COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: BH099 VLBA format 1cm line 2002 Exp. Code: BH099B Schedule Version: 1.00 Processed by SCHED version: Release of 02 July 2002 PI: K. Hachisuka Address: Departament d Astronomia i Astrofisica Universitat de Valencia E-46100 Burjassot - Valencia Spain Phone: +34-96-3981200 EMAIL: kazuya.hachisuka@uv.es Fax: +34-96-3983084 Phone during observation: +34-69-3981200 Observing mode: v1cm-128-4-2 Notes: Two phase-tracking centers for WB114 other position is RA=21:43:01.4593 DEC=54:56:17.936 (J2000) Schedule for VLBA_KP (Code Kp ) Page 2 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- Next scan frequencies: 22235.69 22227.53 22219.37 22243.85 Next BBC frequencies: 735.69 727.53 719.37 743.85 Next scan bandwidths: 8.00 8.00 8.00 8.00 04 51 26 3C454.3 19 46 02 44.7 98.9 -3.1 -60.8 0 1 1 0 04 51 26 04 57 25 --- 19 52 02 45.9 99.9 -3.0 -60.5 359 F 1 2393 04 59 25 2137+510 19 54 02 63.1 37.2 -1.7 -125.3 72 1 1 2393 04 59 25 04 59 45 --- 19 54 22 63.2 37.1 -1.7 -125.4 20 F 1 2526 04 59 45 WB105 19 54 22 62.6 37.1 -1.8 -124.9 -7 1 1 2526 04 59 45 05 00 05 --- 19 54 42 62.7 37.0 -1.8 -125.1 13 F 1 2659 05 00 05 2137+510 19 54 42 63.2 37.1 -1.7 -125.6 -7 1 1 2659 05 00 05 05 00 25 --- 19 55 02 63.2 37.0 -1.7 -125.7 13 F 1 2792 05 00 25 WB105 19 55 02 62.7 37.0 -1.7 -125.2 -7 1 1 2792 05 00 25 05 00 45 --- 19 55 22 62.8 36.9 -1.7 -125.3 13 F 1 2925 05 00 45 2137+510 19 55 22 63.3 36.9 -1.7 -125.8 -7 1 1 2925 05 00 45 05 01 05 --- 19 55 42 63.3 36.9 -1.7 -125.9 13 F 1 3058 05 01 05 WB105 19 55 42 62.8 36.8 -1.7 -125.4 -7 1 1 3058 05 01 05 05 01 25 --- 19 56 02 62.9 36.8 -1.7 -125.6 13 F 1 3191 05 01 25 2137+510 19 56 02 63.4 36.8 -1.7 -126.1 -7 1 1 3191 05 01 25 05 01 45 --- 19 56 22 63.4 36.7 -1.7 -126.2 13 F 1 3324 05 01 45 WB105 19 56 22 62.9 36.7 -1.7 -125.7 -7 1 1 3324 05 01 45 05 02 05 --- 19 56 42 62.9 36.6 -1.7 -125.8 13 F 1 3457 05 02 05 2137+510 19 56 42 63.5 36.7 -1.7 -126.3 -7 1 1 3457 05 02 05 05 02 25 --- 19 57 02 63.5 36.6 -1.7 -126.4 13 F 1 3590 05 02 25 WB105 19 57 02 63.0 36.6 -1.7 -125.9 -7 1 1 3590 05 02 25 05 02 44 --- 19 57 22 63.0 36.5 -1.7 -126.1 13 F 1 3723 05 02 44 2137+510 19 57 22 63.5 36.5 -1.7 -126.6 -7 1 1 3723 05 02 44 05 03 04 --- 19 57 42 63.6 36.5 -1.7 -126.7 13 F 1 3856 05 03 04 WB105 19 57 42 63.1 36.4 -1.7 -126.2 -7 1 1 3856 05 03 04 05 03 24 --- 19 58 02 63.1 36.4 -1.7 -126.3 13 F 1 3989 Schedule for VLBA_KP (Code Kp ) Page 3 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 03 24 2137+510 19 58 02 63.6 36.4 -1.7 -126.8 -7 1 1 3989 05 03 24 05 03 44 --- 19 58 22 63.7 36.3 -1.6 -127.0 13 F 1 4122 05 03 44 WB105 19 58 22 63.1 36.3 -1.7 -126.4 -7 1 1 4122 05 03 44 05 04 04 --- 19 58 42 63.2 36.2 -1.7 -126.6 13 F 1 4255 05 04 04 2137+510 19 58 42 63.7 36.2 -1.6 -127.1 -7 1 1 4255 05 04 04 05 04 24 --- 19 59 02 63.8 36.2 -1.6 -127.2 13 F 1 4388 05 04 24 WB105 19 59 02 63.2 36.2 -1.7 -126.7 -7 1 1 4388 05 04 24 05 04 44 --- 19 59 22 63.3 36.1 -1.7 -126.8 13 F 1 4521 05 04 44 2137+510 19 59 22 63.8 36.1 -1.6 -127.3 -7 1 1 4521 05 04 44 05 05 04 --- 19 59 42 63.8 36.0 -1.6 -127.5 13 F 1 4654 05 05 04 WB105 19 59 42 63.3 36.0 -1.7 -126.9 -7 1 1 4654 05 05 04 05 05 24 --- 20 00 02 63.4 36.0 -1.7 -127.1 13 F 1 4787 05 05 24 2137+510 20 00 02 63.9 36.0 -1.6 -127.6 -7 1 1 4787 05 05 24 05 05 44 --- 20 00 22 63.9 35.9 -1.6 -127.7 13 F 1 4920 05 05 44 WB105 20 00 22 63.4 35.9 -1.7 -127.2 -7 1 1 4920 05 05 44 05 06 04 --- 20 00 42 63.4 35.8 -1.7 -127.3 13 F 1 5053 05 06 04 2137+510 20 00 42 64.0 35.8 -1.6 -127.9 -7 1 1 5053 05 06 04 05 06 24 --- 20 01 02 64.0 35.7 -1.6 -128.0 13 F 1 5186 05 06 24 WB105 20 01 02 63.5 35.8 -1.6 -127.5 -7 1 1 5186 05 06 24 05 06 44 --- 20 01 22 63.5 35.7 -1.6 -127.6 13 F 1 5319 05 06 44 2137+510 20 01 22 64.0 35.7 -1.6 -128.1 -7 1 1 5319 05 06 44 05 07 04 --- 20 01 42 64.1 35.6 -1.6 -128.3 13 F 1 5452 05 07 04 WB105 20 01 42 63.6 35.6 -1.6 -127.7 -7 1 1 5452 05 07 04 05 07 24 --- 20 02 02 63.6 35.5 -1.6 -127.8 13 F 1 5585 05 07 24 2137+510 20 02 02 64.1 35.5 -1.6 -128.4 -7 1 1 5585 05 07 24 05 07 44 --- 20 02 22 64.2 35.4 -1.6 -128.5 13 F 1 5718 05 07 44 WB105 20 02 22 63.6 35.5 -1.6 -128.0 -7 1 1 5718 05 07 44 05 08 04 --- 20 02 42 63.7 35.4 -1.6 -128.1 13 F 1 5851 Schedule for VLBA_KP (Code Kp ) Page 4 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 08 04 2137+510 20 02 42 64.2 35.4 -1.6 -128.6 -7 1 1 5851 05 08 04 05 08 24 --- 20 03 02 64.3 35.3 -1.6 -128.8 13 F 1 5984 05 08 24 WB105 20 03 02 63.7 35.3 -1.6 -128.2 -7 1 1 5984 05 08 24 05 08 43 --- 20 03 22 63.8 35.2 -1.6 -128.4 13 F 1 6117 05 08 43 2137+510 20 03 22 64.3 35.2 -1.6 -128.9 -7 1 1 6117 05 08 43 05 09 03 --- 20 03 42 64.3 35.1 -1.6 -129.0 13 F 1 6250 05 09 03 WB105 20 03 42 63.8 35.2 -1.6 -128.5 -7 1 1 6250 05 09 03 05 09 23 --- 20 04 02 63.9 35.1 -1.6 -128.6 13 F 1 6383 05 09 23 2137+510 20 04 02 64.4 35.1 -1.6 -129.2 -7 1 1 6383 05 09 23 05 09 43 --- 20 04 22 64.4 35.0 -1.5 -129.3 13 F 1 6515 05 09 43 WB105 20 04 22 63.9 35.0 -1.6 -128.8 -7 1 1 6515 05 09 43 05 10 03 --- 20 04 42 63.9 35.0 -1.6 -128.9 13 F 1 6648 05 10 03 2137+510 20 04 42 64.5 34.9 -1.5 -129.4 -7 1 1 6648 05 10 03 05 10 23 --- 20 05 02 64.5 34.8 -1.5 -129.6 13 F 1 6781 05 10 23 WB105 20 05 02 64.0 34.9 -1.6 -129.0 -7 1 1 6781 05 10 23 05 10 43 --- 20 05 22 64.0 34.8 -1.6 -129.2 13 F 1 6914 05 10 43 2137+510 20 05 22 64.5 34.8 -1.5 -129.7 -7 1 1 6914 05 10 43 05 11 03 --- 20 05 42 64.6 34.7 -1.5 -129.9 13 F 1 7047 05 11 03 WB105 20 05 42 64.1 34.7 -1.6 -129.3 -7 1 1 7047 05 11 03 05 11 23 --- 20 06 02 64.1 34.7 -1.6 -129.4 13 F 1 7180 05 11 23 2137+510 20 06 02 64.6 34.6 -1.5 -130.0 -7 1 1 7180 05 11 23 05 11 43 --- 20 06 22 64.7 34.5 -1.5 -130.1 13 F 1 7313 05 11 43 WB105 20 06 22 64.1 34.6 -1.6 -129.6 -7 1 1 7313 05 11 43 05 12 03 --- 20 06 42 64.2 34.5 -1.6 -129.7 13 F 1 7446 05 12 03 2137+510 20 06 42 64.7 34.4 -1.5 -130.3 -7 1 1 7446 05 12 03 05 12 23 --- 20 07 02 64.7 34.4 -1.5 -130.4 13 F 1 7579 05 12 23 WB105 20 07 02 64.2 34.4 -1.5 -129.8 -7 1 1 7579 05 12 23 05 12 43 --- 20 07 22 64.3 34.3 -1.5 -130.0 13 F 1 7712 Schedule for VLBA_KP (Code Kp ) Page 5 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 12 43 2137+510 20 07 22 64.8 34.3 -1.5 -130.5 -7 1 1 7712 05 12 43 05 13 03 --- 20 07 42 64.8 34.2 -1.5 -130.7 13 F 1 7845 05 13 03 WB105 20 07 42 64.3 34.3 -1.5 -130.1 -7 1 1 7845 05 13 03 05 13 23 --- 20 08 02 64.3 34.2 -1.5 -130.2 13 F 1 7978 05 13 23 2137+510 20 08 02 64.9 34.1 -1.5 -130.8 -7 1 1 7978 05 13 23 05 13 43 --- 20 08 22 64.9 34.0 -1.5 -130.9 13 F 1 8111 05 13 43 WB105 20 08 22 64.4 34.1 -1.5 -130.4 -7 1 1 8111 05 13 43 05 14 03 --- 20 08 42 64.4 34.0 -1.5 -130.5 13 F 1 8244 05 14 03 2137+510 20 08 42 64.9 34.0 -1.5 -131.1 -7 1 1 8244 05 14 03 05 14 23 --- 20 09 02 65.0 33.9 -1.5 -131.2 13 F 1 8377 05 14 23 WB105 20 09 02 64.5 34.0 -1.5 -130.6 -7 1 1 8377 05 14 23 05 14 42 --- 20 09 22 64.5 33.9 -1.5 -130.8 13 F 1 8510 05 14 42 2137+510 20 09 22 65.0 33.8 -1.5 -131.4 -7 1 1 8510 05 14 42 05 15 02 --- 20 09 42 65.1 33.7 -1.5 -131.5 13 F 1 8643 05 15 02 WB105 20 09 42 64.5 33.8 -1.5 -130.9 -7 1 1 8643 05 15 02 05 15 22 --- 20 10 02 64.6 33.7 -1.5 -131.0 13 F 1 8776 05 15 22 2137+510 20 10 02 65.1 33.6 -1.5 -131.6 -7 1 1 8776 05 15 22 05 15 42 --- 20 10 22 65.1 33.5 -1.4 -131.8 13 F 1 8909 05 15 42 WB105 20 10 22 64.6 33.6 -1.5 -131.2 -7 1 1 8909 05 15 42 05 16 02 --- 20 10 42 64.6 33.6 -1.5 -131.3 13 F 1 9042 05 16 02 2137+510 20 10 42 65.2 33.5 -1.4 -131.9 -7 1 1 9042 05 16 02 05 16 22 --- 20 11 02 65.2 33.4 -1.4 -132.1 13 F 1 9175 05 16 22 WB105 20 11 02 64.7 33.5 -1.5 -131.5 -7 1 1 9175 05 16 22 05 16 42 --- 20 11 22 64.7 33.4 -1.5 -131.6 13 F 1 9308 05 16 42 2137+510 20 11 22 65.2 33.3 -1.4 -132.2 -7 1 1 9308 05 16 42 05 17 02 --- 20 11 42 65.3 33.2 -1.4 -132.3 13 F 1 9441 05 17 02 WB105 20 11 42 64.8 33.3 -1.5 -131.7 -7 1 1 9441 05 17 02 05 17 22 --- 20 12 02 64.8 33.2 -1.5 -131.9 13 F 1 9574 Schedule for VLBA_KP (Code Kp ) Page 6 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 17 22 2137+510 20 12 02 65.3 33.1 -1.4 -132.5 -7 1 1 9574 05 17 22 05 17 42 --- 20 12 22 65.4 33.0 -1.4 -132.6 13 F 1 9707 05 17 42 WB105 20 12 22 64.8 33.2 -1.5 -132.0 -7 1 1 9707 05 17 42 05 18 02 --- 20 12 42 64.9 33.1 -1.5 -132.1 13 F 1 9840 05 18 02 2137+510 20 12 42 65.4 33.0 -1.4 -132.8 -7 1 1 9840 05 18 02 05 18 22 --- 20 13 02 65.4 32.9 -1.4 -132.9 13 F 1 9973 05 18 22 WB105 20 13 02 64.9 33.0 -1.4 -132.3 -7 1 1 9973 05 18 22 05 18 42 --- 20 13 22 65.0 32.9 -1.4 -132.4 13 F 1 10106 05 18 42 2137+510 20 13 22 65.5 32.8 -1.4 -133.1 -7 1 1 10106 05 18 42 05 19 02 --- 20 13 42 65.5 32.7 -1.4 -133.2 13 F 1 10239 05 19 02 WB105 20 13 42 65.0 32.8 -1.4 -132.6 -7 1 1 10239 05 19 02 05 19 22 --- 20 14 02 65.0 32.7 -1.4 -132.7 13 F 1 10372 05 19 22 2137+510 20 14 02 65.6 32.6 -1.4 -133.3 -7 1 1 10372 05 19 22 05 19 42 --- 20 14 22 65.6 32.5 -1.4 -133.5 13 F 1 10505 05 19 42 WB105 20 14 22 65.1 32.7 -1.4 -132.9 -7 1 1 10505 05 19 42 05 20 02 --- 20 14 42 65.1 32.6 -1.4 -133.0 13 F 1 10638 05 20 02 2137+510 20 14 42 65.6 32.4 -1.4 -133.6 -7 1 1 10638 05 20 02 05 20 22 --- 20 15 02 65.7 32.4 -1.4 -133.8 13 F 1 10771 05 20 22 WB105 20 15 02 65.1 32.5 -1.4 -133.1 -7 1 1 10771 05 20 22 05 20 42 --- 20 15 22 65.2 32.4 -1.4 -133.3 13 F 1 10903 05 20 42 2137+510 20 15 22 65.7 32.3 -1.4 -133.9 -7 1 1 10903 05 20 42 05 21 01 --- 20 15 42 65.7 32.2 -1.4 -134.1 13 F 1 11036 05 21 01 WB105 20 15 42 65.2 32.3 -1.4 -133.4 -7 1 1 11036 05 21 01 05 21 21 --- 20 16 02 65.3 32.2 -1.4 -133.6 13 F 1 11169 05 21 21 2137+510 20 16 02 65.8 32.1 -1.4 -134.2 -7 1 1 11169 05 21 21 05 21 41 --- 20 16 22 65.8 32.0 -1.3 -134.4 13 F 1 11302 05 21 41 WB105 20 16 22 65.3 32.1 -1.4 -133.7 -7 1 1 11302 05 21 41 05 22 01 --- 20 16 42 65.3 32.1 -1.4 -133.8 13 F 1 11435 Schedule for VLBA_KP (Code Kp ) Page 7 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 22 01 2137+510 20 16 42 65.9 31.9 -1.3 -134.5 -7 1 1 11435 05 22 01 05 22 21 --- 20 17 02 65.9 31.8 -1.3 -134.7 13 F 1 11568 05 22 21 WB105 20 17 02 65.4 32.0 -1.4 -134.0 -7 1 1 11568 05 22 21 05 22 41 --- 20 17 22 65.4 31.9 -1.4 -134.1 13 F 1 11701 05 22 41 2137+510 20 17 22 65.9 31.7 -1.3 -134.8 -7 1 1 11701 05 22 41 05 23 01 --- 20 17 42 66.0 31.6 -1.3 -134.9 13 F 1 11834 05 23 01 WB105 20 17 42 65.5 31.8 -1.4 -134.3 -7 1 1 11834 05 23 01 05 23 21 --- 20 18 02 65.5 31.7 -1.4 -134.4 13 F 1 11967 05 23 21 2137+510 20 18 02 66.0 31.5 -1.3 -135.1 -7 1 1 11967 05 23 21 05 23 41 --- 20 18 22 66.0 31.5 -1.3 -135.2 13 F 1 12100 05 23 41 WB105 20 18 22 65.5 31.6 -1.4 -134.6 -7 1 1 12100 05 23 41 05 24 01 --- 20 18 42 65.6 31.5 -1.4 -134.7 13 F 1 12233 05 24 01 2137+510 20 18 42 66.1 31.4 -1.3 -135.4 -7 1 1 12233 05 24 01 05 24 21 --- 20 19 02 66.1 31.3 -1.3 -135.5 13 F 1 12366 05 24 21 WB105 20 19 02 65.6 31.4 -1.3 -134.9 -7 1 1 12366 05 24 21 05 24 41 --- 20 19 22 65.6 31.4 -1.3 -135.0 13 F 1 12499 05 24 41 2137+510 20 19 22 66.2 31.2 -1.3 -135.7 -7 1 1 12499 05 24 41 05 25 01 --- 20 19 42 66.2 31.1 -1.3 -135.8 13 F 1 12632 05 25 01 WB105 20 19 42 65.7 31.3 -1.3 -135.2 -7 1 1 12632 05 25 01 05 25 21 --- 20 20 02 65.7 31.2 -1.3 -135.3 13 F 1 12765 05 25 21 2137+510 20 20 02 66.2 31.0 -1.3 -136.0 -7 1 1 12765 05 25 21 05 25 41 --- 20 20 22 66.3 30.9 -1.3 -136.1 13 F 1 12898 05 25 41 WB105 20 20 22 65.7 31.1 -1.3 -135.4 -7 1 1 12898 05 25 41 05 26 01 --- 20 20 42 65.8 31.0 -1.3 -135.6 13 F 1 13031 05 26 01 2137+510 20 20 42 66.3 30.8 -1.3 -136.3 -7 1 1 13031 05 26 01 05 26 21 --- 20 21 02 66.3 30.7 -1.3 -136.4 13 F 1 13164 05 26 21 WB105 20 21 02 65.8 30.9 -1.3 -135.7 -7 1 1 13164 05 26 21 05 26 41 --- 20 21 22 65.9 30.8 -1.3 -135.9 13 F 1 13297 Schedule for VLBA_KP (Code Kp ) Page 8 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 26 41 2137+510 20 21 22 66.4 30.6 -1.3 -136.6 -7 1 1 13297 05 26 41 05 27 00 --- 20 21 42 66.4 30.5 -1.3 -136.7 13 F 1 13430 05 27 00 WB105 20 21 42 65.9 30.7 -1.3 -136.0 -7 1 1 13430 05 27 00 05 27 20 --- 20 22 02 65.9 30.6 -1.3 -136.2 13 F 1 13563 05 29 20 3C454.3 20 24 02 52.5 105.9 -2.5 -58.1 63 1 1 13563 05 29 20 05 35 19 --- 20 30 02 53.8 107.2 -2.4 -57.5 359 F 1 15956 Next scan frequencies: 22237.77 22229.61 22221.45 22245.93 Next BBC frequencies: 737.77 729.61 721.45 745.93 05 35 19 3C454.3 20 30 02 53.8 107.2 -2.4 -57.5 -6 1 2 15956 05 35 19 05 41 18 --- 20 36 02 55.0 108.6 -2.3 -56.9 353 R 1 16850 05 43 18 2123+550 20 38 02 65.6 15.8 -0.8 -156.3 52 1 2 16850 05 43 18 05 43 38 --- 20 38 22 65.6 15.7 -0.7 -156.5 20 R 1 16717 05 43 38 WB114 20 38 22 64.3 21.7 -1.1 -146.9 -10 1 2 16717 05 43 38 05 43 58 --- 20 38 42 64.3 21.6 -1.1 -147.1 10 R 1 16584 05 43 58 2123+550 20 38 42 65.6 15.6 -0.7 -156.6 -10 1 2 16584 05 43 58 05 44 18 --- 20 39 02 65.7 15.4 -0.7 -156.8 10 R 1 16451 05 44 18 WB114 20 39 02 64.4 21.5 -1.1 -147.2 -10 1 2 16451 05 44 18 05 44 38 --- 20 39 22 64.4 21.4 -1.1 -147.4 10 R 1 16318 05 44 38 2123+550 20 39 22 65.7 15.3 -0.7 -157.0 -10 1 2 16318 05 44 38 05 44 58 --- 20 39 42 65.7 15.2 -0.7 -157.1 10 R 1 16185 05 44 58 WB114 20 39 42 64.4 21.3 -1.1 -147.5 -10 1 2 16185 05 44 58 05 45 17 --- 20 40 02 64.4 21.2 -1.1 -147.7 10 R 1 16052 05 45 17 2123+550 20 40 02 65.7 15.1 -0.7 -157.3 -10 1 2 16052 05 45 17 05 45 37 --- 20 40 22 65.7 15.0 -0.7 -157.4 10 R 1 15919 05 45 37 WB114 20 40 22 64.5 21.1 -1.0 -147.8 -10 1 2 15919 05 45 37 05 45 57 --- 20 40 42 64.5 21.0 -1.0 -148.0 10 R 1 15786 05 45 57 2123+550 20 40 42 65.7 14.9 -0.7 -157.6 -10 1 2 15786 05 45 57 05 46 17 --- 20 41 02 65.8 14.8 -0.7 -157.8 10 R 1 15654 Schedule for VLBA_KP (Code Kp ) Page 9 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 46 17 WB114 20 41 02 64.5 20.9 -1.0 -148.1 -10 1 2 15654 05 46 17 05 46 37 --- 20 41 22 64.5 20.8 -1.0 -148.3 10 R 1 15521 05 46 37 2123+550 20 41 22 65.8 14.7 -0.7 -157.9 -10 1 2 15521 05 46 37 05 46 57 --- 20 41 42 65.8 14.6 -0.7 -158.1 10 R 1 15388 05 46 57 WB114 20 41 42 64.6 20.8 -1.0 -148.4 -10 1 2 15388 05 46 57 05 47 17 --- 20 42 02 64.6 20.7 -1.0 -148.6 10 R 1 15255 05 47 17 2123+550 20 42 02 65.8 14.5 -0.7 -158.3 -10 1 2 15255 05 47 17 05 47 37 --- 20 42 22 65.8 14.4 -0.7 -158.4 10 R 1 15122 05 47 37 WB114 20 42 22 64.6 20.6 -1.0 -148.7 -10 1 2 15122 05 47 37 05 47 57 --- 20 42 42 64.6 20.5 -1.0 -148.9 10 R 1 14989 05 47 57 2123+550 20 42 42 65.9 14.3 -0.7 -158.6 -10 1 2 14989 05 47 57 05 48 17 --- 20 43 02 65.9 14.2 -0.7 -158.8 10 R 1 14856 05 48 17 WB114 20 43 02 64.7 20.4 -1.0 -149.1 -10 1 2 14856 05 48 17 05 48 37 --- 20 43 22 64.7 20.3 -1.0 -149.2 10 R 1 14723 05 48 37 2123+550 20 43 22 65.9 14.0 -0.7 -159.0 -10 1 2 14723 05 48 37 05 48 57 --- 20 43 42 65.9 13.9 -0.7 -159.1 10 R 1 14590 05 48 57 WB114 20 43 42 64.7 20.2 -1.0 -149.4 -10 1 2 14590 05 48 57 05 49 17 --- 20 44 02 64.7 20.1 -1.0 -149.5 10 R 1 14457 05 49 17 2123+550 20 44 02 65.9 13.8 -0.7 -159.3 -10 1 2 14457 05 49 17 05 49 37 --- 20 44 22 65.9 13.7 -0.6 -159.5 10 R 1 14324 05 49 37 WB114 20 44 22 64.8 20.0 -1.0 -149.7 -10 1 2 14324 05 49 37 05 49 57 --- 20 44 42 64.8 19.9 -1.0 -149.8 10 R 1 14191 05 49 57 2123+550 20 44 42 66.0 13.6 -0.6 -159.6 -10 1 2 14191 05 49 57 05 50 17 --- 20 45 02 66.0 13.5 -0.6 -159.8 10 R 1 14058 05 50 17 WB114 20 45 02 64.8 19.8 -1.0 -150.0 -10 1 2 14058 05 50 17 05 50 37 --- 20 45 22 64.8 19.7 -1.0 -150.1 10 R 1 13925 05 50 37 2123+550 20 45 22 66.0 13.4 -0.6 -160.0 -10 1 2 13925 05 50 37 05 50 57 --- 20 45 42 66.0 13.3 -0.6 -160.1 10 R 1 13792 Schedule for VLBA_KP (Code Kp ) Page 10 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 50 57 WB114 20 45 42 64.9 19.6 -1.0 -150.3 -10 1 2 13792 05 50 57 05 51 16 --- 20 46 02 64.9 19.5 -1.0 -150.5 10 R 1 13659 05 51 16 2123+550 20 46 02 66.0 13.2 -0.6 -160.3 -10 1 2 13659 05 51 16 05 51 36 --- 20 46 22 66.0 13.1 -0.6 -160.5 10 R 1 13526 05 51 36 WB114 20 46 22 64.9 19.4 -0.9 -150.6 -10 1 2 13526 05 51 36 05 51 56 --- 20 46 42 64.9 19.3 -0.9 -150.8 10 R 1 13393 05 51 56 2123+550 20 46 42 66.1 12.9 -0.6 -160.6 -10 1 2 13393 05 51 56 05 52 16 --- 20 47 02 66.1 12.8 -0.6 -160.8 10 R 1 13260 05 52 16 WB114 20 47 02 65.0 19.2 -0.9 -150.9 -10 1 2 13260 05 52 16 05 52 36 --- 20 47 22 65.0 19.1 -0.9 -151.1 10 R 1 13127 05 52 36 2123+550 20 47 22 66.1 12.7 -0.6 -161.0 -10 1 2 13127 05 52 36 05 52 56 --- 20 47 42 66.1 12.6 -0.6 -161.2 10 R 1 12994 05 52 56 WB114 20 47 42 65.0 19.0 -0.9 -151.2 -10 1 2 12994 05 52 56 05 53 16 --- 20 48 02 65.0 18.9 -0.9 -151.4 10 R 1 12861 05 53 16 2123+550 20 48 02 66.1 12.5 -0.6 -161.3 -10 1 2 12861 05 53 16 05 53 36 --- 20 48 22 66.1 12.4 -0.6 -161.5 10 R 1 12728 05 53 36 WB114 20 48 22 65.1 18.8 -0.9 -151.6 -10 1 2 12728 05 53 36 05 53 56 --- 20 48 42 65.1 18.7 -0.9 -151.7 10 R 1 12595 05 53 56 2123+550 20 48 42 66.1 12.3 -0.6 -161.7 -10 1 2 12595 05 53 56 05 54 16 --- 20 49 02 66.2 12.2 -0.6 -161.8 10 R 1 12462 05 54 16 WB114 20 49 02 65.1 18.6 -0.9 -151.9 -10 1 2 12462 05 54 16 05 54 36 --- 20 49 22 65.1 18.5 -0.9 -152.0 10 R 1 12329 05 54 36 2123+550 20 49 22 66.2 12.0 -0.6 -162.0 -10 1 2 12329 05 54 36 05 54 56 --- 20 49 42 66.2 11.9 -0.6 -162.2 10 R 1 12196 05 54 56 WB114 20 49 42 65.1 18.4 -0.9 -152.2 -10 1 2 12196 05 54 56 05 55 16 --- 20 50 02 65.2 18.3 -0.9 -152.4 10 R 1 12063 05 55 16 2123+550 20 50 02 66.2 11.8 -0.6 -162.3 -10 1 2 12063 05 55 16 05 55 36 --- 20 50 22 66.2 11.7 -0.5 -162.5 10 R 1 11930 Schedule for VLBA_KP (Code Kp ) Page 11 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 05 55 36 WB114 20 50 22 65.2 18.2 -0.9 -152.5 -10 1 2 11930 05 55 36 05 55 56 --- 20 50 42 65.2 18.1 -0.9 -152.7 10 R 1 11797 05 55 56 2123+550 20 50 42 66.2 11.6 -0.5 -162.7 -10 1 2 11797 05 55 56 05 56 16 --- 20 51 02 66.2 11.5 -0.5 -162.9 10 R 1 11664 05 56 16 WB114 20 51 02 65.2 18.0 -0.9 -152.8 -10 1 2 11664 05 56 16 05 56 36 --- 20 51 22 65.3 17.9 -0.9 -153.0 10 R 1 11531 05 56 36 2123+550 20 51 22 66.3 11.4 -0.5 -163.0 -10 1 2 11531 05 56 36 05 56 56 --- 20 51 42 66.3 11.3 -0.5 -163.2 10 R 1 11399 05 56 56 WB114 20 51 42 65.3 17.8 -0.9 -153.2 -10 1 2 11399 05 56 56 05 57 15 --- 20 52 02 65.3 17.7 -0.9 -153.3 10 R 1 11266 05 57 15 2123+550 20 52 02 66.3 11.1 -0.5 -163.4 -10 1 2 11266 05 57 15 05 57 35 --- 20 52 22 66.3 11.0 -0.5 -163.6 10 R 1 11133 05 57 35 WB114 20 52 22 65.3 17.6 -0.8 -153.5 -10 1 2 11133 05 57 35 05 57 55 --- 20 52 42 65.3 17.5 -0.8 -153.6 10 R 1 11000 05 57 55 2123+550 20 52 42 66.3 10.9 -0.5 -163.7 -10 1 2 11000 05 57 55 05 58 15 --- 20 53 02 66.3 10.8 -0.5 -163.9 10 R 1 10867 05 58 15 WB114 20 53 02 65.4 17.4 -0.8 -153.8 -10 1 2 10867 05 58 15 05 58 35 --- 20 53 22 65.4 17.3 -0.8 -154.0 10 R 1 10734 05 58 35 2123+550 20 53 22 66.3 10.7 -0.5 -164.1 -10 1 2 10734 05 58 35 05 58 55 --- 20 53 42 66.4 10.6 -0.5 -164.2 10 R 1 10601 05 58 55 WB114 20 53 42 65.4 17.2 -0.8 -154.1 -10 1 2 10601 05 58 55 05 59 15 --- 20 54 02 65.4 17.1 -0.8 -154.3 10 R 1 10468 05 59 15 2123+550 20 54 02 66.4 10.5 -0.5 -164.4 -10 1 2 10468 05 59 15 05 59 35 --- 20 54 22 66.4 10.3 -0.5 -164.6 10 R 1 10335 05 59 35 WB114 20 54 22 65.4 17.0 -0.8 -154.5 -10 1 2 10335 05 59 35 05 59 55 --- 20 54 42 65.5 16.9 -0.8 -154.6 10 R 1 10202 05 59 55 2123+550 20 54 42 66.4 10.2 -0.5 -164.8 -10 1 2 10202 05 59 55 06 00 15 --- 20 55 02 66.4 10.1 -0.5 -164.9 10 R 1 10069 Schedule for VLBA_KP (Code Kp ) Page 12 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 00 15 WB114 20 55 02 65.5 16.8 -0.8 -154.8 -10 1 2 10069 06 00 15 06 00 35 --- 20 55 22 65.5 16.7 -0.8 -154.9 10 R 1 9936 06 00 35 2123+550 20 55 22 66.4 10.0 -0.5 -165.1 -10 1 2 9936 06 00 35 06 00 55 --- 20 55 42 66.4 9.9 -0.5 -165.3 10 R 1 9803 06 00 55 WB114 20 55 42 65.5 16.6 -0.8 -155.1 -10 1 2 9803 06 00 55 06 01 15 --- 20 56 02 65.5 16.4 -0.8 -155.3 9 R 1 9670 06 01 15 2123+550 20 56 02 66.4 9.8 -0.5 -165.5 -10 1 2 9670 06 01 15 06 01 35 --- 20 56 22 66.5 9.7 -0.4 -165.6 9 R 1 9537 06 01 35 WB114 20 56 22 65.6 16.3 -0.8 -155.4 -10 1 2 9537 06 01 35 06 01 55 --- 20 56 42 65.6 16.2 -0.8 -155.6 9 R 1 9404 06 01 55 2123+550 20 56 42 66.5 9.5 -0.4 -165.8 -10 1 2 9404 06 01 55 06 02 15 --- 20 57 02 66.5 9.4 -0.4 -166.0 9 R 1 9271 06 02 15 WB114 20 57 02 65.6 16.1 -0.8 -155.8 -10 1 2 9271 06 02 15 06 02 35 --- 20 57 22 65.6 16.0 -0.8 -155.9 9 R 1 9138 06 02 35 2123+550 20 57 22 66.5 9.3 -0.4 -166.2 -10 1 2 9138 06 02 35 06 02 55 --- 20 57 42 66.5 9.2 -0.4 -166.3 9 R 1 9005 06 02 55 WB114 20 57 42 65.6 15.9 -0.8 -156.1 -10 1 2 9005 06 02 55 06 03 15 --- 20 58 02 65.7 15.8 -0.8 -156.3 9 R 1 8872 06 03 15 2123+550 20 58 02 66.5 9.1 -0.4 -166.5 -10 1 2 8872 06 03 15 06 03 34 --- 20 58 22 66.5 9.0 -0.4 -166.7 9 R 1 8739 06 03 34 WB114 20 58 22 65.7 15.7 -0.7 -156.4 -11 1 2 8739 06 03 34 06 03 54 --- 20 58 42 65.7 15.6 -0.7 -156.6 9 R 1 8606 06 03 54 2123+550 20 58 42 66.5 8.8 -0.4 -166.9 -11 1 2 8606 06 03 54 06 04 14 --- 20 59 02 66.5 8.7 -0.4 -167.0 9 R 1 8473 06 04 14 WB114 20 59 02 65.7 15.5 -0.7 -156.8 -11 1 2 8473 06 04 14 06 04 34 --- 20 59 22 65.7 15.4 -0.7 -156.9 9 R 1 8340 06 04 34 2123+550 20 59 22 66.6 8.6 -0.4 -167.2 -11 1 2 8340 06 04 34 06 04 54 --- 20 59 42 66.6 8.5 -0.4 -167.4 9 R 1 8207 Schedule for VLBA_KP (Code Kp ) Page 13 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 04 54 WB114 20 59 42 65.8 15.3 -0.7 -157.1 -11 1 2 8207 06 04 54 06 05 14 --- 21 00 02 65.8 15.2 -0.7 -157.3 9 R 1 8074 06 05 14 2123+550 21 00 02 66.6 8.4 -0.4 -167.6 -11 1 2 8074 06 05 14 06 05 34 --- 21 00 22 66.6 8.3 -0.4 -167.7 9 R 1 7941 06 05 34 WB114 21 00 22 65.8 15.1 -0.7 -157.4 -11 1 2 7941 06 05 34 06 05 54 --- 21 00 42 65.8 15.0 -0.7 -157.6 9 R 1 7808 06 05 54 2123+550 21 00 42 66.6 8.1 -0.4 -167.9 -11 1 2 7808 06 05 54 06 06 14 --- 21 01 02 66.6 8.0 -0.4 -168.1 9 R 1 7675 06 06 14 WB114 21 01 02 65.8 14.8 -0.7 -157.8 -11 1 2 7675 06 06 14 06 06 34 --- 21 01 22 65.9 14.7 -0.7 -157.9 9 R 1 7542 06 06 34 2123+550 21 01 22 66.6 7.9 -0.4 -168.3 -11 1 2 7542 06 06 34 06 06 54 --- 21 01 42 66.6 7.8 -0.4 -168.4 9 R 1 7409 06 06 54 WB114 21 01 42 65.9 14.6 -0.7 -158.1 -11 1 2 7409 06 06 54 06 07 14 --- 21 02 02 65.9 14.5 -0.7 -158.3 9 R 1 7276 06 07 14 2123+550 21 02 02 66.6 7.7 -0.4 -168.6 -11 1 2 7276 06 07 14 06 07 34 --- 21 02 22 66.6 7.5 -0.3 -168.8 9 R 1 7144 06 07 34 WB114 21 02 22 65.9 14.4 -0.7 -158.4 -11 1 2 7144 06 07 34 06 07 54 --- 21 02 42 65.9 14.3 -0.7 -158.6 9 R 1 7011 06 07 54 2123+550 21 02 42 66.7 7.4 -0.3 -169.0 -11 1 2 7011 06 07 54 06 08 14 --- 21 03 02 66.7 7.3 -0.3 -169.2 9 R 1 6878 06 08 14 WB114 21 03 02 65.9 14.2 -0.7 -158.8 -11 1 2 6878 06 08 14 06 08 34 --- 21 03 22 66.0 14.1 -0.7 -158.9 9 R 1 6745 06 08 34 2123+550 21 03 22 66.7 7.2 -0.3 -169.3 -11 1 2 6745 06 08 34 06 08 54 --- 21 03 42 66.7 7.1 -0.3 -169.5 9 R 1 6612 06 08 54 WB114 21 03 42 66.0 14.0 -0.7 -159.1 -11 1 2 6612 06 08 54 06 09 14 --- 21 04 02 66.0 13.9 -0.7 -159.3 9 R 1 6479 06 09 14 2123+550 21 04 02 66.7 7.0 -0.3 -169.7 -11 1 2 6479 06 09 14 06 09 33 --- 21 04 22 66.7 6.8 -0.3 -169.9 9 R 1 6346 Schedule for VLBA_KP (Code Kp ) Page 14 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 09 33 WB114 21 04 22 66.0 13.8 -0.6 -159.4 -11 1 2 6346 06 09 33 06 09 53 --- 21 04 42 66.0 13.6 -0.6 -159.6 9 R 1 6213 06 09 53 2123+550 21 04 42 66.7 6.7 -0.3 -170.0 -11 1 2 6213 06 09 53 06 10 13 --- 21 05 02 66.7 6.6 -0.3 -170.2 9 R 1 6080 06 10 13 WB114 21 05 02 66.0 13.5 -0.6 -159.8 -11 1 2 6080 06 10 13 06 10 33 --- 21 05 22 66.1 13.4 -0.6 -159.9 9 R 1 5947 06 10 33 2123+550 21 05 22 66.7 6.5 -0.3 -170.4 -11 1 2 5947 06 10 33 06 10 53 --- 21 05 42 66.7 6.4 -0.3 -170.6 9 R 1 5814 06 10 53 WB114 21 05 42 66.1 13.3 -0.6 -160.1 -11 1 2 5814 06 10 53 06 11 13 --- 21 06 02 66.1 13.2 -0.6 -160.3 9 R 1 5681 06 13 13 3C454.3 21 08 02 61.2 117.0 -1.8 -51.9 44 1 2 5681 06 13 13 06 19 12 --- 21 14 02 62.3 118.9 -1.7 -50.6 359 R 1 3287 06 21 12 2146+570 21 16 02 64.3 9.6 -0.5 -164.9 41 1 2 3287 06 21 12 06 21 32 --- 21 16 22 64.4 9.5 -0.5 -165.1 20 R 1 3154 06 21 32 WB114 21 16 22 66.5 9.7 -0.4 -165.6 -10 1 2 3154 06 21 32 06 21 51 --- 21 16 42 66.5 9.6 -0.4 -165.8 10 R 1 3021 06 21 51 2146+570 21 16 42 64.4 9.4 -0.5 -165.2 -10 1 2 3021 06 21 51 06 22 11 --- 21 17 02 64.4 9.3 -0.5 -165.4 10 R 1 2888 06 22 11 WB114 21 17 02 66.5 9.4 -0.4 -166.0 -10 1 2 2888 06 22 11 06 22 31 --- 21 17 22 66.6 9.3 -0.4 -166.2 10 R 1 2756 06 22 31 2146+570 21 17 22 64.4 9.2 -0.5 -165.6 -10 1 2 2756 06 22 31 06 22 51 --- 21 17 42 64.4 9.1 -0.5 -165.7 10 R 1 2623 06 22 51 WB114 21 17 42 66.6 9.2 -0.4 -166.3 -10 1 2 2623 06 22 51 06 23 11 --- 21 18 02 66.6 9.1 -0.4 -166.5 10 R 1 2490 06 23 11 2146+570 21 18 02 64.4 9.0 -0.5 -165.9 -10 1 2 2490 06 23 11 06 23 31 --- 21 18 22 64.4 8.9 -0.5 -166.1 10 R 1 2357 06 23 31 WB114 21 18 22 66.6 9.0 -0.4 -166.7 -10 1 2 2357 06 23 31 06 23 51 --- 21 18 42 66.6 8.9 -0.4 -166.9 10 R 1 2224 Schedule for VLBA_KP (Code Kp ) Page 15 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 23 51 2146+570 21 18 42 64.4 8.8 -0.5 -166.2 -10 1 2 2224 06 23 51 06 24 11 --- 21 19 02 64.4 8.7 -0.5 -166.4 10 R 1 2091 06 24 11 WB114 21 19 02 66.6 8.7 -0.4 -167.0 -10 1 2 2091 06 24 11 06 24 31 --- 21 19 22 66.6 8.6 -0.4 -167.2 10 R 1 1958 06 24 31 2146+570 21 19 22 64.5 8.6 -0.5 -166.5 -10 1 2 1958 06 24 31 06 24 51 --- 21 19 42 64.5 8.5 -0.4 -166.7 10 R 1 1825 06 24 51 WB114 21 19 42 66.6 8.5 -0.4 -167.4 -10 1 2 1825 06 24 51 06 25 11 --- 21 20 02 66.6 8.4 -0.4 -167.6 10 R 1 1692 06 25 11 2146+570 21 20 02 64.5 8.4 -0.4 -166.9 -10 1 2 1692 06 25 11 06 25 31 --- 21 20 22 64.5 8.3 -0.4 -167.0 10 R 1 1559 06 25 31 WB114 21 20 22 66.7 8.3 -0.4 -167.7 -10 1 2 1559 06 25 31 06 25 51 --- 21 20 42 66.7 8.1 -0.4 -167.9 10 R 1 1426 06 25 51 2146+570 21 20 42 64.5 8.2 -0.4 -167.2 -10 1 2 1426 06 25 51 06 26 11 --- 21 21 02 64.5 8.1 -0.4 -167.4 10 R 1 1293 06 26 11 WB114 21 21 02 66.7 8.0 -0.4 -168.1 -10 1 2 1293 06 26 11 06 26 31 --- 21 21 22 66.7 7.9 -0.4 -168.3 10 R 1 1160 06 26 31 2146+570 21 21 22 64.5 8.0 -0.4 -167.5 -10 1 2 1160 06 26 31 06 26 51 --- 21 21 42 64.5 7.9 -0.4 -167.7 10 R 1 1027 06 26 51 WB114 21 21 42 66.7 7.8 -0.4 -168.4 -10 1 2 1027 06 26 51 06 27 11 --- 21 22 02 66.7 7.7 -0.4 -168.6 10 R 1 894 06 27 11 2146+570 21 22 02 64.5 7.8 -0.4 -167.8 -10 1 2 894 06 27 11 06 27 31 --- 21 22 22 64.5 7.7 -0.4 -168.0 10 R 1 761 06 27 31 WB114 21 22 22 66.7 7.6 -0.3 -168.8 -10 1 2 761 06 27 31 06 27 50 --- 21 22 42 66.7 7.4 -0.3 -169.0 10 R 1 628 06 27 50 2146+570 21 22 42 64.6 7.6 -0.4 -168.2 -10 1 2 628 06 27 50 06 28 10 --- 21 23 02 64.6 7.4 -0.4 -168.3 10 R 1 495 06 28 10 WB114 21 23 02 66.7 7.3 -0.3 -169.2 -10 1 2 495 06 28 10 06 28 30 --- 21 23 22 66.7 7.2 -0.3 -169.3 10 R 1 362 Schedule for VLBA_KP (Code Kp ) Page 16 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 28 30 2146+570 21 23 22 64.6 7.3 -0.4 -168.5 -10 1 3 362 06 28 30 06 28 50 --- 21 23 42 64.6 7.2 -0.4 -168.7 10 F 1 495 06 28 50 WB114 21 23 42 66.8 7.1 -0.3 -169.5 -10 1 3 495 06 28 50 06 29 10 --- 21 24 02 66.8 7.0 -0.3 -169.7 10 F 1 628 06 29 10 2146+570 21 24 02 64.6 7.1 -0.4 -168.8 -10 1 3 628 06 29 10 06 29 30 --- 21 24 22 64.6 7.0 -0.4 -169.0 10 F 1 761 06 29 30 WB114 21 24 22 66.8 6.8 -0.3 -169.9 -10 1 3 761 06 29 30 06 29 50 --- 21 24 42 66.8 6.7 -0.3 -170.0 10 F 1 894 06 29 50 2146+570 21 24 42 64.6 6.9 -0.4 -169.1 -10 1 3 894 06 29 50 06 30 10 --- 21 25 02 64.6 6.8 -0.4 -169.3 10 F 1 1027 06 30 10 WB114 21 25 02 66.8 6.6 -0.3 -170.2 -10 1 3 1027 06 30 10 06 30 30 --- 21 25 22 66.8 6.5 -0.3 -170.4 10 F 1 1160 06 30 30 2146+570 21 25 22 64.6 6.7 -0.4 -169.5 -10 1 3 1160 06 30 30 06 30 50 --- 21 25 42 64.6 6.6 -0.3 -169.6 10 F 1 1293 06 30 50 WB114 21 25 42 66.8 6.4 -0.3 -170.6 -10 1 3 1293 06 30 50 06 31 10 --- 21 26 02 66.8 6.2 -0.3 -170.8 10 F 1 1426 06 31 10 2146+570 21 26 02 64.6 6.5 -0.3 -169.8 -10 1 3 1426 06 31 10 06 31 30 --- 21 26 22 64.6 6.4 -0.3 -170.0 10 F 1 1559 06 31 30 WB114 21 26 22 66.8 6.1 -0.3 -170.9 -10 1 3 1559 06 31 30 06 31 50 --- 21 26 42 66.8 6.0 -0.3 -171.1 10 F 1 1692 06 31 50 2146+570 21 26 42 64.7 6.3 -0.3 -170.1 -10 1 3 1692 06 31 50 06 32 10 --- 21 27 02 64.7 6.2 -0.3 -170.3 10 F 1 1825 06 32 10 WB114 21 27 02 66.8 5.9 -0.3 -171.3 -10 1 3 1825 06 32 10 06 32 30 --- 21 27 22 66.8 5.8 -0.3 -171.5 10 F 1 1958 06 32 30 2146+570 21 27 22 64.7 6.1 -0.3 -170.5 -10 1 3 1958 06 32 30 06 32 50 --- 21 27 42 64.7 6.0 -0.3 -170.6 10 F 1 2091 06 32 50 WB114 21 27 42 66.8 5.6 -0.3 -171.6 -10 1 3 2091 06 32 50 06 33 10 --- 21 28 02 66.9 5.5 -0.3 -171.8 10 F 1 2224 Schedule for VLBA_KP (Code Kp ) Page 17 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 33 10 2146+570 21 28 02 64.7 5.9 -0.3 -170.8 -10 1 3 2224 06 33 10 06 33 30 --- 21 28 22 64.7 5.8 -0.3 -171.0 10 F 1 2357 06 33 30 WB114 21 28 22 66.9 5.4 -0.2 -172.0 -10 1 3 2357 06 33 30 06 33 49 --- 21 28 42 66.9 5.3 -0.2 -172.2 10 F 1 2490 06 33 49 2146+570 21 28 42 64.7 5.7 -0.3 -171.1 -10 1 3 2490 06 33 49 06 34 09 --- 21 29 02 64.7 5.6 -0.3 -171.3 10 F 1 2623 06 34 09 WB114 21 29 02 66.9 5.2 -0.2 -172.4 -10 1 3 2623 06 34 09 06 34 29 --- 21 29 22 66.9 5.0 -0.2 -172.5 10 F 1 2756 06 34 29 2146+570 21 29 22 64.7 5.5 -0.3 -171.4 -10 1 3 2756 06 34 29 06 34 49 --- 21 29 42 64.7 5.4 -0.3 -171.6 10 F 1 2888 06 34 49 WB114 21 29 42 66.9 4.9 -0.2 -172.7 -10 1 3 2888 06 34 49 06 35 09 --- 21 30 02 66.9 4.8 -0.2 -172.9 10 F 1 3021 06 35 09 2146+570 21 30 02 64.7 5.3 -0.3 -171.8 -10 1 3 3021 06 35 09 06 35 29 --- 21 30 22 64.7 5.2 -0.3 -171.9 10 F 1 3154 06 35 29 WB114 21 30 22 66.9 4.7 -0.2 -173.1 -10 1 3 3154 06 35 29 06 35 49 --- 21 30 42 66.9 4.6 -0.2 -173.3 10 F 1 3287 06 35 49 2146+570 21 30 42 64.7 5.0 -0.3 -172.1 -10 1 3 3287 06 35 49 06 36 09 --- 21 31 02 64.7 4.9 -0.3 -172.3 10 F 1 3420 06 36 09 WB114 21 31 02 66.9 4.4 -0.2 -173.4 -10 1 3 3420 06 36 09 06 36 29 --- 21 31 22 66.9 4.3 -0.2 -173.6 10 F 1 3553 06 36 29 2146+570 21 31 22 64.8 4.8 -0.3 -172.4 -10 1 3 3553 06 36 29 06 36 49 --- 21 31 42 64.8 4.7 -0.2 -172.6 10 F 1 3686 06 36 49 WB114 21 31 42 66.9 4.2 -0.2 -173.8 -10 1 3 3686 06 36 49 06 37 09 --- 21 32 02 66.9 4.1 -0.2 -174.0 10 F 1 3819 06 37 09 2146+570 21 32 02 64.8 4.6 -0.2 -172.8 -10 1 3 3819 06 37 09 06 37 29 --- 21 32 22 64.8 4.5 -0.2 -172.9 10 F 1 3952 06 37 29 WB114 21 32 22 66.9 3.9 -0.2 -174.2 -10 1 3 3952 06 37 29 06 37 49 --- 21 32 42 66.9 3.8 -0.2 -174.3 10 F 1 4085 Schedule for VLBA_KP (Code Kp ) Page 18 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 37 49 2146+570 21 32 42 64.8 4.4 -0.2 -173.1 -10 1 3 4085 06 37 49 06 38 09 --- 21 33 02 64.8 4.3 -0.2 -173.3 10 F 1 4218 06 38 09 WB114 21 33 02 66.9 3.7 -0.2 -174.5 -10 1 3 4218 06 38 09 06 38 29 --- 21 33 22 66.9 3.6 -0.2 -174.7 10 F 1 4351 06 38 29 2146+570 21 33 22 64.8 4.2 -0.2 -173.4 -10 1 3 4351 06 38 29 06 38 49 --- 21 33 42 64.8 4.1 -0.2 -173.6 10 F 1 4484 06 38 49 WB114 21 33 42 66.9 3.5 -0.2 -174.9 -10 1 3 4484 06 38 49 06 39 09 --- 21 34 02 67.0 3.3 -0.2 -175.1 10 F 1 4617 06 39 09 2146+570 21 34 02 64.8 4.0 -0.2 -173.8 -10 1 3 4617 06 39 09 06 39 29 --- 21 34 22 64.8 3.9 -0.2 -173.9 10 F 1 4750 06 39 29 WB114 21 34 22 67.0 3.2 -0.1 -175.2 -10 1 3 4750 06 39 29 06 39 49 --- 21 34 42 67.0 3.1 -0.1 -175.4 10 F 1 4883 06 39 49 2146+570 21 34 42 64.8 3.8 -0.2 -174.1 -10 1 3 4883 06 39 49 06 40 08 --- 21 35 02 64.8 3.7 -0.2 -174.3 10 F 1 5016 06 40 08 WB114 21 35 02 67.0 3.0 -0.1 -175.6 -10 1 3 5016 06 40 08 06 40 28 --- 21 35 22 67.0 2.9 -0.1 -175.8 10 F 1 5149 06 40 28 2146+570 21 35 22 64.8 3.6 -0.2 -174.4 -10 1 3 5149 06 40 28 06 40 48 --- 21 35 42 64.8 3.5 -0.2 -174.6 10 F 1 5282 06 40 48 WB114 21 35 42 67.0 2.7 -0.1 -176.0 -10 1 3 5282 06 40 48 06 41 08 --- 21 36 02 67.0 2.6 -0.1 -176.1 10 F 1 5415 06 41 08 2146+570 21 36 02 64.8 3.4 -0.2 -174.8 -10 1 3 5415 06 41 08 06 41 28 --- 21 36 22 64.8 3.3 -0.2 -174.9 10 F 1 5548 06 41 28 WB114 21 36 22 67.0 2.5 -0.1 -176.3 -10 1 3 5548 06 41 28 06 41 48 --- 21 36 42 67.0 2.4 -0.1 -176.5 10 F 1 5681 06 41 48 2146+570 21 36 42 64.8 3.1 -0.2 -175.1 -10 1 3 5681 06 41 48 06 42 08 --- 21 37 02 64.8 3.0 -0.2 -175.2 10 F 1 5814 06 42 08 WB114 21 37 02 67.0 2.2 -0.1 -176.7 -10 1 3 5814 06 42 08 06 42 28 --- 21 37 22 67.0 2.1 -0.1 -176.9 10 F 1 5947 Schedule for VLBA_KP (Code Kp ) Page 19 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 42 28 2146+570 21 37 22 64.8 2.9 -0.2 -175.4 -10 1 3 5947 06 42 28 06 42 48 --- 21 37 42 64.8 2.8 -0.1 -175.6 10 F 1 6080 06 42 48 WB114 21 37 42 67.0 2.0 -0.1 -177.0 -10 1 3 6080 06 42 48 06 43 08 --- 21 38 02 67.0 1.9 -0.1 -177.2 10 F 1 6213 06 43 08 2146+570 21 38 02 64.8 2.7 -0.1 -175.7 -10 1 3 6213 06 43 08 06 43 28 --- 21 38 22 64.8 2.6 -0.1 -175.9 10 F 1 6346 06 43 28 WB114 21 38 22 67.0 1.8 -0.1 -177.4 -10 1 3 6346 06 43 28 06 43 48 --- 21 38 42 67.0 1.6 -0.1 -177.6 10 F 1 6479 06 43 48 2146+570 21 38 42 64.9 2.5 -0.1 -176.1 -10 1 3 6479 06 43 48 06 44 08 --- 21 39 02 64.9 2.4 -0.1 -176.2 10 F 1 6612 06 44 08 WB114 21 39 02 67.0 1.5 -0.1 -177.8 -10 1 3 6612 06 44 08 06 44 28 --- 21 39 22 67.0 1.4 -0.1 -178.0 10 F 1 6745 06 44 28 2146+570 21 39 22 64.9 2.3 -0.1 -176.4 -10 1 3 6745 06 44 28 06 44 48 --- 21 39 42 64.9 2.2 -0.1 -176.6 10 F 1 6878 06 44 48 WB114 21 39 42 67.0 1.3 -0.1 -178.1 -10 1 3 6878 06 44 48 06 45 08 --- 21 40 02 67.0 1.1 -0.1 -178.3 10 F 1 7011 06 45 08 2146+570 21 40 02 64.9 2.1 -0.1 -176.7 -10 1 3 7011 06 45 08 06 45 28 --- 21 40 22 64.9 2.0 -0.1 -176.9 10 F 1 7143 06 45 28 WB114 21 40 22 67.0 1.0 0.0 -178.5 -10 1 3 7143 06 45 28 06 45 48 --- 21 40 42 67.0 0.9 0.0 -178.7 10 F 1 7276 06 45 48 2146+570 21 40 42 64.9 1.9 -0.1 -177.1 -10 1 3 7276 06 45 48 06 46 07 --- 21 41 02 64.9 1.8 -0.1 -177.2 10 F 1 7409 06 46 07 WB114 21 41 02 67.0 0.8 0.0 -178.9 -10 1 3 7409 06 46 07 06 46 27 --- 21 41 22 67.0 0.7 0.0 -179.0 10 F 1 7542 06 46 27 2146+570 21 41 22 64.9 1.7 -0.1 -177.4 -10 1 3 7542 06 46 27 06 46 47 --- 21 41 42 64.9 1.6 -0.1 -177.6 10 F 1 7675 06 46 47 WB114 21 41 42 67.0 0.5 0.0 -179.2 -10 1 3 7675 06 46 47 06 47 07 --- 21 42 02 67.0 0.4 0.0 -179.4 10 F 1 7808 Schedule for VLBA_KP (Code Kp ) Page 20 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 47 07 2146+570 21 42 02 64.9 1.4 -0.1 -177.7 -10 1 3 7808 06 47 07 06 47 27 --- 21 42 22 64.9 1.3 -0.1 -177.9 10 F 1 7941 06 47 27 WB114 21 42 22 67.0 0.3 0.0 -179.6 -10 1 3 7941 06 47 27 06 47 47 --- 21 42 42 67.0 0.2 0.0 -179.8 10 F 1 8074 06 47 47 2146+570 21 42 42 64.9 1.2 -0.1 -178.1 -10 1 3 8074 06 47 47 06 48 07 --- 21 43 02 64.9 1.1 -0.1 -178.2 10 F 1 8207 06 48 07 WB114 21 43 02 67.0 0.0 0.0 -179.9 -10 1 3 8207 06 48 07 06 48 27 --- 21 43 22 67.0 -0.1 0.0 179.9 10 F 1 8340 06 48 27 2146+570 21 43 22 64.9 1.0 -0.1 -178.4 -10 1 3 8340 06 48 27 06 48 47 --- 21 43 42 64.9 0.9 0.0 -178.6 10 F 1 8473 06 48 47 WB114 21 43 42 67.0 -0.2 0.0 179.7 -10 1 3 8473 06 48 47 06 49 07 --- 21 44 02 67.0 -0.3 0.0 179.5 10 F 1 8606 06 49 07 2146+570 21 44 02 64.9 0.8 0.0 -178.7 -10 1 3 8606 06 49 07 06 49 27 --- 21 44 22 64.9 0.7 0.0 -178.9 10 F 1 8739 06 49 27 WB114 21 44 22 67.0 -0.5 0.0 179.3 -10 1 3 8739 06 49 27 06 49 47 --- 21 44 42 67.0 -0.6 0.0 179.2 10 F 1 8872 06 49 47 2146+570 21 44 42 64.9 0.6 0.0 -179.1 -10 1 3 8872 06 49 47 06 50 07 --- 21 45 02 64.9 0.5 0.0 -179.2 10 F 1 9005 06 50 07 WB114 21 45 02 67.0 -0.7 0.0 179.0 -10 1 3 9005 06 50 07 06 50 27 --- 21 45 22 67.0 -0.8 0.0 178.8 10 F 1 9138 06 50 27 2146+570 21 45 22 64.9 0.4 0.0 -179.4 -10 1 3 9138 06 50 27 06 50 47 --- 21 45 42 64.9 0.3 0.0 -179.6 10 F 1 9271 06 50 47 WB114 21 45 42 67.0 -0.9 0.0 178.6 -10 1 3 9271 06 50 47 06 51 07 --- 21 46 02 67.0 -1.1 0.0 178.4 10 F 1 9404 06 51 07 2146+570 21 46 02 64.9 0.2 0.0 -179.7 -10 1 3 9404 06 51 07 06 51 27 --- 21 46 22 64.9 0.1 0.0 -179.9 10 F 1 9537 06 51 27 WB114 21 46 22 67.0 -1.2 0.1 178.2 -10 1 3 9537 06 51 27 06 51 47 --- 21 46 42 67.0 -1.3 0.1 178.1 10 F 1 9670 Schedule for VLBA_KP (Code Kp ) Page 21 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 06 51 47 2146+570 21 46 42 64.9 0.0 0.0 179.9 -10 1 3 9670 06 51 47 06 52 06 --- 21 47 02 64.9 -0.2 0.0 179.8 10 F 1 9803 06 52 06 WB114 21 47 02 67.0 -1.4 0.1 177.9 -10 1 3 9803 06 52 06 06 52 26 --- 21 47 22 67.0 -1.6 0.1 177.7 10 F 1 9936 06 52 26 2146+570 21 47 22 64.9 -0.3 0.0 179.6 -10 1 3 9936 06 52 26 06 52 46 --- 21 47 42 64.9 -0.4 0.0 179.4 10 F 1 10069 06 52 46 WB114 21 47 42 67.0 -1.7 0.1 177.5 -10 1 3 10069 06 52 46 06 53 06 --- 21 48 02 67.0 -1.8 0.1 177.3 10 F 1 10202 06 53 06 2146+570 21 48 02 64.9 -0.5 0.0 179.3 -10 1 3 10202 06 53 06 06 53 26 --- 21 48 22 64.9 -0.6 0.0 179.1 10 F 1 10335 06 53 26 WB114 21 48 22 67.0 -1.9 0.1 177.2 -10 1 3 10335 06 53 26 06 53 46 --- 21 48 42 67.0 -2.0 0.1 177.0 10 F 1 10468 06 53 46 2146+570 21 48 42 64.9 -0.7 0.0 178.9 -10 1 3 10468 06 53 46 06 54 06 --- 21 49 02 64.9 -0.8 0.0 178.8 10 F 1 10601 06 54 06 WB114 21 49 02 67.0 -2.2 0.1 176.8 -10 1 3 10601 06 54 06 06 54 26 --- 21 49 22 67.0 -2.3 0.1 176.6 10 F 1 10734 06 54 26 2146+570 21 49 22 64.9 -0.9 0.0 178.6 -10 1 3 10734 06 54 26 06 54 46 --- 21 49 42 64.9 -1.0 0.1 178.4 10 F 1 10867 06 54 46 WB114 21 49 42 67.0 -2.4 0.1 176.4 -10 1 3 10867 06 54 46 06 55 06 --- 21 50 02 67.0 -2.5 0.1 176.3 10 F 1 11000 06 57 06 3C454.3 21 52 02 68.8 134.6 -1.0 -39.0 22 1 3 11000 06 57 06 07 03 05 --- 21 58 02 69.7 137.9 -0.9 -36.4 359 F 1 13393 Next scan frequencies: 22235.69 22227.53 22219.37 22243.85 Next BBC frequencies: 735.69 727.53 719.37 743.85 07 03 05 3C454.3 21 58 02 69.7 137.9 -0.9 -36.4 -6 1 3 13393 07 03 05 07 09 04 --- 22 04 02 70.5 141.3 -0.8 -33.5 353 F 1 15786 07 11 03 2137+510 22 06 02 70.2 -13.5 0.5 161.6 10 1 3 15786 07 11 03 07 11 23 --- 22 06 22 70.2 -13.6 0.5 161.4 20 F 1 15919 Schedule for VLBA_KP (Code Kp ) Page 22 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 11 23 WB105 22 06 22 70.0 -12.2 0.4 163.3 -7 1 3 15919 07 11 23 07 11 43 --- 22 06 42 70.0 -12.3 0.4 163.1 13 F 1 16052 07 11 43 2137+510 22 06 42 70.2 -13.8 0.5 161.2 -7 1 3 16052 07 11 43 07 12 03 --- 22 07 02 70.1 -13.9 0.5 161.0 13 F 1 16185 07 12 03 WB105 22 07 02 70.0 -12.5 0.5 162.9 -7 1 3 16185 07 12 03 07 12 23 --- 22 07 22 70.0 -12.6 0.5 162.7 13 F 1 16318 07 12 23 2137+510 22 07 22 70.1 -14.1 0.5 160.8 -7 1 3 16318 07 12 23 07 12 43 --- 22 07 42 70.1 -14.2 0.5 160.6 13 F 1 16451 07 12 43 WB105 22 07 42 69.9 -12.8 0.5 162.5 -7 1 3 16451 07 12 43 07 13 03 --- 22 08 02 69.9 -12.9 0.5 162.3 13 F 1 16584 07 13 03 2137+510 22 08 02 70.1 -14.4 0.5 160.4 -7 1 3 16584 07 13 03 07 13 23 --- 22 08 22 70.1 -14.5 0.5 160.2 13 F 1 16717 07 13 23 WB105 22 08 22 69.9 -13.1 0.5 162.1 -7 1 3 16717 07 13 23 07 13 43 --- 22 08 42 69.9 -13.2 0.5 161.9 13 F 1 16850 07 13 43 2137+510 22 08 42 70.1 -14.7 0.5 160.0 -7 1 3 16850 07 13 43 07 14 03 --- 22 09 02 70.0 -14.8 0.5 159.8 13 F 1 16983 07 14 03 WB105 22 09 02 69.9 -13.4 0.5 161.7 -7 1 3 16983 07 14 03 07 14 23 --- 22 09 22 69.9 -13.5 0.5 161.5 13 F 1 17116 07 14 23 2137+510 22 09 22 70.0 -14.9 0.5 159.6 -7 1 3 17116 07 14 23 07 14 43 --- 22 09 42 70.0 -15.1 0.5 159.4 13 F 1 17249 07 14 43 WB105 22 09 42 69.8 -13.6 0.5 161.3 -7 1 4 17249 07 14 43 07 15 03 --- 22 10 02 69.8 -13.8 0.5 161.1 13 R 1 17116 07 15 03 2137+510 22 10 02 70.0 -15.2 0.5 159.2 -7 1 4 17116 07 15 03 07 15 23 --- 22 10 22 70.0 -15.4 0.6 159.0 13 R 1 16983 07 15 23 WB105 22 10 22 69.8 -13.9 0.5 160.9 -7 1 4 16983 07 15 23 07 15 43 --- 22 10 42 69.8 -14.1 0.5 160.7 13 R 1 16850 07 15 43 2137+510 22 10 42 69.9 -15.5 0.6 158.8 -7 1 4 16850 07 15 43 07 16 03 --- 22 11 02 69.9 -15.7 0.6 158.6 13 R 1 16717 Schedule for VLBA_KP (Code Kp ) Page 23 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 16 03 WB105 22 11 02 69.8 -14.2 0.5 160.5 -7 1 4 16717 07 16 03 07 16 22 --- 22 11 22 69.8 -14.3 0.5 160.3 13 R 1 16584 07 16 22 2137+510 22 11 22 69.9 -15.8 0.6 158.4 -7 1 4 16584 07 16 22 07 16 42 --- 22 11 42 69.9 -15.9 0.6 158.2 13 R 1 16451 07 16 42 WB105 22 11 42 69.7 -14.5 0.5 160.1 -7 1 4 16451 07 16 42 07 17 02 --- 22 12 02 69.7 -14.6 0.5 159.9 13 R 1 16318 07 17 02 2137+510 22 12 02 69.9 -16.1 0.6 158.0 -7 1 4 16318 07 17 02 07 17 22 --- 22 12 22 69.8 -16.2 0.6 157.8 13 R 1 16185 07 17 22 WB105 22 12 22 69.7 -14.8 0.5 159.7 -7 1 4 16185 07 17 22 07 17 42 --- 22 12 42 69.7 -14.9 0.5 159.5 13 R 1 16052 07 17 42 2137+510 22 12 42 69.8 -16.4 0.6 157.7 -7 1 4 16052 07 17 42 07 18 02 --- 22 13 02 69.8 -16.5 0.6 157.5 13 R 1 15919 07 18 02 WB105 22 13 02 69.7 -15.1 0.6 159.3 -7 1 4 15919 07 18 02 07 18 22 --- 22 13 22 69.6 -15.2 0.6 159.1 13 R 1 15786 07 18 22 2137+510 22 13 22 69.8 -16.6 0.6 157.3 -7 1 4 15786 07 18 22 07 18 42 --- 22 13 42 69.8 -16.8 0.6 157.1 13 R 1 15654 07 18 42 WB105 22 13 42 69.6 -15.3 0.6 158.9 -7 1 4 15654 07 18 42 07 19 02 --- 22 14 02 69.6 -15.5 0.6 158.8 13 R 1 15521 07 19 02 2137+510 22 14 02 69.7 -16.9 0.6 156.9 -7 1 4 15521 07 19 02 07 19 22 --- 22 14 22 69.7 -17.1 0.6 156.7 13 R 1 15388 07 19 22 WB105 22 14 22 69.6 -15.6 0.6 158.6 -7 1 4 15388 07 19 22 07 19 42 --- 22 14 42 69.6 -15.7 0.6 158.4 13 R 1 15255 07 19 42 2137+510 22 14 42 69.7 -17.2 0.6 156.5 -7 1 4 15255 07 19 42 07 20 02 --- 22 15 02 69.7 -17.3 0.6 156.3 13 R 1 15122 07 20 02 WB105 22 15 02 69.6 -15.9 0.6 158.2 -7 1 4 15122 07 20 02 07 20 22 --- 22 15 22 69.5 -16.0 0.6 158.0 13 R 1 14989 07 20 22 2137+510 22 15 22 69.7 -17.5 0.6 156.1 -7 1 4 14989 07 20 22 07 20 42 --- 22 15 42 69.6 -17.6 0.6 155.9 13 R 1 14856 Schedule for VLBA_KP (Code Kp ) Page 24 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 20 42 WB105 22 15 42 69.5 -16.2 0.6 157.8 -7 1 4 14856 07 20 42 07 21 02 --- 22 16 02 69.5 -16.3 0.6 157.6 13 R 1 14723 07 21 02 2137+510 22 16 02 69.6 -17.8 0.6 155.7 -7 1 4 14723 07 21 02 07 21 22 --- 22 16 22 69.6 -17.9 0.7 155.5 13 R 1 14590 07 21 22 WB105 22 16 22 69.5 -16.4 0.6 157.4 -7 1 4 14590 07 21 22 07 21 42 --- 22 16 42 69.5 -16.6 0.6 157.2 13 R 1 14457 07 21 42 2137+510 22 16 42 69.6 -18.0 0.7 155.3 -7 1 4 14457 07 21 42 07 22 02 --- 22 17 02 69.6 -18.2 0.7 155.1 13 R 1 14324 07 22 02 WB105 22 17 02 69.4 -16.7 0.6 157.0 -7 1 4 14324 07 22 02 07 22 22 --- 22 17 22 69.4 -16.8 0.6 156.8 13 R 1 14191 07 22 22 2137+510 22 17 22 69.5 -18.3 0.7 154.9 -7 1 4 14191 07 22 22 07 22 41 --- 22 17 42 69.5 -18.4 0.7 154.7 13 R 1 14058 07 22 41 WB105 22 17 42 69.4 -17.0 0.6 156.6 -7 1 4 14058 07 22 41 07 23 01 --- 22 18 02 69.4 -17.1 0.6 156.4 13 R 1 13925 07 23 01 2137+510 22 18 02 69.5 -18.6 0.7 154.5 -7 1 4 13925 07 23 01 07 23 21 --- 22 18 22 69.5 -18.7 0.7 154.4 13 R 1 13792 07 23 21 WB105 22 18 22 69.3 -17.3 0.6 156.2 -7 1 4 13792 07 23 21 07 23 41 --- 22 18 42 69.3 -17.4 0.6 156.0 13 R 1 13659 07 23 41 2137+510 22 18 42 69.4 -18.8 0.7 154.2 -7 1 4 13659 07 23 41 07 24 01 --- 22 19 02 69.4 -19.0 0.7 154.0 13 R 1 13526 07 24 01 WB105 22 19 02 69.3 -17.5 0.7 155.9 -7 1 4 13526 07 24 01 07 24 21 --- 22 19 22 69.3 -17.7 0.7 155.7 13 R 1 13393 07 24 21 2137+510 22 19 22 69.4 -19.1 0.7 153.8 -7 1 4 13393 07 24 21 07 24 41 --- 22 19 42 69.4 -19.2 0.7 153.6 13 R 1 13260 07 24 41 WB105 22 19 42 69.3 -17.8 0.7 155.5 -7 1 4 13260 07 24 41 07 25 01 --- 22 20 02 69.2 -17.9 0.7 155.3 13 R 1 13127 07 25 01 2137+510 22 20 02 69.3 -19.4 0.7 153.4 -7 1 4 13127 07 25 01 07 25 21 --- 22 20 22 69.3 -19.5 0.7 153.2 13 R 1 12994 Schedule for VLBA_KP (Code Kp ) Page 25 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 25 21 WB105 22 20 22 69.2 -18.1 0.7 155.1 -7 1 4 12994 07 25 21 07 25 41 --- 22 20 42 69.2 -18.2 0.7 154.9 13 R 1 12861 07 25 41 2137+510 22 20 42 69.3 -19.6 0.7 153.0 -7 1 4 12861 07 25 41 07 26 01 --- 22 21 02 69.3 -19.8 0.7 152.8 13 R 1 12728 07 26 01 WB105 22 21 02 69.2 -18.3 0.7 154.7 -7 1 4 12728 07 26 01 07 26 21 --- 22 21 22 69.2 -18.5 0.7 154.5 13 R 1 12595 07 26 21 2137+510 22 21 22 69.3 -19.9 0.7 152.7 -7 1 4 12595 07 26 21 07 26 41 --- 22 21 42 69.2 -20.0 0.7 152.5 13 R 1 12462 07 26 41 WB105 22 21 42 69.1 -18.6 0.7 154.3 -7 1 4 12462 07 26 41 07 27 01 --- 22 22 02 69.1 -18.7 0.7 154.1 13 R 1 12329 07 27 01 2137+510 22 22 02 69.2 -20.2 0.7 152.3 -7 1 4 12329 07 27 01 07 27 21 --- 22 22 22 69.2 -20.3 0.8 152.1 13 R 1 12196 07 27 21 WB105 22 22 22 69.1 -18.9 0.7 154.0 -7 1 4 12196 07 27 21 07 27 41 --- 22 22 42 69.1 -19.0 0.7 153.8 13 R 1 12063 07 27 41 2137+510 22 22 42 69.2 -20.4 0.8 151.9 -7 1 4 12063 07 27 41 07 28 01 --- 22 23 02 69.1 -20.6 0.8 151.7 13 R 1 11930 07 28 01 WB105 22 23 02 69.0 -19.1 0.7 153.6 -7 1 4 11930 07 28 01 07 28 21 --- 22 23 22 69.0 -19.2 0.7 153.4 13 R 1 11797 07 28 21 2137+510 22 23 22 69.1 -20.7 0.8 151.5 -7 1 4 11797 07 28 21 07 28 40 --- 22 23 42 69.1 -20.8 0.8 151.3 13 R 1 11664 07 28 40 WB105 22 23 42 69.0 -19.4 0.7 153.2 -7 1 4 11664 07 28 40 07 29 00 --- 22 24 02 69.0 -19.5 0.7 153.0 13 R 1 11531 07 29 00 2137+510 22 24 02 69.1 -20.9 0.8 151.2 -7 1 4 11531 07 29 00 07 29 20 --- 22 24 22 69.0 -21.1 0.8 151.0 13 R 1 11399 07 29 20 WB105 22 24 22 68.9 -19.6 0.7 152.8 -7 1 4 11399 07 29 20 07 29 40 --- 22 24 42 68.9 -19.8 0.7 152.7 13 R 1 11266 07 29 40 2137+510 22 24 42 69.0 -21.2 0.8 150.8 -7 1 4 11266 07 29 40 07 30 00 --- 22 25 02 69.0 -21.3 0.8 150.6 13 R 1 11133 Schedule for VLBA_KP (Code Kp ) Page 26 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 30 00 WB105 22 25 02 68.9 -19.9 0.8 152.5 -7 1 4 11133 07 30 00 07 30 20 --- 22 25 22 68.9 -20.0 0.8 152.3 13 R 1 11000 07 30 20 2137+510 22 25 22 69.0 -21.5 0.8 150.4 -7 1 4 11000 07 30 20 07 30 40 --- 22 25 42 68.9 -21.6 0.8 150.2 13 R 1 10867 07 30 40 WB105 22 25 42 68.9 -20.1 0.8 152.1 -7 1 4 10867 07 30 40 07 31 00 --- 22 26 02 68.8 -20.3 0.8 151.9 13 R 1 10734 07 31 00 2137+510 22 26 02 68.9 -21.7 0.8 150.1 -7 1 4 10734 07 31 00 07 31 20 --- 22 26 22 68.9 -21.8 0.8 149.9 13 R 1 10601 07 31 20 WB105 22 26 22 68.8 -20.4 0.8 151.7 -7 1 4 10601 07 31 20 07 31 40 --- 22 26 42 68.8 -20.5 0.8 151.6 13 R 1 10468 07 31 40 2137+510 22 26 42 68.8 -22.0 0.8 149.7 -7 1 4 10468 07 31 40 07 32 00 --- 22 27 02 68.8 -22.1 0.8 149.5 13 R 1 10335 07 32 00 WB105 22 27 02 68.8 -20.7 0.8 151.4 -7 1 4 10335 07 32 00 07 32 20 --- 22 27 22 68.7 -20.8 0.8 151.2 13 R 1 10202 07 32 20 2137+510 22 27 22 68.8 -22.2 0.8 149.3 -7 1 4 10202 07 32 20 07 32 40 --- 22 27 42 68.8 -22.3 0.8 149.2 13 R 1 10069 07 32 40 WB105 22 27 42 68.7 -20.9 0.8 151.0 -7 1 4 10069 07 32 40 07 33 00 --- 22 28 02 68.7 -21.0 0.8 150.8 13 R 1 9936 07 33 00 2137+510 22 28 02 68.7 -22.5 0.8 149.0 -7 1 4 9936 07 33 00 07 33 20 --- 22 28 22 68.7 -22.6 0.9 148.8 13 R 1 9803 07 33 20 WB105 22 28 22 68.7 -21.2 0.8 150.6 -7 1 4 9803 07 33 20 07 33 40 --- 22 28 42 68.6 -21.3 0.8 150.5 13 R 1 9670 07 33 40 2137+510 22 28 42 68.7 -22.7 0.9 148.6 -7 1 4 9670 07 33 40 07 34 00 --- 22 29 02 68.7 -22.8 0.9 148.4 13 R 1 9537 07 34 00 WB105 22 29 02 68.6 -21.4 0.8 150.3 -7 1 4 9537 07 34 00 07 34 20 --- 22 29 22 68.6 -21.5 0.8 150.1 13 R 1 9404 07 34 20 2137+510 22 29 22 68.6 -22.9 0.9 148.3 -7 1 4 9404 07 34 20 07 34 39 --- 22 29 42 68.6 -23.1 0.9 148.1 13 R 1 9271 Schedule for VLBA_KP (Code Kp ) Page 27 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 34 39 WB105 22 29 42 68.5 -21.6 0.8 149.9 -7 1 4 9271 07 34 39 07 34 59 --- 22 30 02 68.5 -21.8 0.8 149.7 13 R 1 9138 07 34 59 2137+510 22 30 02 68.6 -23.2 0.9 147.9 -7 1 4 9138 07 34 59 07 35 19 --- 22 30 22 68.5 -23.3 0.9 147.7 13 R 1 9005 07 35 19 WB105 22 30 22 68.5 -21.9 0.8 149.6 -7 1 4 9005 07 35 19 07 35 39 --- 22 30 42 68.5 -22.0 0.8 149.4 13 R 1 8872 07 35 39 2137+510 22 30 42 68.5 -23.4 0.9 147.5 -7 1 4 8872 07 35 39 07 35 59 --- 22 31 02 68.5 -23.6 0.9 147.4 13 R 1 8739 07 35 59 WB105 22 31 02 68.4 -22.1 0.9 149.2 -7 1 4 8739 07 35 59 07 36 19 --- 22 31 22 68.4 -22.3 0.9 149.0 13 R 1 8606 07 36 19 2137+510 22 31 22 68.5 -23.7 0.9 147.2 -7 1 4 8606 07 36 19 07 36 39 --- 22 31 42 68.4 -23.8 0.9 147.0 13 R 1 8473 07 36 39 WB105 22 31 42 68.4 -22.4 0.9 148.8 -7 1 4 8473 07 36 39 07 36 59 --- 22 32 02 68.4 -22.5 0.9 148.7 13 R 1 8340 07 36 59 2137+510 22 32 02 68.4 -23.9 0.9 146.8 -7 1 4 8340 07 36 59 07 37 19 --- 22 32 22 68.4 -24.0 0.9 146.7 13 R 1 8207 07 37 19 WB105 22 32 22 68.3 -22.6 0.9 148.5 -7 1 4 8207 07 37 19 07 37 39 --- 22 32 42 68.3 -22.7 0.9 148.3 13 R 1 8074 07 37 39 2137+510 22 32 42 68.3 -24.2 0.9 146.5 -7 1 4 8074 07 37 39 07 37 59 --- 22 33 02 68.3 -24.3 0.9 146.3 13 R 1 7941 07 37 59 WB105 22 33 02 68.3 -22.9 0.9 148.1 -7 1 4 7941 07 37 59 07 38 19 --- 22 33 22 68.3 -23.0 0.9 148.0 13 R 1 7808 07 38 19 2137+510 22 33 22 68.3 -24.4 0.9 146.1 -7 1 4 7808 07 38 19 07 38 39 --- 22 33 42 68.3 -24.5 0.9 146.0 13 R 1 7675 07 38 39 WB105 22 33 42 68.2 -23.1 0.9 147.8 -7 1 4 7675 07 38 39 07 38 59 --- 22 34 02 68.2 -23.2 0.9 147.6 13 R 1 7542 07 40 58 3C454.3 22 36 02 73.7 164.4 -0.3 -13.8 -11 1 4 7542 07 40 58 07 46 57 --- 22 42 02 74.0 169.4 -0.2 -9.3 348 R 1 5149 Schedule for VLBA_KP (Code Kp ) Page 28 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- Next scan frequencies: 22237.77 22229.61 22221.45 22245.93 Next BBC frequencies: 737.77 729.61 721.45 745.93 07 46 57 3C454.3 22 42 02 74.0 169.4 -0.2 -9.3 -6 1 4 5149 07 46 57 07 52 56 --- 22 48 02 74.1 174.7 -0.1 -4.7 353 R 1 2756 07 54 56 2123+550 22 50 02 62.3 332.8 1.4 137.5 8 1 4 2756 07 54 56 07 55 16 --- 22 50 22 62.3 332.8 1.5 137.4 20 R 1 2623 07 55 16 WB114 22 50 22 64.1 337.6 1.1 145.8 -10 1 4 2623 07 55 16 07 55 36 --- 22 50 42 64.1 337.5 1.1 145.6 10 R 1 2490 07 55 36 2123+550 22 50 42 62.3 332.7 1.5 137.2 -10 1 4 2490 07 55 36 07 55 56 --- 22 51 02 62.2 332.6 1.5 137.1 10 R 1 2357 07 55 56 WB114 22 51 02 64.1 337.5 1.1 145.5 -10 1 4 2357 07 55 56 07 56 16 --- 22 51 22 64.0 337.4 1.1 145.3 10 R 1 2224 07 56 16 2123+550 22 51 22 62.2 332.5 1.5 137.0 -10 1 4 2224 07 56 16 07 56 36 --- 22 51 42 62.2 332.5 1.5 136.8 10 R 1 2091 07 56 36 WB114 22 51 42 64.0 337.3 1.1 145.2 -10 1 4 2091 07 56 36 07 56 56 --- 22 52 02 64.0 337.2 1.1 145.1 10 R 1 1958 07 56 56 2123+550 22 52 02 62.1 332.4 1.5 136.7 -10 1 4 1958 07 56 56 07 57 16 --- 22 52 22 62.1 332.3 1.5 136.6 10 R 1 1825 07 57 16 WB114 22 52 22 64.0 337.1 1.2 144.9 -10 1 4 1825 07 57 16 07 57 36 --- 22 52 42 63.9 337.0 1.2 144.8 10 R 1 1692 07 57 36 2123+550 22 52 42 62.1 332.2 1.5 136.4 -10 1 4 1692 07 57 36 07 57 56 --- 22 53 02 62.0 332.2 1.5 136.3 10 R 1 1559 07 57 56 WB114 22 53 02 63.9 336.9 1.2 144.6 -10 1 4 1559 07 57 56 07 58 16 --- 22 53 22 63.9 336.8 1.2 144.5 10 R 1 1426 07 58 16 2123+550 22 53 22 62.0 332.1 1.5 136.2 -10 1 4 1426 07 58 16 07 58 36 --- 22 53 42 62.0 332.0 1.5 136.0 10 R 1 1293 07 58 36 WB114 22 53 42 63.8 336.7 1.2 144.3 -10 1 4 1293 07 58 36 07 58 56 --- 22 54 02 63.8 336.7 1.2 144.2 10 R 1 1160 Schedule for VLBA_KP (Code Kp ) Page 29 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 07 58 56 2123+550 22 54 02 61.9 331.9 1.5 135.9 -10 1 4 1160 07 58 56 07 59 15 --- 22 54 22 61.9 331.9 1.5 135.8 10 R 1 1027 07 59 15 WB114 22 54 22 63.8 336.6 1.2 144.0 -10 1 4 1027 07 59 15 07 59 35 --- 22 54 42 63.8 336.5 1.2 143.9 10 R 1 894 07 59 35 2123+550 22 54 42 61.9 331.8 1.5 135.6 -10 1 4 894 07 59 35 07 59 55 --- 22 55 02 61.8 331.7 1.5 135.5 10 R 1 761 07 59 55 WB114 22 55 02 63.7 336.4 1.2 143.7 -10 1 4 761 07 59 55 08 00 15 --- 22 55 22 63.7 336.3 1.2 143.6 10 R 1 628 08 00 15 2123+550 22 55 22 61.8 331.7 1.5 135.4 -10 1 4 628 08 00 15 08 00 35 --- 22 55 42 61.8 331.6 1.5 135.2 10 R 1 495 08 00 35 WB114 22 55 42 63.7 336.2 1.2 143.4 -10 1 4 495 08 00 35 08 00 55 --- 22 56 02 63.7 336.1 1.2 143.3 10 R 1 362 08 00 55 2123+550 22 56 02 61.7 331.5 1.5 135.1 -10 1 5 362 08 00 55 08 01 15 --- 22 56 22 61.7 331.4 1.6 135.0 10 F 1 495 08 01 15 WB114 22 56 22 63.6 336.0 1.2 143.1 -10 1 5 495 08 01 15 08 01 35 --- 22 56 42 63.6 336.0 1.2 143.0 10 F 1 628 08 01 35 2123+550 22 56 42 61.7 331.4 1.6 134.8 -10 1 5 628 08 01 35 08 01 55 --- 22 57 02 61.6 331.3 1.6 134.7 10 F 1 761 08 01 55 WB114 22 57 02 63.6 335.9 1.2 142.9 -10 1 5 761 08 01 55 08 02 15 --- 22 57 22 63.5 335.8 1.2 142.7 10 F 1 894 08 02 15 2123+550 22 57 22 61.6 331.2 1.6 134.6 -10 1 5 894 08 02 15 08 02 35 --- 22 57 42 61.6 331.2 1.6 134.4 10 F 1 1027 08 02 35 WB114 22 57 42 63.5 335.7 1.2 142.6 -10 1 5 1027 08 02 35 08 02 55 --- 22 58 02 63.5 335.6 1.2 142.4 10 F 1 1160 08 02 55 2123+550 22 58 02 61.5 331.1 1.6 134.3 -10 1 5 1160 08 02 55 08 03 15 --- 22 58 22 61.5 331.0 1.6 134.2 10 F 1 1293 08 03 15 WB114 22 58 22 63.4 335.5 1.3 142.3 -10 1 5 1293 08 03 15 08 03 35 --- 22 58 42 63.4 335.4 1.3 142.1 10 F 1 1426 Schedule for VLBA_KP (Code Kp ) Page 30 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 03 35 2123+550 22 58 42 61.5 330.9 1.6 134.1 -10 1 5 1426 08 03 35 08 03 55 --- 22 59 02 61.4 330.9 1.6 133.9 10 F 1 1559 08 03 55 WB114 22 59 02 63.4 335.4 1.3 142.0 -10 1 5 1559 08 03 55 08 04 15 --- 22 59 22 63.4 335.3 1.3 141.8 10 F 1 1692 08 04 15 2123+550 22 59 22 61.4 330.8 1.6 133.8 -10 1 5 1692 08 04 15 08 04 35 --- 22 59 42 61.4 330.7 1.6 133.7 10 F 1 1825 08 04 35 WB114 22 59 42 63.3 335.2 1.3 141.7 -10 1 5 1825 08 04 35 08 04 55 --- 23 00 02 63.3 335.1 1.3 141.6 10 F 1 1958 08 04 55 2123+550 23 00 02 61.3 330.7 1.6 133.5 -10 1 5 1958 08 04 55 08 05 14 --- 23 00 22 61.3 330.6 1.6 133.4 10 F 1 2091 08 05 14 WB114 23 00 22 63.3 335.0 1.3 141.4 -10 1 5 2091 08 05 14 08 05 34 --- 23 00 42 63.2 334.9 1.3 141.3 10 F 1 2224 08 05 34 2123+550 23 00 42 61.2 330.5 1.6 133.3 -10 1 5 2224 08 05 34 08 05 54 --- 23 01 02 61.2 330.5 1.6 133.2 10 F 1 2357 08 05 54 WB114 23 01 02 63.2 334.9 1.3 141.1 -10 1 5 2357 08 05 54 08 06 14 --- 23 01 22 63.2 334.8 1.3 141.0 10 F 1 2490 08 06 14 2123+550 23 01 22 61.2 330.4 1.6 133.0 -10 1 5 2490 08 06 14 08 06 34 --- 23 01 42 61.1 330.3 1.6 132.9 10 F 1 2623 08 06 34 WB114 23 01 42 63.2 334.7 1.3 140.8 -10 1 5 2623 08 06 34 08 06 54 --- 23 02 02 63.1 334.6 1.3 140.7 10 F 1 2756 08 06 54 2123+550 23 02 02 61.1 330.3 1.6 132.8 -10 1 5 2756 08 06 54 08 07 14 --- 23 02 22 61.1 330.2 1.7 132.6 10 F 1 2888 08 07 14 WB114 23 02 22 63.1 334.5 1.3 140.6 -10 1 5 2888 08 07 14 08 07 34 --- 23 02 42 63.1 334.5 1.3 140.4 10 F 1 3021 08 07 34 2123+550 23 02 42 61.0 330.1 1.7 132.5 -10 1 5 3021 08 07 34 08 07 54 --- 23 03 02 61.0 330.1 1.7 132.4 10 F 1 3154 08 07 54 WB114 23 03 02 63.0 334.4 1.3 140.3 -10 1 5 3154 08 07 54 08 08 14 --- 23 03 22 63.0 334.3 1.3 140.1 10 F 1 3287 Schedule for VLBA_KP (Code Kp ) Page 31 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 08 14 2123+550 23 03 22 61.0 330.0 1.7 132.3 -10 1 5 3287 08 08 14 08 08 34 --- 23 03 42 60.9 329.9 1.7 132.1 10 F 1 3420 08 08 34 WB114 23 03 42 63.0 334.2 1.3 140.0 -10 1 5 3420 08 08 34 08 08 54 --- 23 04 02 62.9 334.1 1.3 139.9 10 F 1 3553 08 08 54 2123+550 23 04 02 60.9 329.9 1.7 132.0 -10 1 5 3553 08 08 54 08 09 14 --- 23 04 22 60.9 329.8 1.7 131.9 10 F 1 3686 08 09 14 WB114 23 04 22 62.9 334.0 1.4 139.7 -10 1 5 3686 08 09 14 08 09 34 --- 23 04 42 62.9 334.0 1.4 139.6 10 F 1 3819 08 09 34 2123+550 23 04 42 60.8 329.7 1.7 131.8 -10 1 5 3819 08 09 34 08 09 54 --- 23 05 02 60.8 329.7 1.7 131.6 10 F 1 3952 08 09 54 WB114 23 05 02 62.8 333.9 1.4 139.4 -10 1 5 3952 08 09 54 08 10 14 --- 23 05 22 62.8 333.8 1.4 139.3 10 F 1 4085 08 10 14 2123+550 23 05 22 60.8 329.6 1.7 131.5 -10 1 5 4085 08 10 14 08 10 34 --- 23 05 42 60.7 329.5 1.7 131.4 10 F 1 4218 08 10 34 WB114 23 05 42 62.8 333.7 1.4 139.2 -10 1 5 4218 08 10 34 08 10 54 --- 23 06 02 62.8 333.7 1.4 139.0 10 F 1 4351 08 10 54 2123+550 23 06 02 60.7 329.5 1.7 131.3 -10 1 5 4351 08 10 54 08 11 13 --- 23 06 22 60.6 329.4 1.7 131.1 10 F 1 4484 08 11 13 WB114 23 06 22 62.7 333.6 1.4 138.9 -10 1 5 4484 08 11 13 08 11 33 --- 23 06 42 62.7 333.5 1.4 138.7 10 F 1 4617 08 11 33 2123+550 23 06 42 60.6 329.3 1.7 131.0 -10 1 5 4617 08 11 33 08 11 53 --- 23 07 02 60.6 329.3 1.7 130.9 10 F 1 4750 08 11 53 WB114 23 07 02 62.7 333.4 1.4 138.6 -10 1 5 4750 08 11 53 08 12 13 --- 23 07 22 62.6 333.3 1.4 138.5 10 F 1 4883 08 12 13 2123+550 23 07 22 60.5 329.2 1.7 130.8 -10 1 5 4883 08 12 13 08 12 33 --- 23 07 42 60.5 329.2 1.7 130.6 10 F 1 5016 08 12 33 WB114 23 07 42 62.6 333.3 1.4 138.3 -10 1 5 5016 08 12 33 08 12 53 --- 23 08 02 62.6 333.2 1.4 138.2 10 F 1 5149 Schedule for VLBA_KP (Code Kp ) Page 32 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 12 53 2123+550 23 08 02 60.5 329.1 1.7 130.5 -10 1 5 5149 08 12 53 08 13 13 --- 23 08 22 60.4 329.0 1.8 130.4 10 F 1 5282 08 13 13 WB114 23 08 22 62.5 333.1 1.4 138.1 -10 1 5 5282 08 13 13 08 13 33 --- 23 08 42 62.5 333.0 1.4 137.9 10 F 1 5415 08 13 33 2123+550 23 08 42 60.4 329.0 1.8 130.3 -10 1 5 5415 08 13 33 08 13 53 --- 23 09 02 60.4 328.9 1.8 130.2 10 F 1 5548 08 13 53 WB114 23 09 02 62.5 333.0 1.4 137.8 -10 1 5 5548 08 13 53 08 14 13 --- 23 09 22 62.4 332.9 1.4 137.7 10 F 1 5681 08 14 13 2123+550 23 09 22 60.3 328.8 1.8 130.0 -10 1 5 5681 08 14 13 08 14 33 --- 23 09 42 60.3 328.8 1.8 129.9 10 F 1 5814 08 14 33 WB114 23 09 42 62.4 332.8 1.4 137.5 -10 1 5 5814 08 14 33 08 14 53 --- 23 10 02 62.4 332.7 1.4 137.4 10 F 1 5947 08 14 53 2123+550 23 10 02 60.2 328.7 1.8 129.8 -10 1 5 5947 08 14 53 08 15 13 --- 23 10 22 60.2 328.7 1.8 129.7 10 F 1 6080 08 15 13 WB114 23 10 22 62.3 332.6 1.5 137.2 -10 1 5 6080 08 15 13 08 15 33 --- 23 10 42 62.3 332.6 1.5 137.1 10 F 1 6213 08 15 33 2123+550 23 10 42 60.2 328.6 1.8 129.5 -10 1 5 6213 08 15 33 08 15 53 --- 23 11 02 60.1 328.5 1.8 129.4 10 F 1 6346 08 15 53 WB114 23 11 02 62.3 332.5 1.5 137.0 -10 1 5 6346 08 15 53 08 16 13 --- 23 11 22 62.2 332.4 1.5 136.8 10 F 1 6479 08 16 13 2123+550 23 11 22 60.1 328.5 1.8 129.3 -10 1 5 6479 08 16 13 08 16 33 --- 23 11 42 60.1 328.4 1.8 129.2 10 F 1 6612 08 16 33 WB114 23 11 42 62.2 332.3 1.5 136.7 -10 1 5 6612 08 16 33 08 16 53 --- 23 12 02 62.2 332.3 1.5 136.6 10 F 1 6745 08 16 53 2123+550 23 12 02 60.0 328.4 1.8 129.1 -10 1 5 6745 08 16 53 08 17 13 --- 23 12 22 60.0 328.3 1.8 128.9 10 F 1 6878 08 17 13 WB114 23 12 22 62.1 332.2 1.5 136.4 -10 1 5 6878 08 17 13 08 17 32 --- 23 12 42 62.1 332.1 1.5 136.3 10 F 1 7011 Schedule for VLBA_KP (Code Kp ) Page 33 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 17 32 2123+550 23 12 42 60.0 328.2 1.8 128.8 -10 1 5 7011 08 17 32 08 17 52 --- 23 13 02 59.9 328.2 1.8 128.7 10 F 1 7143 08 17 52 WB114 23 13 02 62.1 332.0 1.5 136.2 -10 1 5 7143 08 17 52 08 18 12 --- 23 13 22 62.0 332.0 1.5 136.0 10 F 1 7276 08 18 12 2123+550 23 13 22 59.9 328.1 1.8 128.6 -10 1 5 7276 08 18 12 08 18 32 --- 23 13 42 59.8 328.1 1.8 128.5 10 F 1 7409 08 18 32 WB114 23 13 42 62.0 331.9 1.5 135.9 -10 1 5 7409 08 18 32 08 18 52 --- 23 14 02 62.0 331.8 1.5 135.8 10 F 1 7542 08 18 52 2123+550 23 14 02 59.8 328.0 1.8 128.3 -10 1 5 7542 08 18 52 08 19 12 --- 23 14 22 59.8 327.9 1.9 128.2 10 F 1 7675 08 19 12 WB114 23 14 22 61.9 331.8 1.5 135.6 -10 1 5 7675 08 19 12 08 19 32 --- 23 14 42 61.9 331.7 1.5 135.5 10 F 1 7808 08 19 32 2123+550 23 14 42 59.7 327.9 1.9 128.1 -10 1 5 7808 08 19 32 08 19 52 --- 23 15 02 59.7 327.8 1.9 128.0 10 F 1 7941 08 19 52 WB114 23 15 02 61.9 331.6 1.5 135.4 -10 1 5 7941 08 19 52 08 20 12 --- 23 15 22 61.8 331.5 1.5 135.2 10 F 1 8074 08 20 12 2123+550 23 15 22 59.7 327.8 1.9 127.9 -10 1 5 8074 08 20 12 08 20 32 --- 23 15 42 59.6 327.7 1.9 127.7 10 F 1 8207 08 20 32 WB114 23 15 42 61.8 331.5 1.5 135.1 -10 1 5 8207 08 20 32 08 20 52 --- 23 16 02 61.8 331.4 1.5 135.0 10 F 1 8340 08 20 52 2123+550 23 16 02 59.6 327.6 1.9 127.6 -10 1 5 8340 08 20 52 08 21 12 --- 23 16 22 59.5 327.6 1.9 127.5 10 F 1 8473 08 21 12 WB114 23 16 22 61.7 331.3 1.6 134.9 -10 1 5 8473 08 21 12 08 21 32 --- 23 16 42 61.7 331.3 1.6 134.7 10 F 1 8606 08 21 32 2123+550 23 16 42 59.5 327.5 1.9 127.4 -10 1 5 8606 08 21 32 08 21 52 --- 23 17 02 59.5 327.5 1.9 127.3 10 F 1 8739 08 21 52 WB114 23 17 02 61.7 331.2 1.6 134.6 -10 1 5 8739 08 21 52 08 22 12 --- 23 17 22 61.6 331.1 1.6 134.5 10 F 1 8872 Schedule for VLBA_KP (Code Kp ) Page 34 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 22 12 2123+550 23 17 22 59.4 327.4 1.9 127.2 -10 1 5 8872 08 22 12 08 22 32 --- 23 17 42 59.4 327.4 1.9 127.0 10 F 1 9005 08 22 32 WB114 23 17 42 61.6 331.0 1.6 134.3 -10 1 5 9005 08 22 32 08 22 52 --- 23 18 02 61.6 331.0 1.6 134.2 10 F 1 9138 08 24 51 3C454.3 23 20 02 73.1 202.0 0.4 19.3 28 1 5 9138 08 24 51 08 30 50 --- 23 26 02 72.6 206.5 0.5 23.2 359 F 1 11531 08 32 50 2146+570 23 28 02 59.4 332.7 1.7 134.4 30 1 5 11531 08 32 50 08 33 10 --- 23 28 22 59.4 332.7 1.7 134.3 20 F 1 11664 08 33 10 WB114 23 28 22 60.5 328.9 1.8 130.3 -9 1 5 11664 08 33 10 08 33 30 --- 23 28 42 60.4 328.8 1.8 130.2 11 F 1 11797 08 33 30 2146+570 23 28 42 59.4 332.6 1.7 134.1 -9 1 5 11797 08 33 30 08 33 50 --- 23 29 02 59.3 332.6 1.7 134.0 11 F 1 11930 08 33 50 WB114 23 29 02 60.4 328.8 1.8 130.0 -9 1 5 11930 08 33 50 08 34 10 --- 23 29 22 60.4 328.7 1.8 129.9 11 F 1 12063 08 34 10 2146+570 23 29 22 59.3 332.5 1.7 133.9 -9 1 5 12063 08 34 10 08 34 30 --- 23 29 42 59.3 332.4 1.7 133.8 11 F 1 12196 08 34 30 WB114 23 29 42 60.3 328.7 1.8 129.8 -9 1 5 12196 08 34 30 08 34 50 --- 23 30 02 60.3 328.6 1.8 129.7 11 F 1 12329 08 34 50 2146+570 23 30 02 59.2 332.4 1.7 133.6 -9 1 5 12329 08 34 50 08 35 10 --- 23 30 22 59.2 332.3 1.7 133.5 11 F 1 12462 08 35 10 WB114 23 30 22 60.2 328.5 1.8 129.5 -9 1 5 12462 08 35 10 08 35 30 --- 23 30 42 60.2 328.5 1.8 129.4 11 F 1 12595 08 35 30 2146+570 23 30 42 59.2 332.3 1.7 133.4 -9 1 5 12595 08 35 30 08 35 49 --- 23 31 02 59.1 332.2 1.7 133.3 11 F 1 12728 08 35 49 WB114 23 31 02 60.2 328.4 1.8 129.3 -9 1 5 12728 08 35 49 08 36 09 --- 23 31 22 60.1 328.4 1.8 129.2 11 F 1 12861 08 36 09 2146+570 23 31 22 59.1 332.1 1.7 133.1 -9 1 5 12861 08 36 09 08 36 29 --- 23 31 42 59.1 332.1 1.8 133.0 11 F 1 12994 Schedule for VLBA_KP (Code Kp ) Page 35 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 36 29 WB114 23 31 42 60.1 328.3 1.8 129.1 -9 1 5 12994 08 36 29 08 36 49 --- 23 32 02 60.1 328.2 1.8 128.9 11 F 1 13127 08 36 49 2146+570 23 32 02 59.0 332.0 1.8 132.9 -9 1 5 13127 08 36 49 08 37 09 --- 23 32 22 59.0 332.0 1.8 132.8 11 F 1 13260 08 37 09 WB114 23 32 22 60.0 328.2 1.8 128.8 -9 1 5 13260 08 37 09 08 37 29 --- 23 32 42 60.0 328.1 1.8 128.7 11 F 1 13393 08 37 29 2146+570 23 32 42 59.0 331.9 1.8 132.7 -9 1 5 13393 08 37 29 08 37 49 --- 23 33 02 58.9 331.8 1.8 132.5 11 F 1 13526 08 37 49 WB114 23 33 02 60.0 328.1 1.8 128.6 -9 1 5 13526 08 37 49 08 38 09 --- 23 33 22 59.9 328.0 1.8 128.5 11 F 1 13659 08 38 09 2146+570 23 33 22 58.9 331.8 1.8 132.4 -9 1 5 13659 08 38 09 08 38 29 --- 23 33 42 58.9 331.7 1.8 132.3 11 F 1 13792 08 38 29 WB114 23 33 42 59.9 327.9 1.8 128.3 -9 1 5 13792 08 38 29 08 38 49 --- 23 34 02 59.8 327.9 1.8 128.2 11 F 1 13925 08 38 49 2146+570 23 34 02 58.8 331.7 1.8 132.2 -9 1 5 13925 08 38 49 08 39 09 --- 23 34 22 58.8 331.6 1.8 132.1 11 F 1 14058 08 39 09 WB114 23 34 22 59.8 327.8 1.9 128.1 -9 1 5 14058 08 39 09 08 39 29 --- 23 34 42 59.8 327.8 1.9 128.0 11 F 1 14191 08 39 29 2146+570 23 34 42 58.8 331.5 1.8 131.9 -9 1 5 14191 08 39 29 08 39 49 --- 23 35 02 58.7 331.5 1.8 131.8 11 F 1 14324 08 39 49 WB114 23 35 02 59.7 327.7 1.9 127.9 -9 1 5 14324 08 39 49 08 40 09 --- 23 35 22 59.7 327.6 1.9 127.8 11 F 1 14457 08 40 09 2146+570 23 35 22 58.7 331.4 1.8 131.7 -9 1 5 14457 08 40 09 08 40 29 --- 23 35 42 58.7 331.4 1.8 131.6 11 F 1 14590 08 40 29 WB114 23 35 42 59.6 327.6 1.9 127.6 -9 1 5 14590 08 40 29 08 40 49 --- 23 36 02 59.6 327.5 1.9 127.5 11 F 1 14723 08 40 49 2146+570 23 36 02 58.6 331.3 1.8 131.5 -9 1 5 14723 08 40 49 08 41 09 --- 23 36 22 58.6 331.2 1.8 131.3 11 F 1 14856 Schedule for VLBA_KP (Code Kp ) Page 36 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 41 09 WB114 23 36 22 59.6 327.5 1.9 127.4 -9 1 5 14856 08 41 09 08 41 29 --- 23 36 42 59.5 327.4 1.9 127.3 11 F 1 14989 08 41 29 2146+570 23 36 42 58.6 331.2 1.8 131.2 -9 1 5 14989 08 41 29 08 41 48 --- 23 37 02 58.5 331.1 1.8 131.1 11 F 1 15122 08 41 48 WB114 23 37 02 59.5 327.4 1.9 127.2 -9 1 5 15122 08 41 48 08 42 08 --- 23 37 22 59.5 327.3 1.9 127.0 11 F 1 15255 08 42 08 2146+570 23 37 22 58.5 331.1 1.8 131.0 -9 1 5 15255 08 42 08 08 42 28 --- 23 37 42 58.5 331.0 1.9 130.9 11 F 1 15388 08 42 28 WB114 23 37 42 59.4 327.2 1.9 126.9 -9 1 5 15388 08 42 28 08 42 48 --- 23 38 02 59.4 327.2 1.9 126.8 11 F 1 15521 08 42 48 2146+570 23 38 02 58.4 331.0 1.9 130.8 -9 1 5 15521 08 42 48 08 43 08 --- 23 38 22 58.4 330.9 1.9 130.6 11 F 1 15654 08 43 08 WB114 23 38 22 59.3 327.1 1.9 126.7 -9 1 5 15654 08 43 08 08 43 28 --- 23 38 42 59.3 327.1 1.9 126.6 11 F 1 15786 08 43 28 2146+570 23 38 42 58.4 330.8 1.9 130.5 -9 1 5 15786 08 43 28 08 43 48 --- 23 39 02 58.3 330.8 1.9 130.4 11 F 1 15919 08 43 48 WB114 23 39 02 59.3 327.0 1.9 126.5 -9 1 5 15919 08 43 48 08 44 08 --- 23 39 22 59.2 327.0 1.9 126.3 11 F 1 16052 08 44 08 2146+570 23 39 22 58.3 330.7 1.9 130.3 -9 1 5 16052 08 44 08 08 44 28 --- 23 39 42 58.3 330.7 1.9 130.2 11 F 1 16185 08 44 28 WB114 23 39 42 59.2 326.9 1.9 126.2 -9 1 5 16185 08 44 28 08 44 48 --- 23 40 02 59.2 326.9 1.9 126.1 11 F 1 16318 08 44 48 2146+570 23 40 02 58.2 330.6 1.9 130.0 -9 1 5 16318 08 44 48 08 45 08 --- 23 40 22 58.2 330.6 1.9 129.9 11 F 1 16451 08 45 08 WB114 23 40 22 59.1 326.8 2.0 126.0 -9 1 5 16451 08 45 08 08 45 28 --- 23 40 42 59.1 326.7 2.0 125.9 11 F 1 16584 08 45 28 2146+570 23 40 42 58.2 330.5 1.9 129.8 -9 1 5 16584 08 45 28 08 45 48 --- 23 41 02 58.1 330.5 1.9 129.7 11 F 1 16717 Schedule for VLBA_KP (Code Kp ) Page 37 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 45 48 WB114 23 41 02 59.0 326.7 2.0 125.8 -9 1 5 16717 08 45 48 08 46 08 --- 23 41 22 59.0 326.6 2.0 125.7 11 F 1 16850 08 46 08 2146+570 23 41 22 58.1 330.4 1.9 129.6 -9 1 5 16850 08 46 08 08 46 28 --- 23 41 42 58.0 330.4 1.9 129.5 11 F 1 16983 08 46 28 WB114 23 41 42 59.0 326.6 2.0 125.5 -9 1 5 16983 08 46 28 08 46 48 --- 23 42 02 58.9 326.5 2.0 125.4 11 F 1 17116 08 46 48 2146+570 23 42 02 58.0 330.3 1.9 129.3 -9 1 5 17116 08 46 48 08 47 08 --- 23 42 22 58.0 330.2 1.9 129.2 11 F 1 17249 08 47 08 WB114 23 42 22 58.9 326.5 2.0 125.3 -9 1 6 17249 08 47 08 08 47 28 --- 23 42 42 58.8 326.4 2.0 125.2 11 R 1 17116 08 47 28 2146+570 23 42 42 57.9 330.2 1.9 129.1 -9 1 6 17116 08 47 28 08 47 47 --- 23 43 02 57.9 330.1 1.9 129.0 11 R 1 16983 08 47 47 WB114 23 43 02 58.8 326.4 2.0 125.1 -9 1 6 16983 08 47 47 08 48 07 --- 23 43 22 58.8 326.3 2.0 125.0 11 R 1 16850 08 48 07 2146+570 23 43 22 57.9 330.1 1.9 128.9 -9 1 6 16850 08 48 07 08 48 27 --- 23 43 42 57.8 330.0 2.0 128.8 11 R 1 16717 08 48 27 WB114 23 43 42 58.7 326.3 2.0 124.9 -9 1 6 16717 08 48 27 08 48 47 --- 23 44 02 58.7 326.2 2.0 124.7 11 R 1 16584 08 48 47 2146+570 23 44 02 57.8 330.0 2.0 128.7 -9 1 6 16584 08 48 47 08 49 07 --- 23 44 22 57.8 329.9 2.0 128.5 11 R 1 16451 08 49 07 WB114 23 44 22 58.6 326.2 2.0 124.6 -9 1 6 16451 08 49 07 08 49 27 --- 23 44 42 58.6 326.1 2.0 124.5 11 R 1 16318 08 49 27 2146+570 23 44 42 57.7 329.9 2.0 128.4 -9 1 6 16318 08 49 27 08 49 47 --- 23 45 02 57.7 329.8 2.0 128.3 11 R 1 16185 08 49 47 WB114 23 45 02 58.6 326.1 2.0 124.4 -9 1 6 16185 08 49 47 08 50 07 --- 23 45 22 58.5 326.0 2.0 124.3 11 R 1 16052 08 50 07 2146+570 23 45 22 57.7 329.8 2.0 128.2 -9 1 6 16052 08 50 07 08 50 27 --- 23 45 42 57.6 329.7 2.0 128.1 11 R 1 15919 Schedule for VLBA_KP (Code Kp ) Page 38 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 50 27 WB114 23 45 42 58.5 325.9 2.0 124.2 -9 1 6 15919 08 50 27 08 50 47 --- 23 46 02 58.4 325.9 2.0 124.1 11 R 1 15786 08 50 47 2146+570 23 46 02 57.6 329.7 2.0 128.0 -9 1 6 15786 08 50 47 08 51 07 --- 23 46 22 57.6 329.6 2.0 127.9 11 R 1 15654 08 51 07 WB114 23 46 22 58.4 325.8 2.1 124.0 -9 1 6 15654 08 51 07 08 51 27 --- 23 46 42 58.4 325.8 2.1 123.8 11 R 1 15521 08 51 27 2146+570 23 46 42 57.5 329.6 2.0 127.7 -9 1 6 15521 08 51 27 08 51 47 --- 23 47 02 57.5 329.5 2.0 127.6 11 R 1 15388 08 51 47 WB114 23 47 02 58.3 325.7 2.1 123.7 -9 1 6 15388 08 51 47 08 52 07 --- 23 47 22 58.3 325.7 2.1 123.6 11 R 1 15255 08 52 07 2146+570 23 47 22 57.4 329.5 2.0 127.5 -9 1 6 15255 08 52 07 08 52 27 --- 23 47 42 57.4 329.4 2.0 127.4 11 R 1 15122 08 52 27 WB114 23 47 42 58.2 325.6 2.1 123.5 -9 1 6 15122 08 52 27 08 52 47 --- 23 48 02 58.2 325.6 2.1 123.4 11 R 1 14989 08 52 47 2146+570 23 48 02 57.4 329.4 2.0 127.3 -9 1 6 14989 08 52 47 08 53 07 --- 23 48 22 57.3 329.3 2.0 127.2 11 R 1 14856 08 53 07 WB114 23 48 22 58.2 325.5 2.1 123.3 -9 1 6 14856 08 53 07 08 53 27 --- 23 48 42 58.1 325.5 2.1 123.2 11 R 1 14723 08 53 27 2146+570 23 48 42 57.3 329.3 2.0 127.1 -9 1 6 14723 08 53 27 08 53 46 --- 23 49 02 57.3 329.2 2.0 127.0 11 R 1 14590 08 53 46 WB114 23 49 02 58.1 325.4 2.1 123.1 -9 1 6 14590 08 53 46 08 54 06 --- 23 49 22 58.0 325.4 2.1 123.0 11 R 1 14457 08 54 06 2146+570 23 49 22 57.2 329.2 2.0 126.8 -9 1 6 14457 08 54 06 08 54 26 --- 23 49 42 57.2 329.1 2.1 126.7 11 R 1 14324 08 54 26 WB114 23 49 42 58.0 325.3 2.1 122.8 -9 1 6 14324 08 54 26 08 54 46 --- 23 50 02 58.0 325.3 2.1 122.7 11 R 1 14191 08 54 46 2146+570 23 50 02 57.2 329.1 2.1 126.6 -9 1 6 14191 08 54 46 08 55 06 --- 23 50 22 57.1 329.0 2.1 126.5 11 R 1 14058 Schedule for VLBA_KP (Code Kp ) Page 39 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 55 06 WB114 23 50 22 57.9 325.2 2.1 122.6 -9 1 6 14058 08 55 06 08 55 26 --- 23 50 42 57.9 325.2 2.1 122.5 11 R 1 13925 08 55 26 2146+570 23 50 42 57.1 329.0 2.1 126.4 -9 1 6 13925 08 55 26 08 55 46 --- 23 51 02 57.0 328.9 2.1 126.3 11 R 1 13792 08 55 46 WB114 23 51 02 57.8 325.2 2.1 122.4 -9 1 6 13792 08 55 46 08 56 06 --- 23 51 22 57.8 325.1 2.1 122.3 11 R 1 13659 08 56 06 2146+570 23 51 22 57.0 328.9 2.1 126.2 -9 1 6 13659 08 56 06 08 56 26 --- 23 51 42 57.0 328.8 2.1 126.1 11 R 1 13526 08 56 26 WB114 23 51 42 57.8 325.1 2.1 122.2 -8 1 6 13526 08 56 26 08 56 46 --- 23 52 02 57.7 325.0 2.1 122.1 11 R 1 13393 08 56 46 2146+570 23 52 02 56.9 328.8 2.1 125.9 -8 1 6 13393 08 56 46 08 57 06 --- 23 52 22 56.9 328.7 2.1 125.8 11 R 1 13260 08 57 06 WB114 23 52 22 57.7 325.0 2.2 122.0 -8 1 6 13260 08 57 06 08 57 26 --- 23 52 42 57.6 324.9 2.2 121.9 11 R 1 13127 08 57 26 2146+570 23 52 42 56.9 328.7 2.1 125.7 -8 1 6 13127 08 57 26 08 57 46 --- 23 53 02 56.8 328.6 2.1 125.6 11 R 1 12994 08 57 46 WB114 23 53 02 57.6 324.9 2.2 121.8 -8 1 6 12994 08 57 46 08 58 06 --- 23 53 22 57.6 324.8 2.2 121.7 11 R 1 12861 08 58 06 2146+570 23 53 22 56.8 328.6 2.1 125.5 -8 1 6 12861 08 58 06 08 58 26 --- 23 53 42 56.8 328.5 2.1 125.4 11 R 1 12728 08 58 26 WB114 23 53 42 57.5 324.8 2.2 121.5 -8 1 6 12728 08 58 26 08 58 46 --- 23 54 02 57.5 324.7 2.2 121.4 11 R 1 12595 08 58 46 2146+570 23 54 02 56.7 328.5 2.1 125.3 -8 1 6 12595 08 58 46 08 59 06 --- 23 54 22 56.7 328.4 2.1 125.2 11 R 1 12462 08 59 06 WB114 23 54 22 57.4 324.7 2.2 121.3 -8 1 6 12462 08 59 06 08 59 26 --- 23 54 42 57.4 324.6 2.2 121.2 11 R 1 12329 08 59 26 2146+570 23 54 42 56.6 328.4 2.1 125.1 -8 1 6 12329 08 59 26 08 59 46 --- 23 55 02 56.6 328.3 2.1 125.0 11 R 1 12196 Schedule for VLBA_KP (Code Kp ) Page 40 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 08 59 46 WB114 23 55 02 57.4 324.6 2.2 121.1 -8 1 6 12196 08 59 46 09 00 05 --- 23 55 22 57.3 324.5 2.2 121.0 11 R 1 12063 09 00 05 2146+570 23 55 22 56.6 328.3 2.1 124.8 -8 1 6 12063 09 00 05 09 00 25 --- 23 55 42 56.5 328.2 2.2 124.7 11 R 1 11930 09 00 25 WB114 23 55 42 57.3 324.5 2.2 120.9 -8 1 6 11930 09 00 25 09 00 45 --- 23 56 02 57.2 324.4 2.2 120.8 11 R 1 11797 09 00 45 2146+570 23 56 02 56.5 328.2 2.2 124.6 -8 1 6 11797 09 00 45 09 01 05 --- 23 56 22 56.5 328.1 2.2 124.5 11 R 1 11664 09 01 05 WB114 23 56 22 57.2 324.4 2.2 120.7 -8 1 6 11664 09 01 05 09 01 25 --- 23 56 42 57.2 324.4 2.2 120.6 11 R 1 11531 09 01 25 2146+570 23 56 42 56.4 328.1 2.2 124.4 -8 1 6 11531 09 01 25 09 01 45 --- 23 57 02 56.4 328.0 2.2 124.3 11 R 1 11399 09 01 45 WB114 23 57 02 57.1 324.3 2.2 120.5 -8 1 6 11399 09 01 45 09 02 05 --- 23 57 22 57.1 324.3 2.2 120.4 11 R 1 11266 09 02 05 2146+570 23 57 22 56.3 328.0 2.2 124.2 -8 1 6 11266 09 02 05 09 02 25 --- 23 57 42 56.3 328.0 2.2 124.1 11 R 1 11133 09 02 25 WB114 23 57 42 57.0 324.2 2.2 120.3 -8 1 6 11133 09 02 25 09 02 45 --- 23 58 02 57.0 324.2 2.2 120.2 11 R 1 11000 09 02 45 2146+570 23 58 02 56.3 327.9 2.2 124.0 -8 1 6 11000 09 02 45 09 03 05 --- 23 58 22 56.2 327.9 2.2 123.9 11 R 1 10867 09 03 05 WB114 23 58 22 56.9 324.1 2.3 120.1 -8 1 6 10867 09 03 05 09 03 25 --- 23 58 42 56.9 324.1 2.3 120.0 11 R 1 10734 09 03 25 2146+570 23 58 42 56.2 327.8 2.2 123.8 -8 1 6 10734 09 03 25 09 03 45 --- 23 59 02 56.2 327.8 2.2 123.7 11 R 1 10601 09 03 45 WB114 23 59 02 56.9 324.0 2.3 119.8 -8 1 6 10601 09 03 45 09 04 05 --- 23 59 22 56.8 324.0 2.3 119.7 11 R 1 10468 09 04 05 2146+570 23 59 22 56.1 327.7 2.2 123.6 -8 1 6 10468 09 04 05 09 04 25 --- 23 59 42 56.1 327.7 2.2 123.4 11 R 1 10335 Schedule for VLBA_KP (Code Kp ) Page 41 BH099 VLBA format 1cm line 2002 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Tue 27 Aug 2002 Day 239 --- 09 04 25 WB114 23 59 42 56.8 324.0 2.3 119.6 -8 1 6 10335 09 04 25 09 04 45 --- 00 00 02 56.7 323.9 2.3 119.5 11 R 1 10202 09 04 45 2146+570 00 00 02 56.0 327.6 2.2 123.3 -8 1 6 10202 09 04 45 09 05 05 --- 00 00 22 56.0 327.6 2.2 123.2 11 R 1 10069 09 05 05 WB114 00 00 22 56.7 323.9 2.3 119.4 -8 1 6 10069 09 05 05 09 05 25 --- 00 00 42 56.7 323.8 2.3 119.3 11 R 1 9936 09 05 25 2146+570 00 00 42 56.0 327.5 2.2 123.1 -8 1 6 9936 09 05 25 09 05 45 --- 00 01 02 55.9 327.5 2.2 123.0 11 R 1 9803 09 05 45 WB114 00 01 02 56.6 323.8 2.3 119.2 -8 1 6 9803 09 05 45 09 06 04 --- 00 01 22 56.6 323.7 2.3 119.1 11 R 1 9670 09 06 04 2146+570 00 01 22 55.9 327.5 2.2 122.9 -8 1 6 9670 09 06 04 09 06 24 --- 00 01 42 55.9 327.4 2.3 122.8 11 R 1 9537 09 06 24 WB114 00 01 42 56.5 323.7 2.3 119.0 -8 1 6 9537 09 06 24 09 06 44 --- 00 02 02 56.5 323.7 2.3 118.9 11 R 1 9404 09 08 44 3C454.3 00 04 02 67.6 229.2 1.2 42.0 51 1 6 9404 09 08 44 09 14 43 --- 00 10 02 66.6 231.9 1.3 44.1 359 R 1 7011 09 16 43 2123+550 00 12 02 52.6 320.7 2.8 110.4 55 1 6 7011 09 16 43 09 17 03 --- 00 12 22 52.5 320.7 2.8 110.3 20 R 1 6878 09 17 03 WB114 00 12 22 55.2 322.5 2.5 115.8 -11 1 6 6878 09 17 03 09 17 23 --- 00 12 42 55.1 322.4 2.5 115.7 9 R 1 6745 09 17 23 2123+550 00 12 42 52.5 320.6 2.8 110.2 -11 1 6 6745 09 17 23 09 17 43 --- 00 13 02 52.4 320.6 2.8 110.1 9 R 1 6612 09 17 43 WB114 00 13 02 55.1 322.4 2.5 115.6 -11 1 6 6612 09 17 43 09 18 03 --- 00 13 22 55.0 322.3 2.5 115.5 9 R 1 6479 09 18 03 2123+550 00 13 22 52.4 320.6 2.8 110.0 -11 1 6 6479 09 18 03 09 18 22 --- 00 13 42 52.3 320.6 2.8 109.9 9 R 1 6346 09 18 22 WB114 00 13 42 55.0 322.3 2