COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: BD125B freq phase cal 3/7 mm Exp. Code: BD125B Schedule Version: 4.00 Processed by SCHED version: 6.05 June 2006 PI: Richard Dodson Address: OAN Apartado 112, E-28803 Alcala de Henares, Madrid Spain Phone: (+34) 91-8855060 EMAIL: r.dodson@oan.es Fax: (+34) 91-8855062 Phone during observation: (+34) 91-8855061 Observing mode: VLBA Dual 3.5mm and 7mm observations Notes: Doppler is not possible with the freq phase ref technique PHASE REFERENCE experiment, DO NOT INTERRUPT the SCANS SPECTRAL LINE observations, make sure PHASE CAL is OFF Schedule for VLBA_PT (Code Pt ) Page 2 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 19 01 19 3C454.3 01 30 00 50.8 252.4 2.6 55.1 0 1 1 0 Stopped 19 02 49 --- 01 31 30 50.5 252.8 2.6 55.2 90 S 1 0 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 Next scan bandwidths: 16.00 16.00 19 02 49 3C454.3 01 31 30 50.5 252.8 2.6 55.2 -4 1 1 0 19 02 49 19 07 48 --- 01 36 30 49.5 253.8 2.7 55.7 295 F 1 5 19 03 07 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 07 48 3C454.3 01 36 30 49.5 253.8 2.7 55.7 -4 1 1 5 19 07 48 19 12 47 --- 01 41 30 48.5 254.9 2.8 56.1 295 F 1 10 19 07 48 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 14 27 0358+040 01 43 10 46.0 125.3 -2.3 -42.6 7 1 1 10 19 14 27 19 14 52 --- 01 43 35 46.1 125.4 -2.3 -42.5 25 F 1 10 19 14 45 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 14 52 0358+040 01 43 35 46.1 125.4 -2.3 -42.5 -4 1 1 10 19 14 52 19 15 17 --- 01 44 00 46.2 125.5 -2.3 -42.4 21 F 1 10 19 14 52 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 15 17 0358+040 01 44 00 46.2 125.5 -2.3 -42.4 -4 1 1 10 19 15 17 19 15 42 --- 01 44 25 46.2 125.6 -2.3 -42.3 21 F 1 11 19 15 17 Schedule for VLBA_PT (Code Pt ) Page 3 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 15 42 0358+040 01 44 25 46.2 125.6 -2.3 -42.3 -4 1 1 11 19 15 42 19 16 07 --- 01 44 50 46.3 125.7 -2.3 -42.3 21 F 1 11 19 15 42 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 16 07 0358+040 01 44 50 46.3 125.7 -2.3 -42.3 -4 1 1 11 19 16 07 19 16 32 --- 01 45 15 46.4 125.8 -2.3 -42.2 21 F 1 12 19 16 07 19 16 52 IKTAU 01 45 35 52.9 120.3 -2.1 -46.7 1 1 1 12 19 16 32 19 17 17 --- 01 46 00 53.0 120.4 -2.1 -46.6 25 F 1 12 19 16 32 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 17 17 IKTAU 01 46 00 53.0 120.4 -2.1 -46.6 -4 1 1 12 19 17 17 19 17 42 --- 01 46 25 53.1 120.5 -2.1 -46.5 21 F 1 13 19 17 17 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 17 42 IKTAU 01 46 25 53.1 120.5 -2.1 -46.5 -4 1 1 13 19 17 42 19 18 06 --- 01 46 50 53.1 120.7 -2.1 -46.5 21 F 1 13 19 17 42 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 18 06 IKTAU 01 46 50 53.1 120.7 -2.1 -46.5 -4 1 1 13 19 18 06 19 18 31 --- 01 47 15 53.2 120.8 -2.1 -46.4 21 F 1 14 19 18 06 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 18 31 IKTAU 01 47 15 53.2 120.8 -2.1 -46.4 -4 1 1 14 19 18 31 19 18 56 --- 01 47 40 53.3 120.9 -2.1 -46.3 21 F 1 14 19 18 31 Schedule for VLBA_PT (Code Pt ) Page 4 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 18 56 IKTAU 01 47 40 53.3 120.9 -2.1 -46.3 -4 1 1 14 19 18 56 19 19 21 --- 01 48 05 53.4 121.0 -2.1 -46.3 21 F 1 14 19 18 56 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 19 21 IKTAU 01 48 05 53.4 121.0 -2.1 -46.3 -4 1 1 14 19 19 21 19 19 46 --- 01 48 30 53.4 121.1 -2.1 -46.2 21 F 1 15 19 19 21 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 19 46 IKTAU 01 48 30 53.4 121.1 -2.1 -46.2 -4 1 1 15 19 19 46 19 20 11 --- 01 48 55 53.5 121.2 -2.1 -46.1 21 F 1 15 19 19 46 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 20 11 IKTAU 01 48 55 53.5 121.2 -2.1 -46.1 -4 1 1 15 19 20 11 19 20 36 --- 01 49 20 53.6 121.4 -2.1 -46.0 21 F 1 16 19 20 11 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 20 36 IKTAU 01 49 20 53.6 121.4 -2.1 -46.0 -4 1 1 16 19 20 36 19 21 01 --- 01 49 45 53.7 121.5 -2.1 -46.0 21 F 1 16 19 20 36 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 21 01 IKTAU 01 49 45 53.7 121.5 -2.1 -46.0 -4 1 1 16 19 21 01 19 21 26 --- 01 50 10 53.7 121.6 -2.1 -45.9 21 F 1 16 19 21 01 19 21 46 0358+040 01 50 30 47.2 127.3 -2.2 -41.2 1 1 1 16 19 21 26 19 22 11 --- 01 50 55 47.3 127.4 -2.2 -41.2 25 F 1 17 19 21 26 Schedule for VLBA_PT (Code Pt ) Page 5 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 22 11 0358+040 01 50 55 47.3 127.4 -2.2 -41.2 -4 1 1 17 19 22 11 19 22 36 --- 01 51 20 47.4 127.5 -2.2 -41.1 21 F 1 18 19 22 11 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 22 36 0358+040 01 51 20 47.4 127.5 -2.2 -41.1 -4 1 1 18 19 22 36 19 23 01 --- 01 51 45 47.4 127.6 -2.2 -41.0 21 F 1 18 19 22 36 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 23 01 0358+040 01 51 45 47.4 127.6 -2.2 -41.0 -4 1 1 18 19 23 01 19 23 26 --- 01 52 10 47.5 127.7 -2.2 -40.9 21 F 1 18 19 23 01 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 23 26 0358+040 01 52 10 47.5 127.7 -2.2 -40.9 -4 1 1 18 19 23 26 19 23 50 --- 01 52 35 47.6 127.8 -2.2 -40.9 21 F 1 19 19 23 26 19 24 10 IKTAU 01 52 55 54.2 122.4 -2.0 -45.4 1 1 1 19 19 23 50 19 24 35 --- 01 53 20 54.3 122.5 -2.0 -45.3 25 F 1 19 19 23 50 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 24 35 IKTAU 01 53 20 54.3 122.5 -2.0 -45.3 -4 1 1 19 19 24 35 19 25 00 --- 01 53 45 54.4 122.6 -2.0 -45.2 21 F 1 20 19 24 35 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 25 00 IKTAU 01 53 45 54.4 122.6 -2.0 -45.2 -4 1 1 20 19 25 00 19 25 25 --- 01 54 10 54.4 122.8 -2.0 -45.1 21 F 1 20 19 25 00 Schedule for VLBA_PT (Code Pt ) Page 6 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 25 25 IKTAU 01 54 10 54.4 122.8 -2.0 -45.1 -4 1 1 20 19 25 25 19 25 50 --- 01 54 35 54.5 122.9 -2.0 -45.0 21 F 1 21 19 25 25 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 25 50 IKTAU 01 54 35 54.5 122.9 -2.0 -45.0 -4 1 1 21 19 25 50 19 26 15 --- 01 55 00 54.6 123.0 -2.0 -45.0 21 F 1 21 19 25 50 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 26 15 IKTAU 01 55 00 54.6 123.0 -2.0 -45.0 -4 1 1 21 19 26 15 19 26 40 --- 01 55 25 54.6 123.1 -2.0 -44.9 21 F 1 21 19 26 15 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 26 40 IKTAU 01 55 25 54.6 123.1 -2.0 -44.9 -4 1 1 21 19 26 40 19 27 05 --- 01 55 50 54.7 123.3 -2.0 -44.8 21 F 1 22 19 26 40 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 27 05 IKTAU 01 55 50 54.7 123.3 -2.0 -44.8 -4 1 1 22 19 27 05 19 27 30 --- 01 56 15 54.8 123.4 -2.0 -44.7 21 F 1 22 19 27 05 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 27 30 IKTAU 01 56 15 54.8 123.4 -2.0 -44.7 -4 1 1 22 19 27 30 19 27 55 --- 01 56 40 54.9 123.5 -2.0 -44.6 21 F 1 23 19 27 30 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 27 55 IKTAU 01 56 40 54.9 123.5 -2.0 -44.6 -4 1 1 23 19 27 55 19 28 20 --- 01 57 05 54.9 123.6 -1.9 -44.6 21 F 1 23 19 27 55 Schedule for VLBA_PT (Code Pt ) Page 7 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 28 20 IKTAU 01 57 05 54.9 123.6 -1.9 -44.6 -4 1 1 23 19 28 20 19 28 45 --- 01 57 30 55.0 123.8 -1.9 -44.5 21 F 1 23 19 28 20 19 29 05 0358+040 01 57 50 48.4 129.3 -2.1 -39.8 1 1 1 23 19 28 45 19 29 30 --- 01 58 15 48.5 129.4 -2.1 -39.8 25 F 1 24 19 28 45 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 29 30 0358+040 01 58 15 48.5 129.4 -2.1 -39.8 -4 1 1 24 19 29 30 19 29 54 --- 01 58 40 48.6 129.6 -2.1 -39.7 21 F 1 25 19 29 30 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 29 54 0358+040 01 58 40 48.6 129.6 -2.1 -39.7 -4 1 1 25 19 29 54 19 30 19 --- 01 59 05 48.6 129.7 -2.0 -39.6 21 F 1 25 19 29 54 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 30 19 0358+040 01 59 05 48.6 129.7 -2.0 -39.6 -4 1 1 25 19 30 19 19 30 44 --- 01 59 30 48.7 129.8 -2.0 -39.5 21 F 1 25 19 30 19 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 30 44 0358+040 01 59 30 48.7 129.8 -2.0 -39.5 -4 1 1 25 19 30 44 19 31 09 --- 01 59 55 48.8 129.9 -2.0 -39.4 21 F 1 26 19 30 44 19 31 29 IKTAU 02 00 15 55.5 124.6 -1.9 -43.9 1 1 1 26 19 31 09 19 31 54 --- 02 00 40 55.5 124.8 -1.9 -43.8 25 F 1 27 19 31 09 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 31 54 IKTAU 02 00 40 55.5 124.8 -1.9 -43.8 -4 1 1 27 19 31 54 19 32 19 --- 02 01 05 55.6 124.9 -1.9 -43.7 21 F 1 27 19 31 54 Schedule for VLBA_PT (Code Pt ) Page 8 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 32 19 IKTAU 02 01 05 55.6 124.9 -1.9 -43.7 -4 1 1 27 19 32 19 19 32 44 --- 02 01 30 55.7 125.0 -1.9 -43.7 21 F 1 27 19 32 19 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 32 44 IKTAU 02 01 30 55.7 125.0 -1.9 -43.7 -4 1 1 27 19 32 44 19 33 09 --- 02 01 55 55.8 125.1 -1.9 -43.6 21 F 1 28 19 32 44 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 33 09 IKTAU 02 01 55 55.8 125.1 -1.9 -43.6 -4 1 1 28 19 33 09 19 33 34 --- 02 02 20 55.8 125.3 -1.9 -43.5 21 F 1 28 19 33 09 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 33 34 IKTAU 02 02 20 55.8 125.3 -1.9 -43.5 -4 1 1 28 19 33 34 19 33 59 --- 02 02 45 55.9 125.4 -1.9 -43.4 21 F 1 29 19 33 34 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 33 59 IKTAU 02 02 45 55.9 125.4 -1.9 -43.4 -4 1 1 29 19 33 59 19 34 24 --- 02 03 10 56.0 125.5 -1.8 -43.3 21 F 1 29 19 33 59 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 34 24 IKTAU 02 03 10 56.0 125.5 -1.8 -43.3 -4 1 1 29 19 34 24 19 34 49 --- 02 03 35 56.0 125.7 -1.8 -43.2 21 F 1 29 19 34 24 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 34 49 IKTAU 02 03 35 56.0 125.7 -1.8 -43.2 -4 1 1 29 19 34 49 19 35 14 --- 02 04 00 56.1 125.8 -1.8 -43.1 21 F 1 30 19 34 49 Schedule for VLBA_PT (Code Pt ) Page 9 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 35 14 IKTAU 02 04 00 56.1 125.8 -1.8 -43.1 -4 1 1 30 19 35 14 19 35 39 --- 02 04 25 56.2 125.9 -1.8 -43.0 21 F 1 30 19 35 14 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 35 39 IKTAU 02 04 25 56.2 125.9 -1.8 -43.0 -4 1 1 30 19 35 39 19 36 03 --- 02 04 50 56.2 126.1 -1.8 -42.9 21 F 1 31 19 35 39 19 36 23 0358+040 02 05 10 49.6 131.5 -1.9 -38.4 1 1 1 31 19 36 03 19 36 48 --- 02 05 35 49.6 131.6 -1.9 -38.3 25 F 1 31 19 36 03 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 36 48 0358+040 02 05 35 49.6 131.6 -1.9 -38.3 -4 1 1 31 19 36 48 19 37 13 --- 02 06 00 49.7 131.7 -1.9 -38.2 21 F 1 32 19 36 48 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 37 13 0358+040 02 06 00 49.7 131.7 -1.9 -38.2 -4 1 1 32 19 37 13 19 37 38 --- 02 06 25 49.8 131.9 -1.9 -38.1 21 F 1 32 19 37 13 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 37 38 0358+040 02 06 25 49.8 131.9 -1.9 -38.1 -4 1 1 32 19 37 38 19 38 03 --- 02 06 50 49.8 132.0 -1.9 -38.0 21 F 1 32 19 37 38 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 38 03 0358+040 02 06 50 49.8 132.0 -1.9 -38.0 -4 1 1 32 19 38 03 19 38 28 --- 02 07 15 49.9 132.1 -1.9 -37.9 21 F 1 33 19 38 03 19 38 48 IKTAU 02 07 35 56.7 127.0 -1.8 -42.3 0 1 1 33 19 38 28 19 39 13 --- 02 08 00 56.8 127.1 -1.8 -42.2 25 F 1 34 19 38 28 Schedule for VLBA_PT (Code Pt ) Page 10 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 39 13 IKTAU 02 08 00 56.8 127.1 -1.8 -42.2 -4 1 1 34 19 39 13 19 39 38 --- 02 08 25 56.8 127.2 -1.8 -42.1 21 F 1 34 19 39 13 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 39 38 IKTAU 02 08 25 56.8 127.2 -1.8 -42.1 -4 1 1 34 19 39 38 19 40 03 --- 02 08 50 56.9 127.4 -1.8 -42.0 21 F 1 34 19 39 38 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 40 03 IKTAU 02 08 50 56.9 127.4 -1.8 -42.0 -4 1 1 34 19 40 03 19 40 28 --- 02 09 15 57.0 127.5 -1.7 -41.9 21 F 1 35 19 40 03 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 40 28 IKTAU 02 09 15 57.0 127.5 -1.7 -41.9 -4 1 1 35 19 40 28 19 40 53 --- 02 09 40 57.0 127.7 -1.7 -41.8 21 F 1 35 19 40 28 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 40 53 IKTAU 02 09 40 57.0 127.7 -1.7 -41.8 -4 1 1 35 19 40 53 19 41 18 --- 02 10 05 57.1 127.8 -1.7 -41.8 21 F 1 36 19 40 53 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 41 18 IKTAU 02 10 05 57.1 127.8 -1.7 -41.8 -4 1 1 36 19 41 18 19 41 43 --- 02 10 30 57.2 127.9 -1.7 -41.7 21 F 1 36 19 41 18 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 41 43 IKTAU 02 10 30 57.2 127.9 -1.7 -41.7 -4 1 1 36 19 41 43 19 42 07 --- 02 10 55 57.2 128.1 -1.7 -41.6 21 F 1 36 19 41 43 Schedule for VLBA_PT (Code Pt ) Page 11 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 42 07 IKTAU 02 10 55 57.2 128.1 -1.7 -41.6 -4 1 1 36 19 42 07 19 42 32 --- 02 11 20 57.3 128.2 -1.7 -41.5 21 F 1 37 19 42 07 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 42 32 IKTAU 02 11 20 57.3 128.2 -1.7 -41.5 -4 1 1 37 19 42 32 19 42 57 --- 02 11 45 57.4 128.4 -1.7 -41.4 21 F 1 37 19 42 32 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 42 57 IKTAU 02 11 45 57.4 128.4 -1.7 -41.4 -4 1 1 37 19 42 57 19 43 22 --- 02 12 10 57.4 128.5 -1.7 -41.3 21 F 1 38 19 42 57 19 43 42 0358+040 02 12 30 50.7 133.8 -1.8 -36.8 0 1 1 38 19 43 22 19 44 07 --- 02 12 55 50.8 133.9 -1.8 -36.7 25 F 1 38 19 43 22 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 44 07 0358+040 02 12 55 50.8 133.9 -1.8 -36.7 -4 1 1 38 19 44 07 19 44 32 --- 02 13 20 50.8 134.0 -1.8 -36.6 21 F 1 39 19 44 07 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 44 32 0358+040 02 13 20 50.8 134.0 -1.8 -36.6 -4 1 1 39 19 44 32 19 44 57 --- 02 13 45 50.9 134.1 -1.8 -36.5 21 F 1 39 19 44 32 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 44 57 0358+040 02 13 45 50.9 134.1 -1.8 -36.5 -4 1 1 39 19 44 57 19 45 22 --- 02 14 10 50.9 134.3 -1.8 -36.4 21 F 1 40 19 44 57 Schedule for VLBA_PT (Code Pt ) Page 12 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 45 22 0358+040 02 14 10 50.9 134.3 -1.8 -36.4 -4 1 1 40 19 45 22 19 45 47 --- 02 14 35 51.0 134.4 -1.8 -36.3 21 F 1 40 19 45 22 Next scan frequencies: 43105.11 43105.11 Next BBC frequencies: 705.11 705.11 19 46 07 P-IKTAU 02 14 55 57.9 129.5 -1.7 -40.6 0 1 1 40 Stopped 19 47 07 --- 02 15 55 58.0 129.8 -1.6 -40.3 60 S 1 41 19 47 07 P-IKTAU 02 15 55 58.0 129.8 -1.6 -40.3 -4 1 1 41 Stopped 19 48 07 --- 02 16 55 58.2 130.2 -1.6 -40.1 56 S 1 42 19 48 07 P-IKTAU 02 16 55 58.2 130.2 -1.6 -40.1 -4 1 1 42 Stopped 19 49 06 --- 02 17 55 58.4 130.5 -1.6 -39.8 56 S 1 43 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 49 06 IKTAU 02 17 55 58.4 130.5 -1.6 -39.8 -4 1 1 43 19 49 06 19 49 31 --- 02 18 20 58.4 130.7 -1.6 -39.7 21 F 1 43 19 49 24 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 49 31 IKTAU 02 18 20 58.4 130.7 -1.6 -39.7 -4 1 1 43 19 49 31 19 49 56 --- 02 18 45 58.5 130.8 -1.6 -39.6 21 F 1 44 19 49 31 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 49 56 IKTAU 02 18 45 58.5 130.8 -1.6 -39.6 -4 1 1 44 19 49 56 19 50 21 --- 02 19 10 58.6 131.0 -1.6 -39.5 21 F 1 44 19 49 56 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 50 21 IKTAU 02 19 10 58.6 131.0 -1.6 -39.5 -4 1 1 44 19 50 21 19 50 46 --- 02 19 35 58.6 131.1 -1.6 -39.4 21 F 1 44 19 50 21 Schedule for VLBA_PT (Code Pt ) Page 13 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 50 46 IKTAU 02 19 35 58.6 131.1 -1.6 -39.4 -4 1 1 44 19 50 46 19 51 11 --- 02 20 00 58.7 131.3 -1.6 -39.3 21 F 1 45 19 50 46 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 51 11 IKTAU 02 20 00 58.7 131.3 -1.6 -39.3 -4 1 1 45 19 51 11 19 51 36 --- 02 20 25 58.8 131.4 -1.6 -39.2 21 F 1 45 19 51 11 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 51 36 IKTAU 02 20 25 58.8 131.4 -1.6 -39.2 -4 1 1 45 19 51 36 19 52 01 --- 02 20 50 58.8 131.6 -1.6 -39.1 21 F 1 46 19 51 36 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 52 01 IKTAU 02 20 50 58.8 131.6 -1.6 -39.1 -4 1 1 46 19 52 01 19 52 26 --- 02 21 15 58.9 131.7 -1.5 -39.0 21 F 1 46 19 52 01 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 52 26 IKTAU 02 21 15 58.9 131.7 -1.5 -39.0 -4 1 1 46 19 52 26 19 52 51 --- 02 21 40 58.9 131.9 -1.5 -38.9 21 F 1 46 19 52 26 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 52 51 IKTAU 02 21 40 58.9 131.9 -1.5 -38.9 -4 1 1 46 19 52 51 19 53 16 --- 02 22 05 59.0 132.0 -1.5 -38.7 21 F 1 47 19 52 51 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 53 16 IKTAU 02 22 05 59.0 132.0 -1.5 -38.7 -4 1 1 47 19 53 16 19 53 41 --- 02 22 30 59.1 132.2 -1.5 -38.6 21 F 1 47 19 53 16 Schedule for VLBA_PT (Code Pt ) Page 14 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- 19 54 01 0358+040 02 22 50 52.2 137.1 -1.6 -34.3 0 1 1 47 19 53 41 19 54 25 --- 02 23 15 52.2 137.3 -1.6 -34.2 25 F 1 48 19 53 41 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 54 25 0358+040 02 23 15 52.2 137.3 -1.6 -34.2 -4 1 1 48 19 54 25 19 54 50 --- 02 23 40 52.3 137.4 -1.6 -34.1 21 F 1 48 19 54 25 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 54 50 0358+040 02 23 40 52.3 137.4 -1.6 -34.1 -4 1 1 48 19 54 50 19 55 15 --- 02 24 05 52.4 137.5 -1.6 -34.0 21 F 1 49 19 54 50 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 55 15 0358+040 02 24 05 52.4 137.5 -1.6 -34.0 -4 1 1 49 19 55 15 19 55 40 --- 02 24 30 52.4 137.7 -1.6 -33.9 21 F 1 49 19 55 15 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 55 40 0358+040 02 24 30 52.4 137.7 -1.6 -33.9 -4 1 1 49 19 55 40 19 56 05 --- 02 24 55 52.5 137.8 -1.6 -33.8 21 F 1 50 19 55 40 19 56 25 IKTAU 02 25 15 59.5 133.2 -1.5 -37.9 0 1 1 50 19 56 05 19 56 50 --- 02 25 40 59.6 133.4 -1.5 -37.8 25 F 1 50 19 56 05 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 56 50 IKTAU 02 25 40 59.6 133.4 -1.5 -37.8 -4 1 1 50 19 56 50 19 57 15 --- 02 26 05 59.6 133.6 -1.5 -37.6 21 F 1 51 19 56 50 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 57 15 IKTAU 02 26 05 59.6 133.6 -1.5 -37.6 -4 1 1 51 19 57 15 19 57 40 --- 02 26 30 59.7 133.7 -1.5 -37.5 21 F 1 51 19 57 15 Schedule for VLBA_PT (Code Pt ) Page 15 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 57 40 IKTAU 02 26 30 59.7 133.7 -1.5 -37.5 -4 1 1 51 19 57 40 19 58 05 --- 02 26 55 59.7 133.9 -1.5 -37.4 21 F 1 52 19 57 40 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 58 05 IKTAU 02 26 55 59.7 133.9 -1.5 -37.4 -4 1 1 52 19 58 05 19 58 30 --- 02 27 20 59.8 134.0 -1.4 -37.3 21 F 1 52 19 58 05 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 58 30 IKTAU 02 27 20 59.8 134.0 -1.4 -37.3 -4 1 1 52 19 58 30 19 58 55 --- 02 27 45 59.9 134.2 -1.4 -37.2 21 F 1 52 19 58 30 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 58 55 IKTAU 02 27 45 59.9 134.2 -1.4 -37.2 -4 1 1 52 19 58 55 19 59 20 --- 02 28 10 59.9 134.4 -1.4 -37.1 21 F 1 53 19 58 55 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 19 59 20 IKTAU 02 28 10 59.9 134.4 -1.4 -37.1 -4 1 1 53 19 59 20 19 59 45 --- 02 28 35 60.0 134.5 -1.4 -36.9 21 F 1 53 19 59 20 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 19 59 45 IKTAU 02 28 35 60.0 134.5 -1.4 -36.9 -4 1 1 53 19 59 45 20 00 10 --- 02 29 00 60.0 134.7 -1.4 -36.8 21 F 1 54 19 59 45 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 00 10 IKTAU 02 29 00 60.0 134.7 -1.4 -36.8 -4 1 1 54 20 00 10 20 00 34 --- 02 29 25 60.1 134.9 -1.4 -36.7 21 F 1 54 20 00 10 Schedule for VLBA_PT (Code Pt ) Page 16 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 00 34 IKTAU 02 29 25 60.1 134.9 -1.4 -36.7 -4 1 1 54 20 00 34 20 00 59 --- 02 29 50 60.2 135.0 -1.4 -36.6 21 F 1 54 20 00 34 20 01 19 0358+040 02 30 10 53.2 139.6 -1.5 -32.4 0 1 1 54 20 00 59 20 01 44 --- 02 30 35 53.2 139.8 -1.5 -32.3 25 F 1 55 20 00 59 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 01 44 0358+040 02 30 35 53.2 139.8 -1.5 -32.3 -4 1 1 55 20 01 44 20 02 09 --- 02 31 00 53.3 139.9 -1.5 -32.2 21 F 1 55 20 01 44 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 02 09 0358+040 02 31 00 53.3 139.9 -1.5 -32.2 -4 1 1 55 20 02 09 20 02 34 --- 02 31 25 53.4 140.1 -1.5 -32.1 21 F 1 56 20 02 09 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 02 34 0358+040 02 31 25 53.4 140.1 -1.5 -32.1 -4 1 1 56 20 02 34 20 02 59 --- 02 31 50 53.4 140.2 -1.5 -32.0 21 F 1 56 20 02 34 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 02 59 0358+040 02 31 50 53.4 140.2 -1.5 -32.0 -4 1 1 56 20 02 59 20 03 24 --- 02 32 15 53.5 140.4 -1.5 -31.9 21 F 1 57 20 02 59 20 03 44 IKTAU 02 32 35 60.6 136.1 -1.4 -35.7 0 1 1 57 20 03 24 20 04 09 --- 02 33 00 60.6 136.3 -1.3 -35.6 25 F 1 57 20 03 24 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 04 09 IKTAU 02 33 00 60.6 136.3 -1.3 -35.6 -4 1 1 57 20 04 09 20 04 34 --- 02 33 25 60.7 136.5 -1.3 -35.5 21 F 1 58 20 04 09 Schedule for VLBA_PT (Code Pt ) Page 17 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 04 34 IKTAU 02 33 25 60.7 136.5 -1.3 -35.5 -4 1 1 58 20 04 34 20 04 59 --- 02 33 50 60.7 136.6 -1.3 -35.4 21 F 1 58 20 04 34 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 04 59 IKTAU 02 33 50 60.7 136.6 -1.3 -35.4 -4 1 1 58 20 04 59 20 05 24 --- 02 34 15 60.8 136.8 -1.3 -35.2 21 F 1 59 20 04 59 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 05 24 IKTAU 02 34 15 60.8 136.8 -1.3 -35.2 -4 1 1 59 20 05 24 20 05 49 --- 02 34 40 60.9 137.0 -1.3 -35.1 21 F 1 59 20 05 24 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 05 49 IKTAU 02 34 40 60.9 137.0 -1.3 -35.1 -4 1 1 59 20 05 49 20 06 14 --- 02 35 05 60.9 137.1 -1.3 -35.0 21 F 1 59 20 05 49 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 06 14 IKTAU 02 35 05 60.9 137.1 -1.3 -35.0 -4 1 1 59 20 06 14 20 06 38 --- 02 35 30 61.0 137.3 -1.3 -34.8 21 F 1 60 20 06 14 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 06 38 IKTAU 02 35 30 61.0 137.3 -1.3 -34.8 -4 1 1 60 20 06 38 20 07 03 --- 02 35 55 61.0 137.5 -1.3 -34.7 21 F 1 60 20 06 38 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 07 03 IKTAU 02 35 55 61.0 137.5 -1.3 -34.7 -4 1 1 60 20 07 03 20 07 28 --- 02 36 20 61.1 137.7 -1.3 -34.6 21 F 1 61 20 07 03 Schedule for VLBA_PT (Code Pt ) Page 18 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 07 28 IKTAU 02 36 20 61.1 137.7 -1.3 -34.6 -4 1 1 61 20 07 28 20 07 53 --- 02 36 45 61.2 137.8 -1.3 -34.5 21 F 1 61 20 07 28 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 07 53 IKTAU 02 36 45 61.2 137.8 -1.3 -34.5 -4 1 1 61 20 07 53 20 08 18 --- 02 37 10 61.2 138.0 -1.3 -34.3 21 F 1 61 20 07 53 20 08 38 0358+040 02 37 30 54.1 142.3 -1.4 -30.5 0 1 1 61 20 08 18 20 09 03 --- 02 37 55 54.2 142.4 -1.4 -30.3 25 F 1 62 20 08 18 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 09 03 0358+040 02 37 55 54.2 142.4 -1.4 -30.3 -4 1 1 62 20 09 03 20 09 28 --- 02 38 20 54.3 142.6 -1.4 -30.2 21 F 1 63 20 09 03 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 09 28 0358+040 02 38 20 54.3 142.6 -1.4 -30.2 -4 1 1 63 20 09 28 20 09 53 --- 02 38 45 54.3 142.7 -1.4 -30.1 21 F 1 63 20 09 28 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 09 53 0358+040 02 38 45 54.3 142.7 -1.4 -30.1 -4 1 1 63 20 09 53 20 10 18 --- 02 39 10 54.4 142.9 -1.4 -30.0 21 F 1 63 20 09 53 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 10 18 0358+040 02 39 10 54.4 142.9 -1.4 -30.0 -4 1 1 63 20 10 18 20 10 43 --- 02 39 35 54.4 143.0 -1.4 -29.9 21 F 1 64 20 10 18 20 11 03 IKTAU 02 39 55 61.6 139.2 -1.2 -33.4 0 1 1 64 20 10 43 20 11 28 --- 02 40 20 61.6 139.4 -1.2 -33.3 25 F 1 64 20 10 43 Schedule for VLBA_PT (Code Pt ) Page 19 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 11 28 IKTAU 02 40 20 61.6 139.4 -1.2 -33.3 -4 1 1 64 20 11 28 20 11 53 --- 02 40 45 61.7 139.5 -1.2 -33.2 21 F 1 65 20 11 28 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 11 53 IKTAU 02 40 45 61.7 139.5 -1.2 -33.2 -4 1 1 65 20 11 53 20 12 18 --- 02 41 10 61.8 139.7 -1.2 -33.0 21 F 1 65 20 11 53 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 12 18 IKTAU 02 41 10 61.8 139.7 -1.2 -33.0 -4 1 1 65 20 12 18 20 12 42 --- 02 41 35 61.8 139.9 -1.2 -32.9 21 F 1 66 20 12 18 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 12 42 IKTAU 02 41 35 61.8 139.9 -1.2 -32.9 -4 1 1 66 20 12 42 20 13 07 --- 02 42 00 61.9 140.1 -1.2 -32.7 21 F 1 66 20 12 42 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 13 07 IKTAU 02 42 00 61.9 140.1 -1.2 -32.7 -4 1 1 66 20 13 07 20 13 32 --- 02 42 25 61.9 140.3 -1.2 -32.6 21 F 1 67 20 13 07 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 13 32 IKTAU 02 42 25 61.9 140.3 -1.2 -32.6 -4 1 1 67 20 13 32 20 13 57 --- 02 42 50 62.0 140.4 -1.2 -32.5 21 F 1 67 20 13 32 20 14 17 0358+040 02 43 10 54.8 144.4 -1.3 -28.8 0 1 1 67 20 13 57 20 14 42 --- 02 43 35 54.9 144.5 -1.3 -28.7 25 F 1 68 20 13 57 Schedule for VLBA_PT (Code Pt ) Page 20 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 14 42 0358+040 02 43 35 54.9 144.5 -1.3 -28.7 -4 1 1 68 20 14 42 20 15 07 --- 02 44 00 54.9 144.7 -1.3 -28.6 21 F 1 68 20 14 42 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 15 07 0358+040 02 44 00 54.9 144.7 -1.3 -28.6 -4 1 1 68 20 15 07 20 15 32 --- 02 44 25 55.0 144.9 -1.3 -28.5 21 F 1 68 20 15 07 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 15 32 0358+040 02 44 25 55.0 144.9 -1.3 -28.5 -4 1 1 68 20 15 32 20 15 57 --- 02 44 50 55.0 145.0 -1.3 -28.4 21 F 1 69 20 15 32 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 15 57 0358+040 02 44 50 55.0 145.0 -1.3 -28.4 -4 1 1 69 20 15 57 20 16 22 --- 02 45 15 55.1 145.2 -1.3 -28.2 21 F 1 69 20 15 57 Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 20 17 42 3C84 02 46 35 80.2 40.1 -0.6 -134.7 4 1 1 69 Stopped 20 19 41 --- 02 48 35 80.4 38.5 -0.5 -136.6 120 S 1 69 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 Next scan bandwidths: 16.00 16.00 20 19 41 3C84 02 48 35 80.4 38.5 -0.5 -136.6 -4 1 1 69 20 19 41 20 22 41 --- 02 51 35 80.8 35.9 -0.5 -139.7 176 F 1 72 20 19 59 Schedule for VLBA_PT (Code Pt ) Page 21 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 22 41 3C84 02 51 35 80.8 35.9 -0.5 -139.7 -4 1 1 72 20 22 41 20 25 40 --- 02 54 35 81.2 33.1 -0.4 -142.9 176 F 1 75 20 22 41 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 27 00 0358+040 02 55 55 56.3 149.4 -1.1 -24.9 -4 1 1 75 20 27 00 20 27 25 --- 02 56 20 56.3 149.6 -1.1 -24.8 21 F 1 75 20 27 18 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 27 25 0358+040 02 56 20 56.3 149.6 -1.1 -24.8 -4 1 1 75 20 27 25 20 27 50 --- 02 56 45 56.4 149.7 -1.1 -24.7 21 F 1 76 20 27 25 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 27 50 0358+040 02 56 45 56.4 149.7 -1.1 -24.7 -4 1 1 76 20 27 50 20 28 15 --- 02 57 10 56.4 149.9 -1.1 -24.5 21 F 1 76 20 27 50 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 28 15 0358+040 02 57 10 56.4 149.9 -1.1 -24.5 -4 1 1 76 20 28 15 20 28 40 --- 02 57 35 56.5 150.1 -1.1 -24.4 21 F 1 77 20 28 15 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 28 40 0358+040 02 57 35 56.5 150.1 -1.1 -24.4 -4 1 1 77 20 28 40 20 29 05 --- 02 58 00 56.5 150.2 -1.1 -24.3 21 F 1 77 20 28 40 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 29 05 0358+040 02 58 00 56.5 150.2 -1.1 -24.3 -4 1 1 77 20 29 05 20 29 30 --- 02 58 25 56.5 150.4 -1.1 -24.1 21 F 1 77 20 29 05 Schedule for VLBA_PT (Code Pt ) Page 22 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 29 30 0358+040 02 58 25 56.5 150.4 -1.1 -24.1 -4 1 1 77 20 29 30 20 29 55 --- 02 58 50 56.6 150.6 -1.0 -24.0 21 F 1 78 20 29 30 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 29 55 0358+040 02 58 50 56.6 150.6 -1.0 -24.0 -4 1 1 78 20 29 55 20 30 20 --- 02 59 15 56.6 150.8 -1.0 -23.9 21 F 1 78 20 29 55 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 30 20 0358+040 02 59 15 56.6 150.8 -1.0 -23.9 -4 1 1 78 20 30 20 20 30 45 --- 02 59 40 56.7 150.9 -1.0 -23.7 21 F 1 79 20 30 20 20 31 04 IKTAU 03 00 00 64.0 148.5 -0.9 -26.1 -1 1 1 79 20 30 45 20 31 29 --- 03 00 25 64.1 148.7 -0.9 -25.9 24 F 1 79 20 30 45 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 31 29 IKTAU 03 00 25 64.1 148.7 -0.9 -25.9 -4 1 1 79 20 31 29 20 31 54 --- 03 00 50 64.1 149.0 -0.9 -25.8 21 F 1 80 20 31 29 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 31 54 IKTAU 03 00 50 64.1 149.0 -0.9 -25.8 -4 1 1 80 20 31 54 20 32 19 --- 03 01 15 64.2 149.2 -0.9 -25.6 21 F 1 80 20 31 54 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 32 19 IKTAU 03 01 15 64.2 149.2 -0.9 -25.6 -4 1 1 80 20 32 19 20 32 44 --- 03 01 40 64.2 149.4 -0.9 -25.4 21 F 1 81 20 32 19 Schedule for VLBA_PT (Code Pt ) Page 23 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 32 44 IKTAU 03 01 40 64.2 149.4 -0.9 -25.4 -4 1 1 81 20 32 44 20 33 09 --- 03 02 05 64.3 149.6 -0.9 -25.3 21 F 1 81 20 32 44 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 33 09 IKTAU 03 02 05 64.3 149.6 -0.9 -25.3 -4 1 1 81 20 33 09 20 33 34 --- 03 02 30 64.3 149.8 -0.9 -25.1 21 F 1 81 20 33 09 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 33 34 IKTAU 03 02 30 64.3 149.8 -0.9 -25.1 -4 1 1 81 20 33 34 20 33 59 --- 03 02 55 64.3 150.0 -0.9 -24.9 21 F 1 82 20 33 34 20 34 19 0358+040 03 03 15 57.0 152.4 -1.0 -22.5 -1 1 1 82 20 33 59 20 34 44 --- 03 03 40 57.1 152.6 -1.0 -22.4 24 F 1 83 20 33 59 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 34 44 0358+040 03 03 40 57.1 152.6 -1.0 -22.4 -4 1 1 83 20 34 44 20 35 09 --- 03 04 05 57.1 152.8 -1.0 -22.3 21 F 1 83 20 34 44 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 35 09 0358+040 03 04 05 57.1 152.8 -1.0 -22.3 -4 1 1 83 20 35 09 20 35 34 --- 03 04 30 57.1 153.0 -1.0 -22.1 21 F 1 83 20 35 09 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 35 34 0358+040 03 04 30 57.1 153.0 -1.0 -22.1 -4 1 1 83 20 35 34 20 35 59 --- 03 04 55 57.2 153.1 -0.9 -22.0 21 F 1 84 20 35 34 Schedule for VLBA_PT (Code Pt ) Page 24 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 35 59 0358+040 03 04 55 57.2 153.1 -0.9 -22.0 -4 1 1 84 20 35 59 20 36 24 --- 03 05 20 57.2 153.3 -0.9 -21.8 21 F 1 84 20 35 59 20 36 44 IKTAU 03 05 40 64.6 151.4 -0.8 -23.8 -1 1 1 84 20 36 24 20 37 08 --- 03 06 05 64.7 151.7 -0.8 -23.6 24 F 1 85 20 36 24 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 37 08 IKTAU 03 06 05 64.7 151.7 -0.8 -23.6 -4 1 1 85 20 37 08 20 37 33 --- 03 06 30 64.7 151.9 -0.8 -23.4 21 F 1 85 20 37 08 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 37 33 IKTAU 03 06 30 64.7 151.9 -0.8 -23.4 -4 1 1 85 20 37 33 20 37 58 --- 03 06 55 64.7 152.1 -0.8 -23.2 21 F 1 86 20 37 33 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 37 58 IKTAU 03 06 55 64.7 152.1 -0.8 -23.2 -4 1 1 86 20 37 58 20 38 23 --- 03 07 20 64.8 152.3 -0.8 -23.0 21 F 1 86 20 37 58 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 38 23 IKTAU 03 07 20 64.8 152.3 -0.8 -23.0 -4 1 1 86 20 38 23 20 38 48 --- 03 07 45 64.8 152.5 -0.8 -22.9 21 F 1 86 20 38 23 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 38 48 IKTAU 03 07 45 64.8 152.5 -0.8 -22.9 -4 1 1 86 20 38 48 20 39 13 --- 03 08 10 64.9 152.8 -0.8 -22.7 21 F 1 87 20 38 48 Schedule for VLBA_PT (Code Pt ) Page 25 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 39 13 IKTAU 03 08 10 64.9 152.8 -0.8 -22.7 -4 1 1 87 20 39 13 20 39 38 --- 03 08 35 64.9 153.0 -0.8 -22.5 21 F 1 87 20 39 13 20 39 58 0358+040 03 08 55 57.5 154.9 -0.9 -20.6 -1 1 1 87 20 39 38 20 40 23 --- 03 09 20 57.6 155.1 -0.9 -20.4 24 F 1 88 20 39 38 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 40 23 0358+040 03 09 20 57.6 155.1 -0.9 -20.4 -4 1 1 88 20 40 23 20 40 48 --- 03 09 45 57.6 155.2 -0.9 -20.3 21 F 1 88 20 40 23 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 40 48 0358+040 03 09 45 57.6 155.2 -0.9 -20.3 -4 1 1 88 20 40 48 20 41 13 --- 03 10 10 57.6 155.4 -0.9 -20.2 21 F 1 89 20 40 48 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 41 13 0358+040 03 10 10 57.6 155.4 -0.9 -20.2 -4 1 1 89 20 41 13 20 41 38 --- 03 10 35 57.7 155.6 -0.9 -20.0 21 F 1 89 20 41 13 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 41 38 0358+040 03 10 35 57.7 155.6 -0.9 -20.0 -4 1 1 89 20 41 38 20 42 03 --- 03 11 00 57.7 155.8 -0.8 -19.9 21 F 1 90 20 41 38 20 42 23 IKTAU 03 11 20 65.2 154.5 -0.7 -21.3 -1 1 1 90 20 42 03 20 42 48 --- 03 11 45 65.2 154.7 -0.7 -21.1 24 F 1 90 20 42 03 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 42 48 IKTAU 03 11 45 65.2 154.7 -0.7 -21.1 -4 1 1 90 20 42 48 20 43 12 --- 03 12 10 65.2 154.9 -0.7 -20.9 21 F 1 91 20 42 48 Schedule for VLBA_PT (Code Pt ) Page 26 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 43 12 IKTAU 03 12 10 65.2 154.9 -0.7 -20.9 -4 1 1 91 20 43 12 20 43 37 --- 03 12 35 65.3 155.1 -0.7 -20.7 21 F 1 91 20 43 12 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 43 37 IKTAU 03 12 35 65.3 155.1 -0.7 -20.7 -4 1 1 91 20 43 37 20 44 02 --- 03 13 00 65.3 155.4 -0.7 -20.6 21 F 1 92 20 43 37 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 44 02 IKTAU 03 13 00 65.3 155.4 -0.7 -20.6 -4 1 1 92 20 44 02 20 44 27 --- 03 13 25 65.3 155.6 -0.7 -20.4 21 F 1 92 20 44 02 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 44 27 IKTAU 03 13 25 65.3 155.6 -0.7 -20.4 -4 1 1 92 20 44 27 20 44 52 --- 03 13 50 65.4 155.8 -0.7 -20.2 21 F 1 92 20 44 27 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 44 52 IKTAU 03 13 50 65.4 155.8 -0.7 -20.2 -4 1 1 92 20 44 52 20 45 17 --- 03 14 15 65.4 156.1 -0.7 -20.0 21 F 1 93 20 44 52 20 45 37 0358+040 03 14 35 58.0 157.4 -0.8 -18.6 -1 1 1 93 20 45 17 20 46 02 --- 03 15 00 58.0 157.6 -0.8 -18.4 24 F 1 93 20 45 17 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 46 02 0358+040 03 15 00 58.0 157.6 -0.8 -18.4 -4 1 1 93 20 46 02 20 46 27 --- 03 15 25 58.1 157.7 -0.8 -18.3 21 F 1 94 20 46 02 Schedule for VLBA_PT (Code Pt ) Page 27 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 46 27 0358+040 03 15 25 58.1 157.7 -0.8 -18.3 -4 1 1 94 20 46 27 20 46 52 --- 03 15 50 58.1 157.9 -0.8 -18.1 21 F 1 94 20 46 27 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 46 52 0358+040 03 15 50 58.1 157.9 -0.8 -18.1 -4 1 1 94 20 46 52 20 47 17 --- 03 16 15 58.1 158.1 -0.8 -18.0 21 F 1 95 20 46 52 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 47 17 0358+040 03 16 15 58.1 158.1 -0.8 -18.0 -4 1 1 95 20 47 17 20 47 42 --- 03 16 40 58.2 158.3 -0.8 -17.8 21 F 1 95 20 47 17 20 48 02 IKTAU 03 17 00 65.6 157.6 -0.6 -18.7 -1 1 1 95 20 47 42 20 48 27 --- 03 17 25 65.7 157.8 -0.6 -18.5 24 F 1 96 20 47 42 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 48 27 IKTAU 03 17 25 65.7 157.8 -0.6 -18.5 -4 1 1 96 20 48 27 20 48 52 --- 03 17 50 65.7 158.1 -0.6 -18.3 21 F 1 96 20 48 27 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 48 52 IKTAU 03 17 50 65.7 158.1 -0.6 -18.3 -4 1 1 96 20 48 52 20 49 16 --- 03 18 15 65.7 158.3 -0.6 -18.2 21 F 1 97 20 48 52 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 49 16 IKTAU 03 18 15 65.7 158.3 -0.6 -18.2 -4 1 1 97 20 49 16 20 49 41 --- 03 18 40 65.8 158.5 -0.6 -18.0 21 F 1 97 20 49 16 Schedule for VLBA_PT (Code Pt ) Page 28 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 49 41 IKTAU 03 18 40 65.8 158.5 -0.6 -18.0 -4 1 1 97 20 49 41 20 50 06 --- 03 19 05 65.8 158.8 -0.6 -17.8 21 F 1 97 20 49 41 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 50 06 IKTAU 03 19 05 65.8 158.8 -0.6 -17.8 -4 1 1 97 20 50 06 20 50 31 --- 03 19 30 65.8 159.0 -0.6 -17.6 21 F 1 98 20 50 06 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 50 31 IKTAU 03 19 30 65.8 159.0 -0.6 -17.6 -4 1 1 98 20 50 31 20 50 56 --- 03 19 55 65.9 159.3 -0.6 -17.4 21 F 1 98 20 50 31 20 51 16 0358+040 03 20 15 58.4 159.9 -0.7 -16.5 -1 1 1 98 20 50 56 20 51 41 --- 03 20 40 58.5 160.1 -0.7 -16.4 24 F 1 99 20 50 56 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 51 41 0358+040 03 20 40 58.5 160.1 -0.7 -16.4 -4 1 1 99 20 51 41 20 52 06 --- 03 21 05 58.5 160.3 -0.7 -16.2 21 F 1 99 20 51 41 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 52 06 0358+040 03 21 05 58.5 160.3 -0.7 -16.2 -4 1 1 99 20 52 06 20 52 31 --- 03 21 30 58.5 160.5 -0.7 -16.1 21 F 1 100 20 52 06 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 52 31 0358+040 03 21 30 58.5 160.5 -0.7 -16.1 -4 1 1 100 20 52 31 20 52 56 --- 03 21 55 58.6 160.7 -0.7 -15.9 21 F 1 100 20 52 31 Schedule for VLBA_PT (Code Pt ) Page 29 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 52 56 0358+040 03 21 55 58.6 160.7 -0.7 -15.9 -4 1 1 100 20 52 56 20 53 21 --- 03 22 20 58.6 160.9 -0.7 -15.7 21 F 1 101 20 52 56 20 53 41 IKTAU 03 22 40 66.0 160.8 -0.5 -16.1 -1 1 1 101 20 53 21 20 54 06 --- 03 23 05 66.1 161.1 -0.5 -15.9 24 F 1 101 20 53 21 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 54 06 IKTAU 03 23 05 66.1 161.1 -0.5 -15.9 -4 1 1 101 20 54 06 20 54 31 --- 03 23 30 66.1 161.3 -0.5 -15.7 21 F 1 102 20 54 06 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 54 31 IKTAU 03 23 30 66.1 161.3 -0.5 -15.7 -4 1 1 102 20 54 31 20 54 56 --- 03 23 55 66.1 161.6 -0.5 -15.5 21 F 1 102 20 54 31 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 54 56 IKTAU 03 23 55 66.1 161.6 -0.5 -15.5 -4 1 1 102 20 54 56 20 55 20 --- 03 24 20 66.2 161.8 -0.5 -15.3 21 F 1 102 20 54 56 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 55 20 IKTAU 03 24 20 66.2 161.8 -0.5 -15.3 -4 1 1 102 20 55 20 20 55 45 --- 03 24 45 66.2 162.1 -0.5 -15.1 21 F 1 103 20 55 20 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 55 45 IKTAU 03 24 45 66.2 162.1 -0.5 -15.1 -4 1 1 103 20 55 45 20 56 10 --- 03 25 10 66.2 162.3 -0.5 -14.9 21 F 1 103 20 55 45 Schedule for VLBA_PT (Code Pt ) Page 30 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 56 10 IKTAU 03 25 10 66.2 162.3 -0.5 -14.9 -4 1 1 103 20 56 10 20 56 35 --- 03 25 35 66.2 162.5 -0.5 -14.6 21 F 1 104 20 56 10 20 56 55 0358+040 03 25 55 58.8 162.5 -0.6 -14.4 -1 1 1 104 20 56 35 20 57 20 --- 03 26 20 58.8 162.7 -0.6 -14.2 24 F 1 104 20 56 35 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 57 20 0358+040 03 26 20 58.8 162.7 -0.6 -14.2 -4 1 1 104 20 57 20 20 57 45 --- 03 26 45 58.9 162.9 -0.6 -14.1 21 F 1 105 20 57 20 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 57 45 0358+040 03 26 45 58.9 162.9 -0.6 -14.1 -4 1 1 105 20 57 45 20 58 10 --- 03 27 10 58.9 163.1 -0.6 -13.9 21 F 1 105 20 57 45 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 58 10 0358+040 03 27 10 58.9 163.1 -0.6 -13.9 -4 1 1 105 20 58 10 20 58 35 --- 03 27 35 58.9 163.3 -0.6 -13.8 21 F 1 106 20 58 10 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 20 58 35 0358+040 03 27 35 58.9 163.3 -0.6 -13.8 -4 1 1 106 20 58 35 20 59 00 --- 03 28 00 58.9 163.5 -0.6 -13.6 21 F 1 106 20 58 35 20 59 20 IKTAU 03 28 20 66.4 164.2 -0.4 -13.3 -1 1 1 106 20 59 00 20 59 45 --- 03 28 45 66.4 164.4 -0.4 -13.1 24 F 1 107 20 59 00 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 20 59 45 IKTAU 03 28 45 66.4 164.4 -0.4 -13.1 -4 1 1 107 20 59 45 21 00 10 --- 03 29 10 66.4 164.7 -0.4 -12.9 21 F 1 107 20 59 45 Schedule for VLBA_PT (Code Pt ) Page 31 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 00 10 IKTAU 03 29 10 66.4 164.7 -0.4 -12.9 -4 1 1 107 21 00 10 21 00 35 --- 03 29 35 66.5 164.9 -0.4 -12.7 21 F 1 108 21 00 10 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 00 35 IKTAU 03 29 35 66.5 164.9 -0.4 -12.7 -4 1 1 108 21 00 35 21 01 00 --- 03 30 00 66.5 165.2 -0.4 -12.5 21 F 1 108 21 00 35 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 01 00 IKTAU 03 30 00 66.5 165.2 -0.4 -12.5 -4 1 1 108 21 01 00 21 01 24 --- 03 30 25 66.5 165.4 -0.4 -12.3 21 F 1 108 21 01 00 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 01 24 IKTAU 03 30 25 66.5 165.4 -0.4 -12.3 -4 1 1 108 21 01 24 21 01 49 --- 03 30 50 66.5 165.7 -0.4 -12.0 21 F 1 109 21 01 24 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 01 49 IKTAU 03 30 50 66.5 165.7 -0.4 -12.0 -4 1 1 109 21 01 49 21 02 14 --- 03 31 15 66.6 165.9 -0.4 -11.8 21 F 1 109 21 01 49 Next scan frequencies: 43105.11 43105.11 Next BBC frequencies: 705.11 705.11 21 02 14 P-IKTAU 03 31 15 66.6 165.9 -0.4 -11.8 -4 1 1 109 Stopped 21 03 14 --- 03 32 15 66.6 166.5 -0.4 -11.3 56 S 1 110 21 03 14 P-IKTAU 03 32 15 66.6 166.5 -0.4 -11.3 -4 1 1 110 Stopped 21 04 14 --- 03 33 15 66.6 167.1 -0.3 -10.8 56 S 1 111 21 04 14 P-IKTAU 03 33 15 66.6 167.1 -0.3 -10.8 -4 1 1 111 Stopped 21 05 14 --- 03 34 15 66.7 167.7 -0.3 -10.3 56 S 1 112 Schedule for VLBA_PT (Code Pt ) Page 32 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 05 34 0358+040 03 34 35 59.3 166.6 -0.5 -11.0 -1 1 1 112 21 05 34 21 05 59 --- 03 35 00 59.3 166.8 -0.4 -10.9 24 F 1 112 21 05 52 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 05 59 0358+040 03 35 00 59.3 166.8 -0.4 -10.9 -4 1 1 112 21 05 59 21 06 24 --- 03 35 25 59.3 167.0 -0.4 -10.7 21 F 1 113 21 05 59 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 06 24 0358+040 03 35 25 59.3 167.0 -0.4 -10.7 -4 1 1 113 21 06 24 21 06 49 --- 03 35 50 59.4 167.2 -0.4 -10.5 21 F 1 113 21 06 24 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 06 49 0358+040 03 35 50 59.4 167.2 -0.4 -10.5 -4 1 1 113 21 06 49 21 07 14 --- 03 36 15 59.4 167.4 -0.4 -10.4 21 F 1 114 21 06 49 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 07 14 0358+040 03 36 15 59.4 167.4 -0.4 -10.4 -4 1 1 114 21 07 14 21 07 38 --- 03 36 40 59.4 167.6 -0.4 -10.2 21 F 1 114 21 07 14 21 07 55 IKTAU 03 36 57 66.8 169.4 -0.3 -8.9 -4 1 1 114 21 07 38 21 08 20 --- 03 37 22 66.8 169.6 -0.3 -8.7 21 F 1 115 21 07 38 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 08 20 IKTAU 03 37 22 66.8 169.6 -0.3 -8.7 -4 1 1 115 21 08 20 21 08 45 --- 03 37 47 66.8 169.9 -0.3 -8.5 21 F 1 115 21 08 20 Schedule for VLBA_PT (Code Pt ) Page 33 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 08 45 IKTAU 03 37 47 66.8 169.9 -0.3 -8.5 -4 1 1 115 21 08 45 21 09 10 --- 03 38 12 66.9 170.2 -0.3 -8.3 21 F 1 116 21 08 45 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 09 10 IKTAU 03 38 12 66.9 170.2 -0.3 -8.3 -4 1 1 116 21 09 10 21 09 35 --- 03 38 37 66.9 170.4 -0.3 -8.1 21 F 1 116 21 09 10 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 09 35 IKTAU 03 38 37 66.9 170.4 -0.3 -8.1 -4 1 1 116 21 09 35 21 10 00 --- 03 39 02 66.9 170.7 -0.2 -7.9 21 F 1 116 21 09 35 21 10 16 0358+040 03 39 18 59.5 168.9 -0.4 -9.2 -5 1 1 116 21 10 00 21 10 41 --- 03 39 43 59.5 169.1 -0.4 -9.0 20 F 1 117 21 10 00 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 10 41 0358+040 03 39 43 59.5 169.1 -0.4 -9.0 -4 1 1 117 21 10 41 21 11 06 --- 03 40 08 59.5 169.3 -0.4 -8.8 21 F 1 117 21 10 41 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 11 06 0358+040 03 40 08 59.5 169.3 -0.4 -8.8 -4 1 1 117 21 11 06 21 11 31 --- 03 40 33 59.5 169.5 -0.4 -8.7 21 F 1 118 21 11 06 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 11 31 0358+040 03 40 33 59.5 169.5 -0.4 -8.7 -4 1 1 118 21 11 31 21 11 56 --- 03 40 58 59.6 169.7 -0.3 -8.5 21 F 1 118 21 11 31 Schedule for VLBA_PT (Code Pt ) Page 34 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 11 56 0358+040 03 40 58 59.6 169.7 -0.3 -8.5 -4 1 1 118 21 11 56 21 12 21 --- 03 41 23 59.6 169.9 -0.3 -8.3 21 F 1 119 21 11 56 21 12 36 IKTAU 03 41 38 67.0 172.3 -0.2 -6.5 -6 1 1 119 21 12 21 21 13 01 --- 03 42 03 67.0 172.5 -0.2 -6.3 19 F 1 119 21 12 21 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 13 01 IKTAU 03 42 03 67.0 172.5 -0.2 -6.3 -4 1 1 119 21 13 01 21 13 25 --- 03 42 28 67.0 172.8 -0.2 -6.1 21 F 1 120 21 13 01 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 13 25 IKTAU 03 42 28 67.0 172.8 -0.2 -6.1 -4 1 1 120 21 13 25 21 13 50 --- 03 42 53 67.0 173.1 -0.2 -5.8 21 F 1 120 21 13 25 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 13 50 IKTAU 03 42 53 67.0 173.1 -0.2 -5.8 -4 1 1 120 21 13 50 21 14 15 --- 03 43 18 67.0 173.3 -0.2 -5.6 21 F 1 120 21 13 50 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 14 15 IKTAU 03 43 18 67.0 173.3 -0.2 -5.6 -4 1 1 120 21 14 15 21 14 40 --- 03 43 43 67.0 173.6 -0.2 -5.4 21 F 1 121 21 14 15 21 14 55 0358+040 03 43 58 59.7 171.2 -0.3 -7.3 -6 1 1 121 21 14 40 21 15 20 --- 03 44 23 59.7 171.4 -0.3 -7.1 19 F 1 121 21 14 40 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 15 20 0358+040 03 44 23 59.7 171.4 -0.3 -7.1 -4 1 1 121 21 15 20 21 15 45 --- 03 44 48 59.7 171.6 -0.3 -7.0 21 F 1 122 21 15 20 Schedule for VLBA_PT (Code Pt ) Page 35 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 15 45 0358+040 03 44 48 59.7 171.6 -0.3 -7.0 -4 1 1 122 21 15 45 21 16 10 --- 03 45 13 59.7 171.8 -0.3 -6.8 21 F 1 122 21 15 45 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 16 10 0358+040 03 45 13 59.7 171.8 -0.3 -6.8 -4 1 1 122 21 16 10 21 16 35 --- 03 45 38 59.7 172.0 -0.3 -6.6 21 F 1 123 21 16 10 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 16 35 0358+040 03 45 38 59.7 172.0 -0.3 -6.6 -4 1 1 123 21 16 35 21 17 00 --- 03 46 03 59.7 172.2 -0.3 -6.4 21 F 1 123 21 16 35 21 17 15 IKTAU 03 46 18 67.1 175.2 -0.1 -4.0 -6 1 1 123 21 17 00 21 17 50 --- 03 46 53 67.1 175.6 -0.1 -3.7 29 F 1 124 21 17 00 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 17 50 IKTAU 03 46 53 67.1 175.6 -0.1 -3.7 -4 1 1 124 21 17 50 21 18 25 --- 03 47 28 67.1 175.9 -0.1 -3.4 31 F 1 124 21 17 50 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 18 25 IKTAU 03 47 28 67.1 175.9 -0.1 -3.4 -4 1 1 124 21 18 25 21 19 00 --- 03 48 03 67.1 176.3 -0.1 -3.1 31 F 1 125 21 18 25 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 19 00 IKTAU 03 48 03 67.1 176.3 -0.1 -3.1 -4 1 1 125 21 19 00 21 19 34 --- 03 48 38 67.1 176.7 -0.1 -2.8 31 F 1 126 21 19 00 Schedule for VLBA_PT (Code Pt ) Page 36 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 19 34 IKTAU 03 48 38 67.1 176.7 -0.1 -2.8 -4 1 1 126 21 19 34 21 20 09 --- 03 49 13 67.1 177.0 -0.1 -2.5 31 F 1 126 21 19 34 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 20 09 IKTAU 03 49 13 67.1 177.0 -0.1 -2.5 -4 1 1 126 21 20 09 21 20 44 --- 03 49 48 67.1 177.4 -0.1 -2.2 31 F 1 127 21 20 09 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 20 44 IKTAU 03 49 48 67.1 177.4 -0.1 -2.2 -4 1 1 127 21 20 44 21 21 19 --- 03 50 23 67.1 177.8 -0.1 -1.9 31 F 1 127 21 20 44 21 21 34 0358+040 03 50 38 59.8 174.5 -0.2 -4.6 -6 1 1 127 21 21 19 21 22 09 --- 03 51 13 59.8 174.8 -0.2 -4.3 29 F 1 128 21 21 19 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 22 09 0358+040 03 51 13 59.8 174.8 -0.2 -4.3 -4 1 1 128 21 22 09 21 22 44 --- 03 51 48 59.9 175.1 -0.2 -4.1 31 F 1 129 21 22 09 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 22 44 0358+040 03 51 48 59.9 175.1 -0.2 -4.1 -4 1 1 129 21 22 44 21 23 19 --- 03 52 23 59.9 175.3 -0.2 -3.9 31 F 1 129 21 22 44 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 23 19 0358+040 03 52 23 59.9 175.3 -0.2 -3.9 -4 1 1 129 21 23 19 21 23 54 --- 03 52 58 59.9 175.6 -0.1 -3.6 31 F 1 130 21 23 19 Schedule for VLBA_PT (Code Pt ) Page 37 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 23 54 0358+040 03 52 58 59.9 175.6 -0.1 -3.6 -4 1 1 130 21 23 54 21 24 29 --- 03 53 33 59.9 175.9 -0.1 -3.4 31 F 1 130 21 23 54 21 24 44 IKTAU 03 53 48 67.1 179.9 0.0 -0.1 -6 1 1 130 21 24 29 21 25 19 --- 03 54 23 67.1 180.3 0.0 0.2 29 F 1 131 21 24 29 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 25 19 IKTAU 03 54 23 67.1 180.3 0.0 0.2 -4 1 1 131 21 25 19 21 25 53 --- 03 54 58 67.1 180.7 0.0 0.6 31 F 1 132 21 25 19 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 25 53 IKTAU 03 54 58 67.1 180.7 0.0 0.6 -4 1 1 132 21 25 53 21 26 28 --- 03 55 33 67.1 181.0 0.0 0.9 31 F 1 132 21 25 53 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 26 28 IKTAU 03 55 33 67.1 181.0 0.0 0.9 -4 1 1 132 21 26 28 21 27 03 --- 03 56 08 67.1 181.4 0.0 1.2 31 F 1 133 21 26 28 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 27 03 IKTAU 03 56 08 67.1 181.4 0.0 1.2 -4 1 1 133 21 27 03 21 27 38 --- 03 56 43 67.1 181.8 0.0 1.5 31 F 1 133 21 27 03 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 27 38 IKTAU 03 56 43 67.1 181.8 0.0 1.5 -4 1 1 133 21 27 38 21 28 13 --- 03 57 18 67.1 182.1 0.1 1.8 31 F 1 134 21 27 38 Schedule for VLBA_PT (Code Pt ) Page 38 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 28 13 IKTAU 03 57 18 67.1 182.1 0.1 1.8 -4 1 1 134 21 28 13 21 28 48 --- 03 57 53 67.1 182.5 0.1 2.1 31 F 1 135 21 28 13 21 29 03 0358+040 03 58 08 59.9 178.2 -0.1 -1.5 -5 1 1 135 21 28 48 21 29 38 --- 03 58 43 59.9 178.5 -0.1 -1.3 30 F 1 135 21 28 48 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 29 38 0358+040 03 58 43 59.9 178.5 -0.1 -1.3 -4 1 1 135 21 29 38 21 30 13 --- 03 59 18 59.9 178.8 0.0 -1.0 31 F 1 136 21 29 38 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 30 13 0358+040 03 59 18 59.9 178.8 0.0 -1.0 -4 1 1 136 21 30 13 21 30 48 --- 03 59 53 59.9 179.1 0.0 -0.8 31 F 1 136 21 30 13 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 30 48 0358+040 03 59 53 59.9 179.1 0.0 -0.8 -4 1 1 136 21 30 48 21 31 23 --- 04 00 28 59.9 179.4 0.0 -0.5 31 F 1 137 21 30 48 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 31 23 0358+040 04 00 28 59.9 179.4 0.0 -0.5 -4 1 1 137 21 31 23 21 31 57 --- 04 01 03 59.9 179.6 0.0 -0.3 31 F 1 138 21 31 23 21 32 12 IKTAU 04 01 18 67.1 184.6 0.1 3.9 -5 1 1 138 21 31 57 21 32 47 --- 04 01 53 67.1 185.0 0.1 4.2 30 F 1 138 21 31 57 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 32 47 IKTAU 04 01 53 67.1 185.0 0.1 4.2 -4 1 1 138 21 32 47 21 33 22 --- 04 02 28 67.0 185.4 0.1 4.5 31 F 1 139 21 32 47 Schedule for VLBA_PT (Code Pt ) Page 39 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 33 22 IKTAU 04 02 28 67.0 185.4 0.1 4.5 -4 1 1 139 21 33 22 21 33 57 --- 04 03 03 67.0 185.7 0.2 4.8 31 F 1 139 21 33 22 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 33 57 IKTAU 04 03 03 67.0 185.7 0.2 4.8 -4 1 1 139 21 33 57 21 34 32 --- 04 03 38 67.0 186.1 0.2 5.1 31 F 1 140 21 33 57 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 34 32 IKTAU 04 03 38 67.0 186.1 0.2 5.1 -4 1 1 140 21 34 32 21 35 07 --- 04 04 13 67.0 186.5 0.2 5.4 31 F 1 141 21 34 32 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 35 07 IKTAU 04 04 13 67.0 186.5 0.2 5.4 -4 1 1 141 21 35 07 21 35 42 --- 04 04 48 67.0 186.8 0.2 5.8 31 F 1 141 21 35 07 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 35 42 IKTAU 04 04 48 67.0 186.8 0.2 5.8 -4 1 1 141 21 35 42 21 36 17 --- 04 05 23 67.0 187.2 0.2 6.1 31 F 1 142 21 35 42 21 36 32 0358+040 04 05 38 59.9 181.9 0.1 1.6 -5 1 1 142 21 36 17 21 37 07 --- 04 06 13 59.9 182.2 0.1 1.8 30 F 1 143 21 36 17 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 37 07 0358+040 04 06 13 59.9 182.2 0.1 1.8 -4 1 1 143 21 37 07 21 37 42 --- 04 06 48 59.9 182.5 0.1 2.1 31 F 1 143 21 37 07 Schedule for VLBA_PT (Code Pt ) Page 40 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 37 42 0358+040 04 06 48 59.9 182.5 0.1 2.1 -4 1 1 143 21 37 42 21 38 16 --- 04 07 23 59.9 182.8 0.1 2.3 31 F 1 144 21 37 42 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 38 16 0358+040 04 07 23 59.9 182.8 0.1 2.3 -4 1 1 144 21 38 16 21 38 51 --- 04 07 58 59.9 183.1 0.1 2.6 31 F 1 144 21 38 16 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 38 51 0358+040 04 07 58 59.9 183.1 0.1 2.6 -4 1 1 144 21 38 51 21 39 26 --- 04 08 33 59.9 183.4 0.1 2.8 31 F 1 145 21 38 51 Next scan frequencies: 43115.99 43115.99 43215.99 43215.99 Next BBC frequencies: 715.99 715.99 815.99 815.99 Next scan bandwidths: 16.00 16.00 16.00 16.00 21 41 06 3C84 04 10 13 77.8 310.1 0.8 122.4 9 1 1 145 Stopped 21 43 06 --- 04 12 13 77.5 309.2 0.9 121.2 120 S 1 145 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 Next scan bandwidths: 16.00 16.00 21 43 06 3C84 04 12 13 77.5 309.2 0.9 121.2 -4 1 1 145 21 43 06 21 46 05 --- 04 15 13 77.0 307.9 0.9 119.4 176 F 1 148 21 43 24 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 46 05 3C84 04 15 13 77.0 307.9 0.9 119.4 -4 1 1 148 21 46 05 21 49 05 --- 04 18 13 76.5 306.7 1.0 117.8 176 F 1 151 21 46 05 Schedule for VLBA_PT (Code Pt ) Page 41 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 50 24 0358+040 04 19 33 59.7 188.8 0.3 7.3 -5 1 1 151 21 50 24 21 50 59 --- 04 20 08 59.6 189.1 0.3 7.5 30 F 1 151 21 50 42 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 50 59 0358+040 04 20 08 59.6 189.1 0.3 7.5 -4 1 1 151 21 50 59 21 51 34 --- 04 20 43 59.6 189.4 0.3 7.8 31 F 1 152 21 50 59 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 51 34 0358+040 04 20 43 59.6 189.4 0.3 7.8 -4 1 1 152 21 51 34 21 52 09 --- 04 21 18 59.6 189.7 0.3 8.0 31 F 1 152 21 51 34 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 52 09 0358+040 04 21 18 59.6 189.7 0.3 8.0 -4 1 1 152 21 52 09 21 52 44 --- 04 21 53 59.6 189.9 0.3 8.2 31 F 1 153 21 52 09 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 52 44 0358+040 04 21 53 59.6 189.9 0.3 8.2 -4 1 1 153 21 52 44 21 53 19 --- 04 22 28 59.6 190.2 0.3 8.5 31 F 1 153 21 52 44 21 53 34 IKTAU 04 22 43 66.2 197.7 0.5 14.9 -4 1 1 153 21 53 19 21 54 09 --- 04 23 18 66.2 198.1 0.5 15.1 31 F 1 154 21 53 19 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 54 09 IKTAU 04 23 18 66.2 198.1 0.5 15.1 -4 1 1 154 21 54 09 21 54 44 --- 04 23 53 66.1 198.4 0.5 15.4 31 F 1 155 21 54 09 Schedule for VLBA_PT (Code Pt ) Page 42 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 54 44 IKTAU 04 23 53 66.1 198.4 0.5 15.4 -4 1 1 155 21 54 44 21 55 19 --- 04 24 28 66.1 198.7 0.5 15.7 31 F 1 155 21 54 44 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 55 19 IKTAU 04 24 28 66.1 198.7 0.5 15.7 -4 1 1 155 21 55 19 21 55 54 --- 04 25 03 66.1 199.1 0.5 16.0 31 F 1 156 21 55 19 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 55 54 IKTAU 04 25 03 66.1 199.1 0.5 16.0 -4 1 1 156 21 55 54 21 56 28 --- 04 25 38 66.0 199.4 0.5 16.3 31 F 1 156 21 55 54 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 56 28 IKTAU 04 25 38 66.0 199.4 0.5 16.3 -4 1 1 156 21 56 28 21 57 03 --- 04 26 13 66.0 199.8 0.5 16.6 31 F 1 157 21 56 28 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 57 03 IKTAU 04 26 13 66.0 199.8 0.5 16.6 -4 1 1 157 21 57 03 21 57 38 --- 04 26 48 65.9 200.1 0.5 16.8 31 F 1 158 21 57 03 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 57 38 IKTAU 04 26 48 65.9 200.1 0.5 16.8 -4 1 1 158 21 57 38 21 58 13 --- 04 27 23 65.9 200.4 0.6 17.1 31 F 1 158 21 57 38 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 58 13 IKTAU 04 27 23 65.9 200.4 0.6 17.1 -4 1 1 158 21 58 13 21 58 48 --- 04 27 58 65.8 200.8 0.6 17.4 31 F 1 159 21 58 13 Schedule for VLBA_PT (Code Pt ) Page 43 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 21 58 48 IKTAU 04 27 58 65.8 200.8 0.6 17.4 -4 1 1 159 21 58 48 21 59 23 --- 04 28 33 65.8 201.1 0.6 17.7 31 F 1 159 21 58 48 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 21 59 23 IKTAU 04 28 33 65.8 201.1 0.6 17.7 -4 1 1 159 21 59 23 21 59 58 --- 04 29 08 65.8 201.4 0.6 17.9 31 F 1 160 21 59 23 22 00 13 0358+040 04 29 23 59.3 193.6 0.5 11.2 -4 1 1 160 21 59 58 22 00 48 --- 04 29 58 59.2 193.9 0.5 11.4 31 F 1 161 21 59 58 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 00 48 0358+040 04 29 58 59.2 193.9 0.5 11.4 -4 1 1 161 22 00 48 22 01 23 --- 04 30 33 59.2 194.1 0.5 11.7 31 F 1 161 22 00 48 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 01 23 0358+040 04 30 33 59.2 194.1 0.5 11.7 -4 1 1 161 22 01 23 22 01 58 --- 04 31 08 59.2 194.4 0.5 11.9 31 F 1 162 22 01 23 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 01 58 0358+040 04 31 08 59.2 194.4 0.5 11.9 -4 1 1 162 22 01 58 22 02 32 --- 04 31 43 59.2 194.7 0.5 12.1 31 F 1 162 22 01 58 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 02 32 0358+040 04 31 43 59.2 194.7 0.5 12.1 -4 1 1 162 22 02 32 22 03 07 --- 04 32 18 59.1 195.0 0.5 12.3 31 F 1 163 22 02 32 22 03 22 IKTAU 04 32 33 65.5 203.4 0.6 19.5 -4 1 1 163 22 03 07 22 03 57 --- 04 33 08 65.4 203.7 0.7 19.8 31 F 1 164 22 03 07 Schedule for VLBA_PT (Code Pt ) Page 44 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 03 57 IKTAU 04 33 08 65.4 203.7 0.7 19.8 -4 1 1 164 22 03 57 22 04 32 --- 04 33 43 65.4 204.0 0.7 20.0 31 F 1 164 22 03 57 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 04 32 IKTAU 04 33 43 65.4 204.0 0.7 20.0 -4 1 1 164 22 04 32 22 05 07 --- 04 34 18 65.3 204.3 0.7 20.3 31 F 1 165 22 04 32 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 05 07 IKTAU 04 34 18 65.3 204.3 0.7 20.3 -4 1 1 165 22 05 07 22 05 42 --- 04 34 53 65.3 204.6 0.7 20.6 31 F 1 165 22 05 07 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 05 42 IKTAU 04 34 53 65.3 204.6 0.7 20.6 -4 1 1 165 22 05 42 22 06 17 --- 04 35 28 65.2 205.0 0.7 20.8 31 F 1 166 22 05 42 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 06 17 IKTAU 04 35 28 65.2 205.0 0.7 20.8 -4 1 1 166 22 06 17 22 06 52 --- 04 36 03 65.2 205.3 0.7 21.1 31 F 1 167 22 06 17 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 06 52 IKTAU 04 36 03 65.2 205.3 0.7 21.1 -4 1 1 167 22 06 52 22 07 27 --- 04 36 38 65.1 205.6 0.7 21.4 31 F 1 167 22 06 52 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 07 27 IKTAU 04 36 38 65.1 205.6 0.7 21.4 -4 1 1 167 22 07 27 22 08 02 --- 04 37 13 65.1 205.9 0.7 21.6 31 F 1 168 22 07 27 Schedule for VLBA_PT (Code Pt ) Page 45 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 08 02 IKTAU 04 37 13 65.1 205.9 0.7 21.6 -4 1 1 168 22 08 02 22 08 36 --- 04 37 48 65.0 206.2 0.7 21.9 31 F 1 168 22 08 02 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 08 36 IKTAU 04 37 48 65.0 206.2 0.7 21.9 -4 1 1 168 22 08 36 22 09 11 --- 04 38 23 65.0 206.5 0.7 22.1 31 F 1 169 22 08 36 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 09 11 IKTAU 04 38 23 65.0 206.5 0.7 22.1 -4 1 1 169 22 09 11 22 09 46 --- 04 38 58 64.9 206.9 0.8 22.4 31 F 1 169 22 09 11 22 10 01 0358+040 04 39 13 58.7 198.2 0.6 15.0 -3 1 1 169 22 09 46 22 10 36 --- 04 39 48 58.7 198.5 0.6 15.2 31 F 1 170 22 09 46 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 10 36 0358+040 04 39 48 58.7 198.5 0.6 15.2 -4 1 1 170 22 10 36 22 11 11 --- 04 40 23 58.6 198.7 0.6 15.4 31 F 1 171 22 10 36 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 11 11 0358+040 04 40 23 58.6 198.7 0.6 15.4 -4 1 1 171 22 11 11 22 11 46 --- 04 40 58 58.6 199.0 0.7 15.7 31 F 1 171 22 11 11 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 11 46 0358+040 04 40 58 58.6 199.0 0.7 15.7 -4 1 1 171 22 11 46 22 12 21 --- 04 41 33 58.6 199.3 0.7 15.9 31 F 1 172 22 11 46 Schedule for VLBA_PT (Code Pt ) Page 46 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 12 21 0358+040 04 41 33 58.6 199.3 0.7 15.9 -4 1 1 172 22 12 21 22 12 56 --- 04 42 08 58.5 199.6 0.7 16.1 31 F 1 172 22 12 21 22 13 11 IKTAU 04 42 23 64.6 208.7 0.8 23.8 -3 1 1 172 22 12 56 22 13 46 --- 04 42 58 64.5 209.0 0.8 24.1 32 F 1 173 22 12 56 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 13 46 IKTAU 04 42 58 64.5 209.0 0.8 24.1 -4 1 1 173 22 13 46 22 14 20 --- 04 43 33 64.5 209.3 0.8 24.3 31 F 1 174 22 13 46 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 14 20 IKTAU 04 43 33 64.5 209.3 0.8 24.3 -4 1 1 174 22 14 20 22 14 55 --- 04 44 08 64.4 209.6 0.8 24.6 31 F 1 174 22 14 20 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 14 55 IKTAU 04 44 08 64.4 209.6 0.8 24.6 -4 1 1 174 22 14 55 22 15 30 --- 04 44 43 64.4 209.9 0.8 24.8 31 F 1 175 22 14 55 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 15 30 IKTAU 04 44 43 64.4 209.9 0.8 24.8 -4 1 1 175 22 15 30 22 16 05 --- 04 45 18 64.3 210.2 0.9 25.1 31 F 1 175 22 15 30 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 16 05 IKTAU 04 45 18 64.3 210.2 0.9 25.1 -4 1 1 175 22 16 05 22 16 40 --- 04 45 53 64.2 210.5 0.9 25.3 31 F 1 176 22 16 05 Schedule for VLBA_PT (Code Pt ) Page 47 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 16 Apr 2008 Day 107 --- Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 16 40 IKTAU 04 45 53 64.2 210.5 0.9 25.3 -4 1 1 176 22 16 40 22 17 15 --- 04 46 28 64.2 210.8 0.9 25.5 31 F 1 177 22 16 40 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 17 15 IKTAU 04 46 28 64.2 210.8 0.9 25.5 -4 1 1 177 22 17 15 22 17 50 --- 04 47 03 64.1 211.1 0.9 25.8 31 F 1 177 22 17 15 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 17 50 IKTAU 04 47 03 64.1 211.1 0.9 25.8 -4 1 1 177 22 17 50 22 18 25 --- 04 47 38 64.1 211.4 0.9 26.0 31 F 1 178 22 17 50 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 18 25 IKTAU 04 47 38 64.1 211.4 0.9 26.0 -4 1 1 178 22 18 25 22 19 00 --- 04 48 13 64.0 211.6 0.9 26.2 31 F 1 178 22 18 25 Next scan frequencies: 43103.99 43103.99 Next BBC frequencies: 703.99 703.99 22 19 00 IKTAU 04 48 13 64.0 211.6 0.9 26.2 -4 1 1 178 22 19 00 22 19 35 --- 04 48 48 63.9 211.9 0.9 26.5 31 F 1 179 22 19 00 22 19 50 0358+040 04 49 03 58.0 202.7 0.8 18.6 -3 1 1 179 22 19 35 22 20 24 --- 04 49 38 58.0 202.9 0.8 18.8 32 F 1 180 22 19 35 Next scan frequencies: 86215.99 86215.99 Next BBC frequencies: 715.99 715.99 22 20 24 0358+040 04 49 38 58.0 202.9 0.8 18.8 -4 1 1 180 22 20 24 22 20 59 --- 04 50 13 57.9 203.2 0.8 19.0 31 F 1 180 22 20 24 Schedule for VLBA_PT (Code Pt ) Page 48 BD125B freq phase cal 3/7 mm UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Grou