COVER INFORMATION Station: VLBA_OV (Code Ov ) Experiment: BH099 VLBA format 1cm line 2002 Exp. Code: BH099B Schedule Version: 1.00 Processed by SCHED version: Release of 02 July 2002 PI: K. Hachisuka Address: Departament d Astronomia i Astrofisica Universitat de Valencia E-46100 Burjassot - Valencia Spain Phone: +34-96-3981200 EMAIL: kazuya.hachisuka@uv.es Fax: +34-96-3983084 Phone during observation: +34-69-3981200 Observing mode: v1cm-128-4-2 Notes: Two phase-tracking centers for WB114 other position is RA=21:43:01.4593 DEC=54:56:17.936 (J2000) Schedule for VLBA_OV (Code Ov ) Page 2 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- Next scan frequencies: 22235.69 22227.53 22219.37 22243.85 Next BBC frequencies: 735.69 727.53 719.37 743.85 Next scan bandwidths: 8.00 8.00 8.00 8.00 04 51 26 3C454.3 19 19 22 38.4 99.0 -3.6 -55.0 0 1 1 0 04 51 26 04 57 25 --- 19 25 22 39.6 100.1 -3.5 -54.7 359 F 1 2393 04 59 25 2137+510 19 27 22 63.3 48.5 -2.2 -108.4 66 1 1 2393 04 59 25 04 59 45 --- 19 27 42 63.3 48.5 -2.2 -108.5 20 F 1 2526 04 59 45 WB105 19 27 42 62.8 48.1 -2.2 -108.3 -7 1 1 2526 04 59 45 05 00 05 --- 19 28 02 62.9 48.1 -2.2 -108.4 13 F 1 2659 05 00 05 2137+510 19 28 02 63.3 48.5 -2.2 -108.6 -7 1 1 2659 05 00 05 05 00 25 --- 19 28 22 63.4 48.4 -2.1 -108.7 13 F 1 2792 05 00 25 WB105 19 28 22 62.9 48.1 -2.2 -108.5 -7 1 1 2792 05 00 25 05 00 45 --- 19 28 42 63.0 48.0 -2.2 -108.6 13 F 1 2925 05 00 45 2137+510 19 28 42 63.4 48.4 -2.1 -108.8 -7 1 1 2925 05 00 45 05 01 05 --- 19 29 02 63.5 48.4 -2.1 -108.9 13 F 1 3058 05 01 05 WB105 19 29 02 63.0 48.0 -2.2 -108.7 -7 1 1 3058 05 01 05 05 01 25 --- 19 29 22 63.1 47.9 -2.2 -108.8 13 F 1 3191 05 01 25 2137+510 19 29 22 63.5 48.3 -2.1 -109.0 -7 1 1 3191 05 01 25 05 01 45 --- 19 29 42 63.6 48.3 -2.1 -109.1 13 F 1 3324 05 01 45 WB105 19 29 42 63.1 47.9 -2.2 -108.9 -7 1 1 3324 05 01 45 05 02 05 --- 19 30 02 63.2 47.9 -2.2 -109.0 13 F 1 3457 05 02 05 2137+510 19 30 02 63.6 48.2 -2.1 -109.2 -7 1 1 3457 05 02 05 05 02 25 --- 19 30 22 63.7 48.2 -2.1 -109.3 13 F 1 3590 05 02 25 WB105 19 30 22 63.2 47.8 -2.2 -109.1 -7 1 1 3590 05 02 25 05 02 44 --- 19 30 42 63.2 47.8 -2.2 -109.2 13 F 1 3723 05 02 44 2137+510 19 30 42 63.7 48.2 -2.1 -109.4 -7 1 1 3723 05 02 44 05 03 04 --- 19 31 02 63.8 48.1 -2.1 -109.5 13 F 1 3856 05 03 04 WB105 19 31 02 63.3 47.8 -2.1 -109.3 -7 1 1 3856 05 03 04 05 03 24 --- 19 31 22 63.3 47.7 -2.1 -109.4 13 F 1 3989 Schedule for VLBA_OV (Code Ov ) Page 3 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 03 24 2137+510 19 31 22 63.8 48.1 -2.1 -109.6 -7 1 1 3989 05 03 24 05 03 44 --- 19 31 42 63.9 48.0 -2.1 -109.7 13 F 1 4122 05 03 44 WB105 19 31 42 63.4 47.7 -2.1 -109.5 -7 1 1 4122 05 03 44 05 04 04 --- 19 32 02 63.4 47.6 -2.1 -109.6 13 F 1 4255 05 04 04 2137+510 19 32 02 63.9 48.0 -2.1 -109.8 -7 1 1 4255 05 04 04 05 04 24 --- 19 32 22 64.0 48.0 -2.1 -109.9 13 F 1 4388 05 04 24 WB105 19 32 22 63.5 47.6 -2.1 -109.7 -7 1 1 4388 05 04 24 05 04 44 --- 19 32 42 63.5 47.6 -2.1 -109.8 13 F 1 4521 05 04 44 2137+510 19 32 42 64.0 47.9 -2.1 -110.0 -7 1 1 4521 05 04 44 05 05 04 --- 19 33 02 64.1 47.9 -2.1 -110.1 13 F 1 4654 05 05 04 WB105 19 33 02 63.6 47.5 -2.1 -109.9 -7 1 1 4654 05 05 04 05 05 24 --- 19 33 22 63.6 47.5 -2.1 -110.0 13 F 1 4787 05 05 24 2137+510 19 33 22 64.1 47.8 -2.1 -110.2 -7 1 1 4787 05 05 24 05 05 44 --- 19 33 42 64.2 47.8 -2.1 -110.3 13 F 1 4920 05 05 44 WB105 19 33 42 63.7 47.4 -2.1 -110.1 -7 1 1 4920 05 05 44 05 06 04 --- 19 34 02 63.7 47.4 -2.1 -110.2 13 F 1 5053 05 06 04 2137+510 19 34 02 64.2 47.8 -2.1 -110.4 -7 1 1 5053 05 06 04 05 06 24 --- 19 34 22 64.3 47.7 -2.0 -110.5 13 F 1 5186 05 06 24 WB105 19 34 22 63.8 47.4 -2.1 -110.3 -7 1 1 5186 05 06 24 05 06 44 --- 19 34 42 63.8 47.3 -2.1 -110.4 13 F 1 5319 05 06 44 2137+510 19 34 42 64.3 47.7 -2.0 -110.6 -7 1 1 5319 05 06 44 05 07 04 --- 19 35 02 64.4 47.6 -2.0 -110.7 13 F 1 5452 05 07 04 WB105 19 35 02 63.9 47.3 -2.1 -110.5 -7 1 1 5452 05 07 04 05 07 24 --- 19 35 22 63.9 47.2 -2.1 -110.6 13 F 1 5585 05 07 24 2137+510 19 35 22 64.4 47.6 -2.0 -110.8 -7 1 1 5585 05 07 24 05 07 44 --- 19 35 42 64.5 47.5 -2.0 -110.9 13 F 1 5718 05 07 44 WB105 19 35 42 64.0 47.2 -2.1 -110.7 -7 1 1 5718 05 07 44 05 08 04 --- 19 36 02 64.0 47.2 -2.1 -110.8 13 F 1 5851 Schedule for VLBA_OV (Code Ov ) Page 4 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 08 04 2137+510 19 36 02 64.5 47.5 -2.0 -111.0 -7 1 1 5851 05 08 04 05 08 24 --- 19 36 22 64.6 47.5 -2.0 -111.1 13 F 1 5984 05 08 24 WB105 19 36 22 64.1 47.1 -2.1 -110.9 -7 1 1 5984 05 08 24 05 08 43 --- 19 36 42 64.1 47.1 -2.1 -111.0 13 F 1 6117 05 08 43 2137+510 19 36 42 64.6 47.4 -2.0 -111.2 -7 1 1 6117 05 08 43 05 09 03 --- 19 37 02 64.7 47.4 -2.0 -111.3 13 F 1 6250 05 09 03 WB105 19 37 02 64.2 47.0 -2.0 -111.1 -7 1 1 6250 05 09 03 05 09 23 --- 19 37 22 64.2 47.0 -2.0 -111.2 13 F 1 6383 05 09 23 2137+510 19 37 22 64.7 47.3 -2.0 -111.4 -7 1 1 6383 05 09 23 05 09 43 --- 19 37 42 64.8 47.3 -2.0 -111.5 13 F 1 6515 05 09 43 WB105 19 37 42 64.3 46.9 -2.0 -111.3 -7 1 1 6515 05 09 43 05 10 03 --- 19 38 02 64.3 46.9 -2.0 -111.4 13 F 1 6648 05 10 03 2137+510 19 38 02 64.8 47.2 -2.0 -111.6 -7 1 1 6648 05 10 03 05 10 23 --- 19 38 22 64.9 47.2 -2.0 -111.8 13 F 1 6781 05 10 23 WB105 19 38 22 64.4 46.9 -2.0 -111.5 -7 1 1 6781 05 10 23 05 10 43 --- 19 38 42 64.4 46.8 -2.0 -111.6 13 F 1 6914 05 10 43 2137+510 19 38 42 64.9 47.1 -2.0 -111.9 -7 1 1 6914 05 10 43 05 11 03 --- 19 39 02 65.0 47.1 -2.0 -112.0 13 F 1 7047 05 11 03 WB105 19 39 02 64.5 46.8 -2.0 -111.7 -7 1 1 7047 05 11 03 05 11 23 --- 19 39 22 64.5 46.7 -2.0 -111.8 13 F 1 7180 05 11 23 2137+510 19 39 22 65.0 47.0 -2.0 -112.1 -7 1 1 7180 05 11 23 05 11 43 --- 19 39 42 65.1 47.0 -2.0 -112.2 13 F 1 7313 05 11 43 WB105 19 39 42 64.6 46.7 -2.0 -112.0 -7 1 1 7313 05 11 43 05 12 03 --- 19 40 02 64.6 46.6 -2.0 -112.1 13 F 1 7446 05 12 03 2137+510 19 40 02 65.1 46.9 -2.0 -112.3 -7 1 1 7446 05 12 03 05 12 23 --- 19 40 22 65.2 46.9 -1.9 -112.4 13 F 1 7579 05 12 23 WB105 19 40 22 64.7 46.6 -2.0 -112.2 -7 1 1 7579 05 12 23 05 12 43 --- 19 40 42 64.7 46.5 -2.0 -112.3 13 F 1 7712 Schedule for VLBA_OV (Code Ov ) Page 5 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 12 43 2137+510 19 40 42 65.2 46.9 -1.9 -112.5 -7 1 1 7712 05 12 43 05 13 03 --- 19 41 02 65.3 46.8 -1.9 -112.6 13 F 1 7845 05 13 03 WB105 19 41 02 64.8 46.5 -2.0 -112.4 -7 1 1 7845 05 13 03 05 13 23 --- 19 41 22 64.8 46.4 -2.0 -112.5 13 F 1 7978 05 13 23 2137+510 19 41 22 65.3 46.8 -1.9 -112.7 -7 1 1 7978 05 13 23 05 13 43 --- 19 41 42 65.4 46.7 -1.9 -112.8 13 F 1 8111 05 13 43 WB105 19 41 42 64.9 46.4 -2.0 -112.6 -7 1 1 8111 05 13 43 05 14 03 --- 19 42 02 64.9 46.4 -2.0 -112.7 13 F 1 8244 05 14 03 2137+510 19 42 02 65.4 46.7 -1.9 -112.9 -7 1 1 8244 05 14 03 05 14 23 --- 19 42 22 65.5 46.6 -1.9 -113.1 13 F 1 8377 05 14 23 WB105 19 42 22 64.9 46.3 -2.0 -112.8 -7 1 1 8377 05 14 23 05 14 42 --- 19 42 42 65.0 46.3 -2.0 -112.9 13 F 1 8510 05 14 42 2137+510 19 42 42 65.5 46.6 -1.9 -113.2 -7 1 1 8510 05 14 42 05 15 02 --- 19 43 02 65.6 46.5 -1.9 -113.3 13 F 1 8643 05 15 02 WB105 19 43 02 65.0 46.2 -1.9 -113.0 -7 1 1 8643 05 15 02 05 15 22 --- 19 43 22 65.1 46.2 -1.9 -113.1 13 F 1 8776 05 15 22 2137+510 19 43 22 65.6 46.5 -1.9 -113.4 -7 1 1 8776 05 15 22 05 15 42 --- 19 43 42 65.6 46.4 -1.9 -113.5 13 F 1 8909 05 15 42 WB105 19 43 42 65.1 46.1 -1.9 -113.2 -7 1 1 8909 05 15 42 05 16 02 --- 19 44 02 65.2 46.1 -1.9 -113.4 13 F 1 9042 05 16 02 2137+510 19 44 02 65.7 46.4 -1.9 -113.6 -7 1 1 9042 05 16 02 05 16 22 --- 19 44 22 65.7 46.3 -1.9 -113.7 13 F 1 9175 05 16 22 WB105 19 44 22 65.2 46.0 -1.9 -113.5 -7 1 1 9175 05 16 22 05 16 42 --- 19 44 42 65.3 46.0 -1.9 -113.6 13 F 1 9308 05 16 42 2137+510 19 44 42 65.8 46.3 -1.9 -113.8 -7 1 1 9308 05 16 42 05 17 02 --- 19 45 02 65.8 46.2 -1.9 -113.9 13 F 1 9441 05 17 02 WB105 19 45 02 65.3 45.9 -1.9 -113.7 -7 1 1 9441 05 17 02 05 17 22 --- 19 45 22 65.4 45.9 -1.9 -113.8 13 F 1 9574 Schedule for VLBA_OV (Code Ov ) Page 6 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 17 22 2137+510 19 45 22 65.9 46.2 -1.9 -114.0 -7 1 1 9574 05 17 22 05 17 42 --- 19 45 42 65.9 46.1 -1.9 -114.2 13 F 1 9707 05 17 42 WB105 19 45 42 65.4 45.8 -1.9 -113.9 -7 1 1 9707 05 17 42 05 18 02 --- 19 46 02 65.5 45.8 -1.9 -114.0 13 F 1 9840 05 18 02 2137+510 19 46 02 66.0 46.0 -1.9 -114.3 -7 1 1 9840 05 18 02 05 18 22 --- 19 46 22 66.0 46.0 -1.8 -114.4 13 F 1 9973 05 18 22 WB105 19 46 22 65.5 45.7 -1.9 -114.1 -7 1 1 9973 05 18 22 05 18 42 --- 19 46 42 65.6 45.7 -1.9 -114.2 13 F 1 10106 05 18 42 2137+510 19 46 42 66.1 45.9 -1.8 -114.5 -7 1 1 10106 05 18 42 05 19 02 --- 19 47 02 66.1 45.9 -1.8 -114.6 13 F 1 10239 05 19 02 WB105 19 47 02 65.6 45.6 -1.9 -114.4 -7 1 1 10239 05 19 02 05 19 22 --- 19 47 22 65.7 45.6 -1.9 -114.5 13 F 1 10372 05 19 22 2137+510 19 47 22 66.2 45.8 -1.8 -114.7 -7 1 1 10372 05 19 22 05 19 42 --- 19 47 42 66.2 45.8 -1.8 -114.8 13 F 1 10505 05 19 42 WB105 19 47 42 65.7 45.5 -1.9 -114.6 -7 1 1 10505 05 19 42 05 20 02 --- 19 48 02 65.8 45.4 -1.9 -114.7 13 F 1 10638 05 20 02 2137+510 19 48 02 66.3 45.7 -1.8 -115.0 -7 1 1 10638 05 20 02 05 20 22 --- 19 48 22 66.3 45.7 -1.8 -115.1 13 F 1 10771 05 20 22 WB105 19 48 22 65.8 45.4 -1.9 -114.8 -7 1 1 10771 05 20 22 05 20 42 --- 19 48 42 65.9 45.3 -1.9 -114.9 13 F 1 10903 05 20 42 2137+510 19 48 42 66.4 45.6 -1.8 -115.2 -7 1 1 10903 05 20 42 05 21 01 --- 19 49 02 66.4 45.6 -1.8 -115.3 13 F 1 11036 05 21 01 WB105 19 49 02 65.9 45.3 -1.8 -115.0 -7 1 1 11036 05 21 01 05 21 21 --- 19 49 22 65.9 45.2 -1.8 -115.1 13 F 1 11169 05 21 21 2137+510 19 49 22 66.5 45.5 -1.8 -115.4 -7 1 1 11169 05 21 21 05 21 41 --- 19 49 42 66.5 45.4 -1.8 -115.5 13 F 1 11302 05 21 41 WB105 19 49 42 66.0 45.2 -1.8 -115.3 -7 1 1 11302 05 21 41 05 22 01 --- 19 50 02 66.0 45.1 -1.8 -115.4 13 F 1 11435 Schedule for VLBA_OV (Code Ov ) Page 7 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 22 01 2137+510 19 50 02 66.6 45.4 -1.8 -115.7 -7 1 1 11435 05 22 01 05 22 21 --- 19 50 22 66.6 45.3 -1.8 -115.8 13 F 1 11568 05 22 21 WB105 19 50 22 66.1 45.1 -1.8 -115.5 -7 1 1 11568 05 22 21 05 22 41 --- 19 50 42 66.1 45.0 -1.8 -115.6 13 F 1 11701 05 22 41 2137+510 19 50 42 66.6 45.3 -1.8 -115.9 -7 1 1 11701 05 22 41 05 23 01 --- 19 51 02 66.7 45.2 -1.8 -116.0 13 F 1 11834 05 23 01 WB105 19 51 02 66.2 45.0 -1.8 -115.7 -7 1 1 11834 05 23 01 05 23 21 --- 19 51 22 66.2 44.9 -1.8 -115.8 13 F 1 11967 05 23 21 2137+510 19 51 22 66.7 45.2 -1.8 -116.1 -7 1 1 11967 05 23 21 05 23 41 --- 19 51 42 66.8 45.1 -1.8 -116.2 13 F 1 12100 05 23 41 WB105 19 51 42 66.3 44.8 -1.8 -116.0 -7 1 1 12100 05 23 41 05 24 01 --- 19 52 02 66.3 44.8 -1.8 -116.1 13 F 1 12233 05 24 01 2137+510 19 52 02 66.8 45.0 -1.8 -116.4 -7 1 1 12233 05 24 01 05 24 21 --- 19 52 22 66.9 45.0 -1.7 -116.5 13 F 1 12366 05 24 21 WB105 19 52 22 66.4 44.7 -1.8 -116.2 -7 1 1 12366 05 24 21 05 24 41 --- 19 52 42 66.4 44.7 -1.8 -116.3 13 F 1 12499 05 24 41 2137+510 19 52 42 66.9 44.9 -1.7 -116.6 -7 1 1 12499 05 24 41 05 25 01 --- 19 53 02 67.0 44.9 -1.7 -116.7 13 F 1 12632 05 25 01 WB105 19 53 02 66.5 44.6 -1.8 -116.4 -7 1 1 12632 05 25 01 05 25 21 --- 19 53 22 66.5 44.6 -1.8 -116.5 13 F 1 12765 05 25 21 2137+510 19 53 22 67.0 44.8 -1.7 -116.8 -7 1 1 12765 05 25 21 05 25 41 --- 19 53 42 67.1 44.7 -1.7 -117.0 13 F 1 12898 05 25 41 WB105 19 53 42 66.6 44.5 -1.8 -116.7 -7 1 1 12898 05 25 41 05 26 01 --- 19 54 02 66.6 44.4 -1.8 -116.8 13 F 1 13031 05 26 01 2137+510 19 54 02 67.1 44.7 -1.7 -117.1 -7 1 1 13031 05 26 01 05 26 21 --- 19 54 22 67.2 44.6 -1.7 -117.2 13 F 1 13164 05 26 21 WB105 19 54 22 66.6 44.4 -1.8 -116.9 -7 1 1 13164 05 26 21 05 26 41 --- 19 54 42 66.7 44.3 -1.8 -117.0 13 F 1 13297 Schedule for VLBA_OV (Code Ov ) Page 8 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 26 41 2137+510 19 54 42 67.2 44.6 -1.7 -117.3 -7 1 1 13297 05 26 41 05 27 00 --- 19 55 02 67.3 44.5 -1.7 -117.5 13 F 1 13430 05 27 00 WB105 19 55 02 66.7 44.3 -1.7 -117.1 -7 1 1 13430 05 27 00 05 27 20 --- 19 55 22 66.8 44.2 -1.7 -117.3 13 F 1 13563 05 29 20 3C454.3 19 57 22 45.8 106.3 -2.9 -52.7 72 1 1 13563 05 29 20 05 35 19 --- 20 03 22 46.9 107.5 -2.8 -52.2 359 F 1 15956 Next scan frequencies: 22237.77 22229.61 22221.45 22245.93 Next BBC frequencies: 737.77 729.61 721.45 745.93 05 35 19 3C454.3 20 03 22 46.9 107.5 -2.8 -52.2 -6 1 2 15956 05 35 19 05 41 18 --- 20 09 22 48.1 108.8 -2.7 -51.7 353 R 1 16850 05 43 18 2123+550 20 11 22 68.4 28.7 -1.2 -138.1 60 1 2 16850 05 43 18 05 43 38 --- 20 11 42 68.5 28.6 -1.2 -138.3 20 R 1 16717 05 43 38 WB114 20 11 42 66.4 33.9 -1.5 -129.3 -10 1 2 16717 05 43 38 05 43 58 --- 20 12 02 66.5 33.9 -1.5 -129.4 10 R 1 16584 05 43 58 2123+550 20 12 02 68.5 28.5 -1.2 -138.4 -10 1 2 16584 05 43 58 05 44 18 --- 20 12 22 68.5 28.4 -1.2 -138.6 10 R 1 16451 05 44 18 WB114 20 12 22 66.5 33.8 -1.5 -129.6 -10 1 2 16451 05 44 18 05 44 38 --- 20 12 42 66.6 33.7 -1.5 -129.7 10 R 1 16318 05 44 38 2123+550 20 12 42 68.6 28.3 -1.2 -138.8 -10 1 2 16318 05 44 38 05 44 58 --- 20 13 02 68.6 28.2 -1.2 -138.9 10 R 1 16185 05 44 58 WB114 20 13 02 66.6 33.6 -1.5 -129.9 -10 1 2 16185 05 44 58 05 45 17 --- 20 13 22 66.6 33.5 -1.5 -130.0 10 R 1 16052 05 45 17 2123+550 20 13 22 68.6 28.1 -1.2 -139.1 -10 1 2 16052 05 45 17 05 45 37 --- 20 13 42 68.6 28.0 -1.2 -139.2 10 R 1 15919 05 45 37 WB114 20 13 42 66.7 33.5 -1.5 -130.1 -10 1 2 15919 05 45 37 05 45 57 --- 20 14 02 66.7 33.4 -1.5 -130.3 10 R 1 15786 05 45 57 2123+550 20 14 02 68.7 27.9 -1.2 -139.4 -10 1 2 15786 05 45 57 05 46 17 --- 20 14 22 68.7 27.8 -1.1 -139.6 10 R 1 15654 Schedule for VLBA_OV (Code Ov ) Page 9 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 46 17 WB114 20 14 22 66.7 33.3 -1.5 -130.4 -10 1 2 15654 05 46 17 05 46 37 --- 20 14 42 66.8 33.2 -1.5 -130.6 10 R 1 15521 05 46 37 2123+550 20 14 42 68.7 27.7 -1.1 -139.7 -10 1 2 15521 05 46 37 05 46 57 --- 20 15 02 68.8 27.6 -1.1 -139.9 10 R 1 15388 05 46 57 WB114 20 15 02 66.8 33.2 -1.5 -130.7 -10 1 2 15388 05 46 57 05 47 17 --- 20 15 22 66.8 33.1 -1.5 -130.8 10 R 1 15255 05 47 17 2123+550 20 15 22 68.8 27.5 -1.1 -140.0 -10 1 2 15255 05 47 17 05 47 37 --- 20 15 42 68.8 27.4 -1.1 -140.2 10 R 1 15122 05 47 37 WB114 20 15 42 66.9 33.0 -1.5 -131.0 -10 1 2 15122 05 47 37 05 47 57 --- 20 16 02 66.9 32.9 -1.5 -131.1 10 R 1 14989 05 47 57 2123+550 20 16 02 68.9 27.3 -1.1 -140.4 -10 1 2 14989 05 47 57 05 48 17 --- 20 16 22 68.9 27.2 -1.1 -140.5 10 R 1 14856 05 48 17 WB114 20 16 22 67.0 32.8 -1.4 -131.3 -10 1 2 14856 05 48 17 05 48 37 --- 20 16 42 67.0 32.8 -1.4 -131.4 10 R 1 14723 05 48 37 2123+550 20 16 42 68.9 27.1 -1.1 -140.7 -10 1 2 14723 05 48 37 05 48 57 --- 20 17 02 69.0 27.0 -1.1 -140.9 10 R 1 14590 05 48 57 WB114 20 17 02 67.0 32.7 -1.4 -131.5 -10 1 2 14590 05 48 57 05 49 17 --- 20 17 22 67.1 32.6 -1.4 -131.7 10 R 1 14457 05 49 17 2123+550 20 17 22 69.0 26.9 -1.1 -141.0 -10 1 2 14457 05 49 17 05 49 37 --- 20 17 42 69.0 26.8 -1.1 -141.2 10 R 1 14324 05 49 37 WB114 20 17 42 67.1 32.5 -1.4 -131.8 -10 1 2 14324 05 49 37 05 49 57 --- 20 18 02 67.1 32.4 -1.4 -132.0 10 R 1 14191 05 49 57 2123+550 20 18 02 69.0 26.7 -1.1 -141.4 -10 1 2 14191 05 49 57 05 50 17 --- 20 18 22 69.1 26.6 -1.1 -141.5 10 R 1 14058 05 50 17 WB114 20 18 22 67.2 32.3 -1.4 -132.1 -10 1 2 14058 05 50 17 05 50 37 --- 20 18 42 67.2 32.3 -1.4 -132.3 10 R 1 13925 05 50 37 2123+550 20 18 42 69.1 26.5 -1.1 -141.7 -10 1 2 13925 05 50 37 05 50 57 --- 20 19 02 69.1 26.4 -1.1 -141.9 10 R 1 13792 Schedule for VLBA_OV (Code Ov ) Page 10 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 50 57 WB114 20 19 02 67.2 32.2 -1.4 -132.4 -10 1 2 13792 05 50 57 05 51 16 --- 20 19 22 67.3 32.1 -1.4 -132.6 10 R 1 13659 05 51 16 2123+550 20 19 22 69.2 26.3 -1.1 -142.0 -10 1 2 13659 05 51 16 05 51 36 --- 20 19 42 69.2 26.2 -1.1 -142.2 10 R 1 13526 05 51 36 WB114 20 19 42 67.3 32.0 -1.4 -132.7 -10 1 2 13526 05 51 36 05 51 56 --- 20 20 02 67.3 31.9 -1.4 -132.8 10 R 1 13393 05 51 56 2123+550 20 20 02 69.2 26.1 -1.1 -142.4 -10 1 2 13393 05 51 56 05 52 16 --- 20 20 22 69.3 26.0 -1.0 -142.5 10 R 1 13260 05 52 16 WB114 20 20 22 67.4 31.8 -1.4 -133.0 -10 1 2 13260 05 52 16 05 52 36 --- 20 20 42 67.4 31.8 -1.4 -133.1 10 R 1 13127 05 52 36 2123+550 20 20 42 69.3 25.9 -1.0 -142.7 -10 1 2 13127 05 52 36 05 52 56 --- 20 21 02 69.3 25.8 -1.0 -142.9 10 R 1 12994 05 52 56 WB114 20 21 02 67.4 31.7 -1.4 -133.3 -10 1 2 12994 05 52 56 05 53 16 --- 20 21 22 67.5 31.6 -1.4 -133.4 10 R 1 12861 05 53 16 2123+550 20 21 22 69.3 25.7 -1.0 -143.0 -10 1 2 12861 05 53 16 05 53 36 --- 20 21 42 69.4 25.6 -1.0 -143.2 10 R 1 12728 05 53 36 WB114 20 21 42 67.5 31.5 -1.4 -133.6 -10 1 2 12728 05 53 36 05 53 56 --- 20 22 02 67.6 31.4 -1.4 -133.7 10 R 1 12595 05 53 56 2123+550 20 22 02 69.4 25.4 -1.0 -143.4 -10 1 2 12595 05 53 56 05 54 16 --- 20 22 22 69.4 25.3 -1.0 -143.5 10 R 1 12462 05 54 16 WB114 20 22 22 67.6 31.3 -1.3 -133.9 -10 1 2 12462 05 54 16 05 54 36 --- 20 22 42 67.6 31.2 -1.3 -134.0 10 R 1 12329 05 54 36 2123+550 20 22 42 69.5 25.2 -1.0 -143.7 -10 1 2 12329 05 54 36 05 54 56 --- 20 23 02 69.5 25.1 -1.0 -143.9 10 R 1 12196 05 54 56 WB114 20 23 02 67.7 31.2 -1.3 -134.2 -10 1 2 12196 05 54 56 05 55 16 --- 20 23 22 67.7 31.1 -1.3 -134.3 10 R 1 12063 05 55 16 2123+550 20 23 22 69.5 25.0 -1.0 -144.1 -10 1 2 12063 05 55 16 05 55 36 --- 20 23 42 69.5 24.9 -1.0 -144.2 10 R 1 11930 Schedule for VLBA_OV (Code Ov ) Page 11 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 55 36 WB114 20 23 42 67.7 31.0 -1.3 -134.5 -10 1 2 11930 05 55 36 05 55 56 --- 20 24 02 67.8 30.9 -1.3 -134.6 10 R 1 11797 05 55 56 2123+550 20 24 02 69.6 24.8 -1.0 -144.4 -10 1 2 11797 05 55 56 05 56 16 --- 20 24 22 69.6 24.7 -1.0 -144.6 10 R 1 11664 05 56 16 WB114 20 24 22 67.8 30.8 -1.3 -134.8 -10 1 2 11664 05 56 16 05 56 36 --- 20 24 42 67.8 30.7 -1.3 -134.9 10 R 1 11531 05 56 36 2123+550 20 24 42 69.6 24.6 -1.0 -144.7 -10 1 2 11531 05 56 36 05 56 56 --- 20 25 02 69.6 24.4 -1.0 -144.9 10 R 1 11399 05 56 56 WB114 20 25 02 67.9 30.6 -1.3 -135.1 -10 1 2 11399 05 56 56 05 57 15 --- 20 25 22 67.9 30.5 -1.3 -135.2 10 R 1 11266 05 57 15 2123+550 20 25 22 69.7 24.3 -1.0 -145.1 -10 1 2 11266 05 57 15 05 57 35 --- 20 25 42 69.7 24.2 -1.0 -145.3 10 R 1 11133 05 57 35 WB114 20 25 42 67.9 30.4 -1.3 -135.4 -10 1 2 11133 05 57 35 05 57 55 --- 20 26 02 68.0 30.3 -1.3 -135.5 10 R 1 11000 05 57 55 2123+550 20 26 02 69.7 24.1 -1.0 -145.4 -10 1 2 11000 05 57 55 05 58 15 --- 20 26 22 69.8 24.0 -0.9 -145.6 10 R 1 10867 05 58 15 WB114 20 26 22 68.0 30.3 -1.3 -135.7 -10 1 2 10867 05 58 15 05 58 35 --- 20 26 42 68.0 30.2 -1.3 -135.8 10 R 1 10734 05 58 35 2123+550 20 26 42 69.8 23.9 -0.9 -145.8 -10 1 2 10734 05 58 35 05 58 55 --- 20 27 02 69.8 23.8 -0.9 -146.0 10 R 1 10601 05 58 55 WB114 20 27 02 68.1 30.1 -1.3 -136.0 -10 1 2 10601 05 58 55 05 59 15 --- 20 27 22 68.1 30.0 -1.3 -136.2 10 R 1 10468 05 59 15 2123+550 20 27 22 69.8 23.7 -0.9 -146.1 -10 1 2 10468 05 59 15 05 59 35 --- 20 27 42 69.9 23.5 -0.9 -146.3 10 R 1 10335 05 59 35 WB114 20 27 42 68.1 29.9 -1.3 -136.3 -10 1 2 10335 05 59 35 05 59 55 --- 20 28 02 68.2 29.8 -1.3 -136.5 10 R 1 10202 05 59 55 2123+550 20 28 02 69.9 23.4 -0.9 -146.5 -10 1 2 10202 05 59 55 06 00 15 --- 20 28 22 69.9 23.3 -0.9 -146.7 10 R 1 10069 Schedule for VLBA_OV (Code Ov ) Page 12 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 00 15 WB114 20 28 22 68.2 29.7 -1.2 -136.6 -10 1 2 10069 06 00 15 06 00 35 --- 20 28 42 68.2 29.6 -1.2 -136.8 10 R 1 9936 06 00 35 2123+550 20 28 42 69.9 23.2 -0.9 -146.9 -10 1 2 9936 06 00 35 06 00 55 --- 20 29 02 70.0 23.1 -0.9 -147.0 10 R 1 9803 06 00 55 WB114 20 29 02 68.3 29.5 -1.2 -136.9 -10 1 2 9803 06 00 55 06 01 15 --- 20 29 22 68.3 29.4 -1.2 -137.1 10 R 1 9670 06 01 15 2123+550 20 29 22 70.0 23.0 -0.9 -147.2 -10 1 2 9670 06 01 15 06 01 35 --- 20 29 42 70.0 22.8 -0.9 -147.4 10 R 1 9537 06 01 35 WB114 20 29 42 68.3 29.3 -1.2 -137.2 -10 1 2 9537 06 01 35 06 01 55 --- 20 30 02 68.4 29.2 -1.2 -137.4 10 R 1 9404 06 01 55 2123+550 20 30 02 70.0 22.7 -0.9 -147.6 -10 1 2 9404 06 01 55 06 02 15 --- 20 30 22 70.1 22.6 -0.9 -147.7 10 R 1 9271 06 02 15 WB114 20 30 22 68.4 29.1 -1.2 -137.6 -10 1 2 9271 06 02 15 06 02 35 --- 20 30 42 68.4 29.0 -1.2 -137.7 10 R 1 9138 06 02 35 2123+550 20 30 42 70.1 22.5 -0.9 -147.9 -10 1 2 9138 06 02 35 06 02 55 --- 20 31 02 70.1 22.4 -0.9 -148.1 10 R 1 9005 06 02 55 WB114 20 31 02 68.5 28.9 -1.2 -137.9 -10 1 2 9005 06 02 55 06 03 15 --- 20 31 22 68.5 28.8 -1.2 -138.0 10 R 1 8872 06 03 15 2123+550 20 31 22 70.1 22.2 -0.9 -148.3 -10 1 2 8872 06 03 15 06 03 34 --- 20 31 42 70.2 22.1 -0.9 -148.5 10 R 1 8739 06 03 34 WB114 20 31 42 68.5 28.7 -1.2 -138.2 -10 1 2 8739 06 03 34 06 03 54 --- 20 32 02 68.6 28.6 -1.2 -138.3 10 R 1 8606 06 03 54 2123+550 20 32 02 70.2 22.0 -0.9 -148.6 -10 1 2 8606 06 03 54 06 04 14 --- 20 32 22 70.2 21.9 -0.8 -148.8 10 R 1 8473 06 04 14 WB114 20 32 22 68.6 28.5 -1.2 -138.5 -10 1 2 8473 06 04 14 06 04 34 --- 20 32 42 68.6 28.5 -1.2 -138.7 9 R 1 8340 06 04 34 2123+550 20 32 42 70.2 21.8 -0.8 -149.0 -10 1 2 8340 06 04 34 06 04 54 --- 20 33 02 70.3 21.6 -0.8 -149.2 9 R 1 8207 Schedule for VLBA_OV (Code Ov ) Page 13 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 04 54 WB114 20 33 02 68.6 28.4 -1.2 -138.8 -10 1 2 8207 06 04 54 06 05 14 --- 20 33 22 68.7 28.3 -1.2 -139.0 9 R 1 8074 06 05 14 2123+550 20 33 22 70.3 21.5 -0.8 -149.4 -10 1 2 8074 06 05 14 06 05 34 --- 20 33 42 70.3 21.4 -0.8 -149.6 9 R 1 7941 06 05 34 WB114 20 33 42 68.7 28.2 -1.2 -139.1 -11 1 2 7941 06 05 34 06 05 54 --- 20 34 02 68.7 28.1 -1.2 -139.3 9 R 1 7808 06 05 54 2123+550 20 34 02 70.3 21.3 -0.8 -149.7 -11 1 2 7808 06 05 54 06 06 14 --- 20 34 22 70.4 21.1 -0.8 -149.9 9 R 1 7675 06 06 14 WB114 20 34 22 68.8 28.0 -1.1 -139.5 -11 1 2 7675 06 06 14 06 06 34 --- 20 34 42 68.8 27.9 -1.1 -139.6 9 R 1 7542 06 06 34 2123+550 20 34 42 70.4 21.0 -0.8 -150.1 -11 1 2 7542 06 06 34 06 06 54 --- 20 35 02 70.4 20.9 -0.8 -150.3 9 R 1 7409 06 06 54 WB114 20 35 02 68.8 27.8 -1.1 -139.8 -11 1 2 7409 06 06 54 06 07 14 --- 20 35 22 68.9 27.7 -1.1 -140.0 9 R 1 7276 06 07 14 2123+550 20 35 22 70.4 20.8 -0.8 -150.5 -11 1 2 7276 06 07 14 06 07 34 --- 20 35 42 70.5 20.7 -0.8 -150.7 9 R 1 7144 06 07 34 WB114 20 35 42 68.9 27.5 -1.1 -140.1 -11 1 2 7144 06 07 34 06 07 54 --- 20 36 02 68.9 27.4 -1.1 -140.3 9 R 1 7011 06 07 54 2123+550 20 36 02 70.5 20.5 -0.8 -150.9 -11 1 2 7011 06 07 54 06 08 14 --- 20 36 22 70.5 20.4 -0.8 -151.0 9 R 1 6878 06 08 14 WB114 20 36 22 69.0 27.3 -1.1 -140.4 -11 1 2 6878 06 08 14 06 08 34 --- 20 36 42 69.0 27.2 -1.1 -140.6 9 R 1 6745 06 08 34 2123+550 20 36 42 70.5 20.3 -0.8 -151.2 -11 1 2 6745 06 08 34 06 08 54 --- 20 37 02 70.6 20.2 -0.8 -151.4 9 R 1 6612 06 08 54 WB114 20 37 02 69.0 27.1 -1.1 -140.8 -11 1 2 6612 06 08 54 06 09 14 --- 20 37 22 69.0 27.0 -1.1 -140.9 9 R 1 6479 06 09 14 2123+550 20 37 22 70.6 20.0 -0.8 -151.6 -11 1 2 6479 06 09 14 06 09 33 --- 20 37 42 70.6 19.9 -0.8 -151.8 9 R 1 6346 Schedule for VLBA_OV (Code Ov ) Page 14 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 09 33 WB114 20 37 42 69.1 26.9 -1.1 -141.1 -11 1 2 6346 06 09 33 06 09 53 --- 20 38 02 69.1 26.8 -1.1 -141.3 9 R 1 6213 06 09 53 2123+550 20 38 02 70.6 19.8 -0.8 -152.0 -11 1 2 6213 06 09 53 06 10 13 --- 20 38 22 70.6 19.6 -0.7 -152.2 9 R 1 6080 06 10 13 WB114 20 38 22 69.1 26.7 -1.1 -141.4 -11 1 2 6080 06 10 13 06 10 33 --- 20 38 42 69.2 26.6 -1.1 -141.6 9 R 1 5947 06 10 33 2123+550 20 38 42 70.7 19.5 -0.7 -152.4 -11 1 2 5947 06 10 33 06 10 53 --- 20 39 02 70.7 19.4 -0.7 -152.5 9 R 1 5814 06 10 53 WB114 20 39 02 69.2 26.5 -1.1 -141.8 -11 1 2 5814 06 10 53 06 11 13 --- 20 39 22 69.2 26.4 -1.1 -141.9 9 R 1 5681 06 13 13 3C454.3 20 41 22 53.9 116.7 -2.2 -47.8 53 1 2 5681 06 13 13 06 19 12 --- 20 47 22 55.0 118.4 -2.1 -46.8 359 R 1 3287 06 21 12 2146+570 20 49 22 68.0 21.0 -1.0 -148.3 49 1 2 3287 06 21 12 06 21 32 --- 20 49 42 68.0 20.9 -0.9 -148.5 20 R 1 3154 06 21 32 WB114 20 49 42 70.1 22.9 -0.9 -147.3 -10 1 2 3154 06 21 32 06 21 51 --- 20 50 02 70.1 22.8 -0.9 -147.5 10 R 1 3021 06 21 51 2146+570 20 50 02 68.1 20.8 -0.9 -148.7 -10 1 2 3021 06 21 51 06 22 11 --- 20 50 22 68.1 20.7 -0.9 -148.8 10 R 1 2888 06 22 11 WB114 20 50 22 70.1 22.7 -0.9 -147.7 -10 1 2 2888 06 22 11 06 22 31 --- 20 50 42 70.2 22.6 -0.9 -147.9 10 R 1 2756 06 22 31 2146+570 20 50 42 68.1 20.6 -0.9 -149.0 -10 1 2 2756 06 22 31 06 22 51 --- 20 51 02 68.1 20.5 -0.9 -149.2 10 R 1 2623 06 22 51 WB114 20 51 02 70.2 22.4 -0.9 -148.0 -10 1 2 2623 06 22 51 06 23 11 --- 20 51 22 70.2 22.3 -0.9 -148.2 10 R 1 2490 06 23 11 2146+570 20 51 22 68.2 20.4 -0.9 -149.3 -10 1 2 2490 06 23 11 06 23 31 --- 20 51 42 68.2 20.3 -0.9 -149.5 10 R 1 2357 06 23 31 WB114 20 51 42 70.2 22.2 -0.9 -148.4 -10 1 2 2357 06 23 31 06 23 51 --- 20 52 02 70.3 22.1 -0.9 -148.6 10 R 1 2224 Schedule for VLBA_OV (Code Ov ) Page 15 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 23 51 2146+570 20 52 02 68.2 20.2 -0.9 -149.7 -10 1 2 2224 06 23 51 06 24 11 --- 20 52 22 68.2 20.1 -0.9 -149.8 10 R 1 2091 06 24 11 WB114 20 52 22 70.3 22.0 -0.8 -148.8 -10 1 2 2091 06 24 11 06 24 31 --- 20 52 42 70.3 21.8 -0.8 -148.9 10 R 1 1958 06 24 31 2146+570 20 52 42 68.2 20.0 -0.9 -150.0 -10 1 2 1958 06 24 31 06 24 51 --- 20 53 02 68.3 19.9 -0.9 -150.2 10 R 1 1825 06 24 51 WB114 20 53 02 70.3 21.7 -0.8 -149.1 -10 1 2 1825 06 24 51 06 25 11 --- 20 53 22 70.4 21.6 -0.8 -149.3 10 R 1 1692 06 25 11 2146+570 20 53 22 68.3 19.7 -0.9 -150.3 -10 1 2 1692 06 25 11 06 25 31 --- 20 53 42 68.3 19.6 -0.9 -150.5 10 R 1 1559 06 25 31 WB114 20 53 42 70.4 21.5 -0.8 -149.5 -10 1 2 1559 06 25 31 06 25 51 --- 20 54 02 70.4 21.4 -0.8 -149.7 10 R 1 1426 06 25 51 2146+570 20 54 02 68.3 19.5 -0.9 -150.7 -10 1 2 1426 06 25 51 06 26 11 --- 20 54 22 68.4 19.4 -0.9 -150.8 10 R 1 1293 06 26 11 WB114 20 54 22 70.4 21.2 -0.8 -149.9 -10 1 2 1293 06 26 11 06 26 31 --- 20 54 42 70.5 21.1 -0.8 -150.0 10 R 1 1160 06 26 31 2146+570 20 54 42 68.4 19.3 -0.9 -151.0 -10 1 2 1160 06 26 31 06 26 51 --- 20 55 02 68.4 19.2 -0.9 -151.2 10 R 1 1027 06 26 51 WB114 20 55 02 70.5 21.0 -0.8 -150.2 -10 1 2 1027 06 26 51 06 27 11 --- 20 55 22 70.5 20.9 -0.8 -150.4 10 R 1 894 06 27 11 2146+570 20 55 22 68.4 19.1 -0.9 -151.4 -10 1 2 894 06 27 11 06 27 31 --- 20 55 42 68.4 19.0 -0.8 -151.5 10 R 1 761 06 27 31 WB114 20 55 42 70.5 20.7 -0.8 -150.6 -10 1 2 761 06 27 31 06 27 50 --- 20 56 02 70.6 20.6 -0.8 -150.8 10 R 1 628 06 27 50 2146+570 20 56 02 68.5 18.9 -0.8 -151.7 -10 1 2 628 06 27 50 06 28 10 --- 20 56 22 68.5 18.8 -0.8 -151.9 10 R 1 495 06 28 10 WB114 20 56 22 70.6 20.5 -0.8 -151.0 -10 1 2 495 06 28 10 06 28 30 --- 20 56 42 70.6 20.4 -0.8 -151.2 10 R 1 362 Schedule for VLBA_OV (Code Ov ) Page 16 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 28 30 2146+570 20 56 42 68.5 18.7 -0.8 -152.0 -10 1 3 362 06 28 30 06 28 50 --- 20 57 02 68.5 18.6 -0.8 -152.2 10 F 1 495 06 28 50 WB114 20 57 02 70.6 20.2 -0.8 -151.4 -10 1 3 495 06 28 50 06 29 10 --- 20 57 22 70.6 20.1 -0.8 -151.5 10 F 1 628 06 29 10 2146+570 20 57 22 68.5 18.5 -0.8 -152.4 -10 1 3 628 06 29 10 06 29 30 --- 20 57 42 68.6 18.3 -0.8 -152.6 10 F 1 761 06 29 30 WB114 20 57 42 70.7 20.0 -0.8 -151.7 -10 1 3 761 06 29 30 06 29 50 --- 20 58 02 70.7 19.8 -0.8 -151.9 10 F 1 894 06 29 50 2146+570 20 58 02 68.6 18.2 -0.8 -152.7 -10 1 3 894 06 29 50 06 30 10 --- 20 58 22 68.6 18.1 -0.8 -152.9 10 F 1 1027 06 30 10 WB114 20 58 22 70.7 19.7 -0.7 -152.1 -10 1 3 1027 06 30 10 06 30 30 --- 20 58 42 70.7 19.6 -0.7 -152.3 10 F 1 1160 06 30 30 2146+570 20 58 42 68.6 18.0 -0.8 -153.1 -10 1 3 1160 06 30 30 06 30 50 --- 20 59 02 68.7 17.9 -0.8 -153.2 10 F 1 1293 06 30 50 WB114 20 59 02 70.8 19.5 -0.7 -152.5 -10 1 3 1293 06 30 50 06 31 10 --- 20 59 22 70.8 19.3 -0.7 -152.7 10 F 1 1426 06 31 10 2146+570 20 59 22 68.7 17.8 -0.8 -153.4 -10 1 3 1426 06 31 10 06 31 30 --- 20 59 42 68.7 17.7 -0.8 -153.6 10 F 1 1559 06 31 30 WB114 20 59 42 70.8 19.2 -0.7 -152.9 -10 1 3 1559 06 31 30 06 31 50 --- 21 00 02 70.8 19.1 -0.7 -153.1 10 F 1 1692 06 31 50 2146+570 21 00 02 68.7 17.6 -0.8 -153.8 -10 1 3 1692 06 31 50 06 32 10 --- 21 00 22 68.7 17.5 -0.8 -153.9 10 F 1 1825 06 32 10 WB114 21 00 22 70.8 18.9 -0.7 -153.2 -10 1 3 1825 06 32 10 06 32 30 --- 21 00 42 70.9 18.8 -0.7 -153.4 10 F 1 1958 06 32 30 2146+570 21 00 42 68.8 17.3 -0.8 -154.1 -10 1 3 1958 06 32 30 06 32 50 --- 21 01 02 68.8 17.2 -0.8 -154.3 10 F 1 2091 06 32 50 WB114 21 01 02 70.9 18.7 -0.7 -153.6 -10 1 3 2091 06 32 50 06 33 10 --- 21 01 22 70.9 18.6 -0.7 -153.8 10 F 1 2224 Schedule for VLBA_OV (Code Ov ) Page 17 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 33 10 2146+570 21 01 22 68.8 17.1 -0.8 -154.5 -10 1 3 2224 06 33 10 06 33 30 --- 21 01 42 68.8 17.0 -0.7 -154.6 10 F 1 2357 06 33 30 WB114 21 01 42 70.9 18.4 -0.7 -154.0 -10 1 3 2357 06 33 30 06 33 49 --- 21 02 02 70.9 18.3 -0.7 -154.2 10 F 1 2490 06 33 49 2146+570 21 02 02 68.8 16.9 -0.7 -154.8 -10 1 3 2490 06 33 49 06 34 09 --- 21 02 22 68.9 16.8 -0.7 -155.0 10 F 1 2623 06 34 09 WB114 21 02 22 71.0 18.2 -0.7 -154.4 -10 1 3 2623 06 34 09 06 34 29 --- 21 02 42 71.0 18.0 -0.7 -154.6 10 F 1 2756 06 34 29 2146+570 21 02 42 68.9 16.7 -0.7 -155.2 -10 1 3 2756 06 34 29 06 34 49 --- 21 03 02 68.9 16.5 -0.7 -155.3 10 F 1 2888 06 34 49 WB114 21 03 02 71.0 17.9 -0.7 -154.8 -10 1 3 2888 06 34 49 06 35 09 --- 21 03 22 71.0 17.8 -0.7 -155.0 10 F 1 3021 06 35 09 2146+570 21 03 22 68.9 16.4 -0.7 -155.5 -10 1 3 3021 06 35 09 06 35 29 --- 21 03 42 68.9 16.3 -0.7 -155.7 10 F 1 3154 06 35 29 WB114 21 03 42 71.1 17.6 -0.7 -155.2 -10 1 3 3154 06 35 29 06 35 49 --- 21 04 02 71.1 17.5 -0.7 -155.4 10 F 1 3287 06 35 49 2146+570 21 04 02 68.9 16.2 -0.7 -155.9 -10 1 3 3287 06 35 49 06 36 09 --- 21 04 22 69.0 16.1 -0.7 -156.1 10 F 1 3420 06 36 09 WB114 21 04 22 71.1 17.4 -0.6 -155.6 -10 1 3 3420 06 36 09 06 36 29 --- 21 04 42 71.1 17.2 -0.6 -155.8 10 F 1 3553 06 36 29 2146+570 21 04 42 69.0 16.0 -0.7 -156.2 -10 1 3 3553 06 36 29 06 36 49 --- 21 05 02 69.0 15.9 -0.7 -156.4 10 F 1 3686 06 36 49 WB114 21 05 02 71.1 17.1 -0.6 -156.0 -10 1 3 3686 06 36 49 06 37 09 --- 21 05 22 71.2 17.0 -0.6 -156.2 10 F 1 3819 06 37 09 2146+570 21 05 22 69.0 15.7 -0.7 -156.6 -10 1 3 3819 06 37 09 06 37 29 --- 21 05 42 69.0 15.6 -0.7 -156.8 10 F 1 3952 06 37 29 WB114 21 05 42 71.2 16.8 -0.6 -156.4 -10 1 3 3952 06 37 29 06 37 49 --- 21 06 02 71.2 16.7 -0.6 -156.5 10 F 1 4085 Schedule for VLBA_OV (Code Ov ) Page 18 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 37 49 2146+570 21 06 02 69.1 15.5 -0.7 -156.9 -10 1 3 4085 06 37 49 06 38 09 --- 21 06 22 69.1 15.4 -0.7 -157.1 10 F 1 4218 06 38 09 WB114 21 06 22 71.2 16.5 -0.6 -156.7 -10 1 3 4218 06 38 09 06 38 29 --- 21 06 42 71.2 16.4 -0.6 -156.9 10 F 1 4351 06 38 29 2146+570 21 06 42 69.1 15.3 -0.7 -157.3 -10 1 3 4351 06 38 29 06 38 49 --- 21 07 02 69.1 15.2 -0.7 -157.5 10 F 1 4484 06 38 49 WB114 21 07 02 71.2 16.3 -0.6 -157.1 -10 1 3 4484 06 38 49 06 39 09 --- 21 07 22 71.3 16.1 -0.6 -157.3 10 F 1 4617 06 39 09 2146+570 21 07 22 69.1 15.0 -0.7 -157.7 -10 1 3 4617 06 39 09 06 39 29 --- 21 07 42 69.1 14.9 -0.6 -157.8 10 F 1 4750 06 39 29 WB114 21 07 42 71.3 16.0 -0.6 -157.5 -10 1 3 4750 06 39 29 06 39 49 --- 21 08 02 71.3 15.9 -0.6 -157.7 10 F 1 4883 06 39 49 2146+570 21 08 02 69.2 14.8 -0.6 -158.0 -10 1 3 4883 06 39 49 06 40 08 --- 21 08 22 69.2 14.7 -0.6 -158.2 10 F 1 5016 06 40 08 WB114 21 08 22 71.3 15.7 -0.6 -157.9 -10 1 3 5016 06 40 08 06 40 28 --- 21 08 42 71.3 15.6 -0.6 -158.1 10 F 1 5149 06 40 28 2146+570 21 08 42 69.2 14.6 -0.6 -158.4 -10 1 3 5149 06 40 28 06 40 48 --- 21 09 02 69.2 14.4 -0.6 -158.6 10 F 1 5282 06 40 48 WB114 21 09 02 71.4 15.4 -0.6 -158.3 -10 1 3 5282 06 40 48 06 41 08 --- 21 09 22 71.4 15.3 -0.6 -158.5 10 F 1 5415 06 41 08 2146+570 21 09 22 69.2 14.3 -0.6 -158.7 -10 1 3 5415 06 41 08 06 41 28 --- 21 09 42 69.2 14.2 -0.6 -158.9 10 F 1 5548 06 41 28 WB114 21 09 42 71.4 15.2 -0.6 -158.7 -10 1 3 5548 06 41 28 06 41 48 --- 21 10 02 71.4 15.0 -0.6 -158.9 10 F 1 5681 06 41 48 2146+570 21 10 02 69.3 14.1 -0.6 -159.1 -10 1 3 5681 06 41 48 06 42 08 --- 21 10 22 69.3 14.0 -0.6 -159.3 10 F 1 5814 06 42 08 WB114 21 10 22 71.4 14.9 -0.5 -159.1 -10 1 3 5814 06 42 08 06 42 28 --- 21 10 42 71.4 14.7 -0.5 -159.3 10 F 1 5947 Schedule for VLBA_OV (Code Ov ) Page 19 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 42 28 2146+570 21 10 42 69.3 13.9 -0.6 -159.5 -10 1 3 5947 06 42 28 06 42 48 --- 21 11 02 69.3 13.7 -0.6 -159.7 10 F 1 6080 06 42 48 WB114 21 11 02 71.5 14.6 -0.5 -159.5 -10 1 3 6080 06 42 48 06 43 08 --- 21 11 22 71.5 14.5 -0.5 -159.7 10 F 1 6213 06 43 08 2146+570 21 11 22 69.3 13.6 -0.6 -159.8 -10 1 3 6213 06 43 08 06 43 28 --- 21 11 42 69.3 13.5 -0.6 -160.0 10 F 1 6346 06 43 28 WB114 21 11 42 71.5 14.3 -0.5 -159.9 -10 1 3 6346 06 43 28 06 43 48 --- 21 12 02 71.5 14.2 -0.5 -160.2 10 F 1 6479 06 43 48 2146+570 21 12 02 69.4 13.4 -0.6 -160.2 -10 1 3 6479 06 43 48 06 44 08 --- 21 12 22 69.4 13.2 -0.6 -160.4 10 F 1 6612 06 44 08 WB114 21 12 22 71.5 14.0 -0.5 -160.4 -10 1 3 6612 06 44 08 06 44 28 --- 21 12 42 71.5 13.9 -0.5 -160.6 10 F 1 6745 06 44 28 2146+570 21 12 42 69.4 13.1 -0.6 -160.6 -10 1 3 6745 06 44 28 06 44 48 --- 21 13 02 69.4 13.0 -0.6 -160.8 10 F 1 6878 06 44 48 WB114 21 13 02 71.6 13.8 -0.5 -160.8 -10 1 3 6878 06 44 48 06 45 08 --- 21 13 22 71.6 13.6 -0.5 -161.0 10 F 1 7011 06 45 08 2146+570 21 13 22 69.4 12.9 -0.6 -160.9 -10 1 3 7011 06 45 08 06 45 28 --- 21 13 42 69.4 12.8 -0.5 -161.1 10 F 1 7143 06 45 28 WB114 21 13 42 71.6 13.5 -0.5 -161.2 -10 1 3 7143 06 45 28 06 45 48 --- 21 14 02 71.6 13.3 -0.5 -161.4 10 F 1 7276 06 45 48 2146+570 21 14 02 69.4 12.6 -0.5 -161.3 -10 1 3 7276 06 45 48 06 46 07 --- 21 14 22 69.5 12.5 -0.5 -161.5 10 F 1 7409 06 46 07 WB114 21 14 22 71.6 13.2 -0.5 -161.6 -10 1 3 7409 06 46 07 06 46 27 --- 21 14 42 71.6 13.0 -0.5 -161.8 10 F 1 7542 06 46 27 2146+570 21 14 42 69.5 12.4 -0.5 -161.7 -10 1 3 7542 06 46 27 06 46 47 --- 21 15 02 69.5 12.3 -0.5 -161.9 10 F 1 7675 06 46 47 WB114 21 15 02 71.6 12.9 -0.5 -162.0 -10 1 3 7675 06 46 47 06 47 07 --- 21 15 22 71.7 12.7 -0.5 -162.2 10 F 1 7808 Schedule for VLBA_OV (Code Ov ) Page 20 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 47 07 2146+570 21 15 22 69.5 12.2 -0.5 -162.0 -10 1 3 7808 06 47 07 06 47 27 --- 21 15 42 69.5 12.0 -0.5 -162.2 10 F 1 7941 06 47 27 WB114 21 15 42 71.7 12.6 -0.5 -162.4 -10 1 3 7941 06 47 27 06 47 47 --- 21 16 02 71.7 12.5 -0.5 -162.6 10 F 1 8074 06 47 47 2146+570 21 16 02 69.5 11.9 -0.5 -162.4 -10 1 3 8074 06 47 47 06 48 07 --- 21 16 22 69.5 11.8 -0.5 -162.6 10 F 1 8207 06 48 07 WB114 21 16 22 71.7 12.3 -0.4 -162.8 -10 1 3 8207 06 48 07 06 48 27 --- 21 16 42 71.7 12.2 -0.4 -163.0 10 F 1 8340 06 48 27 2146+570 21 16 42 69.6 11.7 -0.5 -162.8 -10 1 3 8340 06 48 27 06 48 47 --- 21 17 02 69.6 11.5 -0.5 -163.0 10 F 1 8473 06 48 47 WB114 21 17 02 71.7 12.0 -0.4 -163.2 -10 1 3 8473 06 48 47 06 49 07 --- 21 17 22 71.7 11.9 -0.4 -163.4 10 F 1 8606 06 49 07 2146+570 21 17 22 69.6 11.4 -0.5 -163.2 -10 1 3 8606 06 49 07 06 49 27 --- 21 17 42 69.6 11.3 -0.5 -163.3 10 F 1 8739 06 49 27 WB114 21 17 42 71.8 11.7 -0.4 -163.6 -10 1 3 8739 06 49 27 06 49 47 --- 21 18 02 71.8 11.6 -0.4 -163.8 10 F 1 8872 06 49 47 2146+570 21 18 02 69.6 11.2 -0.5 -163.5 -10 1 3 8872 06 49 47 06 50 07 --- 21 18 22 69.6 11.0 -0.5 -163.7 10 F 1 9005 06 50 07 WB114 21 18 22 71.8 11.4 -0.4 -164.1 -10 1 3 9005 06 50 07 06 50 27 --- 21 18 42 71.8 11.3 -0.4 -164.3 10 F 1 9138 06 50 27 2146+570 21 18 42 69.6 10.9 -0.5 -163.9 -10 1 3 9138 06 50 27 06 50 47 --- 21 19 02 69.6 10.8 -0.5 -164.1 10 F 1 9271 06 50 47 WB114 21 19 02 71.8 11.1 -0.4 -164.5 -10 1 3 9271 06 50 47 06 51 07 --- 21 19 22 71.8 11.0 -0.4 -164.7 10 F 1 9404 06 51 07 2146+570 21 19 22 69.7 10.7 -0.5 -164.3 -10 1 3 9404 06 51 07 06 51 27 --- 21 19 42 69.7 10.5 -0.4 -164.5 10 F 1 9537 06 51 27 WB114 21 19 42 71.8 10.8 -0.4 -164.9 -10 1 3 9537 06 51 27 06 51 47 --- 21 20 02 71.9 10.7 -0.4 -165.1 10 F 1 9670 Schedule for VLBA_OV (Code Ov ) Page 21 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 51 47 2146+570 21 20 02 69.7 10.4 -0.4 -164.7 -10 1 3 9670 06 51 47 06 52 06 --- 21 20 22 69.7 10.3 -0.4 -164.8 10 F 1 9803 06 52 06 WB114 21 20 22 71.9 10.5 -0.4 -165.3 -10 1 3 9803 06 52 06 06 52 26 --- 21 20 42 71.9 10.4 -0.4 -165.5 10 F 1 9936 06 52 26 2146+570 21 20 42 69.7 10.2 -0.4 -165.0 -10 1 3 9936 06 52 26 06 52 46 --- 21 21 02 69.7 10.0 -0.4 -165.2 10 F 1 10069 06 52 46 WB114 21 21 02 71.9 10.2 -0.4 -165.7 -10 1 3 10069 06 52 46 06 53 06 --- 21 21 22 71.9 10.1 -0.4 -165.9 10 F 1 10202 06 53 06 2146+570 21 21 22 69.7 9.9 -0.4 -165.4 -10 1 3 10202 06 53 06 06 53 26 --- 21 21 42 69.7 9.8 -0.4 -165.6 10 F 1 10335 06 53 26 WB114 21 21 42 71.9 9.9 -0.4 -166.1 -10 1 3 10335 06 53 26 06 53 46 --- 21 22 02 71.9 9.8 -0.4 -166.4 10 F 1 10468 06 53 46 2146+570 21 22 02 69.7 9.6 -0.4 -165.8 -10 1 3 10468 06 53 46 06 54 06 --- 21 22 22 69.8 9.5 -0.4 -166.0 10 F 1 10601 06 54 06 WB114 21 22 22 71.9 9.6 -0.3 -166.6 -10 1 3 10601 06 54 06 06 54 26 --- 21 22 42 71.9 9.5 -0.3 -166.8 10 F 1 10734 06 54 26 2146+570 21 22 42 69.8 9.4 -0.4 -166.2 -10 1 3 10734 06 54 26 06 54 46 --- 21 23 02 69.8 9.3 -0.4 -166.4 10 F 1 10867 06 54 46 WB114 21 23 02 72.0 9.3 -0.3 -167.0 -10 1 3 10867 06 54 46 06 55 06 --- 21 23 22 72.0 9.2 -0.3 -167.2 10 F 1 11000 06 57 06 3C454.3 21 25 22 61.2 131.1 -1.5 -38.6 32 1 3 11000 06 57 06 07 03 05 --- 21 31 22 62.1 133.5 -1.4 -37.0 359 F 1 13393 Next scan frequencies: 22235.69 22227.53 22219.37 22243.85 Next BBC frequencies: 735.69 727.53 719.37 743.85 07 03 05 3C454.3 21 31 22 62.1 133.5 -1.4 -37.0 -6 1 3 13393 07 03 05 07 09 04 --- 21 37 22 63.0 136.0 -1.3 -35.1 353 F 1 15786 07 11 03 2137+510 21 39 22 76.2 -1.5 0.0 178.1 22 1 3 15786 07 11 03 07 11 23 --- 21 39 42 76.2 -1.7 0.0 177.9 20 F 1 15919 Schedule for VLBA_OV (Code Ov ) Page 22 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 11 23 WB105 21 39 42 75.9 0.1 0.0 -179.9 -7 1 3 15919 07 11 23 07 11 43 --- 21 40 02 75.9 -0.2 0.0 179.8 13 F 1 16052 07 11 43 2137+510 21 40 02 76.2 -1.9 0.0 177.6 -7 1 3 16052 07 11 43 07 12 03 --- 21 40 22 76.2 -2.1 0.1 177.3 13 F 1 16185 07 12 03 WB105 21 40 22 75.9 -0.4 0.0 179.5 -7 1 3 16185 07 12 03 07 12 23 --- 21 40 42 75.9 -0.6 0.0 179.3 13 F 1 16318 07 12 23 2137+510 21 40 42 76.2 -2.4 0.1 177.0 -7 1 3 16318 07 12 23 07 12 43 --- 21 41 02 76.2 -2.6 0.1 176.7 13 F 1 16451 07 12 43 WB105 21 41 02 75.9 -0.8 0.0 179.0 -7 1 3 16451 07 12 43 07 13 03 --- 21 41 22 75.9 -1.0 0.0 178.7 13 F 1 16584 07 13 03 2137+510 21 41 22 76.2 -2.8 0.1 176.5 -7 1 3 16584 07 13 03 07 13 23 --- 21 41 42 76.2 -3.0 0.1 176.2 13 F 1 16717 07 13 23 WB105 21 41 42 75.9 -1.2 0.0 178.4 -7 1 3 16717 07 13 23 07 13 43 --- 21 42 02 75.9 -1.4 0.0 178.2 13 F 1 16850 07 13 43 2137+510 21 42 02 76.2 -3.2 0.1 175.9 -7 1 3 16850 07 13 43 07 14 03 --- 21 42 22 76.2 -3.4 0.1 175.6 13 F 1 16983 07 14 03 WB105 21 42 22 75.9 -1.7 0.0 177.9 -7 1 3 16983 07 14 03 07 14 23 --- 21 42 42 75.9 -1.9 0.0 177.6 13 F 1 17116 07 14 23 2137+510 21 42 42 76.2 -3.7 0.1 175.4 -7 1 3 17116 07 14 23 07 14 43 --- 21 43 02 76.2 -3.9 0.1 175.1 13 F 1 17249 07 14 43 WB105 21 43 02 75.9 -2.1 0.1 177.4 -7 1 4 17249 07 14 43 07 15 03 --- 21 43 22 75.9 -2.3 0.1 177.1 13 R 1 17116 07 15 03 2137+510 21 43 22 76.1 -4.1 0.1 174.8 -7 1 4 17116 07 15 03 07 15 23 --- 21 43 42 76.1 -4.3 0.1 174.5 13 R 1 16983 07 15 23 WB105 21 43 42 75.9 -2.5 0.1 176.8 -7 1 4 16983 07 15 23 07 15 43 --- 21 44 02 75.9 -2.7 0.1 176.5 13 R 1 16850 07 15 43 2137+510 21 44 02 76.1 -4.5 0.1 174.3 -7 1 4 16850 07 15 43 07 16 03 --- 21 44 22 76.1 -4.8 0.1 174.0 13 R 1 16717 Schedule for VLBA_OV (Code Ov ) Page 23 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 16 03 WB105 21 44 22 75.9 -2.9 0.1 176.3 -7 1 4 16717 07 16 03 07 16 22 --- 21 44 42 75.9 -3.1 0.1 176.0 13 R 1 16584 07 16 22 2137+510 21 44 42 76.1 -5.0 0.1 173.7 -7 1 4 16584 07 16 22 07 16 42 --- 21 45 02 76.1 -5.2 0.1 173.4 13 R 1 16451 07 16 42 WB105 21 45 02 75.8 -3.4 0.1 175.7 -7 1 4 16451 07 16 42 07 17 02 --- 21 45 22 75.8 -3.6 0.1 175.5 13 R 1 16318 07 17 02 2137+510 21 45 22 76.1 -5.4 0.1 173.2 -7 1 4 16318 07 17 02 07 17 22 --- 21 45 42 76.1 -5.6 0.1 172.9 13 R 1 16185 07 17 22 WB105 21 45 42 75.8 -3.8 0.1 175.2 -7 1 4 16185 07 17 22 07 17 42 --- 21 46 02 75.8 -4.0 0.1 174.9 13 R 1 16052 07 17 42 2137+510 21 46 02 76.1 -5.8 0.1 172.6 -7 1 4 16052 07 17 42 07 18 02 --- 21 46 22 76.1 -6.1 0.2 172.3 13 R 1 15919 07 18 02 WB105 21 46 22 75.8 -4.2 0.1 174.6 -7 1 4 15919 07 18 02 07 18 22 --- 21 46 42 75.8 -4.4 0.1 174.4 13 R 1 15786 07 18 22 2137+510 21 46 42 76.1 -6.3 0.2 172.1 -7 1 4 15786 07 18 22 07 18 42 --- 21 47 02 76.1 -6.5 0.2 171.8 13 R 1 15654 07 18 42 WB105 21 47 02 75.8 -4.6 0.1 174.1 -7 1 4 15654 07 18 42 07 19 02 --- 21 47 22 75.8 -4.8 0.1 173.8 13 R 1 15521 07 19 02 2137+510 21 47 22 76.1 -6.7 0.2 171.5 -7 1 4 15521 07 19 02 07 19 22 --- 21 47 42 76.1 -6.9 0.2 171.2 13 R 1 15388 07 19 22 WB105 21 47 42 75.8 -5.0 0.1 173.6 -7 1 4 15388 07 19 22 07 19 42 --- 21 48 02 75.8 -5.3 0.1 173.3 13 R 1 15255 07 19 42 2137+510 21 48 02 76.1 -7.1 0.2 171.0 -7 1 4 15255 07 19 42 07 20 02 --- 21 48 22 76.0 -7.3 0.2 170.7 13 R 1 15122 07 20 02 WB105 21 48 22 75.8 -5.5 0.1 173.0 -7 1 4 15122 07 20 02 07 20 22 --- 21 48 42 75.8 -5.7 0.1 172.8 13 R 1 14989 07 20 22 2137+510 21 48 42 76.0 -7.6 0.2 170.4 -7 1 4 14989 07 20 22 07 20 42 --- 21 49 02 76.0 -7.8 0.2 170.1 13 R 1 14856 Schedule for VLBA_OV (Code Ov ) Page 24 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 20 42 WB105 21 49 02 75.8 -5.9 0.2 172.5 -7 1 4 14856 07 20 42 07 21 02 --- 21 49 22 75.8 -6.1 0.2 172.2 13 R 1 14723 07 21 02 2137+510 21 49 22 76.0 -8.0 0.2 169.9 -7 1 4 14723 07 21 02 07 21 22 --- 21 49 42 76.0 -8.2 0.2 169.6 13 R 1 14590 07 21 22 WB105 21 49 42 75.8 -6.3 0.2 171.9 -7 1 4 14590 07 21 22 07 21 42 --- 21 50 02 75.8 -6.5 0.2 171.7 13 R 1 14457 07 21 42 2137+510 21 50 02 76.0 -8.4 0.2 169.3 -7 1 4 14457 07 21 42 07 22 02 --- 21 50 22 76.0 -8.6 0.2 169.1 13 R 1 14324 07 22 02 WB105 21 50 22 75.8 -6.7 0.2 171.4 -7 1 4 14324 07 22 02 07 22 22 --- 21 50 42 75.7 -6.9 0.2 171.1 13 R 1 14191 07 22 22 2137+510 21 50 42 76.0 -8.8 0.2 168.8 -7 1 4 14191 07 22 22 07 22 41 --- 21 51 02 76.0 -9.1 0.2 168.5 13 R 1 14058 07 22 41 WB105 21 51 02 75.7 -7.1 0.2 170.9 -7 1 4 14058 07 22 41 07 23 01 --- 21 51 22 75.7 -7.4 0.2 170.6 13 R 1 13925 07 23 01 2137+510 21 51 22 76.0 -9.3 0.2 168.2 -7 1 4 13925 07 23 01 07 23 21 --- 21 51 42 76.0 -9.5 0.2 168.0 13 R 1 13792 07 23 21 WB105 21 51 42 75.7 -7.6 0.2 170.3 -7 1 4 13792 07 23 21 07 23 41 --- 21 52 02 75.7 -7.8 0.2 170.1 13 R 1 13659 07 23 41 2137+510 21 52 02 75.9 -9.7 0.2 167.7 -7 1 4 13659 07 23 41 07 24 01 --- 21 52 22 75.9 -9.9 0.3 167.4 13 R 1 13526 07 24 01 WB105 21 52 22 75.7 -8.0 0.2 169.8 -7 1 4 13526 07 24 01 07 24 21 --- 21 52 42 75.7 -8.2 0.2 169.5 13 R 1 13393 07 24 21 2137+510 21 52 42 75.9 -10.1 0.3 167.2 -7 1 4 13393 07 24 21 07 24 41 --- 21 53 02 75.9 -10.3 0.3 166.9 13 R 1 13260 07 24 41 WB105 21 53 02 75.7 -8.4 0.2 169.3 -7 1 4 13260 07 24 41 07 25 01 --- 21 53 22 75.7 -8.6 0.2 169.0 13 R 1 13127 07 25 01 2137+510 21 53 22 75.9 -10.5 0.3 166.6 -7 1 4 13127 07 25 01 07 25 21 --- 21 53 42 75.9 -10.7 0.3 166.4 13 R 1 12994 Schedule for VLBA_OV (Code Ov ) Page 25 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 25 21 WB105 21 53 42 75.7 -8.8 0.2 168.7 -7 1 4 12994 07 25 21 07 25 41 --- 21 54 02 75.7 -9.0 0.2 168.5 13 R 1 12861 07 25 41 2137+510 21 54 02 75.9 -10.9 0.3 166.1 -7 1 4 12861 07 25 41 07 26 01 --- 21 54 22 75.9 -11.2 0.3 165.8 13 R 1 12728 07 26 01 WB105 21 54 22 75.6 -9.2 0.2 168.2 -7 1 4 12728 07 26 01 07 26 21 --- 21 54 42 75.6 -9.4 0.2 168.0 13 R 1 12595 07 26 21 2137+510 21 54 42 75.8 -11.4 0.3 165.6 -7 1 4 12595 07 26 21 07 26 41 --- 21 55 02 75.8 -11.6 0.3 165.3 13 R 1 12462 07 26 41 WB105 21 55 02 75.6 -9.6 0.3 167.7 -7 1 4 12462 07 26 41 07 27 01 --- 21 55 22 75.6 -9.8 0.3 167.4 13 R 1 12329 07 27 01 2137+510 21 55 22 75.8 -11.8 0.3 165.0 -7 1 4 12329 07 27 01 07 27 21 --- 21 55 42 75.8 -12.0 0.3 164.8 13 R 1 12196 07 27 21 WB105 21 55 42 75.6 -10.0 0.3 167.2 -7 1 4 12196 07 27 21 07 27 41 --- 21 56 02 75.6 -10.2 0.3 166.9 13 R 1 12063 07 27 41 2137+510 21 56 02 75.8 -12.2 0.3 164.5 -7 1 4 12063 07 27 41 07 28 01 --- 21 56 22 75.8 -12.4 0.3 164.2 13 R 1 11930 07 28 01 WB105 21 56 22 75.6 -10.4 0.3 166.6 -7 1 4 11930 07 28 01 07 28 21 --- 21 56 42 75.6 -10.6 0.3 166.4 13 R 1 11797 07 28 21 2137+510 21 56 42 75.8 -12.6 0.3 164.0 -7 1 4 11797 07 28 21 07 28 40 --- 21 57 02 75.7 -12.8 0.3 163.7 13 R 1 11664 07 28 40 WB105 21 57 02 75.6 -10.8 0.3 166.1 -7 1 4 11664 07 28 40 07 29 00 --- 21 57 22 75.5 -11.0 0.3 165.9 13 R 1 11531 07 29 00 2137+510 21 57 22 75.7 -13.0 0.3 163.4 -7 1 4 11531 07 29 00 07 29 20 --- 21 57 42 75.7 -13.2 0.3 163.2 13 R 1 11399 07 29 20 WB105 21 57 42 75.5 -11.3 0.3 165.6 -7 1 4 11399 07 29 20 07 29 40 --- 21 58 02 75.5 -11.5 0.3 165.3 13 R 1 11266 07 29 40 2137+510 21 58 02 75.7 -13.4 0.3 162.9 -7 1 4 11266 07 29 40 07 30 00 --- 21 58 22 75.7 -13.6 0.4 162.7 13 R 1 11133 Schedule for VLBA_OV (Code Ov ) Page 26 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 30 00 WB105 21 58 22 75.5 -11.7 0.3 165.1 -7 1 4 11133 07 30 00 07 30 20 --- 21 58 42 75.5 -11.9 0.3 164.8 13 R 1 11000 07 30 20 2137+510 21 58 42 75.7 -13.8 0.4 162.4 -7 1 4 11000 07 30 20 07 30 40 --- 21 59 02 75.7 -14.0 0.4 162.1 13 R 1 10867 07 30 40 WB105 21 59 02 75.5 -12.1 0.3 164.6 -7 1 4 10867 07 30 40 07 31 00 --- 21 59 22 75.5 -12.3 0.3 164.3 13 R 1 10734 07 31 00 2137+510 21 59 22 75.6 -14.2 0.4 161.9 -7 1 4 10734 07 31 00 07 31 20 --- 21 59 42 75.6 -14.4 0.4 161.6 13 R 1 10601 07 31 20 WB105 21 59 42 75.4 -12.5 0.3 164.0 -7 1 4 10601 07 31 20 07 31 40 --- 22 00 02 75.4 -12.7 0.3 163.8 13 R 1 10468 07 31 40 2137+510 22 00 02 75.6 -14.6 0.4 161.4 -7 1 4 10468 07 31 40 07 32 00 --- 22 00 22 75.6 -14.8 0.4 161.1 13 R 1 10335 07 32 00 WB105 22 00 22 75.4 -12.8 0.3 163.5 -7 1 4 10335 07 32 00 07 32 20 --- 22 00 42 75.4 -13.0 0.3 163.3 13 R 1 10202 07 32 20 2137+510 22 00 42 75.6 -15.0 0.4 160.8 -7 1 4 10202 07 32 20 07 32 40 --- 22 01 02 75.6 -15.2 0.4 160.6 13 R 1 10069 07 32 40 WB105 22 01 02 75.4 -13.2 0.4 163.0 -7 1 4 10069 07 32 40 07 33 00 --- 22 01 22 75.4 -13.4 0.4 162.8 13 R 1 9936 07 33 00 2137+510 22 01 22 75.5 -15.4 0.4 160.3 -7 1 4 9936 07 33 00 07 33 20 --- 22 01 42 75.5 -15.6 0.4 160.1 13 R 1 9803 07 33 20 WB105 22 01 42 75.4 -13.6 0.4 162.5 -7 1 4 9803 07 33 20 07 33 40 --- 22 02 02 75.3 -13.8 0.4 162.2 13 R 1 9670 07 33 40 2137+510 22 02 02 75.5 -15.8 0.4 159.8 -7 1 4 9670 07 33 40 07 34 00 --- 22 02 22 75.5 -16.0 0.4 159.6 13 R 1 9537 07 34 00 WB105 22 02 22 75.3 -14.0 0.4 162.0 -7 1 4 9537 07 34 00 07 34 20 --- 22 02 42 75.3 -14.2 0.4 161.7 13 R 1 9404 07 34 20 2137+510 22 02 42 75.5 -16.2 0.4 159.3 -7 1 4 9404 07 34 20 07 34 39 --- 22 03 02 75.4 -16.4 0.4 159.1 13 R 1 9271 Schedule for VLBA_OV (Code Ov ) Page 27 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 34 39 WB105 22 03 02 75.3 -14.4 0.4 161.5 -7 1 4 9271 07 34 39 07 34 59 --- 22 03 22 75.3 -14.6 0.4 161.2 13 R 1 9138 07 34 59 2137+510 22 03 22 75.4 -16.6 0.4 158.8 -7 1 4 9138 07 34 59 07 35 19 --- 22 03 42 75.4 -16.8 0.4 158.6 13 R 1 9005 07 35 19 WB105 22 03 42 75.3 -14.8 0.4 161.0 -7 1 4 9005 07 35 19 07 35 39 --- 22 04 02 75.2 -15.0 0.4 160.7 13 R 1 8872 07 35 39 2137+510 22 04 02 75.4 -17.0 0.4 158.3 -7 1 4 8872 07 35 39 07 35 59 --- 22 04 22 75.4 -17.2 0.5 158.1 13 R 1 8739 07 35 59 WB105 22 04 22 75.2 -15.2 0.4 160.5 -7 1 4 8739 07 35 59 07 36 19 --- 22 04 42 75.2 -15.4 0.4 160.2 13 R 1 8606 07 36 19 2137+510 22 04 42 75.3 -17.4 0.5 157.8 -7 1 4 8606 07 36 19 07 36 39 --- 22 05 02 75.3 -17.6 0.5 157.6 13 R 1 8473 07 36 39 WB105 22 05 02 75.2 -15.6 0.4 160.0 -7 1 4 8473 07 36 39 07 36 59 --- 22 05 22 75.2 -15.8 0.4 159.7 13 R 1 8340 07 36 59 2137+510 22 05 22 75.3 -17.7 0.5 157.3 -7 1 4 8340 07 36 59 07 37 19 --- 22 05 42 75.3 -17.9 0.5 157.1 13 R 1 8207 07 37 19 WB105 22 05 42 75.2 -16.0 0.4 159.5 -7 1 4 8207 07 37 19 07 37 39 --- 22 06 02 75.1 -16.1 0.4 159.2 13 R 1 8074 07 37 39 2137+510 22 06 02 75.3 -18.1 0.5 156.8 -7 1 4 8074 07 37 39 07 37 59 --- 22 06 22 75.2 -18.3 0.5 156.6 13 R 1 7941 07 37 59 WB105 22 06 22 75.1 -16.3 0.4 159.0 -7 1 4 7941 07 37 59 07 38 19 --- 22 06 42 75.1 -16.5 0.4 158.7 13 R 1 7808 07 38 19 2137+510 22 06 42 75.2 -18.5 0.5 156.3 -7 1 4 7808 07 38 19 07 38 39 --- 22 07 02 75.2 -18.7 0.5 156.1 13 R 1 7675 07 38 39 WB105 22 07 02 75.1 -16.7 0.5 158.5 -7 1 4 7675 07 38 39 07 38 59 --- 22 07 22 75.1 -16.9 0.5 158.2 13 R 1 7542 07 40 58 3C454.3 22 09 22 66.7 151.9 -0.7 -23.0 1 1 4 7542 07 40 58 07 46 57 --- 22 15 22 67.3 155.3 -0.6 -20.3 359 R 1 5149 Schedule for VLBA_OV (Code Ov ) Page 28 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- Next scan frequencies: 22237.77 22229.61 22221.45 22245.93 Next BBC frequencies: 737.77 729.61 721.45 745.93 07 46 57 3C454.3 22 15 22 67.3 155.3 -0.6 -20.3 -6 1 4 5149 07 46 57 07 52 56 --- 22 21 22 67.7 158.9 -0.5 -17.4 353 R 1 2756 07 54 56 2123+550 22 23 22 69.5 334.9 1.0 143.9 -4 1 4 2756 07 54 56 07 55 16 --- 22 23 42 69.5 334.8 1.0 143.7 16 R 1 2623 07 55 16 WB114 22 23 42 71.0 341.9 0.7 154.5 -11 1 4 2623 07 55 16 07 55 36 --- 22 24 02 71.0 341.8 0.7 154.3 9 R 1 2490 07 55 36 2123+550 22 24 02 69.4 334.7 1.0 143.5 -11 1 4 2490 07 55 36 07 55 56 --- 22 24 22 69.4 334.6 1.0 143.4 9 R 1 2357 07 55 56 WB114 22 24 22 70.9 341.7 0.7 154.1 -11 1 4 2357 07 55 56 07 56 16 --- 22 24 42 70.9 341.5 0.7 153.9 9 R 1 2224 07 56 16 2123+550 22 24 42 69.4 334.4 1.0 143.2 -11 1 4 2224 07 56 16 07 56 36 --- 22 25 02 69.3 334.3 1.0 143.0 9 R 1 2091 07 56 36 WB114 22 25 02 70.9 341.4 0.7 153.7 -11 1 4 2091 07 56 36 07 56 56 --- 22 25 22 70.9 341.3 0.7 153.6 9 R 1 1958 07 56 56 2123+550 22 25 22 69.3 334.2 1.0 142.9 -11 1 4 1958 07 56 56 07 57 16 --- 22 25 42 69.3 334.1 1.0 142.7 9 R 1 1825 07 57 16 WB114 22 25 42 70.9 341.1 0.7 153.4 -11 1 4 1825 07 57 16 07 57 36 --- 22 26 02 70.8 341.0 0.7 153.2 9 R 1 1692 07 57 36 2123+550 22 26 02 69.3 334.0 1.0 142.5 -11 1 4 1692 07 57 36 07 57 56 --- 22 26 22 69.2 333.9 1.1 142.3 9 R 1 1559 07 57 56 WB114 22 26 22 70.8 340.9 0.7 153.0 -11 1 4 1559 07 57 56 07 58 16 --- 22 26 42 70.8 340.7 0.7 152.8 9 R 1 1426 07 58 16 2123+550 22 26 42 69.2 333.8 1.1 142.2 -11 1 4 1426 07 58 16 07 58 36 --- 22 27 02 69.2 333.7 1.1 142.0 9 R 1 1293 07 58 36 WB114 22 27 02 70.8 340.6 0.7 152.6 -11 1 4 1293 07 58 36 07 58 56 --- 22 27 22 70.7 340.5 0.7 152.4 9 R 1 1160 Schedule for VLBA_OV (Code Ov ) Page 29 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 58 56 2123+550 22 27 22 69.1 333.6 1.1 141.8 -11 1 4 1160 07 58 56 07 59 15 --- 22 27 42 69.1 333.5 1.1 141.7 9 R 1 1027 07 59 15 WB114 22 27 42 70.7 340.4 0.7 152.2 -11 1 4 1027 07 59 15 07 59 35 --- 22 28 02 70.7 340.2 0.7 152.0 9 R 1 894 07 59 35 2123+550 22 28 02 69.1 333.4 1.1 141.5 -11 1 4 894 07 59 35 07 59 55 --- 22 28 22 69.0 333.3 1.1 141.3 9 R 1 761 07 59 55 WB114 22 28 22 70.7 340.1 0.8 151.8 -11 1 4 761 07 59 55 08 00 15 --- 22 28 42 70.7 340.0 0.8 151.7 9 R 1 628 08 00 15 2123+550 22 28 42 69.0 333.2 1.1 141.2 -11 1 4 628 08 00 15 08 00 35 --- 22 29 02 69.0 333.1 1.1 141.0 9 R 1 495 08 00 35 WB114 22 29 02 70.6 339.8 0.8 151.5 -11 1 4 495 08 00 35 08 00 55 --- 22 29 22 70.6 339.7 0.8 151.3 9 R 1 362 08 00 55 2123+550 22 29 22 69.0 333.0 1.1 140.9 -11 1 5 362 08 00 55 08 01 15 --- 22 29 42 68.9 332.9 1.1 140.7 9 F 1 495 08 01 15 WB114 22 29 42 70.6 339.6 0.8 151.1 -10 1 5 495 08 01 15 08 01 35 --- 22 30 02 70.6 339.5 0.8 150.9 9 F 1 628 08 01 35 2123+550 22 30 02 68.9 332.8 1.1 140.5 -10 1 5 628 08 01 35 08 01 55 --- 22 30 22 68.9 332.7 1.1 140.4 9 F 1 761 08 01 55 WB114 22 30 22 70.5 339.3 0.8 150.7 -10 1 5 761 08 01 55 08 02 15 --- 22 30 42 70.5 339.2 0.8 150.5 9 F 1 894 08 02 15 2123+550 22 30 42 68.8 332.6 1.1 140.2 -10 1 5 894 08 02 15 08 02 35 --- 22 31 02 68.8 332.4 1.1 140.0 10 F 1 1027 08 02 35 WB114 22 31 02 70.5 339.1 0.8 150.3 -10 1 5 1027 08 02 35 08 02 55 --- 22 31 22 70.5 339.0 0.8 150.2 10 F 1 1160 08 02 55 2123+550 22 31 22 68.8 332.3 1.1 139.9 -10 1 5 1160 08 02 55 08 03 15 --- 22 31 42 68.7 332.2 1.1 139.7 10 F 1 1293 08 03 15 WB114 22 31 42 70.4 338.8 0.8 150.0 -10 1 5 1293 08 03 15 08 03 35 --- 22 32 02 70.4 338.7 0.8 149.8 10 F 1 1426 Schedule for VLBA_OV (Code Ov ) Page 30 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 03 35 2123+550 22 32 02 68.7 332.1 1.1 139.5 -10 1 5 1426 08 03 35 08 03 55 --- 22 32 22 68.7 332.0 1.2 139.4 10 F 1 1559 08 03 55 WB114 22 32 22 70.4 338.6 0.8 149.6 -10 1 5 1559 08 03 55 08 04 15 --- 22 32 42 70.4 338.5 0.8 149.4 10 F 1 1692 08 04 15 2123+550 22 32 42 68.6 331.9 1.2 139.2 -10 1 5 1692 08 04 15 08 04 35 --- 22 33 02 68.6 331.8 1.2 139.1 10 F 1 1825 08 04 35 WB114 22 33 02 70.4 338.3 0.8 149.2 -10 1 5 1825 08 04 35 08 04 55 --- 22 33 22 70.3 338.2 0.8 149.1 10 F 1 1958 08 04 55 2123+550 22 33 22 68.6 331.8 1.2 138.9 -10 1 5 1958 08 04 55 08 05 14 --- 22 33 42 68.6 331.7 1.2 138.7 10 F 1 2091 08 05 14 WB114 22 33 42 70.3 338.1 0.8 148.9 -10 1 5 2091 08 05 14 08 05 34 --- 22 34 02 70.3 338.0 0.8 148.7 10 F 1 2224 08 05 34 2123+550 22 34 02 68.5 331.6 1.2 138.6 -10 1 5 2224 08 05 34 08 05 54 --- 22 34 22 68.5 331.5 1.2 138.4 10 F 1 2357 08 05 54 WB114 22 34 22 70.3 337.9 0.9 148.5 -10 1 5 2357 08 05 54 08 06 14 --- 22 34 42 70.2 337.7 0.9 148.3 10 F 1 2490 08 06 14 2123+550 22 34 42 68.5 331.4 1.2 138.3 -10 1 5 2490 08 06 14 08 06 34 --- 22 35 02 68.4 331.3 1.2 138.1 10 F 1 2623 08 06 34 WB114 22 35 02 70.2 337.6 0.9 148.1 -10 1 5 2623 08 06 34 08 06 54 --- 22 35 22 70.2 337.5 0.9 148.0 10 F 1 2756 08 06 54 2123+550 22 35 22 68.4 331.2 1.2 137.9 -10 1 5 2756 08 06 54 08 07 14 --- 22 35 42 68.4 331.1 1.2 137.8 10 F 1 2888 08 07 14 WB114 22 35 42 70.2 337.4 0.9 147.8 -10 1 5 2888 08 07 14 08 07 34 --- 22 36 02 70.1 337.3 0.9 147.6 10 F 1 3021 08 07 34 2123+550 22 36 02 68.3 331.0 1.2 137.6 -10 1 5 3021 08 07 34 08 07 54 --- 22 36 22 68.3 330.9 1.2 137.5 10 F 1 3154 08 07 54 WB114 22 36 22 70.1 337.1 0.9 147.4 -10 1 5 3154 08 07 54 08 08 14 --- 22 36 42 70.1 337.0 0.9 147.2 10 F 1 3287 Schedule for VLBA_OV (Code Ov ) Page 31 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 08 14 2123+550 22 36 42 68.3 330.8 1.2 137.3 -10 1 5 3287 08 08 14 08 08 34 --- 22 37 02 68.2 330.7 1.2 137.2 10 F 1 3420 08 08 34 WB114 22 37 02 70.0 336.9 0.9 147.1 -10 1 5 3420 08 08 34 08 08 54 --- 22 37 22 70.0 336.8 0.9 146.9 10 F 1 3553 08 08 54 2123+550 22 37 22 68.2 330.6 1.2 137.0 -10 1 5 3553 08 08 54 08 09 14 --- 22 37 42 68.2 330.5 1.2 136.9 10 F 1 3686 08 09 14 WB114 22 37 42 70.0 336.7 0.9 146.7 -10 1 5 3686 08 09 14 08 09 34 --- 22 38 02 70.0 336.6 0.9 146.5 10 F 1 3819 08 09 34 2123+550 22 38 02 68.1 330.4 1.2 136.7 -10 1 5 3819 08 09 34 08 09 54 --- 22 38 22 68.1 330.3 1.3 136.5 10 F 1 3952 08 09 54 WB114 22 38 22 69.9 336.4 0.9 146.4 -10 1 5 3952 08 09 54 08 10 14 --- 22 38 42 69.9 336.3 0.9 146.2 10 F 1 4085 08 10 14 2123+550 22 38 42 68.1 330.2 1.3 136.4 -10 1 5 4085 08 10 14 08 10 34 --- 22 39 02 68.0 330.1 1.3 136.2 10 F 1 4218 08 10 34 WB114 22 39 02 69.9 336.2 0.9 146.0 -10 1 5 4218 08 10 34 08 10 54 --- 22 39 22 69.9 336.1 0.9 145.8 10 F 1 4351 08 10 54 2123+550 22 39 22 68.0 330.0 1.3 136.1 -10 1 5 4351 08 10 54 08 11 13 --- 22 39 42 68.0 329.9 1.3 135.9 10 F 1 4484 08 11 13 WB114 22 39 42 69.8 336.0 0.9 145.6 -10 1 5 4484 08 11 13 08 11 33 --- 22 40 02 69.8 335.9 0.9 145.5 10 F 1 4617 08 11 33 2123+550 22 40 02 67.9 329.9 1.3 135.8 -10 1 5 4617 08 11 33 08 11 53 --- 22 40 22 67.9 329.8 1.3 135.6 10 F 1 4750 08 11 53 WB114 22 40 22 69.8 335.8 1.0 145.3 -10 1 5 4750 08 11 53 08 12 13 --- 22 40 42 69.8 335.6 1.0 145.1 10 F 1 4883 08 12 13 2123+550 22 40 42 67.9 329.7 1.3 135.5 -10 1 5 4883 08 12 13 08 12 33 --- 22 41 02 67.8 329.6 1.3 135.3 10 F 1 5016 08 12 33 WB114 22 41 02 69.7 335.5 1.0 144.9 -10 1 5 5016 08 12 33 08 12 53 --- 22 41 22 69.7 335.4 1.0 144.8 10 F 1 5149 Schedule for VLBA_OV (Code Ov ) Page 32 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 12 53 2123+550 22 41 22 67.8 329.5 1.3 135.2 -10 1 5 5149 08 12 53 08 13 13 --- 22 41 42 67.8 329.4 1.3 135.0 10 F 1 5282 08 13 13 WB114 22 41 42 69.7 335.3 1.0 144.6 -10 1 5 5282 08 13 13 08 13 33 --- 22 42 02 69.6 335.2 1.0 144.4 10 F 1 5415 08 13 33 2123+550 22 42 02 67.7 329.3 1.3 134.9 -10 1 5 5415 08 13 33 08 13 53 --- 22 42 22 67.7 329.2 1.3 134.7 10 F 1 5548 08 13 53 WB114 22 42 22 69.6 335.1 1.0 144.2 -10 1 5 5548 08 13 53 08 14 13 --- 22 42 42 69.6 335.0 1.0 144.1 10 F 1 5681 08 14 13 2123+550 22 42 42 67.7 329.1 1.3 134.6 -10 1 5 5681 08 14 13 08 14 33 --- 22 43 02 67.6 329.0 1.3 134.4 10 F 1 5814 08 14 33 WB114 22 43 02 69.6 334.9 1.0 143.9 -10 1 5 5814 08 14 33 08 14 53 --- 22 43 22 69.5 334.7 1.0 143.7 10 F 1 5947 08 14 53 2123+550 22 43 22 67.6 329.0 1.3 134.3 -10 1 5 5947 08 14 53 08 15 13 --- 22 43 42 67.6 328.9 1.3 134.1 10 F 1 6080 08 15 13 WB114 22 43 42 69.5 334.6 1.0 143.6 -10 1 5 6080 08 15 13 08 15 33 --- 22 44 02 69.5 334.5 1.0 143.4 10 F 1 6213 08 15 33 2123+550 22 44 02 67.5 328.8 1.3 134.0 -10 1 5 6213 08 15 33 08 15 53 --- 22 44 22 67.5 328.7 1.4 133.8 10 F 1 6346 08 15 53 WB114 22 44 22 69.4 334.4 1.0 143.2 -10 1 5 6346 08 15 53 08 16 13 --- 22 44 42 69.4 334.3 1.0 143.1 10 F 1 6479 08 16 13 2123+550 22 44 42 67.5 328.6 1.4 133.7 -10 1 5 6479 08 16 13 08 16 33 --- 22 45 02 67.4 328.5 1.4 133.5 10 F 1 6612 08 16 33 WB114 22 45 02 69.4 334.2 1.0 142.9 -10 1 5 6612 08 16 33 08 16 53 --- 22 45 22 69.4 334.1 1.0 142.7 10 F 1 6745 08 16 53 2123+550 22 45 22 67.4 328.4 1.4 133.4 -10 1 5 6745 08 16 53 08 17 13 --- 22 45 42 67.4 328.4 1.4 133.2 10 F 1 6878 08 17 13 WB114 22 45 42 69.3 334.0 1.0 142.5 -10 1 5 6878 08 17 13 08 17 32 --- 22 46 02 69.3 333.9 1.0 142.4 10 F 1 7011 Schedule for VLBA_OV (Code Ov ) Page 33 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 17 32 2123+550 22 46 02 67.3 328.3 1.4 133.1 -10 1 5 7011 08 17 32 08 17 52 --- 22 46 22 67.3 328.2 1.4 132.9 10 F 1 7143 08 17 52 WB114 22 46 22 69.3 333.8 1.1 142.2 -10 1 5 7143 08 17 52 08 18 12 --- 22 46 42 69.2 333.7 1.1 142.0 10 F 1 7276 08 18 12 2123+550 22 46 42 67.3 328.1 1.4 132.8 -10 1 5 7276 08 18 12 08 18 32 --- 22 47 02 67.2 328.0 1.4 132.6 10 F 1 7409 08 18 32 WB114 22 47 02 69.2 333.6 1.1 141.9 -10 1 5 7409 08 18 32 08 18 52 --- 22 47 22 69.2 333.4 1.1 141.7 10 F 1 7542 08 18 52 2123+550 22 47 22 67.2 327.9 1.4 132.5 -10 1 5 7542 08 18 52 08 19 12 --- 22 47 42 67.1 327.9 1.4 132.4 10 F 1 7675 08 19 12 WB114 22 47 42 69.2 333.3 1.1 141.5 -10 1 5 7675 08 19 12 08 19 32 --- 22 48 02 69.1 333.2 1.1 141.4 10 F 1 7808 08 19 32 2123+550 22 48 02 67.1 327.8 1.4 132.2 -10 1 5 7808 08 19 32 08 19 52 --- 22 48 22 67.1 327.7 1.4 132.1 10 F 1 7941 08 19 52 WB114 22 48 22 69.1 333.1 1.1 141.2 -10 1 5 7941 08 19 52 08 20 12 --- 22 48 42 69.1 333.0 1.1 141.0 10 F 1 8074 08 20 12 2123+550 22 48 42 67.0 327.6 1.4 131.9 -10 1 5 8074 08 20 12 08 20 32 --- 22 49 02 67.0 327.5 1.4 131.8 10 F 1 8207 08 20 32 WB114 22 49 02 69.0 332.9 1.1 140.9 -10 1 5 8207 08 20 32 08 20 52 --- 22 49 22 69.0 332.8 1.1 140.7 10 F 1 8340 08 20 52 2123+550 22 49 22 67.0 327.4 1.4 131.6 -10 1 5 8340 08 20 52 08 21 12 --- 22 49 42 66.9 327.4 1.4 131.5 10 F 1 8473 08 21 12 WB114 22 49 42 69.0 332.7 1.1 140.5 -10 1 5 8473 08 21 12 08 21 32 --- 22 50 02 68.9 332.6 1.1 140.4 10 F 1 8606 08 21 32 2123+550 22 50 02 66.9 327.3 1.4 131.4 -10 1 5 8606 08 21 32 08 21 52 --- 22 50 22 66.9 327.2 1.5 131.2 10 F 1 8739 08 21 52 WB114 22 50 22 68.9 332.5 1.1 140.2 -10 1 5 8739 08 21 52 08 22 12 --- 22 50 42 68.9 332.4 1.1 140.1 10 F 1 8872 Schedule for VLBA_OV (Code Ov ) Page 34 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 22 12 2123+550 22 50 42 66.8 327.1 1.5 131.1 -10 1 5 8872 08 22 12 08 22 32 --- 22 51 02 66.8 327.0 1.5 130.9 10 F 1 9005 08 22 32 WB114 22 51 02 68.9 332.3 1.1 139.9 -10 1 5 9005 08 22 32 08 22 52 --- 22 51 22 68.8 332.2 1.1 139.7 10 F 1 9138 08 24 51 3C454.3 22 53 22 68.9 179.5 0.0 -0.4 12 1 5 9138 08 24 51 08 30 50 --- 22 59 22 68.9 183.5 0.1 2.9 359 F 1 11531 08 32 50 2146+570 23 01 22 66.6 334.0 1.2 140.0 13 1 5 11531 08 32 50 08 33 10 --- 23 01 42 66.6 333.9 1.3 139.8 20 F 1 11664 08 33 10 WB114 23 01 42 67.8 329.3 1.3 134.9 -9 1 5 11664 08 33 10 08 33 30 --- 23 02 02 67.8 329.2 1.3 134.7 11 F 1 11797 08 33 30 2146+570 23 02 02 66.5 333.8 1.3 139.7 -9 1 5 11797 08 33 30 08 33 50 --- 23 02 22 66.5 333.7 1.3 139.5 11 F 1 11930 08 33 50 WB114 23 02 22 67.7 329.1 1.3 134.6 -9 1 5 11930 08 33 50 08 34 10 --- 23 02 42 67.7 329.0 1.3 134.4 11 F 1 12063 08 34 10 2146+570 23 02 42 66.5 333.6 1.3 139.4 -9 1 5 12063 08 34 10 08 34 30 --- 23 03 02 66.5 333.5 1.3 139.2 11 F 1 12196 08 34 30 WB114 23 03 02 67.7 328.9 1.3 134.3 -9 1 5 12196 08 34 30 08 34 50 --- 23 03 22 67.6 328.8 1.3 134.1 11 F 1 12329 08 34 50 2146+570 23 03 22 66.4 333.4 1.3 139.1 -9 1 5 12329 08 34 50 08 35 10 --- 23 03 42 66.4 333.3 1.3 138.9 11 F 1 12462 08 35 10 WB114 23 03 42 67.6 328.7 1.3 134.0 -9 1 5 12462 08 35 10 08 35 30 --- 23 04 02 67.6 328.6 1.3 133.8 11 F 1 12595 08 35 30 2146+570 23 04 02 66.4 333.3 1.3 138.8 -9 1 5 12595 08 35 30 08 35 49 --- 23 04 22 66.3 333.2 1.3 138.6 11 F 1 12728 08 35 49 WB114 23 04 22 67.5 328.6 1.4 133.7 -9 1 5 12728 08 35 49 08 36 09 --- 23 04 42 67.5 328.5 1.4 133.5 11 F 1 12861 08 36 09 2146+570 23 04 42 66.3 333.1 1.3 138.5 -9 1 5 12861 08 36 09 08 36 29 --- 23 05 02 66.3 333.0 1.3 138.3 11 F 1 12994 Schedule for VLBA_OV (Code Ov ) Page 35 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 36 29 WB114 23 05 02 67.5 328.4 1.4 133.4 -9 1 5 12994 08 36 29 08 36 49 --- 23 05 22 67.4 328.3 1.4 133.2 11 F 1 13127 08 36 49 2146+570 23 05 22 66.2 332.9 1.3 138.2 -9 1 5 13127 08 36 49 08 37 09 --- 23 05 42 66.2 332.8 1.3 138.0 11 F 1 13260 08 37 09 WB114 23 05 42 67.4 328.2 1.4 133.1 -9 1 5 13260 08 37 09 08 37 29 --- 23 06 02 67.4 328.1 1.4 132.9 11 F 1 13393 08 37 29 2146+570 23 06 02 66.2 332.8 1.3 137.9 -9 1 5 13393 08 37 29 08 37 49 --- 23 06 22 66.2 332.7 1.3 137.8 11 F 1 13526 08 37 49 WB114 23 06 22 67.3 328.0 1.4 132.8 -9 1 5 13526 08 37 49 08 38 09 --- 23 06 42 67.3 328.0 1.4 132.6 11 F 1 13659 08 38 09 2146+570 23 06 42 66.1 332.6 1.3 137.6 -9 1 5 13659 08 38 09 08 38 29 --- 23 07 02 66.1 332.5 1.3 137.5 11 F 1 13792 08 38 29 WB114 23 07 02 67.3 327.9 1.4 132.5 -9 1 5 13792 08 38 29 08 38 49 --- 23 07 22 67.2 327.8 1.4 132.4 11 F 1 13925 08 38 49 2146+570 23 07 22 66.1 332.4 1.3 137.3 -9 1 5 13925 08 38 49 08 39 09 --- 23 07 42 66.0 332.3 1.4 137.2 11 F 1 14058 08 39 09 WB114 23 07 42 67.2 327.7 1.4 132.2 -9 1 5 14058 08 39 09 08 39 29 --- 23 08 02 67.2 327.6 1.4 132.1 11 F 1 14191 08 39 29 2146+570 23 08 02 66.0 332.3 1.4 137.0 -9 1 5 14191 08 39 29 08 39 49 --- 23 08 22 66.0 332.2 1.4 136.9 11 F 1 14324 08 39 49 WB114 23 08 22 67.1 327.5 1.4 131.9 -9 1 5 14324 08 39 49 08 40 09 --- 23 08 42 67.1 327.5 1.4 131.8 11 F 1 14457 08 40 09 2146+570 23 08 42 65.9 332.1 1.4 136.7 -9 1 5 14457 08 40 09 08 40 29 --- 23 09 02 65.9 332.0 1.4 136.6 11 F 1 14590 08 40 29 WB114 23 09 02 67.0 327.4 1.4 131.6 -9 1 5 14590 08 40 29 08 40 49 --- 23 09 22 67.0 327.3 1.4 131.5 11 F 1 14723 08 40 49 2146+570 23 09 22 65.9 331.9 1.4 136.5 -9 1 5 14723 08 40 49 08 41 09 --- 23 09 42 65.9 331.9 1.4 136.3 11 F 1 14856 Schedule for VLBA_OV (Code Ov ) Page 36 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 41 09 WB114 23 09 42 67.0 327.2 1.4 131.3 -9 1 5 14856 08 41 09 08 41 29 --- 23 10 02 66.9 327.1 1.4 131.2 11 F 1 14989 08 41 29 2146+570 23 10 02 65.8 331.8 1.4 136.2 -9 1 5 14989 08 41 29 08 41 48 --- 23 10 22 65.8 331.7 1.4 136.0 11 F 1 15122 08 41 48 WB114 23 10 22 66.9 327.1 1.5 131.1 -9 1 5 15122 08 41 48 08 42 08 --- 23 10 42 66.9 327.0 1.5 130.9 11 F 1 15255 08 42 08 2146+570 23 10 42 65.8 331.6 1.4 135.9 -9 1 5 15255 08 42 08 08 42 28 --- 23 11 02 65.7 331.5 1.4 135.7 11 F 1 15388 08 42 28 WB114 23 11 02 66.8 326.9 1.5 130.8 -9 1 5 15388 08 42 28 08 42 48 --- 23 11 22 66.8 326.8 1.5 130.6 11 F 1 15521 08 42 48 2146+570 23 11 22 65.7 331.5 1.4 135.6 -9 1 5 15521 08 42 48 08 43 08 --- 23 11 42 65.7 331.4 1.4 135.5 11 F 1 15654 08 43 08 WB114 23 11 42 66.8 326.7 1.5 130.5 -9 1 5 15654 08 43 08 08 43 28 --- 23 12 02 66.7 326.7 1.5 130.4 11 F 1 15786 08 43 28 2146+570 23 12 02 65.6 331.3 1.4 135.3 -9 1 5 15786 08 43 28 08 43 48 --- 23 12 22 65.6 331.2 1.4 135.2 11 F 1 15919 08 43 48 WB114 23 12 22 66.7 326.6 1.5 130.2 -9 1 5 15919 08 43 48 08 44 08 --- 23 12 42 66.6 326.5 1.5 130.1 11 F 1 16052 08 44 08 2146+570 23 12 42 65.6 331.2 1.4 135.0 -9 1 5 16052 08 44 08 08 44 28 --- 23 13 02 65.5 331.1 1.4 134.9 11 F 1 16185 08 44 28 WB114 23 13 02 66.6 326.4 1.5 129.9 -9 1 5 16185 08 44 28 08 44 48 --- 23 13 22 66.6 326.3 1.5 129.8 11 F 1 16318 08 44 48 2146+570 23 13 22 65.5 331.0 1.4 134.8 -9 1 5 16318 08 44 48 08 45 08 --- 23 13 42 65.5 330.9 1.5 134.6 11 F 1 16451 08 45 08 WB114 23 13 42 66.5 326.3 1.5 129.7 -9 1 5 16451 08 45 08 08 45 28 --- 23 14 02 66.5 326.2 1.5 129.5 11 F 1 16584 08 45 28 2146+570 23 14 02 65.4 330.8 1.5 134.5 -9 1 5 16584 08 45 28 08 45 48 --- 23 14 22 65.4 330.8 1.5 134.3 11 F 1 16717 Schedule for VLBA_OV (Code Ov ) Page 37 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 45 48 WB114 23 14 22 66.5 326.1 1.5 129.4 -9 1 5 16717 08 45 48 08 46 08 --- 23 14 42 66.4 326.0 1.5 129.2 11 F 1 16850 08 46 08 2146+570 23 14 42 65.4 330.7 1.5 134.2 -9 1 5 16850 08 46 08 08 46 28 --- 23 15 02 65.3 330.6 1.5 134.1 11 F 1 16983 08 46 28 WB114 23 15 02 66.4 326.0 1.5 129.1 -9 1 5 16983 08 46 28 08 46 48 --- 23 15 22 66.4 325.9 1.5 129.0 11 F 1 17116 08 46 48 2146+570 23 15 22 65.3 330.5 1.5 133.9 -9 1 5 17116 08 46 48 08 47 08 --- 23 15 42 65.3 330.5 1.5 133.8 11 F 1 17249 08 47 08 WB114 23 15 42 66.3 325.8 1.5 128.8 -9 1 6 17249 08 47 08 08 47 28 --- 23 16 02 66.3 325.7 1.5 128.7 11 R 1 17116 08 47 28 2146+570 23 16 02 65.2 330.4 1.5 133.6 -9 1 6 17116 08 47 28 08 47 47 --- 23 16 22 65.2 330.3 1.5 133.5 11 R 1 16983 08 47 47 WB114 23 16 22 66.2 325.7 1.6 128.6 -9 1 6 16983 08 47 47 08 48 07 --- 23 16 42 66.2 325.6 1.6 128.4 11 R 1 16850 08 48 07 2146+570 23 16 42 65.2 330.2 1.5 133.4 -9 1 6 16850 08 48 07 08 48 27 --- 23 17 02 65.1 330.2 1.5 133.2 11 R 1 16717 08 48 27 WB114 23 17 02 66.2 325.5 1.6 128.3 -9 1 6 16717 08 48 27 08 48 47 --- 23 17 22 66.1 325.4 1.6 128.2 11 R 1 16584 08 48 47 2146+570 23 17 22 65.1 330.1 1.5 133.1 -9 1 6 16584 08 48 47 08 49 07 --- 23 17 42 65.1 330.0 1.5 133.0 11 R 1 16451 08 49 07 WB114 23 17 42 66.1 325.4 1.6 128.0 -9 1 6 16451 08 49 07 08 49 27 --- 23 18 02 66.1 325.3 1.6 127.9 11 R 1 16318 08 49 27 2146+570 23 18 02 65.0 329.9 1.5 132.8 -9 1 6 16318 08 49 27 08 49 47 --- 23 18 22 65.0 329.9 1.5 132.7 11 R 1 16185 08 49 47 WB114 23 18 22 66.0 325.2 1.6 127.7 -9 1 6 16185 08 49 47 08 50 07 --- 23 18 42 66.0 325.2 1.6 127.6 11 R 1 16052 08 50 07 2146+570 23 18 42 65.0 329.8 1.5 132.6 -9 1 6 16052 08 50 07 08 50 27 --- 23 19 02 64.9 329.7 1.5 132.4 11 R 1 15919 Schedule for VLBA_OV (Code Ov ) Page 38 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 50 27 WB114 23 19 02 65.9 325.1 1.6 127.5 -9 1 6 15919 08 50 27 08 50 47 --- 23 19 22 65.9 325.0 1.6 127.3 11 R 1 15786 08 50 47 2146+570 23 19 22 64.9 329.7 1.5 132.3 -9 1 6 15786 08 50 47 08 51 07 --- 23 19 42 64.9 329.6 1.6 132.1 11 R 1 15654 08 51 07 WB114 23 19 42 65.9 324.9 1.6 127.2 -9 1 6 15654 08 51 07 08 51 27 --- 23 20 02 65.8 324.9 1.6 127.1 11 R 1 15521 08 51 27 2146+570 23 20 02 64.8 329.5 1.6 132.0 -9 1 6 15521 08 51 27 08 51 47 --- 23 20 22 64.8 329.4 1.6 131.9 11 R 1 15388 08 51 47 WB114 23 20 22 65.8 324.8 1.6 127.0 -9 1 6 15388 08 51 47 08 52 07 --- 23 20 42 65.7 324.7 1.6 126.8 11 R 1 15255 08 52 07 2146+570 23 20 42 64.8 329.4 1.6 131.7 -9 1 6 15255 08 52 07 08 52 27 --- 23 21 02 64.7 329.3 1.6 131.6 11 R 1 15122 08 52 27 WB114 23 21 02 65.7 324.7 1.6 126.7 -9 1 6 15122 08 52 27 08 52 47 --- 23 21 22 65.7 324.6 1.6 126.6 11 R 1 14989 08 52 47 2146+570 23 21 22 64.7 329.2 1.6 131.5 -9 1 6 14989 08 52 47 08 53 07 --- 23 21 42 64.7 329.2 1.6 131.3 11 R 1 14856 08 53 07 WB114 23 21 42 65.6 324.5 1.6 126.4 -9 1 6 14856 08 53 07 08 53 27 --- 23 22 02 65.6 324.5 1.6 126.3 11 R 1 14723 08 53 27 2146+570 23 22 02 64.6 329.1 1.6 131.2 -9 1 6 14723 08 53 27 08 53 46 --- 23 22 22 64.6 329.0 1.6 131.1 11 R 1 14590 08 53 46 WB114 23 22 22 65.6 324.4 1.7 126.2 -9 1 6 14590 08 53 46 08 54 06 --- 23 22 42 65.5 324.3 1.7 126.0 11 R 1 14457 08 54 06 2146+570 23 22 42 64.6 329.0 1.6 130.9 -9 1 6 14457 08 54 06 08 54 26 --- 23 23 02 64.5 328.9 1.6 130.8 11 R 1 14324 08 54 26 WB114 23 23 02 65.5 324.2 1.7 125.9 -9 1 6 14324 08 54 26 08 54 46 --- 23 23 22 65.4 324.2 1.7 125.8 11 R 1 14191 08 54 46 2146+570 23 23 22 64.5 328.8 1.6 130.7 -9 1 6 14191 08 54 46 08 55 06 --- 23 23 42 64.5 328.7 1.6 130.5 11 R 1 14058 Schedule for VLBA_OV (Code Ov ) Page 39 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 55 06 WB114 23 23 42 65.4 324.1 1.7 125.6 -9 1 6 14058 08 55 06 08 55 26 --- 23 24 02 65.4 324.0 1.7 125.5 11 R 1 13925 08 55 26 2146+570 23 24 02 64.4 328.7 1.6 130.4 -9 1 6 13925 08 55 26 08 55 46 --- 23 24 22 64.4 328.6 1.6 130.3 11 R 1 13792 08 55 46 WB114 23 24 22 65.3 324.0 1.7 125.4 -9 1 6 13792 08 55 46 08 56 06 --- 23 24 42 65.3 323.9 1.7 125.3 11 R 1 13659 08 56 06 2146+570 23 24 42 64.4 328.5 1.6 130.2 -9 1 6 13659 08 56 06 08 56 26 --- 23 25 02 64.3 328.5 1.6 130.0 11 R 1 13526 08 56 26 WB114 23 25 02 65.2 323.8 1.7 125.1 -9 1 6 13526 08 56 26 08 56 46 --- 23 25 22 65.2 323.8 1.7 125.0 11 R 1 13393 08 56 46 2146+570 23 25 22 64.3 328.4 1.6 129.9 -9 1 6 13393 08 56 46 08 57 06 --- 23 25 42 64.3 328.3 1.7 129.8 11 R 1 13260 08 57 06 WB114 23 25 42 65.2 323.7 1.7 124.9 -9 1 6 13260 08 57 06 08 57 26 --- 23 26 02 65.1 323.7 1.7 124.7 11 R 1 13127 08 57 26 2146+570 23 26 02 64.2 328.3 1.7 129.6 -9 1 6 13127 08 57 26 08 57 46 --- 23 26 22 64.2 328.2 1.7 129.5 11 R 1 12994 08 57 46 WB114 23 26 22 65.1 323.6 1.7 124.6 -9 1 6 12994 08 57 46 08 58 06 --- 23 26 42 65.0 323.5 1.7 124.5 11 R 1 12861 08 58 06 2146+570 23 26 42 64.2 328.1 1.7 129.4 -9 1 6 12861 08 58 06 08 58 26 --- 23 27 02 64.1 328.1 1.7 129.2 11 R 1 12728 08 58 26 WB114 23 27 02 65.0 323.5 1.7 124.4 -9 1 6 12728 08 58 26 08 58 46 --- 23 27 22 65.0 323.4 1.7 124.2 11 R 1 12595 08 58 46 2146+570 23 27 22 64.1 328.0 1.7 129.1 -9 1 6 12595 08 58 46 08 59 06 --- 23 27 42 64.1 327.9 1.7 129.0 11 R 1 12462 08 59 06 WB114 23 27 42 64.9 323.3 1.7 124.1 -9 1 6 12462 08 59 06 08 59 26 --- 23 28 02 64.9 323.3 1.7 124.0 11 R 1 12329 08 59 26 2146+570 23 28 02 64.0 327.9 1.7 128.9 -9 1 6 12329 08 59 26 08 59 46 --- 23 28 22 64.0 327.8 1.7 128.7 11 R 1 12196 Schedule for VLBA_OV (Code Ov ) Page 40 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 59 46 WB114 23 28 22 64.9 323.2 1.8 123.9 -9 1 6 12196 08 59 46 09 00 05 --- 23 28 42 64.8 323.1 1.8 123.7 11 R 1 12063 09 00 05 2146+570 23 28 42 63.9 327.8 1.7 128.6 -9 1 6 12063 09 00 05 09 00 25 --- 23 29 02 63.9 327.7 1.7 128.5 11 R 1 11930 09 00 25 WB114 23 29 02 64.8 323.1 1.8 123.6 -9 1 6 11930 09 00 25 09 00 45 --- 23 29 22 64.7 323.0 1.8 123.5 11 R 1 11797 09 00 45 2146+570 23 29 22 63.9 327.6 1.7 128.3 -9 1 6 11797 09 00 45 09 01 05 --- 23 29 42 63.8 327.6 1.7 128.2 11 R 1 11664 09 01 05 WB114 23 29 42 64.7 323.0 1.8 123.4 -9 1 6 11664 09 01 05 09 01 25 --- 23 30 02 64.7 322.9 1.8 123.2 11 R 1 11531 09 01 25 2146+570 23 30 02 63.8 327.5 1.7 128.1 -9 1 6 11531 09 01 25 09 01 45 --- 23 30 22 63.8 327.4 1.7 128.0 11 R 1 11399 09 01 45 WB114 23 30 22 64.6 322.8 1.8 123.1 -9 1 6 11399 09 01 45 09 02 05 --- 23 30 42 64.6 322.8 1.8 123.0 11 R 1 11266 09 02 05 2146+570 23 30 42 63.7 327.4 1.7 127.8 -9 1 6 11266 09 02 05 09 02 25 --- 23 31 02 63.7 327.3 1.7 127.7 11 R 1 11133 09 02 25 WB114 23 31 02 64.5 322.7 1.8 122.9 -9 1 6 11133 09 02 25 09 02 45 --- 23 31 22 64.5 322.7 1.8 122.8 11 R 1 11000 09 02 45 2146+570 23 31 22 63.7 327.2 1.7 127.6 -9 1 6 11000 09 02 45 09 03 05 --- 23 31 42 63.6 327.2 1.8 127.5 11 R 1 10867 09 03 05 WB114 23 31 42 64.5 322.6 1.8 122.6 -9 1 6 10867 09 03 05 09 03 25 --- 23 32 02 64.4 322.5 1.8 122.5 11 R 1 10734 09 03 25 2146+570 23 32 02 63.6 327.1 1.8 127.3 -9 1 6 10734 09 03 25 09 03 45 --- 23 32 22 63.6 327.1 1.8 127.2 11 R 1 10601 09 03 45 WB114 23 32 22 64.4 322.5 1.8 122.4 -9 1 6 10601 09 03 45 09 04 05 --- 23 32 42 64.3 322.4 1.8 122.3 11 R 1 10468 09 04 05 2146+570 23 32 42 63.5 327.0 1.8 127.1 -9 1 6 10468 09 04 05 09 04 25 --- 23 33 02 63.5 326.9 1.8 127.0 11 R 1 10335 Schedule for VLBA_OV (Code Ov ) Page 41 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 09 04 25 WB114 23 33 02 64.3 322.4 1.8 122.1 -9 1 6 10335 09 04 25 09 04 45 --- 23 33 22 64.2 322.3 1.8 122.0 11 R 1 10202 09 04 45 2146+570 23 33 22 63.4 326.9 1.8 126.8 -9 1 6 10202 09 04 45 09 05 05 --- 23 33 42 63.4 326.8 1.8 126.7 11 R 1 10069 09 05 05 WB114 23 33 42 64.2 322.2 1.8 121.9 -9 1 6 10069 09 05 05 09 05 25 --- 23 34 02 64.2 322.2 1.8 121.8 11 R 1 9936 09 05 25 2146+570 23 34 02 63.4 326.8 1.8 126.6 -9 1 6 9936 09 05 25 09 05 45 --- 23 34 22 63.3 326.7 1.8 126.5 11 R 1 9803 09 05 45 WB114 23 34 22 64.1 322.1 1.9 121.7 -9 1 6 9803 09 05 45 09 06 04 --- 23 34 42 64.1 322.1 1.9 121.5 11 R 1 9670 09 06 04 2146+570 23 34 42 63.3 326.6 1.8 126.3 -9 1 6 9670 09 06 04 09 06 24 --- 23 35 02 63.3 326.6 1.8 126.2 11 R 1 9537 09 06 24 WB114 23 35 02 64.0 322.0 1.9 121.4 -9 1 6 9537 09 06 24 09 06 44 --- 23 35 22 64.0 322.0 1.9 121.3 11 R 1 9404 09 08 44 3C454.3 23 37 22 66.9 207.3 0.7 22.4 37 1 6 9404 09 08 44 09 14 43 --- 23 43 22 66.3 210.6 0.8 25.0 359 R 1 7011 09 16 43 2123+550 23 45 22 60.1 318.0 2.4 111.7 42 1 6 7011 09 16 43 09 17 03 --- 23 45 42 60.1 318.0 2.4 111.6 20 R 1 6878 09 17 03 WB114 23 45 42 62.7 320.3 2.0 117.7 -11 1 6 6878 09 17 03 09 17 23 --- 23 46 02 62.7 320.3 2.0 117.6 9 R 1 6745 09 17 23 2123+550 23 46 02 60.0 317.9 2.4 111.5 -11 1 6 6745 09 17 23 09 17 43 --- 23 46 22 60.0 317.9 2.4 111.4 9 R 1 6612 09 17 43 WB114 23 46 22 62.6 320.2 2.1 117.5 -11 1 6 6612 09 17 43 09 18 03 --- 23 46 42 62.6 320.2 2.1 117.4 9 R 1 6479 09 18 03 2123+550 23 46 42 60.0 317.9 2.4 111.3 -11 1 6 6479 09 18 03 09 18 22 --- 23 47 02 59.9 317.8 2.4 111.2 9 R 1 6346 09 18 22 WB114 23 47 02 62.5 320.1 2