COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: BH099 VLBA format 1cm line 2002 Exp. Code: BH099B Schedule Version: 1.00 Processed by SCHED version: Release of 02 July 2002 PI: K. Hachisuka Address: Departament d Astronomia i Astrofisica Universitat de Valencia E-46100 Burjassot - Valencia Spain Phone: +34-96-3981200 EMAIL: kazuya.hachisuka@uv.es Fax: +34-96-3983084 Phone during observation: +34-69-3981200 Observing mode: v1cm-128-4-2 Notes: Two phase-tracking centers for WB114 other position is RA=21:43:01.4593 DEC=54:56:17.936 (J2000) Schedule for VLBA_PT (Code Pt ) Page 2 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- Next scan frequencies: 22235.69 22227.53 22219.37 22243.85 Next BBC frequencies: 735.69 727.53 719.37 743.85 Next scan bandwidths: 8.00 8.00 8.00 8.00 04 51 26 3C454.3 20 00 00 47.1 103.8 -2.9 -56.6 0 1 1 0 04 51 26 04 57 25 --- 20 06 00 48.3 105.0 -2.8 -56.2 359 F 1 2393 04 59 25 2137+510 20 08 00 66.8 37.2 -1.5 -127.5 68 1 1 2393 04 59 25 04 59 45 --- 20 08 20 66.8 37.1 -1.5 -127.6 20 F 1 2526 04 59 45 WB105 20 08 20 66.3 37.1 -1.5 -127.1 -7 1 1 2526 04 59 45 05 00 05 --- 20 08 40 66.3 37.0 -1.5 -127.2 13 F 1 2659 05 00 05 2137+510 20 08 40 66.8 37.0 -1.5 -127.7 -7 1 1 2659 05 00 05 05 00 25 --- 20 09 00 66.9 36.9 -1.5 -127.9 13 F 1 2792 05 00 25 WB105 20 09 00 66.4 36.9 -1.5 -127.4 -7 1 1 2792 05 00 25 05 00 45 --- 20 09 20 66.4 36.9 -1.5 -127.5 13 F 1 2925 05 00 45 2137+510 20 09 20 66.9 36.8 -1.5 -128.0 -7 1 1 2925 05 00 45 05 01 05 --- 20 09 40 67.0 36.8 -1.5 -128.2 13 F 1 3058 05 01 05 WB105 20 09 40 66.4 36.8 -1.5 -127.6 -7 1 1 3058 05 01 05 05 01 25 --- 20 10 00 66.5 36.7 -1.5 -127.8 13 F 1 3191 05 01 25 2137+510 20 10 00 67.0 36.7 -1.5 -128.3 -7 1 1 3191 05 01 25 05 01 45 --- 20 10 20 67.0 36.6 -1.4 -128.4 13 F 1 3324 05 01 45 WB105 20 10 20 66.5 36.6 -1.5 -127.9 -7 1 1 3324 05 01 45 05 02 05 --- 20 10 40 66.6 36.5 -1.5 -128.0 13 F 1 3457 05 02 05 2137+510 20 10 40 67.1 36.5 -1.4 -128.6 -7 1 1 3457 05 02 05 05 02 25 --- 20 11 00 67.1 36.4 -1.4 -128.7 13 F 1 3590 05 02 25 WB105 20 11 00 66.6 36.5 -1.5 -128.2 -7 1 1 3590 05 02 25 05 02 44 --- 20 11 20 66.6 36.4 -1.5 -128.3 13 F 1 3723 05 02 44 2137+510 20 11 20 67.2 36.3 -1.4 -128.9 -7 1 1 3723 05 02 44 05 03 04 --- 20 11 40 67.2 36.3 -1.4 -129.0 13 F 1 3856 05 03 04 WB105 20 11 40 66.7 36.3 -1.5 -128.5 -7 1 1 3856 05 03 04 05 03 24 --- 20 12 00 66.7 36.2 -1.5 -128.6 13 F 1 3989 Schedule for VLBA_PT (Code Pt ) Page 3 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 03 24 2137+510 20 12 00 67.3 36.2 -1.4 -129.2 -7 1 1 3989 05 03 24 05 03 44 --- 20 12 20 67.3 36.1 -1.4 -129.3 13 F 1 4122 05 03 44 WB105 20 12 20 66.8 36.1 -1.5 -128.7 -7 1 1 4122 05 03 44 05 04 04 --- 20 12 40 66.8 36.0 -1.5 -128.9 13 F 1 4255 05 04 04 2137+510 20 12 40 67.3 36.0 -1.4 -129.4 -7 1 1 4255 05 04 04 05 04 24 --- 20 13 00 67.4 35.9 -1.4 -129.6 13 F 1 4388 05 04 24 WB105 20 13 00 66.9 36.0 -1.4 -129.0 -7 1 1 4388 05 04 24 05 04 44 --- 20 13 20 66.9 35.9 -1.4 -129.2 13 F 1 4521 05 04 44 2137+510 20 13 20 67.4 35.8 -1.4 -129.7 -7 1 1 4521 05 04 44 05 05 04 --- 20 13 40 67.5 35.7 -1.4 -129.9 13 F 1 4654 05 05 04 WB105 20 13 40 66.9 35.8 -1.4 -129.3 -7 1 1 4654 05 05 04 05 05 24 --- 20 14 00 67.0 35.7 -1.4 -129.5 13 F 1 4787 05 05 24 2137+510 20 14 00 67.5 35.7 -1.4 -130.0 -7 1 1 4787 05 05 24 05 05 44 --- 20 14 20 67.5 35.6 -1.4 -130.2 13 F 1 4920 05 05 44 WB105 20 14 20 67.0 35.6 -1.4 -129.6 -7 1 1 4920 05 05 44 05 06 04 --- 20 14 40 67.1 35.5 -1.4 -129.7 13 F 1 5053 05 06 04 2137+510 20 14 40 67.6 35.5 -1.4 -130.3 -7 1 1 5053 05 06 04 05 06 24 --- 20 15 00 67.6 35.4 -1.4 -130.5 13 F 1 5186 05 06 24 WB105 20 15 00 67.1 35.5 -1.4 -129.9 -7 1 1 5186 05 06 24 05 06 44 --- 20 15 20 67.1 35.4 -1.4 -130.0 13 F 1 5319 05 06 44 2137+510 20 15 20 67.7 35.3 -1.4 -130.6 -7 1 1 5319 05 06 44 05 07 04 --- 20 15 40 67.7 35.2 -1.4 -130.8 13 F 1 5452 05 07 04 WB105 20 15 40 67.2 35.3 -1.4 -130.2 -7 1 1 5452 05 07 04 05 07 24 --- 20 16 00 67.2 35.2 -1.4 -130.3 13 F 1 5585 05 07 24 2137+510 20 16 00 67.7 35.1 -1.4 -130.9 -7 1 1 5585 05 07 24 05 07 44 --- 20 16 20 67.8 35.0 -1.3 -131.1 13 F 1 5718 05 07 44 WB105 20 16 20 67.3 35.1 -1.4 -130.5 -7 1 1 5718 05 07 44 05 08 04 --- 20 16 40 67.3 35.0 -1.4 -130.6 13 F 1 5851 Schedule for VLBA_PT (Code Pt ) Page 4 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 08 04 2137+510 20 16 40 67.8 34.9 -1.3 -131.2 -7 1 1 5851 05 08 04 05 08 24 --- 20 17 00 67.9 34.8 -1.3 -131.4 13 F 1 5984 05 08 24 WB105 20 17 00 67.3 34.9 -1.4 -130.8 -7 1 1 5984 05 08 24 05 08 43 --- 20 17 20 67.4 34.8 -1.4 -130.9 13 F 1 6117 05 08 43 2137+510 20 17 20 67.9 34.8 -1.3 -131.5 -7 1 1 6117 05 08 43 05 09 03 --- 20 17 40 67.9 34.7 -1.3 -131.7 13 F 1 6250 05 09 03 WB105 20 17 40 67.4 34.8 -1.4 -131.0 -7 1 1 6250 05 09 03 05 09 23 --- 20 18 00 67.4 34.7 -1.4 -131.2 13 F 1 6383 05 09 23 2137+510 20 18 00 68.0 34.6 -1.3 -131.8 -7 1 1 6383 05 09 23 05 09 43 --- 20 18 20 68.0 34.5 -1.3 -132.0 13 F 1 6515 05 09 43 WB105 20 18 20 67.5 34.6 -1.4 -131.3 -7 1 1 6515 05 09 43 05 10 03 --- 20 18 40 67.5 34.5 -1.4 -131.5 13 F 1 6648 05 10 03 2137+510 20 18 40 68.0 34.4 -1.3 -132.1 -7 1 1 6648 05 10 03 05 10 23 --- 20 19 00 68.1 34.3 -1.3 -132.3 13 F 1 6781 05 10 23 WB105 20 19 00 67.6 34.4 -1.3 -131.6 -7 1 1 6781 05 10 23 05 10 43 --- 20 19 20 67.6 34.3 -1.3 -131.8 13 F 1 6914 05 10 43 2137+510 20 19 20 68.1 34.2 -1.3 -132.4 -7 1 1 6914 05 10 43 05 11 03 --- 20 19 40 68.2 34.1 -1.3 -132.6 13 F 1 7047 05 11 03 WB105 20 19 40 67.6 34.2 -1.3 -131.9 -7 1 1 7047 05 11 03 05 11 23 --- 20 20 00 67.7 34.1 -1.3 -132.1 13 F 1 7180 05 11 23 2137+510 20 20 00 68.2 34.0 -1.3 -132.7 -7 1 1 7180 05 11 23 05 11 43 --- 20 20 20 68.2 33.9 -1.3 -132.9 13 F 1 7313 05 11 43 WB105 20 20 20 67.7 34.0 -1.3 -132.2 -7 1 1 7313 05 11 43 05 12 03 --- 20 20 40 67.8 33.9 -1.3 -132.4 13 F 1 7446 05 12 03 2137+510 20 20 40 68.3 33.8 -1.3 -133.0 -7 1 1 7446 05 12 03 05 12 23 --- 20 21 00 68.3 33.7 -1.3 -133.2 13 F 1 7579 05 12 23 WB105 20 21 00 67.8 33.8 -1.3 -132.5 -7 1 1 7579 05 12 23 05 12 43 --- 20 21 20 67.8 33.8 -1.3 -132.7 13 F 1 7712 Schedule for VLBA_PT (Code Pt ) Page 5 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 12 43 2137+510 20 21 20 68.4 33.6 -1.3 -133.3 -7 1 1 7712 05 12 43 05 13 03 --- 20 21 40 68.4 33.5 -1.3 -133.5 13 F 1 7845 05 13 03 WB105 20 21 40 67.9 33.7 -1.3 -132.8 -7 1 1 7845 05 13 03 05 13 23 --- 20 22 00 67.9 33.6 -1.3 -133.0 13 F 1 7978 05 13 23 2137+510 20 22 00 68.4 33.4 -1.3 -133.7 -7 1 1 7978 05 13 23 05 13 43 --- 20 22 20 68.5 33.3 -1.2 -133.8 13 F 1 8111 05 13 43 WB105 20 22 20 67.9 33.5 -1.3 -133.2 -7 1 1 8111 05 13 43 05 14 03 --- 20 22 40 68.0 33.4 -1.3 -133.3 13 F 1 8244 05 14 03 2137+510 20 22 40 68.5 33.2 -1.2 -134.0 -7 1 1 8244 05 14 03 05 14 23 --- 20 23 00 68.5 33.1 -1.2 -134.1 13 F 1 8377 05 14 23 WB105 20 23 00 68.0 33.3 -1.3 -133.5 -7 1 1 8377 05 14 23 05 14 42 --- 20 23 20 68.1 33.2 -1.3 -133.6 13 F 1 8510 05 14 42 2137+510 20 23 20 68.6 33.0 -1.2 -134.3 -7 1 1 8510 05 14 42 05 15 02 --- 20 23 40 68.6 32.9 -1.2 -134.4 13 F 1 8643 05 15 02 WB105 20 23 40 68.1 33.1 -1.3 -133.8 -7 1 1 8643 05 15 02 05 15 22 --- 20 24 00 68.1 33.0 -1.3 -133.9 13 F 1 8776 05 15 22 2137+510 20 24 00 68.7 32.8 -1.2 -134.6 -7 1 1 8776 05 15 22 05 15 42 --- 20 24 20 68.7 32.7 -1.2 -134.8 13 F 1 8909 05 15 42 WB105 20 24 20 68.2 32.9 -1.3 -134.1 -7 1 1 8909 05 15 42 05 16 02 --- 20 24 40 68.2 32.8 -1.3 -134.2 13 F 1 9042 05 16 02 2137+510 20 24 40 68.7 32.6 -1.2 -134.9 -7 1 1 9042 05 16 02 05 16 22 --- 20 25 00 68.8 32.5 -1.2 -135.1 13 F 1 9175 05 16 22 WB105 20 25 00 68.2 32.7 -1.2 -134.4 -7 1 1 9175 05 16 22 05 16 42 --- 20 25 20 68.3 32.6 -1.2 -134.5 13 F 1 9308 05 16 42 2137+510 20 25 20 68.8 32.4 -1.2 -135.2 -7 1 1 9308 05 16 42 05 17 02 --- 20 25 40 68.8 32.3 -1.2 -135.4 13 F 1 9441 05 17 02 WB105 20 25 40 68.3 32.5 -1.2 -134.7 -7 1 1 9441 05 17 02 05 17 22 --- 20 26 00 68.4 32.4 -1.2 -134.9 13 F 1 9574 Schedule for VLBA_PT (Code Pt ) Page 6 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 17 22 2137+510 20 26 00 68.9 32.2 -1.2 -135.6 -7 1 1 9574 05 17 22 05 17 42 --- 20 26 20 68.9 32.1 -1.2 -135.7 13 F 1 9707 05 17 42 WB105 20 26 20 68.4 32.3 -1.2 -135.0 -7 1 1 9707 05 17 42 05 18 02 --- 20 26 40 68.4 32.2 -1.2 -135.2 13 F 1 9840 05 18 02 2137+510 20 26 40 69.0 32.0 -1.2 -135.9 -7 1 1 9840 05 18 02 05 18 22 --- 20 27 00 69.0 31.9 -1.2 -136.1 13 F 1 9973 05 18 22 WB105 20 27 00 68.5 32.1 -1.2 -135.3 -7 1 1 9973 05 18 22 05 18 42 --- 20 27 20 68.5 32.0 -1.2 -135.5 13 F 1 10106 05 18 42 2137+510 20 27 20 69.0 31.8 -1.2 -136.2 -7 1 1 10106 05 18 42 05 19 02 --- 20 27 40 69.1 31.7 -1.2 -136.4 13 F 1 10239 05 19 02 WB105 20 27 40 68.5 31.9 -1.2 -135.7 -7 1 1 10239 05 19 02 05 19 22 --- 20 28 00 68.6 31.8 -1.2 -135.8 13 F 1 10372 05 19 22 2137+510 20 28 00 69.1 31.6 -1.2 -136.5 -7 1 1 10372 05 19 22 05 19 42 --- 20 28 20 69.1 31.5 -1.1 -136.7 13 F 1 10505 05 19 42 WB105 20 28 20 68.6 31.7 -1.2 -136.0 -7 1 1 10505 05 19 42 05 20 02 --- 20 28 40 68.7 31.6 -1.2 -136.1 13 F 1 10638 05 20 02 2137+510 20 28 40 69.2 31.4 -1.1 -136.9 -7 1 1 10638 05 20 02 05 20 22 --- 20 29 00 69.2 31.2 -1.1 -137.0 13 F 1 10771 05 20 22 WB105 20 29 00 68.7 31.5 -1.2 -136.3 -7 1 1 10771 05 20 22 05 20 42 --- 20 29 20 68.7 31.4 -1.2 -136.5 13 F 1 10903 05 20 42 2137+510 20 29 20 69.2 31.1 -1.1 -137.2 -7 1 1 10903 05 20 42 05 21 01 --- 20 29 40 69.3 31.0 -1.1 -137.4 13 F 1 11036 05 21 01 WB105 20 29 40 68.8 31.3 -1.2 -136.6 -7 1 1 11036 05 21 01 05 21 21 --- 20 30 00 68.8 31.2 -1.2 -136.8 13 F 1 11169 05 21 21 2137+510 20 30 00 69.3 30.9 -1.1 -137.5 -7 1 1 11169 05 21 21 05 21 41 --- 20 30 20 69.3 30.8 -1.1 -137.7 13 F 1 11302 05 21 41 WB105 20 30 20 68.8 31.1 -1.2 -136.9 -7 1 1 11302 05 21 41 05 22 01 --- 20 30 40 68.9 31.0 -1.2 -137.1 13 F 1 11435 Schedule for VLBA_PT (Code Pt ) Page 7 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 22 01 2137+510 20 30 40 69.4 30.7 -1.1 -137.9 -7 1 1 11435 05 22 01 05 22 21 --- 20 31 00 69.4 30.6 -1.1 -138.0 13 F 1 11568 05 22 21 WB105 20 31 00 68.9 30.9 -1.1 -137.3 -7 1 1 11568 05 22 21 05 22 41 --- 20 31 20 68.9 30.8 -1.1 -137.4 13 F 1 11701 05 22 41 2137+510 20 31 20 69.5 30.5 -1.1 -138.2 -7 1 1 11701 05 22 41 05 23 01 --- 20 31 40 69.5 30.4 -1.1 -138.4 13 F 1 11834 05 23 01 WB105 20 31 40 69.0 30.6 -1.1 -137.6 -7 1 1 11834 05 23 01 05 23 21 --- 20 32 00 69.0 30.5 -1.1 -137.8 13 F 1 11967 05 23 21 2137+510 20 32 00 69.5 30.3 -1.1 -138.5 -7 1 1 11967 05 23 21 05 23 41 --- 20 32 20 69.6 30.1 -1.1 -138.7 13 F 1 12100 05 23 41 WB105 20 32 20 69.0 30.4 -1.1 -137.9 -7 1 1 12100 05 23 41 05 24 01 --- 20 32 40 69.1 30.3 -1.1 -138.1 13 F 1 12233 05 24 01 2137+510 20 32 40 69.6 30.0 -1.1 -138.9 -7 1 1 12233 05 24 01 05 24 21 --- 20 33 00 69.6 29.9 -1.1 -139.1 13 F 1 12366 05 24 21 WB105 20 33 00 69.1 30.2 -1.1 -138.3 -7 1 1 12366 05 24 21 05 24 41 --- 20 33 20 69.1 30.1 -1.1 -138.4 13 F 1 12499 05 24 41 2137+510 20 33 20 69.7 29.8 -1.1 -139.2 -7 1 1 12499 05 24 41 05 25 01 --- 20 33 40 69.7 29.7 -1.1 -139.4 13 F 1 12632 05 25 01 WB105 20 33 40 69.2 30.0 -1.1 -138.6 -7 1 1 12632 05 25 01 05 25 21 --- 20 34 00 69.2 29.9 -1.1 -138.8 13 F 1 12765 05 25 21 2137+510 20 34 00 69.7 29.6 -1.1 -139.6 -7 1 1 12765 05 25 21 05 25 41 --- 20 34 20 69.8 29.5 -1.0 -139.7 13 F 1 12898 05 25 41 WB105 20 34 20 69.2 29.8 -1.1 -138.9 -7 1 1 12898 05 25 41 05 26 01 --- 20 34 40 69.3 29.7 -1.1 -139.1 13 F 1 13031 05 26 01 2137+510 20 34 40 69.8 29.3 -1.0 -139.9 -7 1 1 13031 05 26 01 05 26 21 --- 20 35 00 69.8 29.2 -1.0 -140.1 13 F 1 13164 05 26 21 WB105 20 35 00 69.3 29.6 -1.1 -139.3 -7 1 1 13164 05 26 21 05 26 41 --- 20 35 20 69.4 29.4 -1.1 -139.4 13 F 1 13297 Schedule for VLBA_PT (Code Pt ) Page 8 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 26 41 2137+510 20 35 20 69.9 29.1 -1.0 -140.3 -7 1 1 13297 05 26 41 05 27 00 --- 20 35 40 69.9 29.0 -1.0 -140.4 13 F 1 13430 05 27 00 WB105 20 35 40 69.4 29.3 -1.1 -139.6 -7 1 1 13430 05 27 00 05 27 20 --- 20 36 00 69.4 29.2 -1.1 -139.8 13 F 1 13563 05 29 20 3C454.3 20 38 00 54.5 112.1 -2.3 -52.8 58 1 1 13563 05 29 20 05 35 19 --- 20 44 00 55.7 113.7 -2.2 -52.0 359 F 1 15956 Next scan frequencies: 22237.77 22229.61 22221.45 22245.93 Next BBC frequencies: 737.77 729.61 721.45 745.93 05 35 19 3C454.3 20 44 00 55.7 113.7 -2.2 -52.0 -6 1 2 15956 05 35 19 05 41 18 --- 20 50 00 56.8 115.3 -2.1 -51.0 353 R 1 16850 05 43 18 2123+550 20 52 00 68.6 12.3 -0.5 -162.1 45 1 2 16850 05 43 18 05 43 38 --- 20 52 20 68.6 12.2 -0.5 -162.3 20 R 1 16717 05 43 38 WB114 20 52 20 67.5 19.3 -0.8 -151.6 -11 1 2 16717 05 43 38 05 43 58 --- 20 52 40 67.6 19.2 -0.8 -151.8 9 R 1 16584 05 43 58 2123+550 20 52 40 68.6 12.1 -0.5 -162.5 -11 1 2 16584 05 43 58 05 44 18 --- 20 53 00 68.6 11.9 -0.5 -162.7 9 R 1 16451 05 44 18 WB114 20 53 00 67.6 19.1 -0.8 -152.0 -11 1 2 16451 05 44 18 05 44 38 --- 20 53 20 67.6 19.0 -0.8 -152.1 9 R 1 16318 05 44 38 2123+550 20 53 20 68.6 11.8 -0.5 -162.9 -11 1 2 16318 05 44 38 05 44 58 --- 20 53 40 68.7 11.7 -0.5 -163.0 9 R 1 16185 05 44 58 WB114 20 53 40 67.6 18.9 -0.8 -152.3 -11 1 2 16185 05 44 58 05 45 17 --- 20 54 00 67.7 18.7 -0.8 -152.5 9 R 1 16052 05 45 17 2123+550 20 54 00 68.7 11.5 -0.5 -163.2 -11 1 2 16052 05 45 17 05 45 37 --- 20 54 20 68.7 11.4 -0.5 -163.4 9 R 1 15919 05 45 37 WB114 20 54 20 67.7 18.6 -0.8 -152.6 -11 1 2 15919 05 45 37 05 45 57 --- 20 54 40 67.7 18.5 -0.8 -152.8 9 R 1 15786 05 45 57 2123+550 20 54 40 68.7 11.3 -0.5 -163.6 -11 1 2 15786 05 45 57 05 46 17 --- 20 55 00 68.7 11.2 -0.5 -163.8 9 R 1 15654 Schedule for VLBA_PT (Code Pt ) Page 9 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 46 17 WB114 20 55 00 67.7 18.4 -0.8 -153.0 -11 1 2 15654 05 46 17 05 46 37 --- 20 55 20 67.7 18.3 -0.8 -153.2 9 R 1 15521 05 46 37 2123+550 20 55 20 68.7 11.0 -0.5 -164.0 -11 1 2 15521 05 46 37 05 46 57 --- 20 55 40 68.7 10.9 -0.5 -164.2 9 R 1 15388 05 46 57 WB114 20 55 40 67.8 18.2 -0.8 -153.3 -11 1 2 15388 05 46 57 05 47 17 --- 20 56 00 67.8 18.1 -0.8 -153.5 9 R 1 15255 05 47 17 2123+550 20 56 00 68.7 10.8 -0.5 -164.3 -11 1 2 15255 05 47 17 05 47 37 --- 20 56 20 68.8 10.7 -0.4 -164.5 9 R 1 15122 05 47 37 WB114 20 56 20 67.8 18.0 -0.8 -153.7 -11 1 2 15122 05 47 37 05 47 57 --- 20 56 40 67.8 17.8 -0.8 -153.8 9 R 1 14989 05 47 57 2123+550 20 56 40 68.8 10.5 -0.4 -164.7 -11 1 2 14989 05 47 57 05 48 17 --- 20 57 00 68.8 10.4 -0.4 -164.9 9 R 1 14856 05 48 17 WB114 20 57 00 67.8 17.7 -0.8 -154.0 -11 1 2 14856 05 48 17 05 48 37 --- 20 57 20 67.9 17.6 -0.8 -154.2 9 R 1 14723 05 48 37 2123+550 20 57 20 68.8 10.3 -0.4 -165.1 -11 1 2 14723 05 48 37 05 48 57 --- 20 57 40 68.8 10.2 -0.4 -165.3 9 R 1 14590 05 48 57 WB114 20 57 40 67.9 17.5 -0.8 -154.4 -11 1 2 14590 05 48 57 05 49 17 --- 20 58 00 67.9 17.4 -0.8 -154.5 9 R 1 14457 05 49 17 2123+550 20 58 00 68.8 10.0 -0.4 -165.5 -11 1 2 14457 05 49 17 05 49 37 --- 20 58 20 68.8 9.9 -0.4 -165.7 9 R 1 14324 05 49 37 WB114 20 58 20 67.9 17.3 -0.7 -154.7 -11 1 2 14324 05 49 37 05 49 57 --- 20 58 40 68.0 17.2 -0.7 -154.9 9 R 1 14191 05 49 57 2123+550 20 58 40 68.8 9.8 -0.4 -165.8 -11 1 2 14191 05 49 57 05 50 17 --- 20 59 00 68.9 9.6 -0.4 -166.0 9 R 1 14058 05 50 17 WB114 20 59 00 68.0 17.0 -0.7 -155.1 -11 1 2 14058 05 50 17 05 50 37 --- 20 59 20 68.0 16.9 -0.7 -155.2 9 R 1 13925 05 50 37 2123+550 20 59 20 68.9 9.5 -0.4 -166.2 -11 1 2 13925 05 50 37 05 50 57 --- 20 59 40 68.9 9.4 -0.4 -166.4 9 R 1 13792 Schedule for VLBA_PT (Code Pt ) Page 10 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 50 57 WB114 20 59 40 68.0 16.8 -0.7 -155.4 -11 1 2 13792 05 50 57 05 51 16 --- 21 00 00 68.0 16.7 -0.7 -155.6 9 R 1 13659 05 51 16 2123+550 21 00 00 68.9 9.3 -0.4 -166.6 -11 1 2 13659 05 51 16 05 51 36 --- 21 00 20 68.9 9.1 -0.4 -166.8 9 R 1 13526 05 51 36 WB114 21 00 20 68.1 16.6 -0.7 -155.8 -11 1 2 13526 05 51 36 05 51 56 --- 21 00 40 68.1 16.5 -0.7 -156.0 9 R 1 13393 05 51 56 2123+550 21 00 40 68.9 9.0 -0.4 -167.0 -11 1 2 13393 05 51 56 05 52 16 --- 21 01 00 68.9 8.9 -0.4 -167.2 9 R 1 13260 05 52 16 WB114 21 01 00 68.1 16.3 -0.7 -156.1 -11 1 2 13260 05 52 16 05 52 36 --- 21 01 20 68.1 16.2 -0.7 -156.3 9 R 1 13127 05 52 36 2123+550 21 01 20 68.9 8.7 -0.4 -167.4 -11 1 2 13127 05 52 36 05 52 56 --- 21 01 40 68.9 8.6 -0.4 -167.5 9 R 1 12994 05 52 56 WB114 21 01 40 68.1 16.1 -0.7 -156.5 -11 1 2 12994 05 52 56 05 53 16 --- 21 02 00 68.1 16.0 -0.7 -156.7 9 R 1 12861 05 53 16 2123+550 21 02 00 69.0 8.5 -0.4 -167.7 -11 1 2 12861 05 53 16 05 53 36 --- 21 02 20 69.0 8.3 -0.3 -167.9 9 R 1 12728 05 53 36 WB114 21 02 20 68.2 15.9 -0.7 -156.8 -11 1 2 12728 05 53 36 05 53 56 --- 21 02 40 68.2 15.8 -0.7 -157.0 9 R 1 12595 05 53 56 2123+550 21 02 40 69.0 8.2 -0.3 -168.1 -11 1 2 12595 05 53 56 05 54 16 --- 21 03 00 69.0 8.1 -0.3 -168.3 9 R 1 12462 05 54 16 WB114 21 03 00 68.2 15.6 -0.7 -157.2 -11 1 2 12462 05 54 16 05 54 36 --- 21 03 20 68.2 15.5 -0.7 -157.4 9 R 1 12329 05 54 36 2123+550 21 03 20 69.0 8.0 -0.3 -168.5 -11 1 2 12329 05 54 36 05 54 56 --- 21 03 40 69.0 7.8 -0.3 -168.7 9 R 1 12196 05 54 56 WB114 21 03 40 68.2 15.4 -0.7 -157.6 -11 1 2 12196 05 54 56 05 55 16 --- 21 04 00 68.3 15.3 -0.7 -157.7 9 R 1 12063 05 55 16 2123+550 21 04 00 69.0 7.7 -0.3 -168.9 -11 1 2 12063 05 55 16 05 55 36 --- 21 04 20 69.0 7.6 -0.3 -169.1 9 R 1 11930 Schedule for VLBA_PT (Code Pt ) Page 11 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 55 36 WB114 21 04 20 68.3 15.2 -0.6 -157.9 -11 1 2 11930 05 55 36 05 55 56 --- 21 04 40 68.3 15.0 -0.6 -158.1 9 R 1 11797 05 55 56 2123+550 21 04 40 69.0 7.4 -0.3 -169.3 -11 1 2 11797 05 55 56 05 56 16 --- 21 05 00 69.0 7.3 -0.3 -169.4 9 R 1 11664 05 56 16 WB114 21 05 00 68.3 14.9 -0.6 -158.3 -11 1 2 11664 05 56 16 05 56 36 --- 21 05 20 68.3 14.8 -0.6 -158.5 9 R 1 11531 05 56 36 2123+550 21 05 20 69.1 7.2 -0.3 -169.6 -11 1 2 11531 05 56 36 05 56 56 --- 21 05 40 69.1 7.0 -0.3 -169.8 9 R 1 11399 05 56 56 WB114 21 05 40 68.3 14.7 -0.6 -158.6 -11 1 2 11399 05 56 56 05 57 15 --- 21 06 00 68.4 14.6 -0.6 -158.8 9 R 1 11266 05 57 15 2123+550 21 06 00 69.1 6.9 -0.3 -170.0 -11 1 2 11266 05 57 15 05 57 35 --- 21 06 20 69.1 6.8 -0.3 -170.2 9 R 1 11133 05 57 35 WB114 21 06 20 68.4 14.4 -0.6 -159.0 -11 1 2 11133 05 57 35 05 57 55 --- 21 06 40 68.4 14.3 -0.6 -159.2 9 R 1 11000 05 57 55 2123+550 21 06 40 69.1 6.6 -0.3 -170.4 -11 1 2 11000 05 57 55 05 58 15 --- 21 07 00 69.1 6.5 -0.3 -170.6 9 R 1 10867 05 58 15 WB114 21 07 00 68.4 14.2 -0.6 -159.4 -11 1 2 10867 05 58 15 05 58 35 --- 21 07 20 68.4 14.1 -0.6 -159.5 9 R 1 10734 05 58 35 2123+550 21 07 20 69.1 6.4 -0.3 -170.8 -11 1 2 10734 05 58 35 05 58 55 --- 21 07 40 69.1 6.2 -0.3 -171.0 9 R 1 10601 05 58 55 WB114 21 07 40 68.4 13.9 -0.6 -159.7 -11 1 2 10601 05 58 55 05 59 15 --- 21 08 00 68.5 13.8 -0.6 -159.9 9 R 1 10468 05 59 15 2123+550 21 08 00 69.1 6.1 -0.3 -171.2 -11 1 2 10468 05 59 15 05 59 35 --- 21 08 20 69.1 6.0 -0.2 -171.4 9 R 1 10335 05 59 35 WB114 21 08 20 68.5 13.7 -0.6 -160.1 -11 1 2 10335 05 59 35 05 59 55 --- 21 08 40 68.5 13.6 -0.6 -160.3 9 R 1 10202 05 59 55 2123+550 21 08 40 69.1 5.9 -0.2 -171.6 -11 1 2 10202 05 59 55 06 00 15 --- 21 09 00 69.1 5.7 -0.2 -171.7 9 R 1 10069 Schedule for VLBA_PT (Code Pt ) Page 12 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 00 15 WB114 21 09 00 68.5 13.5 -0.6 -160.4 -11 1 2 10069 06 00 15 06 00 35 --- 21 09 20 68.5 13.3 -0.6 -160.6 9 R 1 9936 06 00 35 2123+550 21 09 20 69.1 5.6 -0.2 -171.9 -11 1 2 9936 06 00 35 06 00 55 --- 21 09 40 69.1 5.5 -0.2 -172.1 9 R 1 9803 06 00 55 WB114 21 09 40 68.5 13.2 -0.6 -160.8 -11 1 2 9803 06 00 55 06 01 15 --- 21 10 00 68.6 13.1 -0.6 -161.0 9 R 1 9670 06 01 15 2123+550 21 10 00 69.2 5.3 -0.2 -172.3 -11 1 2 9670 06 01 15 06 01 35 --- 21 10 20 69.2 5.2 -0.2 -172.5 9 R 1 9537 06 01 35 WB114 21 10 20 68.6 13.0 -0.5 -161.2 -11 1 2 9537 06 01 35 06 01 55 --- 21 10 40 68.6 12.8 -0.5 -161.4 9 R 1 9404 06 01 55 2123+550 21 10 40 69.2 5.1 -0.2 -172.7 -11 1 2 9404 06 01 55 06 02 15 --- 21 11 00 69.2 4.9 -0.2 -172.9 9 R 1 9271 06 02 15 WB114 21 11 00 68.6 12.7 -0.5 -161.5 -11 1 2 9271 06 02 15 06 02 35 --- 21 11 20 68.6 12.6 -0.5 -161.7 9 R 1 9138 06 02 35 2123+550 21 11 20 69.2 4.8 -0.2 -173.1 -11 1 2 9138 06 02 35 06 02 55 --- 21 11 40 69.2 4.7 -0.2 -173.3 9 R 1 9005 06 02 55 WB114 21 11 40 68.6 12.5 -0.5 -161.9 -11 1 2 9005 06 02 55 06 03 15 --- 21 12 00 68.7 12.3 -0.5 -162.1 9 R 1 8872 06 03 15 2123+550 21 12 00 69.2 4.5 -0.2 -173.5 -11 1 2 8872 06 03 15 06 03 34 --- 21 12 20 69.2 4.4 -0.2 -173.7 9 R 1 8739 06 03 34 WB114 21 12 20 68.7 12.2 -0.5 -162.3 -11 1 2 8739 06 03 34 06 03 54 --- 21 12 40 68.7 12.1 -0.5 -162.5 9 R 1 8606 06 03 54 2123+550 21 12 40 69.2 4.3 -0.2 -173.9 -11 1 2 8606 06 03 54 06 04 14 --- 21 13 00 69.2 4.1 -0.2 -174.1 9 R 1 8473 06 04 14 WB114 21 13 00 68.7 12.0 -0.5 -162.7 -11 1 2 8473 06 04 14 06 04 34 --- 21 13 20 68.7 11.8 -0.5 -162.8 9 R 1 8340 06 04 34 2123+550 21 13 20 69.2 4.0 -0.2 -174.3 -11 1 2 8340 06 04 34 06 04 54 --- 21 13 40 69.2 3.8 -0.2 -174.4 9 R 1 8207 Schedule for VLBA_PT (Code Pt ) Page 13 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 04 54 WB114 21 13 40 68.7 11.7 -0.5 -163.0 -11 1 2 8207 06 04 54 06 05 14 --- 21 14 00 68.7 11.6 -0.5 -163.2 9 R 1 8074 06 05 14 2123+550 21 14 00 69.2 3.7 -0.2 -174.6 -11 1 2 8074 06 05 14 06 05 34 --- 21 14 20 69.2 3.6 -0.1 -174.8 9 R 1 7941 06 05 34 WB114 21 14 20 68.8 11.5 -0.5 -163.4 -11 1 2 7941 06 05 34 06 05 54 --- 21 14 40 68.8 11.3 -0.5 -163.6 9 R 1 7808 06 05 54 2123+550 21 14 40 69.2 3.4 -0.1 -175.0 -11 1 2 7808 06 05 54 06 06 14 --- 21 15 00 69.2 3.3 -0.1 -175.2 9 R 1 7675 06 06 14 WB114 21 15 00 68.8 11.2 -0.5 -163.8 -11 1 2 7675 06 06 14 06 06 34 --- 21 15 20 68.8 11.1 -0.5 -164.0 9 R 1 7542 06 06 34 2123+550 21 15 20 69.2 3.2 -0.1 -175.4 -11 1 2 7542 06 06 34 06 06 54 --- 21 15 40 69.2 3.0 -0.1 -175.6 9 R 1 7409 06 06 54 WB114 21 15 40 68.8 10.9 -0.5 -164.1 -11 1 2 7409 06 06 54 06 07 14 --- 21 16 00 68.8 10.8 -0.5 -164.3 9 R 1 7276 06 07 14 2123+550 21 16 00 69.2 2.9 -0.1 -175.8 -11 1 2 7276 06 07 14 06 07 34 --- 21 16 20 69.2 2.8 -0.1 -176.0 9 R 1 7144 06 07 34 WB114 21 16 20 68.8 10.7 -0.4 -164.5 -11 1 2 7144 06 07 34 06 07 54 --- 21 16 40 68.8 10.6 -0.4 -164.7 9 R 1 7011 06 07 54 2123+550 21 16 40 69.3 2.6 -0.1 -176.2 -11 1 2 7011 06 07 54 06 08 14 --- 21 17 00 69.3 2.5 -0.1 -176.4 9 R 1 6878 06 08 14 WB114 21 17 00 68.9 10.4 -0.4 -164.9 -11 1 2 6878 06 08 14 06 08 34 --- 21 17 20 68.9 10.3 -0.4 -165.1 9 R 1 6745 06 08 34 2123+550 21 17 20 69.3 2.4 -0.1 -176.6 -11 1 2 6745 06 08 34 06 08 54 --- 21 17 40 69.3 2.2 -0.1 -176.8 9 R 1 6612 06 08 54 WB114 21 17 40 68.9 10.2 -0.4 -165.3 -11 1 2 6612 06 08 54 06 09 14 --- 21 18 00 68.9 10.1 -0.4 -165.5 9 R 1 6479 06 09 14 2123+550 21 18 00 69.3 2.1 -0.1 -177.0 -11 1 2 6479 06 09 14 06 09 33 --- 21 18 20 69.3 2.0 -0.1 -177.2 9 R 1 6346 Schedule for VLBA_PT (Code Pt ) Page 14 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 09 33 WB114 21 18 20 68.9 9.9 -0.4 -165.6 -11 1 2 6346 06 09 33 06 09 53 --- 21 18 40 68.9 9.8 -0.4 -165.8 9 R 1 6213 06 09 53 2123+550 21 18 40 69.3 1.8 -0.1 -177.4 -11 1 2 6213 06 09 53 06 10 13 --- 21 19 00 69.3 1.7 -0.1 -177.6 9 R 1 6080 06 10 13 WB114 21 19 00 68.9 9.7 -0.4 -166.0 -11 1 2 6080 06 10 13 06 10 33 --- 21 19 20 68.9 9.5 -0.4 -166.2 9 R 1 5947 06 10 33 2123+550 21 19 20 69.3 1.6 -0.1 -177.7 -11 1 2 5947 06 10 33 06 10 53 --- 21 19 40 69.3 1.4 -0.1 -177.9 9 R 1 5814 06 10 53 WB114 21 19 40 69.0 9.4 -0.4 -166.4 -11 1 2 5814 06 10 53 06 11 13 --- 21 20 00 69.0 9.3 -0.4 -166.6 9 R 1 5681 06 13 13 3C454.3 21 22 00 62.5 125.5 -1.5 -44.4 36 1 2 5681 06 13 13 06 19 12 --- 21 28 00 63.5 127.8 -1.4 -42.8 359 R 1 3287 06 21 12 2146+570 21 30 00 67.1 5.8 -0.3 -171.2 32 1 2 3287 06 21 12 06 21 32 --- 21 30 20 67.1 5.7 -0.3 -171.4 20 R 1 3154 06 21 32 WB114 21 30 20 69.2 5.2 -0.2 -172.5 -10 1 2 3154 06 21 32 06 21 51 --- 21 30 40 69.2 5.1 -0.2 -172.7 10 R 1 3021 06 21 51 2146+570 21 30 40 67.1 5.5 -0.3 -171.6 -10 1 2 3021 06 21 51 06 22 11 --- 21 31 00 67.1 5.4 -0.3 -171.7 10 R 1 2888 06 22 11 WB114 21 31 00 69.2 4.9 -0.2 -172.9 -10 1 2 2888 06 22 11 06 22 31 --- 21 31 20 69.2 4.8 -0.2 -173.1 10 R 1 2756 06 22 31 2146+570 21 31 20 67.1 5.3 -0.3 -171.9 -10 1 2 2756 06 22 31 06 22 51 --- 21 31 40 67.1 5.2 -0.2 -172.1 10 R 1 2623 06 22 51 WB114 21 31 40 69.3 4.7 -0.2 -173.3 -10 1 2 2623 06 22 51 06 23 11 --- 21 32 00 69.3 4.5 -0.2 -173.5 10 R 1 2490 06 23 11 2146+570 21 32 00 67.1 5.1 -0.2 -172.3 -10 1 2 2490 06 23 11 06 23 31 --- 21 32 20 67.1 5.0 -0.2 -172.4 10 R 1 2357 06 23 31 WB114 21 32 20 69.3 4.4 -0.2 -173.7 -10 1 2 2357 06 23 31 06 23 51 --- 21 32 40 69.3 4.2 -0.2 -173.9 10 R 1 2224 Schedule for VLBA_PT (Code Pt ) Page 15 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 23 51 2146+570 21 32 40 67.1 4.9 -0.2 -172.6 -10 1 2 2224 06 23 51 06 24 11 --- 21 33 00 67.1 4.7 -0.2 -172.8 10 R 1 2091 06 24 11 WB114 21 33 00 69.3 4.1 -0.2 -174.1 -10 1 2 2091 06 24 11 06 24 31 --- 21 33 20 69.3 4.0 -0.2 -174.3 10 R 1 1958 06 24 31 2146+570 21 33 20 67.1 4.6 -0.2 -173.0 -10 1 2 1958 06 24 31 06 24 51 --- 21 33 40 67.1 4.5 -0.2 -173.1 10 R 1 1825 06 24 51 WB114 21 33 40 69.3 3.8 -0.2 -174.5 -10 1 2 1825 06 24 51 06 25 11 --- 21 34 00 69.3 3.7 -0.2 -174.7 10 R 1 1692 06 25 11 2146+570 21 34 00 67.1 4.4 -0.2 -173.3 -10 1 2 1692 06 25 11 06 25 31 --- 21 34 20 67.1 4.3 -0.2 -173.5 10 R 1 1559 06 25 31 WB114 21 34 20 69.3 3.6 -0.1 -174.9 -10 1 2 1559 06 25 31 06 25 51 --- 21 34 40 69.3 3.4 -0.1 -175.0 10 R 1 1426 06 25 51 2146+570 21 34 40 67.1 4.2 -0.2 -173.7 -10 1 2 1426 06 25 51 06 26 11 --- 21 35 00 67.1 4.0 -0.2 -173.9 10 R 1 1293 06 26 11 WB114 21 35 00 69.3 3.3 -0.1 -175.2 -10 1 2 1293 06 26 11 06 26 31 --- 21 35 20 69.3 3.2 -0.1 -175.4 10 R 1 1160 06 26 31 2146+570 21 35 20 67.2 3.9 -0.2 -174.0 -10 1 2 1160 06 26 31 06 26 51 --- 21 35 40 67.2 3.8 -0.2 -174.2 10 R 1 1027 06 26 51 WB114 21 35 40 69.3 3.0 -0.1 -175.6 -10 1 2 1027 06 26 51 06 27 11 --- 21 36 00 69.3 2.9 -0.1 -175.8 10 R 1 894 06 27 11 2146+570 21 36 00 67.2 3.7 -0.2 -174.4 -10 1 2 894 06 27 11 06 27 31 --- 21 36 20 67.2 3.6 -0.2 -174.6 10 R 1 761 06 27 31 WB114 21 36 20 69.3 2.8 -0.1 -176.0 -10 1 2 761 06 27 31 06 27 50 --- 21 36 40 69.3 2.6 -0.1 -176.2 10 R 1 628 06 27 50 2146+570 21 36 40 67.2 3.5 -0.2 -174.7 -10 1 2 628 06 27 50 06 28 10 --- 21 37 00 67.2 3.3 -0.2 -174.9 10 R 1 495 06 28 10 WB114 21 37 00 69.3 2.5 -0.1 -176.4 -10 1 2 495 06 28 10 06 28 30 --- 21 37 20 69.3 2.4 -0.1 -176.6 10 R 1 362 Schedule for VLBA_PT (Code Pt ) Page 16 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 28 30 2146+570 21 37 20 67.2 3.2 -0.2 -175.1 -10 1 3 362 06 28 30 06 28 50 --- 21 37 40 67.2 3.1 -0.1 -175.3 10 F 1 495 06 28 50 WB114 21 37 40 69.3 2.2 -0.1 -176.8 -10 1 3 495 06 28 50 06 29 10 --- 21 38 00 69.3 2.1 -0.1 -177.0 10 F 1 628 06 29 10 2146+570 21 38 00 67.2 3.0 -0.1 -175.4 -10 1 3 628 06 29 10 06 29 30 --- 21 38 20 67.2 2.9 -0.1 -175.6 10 F 1 761 06 29 30 WB114 21 38 20 69.3 2.0 -0.1 -177.2 -10 1 3 761 06 29 30 06 29 50 --- 21 38 40 69.3 1.8 -0.1 -177.4 10 F 1 894 06 29 50 2146+570 21 38 40 67.2 2.8 -0.1 -175.8 -10 1 3 894 06 29 50 06 30 10 --- 21 39 00 67.2 2.6 -0.1 -176.0 10 F 1 1027 06 30 10 WB114 21 39 00 69.3 1.7 -0.1 -177.6 -10 1 3 1027 06 30 10 06 30 30 --- 21 39 20 69.3 1.5 -0.1 -177.8 10 F 1 1160 06 30 30 2146+570 21 39 20 67.2 2.5 -0.1 -176.2 -10 1 3 1160 06 30 30 06 30 50 --- 21 39 40 67.2 2.4 -0.1 -176.3 10 F 1 1293 06 30 50 WB114 21 39 40 69.3 1.4 -0.1 -178.0 -10 1 3 1293 06 30 50 06 31 10 --- 21 40 00 69.3 1.3 -0.1 -178.2 10 F 1 1426 06 31 10 2146+570 21 40 00 67.2 2.3 -0.1 -176.5 -10 1 3 1426 06 31 10 06 31 30 --- 21 40 20 67.2 2.2 -0.1 -176.7 10 F 1 1559 06 31 30 WB114 21 40 20 69.3 1.1 0.0 -178.4 -10 1 3 1559 06 31 30 06 31 50 --- 21 40 40 69.3 1.0 0.0 -178.6 10 F 1 1692 06 31 50 2146+570 21 40 40 67.2 2.1 -0.1 -176.9 -10 1 3 1692 06 31 50 06 32 10 --- 21 41 00 67.2 1.9 -0.1 -177.0 10 F 1 1825 06 32 10 WB114 21 41 00 69.3 0.9 0.0 -178.8 -10 1 3 1825 06 32 10 06 32 30 --- 21 41 20 69.3 0.7 0.0 -178.9 10 F 1 1958 06 32 30 2146+570 21 41 20 67.2 1.8 -0.1 -177.2 -10 1 3 1958 06 32 30 06 32 50 --- 21 41 40 67.2 1.7 -0.1 -177.4 10 F 1 2091 06 32 50 WB114 21 41 40 69.3 0.6 0.0 -179.1 -10 1 3 2091 06 32 50 06 33 10 --- 21 42 00 69.4 0.5 0.0 -179.3 10 F 1 2224 Schedule for VLBA_PT (Code Pt ) Page 17 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 33 10 2146+570 21 42 00 67.2 1.6 -0.1 -177.6 -10 1 3 2224 06 33 10 06 33 30 --- 21 42 20 67.2 1.5 -0.1 -177.8 10 F 1 2357 06 33 30 WB114 21 42 20 69.4 0.3 0.0 -179.5 -10 1 3 2357 06 33 30 06 33 49 --- 21 42 40 69.4 0.2 0.0 -179.7 10 F 1 2490 06 33 49 2146+570 21 42 40 67.2 1.4 -0.1 -177.9 -10 1 3 2490 06 33 49 06 34 09 --- 21 43 00 67.2 1.2 -0.1 -178.1 10 F 1 2623 06 34 09 WB114 21 43 00 69.4 0.1 0.0 -179.9 -10 1 3 2623 06 34 09 06 34 29 --- 21 43 20 69.4 -0.1 0.0 179.9 10 F 1 2756 06 34 29 2146+570 21 43 20 67.2 1.1 -0.1 -178.3 -10 1 3 2756 06 34 29 06 34 49 --- 21 43 40 67.2 1.0 0.0 -178.5 10 F 1 2888 06 34 49 WB114 21 43 40 69.4 -0.2 0.0 179.7 -10 1 3 2888 06 34 49 06 35 09 --- 21 44 00 69.4 -0.4 0.0 179.5 10 F 1 3021 06 35 09 2146+570 21 44 00 67.2 0.9 0.0 -178.6 -10 1 3 3021 06 35 09 06 35 29 --- 21 44 20 67.2 0.8 0.0 -178.8 10 F 1 3154 06 35 29 WB114 21 44 20 69.4 -0.5 0.0 179.3 -10 1 3 3154 06 35 29 06 35 49 --- 21 44 40 69.3 -0.6 0.0 179.1 10 F 1 3287 06 35 49 2146+570 21 44 40 67.2 0.7 0.0 -179.0 -10 1 3 3287 06 35 49 06 36 09 --- 21 45 00 67.2 0.5 0.0 -179.2 10 F 1 3420 06 36 09 WB114 21 45 00 69.3 -0.8 0.0 178.9 -10 1 3 3420 06 36 09 06 36 29 --- 21 45 20 69.3 -0.9 0.0 178.7 10 F 1 3553 06 36 29 2146+570 21 45 20 67.2 0.4 0.0 -179.4 -10 1 3 3553 06 36 29 06 36 49 --- 21 45 40 67.2 0.3 0.0 -179.5 10 F 1 3686 06 36 49 WB114 21 45 40 69.3 -1.0 0.0 178.5 -10 1 3 3686 06 36 49 06 37 09 --- 21 46 00 69.3 -1.2 0.0 178.3 10 F 1 3819 06 37 09 2146+570 21 46 00 67.2 0.2 0.0 -179.7 -10 1 3 3819 06 37 09 06 37 29 --- 21 46 20 67.2 0.1 0.0 -179.9 10 F 1 3952 06 37 29 WB114 21 46 20 69.3 -1.3 0.1 178.1 -10 1 3 3952 06 37 29 06 37 49 --- 21 46 40 69.3 -1.4 0.1 177.9 10 F 1 4085 Schedule for VLBA_PT (Code Pt ) Page 18 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 37 49 2146+570 21 46 40 67.2 0.0 0.0 179.9 -10 1 3 4085 06 37 49 06 38 09 --- 21 47 00 67.2 -0.2 0.0 179.8 10 F 1 4218 06 38 09 WB114 21 47 00 69.3 -1.6 0.1 177.7 -10 1 3 4218 06 38 09 06 38 29 --- 21 47 20 69.3 -1.7 0.1 177.5 10 F 1 4351 06 38 29 2146+570 21 47 20 67.2 -0.3 0.0 179.6 -10 1 3 4351 06 38 29 06 38 49 --- 21 47 40 67.2 -0.4 0.0 179.4 10 F 1 4484 06 38 49 WB114 21 47 40 69.3 -1.8 0.1 177.3 -10 1 3 4484 06 38 49 06 39 09 --- 21 48 00 69.3 -2.0 0.1 177.2 10 F 1 4617 06 39 09 2146+570 21 48 00 67.2 -0.5 0.0 179.2 -10 1 3 4617 06 39 09 06 39 29 --- 21 48 20 67.2 -0.6 0.0 179.0 10 F 1 4750 06 39 29 WB114 21 48 20 69.3 -2.1 0.1 177.0 -10 1 3 4750 06 39 29 06 39 49 --- 21 48 40 69.3 -2.3 0.1 176.8 10 F 1 4883 06 39 49 2146+570 21 48 40 67.2 -0.7 0.0 178.9 -10 1 3 4883 06 39 49 06 40 08 --- 21 49 00 67.2 -0.9 0.0 178.7 10 F 1 5016 06 40 08 WB114 21 49 00 69.3 -2.4 0.1 176.6 -10 1 3 5016 06 40 08 06 40 28 --- 21 49 20 69.3 -2.5 0.1 176.4 10 F 1 5149 06 40 28 2146+570 21 49 20 67.2 -1.0 0.0 178.5 -10 1 3 5149 06 40 28 06 40 48 --- 21 49 40 67.2 -1.1 0.1 178.3 10 F 1 5282 06 40 48 WB114 21 49 40 69.3 -2.7 0.1 176.2 -10 1 3 5282 06 40 48 06 41 08 --- 21 50 00 69.3 -2.8 0.1 176.0 10 F 1 5415 06 41 08 2146+570 21 50 00 67.2 -1.2 0.1 178.2 -10 1 3 5415 06 41 08 06 41 28 --- 21 50 20 67.2 -1.3 0.1 178.0 10 F 1 5548 06 41 28 WB114 21 50 20 69.3 -2.9 0.1 175.8 -10 1 3 5548 06 41 28 06 41 48 --- 21 50 40 69.3 -3.1 0.1 175.6 10 F 1 5681 06 41 48 2146+570 21 50 40 67.2 -1.4 0.1 177.8 -10 1 3 5681 06 41 48 06 42 08 --- 21 51 00 67.2 -1.6 0.1 177.6 10 F 1 5814 06 42 08 WB114 21 51 00 69.3 -3.2 0.1 175.4 -10 1 3 5814 06 42 08 06 42 28 --- 21 51 20 69.3 -3.3 0.1 175.2 10 F 1 5947 Schedule for VLBA_PT (Code Pt ) Page 19 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 42 28 2146+570 21 51 20 67.2 -1.7 0.1 177.4 -10 1 3 5947 06 42 28 06 42 48 --- 21 51 40 67.2 -1.8 0.1 177.3 10 F 1 6080 06 42 48 WB114 21 51 40 69.3 -3.5 0.1 175.0 -10 1 3 6080 06 42 48 06 43 08 --- 21 52 00 69.3 -3.6 0.1 174.8 10 F 1 6213 06 43 08 2146+570 21 52 00 67.2 -1.9 0.1 177.1 -10 1 3 6213 06 43 08 06 43 28 --- 21 52 20 67.2 -2.0 0.1 176.9 10 F 1 6346 06 43 28 WB114 21 52 20 69.3 -3.7 0.2 174.6 -10 1 3 6346 06 43 28 06 43 48 --- 21 52 40 69.3 -3.9 0.2 174.4 10 F 1 6479 06 43 48 2146+570 21 52 40 67.2 -2.1 0.1 176.7 -10 1 3 6479 06 43 48 06 44 08 --- 21 53 00 67.2 -2.3 0.1 176.6 10 F 1 6612 06 44 08 WB114 21 53 00 69.3 -4.0 0.2 174.2 -10 1 3 6612 06 44 08 06 44 28 --- 21 53 20 69.3 -4.1 0.2 174.0 10 F 1 6745 06 44 28 2146+570 21 53 20 67.2 -2.4 0.1 176.4 -10 1 3 6745 06 44 28 06 44 48 --- 21 53 40 67.2 -2.5 0.1 176.2 10 F 1 6878 06 44 48 WB114 21 53 40 69.3 -4.3 0.2 173.8 -10 1 3 6878 06 44 48 06 45 08 --- 21 54 00 69.3 -4.4 0.2 173.7 10 F 1 7011 06 45 08 2146+570 21 54 00 67.2 -2.6 0.1 176.0 -10 1 3 7011 06 45 08 06 45 28 --- 21 54 20 67.2 -2.7 0.1 175.8 10 F 1 7143 06 45 28 WB114 21 54 20 69.3 -4.5 0.2 173.5 -10 1 3 7143 06 45 28 06 45 48 --- 21 54 40 69.3 -4.7 0.2 173.3 10 F 1 7276 06 45 48 2146+570 21 54 40 67.2 -2.8 0.1 175.7 -10 1 3 7276 06 45 48 06 46 07 --- 21 55 00 67.2 -3.0 0.1 175.5 10 F 1 7409 06 46 07 WB114 21 55 00 69.2 -4.8 0.2 173.1 -10 1 3 7409 06 46 07 06 46 27 --- 21 55 20 69.2 -4.9 0.2 172.9 10 F 1 7542 06 46 27 2146+570 21 55 20 67.2 -3.1 0.1 175.3 -10 1 3 7542 06 46 27 06 46 47 --- 21 55 40 67.2 -3.2 0.2 175.1 10 F 1 7675 06 46 47 WB114 21 55 40 69.2 -5.1 0.2 172.7 -10 1 3 7675 06 46 47 06 47 07 --- 21 56 00 69.2 -5.2 0.2 172.5 10 F 1 7808 Schedule for VLBA_PT (Code Pt ) Page 20 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 47 07 2146+570 21 56 00 67.2 -3.3 0.2 175.0 -10 1 3 7808 06 47 07 06 47 27 --- 21 56 20 67.2 -3.4 0.2 174.8 10 F 1 7941 06 47 27 WB114 21 56 20 69.2 -5.3 0.2 172.3 -10 1 3 7941 06 47 27 06 47 47 --- 21 56 40 69.2 -5.5 0.2 172.1 10 F 1 8074 06 47 47 2146+570 21 56 40 67.2 -3.5 0.2 174.6 -10 1 3 8074 06 47 47 06 48 07 --- 21 57 00 67.2 -3.7 0.2 174.4 10 F 1 8207 06 48 07 WB114 21 57 00 69.2 -5.6 0.2 171.9 -10 1 3 8207 06 48 07 06 48 27 --- 21 57 20 69.2 -5.7 0.2 171.7 10 F 1 8340 06 48 27 2146+570 21 57 20 67.2 -3.8 0.2 174.3 -10 1 3 8340 06 48 27 06 48 47 --- 21 57 40 67.2 -3.9 0.2 174.1 10 F 1 8473 06 48 47 WB114 21 57 40 69.2 -5.9 0.2 171.5 -10 1 3 8473 06 48 47 06 49 07 --- 21 58 00 69.2 -6.0 0.2 171.3 10 F 1 8606 06 49 07 2146+570 21 58 00 67.1 -4.0 0.2 173.9 -10 1 3 8606 06 49 07 06 49 27 --- 21 58 20 67.1 -4.1 0.2 173.7 10 F 1 8739 06 49 27 WB114 21 58 20 69.2 -6.1 0.3 171.1 -10 1 3 8739 06 49 27 06 49 47 --- 21 58 40 69.2 -6.3 0.3 170.9 10 F 1 8872 06 49 47 2146+570 21 58 40 67.1 -4.2 0.2 173.5 -10 1 3 8872 06 49 47 06 50 07 --- 21 59 00 67.1 -4.4 0.2 173.4 10 F 1 9005 06 50 07 WB114 21 59 00 69.2 -6.4 0.3 170.8 -10 1 3 9005 06 50 07 06 50 27 --- 21 59 20 69.2 -6.5 0.3 170.6 10 F 1 9138 06 50 27 2146+570 21 59 20 67.1 -4.5 0.2 173.2 -10 1 3 9138 06 50 27 06 50 47 --- 21 59 40 67.1 -4.6 0.2 173.0 10 F 1 9271 06 50 47 WB114 21 59 40 69.2 -6.7 0.3 170.4 -10 1 3 9271 06 50 47 06 51 07 --- 22 00 00 69.1 -6.8 0.3 170.2 10 F 1 9404 06 51 07 2146+570 22 00 00 67.1 -4.7 0.2 172.8 -10 1 3 9404 06 51 07 06 51 27 --- 22 00 20 67.1 -4.8 0.2 172.7 10 F 1 9537 06 51 27 WB114 22 00 20 69.1 -6.9 0.3 170.0 -10 1 3 9537 06 51 27 06 51 47 --- 22 00 40 69.1 -7.1 0.3 169.8 10 F 1 9670 Schedule for VLBA_PT (Code Pt ) Page 21 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 51 47 2146+570 22 00 40 67.1 -4.9 0.2 172.5 -10 1 3 9670 06 51 47 06 52 06 --- 22 01 00 67.1 -5.1 0.2 172.3 10 F 1 9803 06 52 06 WB114 22 01 00 69.1 -7.2 0.3 169.6 -10 1 3 9803 06 52 06 06 52 26 --- 22 01 20 69.1 -7.3 0.3 169.4 10 F 1 9936 06 52 26 2146+570 22 01 20 67.1 -5.2 0.2 172.1 -10 1 3 9936 06 52 26 06 52 46 --- 22 01 40 67.1 -5.3 0.3 172.0 10 F 1 10069 06 52 46 WB114 22 01 40 69.1 -7.5 0.3 169.2 -10 1 3 10069 06 52 46 06 53 06 --- 22 02 00 69.1 -7.6 0.3 169.0 10 F 1 10202 06 53 06 2146+570 22 02 00 67.1 -5.4 0.3 171.8 -10 1 3 10202 06 53 06 06 53 26 --- 22 02 20 67.1 -5.5 0.3 171.6 10 F 1 10335 06 53 26 WB114 22 02 20 69.1 -7.7 0.3 168.8 -10 1 3 10335 06 53 26 06 53 46 --- 22 02 40 69.1 -7.9 0.3 168.6 10 F 1 10468 06 53 46 2146+570 22 02 40 67.1 -5.6 0.3 171.4 -10 1 3 10468 06 53 46 06 54 06 --- 22 03 00 67.1 -5.7 0.3 171.3 10 F 1 10601 06 54 06 WB114 22 03 00 69.1 -8.0 0.3 168.5 -10 1 3 10601 06 54 06 06 54 26 --- 22 03 20 69.1 -8.1 0.3 168.3 10 F 1 10734 06 54 26 2146+570 22 03 20 67.1 -5.9 0.3 171.1 -10 1 3 10734 06 54 26 06 54 46 --- 22 03 40 67.0 -6.0 0.3 170.9 10 F 1 10867 06 54 46 WB114 22 03 40 69.0 -8.3 0.3 168.1 -10 1 3 10867 06 54 46 06 55 06 --- 22 04 00 69.0 -8.4 0.3 167.9 10 F 1 11000 06 57 06 3C454.3 22 06 00 68.9 146.2 -0.8 -28.5 11 1 3 11000 06 57 06 07 03 05 --- 22 12 00 69.5 149.9 -0.7 -25.6 359 F 1 13393 Next scan frequencies: 22235.69 22227.53 22219.37 22243.85 Next BBC frequencies: 735.69 727.53 719.37 743.85 07 03 05 3C454.3 22 12 00 69.5 149.9 -0.7 -25.6 -6 1 3 13393 07 03 05 07 09 04 --- 22 18 00 70.1 153.7 -0.6 -22.4 353 F 1 15786 07 11 03 2137+510 22 20 00 71.5 -21.7 0.7 151.0 -3 1 3 15786 07 11 03 07 11 23 --- 22 20 20 71.5 -21.8 0.7 150.8 17 F 1 15919 Schedule for VLBA_PT (Code Pt ) Page 22 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 11 23 WB105 22 20 20 71.4 -20.2 0.7 152.8 -7 1 3 15919 07 11 23 07 11 43 --- 22 20 40 71.4 -20.3 0.7 152.6 13 F 1 16052 07 11 43 2137+510 22 20 40 71.5 -22.0 0.7 150.6 -7 1 3 16052 07 11 43 07 12 03 --- 22 21 00 71.5 -22.1 0.7 150.4 13 F 1 16185 07 12 03 WB105 22 21 00 71.4 -20.5 0.7 152.4 -7 1 3 16185 07 12 03 07 12 23 --- 22 21 20 71.4 -20.6 0.7 152.2 13 F 1 16318 07 12 23 2137+510 22 21 20 71.4 -22.3 0.7 150.2 -7 1 3 16318 07 12 23 07 12 43 --- 22 21 40 71.4 -22.4 0.7 150.0 13 F 1 16451 07 12 43 WB105 22 21 40 71.3 -20.8 0.7 152.0 -7 1 3 16451 07 12 43 07 13 03 --- 22 22 00 71.3 -20.9 0.7 151.8 13 F 1 16584 07 13 03 2137+510 22 22 00 71.4 -22.5 0.7 149.8 -7 1 3 16584 07 13 03 07 13 23 --- 22 22 20 71.4 -22.7 0.8 149.6 13 F 1 16717 07 13 23 WB105 22 22 20 71.3 -21.1 0.7 151.6 -7 1 3 16717 07 13 23 07 13 43 --- 22 22 40 71.3 -21.2 0.7 151.4 13 F 1 16850 07 13 43 2137+510 22 22 40 71.3 -22.8 0.8 149.4 -7 1 3 16850 07 13 43 07 14 03 --- 22 23 00 71.3 -23.0 0.8 149.2 13 F 1 16983 07 14 03 WB105 22 23 00 71.2 -21.3 0.7 151.2 -7 1 3 16983 07 14 03 07 14 23 --- 22 23 20 71.2 -21.5 0.7 151.0 13 F 1 17116 07 14 23 2137+510 22 23 20 71.3 -23.1 0.8 149.0 -7 1 3 17116 07 14 23 07 14 43 --- 22 23 40 71.3 -23.2 0.8 148.8 13 F 1 17249 07 14 43 WB105 22 23 40 71.2 -21.6 0.7 150.8 -7 1 4 17249 07 14 43 07 15 03 --- 22 24 00 71.2 -21.8 0.7 150.6 13 R 1 17116 07 15 03 2137+510 22 24 00 71.2 -23.4 0.8 148.6 -7 1 4 17116 07 15 03 07 15 23 --- 22 24 20 71.2 -23.5 0.8 148.4 13 R 1 16983 07 15 23 WB105 22 24 20 71.1 -21.9 0.7 150.4 -7 1 4 16983 07 15 23 07 15 43 --- 22 24 40 71.1 -22.1 0.7 150.2 13 R 1 16850 07 15 43 2137+510 22 24 40 71.2 -23.7 0.8 148.2 -7 1 4 16850 07 15 43 07 16 03 --- 22 25 00 71.1 -23.8 0.8 148.0 13 R 1 16717 Schedule for VLBA_PT (Code Pt ) Page 23 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 16 03 WB105 22 25 00 71.1 -22.2 0.8 150.0 -7 1 4 16717 07 16 03 07 16 22 --- 22 25 20 71.1 -22.3 0.8 149.8 13 R 1 16584 07 16 22 2137+510 22 25 20 71.1 -23.9 0.8 147.8 -7 1 4 16584 07 16 22 07 16 42 --- 22 25 40 71.1 -24.1 0.8 147.6 13 R 1 16451 07 16 42 WB105 22 25 40 71.0 -22.5 0.8 149.6 -7 1 4 16451 07 16 42 07 17 02 --- 22 26 00 71.0 -22.6 0.8 149.4 13 R 1 16318 07 17 02 2137+510 22 26 00 71.1 -24.2 0.8 147.4 -7 1 4 16318 07 17 02 07 17 22 --- 22 26 20 71.0 -24.3 0.8 147.2 13 R 1 16185 07 17 22 WB105 22 26 20 71.0 -22.7 0.8 149.2 -7 1 4 16185 07 17 22 07 17 42 --- 22 26 40 71.0 -22.9 0.8 149.0 13 R 1 16052 07 17 42 2137+510 22 26 40 71.0 -24.5 0.8 147.0 -7 1 4 16052 07 17 42 07 18 02 --- 22 27 00 71.0 -24.6 0.8 146.8 13 R 1 15919 07 18 02 WB105 22 27 00 70.9 -23.0 0.8 148.9 -7 1 4 15919 07 18 02 07 18 22 --- 22 27 20 70.9 -23.2 0.8 148.7 13 R 1 15786 07 18 22 2137+510 22 27 20 70.9 -24.7 0.8 146.6 -7 1 4 15786 07 18 22 07 18 42 --- 22 27 40 70.9 -24.9 0.8 146.4 13 R 1 15654 07 18 42 WB105 22 27 40 70.9 -23.3 0.8 148.5 -7 1 4 15654 07 18 42 07 19 02 --- 22 28 00 70.8 -23.4 0.8 148.3 13 R 1 15521 07 19 02 2137+510 22 28 00 70.9 -25.0 0.8 146.3 -7 1 4 15521 07 19 02 07 19 22 --- 22 28 20 70.9 -25.1 0.9 146.1 13 R 1 15388 07 19 22 WB105 22 28 20 70.8 -23.6 0.8 148.1 -7 1 4 15388 07 19 22 07 19 42 --- 22 28 40 70.8 -23.7 0.8 147.9 13 R 1 15255 07 19 42 2137+510 22 28 40 70.8 -25.3 0.9 145.9 -7 1 4 15255 07 19 42 07 20 02 --- 22 29 00 70.8 -25.4 0.9 145.7 13 R 1 15122 07 20 02 WB105 22 29 00 70.8 -23.8 0.8 147.7 -7 1 4 15122 07 20 02 07 20 22 --- 22 29 20 70.7 -24.0 0.8 147.5 13 R 1 14989 07 20 22 2137+510 22 29 20 70.8 -25.5 0.9 145.5 -7 1 4 14989 07 20 22 07 20 42 --- 22 29 40 70.7 -25.7 0.9 145.3 13 R 1 14856 Schedule for VLBA_PT (Code Pt ) Page 24 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 20 42 WB105 22 29 40 70.7 -24.1 0.8 147.3 -7 1 4 14856 07 20 42 07 21 02 --- 22 30 00 70.7 -24.2 0.8 147.1 13 R 1 14723 07 21 02 2137+510 22 30 00 70.7 -25.8 0.9 145.1 -7 1 4 14723 07 21 02 07 21 22 --- 22 30 20 70.7 -25.9 0.9 144.9 13 R 1 14590 07 21 22 WB105 22 30 20 70.7 -24.4 0.8 146.9 -7 1 4 14590 07 21 22 07 21 42 --- 22 30 40 70.6 -24.5 0.8 146.7 13 R 1 14457 07 21 42 2137+510 22 30 40 70.7 -26.1 0.9 144.7 -7 1 4 14457 07 21 42 07 22 02 --- 22 31 00 70.6 -26.2 0.9 144.6 13 R 1 14324 07 22 02 WB105 22 31 00 70.6 -24.6 0.9 146.6 -7 1 4 14324 07 22 02 07 22 22 --- 22 31 20 70.6 -24.7 0.9 146.4 13 R 1 14191 07 22 22 2137+510 22 31 20 70.6 -26.3 0.9 144.4 -7 1 4 14191 07 22 22 07 22 41 --- 22 31 40 70.6 -26.4 0.9 144.2 13 R 1 14058 07 22 41 WB105 22 31 40 70.5 -24.9 0.9 146.2 -7 1 4 14058 07 22 41 07 23 01 --- 22 32 00 70.5 -25.0 0.9 146.0 13 R 1 13925 07 23 01 2137+510 22 32 00 70.5 -26.6 0.9 144.0 -7 1 4 13925 07 23 01 07 23 21 --- 22 32 20 70.5 -26.7 0.9 143.8 13 R 1 13792 07 23 21 WB105 22 32 20 70.5 -25.1 0.9 145.8 -7 1 4 13792 07 23 21 07 23 41 --- 22 32 40 70.5 -25.3 0.9 145.6 13 R 1 13659 07 23 41 2137+510 22 32 40 70.5 -26.8 0.9 143.6 -7 1 4 13659 07 23 41 07 24 01 --- 22 33 00 70.4 -27.0 0.9 143.5 13 R 1 13526 07 24 01 WB105 22 33 00 70.4 -25.4 0.9 145.4 -7 1 4 13526 07 24 01 07 24 21 --- 22 33 20 70.4 -25.5 0.9 145.3 13 R 1 13393 07 24 21 2137+510 22 33 20 70.4 -27.1 0.9 143.3 -7 1 4 13393 07 24 21 07 24 41 --- 22 33 40 70.4 -27.2 0.9 143.1 13 R 1 13260 07 24 41 WB105 22 33 40 70.4 -25.6 0.9 145.1 -7 1 4 13260 07 24 41 07 25 01 --- 22 34 00 70.3 -25.8 0.9 144.9 13 R 1 13127 07 25 01 2137+510 22 34 00 70.3 -27.3 0.9 142.9 -7 1 4 13127 07 25 01 07 25 21 --- 22 34 20 70.3 -27.5 1.0 142.7 13 R 1 12994 Schedule for VLBA_PT (Code Pt ) Page 25 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 25 21 WB105 22 34 20 70.3 -25.9 0.9 144.7 -7 1 4 12994 07 25 21 07 25 41 --- 22 34 40 70.3 -26.0 0.9 144.5 13 R 1 12861 07 25 41 2137+510 22 34 40 70.3 -27.6 1.0 142.5 -7 1 4 12861 07 25 41 07 26 01 --- 22 35 00 70.2 -27.7 1.0 142.4 13 R 1 12728 07 26 01 WB105 22 35 00 70.2 -26.2 0.9 144.3 -7 1 4 12728 07 26 01 07 26 21 --- 22 35 20 70.2 -26.3 0.9 144.2 13 R 1 12595 07 26 21 2137+510 22 35 20 70.2 -27.8 1.0 142.2 -7 1 4 12595 07 26 21 07 26 41 --- 22 35 40 70.2 -27.9 1.0 142.0 13 R 1 12462 07 26 41 WB105 22 35 40 70.2 -26.4 0.9 144.0 -7 1 4 12462 07 26 41 07 27 01 --- 22 36 00 70.2 -26.5 0.9 143.8 13 R 1 12329 07 27 01 2137+510 22 36 00 70.2 -28.1 1.0 141.8 -7 1 4 12329 07 27 01 07 27 21 --- 22 36 20 70.1 -28.2 1.0 141.6 13 R 1 12196 07 27 21 WB105 22 36 20 70.1 -26.7 0.9 143.6 -7 1 4 12196 07 27 21 07 27 41 --- 22 36 40 70.1 -26.8 0.9 143.4 13 R 1 12063 07 27 41 2137+510 22 36 40 70.1 -28.3 1.0 141.5 -7 1 4 12063 07 27 41 07 28 01 --- 22 37 00 70.1 -28.4 1.0 141.3 13 R 1 11930 07 28 01 WB105 22 37 00 70.1 -26.9 1.0 143.2 -7 1 4 11930 07 28 01 07 28 21 --- 22 37 20 70.0 -27.0 1.0 143.1 13 R 1 11797 07 28 21 2137+510 22 37 20 70.0 -28.5 1.0 141.1 -7 1 4 11797 07 28 21 07 28 40 --- 22 37 40 70.0 -28.7 1.0 140.9 13 R 1 11664 07 28 40 WB105 22 37 40 70.0 -27.1 1.0 142.9 -7 1 4 11664 07 28 40 07 29 00 --- 22 38 00 70.0 -27.3 1.0 142.7 13 R 1 11531 07 29 00 2137+510 22 38 00 70.0 -28.8 1.0 140.8 -7 1 4 11531 07 29 00 07 29 20 --- 22 38 20 69.9 -28.9 1.0 140.6 13 R 1 11399 07 29 20 WB105 22 38 20 69.9 -27.4 1.0 142.5 -7 1 4 11399 07 29 20 07 29 40 --- 22 38 40 69.9 -27.5 1.0 142.4 13 R 1 11266 07 29 40 2137+510 22 38 40 69.9 -29.0 1.0 140.4 -7 1 4 11266 07 29 40 07 30 00 --- 22 39 00 69.9 -29.1 1.0 140.2 13 R 1 11133 Schedule for VLBA_PT (Code Pt ) Page 26 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 30 00 WB105 22 39 00 69.9 -27.6 1.0 142.2 -7 1 4 11133 07 30 00 07 30 20 --- 22 39 20 69.8 -27.7 1.0 142.0 13 R 1 11000 07 30 20 2137+510 22 39 20 69.8 -29.3 1.0 140.1 -7 1 4 11000 07 30 20 07 30 40 --- 22 39 40 69.8 -29.4 1.0 139.9 13 R 1 10867 07 30 40 WB105 22 39 40 69.8 -27.9 1.0 141.8 -7 1 4 10867 07 30 40 07 31 00 --- 22 40 00 69.8 -28.0 1.0 141.6 13 R 1 10734 07 31 00 2137+510 22 40 00 69.8 -29.5 1.0 139.7 -7 1 4 10734 07 31 00 07 31 20 --- 22 40 20 69.7 -29.6 1.1 139.5 13 R 1 10601 07 31 20 WB105 22 40 20 69.7 -28.1 1.0 141.5 -7 1 4 10601 07 31 20 07 31 40 --- 22 40 40 69.7 -28.2 1.0 141.3 13 R 1 10468 07 31 40 2137+510 22 40 40 69.7 -29.7 1.1 139.4 -7 1 4 10468 07 31 40 07 32 00 --- 22 41 00 69.7 -29.8 1.1 139.2 13 R 1 10335 07 32 00 WB105 22 41 00 69.7 -28.3 1.0 141.1 -7 1 4 10335 07 32 00 07 32 20 --- 22 41 20 69.6 -28.4 1.0 140.9 13 R 1 10202 07 32 20 2137+510 22 41 20 69.6 -29.9 1.1 139.0 -7 1 4 10202 07 32 20 07 32 40 --- 22 41 40 69.6 -30.1 1.1 138.8 13 R 1 10069 07 32 40 WB105 22 41 40 69.6 -28.6 1.0 140.8 -7 1 4 10069 07 32 40 07 33 00 --- 22 42 00 69.6 -28.7 1.0 140.6 13 R 1 9936 07 33 00 2137+510 22 42 00 69.5 -30.2 1.1 138.7 -7 1 4 9936 07 33 00 07 33 20 --- 22 42 20 69.5 -30.3 1.1 138.5 13 R 1 9803 07 33 20 WB105 22 42 20 69.5 -28.8 1.0 140.4 -7 1 4 9803 07 33 20 07 33 40 --- 22 42 40 69.5 -28.9 1.0 140.3 13 R 1 9670 07 33 40 2137+510 22 42 40 69.5 -30.4 1.1 138.3 -7 1 4 9670 07 33 40 07 34 00 --- 22 43 00 69.4 -30.5 1.1 138.2 13 R 1 9537 07 34 00 WB105 22 43 00 69.5 -29.0 1.1 140.1 -7 1 4 9537 07 34 00 07 34 20 --- 22 43 20 69.4 -29.1 1.1 139.9 13 R 1 9404 07 34 20 2137+510 22 43 20 69.4 -30.6 1.1 138.0 -7 1 4 9404 07 34 20 07 34 39 --- 22 43 40 69.4 -30.7 1.1 137.8 13 R 1 9271 Schedule for VLBA_PT (Code Pt ) Page 27 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 34 39 WB105 22 43 40 69.4 -29.2 1.1 139.7 -7 1 4 9271 07 34 39 07 34 59 --- 22 44 00 69.4 -29.4 1.1 139.6 13 R 1 9138 07 34 59 2137+510 22 44 00 69.3 -30.8 1.1 137.7 -7 1 4 9138 07 34 59 07 35 19 --- 22 44 20 69.3 -30.9 1.1 137.5 13 R 1 9005 07 35 19 WB105 22 44 20 69.3 -29.5 1.1 139.4 -7 1 4 9005 07 35 19 07 35 39 --- 22 44 40 69.3 -29.6 1.1 139.2 13 R 1 8872 07 35 39 2137+510 22 44 40 69.3 -31.1 1.1 137.3 -7 1 4 8872 07 35 39 07 35 59 --- 22 45 00 69.2 -31.2 1.1 137.2 13 R 1 8739 07 35 59 WB105 22 45 00 69.3 -29.7 1.1 139.1 -7 1 4 8739 07 35 59 07 36 19 --- 22 45 20 69.2 -29.8 1.1 138.9 13 R 1 8606 07 36 19 2137+510 22 45 20 69.2 -31.3 1.1 137.0 -7 1 4 8606 07 36 19 07 36 39 --- 22 45 40 69.2 -31.4 1.1 136.8 13 R 1 8473 07 36 39 WB105 22 45 40 69.2 -29.9 1.1 138.7 -7 1 4 8473 07 36 39 07 36 59 --- 22 46 00 69.2 -30.0 1.1 138.6 13 R 1 8340 07 36 59 2137+510 22 46 00 69.1 -31.5 1.1 136.7 -7 1 4 8340 07 36 59 07 37 19 --- 22 46 20 69.1 -31.6 1.2 136.5 13 R 1 8207 07 37 19 WB105 22 46 20 69.1 -30.1 1.1 138.4 -7 1 4 8207 07 37 19 07 37 39 --- 22 46 40 69.1 -30.2 1.1 138.2 13 R 1 8074 07 37 39 2137+510 22 46 40 69.1 -31.7 1.2 136.3 -7 1 4 8074 07 37 39 07 37 59 --- 22 47 00 69.0 -31.8 1.2 136.2 13 R 1 7941 07 37 59 WB105 22 47 00 69.1 -30.4 1.1 138.1 -7 1 4 7941 07 37 59 07 38 19 --- 22 47 20 69.0 -30.5 1.1 137.9 13 R 1 7808 07 38 19 2137+510 22 47 20 69.0 -31.9 1.2 136.0 -7 1 4 7808 07 38 19 07 38 39 --- 22 47 40 68.9 -32.0 1.2 135.9 13 R 1 7675 07 38 39 WB105 22 47 40 69.0 -30.6 1.1 137.7 -7 1 4 7675 07 38 39 07 38 59 --- 22 48 00 69.0 -30.7 1.1 137.6 13 R 1 7542 07 40 58 3C454.3 22 50 00 71.8 176.8 -0.1 -2.7 -25 1 4 7542 07 40 58 07 46 57 --- 22 56 00 71.9 181.5 0.0 1.3 334 R 1 5149 Schedule for VLBA_PT (Code Pt ) Page 28 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- Next scan frequencies: 22237.77 22229.61 22221.45 22245.93 Next BBC frequencies: 737.77 729.61 721.45 745.93 07 46 57 3C454.3 22 56 00 71.9 181.5 0.0 1.3 -6 1 4 5149 07 46 57 07 52 56 --- 23 02 00 71.8 186.1 0.1 5.2 353 R 1 2756 07 54 56 2123+550 23 04 00 62.9 327.6 1.7 129.4 19 1 4 2756 07 54 56 07 55 16 --- 23 04 20 62.9 327.5 1.7 129.3 20 R 1 2623 07 55 16 WB114 23 04 20 65.0 331.9 1.4 137.3 -10 1 4 2623 07 55 16 07 55 36 --- 23 04 40 65.0 331.8 1.4 137.2 10 R 1 2490 07 55 36 2123+550 23 04 40 62.8 327.5 1.7 129.2 -10 1 4 2490 07 55 36 07 55 56 --- 23 05 00 62.8 327.4 1.7 129.1 10 R 1 2357 07 55 56 WB114 23 05 00 64.9 331.7 1.4 137.0 -10 1 4 2357 07 55 56 07 56 16 --- 23 05 20 64.9 331.6 1.4 136.9 10 R 1 2224 07 56 16 2123+550 23 05 20 62.8 327.3 1.7 128.9 -10 1 4 2224 07 56 16 07 56 36 --- 23 05 40 62.7 327.3 1.7 128.8 10 R 1 2091 07 56 36 WB114 23 05 40 64.9 331.5 1.4 136.7 -10 1 4 2091 07 56 36 07 56 56 --- 23 06 00 64.8 331.5 1.4 136.6 10 R 1 1958 07 56 56 2123+550 23 06 00 62.7 327.2 1.7 128.7 -10 1 4 1958 07 56 56 07 57 16 --- 23 06 20 62.6 327.1 1.7 128.6 10 R 1 1825 07 57 16 WB114 23 06 20 64.8 331.4 1.4 136.4 -10 1 4 1825 07 57 16 07 57 36 --- 23 06 40 64.8 331.3 1.4 136.3 10 R 1 1692 07 57 36 2123+550 23 06 40 62.6 327.1 1.7 128.4 -10 1 4 1692 07 57 36 07 57 56 --- 23 07 00 62.6 327.0 1.7 128.3 10 R 1 1559 07 57 56 WB114 23 07 00 64.7 331.2 1.4 136.2 -10 1 4 1559 07 57 56 07 58 16 --- 23 07 20 64.7 331.1 1.4 136.0 10 R 1 1426 07 58 16 2123+550 23 07 20 62.5 326.9 1.7 128.2 -10 1 4 1426 07 58 16 07 58 36 --- 23 07 40 62.5 326.9 1.7 128.1 10 R 1 1293 07 58 36 WB114 23 07 40 64.7 331.1 1.4 135.9 -10 1 4 1293 07 58 36 07 58 56 --- 23 08 00 64.6 331.0 1.4 135.7 10 R 1 1160 Schedule for VLBA_PT (Code Pt ) Page 29 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 58 56 2123+550 23 08 00 62.5 326.8 1.7 127.9 -10 1 4 1160 07 58 56 07 59 15 --- 23 08 20 62.4 326.7 1.8 127.8 10 R 1 1027 07 59 15 WB114 23 08 20 64.6 330.9 1.4 135.6 -10 1 4 1027 07 59 15 07 59 35 --- 23 08 40 64.6 330.8 1.4 135.5 10 R 1 894 07 59 35 2123+550 23 08 40 62.4 326.7 1.8 127.7 -10 1 4 894 07 59 35 07 59 55 --- 23 09 00 62.3 326.6 1.8 127.6 10 R 1 761 07 59 55 WB114 23 09 00 64.5 330.7 1.4 135.3 -10 1 4 761 07 59 55 08 00 15 --- 23 09 20 64.5 330.7 1.4 135.2 10 R 1 628 08 00 15 2123+550 23 09 20 62.3 326.6 1.8 127.4 -10 1 4 628 08 00 15 08 00 35 --- 23 09 40 62.3 326.5 1.8 127.3 10 R 1 495 08 00 35 WB114 23 09 40 64.5 330.6 1.4 135.0 -10 1 4 495 08 00 35 08 00 55 --- 23 10 00 64.4 330.5 1.4 134.9 10 R 1 362 08 00 55 2123+550 23 10 00 62.2 326.4 1.8 127.2 -10 1 5 362 08 00 55 08 01 15 --- 23 10 20 62.2 326.4 1.8 127.1 10 F 1 495 08 01 15 WB114 23 10 20 64.4 330.4 1.5 134.8 -10 1 5 495 08 01 15 08 01 35 --- 23 10 40 64.4 330.3 1.5 134.6 10 F 1 628 08 01 35 2123+550 23 10 40 62.2 326.3 1.8 126.9 -10 1 5 628 08 01 35 08 01 55 --- 23 11 00 62.1 326.2 1.8 126.8 10 F 1 761 08 01 55 WB114 23 11 00 64.3 330.3 1.5 134.5 -10 1 5 761 08 01 55 08 02 15 --- 23 11 20 64.3 330.2 1.5 134.4 10 F 1 894 08 02 15 2123+550 23 11 20 62.1 326.2 1.8 126.7 -10 1 5 894 08 02 15 08 02 35 --- 23 11 40 62.0 326.1 1.8 126.6 10 F 1 1027 08 02 35 WB114 23 11 40 64.3 330.1 1.5 134.2 -10 1 5 1027 08 02 35 08 02 55 --- 23 12 00 64.2 330.0 1.5 134.1 9 F 1 1160 08 02 55 2123+550 23 12 00 62.0 326.1 1.8 126.4 -10 1 5 1160 08 02 55 08 03 15 --- 23 12 20 62.0 326.0 1.8 126.3 9 F 1 1293 08 03 15 WB114 23 12 20 64.2 330.0 1.5 133.9 -10 1 5 1293 08 03 15 08 03 35 --- 23 12 40 64.2 329.9 1.5 133.8 9 F 1 1426 Schedule for VLBA_PT (Code Pt ) Page 30 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 03 35 2123+550 23 12 40 61.9 325.9 1.8 126.2 -10 1 5 1426 08 03 35 08 03 55 --- 23 13 00 61.9 325.9 1.8 126.1 9 F 1 1559 08 03 55 WB114 23 13 00 64.1 329.8 1.5 133.7 -10 1 5 1559 08 03 55 08 04 15 --- 23 13 20 64.1 329.7 1.5 133.5 9 F 1 1692 08 04 15 2123+550 23 13 20 61.8 325.8 1.8 126.0 -10 1 5 1692 08 04 15 08 04 35 --- 23 13 40 61.8 325.8 1.8 125.8 9 F 1 1825 08 04 35 WB114 23 13 40 64.1 329.7 1.5 133.4 -10 1 5 1825 08 04 35 08 04 55 --- 23 14 00 64.0 329.6 1.5 133.3 9 F 1 1958 08 04 55 2123+550 23 14 00 61.8 325.7 1.8 125.7 -11 1 5 1958 08 04 55 08 05 14 --- 23 14 20 61.7 325.6 1.9 125.6 9 F 1 2091 08 05 14 WB114 23 14 20 64.0 329.5 1.5 133.1 -11 1 5 2091 08 05 14 08 05 34 --- 23 14 40 64.0 329.4 1.5 133.0 9 F 1 2224 08 05 34 2123+550 23 14 40 61.7 325.6 1.9 125.5 -11 1 5 2224 08 05 34 08 05 54 --- 23 15 00 61.7 325.5 1.9 125.4 9 F 1 2357 08 05 54 WB114 23 15 00 63.9 329.4 1.5 132.9 -11 1 5 2357 08 05 54 08 06 14 --- 23 15 20 63.9 329.3 1.5 132.7 9 F 1 2490 08 06 14 2123+550 23 15 20 61.6 325.5 1.9 125.2 -11 1 5 2490 08 06 14 08 06 34 --- 23 15 40 61.6 325.4 1.9 125.1 9 F 1 2623 08 06 34 WB114 23 15 40 63.8 329.2 1.5 132.6 -11 1 5 2623 08 06 34 08 06 54 --- 23 16 00 63.8 329.1 1.5 132.4 9 F 1 2756 08 06 54 2123+550 23 16 00 61.5 325.4 1.9 125.0 -11 1 5 2756 08 06 54 08 07 14 --- 23 16 20 61.5 325.3 1.9 124.9 9 F 1 2888 08 07 14 WB114 23 16 20 63.8 329.1 1.6 132.3 -11 1 5 2888 08 07 14 08 07 34 --- 23 16 40 63.7 329.0 1.6 132.2 9 F 1 3021 08 07 34 2123+550 23 16 40 61.5 325.2 1.9 124.8 -11 1 5 3021 08 07 34 08 07 54 --- 23 17 00 61.4 325.2 1.9 124.7 9 F 1 3154 08 07 54 WB114 23 17 00 63.7 328.9 1.6 132.0 -11 1 5 3154 08 07 54 08 08 14 --- 23 17 20 63.7 328.8 1.6 131.9 9 F 1 3287 Schedule for VLBA_PT (Code Pt ) Page 31 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 08 14 2123+550 23 17 20 61.4 325.1 1.9 124.5 -11 1 5 3287 08 08 14 08 08 34 --- 23 17 40 61.3 325.1 1.9 124.4 9 F 1 3420 08 08 34 WB114 23 17 40 63.6 328.8 1.6 131.8 -11 1 5 3420 08 08 34 08 08 54 --- 23 18 00 63.6 328.7 1.6 131.7 9 F 1 3553 08 08 54 2123+550 23 18 00 61.3 325.0 1.9 124.3 -11 1 5 3553 08 08 54 08 09 14 --- 23 18 20 61.3 325.0 1.9 124.2 9 F 1 3686 08 09 14 WB114 23 18 20 63.6 328.6 1.6 131.5 -11 1 5 3686 08 09 14 08 09 34 --- 23 18 40 63.5 328.6 1.6 131.4 9 F 1 3819 08 09 34 2123+550 23 18 40 61.2 324.9 1.9 124.1 -11 1 5 3819 08 09 34 08 09 54 --- 23 19 00 61.2 324.9 1.9 123.9 9 F 1 3952 08 09 54 WB114 23 19 00 63.5 328.5 1.6 131.3 -11 1 5 3952 08 09 54 08 10 14 --- 23 19 20 63.5 328.4 1.6 131.1 9 F 1 4085 08 10 14 2123+550 23 19 20 61.1 324.8 1.9 123.8 -11 1 5 4085 08 10 14 08 10 34 --- 23 19 40 61.1 324.7 1.9 123.7 9 F 1 4218 08 10 34 WB114 23 19 40 63.4 328.3 1.6 131.0 -11 1 5 4218 08 10 34 08 10 54 --- 23 20 00 63.4 328.3 1.6 130.9 9 F 1 4351 08 10 54 2123+550 23 20 00 61.1 324.7 1.9 123.6 -11 1 5 4351 08 10 54 08 11 13 --- 23 20 20 61.0 324.6 2.0 123.5 9 F 1 4484 08 11 13 WB114 23 20 20 63.3 328.2 1.6 130.7 -11 1 5 4484 08 11 13 08 11 33 --- 23 20 40 63.3 328.1 1.6 130.6 9 F 1 4617 08 11 33 2123+550 23 20 40 61.0 324.6 2.0 123.4 -11 1 5 4617 08 11 33 08 11 53 --- 23 21 00 60.9 324.5 2.0 123.3 9 F 1 4750 08 11 53 WB114 23 21 00 63.3 328.1 1.6 130.5 -11 1 5 4750 08 11 53 08 12 13 --- 23 21 20 63.2 328.0 1.6 130.3 9 F 1 4883 08 12 13 2123+550 23 21 20 60.9 324.5 2.0 123.1 -11 1 5 4883 08 12 13 08 12 33 --- 23 21 40 60.9 324.4 2.0 123.0 9 F 1 5016 08 12 33 WB114 23 21 40 63.2 327.9 1.6 130.2 -11 1 5 5016 08 12 33 08 12 53 --- 23 22 00 63.2 327.9 1.6 130.1 9 F 1 5149 Schedule for VLBA_PT (Code Pt ) Page 32 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 12 53 2123+550 23 22 00 60.8 324.4 2.0 122.9 -11 1 5 5149 08 12 53 08 13 13 --- 23 22 20 60.8 324.3 2.0 122.8 9 F 1 5282 08 13 13 WB114 23 22 20 63.1 327.8 1.7 130.0 -11 1 5 5282 08 13 13 08 13 33 --- 23 22 40 63.1 327.7 1.7 129.8 9 F 1 5415 08 13 33 2123+550 23 22 40 60.7 324.3 2.0 122.7 -11 1 5 5415 08 13 33 08 13 53 --- 23 23 00 60.7 324.2 2.0 122.6 9 F 1 5548 08 13 53 WB114 23 23 00 63.1 327.7 1.7 129.7 -11 1 5 5548 08 13 53 08 14 13 --- 23 23 20 63.0 327.6 1.7 129.6 9 F 1 5681 08 14 13 2123+550 23 23 20 60.7 324.2 2.0 122.4 -11 1 5 5681 08 14 13 08 14 33 --- 23 23 40 60.6 324.1 2.0 122.3 9 F 1 5814 08 14 33 WB114 23 23 40 63.0 327.5 1.7 129.4 -11 1 5 5814 08 14 33 08 14 53 --- 23 24 00 62.9 327.5 1.7 129.3 9 F 1 5947 08 14 53 2123+550 23 24 00 60.6 324.0 2.0 122.2 -11 1 5 5947 08 14 53 08 15 13 --- 23 24 20 60.5 324.0 2.0 122.1 9 F 1 6080 08 15 13 WB114 23 24 20 62.9 327.4 1.7 129.2 -11 1 5 6080 08 15 13 08 15 33 --- 23 24 40 62.9 327.3 1.7 129.1 9 F 1 6213 08 15 33 2123+550 23 24 40 60.5 323.9 2.0 122.0 -11 1 5 6213 08 15 33 08 15 53 --- 23 25 00 60.5 323.9 2.0 121.9 9 F 1 6346 08 15 53 WB114 23 25 00 62.8 327.3 1.7 128.9 -11 1 5 6346 08 15 53 08 16 13 --- 23 25 20 62.8 327.2 1.7 128.8 9 F 1 6479 08 16 13 2123+550 23 25 20 60.4 323.8 2.0 121.8 -11 1 5 6479 08 16 13 08 16 33 --- 23 25 40 60.4 323.8 2.0 121.7 9 F 1 6612 08 16 33 WB114 23 25 40 62.8 327.1 1.7 128.7 -11 1 5 6612 08 16 33 08 16 53 --- 23 26 00 62.7 327.1 1.7 128.6 9 F 1 6745 08 16 53 2123+550 23 26 00 60.3 323.7 2.0 121.5 -11 1 5 6745 08 16 53 08 17 13 --- 23 26 20 60.3 323.7 2.1 121.4 9 F 1 6878 08 17 13 WB114 23 26 20 62.7 327.0 1.7 128.4 -11 1 5 6878 08 17 13 08 17 32 --- 23 26 40 62.6 326.9 1.7 128.3 9 F 1 7011 Schedule for VLBA_PT (Code Pt ) Page 33 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 17 32 2123+550 23 26 40 60.3 323.6 2.1 121.3 -11 1 5 7011 08 17 32 08 17 52 --- 23 27 00 60.2 323.6 2.1 121.2 9 F 1 7143 08 17 52 WB114 23 27 00 62.6 326.9 1.7 128.2 -11 1 5 7143 08 17 52 08 18 12 --- 23 27 20 62.6 326.8 1.7 128.0 9 F 1 7276 08 18 12 2123+550 23 27 20 60.2 323.5 2.1 121.1 -11 1 5 7276 08 18 12 08 18 32 --- 23 27 40 60.1 323.5 2.1 121.0 9 F 1 7409 08 18 32 WB114 23 27 40 62.5 326.7 1.7 127.9 -11 1 5 7409 08 18 32 08 18 52 --- 23 28 00 62.5 326.7 1.7 127.8 9 F 1 7542 08 18 52 2123+550 23 28 00 60.1 323.4 2.1 120.9 -11 1 5 7542 08 18 52 08 19 12 --- 23 28 20 60.1 323.4 2.1 120.8 9 F 1 7675 08 19 12 WB114 23 28 20 62.5 326.6 1.8 127.7 -11 1 5 7675 08 19 12 08 19 32 --- 23 28 40 62.4 326.6 1.8 127.6 9 F 1 7808 08 19 32 2123+550 23 28 40 60.0 323.3 2.1 120.7 -11 1 5 7808 08 19 32 08 19 52 --- 23 29 00 60.0 323.3 2.1 120.5 9 F 1 7941 08 19 52 WB114 23 29 00 62.4 326.5 1.8 127.4 -11 1 5 7941 08 19 52 08 20 12 --- 23 29 20 62.3 326.4 1.8 127.3 9 F 1 8074 08 20 12 2123+550 23 29 20 59.9 323.2 2.1 120.4 -11 1 5 8074 08 20 12 08 20 32 --- 23 29 40 59.9 323.2 2.1 120.3 9 F 1 8207 08 20 32 WB114 23 29 40 62.3 326.4 1.8 127.2 -11 1 5 8207 08 20 32 08 20 52 --- 23 30 00 62.3 326.3 1.8 127.1 9 F 1 8340 08 20 52 2123+550 23 30 00 59.8 323.1 2.1 120.2 -11 1 5 8340 08 20 52 08 21 12 --- 23 30 20 59.8 323.1 2.1 120.1 9 F 1 8473 08 21 12 WB114 23 30 20 62.2 326.2 1.8 126.9 -11 1 5 8473 08 21 12 08 21 32 --- 23 30 40 62.2 326.2 1.8 126.8 9 F 1 8606 08 21 32 2123+550 23 30 40 59.8 323.1 2.1 120.0 -11 1 5 8606 08 21 32 08 21 52 --- 23 31 00 59.7 323.0 2.1 119.9 9 F 1 8739 08 21 52 WB114 23 31 00 62.2 326.1 1.8 126.7 -11 1 5 8739 08 21 52 08 22 12 --- 23 31 20 62.1 326.1 1.8 126.6 9 F 1 8872 Schedule for VLBA_PT (Code Pt ) Page 34 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 22 12 2123+550 23 31 20 59.7 323.0 2.1 119.8 -11 1 5 8872 08 22 12 08 22 32 --- 23 31 40 59.6 322.9 2.1 119.7 9 F 1 9005 08 22 32 WB114 23 31 40 62.1 326.0 1.8 126.4 -11 1 5 9005 08 22 32 08 22 52 --- 23 32 00 62.0 325.9 1.8 126.3 9 F 1 9138 08 24 51 3C454.3 23 34 00 69.8 208.8 0.7 24.4 36 1 5 9138 08 24 51 08 30 50 --- 23 40 00 69.1 212.5 0.8 27.5 359 F 1 11531 08 32 50 2146+570 23 42 00 60.0 328.3 1.9 127.0 36 1 5 11531 08 32 50 08 33 10 --- 23 42 20 60.0 328.3 1.9 126.9 20 F 1 11664 08 33 10 WB114 23 42 20 60.8 324.2 2.0 122.7 -9 1 5 11664 08 33 10 08 33 30 --- 23 42 40 60.8 324.1 2.0 122.6 11 F 1 11797 08 33 30 2146+570 23 42 40 60.0 328.2 1.9 126.8 -9 1 5 11797 08 33 30 08 33 50 --- 23 43 00 59.9 328.1 1.9 126.7 11 F 1 11930 08 33 50 WB114 23 43 00 60.7 324.1 2.0 122.4 -9 1 5 11930 08 33 50 08 34 10 --- 23 43 20 60.7 324.0 2.0 122.3 11 F 1 12063 08 34 10 2146+570 23 43 20 59.9 328.1 1.9 126.6 -9 1 5 12063 08 34 10 08 34 30 --- 23 43 40 59.8 328.0 2.0 126.4 11 F 1 12196 08 34 30 WB114 23 43 40 60.7 324.0 2.0 122.2 -9 1 5 12196 08 34 30 08 34 50 --- 23 44 00 60.6 323.9 2.0 122.1 11 F 1 12329 08 34 50 2146+570 23 44 00 59.8 328.0 2.0 126.3 -9 1 5 12329 08 34 50 08 35 10 --- 23 44 20 59.8 327.9 2.0 126.2 11 F 1 12462 08 35 10 WB114 23 44 20 60.6 323.9 2.0 122.0 -9 1 5 12462 08 35 10 08 35 30 --- 23 44 40 60.5 323.8 2.0 121.9 11 F 1 12595 08 35 30 2146+570 23 44 40 59.7 327.9 2.0 126.1 -9 1 5 12595 08 35 30 08 35 49 --- 23 45 00 59.7 327.8 2.0 126.0 11 F 1 12728 08 35 49 WB114 23 45 00 60.5 323.8 2.0 121.8 -9 1 5 12728 08 35 49 08 36 09 --- 23 45 20 60.4 323.7 2.0 121.6 11 F 1 12861 08 36 09 2146+570 23 45 20 59.7 327.8 2.0 125.9 -9 1 5 12861 08 36 09 08 36 29 --- 23 45 40 59.6 327.7 2.0 125.8 11 F 1 12994 Schedule for VLBA_PT (Code Pt ) Page 35 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 36 29 WB114 23 45 40 60.4 323.7 2.0 121.5 -9 1 5 12994 08 36 29 08 36 49 --- 23 46 00 60.4 323.6 2.0 121.4 11 F 1 13127 08 36 49 2146+570 23 46 00 59.6 327.7 2.0 125.6 -9 1 5 13127 08 36 49 08 37 09 --- 23 46 20 59.6 327.6 2.0 125.5 11 F 1 13260 08 37 09 WB114 23 46 20 60.3 323.6 2.1 121.3 -9 1 5 13260 08 37 09 08 37 29 --- 23 46 40 60.3 323.5 2.1 121.2 11 F 1 13393 08 37 29 2146+570 23 46 40 59.5 327.6 2.0 125.4 -9 1 5 13393 08 37 29 08 37 49 --- 23 47 00 59.5 327.5 2.0 125.3 11 F 1 13526 08 37 49 WB114 23 47 00 60.2 323.5 2.1 121.1 -9 1 5 13526 08 37 49 08 38 09 --- 23 47 20 60.2 323.4 2.1 121.0 11 F 1 13659 08 38 09 2146+570 23 47 20 59.4 327.5 2.0 125.2 -9 1 5 13659 08 38 09 08 38 29 --- 23 47 40 59.4 327.4 2.0 125.1 11 F 1 13792 08 38 29 WB114 23 47 40 60.2 323.4 2.1 120.9 -9 1 5 13792 08 38 29 08 38 49 --- 23 48 00 60.1 323.3 2.1 120.8 11 F 1 13925 08 38 49 2146+570 23 48 00 59.4 327.4 2.0 125.0 -9 1 5 13925 08 38 49 08 39 09 --- 23 48 20 59.3 327.3 2.0 124.8 11 F 1 14058 08 39 09 WB114 23 48 20 60.1 323.3 2.1 120.6 -9 1 5 14058 08 39 09 08 39 29 --- 23 48 40 60.0 323.2 2.1 120.5 11 F 1 14191 08 39 29 2146+570 23 48 40 59.3 327.3 2.0 124.7 -9 1 5 14191 08 39 29 08 39 49 --- 23 49 00 59.3 327.2 2.0 124.6 11 F 1 14324 08 39 49 WB114 23 49 00 60.0 323.2 2.1 120.4 -9 1 5 14324 08 39 49 08 40 09 --- 23 49 20 60.0 323.1 2.1 120.3 11 F 1 14457 08 40 09 2146+570 23 49 20 59.2 327.2 2.0 124.5 -9 1 5 14457 08 40 09 08 40 29 --- 23 49 40 59.2 327.1 2.1 124.4 11 F 1 14590 08 40 29 WB114 23 49 40 59.9 323.1 2.1 120.2 -9 1 5 14590 08 40 29 08 40 49 --- 23 50 00 59.9 323.0 2.1 120.1 11 F 1 14723 08 40 49 2146+570 23 50 00 59.1 327.1 2.1 124.3 -9 1 5 14723 08 40 49 08 41 09 --- 23 50 20 59.1 327.0 2.1 124.2 11 F 1 14856 Schedule for VLBA_PT (Code Pt ) Page 36 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 41 09 WB114 23 50 20 59.8 323.0 2.1 120.0 -9 1 5 14856 08 41 09 08 41 29 --- 23 50 40 59.8 322.9 2.1 119.9 11 F 1 14989 08 41 29 2146+570 23 50 40 59.1 327.0 2.1 124.0 -9 1 5 14989 08 41 29 08 41 48 --- 23 51 00 59.0 326.9 2.1 123.9 11 F 1 15122 08 41 48 WB114 23 51 00 59.7 322.9 2.1 119.8 -9 1 5 15122 08 41 48 08 42 08 --- 23 51 20 59.7 322.8 2.1 119.7 11 F 1 15255 08 42 08 2146+570 23 51 20 59.0 326.9 2.1 123.8 -9 1 5 15255 08 42 08 08 42 28 --- 23 51 40 59.0 326.8 2.1 123.7 11 F 1 15388 08 42 28 WB114 23 51 40 59.7 322.8 2.1 119.5 -9 1 5 15388 08 42 28 08 42 48 --- 23 52 00 59.6 322.7 2.1 119.4 11 F 1 15521 08 42 48 2146+570 23 52 00 58.9 326.8 2.1 123.6 -9 1 5 15521 08 42 48 08 43 08 --- 23 52 20 58.9 326.7 2.1 123.5 11 F 1 15654 08 43 08 WB114 23 52 20 59.6 322.7 2.2 119.3 -9 1 5 15654 08 43 08 08 43 28 --- 23 52 40 59.5 322.6 2.2 119.2 11 F 1 15786 08 43 28 2146+570 23 52 40 58.8 326.7 2.1 123.4 -9 1 5 15786 08 43 28 08 43 48 --- 23 53 00 58.8 326.6 2.1 123.3 11 F 1 15919 08 43 48 WB114 23 53 00 59.5 322.6 2.2 119.1 -9 1 5 15919 08 43 48 08 44 08 --- 23 53 20 59.5 322.6 2.2 119.0 11 F 1 16052 08 44 08 2146+570 23 53 20 58.8 326.6 2.1 123.2 -9 1 5 16052 08 44 08 08 44 28 --- 23 53 40 58.7 326.5 2.1 123.0 11 F 1 16185 08 44 28 WB114 23 53 40 59.4 322.5 2.2 118.9 -9 1 5 16185 08 44 28 08 44 48 --- 23 54 00 59.4 322.5 2.2 118.8 11 F 1 16318 08 44 48 2146+570 23 54 00 58.7 326.5 2.1 122.9 -9 1 5 16318 08 44 48 08 45 08 --- 23 54 20 58.7 326.4 2.1 122.8 11 F 1 16451 08 45 08 WB114 23 54 20 59.3 322.4 2.2 118.7 -9 1 5 16451 08 45 08 08 45 28 --- 23 54 40 59.3 322.4 2.2 118.6 11 F 1 16584 08 45 28 2146+570 23 54 40 58.6 326.4 2.1 122.7 -9 1 5 16584 08 45 28 08 45 48 --- 23 55 00 58.6 326.3 2.1 122.6 11 F 1 16717 Schedule for VLBA_PT (Code Pt ) Page 37 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 45 48 WB114 23 55 00 59.2 322.3 2.2 118.5 -9 1 5 16717 08 45 48 08 46 08 --- 23 55 20 59.2 322.3 2.2 118.4 11 F 1 16850 08 46 08 2146+570 23 55 20 58.5 326.3 2.1 122.5 -9 1 5 16850 08 46 08 08 46 28 --- 23 55 40 58.5 326.2 2.2 122.4 11 F 1 16983 08 46 28 WB114 23 55 40 59.2 322.2 2.2 118.3 -9 1 5 16983 08 46 28 08 46 48 --- 23 56 00 59.1 322.2 2.2 118.1 11 F 1 17116 08 46 48 2146+570 23 56 00 58.5 326.2 2.2 122.3 -9 1 5 17116 08 46 48 08 47 08 --- 23 56 20 58.4 326.1 2.2 122.2 11 F 1 17249 08 47 08 WB114 23 56 20 59.1 322.2 2.2 118.0 -9 1 6 17249 08 47 08 08 47 28 --- 23 56 40 59.0 322.1 2.2 117.9 11 R 1 17116 08 47 28 2146+570 23 56 40 58.4 326.1 2.2 122.1 -9 1 6 17116 08 47 28 08 47 47 --- 23 57 00 58.3 326.1 2.2 121.9 11 R 1 16983 08 47 47 WB114 23 57 00 59.0 322.1 2.2 117.8 -9 1 6 16983 08 47 47 08 48 07 --- 23 57 20 59.0 322.0 2.2 117.7 11 R 1 16850 08 48 07 2146+570 23 57 20 58.3 326.0 2.2 121.8 -9 1 6 16850 08 48 07 08 48 27 --- 23 57 40 58.3 326.0 2.2 121.7 11 R 1 16717 08 48 27 WB114 23 57 40 58.9 322.0 2.2 117.6 -9 1 6 16717 08 48 27 08 48 47 --- 23 58 00 58.9 321.9 2.2 117.5 11 R 1 16584 08 48 47 2146+570 23 58 00 58.2 325.9 2.2 121.6 -9 1 6 16584 08 48 47 08 49 07 --- 23 58 20 58.2 325.9 2.2 121.5 11 R 1 16451 08 49 07 WB114 23 58 20 58.8 321.9 2.3 117.4 -9 1 6 16451 08 49 07 08 49 27 --- 23 58 40 58.8 321.9 2.3 117.3 11 R 1 16318 08 49 27 2146+570 23 58 40 58.2 325.8 2.2 121.4 -9 1 6 16318 08 49 27 08 49 47 --- 23 59 00 58.1 325.8 2.2 121.3 11 R 1 16185 08 49 47 WB114 23 59 00 58.7 321.8 2.3 117.2 -9 1 6 16185 08 49 47 08 50 07 --- 23 59 20 58.7 321.8 2.3 117.1 11 R 1 16052 08 50 07 2146+570 23 59 20 58.1 325.7 2.2 121.2 -9 1 6 16052 08 50 07 08 50 27 --- 23 59 40 58.0 325.7 2.2 121.1 11 R 1 15919 Schedule for VLBA_PT (Code Pt ) Page 38 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 50 27 WB114 23 59 40 58.7 321.7 2.3 117.0 -9 1 6 15919 08 50 27 08 50 47 --- 00 00 00 58.6 321.7 2.3 116.9 11 R 1 15786 08 50 47 2146+570 00 00 00 58.0 325.7 2.2 121.0 -9 1 6 15786 08 50 47 08 51 07 --- 00 00 20 58.0 325.6 2.2 120.9 11 R 1 15654 08 51 07 WB114 00 00 20 58.6 321.6 2.3 116.8 -9 1 6 15654 08 51 07 08 51 27 --- 00 00 40 58.5 321.6 2.3 116.7 11 R 1 15521 08 51 27 2146+570 00 00 40 57.9 325.6 2.2 120.8 -9 1 6 15521 08 51 27 08 51 47 --- 00 01 00 57.9 325.5 2.2 120.7 11 R 1 15388 08 51 47 WB114 00 01 00 58.5 321.6 2.3 116.6 -9 1 6 15388 08 51 47 08 52 07 --- 00 01 20 58.4 321.5 2.3 116.5 11 R 1 15255 08 52 07 2146+570 00 01 20 57.8 325.5 2.2 120.5 -9 1 6 15255 08 52 07 08 52 27 --- 00 01 40 57.8 325.4 2.3 120.4 11 R 1 15122 08 52 27 WB114 00 01 40 58.4 321.5 2.3 116.4 -9 1 6 15122 08 52 27 08 52 47 --- 00 02 00 58.4 321.4 2.3 116.3 11 R 1 14989 08 52 47 2146+570 00 02 00 57.8 325.4 2.3 120.3 -9 1 6 14989 08 52 47 08 53 07 --- 00 02 20 57.7 325.3 2.3 120.2 11 R 1 14856 08 53 07 WB114 00 02 20 58.3 321.4 2.3 116.2 -9 1 6 14856 08 53 07 08 53 27 --- 00 02 40 58.3 321.4 2.3 116.1 11 R 1 14723 08 53 27 2146+570 00 02 40 57.7 325.3 2.3 120.1 -9 1 6 14723 08 53 27 08 53 46 --- 00 03 00 57.7 325.3 2.3 120.0 11 R 1 14590 08 53 46 WB114 00 03 00 58.2 321.3 2.3 116.0 -9 1 6 14590 08 53 46 08 54 06 --- 00 03 20 58.2 321.3 2.3 115.9 11 R 1 14457 08 54 06 2146+570 00 03 20 57.6 325.2 2.3 119.9 -9 1 6 14457 08 54 06 08 54 26 --- 00 03 40 57.6 325.2 2.3 119.8 11 R 1 14324 08 54 26 WB114 00 03 40 58.1 321.2 2.3 115.8 -9 1 6 14324 08 54 26 08 54 46 --- 00 04 00 58.1 321.2 2.3 115.7 11 R 1 14191 08 54 46 2146+570 00 04 00 57.5 325.1 2.3 119.7 -9 1 6 14191 08 54 46 08 55 06 --- 00 04 20 57.5 325.1 2.3 119.6 11 R 1 14058 Schedule for VLBA_PT (Code Pt ) Page 39 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 55 06 WB114 00 04 20 58.1 321.2 2.4 115.6 -9 1 6 14058 08 55 06 08 55 26 --- 00 04 40 58.0 321.1 2.4 115.5 11 R 1 13925 08 55 26 2146+570 00 04 40 57.5 325.1 2.3 119.5 -9 1 6 13925 08 55 26 08 55 46 --- 00 05 00 57.4 325.0 2.3 119.4 11 R 1 13792 08 55 46 WB114 00 05 00 58.0 321.1 2.4 115.4 -9 1 6 13792 08 55 46 08 56 06 --- 00 05 20 57.9 321.0 2.4 115.3 11 R 1 13659 08 56 06 2146+570 00 05 20 57.4 325.0 2.3 119.3 -9 1 6 13659 08 56 06 08 56 26 --- 00 05 40 57.3 324.9 2.3 119.2 11 R 1 13526 08 56 26 WB114 00 05 40 57.9 321.0 2.4 115.2 -9 1 6 13526 08 56 26 08 56 46 --- 00 06 00 57.8 321.0 2.4 115.1 11 R 1 13393 08 56 46 2146+570 00 06 00 57.3 324.9 2.3 119.1 -9 1 6 13393 08 56 46 08 57 06 --- 00 06 20 57.3 324.8 2.3 119.0 11 R 1 13260 08 57 06 WB114 00 06 20 57.8 320.9 2.4 115.0 -9 1 6 13260 08 57 06 08 57 26 --- 00 06 40 57.7 320.9 2.4 114.9 11 R 1 13127 08 57 26 2146+570 00 06 40 57.2 324.8 2.3 118.9 -9 1 6 13127 08 57 26 08 57 46 --- 00 07 00 57.2 324.8 2.3 118.8 11 R 1 12994 08 57 46 WB114 00 07 00 57.7 320.9 2.4 114.8 -9 1 6 12994 08 57 46 08 58 06 --- 00 07 20 57.7 320.8 2.4 114.7 11 R 1 12861 08 58 06 2146+570 00 07 20 57.1 324.7 2.3 118.7 -9 1 6 12861 08 58 06 08 58 26 --- 00 07 40 57.1 324.7 2.4 118.6 11 R 1 12728 08 58 26 WB114 00 07 40 57.6 320.8 2.4 114.6 -9 1 6 12728 08 58 26 08 58 46 --- 00 08 00 57.6 320.7 2.4 114.5 11 R 1 12595 08 58 46 2146+570 00 08 00 57.1 324.6 2.4 118.5 -9 1 6 12595 08 58 46 08 59 06 --- 00 08 20 57.0 324.6 2.4 118.3 11 R 1 12462 08 59 06 WB114 00 08 20 57.5 320.7 2.4 114.4 -9 1 6 12462 08 59 06 08 59 26 --- 00 08 40 57.5 320.7 2.4 114.3 11 R 1 12329 08 59 26 2146+570 00 08 40 57.0 324.6 2.4 118.2 -9 1 6 12329 08 59 26 08 59 46 --- 00 09 00 56.9 324.5 2.4 118.1 11 R 1 12196 Schedule for VLBA_PT (Code Pt ) Page 40 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 59 46 WB114 00 09 00 57.4 320.6 2.4 114.2 -9 1 6 12196 08 59 46 09 00 05 --- 00 09 20 57.4 320.6 2.4 114.1 11 R 1 12063 09 00 05 2146+570 00 09 20 56.9 324.5 2.4 118.0 -9 1 6 12063 09 00 05 09 00 25 --- 00 09 40 56.9 324.5 2.4 117.9 11 R 1 11930 09 00 25 WB114 00 09 40 57.4 320.6 2.4 114.0 -9 1 6 11930 09 00 25 09 00 45 --- 00 10 00 57.3 320.5 2.4 113.9 11 R 1 11797 09 00 45 2146+570 00 10 00 56.8 324.4 2.4 117.8 -9 1 6 11797 09 00 45 09 01 05 --- 00 10 20 56.8 324.4 2.4 117.7 11 R 1 11664 09 01 05 WB114 00 10 20 57.3 320.5 2.5 113.8 -9 1 6 11664 09 01 05 09 01 25 --- 00 10 40 57.2 320.5 2.5 113.7 11 R 1 11531 09 01 25 2146+570 00 10 40 56.7 324.3 2.4 117.6 -9 1 6 11531 09 01 25 09 01 45 --- 00 11 00 56.7 324.3 2.4 117.5 11 R 1 11399 09 01 45 WB114 00 11 00 57.2 320.4 2.5 113.6 -9 1 6 11399 09 01 45 09 02 05 --- 00 11 20 57.1 320.4 2.5 113.5 11 R 1 11266 09 02 05 2146+570 00 11 20 56.7 324.3 2.4 117.4 -9 1 6 11266 09 02 05 09 02 25 --- 00 11 40 56.6 324.2 2.4 117.3 11 R 1 11133 09 02 25 WB114 00 11 40 57.1 320.3 2.5 113.4 -9 1 6 11133 09 02 25 09 02 45 --- 00 12 00 57.1 320.3 2.5 113.3 11 R 1 11000 09 02 45 2146+570 00 12 00 56.6 324.2 2.4 117.2 -9 1 6 11000 09 02 45 09 03 05 --- 00 12 20 56.5 324.1 2.4 117.1 11 R 1 10867 09 03 05 WB114 00 12 20 57.0 320.3 2.5 113.2 -9 1 6 10867 09 03 05 09 03 25 --- 00 12 40 57.0 320.2 2.5 113.1 11 R 1 10734 09 03 25 2146+570 00 12 40 56.5 324.1 2.4 117.0 -9 1 6 10734 09 03 25 09 03 45 --- 00 13 00 56.5 324.1 2.4 116.9 11 R 1 10601 09 03 45 WB114 00 13 00 56.9 320.2 2.5 113.0 -9 1 6 10601 09 03 45 09 04 05 --- 00 13 20 56.9 320.2 2.5 112.9 11 R 1 10468 09 04 05 2146+570 00 13 20 56.4 324.0 2.4 116.8 -9 1 6 10468 09 04 05 09 04 25 --- 00 13 40 56.4 324.0 2.5 116.7 11 R 1 10335 Schedule for VLBA_PT (Code Pt ) Page 41 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 09 04 25 WB114 00 13 40 56.8 320.1 2.5 112.8 -9 1 6 10335 09 04 25 09 04 45 --- 00 14 00 56.8 320.1 2.5 112.7 11 R 1 10202 09 04 45 2146+570 00 14 00 56.3 324.0 2.5 116.6 -9 1 6 10202 09 04 45 09 05 05 --- 00 14 20 56.3 323.9 2.5 116.5 11 R 1 10069 09 05 05 WB114 00 14 20 56.7 320.1 2.5 112.6 -9 1 6 10069 09 05 05 09 05 25 --- 00 14 40 56.7 320.0 2.5 112.5 11 R 1 9936 09 05 25 2146+570 00 14 40 56.3 323.9 2.5 116.4 -9 1 6 9936 09 05 25 09 05 45 --- 00 15 00 56.2 323.9 2.5 116.3 11 R 1 9803 09 05 45 WB114 00 15 00 56.7 320.0 2.5 112.4 -9 1 6 9803 09 05 45 09 06 04 --- 00 15 20 56.6 320.0 2.5 112.3 11 R 1 9670 09 06 04 2146+570 00 15 20 56.2 323.8 2.5 116.2 -9 1 6 9670 09 06 04 09 06 24 --- 00 15 40 56.1 323.8 2.5 116.1 11 R 1 9537 09 06 24 WB114 00 15 40 56.6 319.9 2.5 112.2 -9 1 6 9537 09 06 24 09 06 44 --- 00 16 00 56.5 319.9 2.5 112.1 11 R 1 9404 09 08 44 3C454.3 00 18 00 63.9 231.3 1.4 42.2 55 1 6 9404 09 08 44 09 14 43 --- 00 24 00 62.9 233.7 1.5 43.8 359 R 1 7011 09 16 43 2123+550 00 26 00 52.4 317.7 3.0 104.2 58 1 6 7011 09 16 43 09 17 03 --- 00 26 20 52.4 317.7 3.1 104.1 20 R 1 6878 09 17 03 WB114 00 26 20 55.1 319.0 2.7 109.2 -12 1 6 6878 09 17 03 09 17 23 --- 00 26 40 55.1 318.9 2.7 109.1 8 R 1 6745 09 17 23 2123+550 00 26 40 52.3 317.7 3.1 104.0 -12 1 6 6745 09 17 23 09 17 43 --- 00 27 00 52.3 317.7 3.1 104.0 8 R 1 6612 09 17 43 WB114 00 27 00 55.0 318.9 2.7 109.0 -12 1 6 6612 09 17 43 09 18 03 --- 00 27 20 55.0 318.9 2.7 109.0 8 R 1 6479 09 18 03 2123+550 00 27 20 52.2 317.6 3.1 103.9 -12 1 6 6479 09 18 03 09 18 22 --- 00 27 40 52.2 317.6 3.1 103.8 8 R 1 6346 09 18 22 WB114 00 27 40 55.0 318.9 2