776 Schedule for VLBA_BR (Code Br ) Page 5 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 11 06 23 UORI 00 46 21 23.2 85.2 -5.2 -45.1 1 1 1 4776 11 06 15 11 07 23 --- 00 47 21 23.3 85.3 -5.1 -45.1 60 F 2 5679 11 07 31 J0552+1913 00 47 29 22.8 86.2 -5.1 -44.9 1 1 1 5679 11 07 23 11 08 31 =0549+192 00 48 29 22.9 86.3 -5.1 -44.9 60 F 2 6582 11 08 39 UORI 00 48 37 23.6 85.6 -5.1 -45.1 1 1 1 6582 11 08 31 11 09 39 --- 00 49 37 23.7 85.7 -5.1 -45.2 60 F 2 7486 11 09 47 J0552+1913 00 49 45 23.1 86.6 -5.1 -44.9 1 1 1 7486 11 09 39 11 10 47 =0549+192 00 50 45 23.3 86.8 -5.1 -44.9 60 F 2 8390 11 10 54 UORI 00 50 53 23.9 86.0 -5.1 -45.2 1 1 1 8390 11 10 47 11 11 54 --- 00 51 53 24.1 86.2 -5.1 -45.2 60 F 2 9294 11 12 02 J0552+1913 00 52 01 23.5 87.0 -5.1 -44.9 1 1 1 9294 11 11 54 11 13 02 =0549+192 00 53 01 23.7 87.2 -5.0 -44.9 60 F 2 10198 11 13 10 UORI 00 53 09 24.3 86.4 -5.0 -45.2 1 1 1 10198 11 13 02 11 14 10 --- 00 54 09 24.5 86.6 -5.0 -45.2 60 F 2 11103 11 14 18 J0552+1913 00 54 17 23.9 87.4 -5.0 -44.9 1 1 1 11103 11 14 10 11 15 18 =0549+192 00 55 17 24.1 87.6 -5.0 -44.9 60 F 2 12008 11 15 26 UORI 00 55 25 24.7 86.8 -5.0 -45.2 1 1 1 12008 11 15 18 11 16 26 --- 00 56 25 24.9 87.0 -5.0 -45.2 60 F 2 12914 11 16 34 J0552+1913 00 56 33 24.3 87.8 -5.0 -44.9 1 1 1 12914 11 16 26 11 17 34 =0549+192 00 57 33 24.4 88.0 -5.0 -44.9 60 F 2 13820 11 17 42 UORI 00 57 41 25.1 87.2 -5.0 -45.3 1 1 1 13820 11 17 34 11 18 42 --- 00 58 42 25.2 87.4 -5.0 -45.3 60 F 2 14726 11 18 50 J0552+1913 00 58 50 24.7 88.2 -4.9 -45.0 1 1 1 14726 11 18 42 11 19 50 =0549+192 00 59 50 24.8 88.4 -4.9 -45.0 60 F 2 15632 11 19 58 UORI 00 59 58 25.4 87.6 -4.9 -45.3 1 1 1 15632 11 19 50 11 20 58 --- 01 00 58 25.6 87.8 -4.9 -45.3 60 F 2 16539 11 21 06 J0552+1913 01 01 06 25.0 88.6 -4.9 -45.0 1 1 1 16539 11 20 58 11 22 06 =0549+192 01 02 06 25.2 88.8 -4.9 -45.0 60 F 2 17447 Schedule for VLBA_BR (Code Br ) Page 6 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 11 22 14 UORI 01 02 14 25.8 88.0 -4.9 -45.3 1 1 2 17447 11 22 06 11 23 14 --- 01 03 14 26.0 88.2 -4.9 -45.3 60 R 2 16539 11 23 22 J0552+1913 01 03 23 25.4 89.1 -4.9 -45.0 1 1 2 16539 11 23 14 11 24 22 =0549+192 01 04 23 25.6 89.3 -4.9 -45.0 60 R 2 15631 11 24 30 UORI 01 04 31 26.2 88.5 -4.9 -45.3 1 1 2 15631 11 24 22 11 25 30 --- 01 05 31 26.4 88.6 -4.8 -45.3 60 R 2 14722 11 25 38 J0552+1913 01 05 39 25.8 89.5 -4.8 -45.0 1 1 2 14722 11 25 30 11 26 38 =0549+192 01 06 39 26.0 89.7 -4.8 -45.0 60 R 2 13813 11 26 46 UORI 01 06 48 26.6 88.9 -4.8 -45.3 1 1 2 13813 11 26 38 11 27 46 --- 01 07 48 26.7 89.1 -4.8 -45.3 60 R 2 12904 11 27 55 J0552+1913 01 07 56 26.2 89.9 -4.8 -45.0 1 1 2 12904 11 27 46 11 28 55 =0549+192 01 08 56 26.3 90.1 -4.8 -45.0 60 R 2 11994 11 29 03 UORI 01 09 05 27.0 89.3 -4.8 -45.3 1 1 2 11994 11 28 55 11 30 03 --- 01 10 05 27.1 89.5 -4.8 -45.3 60 R 2 11084 11 32 03 J0552+1913 01 12 05 26.9 90.7 -4.7 -45.0 113 1 2 11084 11 32 03 11 33 03 =0549+192 01 13 05 27.0 90.9 -4.7 -45.0 60 R 2 10284 11 33 11 UORI 01 13 14 27.7 90.1 -4.7 -45.3 1 1 2 10284 11 33 03 11 34 11 --- 01 14 14 27.8 90.3 -4.7 -45.3 60 R 2 9372 11 34 20 J0552+1913 01 14 22 27.3 91.1 -4.7 -45.0 1 1 2 9372 11 34 11 11 34 50 =0549+192 01 14 52 27.3 91.2 -4.7 -45.0 30 R 2 8859 11 34 58 UORI 01 15 01 28.0 90.4 -4.7 -45.3 1 1 2 8859 11 34 50 11 35 28 --- 01 15 31 28.0 90.5 -4.7 -45.3 30 R 2 8346 11 35 37 J0552+1913 01 15 39 27.5 91.4 -4.7 -45.0 1 1 2 8346 11 35 28 11 36 07 =0549+192 01 16 10 27.6 91.5 -4.7 -45.0 30 R 2 7832 11 36 15 UORI 01 16 18 28.2 90.6 -4.7 -45.3 1 1 2 7832 11 36 07 11 36 45 --- 01 16 48 28.2 90.7 -4.7 -45.3 30 R 2 7319 11 36 54 J0552+1913 01 16 57 27.7 91.6 -4.6 -45.0 1 1 2 7319 11 36 45 11 37 24 =0549+192 01 17 27 27.8 91.7 -4.6 -45.0 30 R 2 6805 Schedule for VLBA_BR (Code Br ) Page 7 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 11 37 33 UORI 01 17 35 28.4 90.9 -4.6 -45.3 1 1 2 6805 11 37 24 11 38 03 --- 01 18 06 28.5 91.0 -4.6 -45.3 30 R 2 6290 11 38 11 J0552+1913 01 18 14 27.9 91.8 -4.6 -45.0 1 1 2 6290 11 38 03 11 38 41 =0549+192 01 18 44 28.0 91.9 -4.6 -45.0 30 R 2 5776 11 38 50 UORI 01 18 53 28.6 91.1 -4.6 -45.3 1 1 2 5776 11 38 41 11 39 20 --- 01 19 23 28.7 91.2 -4.6 -45.3 30 R 2 5260 11 39 28 J0552+1913 01 19 32 28.1 92.1 -4.6 -44.9 2 1 2 5260 11 39 20 11 39 58 =0549+192 01 20 02 28.2 92.2 -4.6 -44.9 30 R 2 4745 11 40 07 UORI 01 20 10 28.8 91.4 -4.6 -45.3 1 1 2 4745 11 39 58 11 40 37 --- 01 20 41 28.9 91.5 -4.6 -45.3 30 R 2 4229 11 40 46 J0552+1913 01 20 49 28.3 92.3 -4.6 -44.9 2 1 2 4229 11 40 37 11 41 16 =0549+192 01 21 19 28.4 92.4 -4.6 -44.9 30 R 2 3713 11 41 25 UORI 01 21 28 29.0 91.6 -4.6 -45.3 2 1 2 3713 11 41 16 11 41 55 --- 01 21 58 29.1 91.7 -4.6 -45.3 30 R 2 3196 11 42 03 J0552+1913 01 22 07 28.5 92.6 -4.6 -44.9 2 1 2 3196 11 41 55 11 42 33 =0549+192 01 22 37 28.6 92.7 -4.5 -44.9 30 R 2 2679 11 42 42 UORI 01 22 46 29.2 91.9 -4.6 -45.3 2 1 2 2679 11 42 33 11 43 12 --- 01 23 16 29.3 92.0 -4.5 -45.3 30 R 2 2161 11 43 21 J0552+1913 01 23 25 28.8 92.8 -4.5 -44.9 2 1 2 2161 11 43 12 11 43 51 =0549+192 01 23 55 28.8 92.9 -4.5 -44.9 30 R 2 1644 11 44 00 UORI 01 24 04 29.5 92.1 -4.5 -45.3 2 1 2 1644 11 43 51 11 44 30 --- 01 24 34 29.5 92.2 -4.5 -45.3 30 R 2 1125 11 44 39 J0552+1913 01 24 43 29.0 93.1 -4.5 -44.9 2 1 2 1125 11 44 30 11 45 09 =0549+192 01 25 13 29.1 93.2 -4.5 -44.9 30 R 2 606 11 45 18 UORI 01 25 22 29.7 92.4 -4.5 -45.3 2 1 2 606 11 45 09 11 45 48 --- 01 25 52 29.8 92.4 -4.5 -45.3 30 R 2 87 11 45 57 J0552+1913 01 26 01 29.2 93.3 -4.5 -44.9 2 1 3 87 11 45 48 11 46 27 =0549+192 01 26 31 29.3 93.4 -4.5 -44.9 30 F 1 607 Schedule for VLBA_BR (Code Br ) Page 8 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 11 46 36 UORI 01 26 40 29.9 92.6 -4.5 -45.3 2 1 3 607 11 46 27 11 47 06 --- 01 27 10 30.0 92.7 -4.5 -45.3 30 F 1 1127 11 47 15 J0552+1913 01 27 19 29.4 93.6 -4.5 -44.9 2 1 3 1127 11 47 06 11 47 45 =0549+192 01 27 49 29.5 93.7 -4.5 -44.9 30 F 1 1647 11 47 54 UORI 01 27 59 30.1 92.8 -4.5 -45.2 2 1 3 1647 11 47 45 11 48 24 --- 01 28 29 30.2 92.9 -4.5 -45.2 30 F 1 2169 11 48 33 J0552+1913 01 28 38 29.6 93.8 -4.4 -44.9 2 1 3 2169 11 48 24 11 49 03 =0549+192 01 29 08 29.7 93.9 -4.4 -44.8 30 F 1 2690 11 49 12 UORI 01 29 17 30.3 93.1 -4.4 -45.2 2 1 3 2690 11 49 03 11 49 42 --- 01 29 47 30.4 93.2 -4.4 -45.2 30 F 1 3213 11 49 51 J0552+1913 01 29 56 29.8 94.1 -4.4 -44.8 2 1 3 3213 11 49 42 11 50 21 =0549+192 01 30 26 29.9 94.2 -4.4 -44.8 30 F 1 3736 11 50 31 UORI 01 30 36 30.5 93.4 -4.4 -45.2 2 1 3 3736 11 50 21 11 51 01 --- 01 31 06 30.6 93.4 -4.4 -45.2 30 F 1 4259 11 51 10 J0552+1913 01 31 15 30.1 94.3 -4.4 -44.8 2 1 3 4259 11 51 01 11 51 40 =0549+192 01 31 45 30.2 94.4 -4.4 -44.8 30 F 1 4783 11 51 49 UORI 01 31 55 30.8 93.6 -4.4 -45.2 2 1 3 4783 11 51 40 11 52 19 --- 01 32 25 30.9 93.7 -4.4 -45.2 30 F 1 5308 11 52 29 J0552+1913 01 32 34 30.3 94.6 -4.4 -44.8 2 1 3 5308 11 52 19 11 52 59 =0549+192 01 33 04 30.4 94.7 -4.4 -44.8 30 F 1 5833 11 53 08 UORI 01 33 14 31.0 93.9 -4.4 -45.2 2 1 3 5833 11 52 59 11 53 38 --- 01 33 44 31.1 94.0 -4.4 -45.2 30 F 1 6359 11 53 48 J0552+1913 01 33 53 30.5 94.8 -4.4 -44.8 2 1 3 6359 11 53 38 11 54 18 =0549+192 01 34 23 30.6 94.9 -4.4 -44.8 30 F 1 6885 11 54 27 UORI 01 34 33 31.2 94.1 -4.4 -45.2 2 1 3 6885 11 54 18 11 54 57 --- 01 35 03 31.3 94.2 -4.3 -45.2 30 F 1 7412 11 55 07 J0552+1913 01 35 13 30.7 95.1 -4.3 -44.8 2 1 3 7412 11 54 57 11 55 37 =0549+192 01 35 43 30.8 95.2 -4.3 -44.7 30 F 1 7940 Schedule for VLBA_BR (Code Br ) Page 9 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 11 55 46 UORI 01 35 52 31.4 94.4 -4.3 -45.2 2 1 3 7940 11 55 37 11 56 16 --- 01 36 22 31.5 94.5 -4.3 -45.1 30 F 1 8469 11 56 26 J0552+1913 01 36 32 30.9 95.4 -4.3 -44.7 3 1 3 8469 11 56 16 11 56 56 =0549+192 01 37 02 31.0 95.5 -4.3 -44.7 30 F 1 8998 11 57 06 UORI 01 37 12 31.6 94.6 -4.3 -45.1 3 1 3 8998 11 56 56 11 57 36 --- 01 37 42 31.7 94.7 -4.3 -45.1 30 F 1 9528 11 57 46 J0552+1913 01 37 52 31.2 95.6 -4.3 -44.7 3 1 3 9528 11 57 36 11 58 16 =0549+192 01 38 22 31.2 95.7 -4.3 -44.7 30 F 1 10058 11 58 26 UORI 01 38 32 31.9 94.9 -4.3 -45.1 3 1 3 10058 11 58 16 11 58 56 --- 01 39 02 32.0 95.0 -4.3 -45.1 30 F 1 10590 11 59 05 J0552+1913 01 39 12 31.4 95.9 -4.3 -44.7 3 1 3 10590 11 58 56 11 59 35 =0549+192 01 39 42 31.5 96.0 -4.3 -44.7 30 F 1 11122 11 59 45 UORI 01 39 52 32.1 95.1 -4.3 -45.1 3 1 3 11122 11 59 35 12 00 15 --- 01 40 22 32.2 95.2 -4.3 -45.1 30 F 1 11656 12 00 25 J0552+1913 01 40 32 31.6 96.1 -4.2 -44.7 3 1 3 11656 12 00 15 12 00 55 =0549+192 01 41 02 31.7 96.2 -4.2 -44.6 30 F 1 12190 12 01 06 UORI 01 41 12 32.3 95.4 -4.2 -45.1 3 1 3 12190 12 00 55 12 01 36 --- 01 41 42 32.4 95.5 -4.2 -45.1 30 F 1 12725 12 01 46 J0552+1913 01 41 53 31.8 96.4 -4.2 -44.6 3 1 3 12725 12 01 36 12 02 16 =0549+192 01 42 23 31.9 96.5 -4.2 -44.6 30 F 1 13261 12 02 26 UORI 01 42 33 32.5 95.7 -4.2 -45.0 3 1 3 13261 12 02 16 12 02 56 --- 01 43 03 32.6 95.8 -4.2 -45.0 30 F 1 13798 12 03 06 J0552+1913 01 43 14 32.1 96.7 -4.2 -44.6 3 1 3 13798 12 02 56 12 03 36 =0549+192 01 43 44 32.1 96.8 -4.2 -44.6 30 F 1 14335 12 03 47 UORI 01 43 54 32.8 95.9 -4.2 -45.0 3 1 3 14335 12 03 36 12 04 17 --- 01 44 24 32.8 96.0 -4.2 -45.0 30 F 1 14875 12 04 27 J0552+1913 01 44 35 32.3 96.9 -4.2 -44.6 3 1 3 14875 12 04 17 12 04 57 =0549+192 01 45 05 32.4 97.0 -4.2 -44.6 30 F 1 15414 Schedule for VLBA_BR (Code Br ) Page 10 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 12 05 08 UORI 01 45 15 33.0 96.2 -4.2 -45.0 3 1 3 15414 12 04 57 12 05 38 --- 01 45 45 33.1 96.3 -4.2 -45.0 30 F 1 15956 12 05 49 J0552+1913 01 45 56 32.5 97.2 -4.2 -44.5 3 1 3 15956 12 05 38 12 06 19 =0549+192 01 46 26 32.6 97.3 -4.2 -44.5 30 F 1 16498 12 06 29 UORI 01 46 37 33.2 96.5 -4.2 -45.0 4 1 3 16498 12 06 19 12 06 59 --- 01 47 07 33.3 96.6 -4.1 -44.9 30 F 1 17042 12 07 10 J0552+1913 01 47 18 32.7 97.5 -4.1 -44.5 4 1 3 17042 12 06 59 12 07 40 =0549+192 01 47 48 32.8 97.6 -4.1 -44.5 30 F 1 17586 12 07 51 UORI 01 47 59 33.4 96.7 -4.1 -44.9 4 1 4 17586 12 07 40 12 08 21 --- 01 48 29 33.5 96.8 -4.1 -44.9 30 R 1 17039 12 08 32 J0552+1913 01 48 40 33.0 97.8 -4.1 -44.5 4 1 4 17039 12 08 21 12 09 02 =0549+192 01 49 10 33.0 97.9 -4.1 -44.4 30 R 1 16493 12 09 13 UORI 01 49 22 33.7 97.0 -4.1 -44.9 4 1 4 16493 12 09 02 12 09 43 --- 01 49 52 33.7 97.1 -4.1 -44.9 30 R 1 15943 12 09 55 J0552+1913 01 50 03 33.2 98.0 -4.1 -44.4 4 1 4 15943 12 09 43 12 10 25 =0549+192 01 50 33 33.3 98.1 -4.1 -44.4 30 R 1 15394 12 10 36 UORI 01 50 44 33.9 97.3 -4.1 -44.9 4 1 4 15394 12 10 25 12 11 06 --- 01 51 14 34.0 97.4 -4.1 -44.8 30 R 1 14841 12 11 17 J0552+1913 01 51 26 33.4 98.3 -4.1 -44.4 4 1 4 14841 12 11 06 12 11 47 =0549+192 01 51 56 33.5 98.4 -4.1 -44.4 30 R 1 14289 12 11 59 UORI 01 52 08 34.1 97.6 -4.1 -44.8 4 1 4 14289 12 11 47 12 12 29 --- 01 52 38 34.2 97.7 -4.1 -44.8 30 R 1 13733 12 12 41 J0552+1913 01 52 49 33.6 98.6 -4.0 -44.3 5 1 4 13733 12 12 29 12 13 11 =0549+192 01 53 20 33.7 98.7 -4.0 -44.3 30 R 1 13178 12 13 23 UORI 01 53 32 34.4 97.9 -4.0 -44.8 5 1 4 13178 12 13 11 12 13 53 --- 01 54 02 34.4 98.0 -4.0 -44.8 30 R 1 12618 12 14 05 J0552+1913 01 54 14 33.9 98.9 -4.0 -44.3 5 1 4 12618 12 13 53 12 14 35 =0549+192 01 54 44 34.0 99.0 -4.0 -44.3 30 R 1 12060 Schedule for VLBA_BR (Code Br ) Page 11 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 12 14 47 UORI 01 54 56 34.6 98.1 -4.0 -44.7 5 1 4 12060 12 14 35 12 15 17 --- 01 55 26 34.7 98.2 -4.0 -44.7 30 R 1 11496 12 15 29 J0552+1913 01 55 38 34.1 99.2 -4.0 -44.3 5 1 4 11496 12 15 17 12 15 59 =0549+192 01 56 08 34.2 99.3 -4.0 -44.2 30 R 1 10934 12 16 12 UORI 01 56 21 34.8 98.4 -4.0 -44.7 5 1 4 10934 12 15 59 12 16 42 --- 01 56 51 34.9 98.5 -4.0 -44.7 30 R 1 10366 12 16 54 J0552+1913 01 57 03 34.3 99.5 -4.0 -44.2 5 1 4 10366 12 16 42 12 17 24 =0549+192 01 57 34 34.4 99.6 -4.0 -44.2 30 R 1 9801 12 17 37 UORI 01 57 47 35.1 98.7 -4.0 -44.7 6 1 4 9801 12 17 24 12 18 07 --- 01 58 17 35.1 98.8 -4.0 -44.6 30 R 1 9228 12 18 20 J0552+1913 01 58 29 34.6 99.8 -4.0 -44.2 6 1 4 9228 12 18 07 12 18 50 =0549+192 01 58 59 34.7 99.9 -3.9 -44.1 30 R 1 8659 12 19 03 UORI 01 59 13 35.3 99.0 -3.9 -44.6 6 1 4 8659 12 18 50 12 19 33 --- 01 59 43 35.4 99.1 -3.9 -44.6 30 R 1 8082 12 19 46 J0552+1913 01 59 56 34.8 100.1 -3.9 -44.1 6 1 4 8082 12 19 33 12 20 16 =0549+192 02 00 26 34.9 100.2 -3.9 -44.1 30 R 1 7508 12 20 30 UORI 02 00 40 35.5 99.3 -3.9 -44.6 6 1 4 7508 12 20 16 12 21 00 --- 02 01 10 35.6 99.4 -3.9 -44.5 30 R 1 6926 12 21 13 J0552+1913 02 01 23 35.1 100.4 -3.9 -44.1 6 1 4 6926 12 21 00 12 21 43 =0549+192 02 01 53 35.1 100.5 -3.9 -44.0 30 R 1 6348 12 21 57 UORI 02 02 07 35.8 99.6 -3.9 -44.5 7 1 4 6348 12 21 43 12 22 27 --- 02 02 37 35.9 99.7 -3.9 -44.5 30 R 1 5761 12 22 41 J0552+1913 02 02 51 35.3 100.7 -3.9 -44.0 6 1 4 5761 12 22 27 12 23 11 =0549+192 02 03 21 35.4 100.8 -3.9 -44.0 30 R 1 5179 12 23 25 UORI 02 03 36 36.0 99.9 -3.9 -44.5 7 1 4 5179 12 23 11 12 23 55 --- 02 04 06 36.1 100.0 -3.9 -44.4 30 R 1 4587 12 24 09 J0552+1913 02 04 19 35.5 101.0 -3.9 -43.9 7 1 4 4587 12 23 55 12 24 39 =0549+192 02 04 50 35.6 101.1 -3.8 -43.9 30 R 1 4003 Schedule for VLBA_BR (Code Br ) Page 12 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 12 24 54 UORI 02 05 04 36.3 100.2 -3.8 -44.4 7 1 4 4003 12 24 39 12 25 24 --- 02 05 34 36.3 100.3 -3.8 -44.4 30 R 1 3407 12 25 38 J0552+1913 02 05 48 35.8 101.3 -3.8 -43.9 7 1 4 3407 12 25 24 12 26 08 =0549+192 02 06 18 35.9 101.4 -3.8 -43.9 30 R 1 2821 12 26 22 UORI 02 06 33 36.5 100.5 -3.8 -44.4 8 1 4 2821 12 26 08 12 26 52 --- 02 07 03 36.6 100.6 -3.8 -44.3 30 R 1 2222 12 27 06 J0552+1913 02 07 17 36.0 101.6 -3.8 -43.8 7 1 4 2222 12 26 52 12 27 36 =0549+192 02 07 47 36.1 101.7 -3.8 -43.8 30 R 1 1638 12 27 51 UORI 02 08 02 36.7 100.8 -3.8 -44.3 8 1 4 1638 12 27 36 12 28 21 --- 02 08 32 36.8 100.9 -3.8 -44.3 30 R 1 1041 12 28 34 J0552+1913 02 08 46 36.3 101.9 -3.8 -43.8 6 1 4 1041 12 28 21 12 29 04 =0549+192 02 09 16 36.3 102.0 -3.8 -43.7 30 R 1 462 12 29 19 UORI 02 09 30 37.0 101.1 -3.8 -44.2 7 1 3 462 12 29 04 12 29 49 --- 02 10 00 37.1 101.3 -3.8 -44.2 30 F 2 129 12 30 01 J0552+1913 02 10 13 36.5 102.2 -3.8 -43.7 5 1 3 129 12 29 49 12 30 31 =0549+192 02 10 43 36.6 102.3 -3.7 -43.7 30 F 2 694 12 30 44 UORI 02 10 56 37.2 101.5 -3.8 -44.2 6 1 3 694 12 30 31 12 31 14 --- 02 11 26 37.3 101.6 -3.7 -44.2 30 F 2 1271 12 31 25 J0552+1913 02 11 37 36.7 102.5 -3.7 -43.6 4 1 3 1271 12 31 14 12 31 55 =0549+192 02 12 07 36.8 102.6 -3.7 -43.6 30 F 2 1815 12 32 07 UORI 02 12 18 37.4 101.7 -3.7 -44.1 4 1 3 1815 12 31 55 12 32 37 --- 02 12 49 37.5 101.8 -3.7 -44.1 30 F 2 2366 12 32 45 J0552+1913 02 12 57 36.9 102.8 -3.7 -43.6 1 1 3 2366 12 32 37 12 33 15 =0549+192 02 13 27 37.0 102.9 -3.7 -43.6 30 F 2 2881 12 33 24 UORI 02 13 36 37.7 102.0 -3.7 -44.1 1 1 3 2881 12 33 15 12 33 54 --- 02 14 06 37.7 102.1 -3.7 -44.0 30 F 2 3397 12 34 02 J0552+1913 02 14 14 37.2 103.1 -3.7 -43.5 1 1 3 3397 12 33 54 12 34 32 =0549+192 02 14 44 37.2 103.2 -3.7 -43.5 30 F 2 3902 Schedule for VLBA_BR (Code Br ) Page 13 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 12 34 40 UORI 02 14 52 37.9 102.3 -3.7 -44.0 1 1 3 3902 12 34 32 12 35 10 --- 02 15 22 37.9 102.4 -3.7 -44.0 30 F 2 4408 12 35 19 J0552+1913 02 15 31 37.4 103.3 -3.7 -43.5 2 1 3 4408 12 35 10 12 35 49 =0549+192 02 16 01 37.4 103.5 -3.7 -43.4 30 F 2 4929 12 35 58 UORI 02 16 10 38.1 102.6 -3.7 -43.9 2 1 3 4929 12 35 49 12 36 28 --- 02 16 41 38.2 102.7 -3.7 -43.9 30 F 2 5451 12 36 40 J0552+1913 02 16 53 37.6 103.6 -3.6 -43.4 5 1 3 5451 12 36 28 12 37 10 =0549+192 02 17 23 37.7 103.7 -3.6 -43.4 30 F 2 6015 12 37 22 UORI 02 17 35 38.3 102.9 -3.6 -43.9 5 1 3 6015 12 37 10 12 37 52 --- 02 18 05 38.4 103.0 -3.6 -43.9 30 F 2 6572 12 38 07 J0552+1913 02 18 20 37.8 104.0 -3.6 -43.3 8 1 3 6572 12 37 52 12 38 37 =0549+192 02 18 50 37.9 104.1 -3.6 -43.3 30 F 2 7170 12 38 51 UORI 02 19 04 38.5 103.2 -3.6 -43.8 7 1 3 7170 12 38 37 12 39 21 --- 02 19 34 38.6 103.3 -3.6 -43.8 30 F 2 7755 12 39 37 J0552+1913 02 19 50 38.1 104.3 -3.6 -43.2 9 1 3 7755 12 39 21 12 40 07 =0549+192 02 20 20 38.1 104.4 -3.6 -43.2 30 F 2 8373 12 40 22 UORI 02 20 35 38.8 103.5 -3.6 -43.7 8 1 3 8373 12 40 07 12 40 52 --- 02 21 06 38.9 103.6 -3.6 -43.7 30 F 2 8975 12 41 09 J0552+1913 02 21 23 38.3 104.6 -3.6 -43.2 10 1 3 8975 12 40 52 12 41 39 =0549+192 02 21 53 38.4 104.7 -3.6 -43.1 30 F 2 9602 12 41 55 UORI 02 22 08 39.0 103.9 -3.6 -43.7 8 1 3 9602 12 41 39 12 42 25 --- 02 22 39 39.1 104.0 -3.6 -43.6 30 F 2 10211 12 42 42 J0552+1913 02 22 56 38.6 105.0 -3.5 -43.1 10 1 3 10211 12 42 25 12 43 12 =0549+192 02 23 26 38.6 105.1 -3.5 -43.0 30 F 2 10839 12 43 28 UORI 02 23 41 39.3 104.2 -3.5 -43.6 8 1 3 10839 12 43 12 12 43 58 --- 02 24 12 39.4 104.3 -3.5 -43.6 30 F 2 11448 12 44 14 J0552+1913 02 24 28 38.8 105.3 -3.5 -43.0 10 1 3 11448 12 43 58 12 44 44 =0549+192 02 24 58 38.9 105.4 -3.5 -43.0 30 F 2 12071 Schedule for VLBA_BR (Code Br ) Page 14 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 12 45 00 UORI 02 25 14 39.5 104.5 -3.5 -43.5 8 1 3 12071 12 44 44 12 45 30 --- 02 25 44 39.6 104.6 -3.5 -43.5 30 F 2 12678 12 45 46 J0552+1913 02 26 00 39.1 105.6 -3.5 -42.9 9 1 3 12678 12 45 30 12 46 16 =0549+192 02 26 30 39.1 105.8 -3.5 -42.9 30 F 2 13294 12 46 31 UORI 02 26 46 39.8 104.9 -3.5 -43.4 8 1 3 13294 12 46 16 12 47 01 --- 02 27 16 39.9 105.0 -3.5 -43.4 30 F 2 13895 12 47 17 J0552+1913 02 27 31 39.3 106.0 -3.5 -42.8 8 1 3 13895 12 47 01 12 47 47 =0549+192 02 28 01 39.4 106.1 -3.5 -42.8 30 F 2 14504 12 48 02 UORI 02 28 16 40.0 105.2 -3.5 -43.3 7 1 3 14504 12 47 47 12 48 32 --- 02 28 46 40.1 105.3 -3.5 -43.3 30 F 2 15099 12 48 47 J0552+1913 02 29 01 39.5 106.3 -3.4 -42.7 8 1 3 15099 12 48 32 12 49 17 =0549+192 02 29 31 39.6 106.4 -3.4 -42.7 30 F 2 15700 12 49 31 UORI 02 29 46 40.3 105.5 -3.4 -43.2 7 1 3 15700 12 49 17 12 50 01 --- 02 30 16 40.4 105.7 -3.4 -43.2 30 F 2 16289 12 50 15 J0552+1913 02 30 30 39.8 106.6 -3.4 -42.6 7 1 3 16289 12 50 01 12 50 45 =0549+192 02 31 00 39.9 106.8 -3.4 -42.6 30 F 2 16883 12 50 59 UORI 02 31 14 40.5 105.9 -3.4 -43.2 6 1 3 16883 12 50 45 12 51 29 --- 02 31 44 40.6 106.0 -3.4 -43.1 30 F 2 17466 12 51 43 J0552+1913 02 31 58 40.0 107.0 -3.4 -42.5 7 1 4 17466 12 51 29 12 52 13 =0549+192 02 32 28 40.1 107.1 -3.4 -42.5 30 R 2 16880 12 52 26 UORI 02 32 42 40.7 106.2 -3.4 -43.1 6 1 4 16880 12 52 13 12 52 56 --- 02 33 12 40.8 106.3 -3.4 -43.0 30 R 2 16302 12 53 10 J0552+1913 02 33 25 40.2 107.3 -3.4 -42.4 6 1 4 16302 12 52 56 12 53 40 =0549+192 02 33 55 40.3 107.4 -3.4 -42.4 30 R 2 15721 12 53 53 UORI 02 34 08 41.0 106.5 -3.4 -43.0 6 1 4 15721 12 53 40 12 54 23 --- 02 34 38 41.1 106.6 -3.4 -42.9 30 R 2 15148 12 54 23 J0555+3948 02 34 38 53.0 83.5 -3.4 -59.7 -30 1 4 15148 12 54 23 12 59 23 =0552+398 02 39 39 53.8 84.3 -3.3 -59.8 270 R 2 11148 Schedule for VLBA_BR (Code Br ) Page 15 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 13 00 12 J0552+1913 02 40 29 41.4 108.9 -3.3 -42.0 18 1 4 11148 13 00 12 13 01 12 =0549+192 02 41 29 41.5 109.2 -3.2 -41.9 60 R 2 10348 13 01 23 UORI 02 41 40 42.2 108.3 -3.2 -42.5 4 1 4 10348 13 01 12 13 02 23 --- 02 42 40 42.3 108.5 -3.2 -42.4 60 R 2 9396 13 02 35 J0552+1913 02 42 52 41.7 109.5 -3.2 -41.8 4 1 4 9396 13 02 23 13 03 35 =0549+192 02 43 52 41.9 109.7 -3.2 -41.7 60 R 2 8445 13 03 46 UORI 02 44 03 42.6 108.8 -3.2 -42.3 4 1 4 8445 13 03 35 13 04 46 --- 02 45 03 42.7 109.1 -3.2 -42.2 60 R 2 7499 13 04 57 J0552+1913 02 45 14 42.1 110.1 -3.2 -41.6 4 1 4 7499 13 04 46 13 05 57 =0549+192 02 46 14 42.3 110.3 -3.2 -41.5 60 R 2 6553 13 06 07 UORI 02 46 25 42.9 109.4 -3.2 -42.1 3 1 4 6553 13 05 57 13 07 07 --- 02 47 25 43.1 109.6 -3.1 -42.0 60 R 2 5610 13 07 18 J0552+1913 02 47 36 42.5 110.6 -3.1 -41.4 3 1 4 5610 13 07 07 13 08 18 =0549+192 02 48 36 42.6 110.9 -3.1 -41.3 60 R 2 4669 13 08 28 UORI 02 48 46 43.3 109.9 -3.1 -41.9 3 1 4 4669 13 08 18 13 09 28 --- 02 49 46 43.5 110.2 -3.1 -41.9 60 R 2 3730 13 09 39 J0552+1913 02 49 57 42.8 111.2 -3.1 -41.2 3 1 4 3730 13 09 28 13 10 39 =0549+192 02 50 57 43.0 111.4 -3.1 -41.1 60 R 2 2793 13 10 49 UORI 02 51 07 43.7 110.5 -3.1 -41.8 3 1 4 2793 13 10 39 13 11 49 --- 02 52 07 43.8 110.8 -3.1 -41.7 60 R 2 1858 13 11 59 J0552+1913 02 52 17 43.2 111.8 -3.1 -41.0 3 1 4 1858 13 11 49 13 12 59 =0549+192 02 53 18 43.4 112.0 -3.0 -40.9 60 R 2 923 13 13 09 UORI 02 53 27 44.0 111.1 -3.0 -41.6 3 1 4 923 13 12 59 13 14 09 --- 02 54 28 44.2 111.3 -3.0 -41.5 60 R 2 -8 13 14 19 J0552+1913 02 54 37 43.6 112.3 -3.0 -40.8 3 1 5 -8 13 14 09 13 15 19 =0549+192 02 55 38 43.7 112.6 -3.0 -40.7 60 F 1 923 13 15 28 UORI 02 55 47 44.4 111.7 -3.0 -41.4 2 1 5 923 13 15 19 13 16 28 --- 02 56 48 44.5 111.9 -3.0 -41.3 60 F 1 1852 Schedule for VLBA_BR (Code Br ) Page 16 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 13 16 38 J0552+1913 02 56 57 43.9 112.9 -3.0 -40.6 2 1 5 1852 13 16 28 13 17 38 =0549+192 02 57 57 44.1 113.2 -3.0 -40.5 60 F 1 2780 13 17 47 UORI 02 58 07 44.7 112.2 -3.0 -41.2 2 1 5 2780 13 17 38 13 18 47 --- 02 59 07 44.9 112.5 -2.9 -41.1 60 F 1 3707 13 18 57 J0552+1913 02 59 17 44.3 113.5 -2.9 -40.4 2 1 5 3707 13 18 47 13 19 57 =0549+192 03 00 17 44.4 113.7 -2.9 -40.3 60 F 1 4633 13 20 06 UORI 03 00 26 45.1 112.8 -2.9 -41.0 2 1 5 4633 13 19 57 13 21 06 --- 03 01 26 45.3 113.1 -2.9 -40.9 60 F 1 5557 13 21 16 J0552+1913 03 01 36 44.6 114.1 -2.9 -40.2 2 1 5 5557 13 21 06 13 22 16 =0549+192 03 02 36 44.8 114.3 -2.9 -40.1 60 F 1 6481 13 22 25 UORI 03 02 45 45.5 113.4 -2.9 -40.7 2 1 5 6481 13 22 16 13 23 25 --- 03 03 45 45.6 113.6 -2.9 -40.6 60 F 1 7404 13 23 34 J0552+1913 03 03 54 45.0 114.7 -2.9 -40.0 2 1 5 7404 13 23 25 13 24 34 =0549+192 03 04 54 45.1 114.9 -2.8 -39.9 60 F 1 8325 13 24 43 UORI 03 05 03 45.8 114.0 -2.8 -40.5 2 1 5 8325 13 24 34 13 25 43 --- 03 06 04 46.0 114.2 -2.8 -40.4 60 F 1 9246 13 25 52 J0552+1913 03 06 13 45.3 115.3 -2.8 -39.7 2 1 5 9246 13 25 43 13 26 52 =0549+192 03 07 13 45.5 115.5 -2.8 -39.6 60 F 1 10166 13 27 01 UORI 03 07 22 46.2 114.6 -2.8 -40.3 2 1 5 10166 13 26 52 13 28 01 --- 03 08 22 46.3 114.8 -2.8 -40.2 60 F 1 11085 13 28 10 J0552+1913 03 08 31 45.7 115.9 -2.8 -39.5 2 1 5 11085 13 28 01 13 29 10 =0549+192 03 09 31 45.8 116.1 -2.8 -39.4 60 F 1 12003 13 29 18 UORI 03 09 40 46.5 115.2 -2.8 -40.1 1 1 5 12003 13 29 10 13 30 18 --- 03 10 40 46.7 115.4 -2.8 -40.0 60 F 1 12920 13 30 27 J0552+1913 03 10 49 46.0 116.5 -2.7 -39.3 1 1 5 12920 13 30 18 13 31 27 =0549+192 03 11 49 46.2 116.7 -2.7 -39.2 60 F 1 13837 13 31 36 UORI 03 11 58 46.9 115.8 -2.7 -39.8 1 1 5 13837 13 31 27 13 32 36 --- 03 12 58 47.0 116.0 -2.7 -39.7 60 F 1 14753 Schedule for VLBA_BR (Code Br ) Page 17 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 13 32 45 J0552+1913 03 13 06 46.4 117.1 -2.7 -39.0 1 1 5 14753 13 32 36 13 33 45 =0549+192 03 14 07 46.5 117.3 -2.7 -38.9 60 F 1 15668 13 33 53 UORI 03 14 15 47.2 116.4 -2.7 -39.6 1 1 5 15668 13 33 45 13 34 53 --- 03 15 15 47.4 116.7 -2.7 -39.5 60 F 1 16583 13 35 02 J0552+1913 03 15 24 46.7 117.7 -2.7 -38.8 1 1 5 16583 13 34 53 13 36 02 =0549+192 03 16 24 46.9 117.9 -2.7 -38.6 60 F 1 17497 13 36 10 UORI 03 16 33 47.5 117.0 -2.7 -39.3 1 1 6 17497 13 36 02 13 37 10 --- 03 17 33 47.7 117.3 -2.6 -39.2 60 R 1 16583 13 37 19 J0552+1913 03 17 41 47.0 118.3 -2.6 -38.5 1 1 6 16583 13 37 10 13 38 19 =0549+192 03 18 41 47.2 118.6 -2.6 -38.4 60 R 1 15671 13 38 27 UORI 03 18 50 47.9 117.6 -2.6 -39.1 1 1 6 15671 13 38 19 13 39 27 --- 03 19 50 48.0 117.9 -2.6 -38.9 60 R 1 14759 13 39 35 J0552+1913 03 19 58 47.4 118.9 -2.6 -38.2 1 1 6 14759 13 39 27 13 40 35 =0549+192 03 20 59 47.5 119.2 -2.6 -38.1 60 R 1 13847 13 40 44 UORI 03 21 07 48.2 118.2 -2.6 -38.8 1 1 6 13847 13 40 35 13 41 44 --- 03 22 07 48.4 118.5 -2.6 -38.7 60 R 1 12936 13 41 52 J0552+1913 03 22 15 47.7 119.5 -2.6 -37.9 1 1 6 12936 13 41 44 13 42 52 =0549+192 03 23 16 47.9 119.8 -2.5 -37.8 60 R 1 12025 13 43 00 UORI 03 23 24 48.6 118.9 -2.5 -38.5 1 1 6 12025 13 42 52 13 44 00 --- 03 24 24 48.7 119.1 -2.5 -38.4 60 R 1 11115 13 44 09 J0552+1913 03 24 32 48.0 120.2 -2.5 -37.7 1 1 6 11115 13 44 00 13 45 09 =0549+192 03 25 32 48.2 120.5 -2.5 -37.5 60 R 1 10205 13 45 17 UORI 03 25 41 48.9 119.5 -2.5 -38.2 1 1 6 10205 13 45 09 13 46 17 --- 03 26 41 49.0 119.8 -2.5 -38.1 60 R 1 9296 13 46 25 J0552+1913 03 26 49 48.4 120.8 -2.5 -37.4 1 1 6 9296 13 46 17 13 47 25 =0549+192 03 27 49 48.5 121.1 -2.5 -37.2 60 R 1 8388 13 47 33 UORI 03 27 57 49.2 120.1 -2.5 -37.9 1 1 6 8388 13 47 25 13 48 33 --- 03 28 57 49.4 120.4 -2.4 -37.8 60 R 1 7479 Schedule for VLBA_BR (Code Br ) Page 18 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 13 48 41 J0552+1913 03 29 06 48.7 121.5 -2.4 -37.1 1 1 6 7479 13 48 33 13 49 41 =0549+192 03 30 06 48.8 121.8 -2.4 -36.9 60 R 1 6572 13 49 49 UORI 03 30 14 49.5 120.8 -2.4 -37.6 1 1 6 6572 13 49 41 13 50 49 --- 03 31 14 49.7 121.1 -2.4 -37.5 60 R 1 5664 13 50 57 J0552+1913 03 31 22 49.0 122.1 -2.4 -36.8 1 1 6 5664 13 50 49 13 51 57 =0549+192 03 32 22 49.2 122.4 -2.4 -36.6 60 R 1 4757 13 52 05 UORI 03 32 30 49.9 121.4 -2.4 -37.3 1 1 6 4757 13 51 57 13 53 05 --- 03 33 30 50.0 121.7 -2.4 -37.2 60 R 1 3850 13 53 13 J0552+1913 03 33 38 49.3 122.8 -2.4 -36.5 1 1 6 3850 13 53 05 13 54 13 =0549+192 03 34 39 49.5 123.1 -2.3 -36.3 60 R 1 2944 13 54 21 UORI 03 34 46 50.2 122.1 -2.4 -37.0 1 1 6 2944 13 54 13 13 55 21 --- 03 35 47 50.3 122.4 -2.3 -36.9 60 R 1 2038 13 55 29 J0552+1913 03 35 55 49.7 123.4 -2.3 -36.1 1 1 6 2038 13 55 21 13 56 29 =0549+192 03 36 55 49.8 123.7 -2.3 -36.0 60 R 1 1133 13 56 37 UORI 03 37 03 50.5 122.8 -2.3 -36.7 0 1 6 1133 13 56 29 13 57 37 --- 03 38 03 50.7 123.1 -2.3 -36.6 60 R 1 228 13 57 45 J0552+1913 03 38 11 50.0 124.1 -2.3 -35.8 1 1 5 228 13 57 37 13 58 45 =0549+192 03 39 11 50.1 124.4 -2.3 -35.7 60 F 2 1132 13 58 53 UORI 03 39 19 50.8 123.5 -2.3 -36.4 0 1 5 1132 13 58 45 13 59 53 --- 03 40 19 51.0 123.8 -2.3 -36.2 60 F 2 2037 14 00 00 J0552+1913 03 40 27 50.3 124.8 -2.3 -35.5 0 1 5 2037 13 59 53 14 01 00 =0549+192 03 41 27 50.4 125.1 -2.2 -35.3 60 F 2 2941 14 01 08 UORI 03 41 35 51.1 124.1 -2.2 -36.1 0 1 5 2941 14 01 00 14 02 08 --- 03 42 35 51.3 124.4 -2.2 -35.9 60 F 2 3846 14 02 16 J0552+1913 03 42 43 50.6 125.5 -2.2 -35.1 0 1 5 3846 14 02 08 14 03 16 =0549+192 03 43 43 50.7 125.8 -2.2 -35.0 60 F 2 4750 14 03 24 UORI 03 43 51 51.5 124.8 -2.2 -35.7 0 1 5 4750 14 03 16 14 04 24 --- 03 44 51 51.6 125.1 -2.2 -35.6 60 F 2 5654 Schedule for VLBA_BR (Code Br ) Page 19 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 14 04 32 J0552+1913 03 44 59 50.9 126.2 -2.2 -34.8 0 1 5 5654 14 04 24 14 05 32 =0549+192 03 45 59 51.0 126.5 -2.2 -34.6 60 F 2 6559 14 05 40 UORI 03 46 07 51.8 125.5 -2.2 -35.4 0 1 5 6559 14 05 32 14 06 40 --- 03 47 07 51.9 125.8 -2.1 -35.2 60 F 2 7463 14 06 47 J0552+1913 03 47 15 51.2 126.9 -2.1 -34.4 0 1 5 7463 14 06 40 14 07 47 =0549+192 03 48 15 51.3 127.2 -2.1 -34.3 60 F 2 8367 14 07 55 UORI 03 48 23 52.1 126.2 -2.1 -35.0 0 1 5 8367 14 07 47 14 08 55 --- 03 49 23 52.2 126.5 -2.1 -34.8 60 F 2 9272 14 10 55 J0552+1913 03 51 23 51.8 128.2 -2.1 -33.8 113 1 5 9272 14 10 55 14 11 55 =0549+192 03 52 23 51.9 128.5 -2.1 -33.6 60 F 2 10072 14 12 03 UORI 03 52 31 52.6 127.5 -2.1 -34.3 0 1 5 10072 14 11 55 14 13 03 --- 03 53 32 52.8 127.9 -2.0 -34.2 60 F 2 10977 14 13 11 J0552+1913 03 53 39 52.0 128.9 -2.0 -33.4 0 1 5 10977 14 13 03 14 13 41 =0549+192 03 54 09 52.1 129.1 -2.0 -33.3 30 F 2 11481 14 13 49 UORI 03 54 17 52.9 128.1 -2.0 -34.0 0 1 5 11481 14 13 41 14 14 19 --- 03 54 47 52.9 128.3 -2.0 -33.9 30 F 2 11986 14 14 27 J0552+1913 03 54 55 52.2 129.3 -2.0 -33.2 0 1 5 11986 14 14 19 14 14 57 =0549+192 03 55 25 52.3 129.5 -2.0 -33.1 30 F 2 12491 14 15 05 UORI 03 55 33 53.0 128.5 -2.0 -33.8 0 1 5 12491 14 14 57 14 15 35 --- 03 56 03 53.1 128.7 -2.0 -33.7 30 F 2 12996 14 15 42 J0552+1913 03 56 11 52.4 129.7 -2.0 -32.9 0 1 5 12996 14 15 35 14 16 12 =0549+192 03 56 41 52.4 129.9 -2.0 -32.9 30 F 2 13501 14 16 20 UORI 03 56 49 53.2 128.9 -2.0 -33.6 0 1 5 13501 14 16 12 14 16 50 --- 03 57 19 53.3 129.1 -2.0 -33.5 30 F 2 14006 14 16 58 J0552+1913 03 57 27 52.5 130.1 -2.0 -32.7 0 1 5 14006 14 16 50 14 17 28 =0549+192 03 57 57 52.6 130.3 -2.0 -32.6 30 F 2 14510 14 17 36 UORI 03 58 05 53.3 129.3 -2.0 -33.4 0 1 5 14510 14 17 28 14 18 06 --- 03 58 35 53.4 129.5 -2.0 -33.3 30 F 2 15015 Schedule for VLBA_BR (Code Br ) Page 20 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 14 18 14 J0552+1913 03 58 43 52.7 130.5 -1.9 -32.5 0 1 5 15015 14 18 06 14 18 44 =0549+192 03 59 13 52.8 130.7 -1.9 -32.4 30 F 2 15520 14 18 52 UORI 03 59 21 53.5 129.8 -1.9 -33.1 0 1 5 15520 14 18 44 14 19 22 --- 03 59 51 53.6 129.9 -1.9 -33.0 30 F 2 16025 14 19 30 J0552+1913 03 59 59 52.9 131.0 -1.9 -32.3 0 1 5 16025 14 19 22 14 20 00 =0549+192 04 00 29 52.9 131.1 -1.9 -32.2 30 F 2 16530 14 20 07 UORI 04 00 37 53.7 130.2 -1.9 -32.9 0 1 5 16530 14 20 00 14 20 37 --- 04 01 07 53.7 130.3 -1.9 -32.8 30 F 2 17035 14 20 45 J0552+1913 04 01 15 53.0 131.4 -1.9 -32.0 0 1 5 17035 14 20 37 14 21 15 =0549+192 04 01 45 53.1 131.5 -1.9 -31.9 30 F 2 17540 14 21 23 UORI 04 01 53 53.8 130.6 -1.9 -32.7 0 1 6 17540 14 21 15 14 21 53 --- 04 02 23 53.9 130.8 -1.9 -32.6 30 R 2 17035 14 22 01 J0552+1913 04 02 31 53.2 131.8 -1.9 -31.8 0 1 6 17035 14 21 53 14 22 31 =0549+192 04 03 01 53.2 132.0 -1.9 -31.7 30 R 2 16530 14 22 39 UORI 04 03 09 54.0 131.0 -1.9 -32.4 0 1 6 16530 14 22 31 14 23 09 --- 04 03 39 54.1 131.2 -1.9 -32.4 30 R 2 16025 14 23 17 J0552+1913 04 03 47 53.3 132.2 -1.9 -31.6 0 1 6 16025 14 23 09 14 23 47 =0549+192 04 04 17 53.4 132.4 -1.9 -31.5 30 R 2 15520 14 23 55 UORI 04 04 25 54.2 131.4 -1.9 -32.2 0 1 6 15520 14 23 47 14 24 25 --- 04 04 55 54.2 131.6 -1.9 -32.1 30 R 2 15015 14 24 33 J0552+1913 04 05 03 53.5 132.6 -1.8 -31.3 0 1 6 15015 14 24 25 14 25 03 =0549+192 04 05 33 53.5 132.8 -1.8 -31.2 30 R 2 14510 14 25 11 UORI 04 05 41 54.3 131.9 -1.8 -32.0 0 1 6 14510 14 25 03 14 25 41 --- 04 06 11 54.4 132.0 -1.8 -31.9 30 R 2 14005 14 25 48 J0552+1913 04 06 19 53.6 133.1 -1.8 -31.1 0 1 6 14005 14 25 41 14 26 18 =0549+192 04 06 49 53.7 133.3 -1.8 -31.0 30 R 2 13500 14 26 26 UORI 04 06 57 54.5 132.3 -1.8 -31.7 0 1 6 13500 14 26 18 14 26 56 --- 04 07 27 54.5 132.5 -1.8 -31.6 30 R 2 12995 Schedule for VLBA_BR (Code Br ) Page 21 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 14 27 04 J0552+1913 04 07 35 53.8 133.5 -1.8 -30.8 0 1 6 12995 14 26 56 14 27 34 =0549+192 04 08 05 53.9 133.7 -1.8 -30.7 30 R 2 12489 14 27 42 UORI 04 08 13 54.6 132.7 -1.8 -31.5 0 1 6 12489 14 27 34 14 28 12 --- 04 08 43 54.7 132.9 -1.8 -31.4 30 R 2 11984 14 28 20 J0552+1913 04 08 51 53.9 133.9 -1.8 -30.6 0 1 6 11984 14 28 12 14 28 50 =0549+192 04 09 21 54.0 134.1 -1.8 -30.5 30 R 2 11479 14 28 58 UORI 04 09 29 54.8 133.2 -1.8 -31.2 0 1 6 11479 14 28 50 14 29 28 --- 04 09 59 54.8 133.4 -1.8 -31.1 30 R 2 10974 14 29 36 J0552+1913 04 10 07 54.1 134.4 -1.8 -30.3 0 1 6 10974 14 29 28 14 30 06 =0549+192 04 10 37 54.2 134.6 -1.7 -30.2 30 R 2 10469 14 30 14 UORI 04 10 45 54.9 133.6 -1.8 -31.0 0 1 6 10469 14 30 06 14 30 44 --- 04 11 15 55.0 133.8 -1.7 -30.9 30 R 2 9964 14 30 51 J0552+1913 04 11 23 54.3 134.8 -1.7 -30.1 0 1 6 9964 14 30 44 14 31 21 =0549+192 04 11 53 54.3 135.0 -1.7 -30.0 30 R 2 9458 14 31 29 UORI 04 12 01 55.1 134.1 -1.7 -30.7 0 1 6 9458 14 31 21 14 31 59 --- 04 12 31 55.1 134.3 -1.7 -30.6 30 R 2 8953 14 32 07 J0552+1913 04 12 39 54.4 135.3 -1.7 -29.8 0 1 6 8953 14 31 59 14 32 37 =0549+192 04 13 09 54.5 135.4 -1.7 -29.7 30 R 2 8448 14 32 45 UORI 04 13 17 55.2 134.5 -1.7 -30.5 0 1 6 8448 14 32 37 14 33 15 --- 04 13 47 55.3 134.7 -1.7 -30.4 30 R 2 7943 14 33 23 J0552+1913 04 13 55 54.5 135.7 -1.7 -29.6 0 1 6 7943 14 33 15 14 33 53 =0549+192 04 14 25 54.6 135.9 -1.7 -29.5 30 R 2 7437 14 34 01 UORI 04 14 33 55.4 135.0 -1.7 -30.2 0 1 6 7437 14 33 53 14 34 31 --- 04 15 03 55.4 135.2 -1.7 -30.1 30 R 2 6932 14 34 39 J0552+1913 04 15 11 54.7 136.2 -1.7 -29.3 0 1 6 6932 14 34 31 14 35 09 =0549+192 04 15 41 54.8 136.3 -1.7 -29.2 30 R 2 6427 14 35 17 UORI 04 15 49 55.5 135.4 -1.7 -29.9 0 1 6 6427 14 35 09 14 35 47 --- 04 16 19 55.6 135.6 -1.7 -29.8 30 R 2 5922 Schedule for VLBA_BR (Code Br ) Page 22 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 14 35 55 J0552+1913 04 16 27 54.8 136.6 -1.7 -29.0 0 1 6 5922 14 35 47 14 36 25 =0549+192 04 16 57 54.9 136.8 -1.6 -28.9 30 R 2 5417 14 36 33 UORI 04 17 05 55.7 135.9 -1.6 -29.7 0 1 6 5417 14 36 25 14 37 03 --- 04 17 35 55.7 136.1 -1.6 -29.6 30 R 2 4911 14 37 10 J0552+1913 04 17 43 55.0 137.1 -1.6 -28.8 0 1 6 4911 14 37 03 14 37 40 =0549+192 04 18 13 55.0 137.3 -1.6 -28.7 30 R 2 4406 14 37 48 UORI 04 18 21 55.8 136.3 -1.6 -29.4 0 1 6 4406 14 37 40 14 38 18 --- 04 18 51 55.9 136.5 -1.6 -29.3 30 R 2 3901 14 38 26 J0552+1913 04 18 59 55.1 137.5 -1.6 -28.5 0 1 6 3901 14 38 18 14 38 56 =0549+192 04 19 29 55.2 137.7 -1.6 -28.4 30 R 2 3396 14 39 04 UORI 04 19 37 56.0 136.8 -1.6 -29.1 0 1 6 3396 14 38 56 14 39 34 --- 04 20 07 56.0 137.0 -1.6 -29.0 30 R 2 2891 14 39 42 J0552+1913 04 20 15 55.3 138.0 -1.6 -28.2 0 1 6 2891 14 39 34 14 40 12 =0549+192 04 20 45 55.3 138.2 -1.6 -28.1 30 R 2 2385 14 40 20 UORI 04 20 53 56.1 137.3 -1.6 -28.8 0 1 6 2385 14 40 12 14 40 50 --- 04 21 23 56.2 137.5 -1.6 -28.7 30 R 2 1880 14 40 58 J0552+1913 04 21 31 55.4 138.5 -1.6 -28.0 0 1 6 1880 14 40 50 14 41 28 =0549+192 04 22 01 55.5 138.6 -1.6 -27.8 30 R 2 1375 14 41 36 UORI 04 22 09 56.3 137.7 -1.6 -28.6 0 1 6 1375 14 41 28 14 42 06 --- 04 22 39 56.3 137.9 -1.6 -28.5 30 R 2 870 14 42 14 J0552+1913 04 22 47 55.6 138.9 -1.5 -27.7 0 1 6 870 14 42 06 14 42 44 =0549+192 04 23 17 55.6 139.1 -1.5 -27.6 30 R 2 365 14 42 51 UORI 04 23 25 56.4 138.2 -1.5 -28.3 0 1 7 365 14 42 44 14 43 21 --- 04 23 55 56.5 138.4 -1.5 -28.2 30 F 1 870 14 43 29 J0552+1913 04 24 03 55.7 139.4 -1.5 -27.4 0 1 7 870 14 43 21 14 43 59 =0549+192 04 24 33 55.7 139.6 -1.5 -27.3 30 F 1 1375 14 44 07 UORI 04 24 41 56.5 138.7 -1.5 -28.0 0 1 7 1375 14 43 59 14 44 37 --- 04 25 11 56.6 138.9 -1.5 -27.9 30 F 1 1880 Schedule for VLBA_BR (Code Br ) Page 23 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 14 44 45 J0552+1913 04 25 19 55.8 139.9 -1.5 -27.1 0 1 7 1880 14 44 37 14 45 15 =0549+192 04 25 49 55.9 140.1 -1.5 -27.0 30 F 1 2385 14 45 23 UORI 04 25 57 56.7 139.2 -1.5 -27.7 0 1 7 2385 14 45 15 14 45 53 --- 04 26 27 56.7 139.4 -1.5 -27.6 30 F 1 2890 14 46 01 J0552+1913 04 26 35 56.0 140.3 -1.5 -26.8 0 1 7 2890 14 45 53 14 46 31 =0549+192 04 27 05 56.0 140.5 -1.5 -26.7 30 F 1 3395 14 46 39 UORI 04 27 13 56.8 139.6 -1.5 -27.4 0 1 7 3395 14 46 31 14 47 09 --- 04 27 43 56.9 139.8 -1.5 -27.3 30 F 1 3900 14 47 17 J0552+1913 04 27 51 56.1 140.8 -1.5 -26.5 0 1 7 3900 14 47 09 14 47 47 =0549+192 04 28 21 56.1 141.0 -1.5 -26.4 30 F 1 4406 14 47 54 UORI 04 28 29 57.0 140.1 -1.5 -27.1 0 1 7 4406 14 47 47 14 48 24 --- 04 28 59 57.0 140.3 -1.4 -27.0 30 F 1 4911 14 48 32 J0552+1913 04 29 07 56.2 141.3 -1.4 -26.2 0 1 7 4911 14 48 24 14 49 02 =0549+192 04 29 37 56.3 141.5 -1.4 -26.1 30 F 1 5416 14 49 10 UORI 04 29 45 57.1 140.6 -1.4 -26.8 0 1 7 5416 14 49 02 14 49 40 --- 04 30 15 57.1 140.8 -1.4 -26.7 30 F 1 5921 14 49 48 J0552+1913 04 30 23 56.4 141.8 -1.4 -25.9 0 1 7 5921 14 49 40 14 50 18 =0549+192 04 30 53 56.4 142.0 -1.4 -25.8 30 F 1 6426 14 50 26 UORI 04 31 01 57.2 141.1 -1.4 -26.5 0 1 7 6426 14 50 18 14 50 56 --- 04 31 31 57.3 141.3 -1.4 -26.4 30 F 1 6931 14 51 04 J0552+1913 04 31 39 56.5 142.3 -1.4 -25.6 0 1 7 6931 14 50 56 14 51 34 =0549+192 04 32 09 56.5 142.5 -1.4 -25.5 30 F 1 7436 14 51 42 UORI 04 32 17 57.4 141.6 -1.4 -26.2 0 1 7 7436 14 51 34 14 52 12 --- 04 32 47 57.4 141.8 -1.4 -26.1 30 F 1 7941 14 52 20 J0552+1913 04 32 55 56.6 142.8 -1.4 -25.3 0 1 7 7941 14 52 12 14 52 50 =0549+192 04 33 25 56.7 143.0 -1.4 -25.2 30 F 1 8446 14 52 57 UORI 04 33 32 57.5 142.1 -1.4 -25.9 0 1 7 8446 14 52 50 14 53 27 --- 04 34 03 57.5 142.3 -1.4 -25.8 30 F 1 8951 Schedule for VLBA_BR (Code Br ) Page 24 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 14 53 35 J0552+1913 04 34 10 56.7 143.3 -1.4 -25.0 0 1 7 8951 14 53 27 14 54 05 =0549+192 04 34 41 56.8 143.4 -1.3 -24.9 30 F 1 9456 14 54 13 UORI 04 34 48 57.6 142.6 -1.4 -25.6 0 1 7 9456 14 54 05 14 54 43 --- 04 35 19 57.7 142.8 -1.3 -25.5 30 F 1 9961 14 54 51 J0552+1913 04 35 26 56.9 143.7 -1.3 -24.7 0 1 7 9961 14 54 43 14 55 21 =0549+192 04 35 57 56.9 143.9 -1.3 -24.6 30 F 1 10466 14 55 29 UORI 04 36 04 57.7 143.1 -1.3 -25.3 0 1 7 10466 14 55 21 14 55 59 --- 04 36 34 57.8 143.3 -1.3 -25.2 30 F 1 10970 14 56 07 J0552+1913 04 36 42 57.0 144.2 -1.3 -24.4 0 1 7 10970 14 55 59 14 56 37 =0549+192 04 37 12 57.0 144.4 -1.3 -24.3 30 F 1 11475 14 56 45 UORI 04 37 20 57.9 143.6 -1.3 -25.0 0 1 7 11475 14 56 37 14 57 15 --- 04 37 50 57.9 143.8 -1.3 -24.8 30 F 1 11980 14 57 23 J0552+1913 04 37 58 57.1 144.7 -1.3 -24.1 0 1 7 11980 14 57 15 14 57 53 =0549+192 04 38 28 57.2 144.9 -1.3 -24.0 30 F 1 12485 14 58 00 UORI 04 38 36 58.0 144.1 -1.3 -24.6 0 1 7 12485 14 57 53 14 58 30 --- 04 39 06 58.0 144.3 -1.3 -24.5 30 F 1 12990 14 58 38 J0552+1913 04 39 14 57.2 145.3 -1.3 -23.8 0 1 7 12990 14 58 30 14 59 08 =0549+192 04 39 44 57.3 145.5 -1.3 -23.6 30 F 1 13495 14 59 16 UORI 04 39 52 58.1 144.6 -1.3 -24.3 0 1 7 13495 14 59 08 14 59 46 --- 04 40 22 58.2 144.8 -1.3 -24.2 30 F 1 13999 14 59 54 J0552+1913 04 40 30 57.4 145.8 -1.3 -23.4 0 1 7 13999 14 59 46 15 00 24 =0549+192 04 41 00 57.4 146.0 -1.2 -23.3 30 F 1 14504 15 00 32 UORI 04 41 08 58.2 145.1 -1.2 -24.0 0 1 7 14504 15 00 24 15 01 02 --- 04 41 38 58.3 145.3 -1.2 -23.9 30 F 1 15009 15 01 10 J0552+1913 04 41 46 57.5 146.3 -1.2 -23.1 0 1 7 15009 15 01 02 15 01 40 =0549+192 04 42 16 57.5 146.5 -1.2 -23.0 30 F 1 15513 15 01 48 UORI 04 42 24 58.4 145.6 -1.2 -23.7 0 1 7 15513 15 01 40 15 02 18 --- 04 42 54 58.4 145.8 -1.2 -23.5 30 F 1 16018 Schedule for VLBA_BR (Code Br ) Page 25 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 15 02 25 J0552+1913 04 43 02 57.6 146.8 -1.2 -22.8 0 1 7 16018 15 02 18 15 02 55 =0549+192 04 43 32 57.6 147.0 -1.2 -22.7 30 F 1 16523 15 03 03 UORI 04 43 40 58.5 146.2 -1.2 -23.3 0 1 7 16523 15 02 55 15 03 33 --- 04 44 10 58.5 146.4 -1.2 -23.2 30 F 1 17027 15 03 41 J0552+1913 04 44 18 57.7 147.3 -1.2 -22.5 0 1 7 17027 15 03 33 15 04 11 =0549+192 04 44 48 57.8 147.5 -1.2 -22.3 30 F 1 17532 15 04 19 UORI 04 44 56 58.6 146.7 -1.2 -23.0 0 1 8 17532 15 04 11 15 04 49 --- 04 45 26 58.6 146.9 -1.2 -22.9 30 R 1 17027 15 04 57 J0552+1913 04 45 34 57.8 147.8 -1.2 -22.1 0 1 8 17027 15 04 49 15 05 27 =0549+192 04 46 04 57.9 148.0 -1.2 -22.0 30 R 1 16523 15 05 35 UORI 04 46 12 58.7 147.2 -1.2 -22.6 0 1 8 16523 15 05 27 15 06 05 --- 04 46 42 58.8 147.4 -1.2 -22.5 30 R 1 16018 15 06 12 J0552+1913 04 46 50 57.9 148.3 -1.1 -21.8 0 1 8 16018 15 06 05 15 06 42 =0549+192 04 47 20 58.0 148.5 -1.1 -21.6 30 R 1 15513 15 06 50 UORI 04 47 28 58.8 147.7 -1.1 -22.3 0 1 8 15513 15 06 42 15 07 20 --- 04 47 58 58.9 148.0 -1.1 -22.2 30 R 1 15009 15 07 28 J0552+1913 04 48 06 58.0 148.9 -1.1 -21.4 0 1 8 15009 15 07 20 15 07 58 =0549+192 04 48 36 58.1 149.1 -1.1 -21.3 30 R 1 14504 15 08 06 UORI 04 48 44 58.9 148.3 -1.1 -22.0 0 1 8 14504 15 07 58 15 08 36 --- 04 49 14 59.0 148.5 -1.1 -21.8 30 R 1 13999 15 08 44 J0552+1913 04 49 21 58.2 149.4 -1.1 -21.1 0 1 8 13999 15 08 36 15 09 14 =0549+192 04 49 52 58.2 149.6 -1.1 -21.0 30 R 1 13494 15 09 22 UORI 04 49 59 59.0 148.8 -1.1 -21.6 0 1 8 13494 15 09 14 15 09 52 --- 04 50 30 59.1 149.0 -1.1 -21.5 30 R 1 12989 15 10 00 J0552+1913 04 50 37 58.3 149.9 -1.1 -20.8 0 1 8 12989 15 09 52 15 10 30 =0549+192 04 51 08 58.3 150.1 -1.1 -20.6 30 R 1 12484 15 10 38 UORI 04 51 15 59.2 149.3 -1.1 -21.3 0 1 8 12484 15 10 30 15 11 08 --- 04 51 46 59.2 149.6 -1.1 -21.1 30 R 1 11980 Schedule for VLBA_BR (Code Br ) Page 26 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 15 11 15 J0552+1913 04 51 53 58.4 150.4 -1.1 -20.4 0 1 8 11980 15 11 08 15 11 45 =0549+192 04 52 23 58.4 150.7 -1.1 -20.3 30 R 1 11475 15 11 53 UORI 04 52 31 59.3 149.9 -1.1 -20.9 0 1 8 11475 15 11 45 15 12 23 --- 04 53 01 59.3 150.1 -1.0 -20.8 30 R 1 10969 15 12 31 J0552+1913 04 53 09 58.5 151.0 -1.0 -20.1 0 1 8 10969 15 12 23 15 13 01 =0549+192 04 53 39 58.5 151.2 -1.0 -19.9 30 R 1 10464 15 13 09 UORI 04 53 47 59.4 150.4 -1.0 -20.5 0 1 8 10464 15 13 01 15 13 39 --- 04 54 17 59.4 150.6 -1.0 -20.4 30 R 1 9959 15 13 47 J0552+1913 04 54 25 58.6 151.5 -1.0 -19.7 0 1 8 9959 15 13 39 15 14 17 =0549+192 04 54 55 58.6 151.7 -1.0 -19.6 30 R 1 9454 15 14 25 UORI 04 55 03 59.5 151.0 -1.0 -20.2 0 1 8 9454 15 14 17 15 14 55 --- 04 55 33 59.5 151.2 -1.0 -20.0 30 R 1 8949 15 15 03 J0552+1913 04 55 41 58.7 152.1 -1.0 -19.3 0 1 8 8949 15 14 55 15 15 33 =0549+192 04 56 11 58.7 152.3 -1.0 -19.2 30 R 1 8444 15 15 41 UORI 04 56 19 59.6 151.5 -1.0 -19.8 0 1 8 8444 15 15 33 15 16 11 --- 04 56 49 59.6 151.7 -1.0 -19.7 30 R 1 7939 15 16 18 J0552+1913 04 56 57 58.8 152.6 -1.0 -19.0 0 1 8 7939 15 16 11 15 16 48 =0549+192 04 57 27 58.8 152.8 -1.0 -18.8 30 R 1 7433 15 16 56 UORI 04 57 35 59.7 152.1 -1.0 -19.4 0 1 8 7433 15 16 48 15 17 26 --- 04 58 05 59.7 152.3 -1.0 -19.3 30 R 1 6928 15 17 34 J0552+1913 04 58 13 58.9 153.2 -1.0 -18.6 0 1 8 6928 15 17 26 15 18 04 =0549+192 04 58 43 58.9 153.4 -0.9 -18.5 30 R 1 6423 15 18 12 UORI 04 58 51 59.8 152.6 -1.0 -19.1 0 1 8 6423 15 18 04 15 18 42 --- 04 59 21 59.8 152.9 -0.9 -18.9 30 R 1 5918 15 18 50 J0552+1913 04 59 29 59.0 153.7 -0.9 -18.3 0 1 8 5918 15 18 42 15 19 20 =0549+192 04 59 59 59.0 153.9 -0.9 -18.1 30 R 1 5412 15 19 28 UORI 05 00 07 59.9 153.2 -0.9 -18.7 0 1 8 5412 15 19 20 15 19 58 --- 05 00 37 59.9 153.4 -0.9 -18.6 30 R 1 4907 Schedule for VLBA_BR (Code Br ) Page 27 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 15 20 06 J0552+1913 05 00 45 59.0 154.3 -0.9 -17.9 0 1 8 4907 15 19 58 15 20 36 =0549+192 05 01 15 59.1 154.5 -0.9 -17.7 30 R 1 4402 15 20 44 UORI 05 01 23 60.0 153.8 -0.9 -18.3 0 1 8 4402 15 20 36 15 21 14 --- 05 01 53 60.0 154.0 -0.9 -18.2 30 R 1 3897 15 21 22 J0552+1913 05 02 01 59.1 154.8 -0.9 -17.5 0 1 8 3897 15 21 14 15 21 52 =0549+192 05 02 31 59.2 155.0 -0.9 -17.4 30 R 1 3392 15 21 59 UORI 05 02 39 60.0 154.3 -0.9 -17.9 0 1 8 3392 15 21 52 15 22 29 --- 05 03 09 60.1 154.6 -0.9 -17.8 30 R 1 2887 15 22 37 J0552+1913 05 03 17 59.2 155.4 -0.9 -17.1 0 1 8 2887 15 22 29 15 23 07 =0549+192 05 03 47 59.3 155.6 -0.9 -17.0 30 R 1 2381 15 23 15 UORI 05 03 55 60.1 154.9 -0.9 -17.6 0 1 8 2381 15 23 07 15 23 45 --- 05 04 25 60.2 155.1 -0.9 -17.4 30 R 1 1876 15 23 53 J0552+1913 05 04 33 59.3 155.9 -0.8 -16.8 0 1 8 1876 15 23 45 15 24 23 =0549+192 05 05 03 59.4 156.1 -0.8 -16.6 30 R 1 1371 15 24 31 UORI 05 05 11 60.2 155.5 -0.8 -17.2 0 1 8 1371 15 24 23 15 25 01 --- 05 05 41 60.3 155.7 -0.8 -17.0 30 R 1 866 15 25 09 J0552+1913 05 05 49 59.4 156.5 -0.8 -16.4 0 1 8 866 15 25 01 15 25 39 =0549+192 05 06 19 59.4 156.7 -0.8 -16.2 30 R 1 361 15 25 47 UORI 05 06 27 60.3 156.0 -0.8 -16.8 0 1 7 361 15 25 39 15 26 17 --- 05 06 57 60.3 156.3 -0.8 -16.6 30 F 2 866 15 26 17 J0555+3948 05 06 57 77.5 126.8 -0.9 -44.1 -40 1 7 866 15 26 17 15 31 17 =0552+398 05 11 58 78.1 130.2 -0.8 -41.6 260 F 2 4866 15 33 24 J0552+1913 05 14 06 59.9 160.2 -0.7 -13.8 85 1 7 4866 15 33 24 15 34 24 =0549+192 05 15 06 60.0 160.7 -0.7 -13.5 60 F 2 5666 15 34 32 UORI 05 15 14 60.9 160.1 -0.7 -14.0 0 1 7 5666 15 34 24 15 35 32 --- 05 16 14 60.9 160.6 -0.7 -13.7 60 F 2 6571 15 35 40 J0552+1913 05 16 22 60.0 161.3 -0.7 -13.1 0 1 7 6571 15 35 32 15 36 40 =0549+192 05 17 22 60.1 161.7 -0.6 -12.8 60 F 2 7476 Schedule for VLBA_BR (Code Br ) Page 28 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 15 36 48 UORI 05 17 30 61.0 161.1 -0.6 -13.3 0 1 7 7476 15 36 40 15 37 48 --- 05 18 31 61.0 161.6 -0.6 -13.0 60 F 2 8381 15 37 56 J0552+1913 05 18 38 60.2 162.3 -0.6 -12.4 0 1 7 8381 15 37 48 15 38 56 =0549+192 05 19 39 60.2 162.8 -0.6 -12.1 60 F 2 9287 15 39 04 UORI 05 19 47 61.1 162.2 -0.6 -12.5 0 1 7 9287 15 38 56 15 40 04 --- 05 20 47 61.2 162.7 -0.6 -12.2 60 F 2 10192 15 40 12 J0552+1913 05 20 55 60.3 163.4 -0.6 -11.7 0 1 7 10192 15 40 04 15 41 12 =0549+192 05 21 55 60.3 163.8 -0.6 -11.4 60 F 2 11097 15 41 20 UORI 05 22 03 61.2 163.3 -0.6 -11.8 0 1 7 11097 15 41 12 15 42 20 --- 05 23 03 61.3 163.8 -0.5 -11.5 60 F 2 12002 15 42 28 J0552+1913 05 23 11 60.4 164.4 -0.5 -10.9 0 1 7 12002 15 42 20 15 43 28 =0549+192 05 24 11 60.4 164.9 -0.5 -10.6 60 F 2 12907 15 43 35 UORI 05 24 19 61.3 164.4 -0.5 -11.0 0 1 7 12907 15 43 28 15 44 35 --- 05 25 19 61.4 164.9 -0.5 -10.7 60 F 2 13813 15 44 43 J0552+1913 05 25 27 60.5 165.5 -0.5 -10.2 0 1 7 13813 15 44 35 15 45 43 =0549+192 05 26 27 60.5 166.0 -0.5 -9.9 60 F 2 14718 15 45 51 UORI 05 26 35 61.4 165.5 -0.5 -10.3 0 1 7 14718 15 45 43 15 46 51 --- 05 27 35 61.5 166.0 -0.5 -9.9 60 F 2 15623 15 46 59 J0552+1913 05 27 43 60.6 166.6 -0.5 -9.5 0 1 7 15623 15 46 51 15 47 59 =0549+192 05 28 43 60.6 167.0 -0.4 -9.1 60 F 2 16528 15 48 07 UORI 05 28 51 61.5 166.6 -0.5 -9.5 0 1 7 16528 15 47 59 15 49 07 --- 05 29 51 61.6 167.1 -0.4 -9.2 60 F 2 17433 15 49 15 J0552+1913 05 29 59 60.6 167.6 -0.4 -8.7 0 1 8 17433 15 49 07 15 50 15 =0549+192 05 30 59 60.7 168.1 -0.4 -8.4 60 R 2 16528 15 50 23 UORI 05 31 07 61.6 167.7 -0.4 -8.7 0 1 8 16528 15 50 15 15 51 23 --- 05 32 07 61.6 168.2 -0.4 -8.4 60 R 2 15623 15 51 31 J0552+1913 05 32 15 60.7 168.7 -0.4 -7.9 0 1 8 15623 15 51 23 15 52 31 =0549+192 05 33 16 60.8 169.2 -0.4 -7.6 60 R 2 14718 Schedule for VLBA_BR (Code Br ) Page 29 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 15 52 39 UORI 05 33 23 61.7 168.8 -0.4 -7.9 0 1 8 14718 15 52 31 15 53 39 --- 05 34 24 61.7 169.3 -0.4 -7.6 60 R 2 13813 15 53 46 J0552+1913 05 34 32 60.8 169.8 -0.3 -7.2 0 1 8 13813 15 53 39 15 54 46 =0549+192 05 35 32 60.8 170.3 -0.3 -6.8 60 R 2 12907 15 54 54 UORI 05 35 40 61.7 169.9 -0.3 -7.2 0 1 8 12907 15 54 46 15 55 54 --- 05 36 40 61.8 170.4 -0.3 -6.8 60 R 2 12002 15 56 02 J0552+1913 05 36 48 60.9 170.9 -0.3 -6.4 0 1 8 12002 15 55 54 15 57 02 =0549+192 05 37 48 60.9 171.4 -0.3 -6.1 60 R 2 11097 15 57 10 UORI 05 37 56 61.8 171.0 -0.3 -6.4 0 1 8 11097 15 57 02 15 58 10 --- 05 38 56 61.8 171.5 -0.3 -6.0 60 R 2 10192 15 58 18 J0552+1913 05 39 04 60.9 172.0 -0.3 -5.6 0 1 8 10192 15 58 10 15 59 18 =0549+192 05 40 04 60.9 172.5 -0.3 -5.3 60 R 2 9287 15 59 26 UORI 05 40 12 61.9 172.1 -0.3 -5.6 0 1 8 9287 15 59 18 16 00 26 --- 05 41 12 61.9 172.6 -0.2 -5.2 60 R 2 8382 16 00 34 J0552+1913 05 41 20 61.0 173.1 -0.2 -4.9 0 1 8 8382 16 00 26 16 01 34 =0549+192 05 42 20 61.0 173.6 -0.2 -4.5 60 R 2 7477 16 01 42 UORI 05 42 28 61.9 173.3 -0.2 -4.8 0 1 8 7477 16 01 34 16 02 42 --- 05 43 28 61.9 173.8 -0.2 -4.4 60 R 2 6573 16 02 49 J0552+1913 05 43 36 61.0 174.2 -0.2 -4.1 0 1 8 6573 16 02 42 16 03 49 =0549+192 05 44 36 61.0 174.7 -0.2 -3.8 60 R 2 5668 16 03 57 UORI 05 44 44 62.0 174.4 -0.2 -4.0 0 1 8 5668 16 03 49 16 04 57 --- 05 45 44 62.0 174.9 -0.2 -3.6 60 R 2 4763 16 05 05 J0552+1913 05 45 52 61.0 175.3 -0.2 -3.3 0 1 8 4763 16 04 57 16 06 05 =0549+192 05 46 52 61.1 175.8 -0.1 -3.0 60 R 2 3858 16 06 13 UORI 05 47 00 62.0 175.5 -0.1 -3.2 0 1 8 3858 16 06 05 16 07 13 --- 05 48 00 62.0 176.0 -0.1 -2.8 60 R 2 2953 16 07 21 J0552+1913 05 48 08 61.1 176.4 -0.1 -2.5 0 1 8 2953 16 07 13 16 08 21 =0549+192 05 49 08 61.1 176.9 -0.1 -2.2 60 R 2 2048 Schedule for VLBA_BR (Code Br ) Page 30 Phase Reference test at K-band UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Fri 16 Aug 2002 Day 228 --- 16 08 29 UORI 05 49 16 62.0 176.7 -0.1 -2.4 0 1 8 2048 16 08 21 16 09 29 --- 05 50 16 62.0 177.2 -0.1 -2.0 60 R 2 1143 16 09 37 J0552+1913 05 50 24 61.1 177.5 -0.1 -1.8 0 1 8 1143 16 09 29 16 10 37 =0549+192 05 51 24 61.1 178.0 -0.1 -1.4 60 R 2 238 16 10 45 UORI 05 51 32 62.0 177.8 -0.1 -1.6 0 1 9 238 16 10 37 16 11 45 --- 05 52 33 62.0 178.3 -0.1 -1.2 60 F 1 1143 16 11 52 J0552+1913 05 52 40 61.1 178.6 0.0 -1.0 0 1 9 1143 16 11 45 16 12 52 =0549+192 05 53 41 61.1 179.1 0.0 -0.6 60 F 1 2048 16 13 00 UORI 05 53 49 62.0 178.9 0.0 -0.8 0 1 9 2048 16 12 52 16 14 00 --- 05 54 49 62.0 179.4 0.0 -0.4 60 F 1 2953 16 14 00 J0555+3948 05 54 49 81.6 174.3 -0.1 -5.0 -45 1 9 2953 16 14 00 16 19 00 =0552+398 05 59 50 81.7 180.9 0.0 0.8 255 F 1 6953 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: tp021.set Matches group v1cm_b3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 1 Station: VLBA Total bit rate: 128 Format: VLBA1:4 Bits per sample: 1 Sample rate: 32.000 Number of channels: 4 Passes/head pos: 2 Speedup factor: 1.00 Tape speeds: Low density - 266.660 ips, High density - 160.00 ips Time per pass for 17600 ft, High density tapes is: 00:22:00 1st LO= 21500.00 21500.00 21500.00 21500.00 Net SB= U U U U Pol. = RCP LCP RCP LCP BBC = 1 2 3 4 BBC SB= U U U U IF = B D B D VLBA FE= omit 1cm omit 1cm VLBA Synth= 9.1 15.4 12.4 The following frequency sets based on this setup were used. Frequency Set: 1 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 22236.66 22236.66 22213.08 22213.08 BBC fr= 736.66 736.66 713.08 713.08 Bandwd= 4.000 4.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S3 OFF OFF OFF OFF OFF OFF PCALXB2= S2 S4 OFF OFF OFF OFF OFF OFF PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: track1= 2, 10, 18, 26 track2= 3, 11, 19, 27 barrel=roll_auto SOURCE LIST -- Phase Reference test at K-band Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Source Source position (RA/Dec) (B1950) (J2000) (Date) * UORI * 05 52 51.000000 05 55 49.277754 05 55 56.705911 * 20 10 06.20000 20 10 30.96790 20 10 35.34263 From catalog imbedded in main SCHED input file. program source * J0552+1913 * 05 52 25.885800 05 55 22.925946 05 55 30.303643 0549+192 * 19 13 40.27500 19 14 06.91877 19 14 11.64637 From catalog imbedded in main SCHED input file. JVAS - Browne et al. 1998, mnras, 293, 257; S8.4GHz= 151 mJy * J0555+3948 * 05 55 30.805609 05 59 00.231304 05 59 08.901082 0552+398 * 39 48 49.16500 39 49 01.12909 39 48 59.35127 0552+398 From catalog imbedded in main SCHED input file. DA193 ICRF - Ext.1 Source - 1998 IERS Annual Report J0555+39 The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) UORI 54.5 J0552+1913 54.7 J0555+3948 55.4 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg