COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: RIPL: GJ873/GJ53B Exp. Code: BB240Z Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_PT (Code Pt ) Page 2 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 12 30 00 3C454.3 18 26 04 27.8 88.7 -4.5 -59.3 0 1 1 0 12 30 00 12 38 00 --- 18 34 05 29.4 89.9 -4.3 -59.3 480 F 1 31 12 30 18 12 48 11 J2237+4216 18 44 18 44.5 61.8 -3.9 -80.0 575 1 1 31 12 48 11 12 48 51 --- 18 44 58 44.6 61.8 -3.9 -80.1 40 F 1 34 12 48 29 12 48 51 J2255+4202 18 44 58 41.2 61.2 -4.2 -77.4 -13 1 1 34 12 48 51 12 50 01 =2253+417 18 46 08 41.4 61.3 -4.2 -77.5 57 F 1 38 12 48 51 12 50 01 J2237+4216 18 46 08 44.8 61.9 -3.9 -80.2 -13 1 1 38 12 50 01 12 51 11 --- 18 47 18 45.0 61.9 -3.8 -80.4 57 F 1 43 12 50 01 12 51 11 GJ873 18 47 18 43.6 58.7 -4.0 -81.0 -9 1 1 43 12 51 11 12 54 11 --- 18 50 19 44.1 58.8 -3.9 -81.4 171 F 1 54 12 51 11 12 54 11 J2237+4216 18 50 19 45.6 62.1 -3.8 -80.8 -9 1 1 54 12 54 11 12 55 21 --- 18 51 29 45.8 62.1 -3.8 -81.0 61 F 1 59 12 54 11 12 55 21 GJ873 18 51 29 44.3 58.9 -3.9 -81.6 -9 1 1 59 12 55 21 12 58 21 --- 18 54 30 44.9 59.0 -3.9 -82.0 171 F 1 70 12 55 21 12 58 21 J2237+4216 18 54 30 46.3 62.2 -3.7 -81.4 -9 1 1 70 12 58 21 12 59 31 --- 18 55 40 46.5 62.3 -3.7 -81.5 61 F 1 75 12 58 21 12 59 31 GJ873 18 55 40 45.1 59.0 -3.9 -82.2 -9 1 1 75 12 59 31 13 02 31 --- 18 58 40 45.6 59.1 -3.8 -82.7 171 F 1 86 12 59 31 13 02 31 J2237+4216 18 58 40 47.1 62.4 -3.6 -82.0 -9 1 1 86 13 02 31 13 03 41 --- 18 59 51 47.3 62.5 -3.6 -82.1 61 F 1 91 13 02 31 13 03 41 GJ873 18 59 51 45.8 59.2 -3.8 -82.8 -9 1 1 91 13 03 41 13 06 41 --- 19 02 51 46.4 59.2 -3.7 -83.3 171 F 1 103 13 03 41 13 06 41 J2237+4216 19 02 51 47.9 62.6 -3.6 -82.6 -9 1 1 103 13 06 41 13 07 51 --- 19 04 01 48.1 62.6 -3.6 -82.7 61 F 1 107 13 06 41 Schedule for VLBA_PT (Code Pt ) Page 3 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 13 07 51 GJ873 19 04 01 46.6 59.3 -3.7 -83.5 -9 1 1 107 13 07 51 13 10 51 --- 19 07 02 47.1 59.4 -3.7 -84.0 171 F 1 119 13 07 51 13 10 51 J2237+4216 19 07 02 48.6 62.7 -3.5 -83.1 -9 1 1 119 13 10 51 13 12 01 --- 19 08 12 48.8 62.7 -3.5 -83.3 61 F 1 123 13 10 51 13 12 01 J2255+4202 19 08 12 45.4 62.4 -3.8 -80.5 -13 1 1 123 13 12 01 13 13 11 =2253+417 19 09 22 45.6 62.4 -3.8 -80.6 57 F 1 128 13 12 01 13 13 11 J2237+4216 19 09 22 49.1 62.8 -3.5 -83.5 -13 1 1 128 13 13 11 13 14 21 --- 19 10 32 49.3 62.8 -3.4 -83.7 57 F 1 132 13 13 11 13 16 18 J0124+5618 19 12 29 26.4 38.1 -6.2 -67.0 65 1 1 132 13 16 18 13 16 58 =0121+560 19 13 09 26.5 38.2 -6.2 -67.2 40 F 1 135 13 16 36 13 16 58 J0110+5404 19 13 09 27.5 41.4 -6.0 -68.6 -8 1 1 135 13 16 58 13 18 08 --- 19 14 20 27.6 41.4 -5.9 -68.8 62 F 1 139 13 16 58 13 18 08 J0124+5618 19 14 20 26.6 38.2 -6.2 -67.4 -8 1 1 139 13 18 08 13 19 18 =0121+560 19 15 30 26.8 38.3 -6.2 -67.6 62 F 1 144 13 18 08 13 19 18 GJ53B 19 15 30 28.4 40.7 -5.9 -69.8 -9 1 1 144 13 19 18 13 22 18 --- 19 18 30 28.8 40.9 -5.8 -70.3 171 F 1 155 13 19 18 13 22 18 J0124+5618 19 18 30 27.2 38.5 -6.1 -68.1 -9 1 1 155 13 22 18 13 23 28 =0121+560 19 19 40 27.3 38.6 -6.1 -68.3 61 F 1 160 13 22 18 13 23 28 GJ53B 19 19 40 28.9 40.9 -5.8 -70.5 -9 1 1 160 13 23 28 13 26 28 --- 19 22 41 29.3 41.1 -5.8 -71.1 171 F 1 172 13 23 28 13 26 28 J0124+5618 19 22 41 27.7 38.7 -6.0 -68.9 -9 1 1 172 13 26 28 13 27 38 =0121+560 19 23 51 27.8 38.8 -6.0 -69.1 61 F 1 176 13 26 28 13 27 38 GJ53B 19 23 51 29.5 41.2 -5.7 -71.3 -9 1 1 176 13 27 38 13 30 38 --- 19 26 52 29.9 41.3 -5.7 -71.8 171 F 1 188 13 27 38 13 30 38 J0124+5618 19 26 52 28.2 39.0 -6.0 -69.7 -9 1 1 188 13 30 38 13 31 48 =0121+560 19 28 02 28.4 39.0 -5.9 -69.9 61 F 1 192 13 30 38 13 31 48 GJ53B 19 28 02 30.1 41.4 -5.7 -72.0 -9 1 1 192 13 31 48 13 34 48 --- 19 31 02 30.5 41.5 -5.6 -72.6 171 F 1 204 13 31 48 Schedule for VLBA_PT (Code Pt ) Page 4 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 13 34 48 J0124+5618 19 31 02 28.8 39.2 -5.9 -70.4 -9 1 1 204 13 34 48 13 35 58 =0121+560 19 32 12 28.9 39.2 -5.9 -70.6 61 F 1 208 13 34 48 13 35 58 GJ53B 19 32 12 30.6 41.6 -5.6 -72.8 -9 1 1 208 13 35 58 13 38 58 --- 19 35 13 31.1 41.7 -5.6 -73.3 171 F 1 220 13 35 58 13 38 58 J0124+5618 19 35 13 29.3 39.4 -5.8 -71.2 -9 1 1 220 13 38 58 13 40 08 =0121+560 19 36 23 29.5 39.5 -5.8 -71.4 61 F 1 225 13 38 58 13 40 08 J0110+5404 19 36 23 30.7 42.6 -5.6 -72.7 -8 1 1 225 13 40 08 13 41 18 --- 19 37 33 30.9 42.7 -5.6 -72.9 62 F 1 229 13 40 08 13 41 18 J0124+5618 19 37 33 29.6 39.5 -5.8 -71.6 -8 1 1 229 13 41 18 13 42 28 =0121+560 19 38 44 29.8 39.6 -5.8 -71.8 62 F 1 234 13 41 18 13 44 31 J2237+4216 19 40 47 54.8 63.5 -2.9 -88.2 67 1 1 234 13 44 31 13 45 11 --- 19 41 27 55.0 63.5 -2.9 -88.3 40 F 1 236 13 44 49 13 45 11 J2255+4202 19 41 27 51.5 63.5 -3.2 -85.2 -13 1 1 236 13 45 11 13 46 21 =2253+417 19 42 37 51.7 63.6 -3.2 -85.4 57 F 1 241 13 45 11 13 46 21 J2237+4216 19 42 37 55.2 63.5 -2.9 -88.5 -13 1 1 241 13 46 21 13 47 31 --- 19 43 47 55.4 63.5 -2.9 -88.7 57 F 1 245 13 46 21 13 47 31 GJ873 19 43 47 53.7 59.9 -3.1 -90.0 -9 1 1 245 13 47 31 13 50 31 --- 19 46 48 54.2 59.9 -3.0 -90.5 171 F 1 257 13 47 31 13 50 31 J2237+4216 19 46 48 56.0 63.5 -2.8 -89.2 -10 1 1 257 13 50 31 13 51 41 --- 19 47 58 56.2 63.5 -2.8 -89.4 60 F 1 261 13 50 31 13 51 41 GJ873 19 47 58 54.4 59.9 -3.0 -90.7 -10 1 1 261 13 51 41 13 54 41 --- 19 50 59 54.9 59.9 -2.9 -91.2 170 F 1 273 13 51 41 13 54 41 J2237+4216 19 50 59 56.7 63.5 -2.8 -89.9 -10 1 1 273 13 54 41 13 55 51 --- 19 52 09 56.9 63.5 -2.8 -90.1 60 F 1 277 13 54 41 13 55 51 GJ873 19 52 09 55.1 59.9 -2.9 -91.5 -10 1 1 277 13 55 51 13 58 51 --- 19 55 09 55.7 59.9 -2.9 -92.0 170 F 1 289 13 55 51 13 58 51 J2237+4216 19 55 09 57.5 63.5 -2.7 -90.6 -10 1 1 289 13 58 51 14 00 01 --- 19 56 19 57.7 63.5 -2.7 -90.8 60 F 1 294 13 58 51 Schedule for VLBA_PT (Code Pt ) Page 5 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 14 00 01 GJ873 19 56 19 55.9 59.8 -2.8 -92.2 -10 1 1 294 14 00 01 14 03 01 --- 19 59 20 56.4 59.8 -2.8 -92.8 170 F 1 305 14 00 01 14 03 01 J2237+4216 19 59 20 58.3 63.5 -2.6 -91.3 -10 1 1 305 14 03 01 14 04 11 --- 20 00 30 58.5 63.5 -2.6 -91.6 60 F 1 310 14 03 01 14 04 11 GJ873 20 00 30 56.6 59.8 -2.8 -93.0 -10 1 1 310 14 04 11 14 07 11 --- 20 03 31 57.2 59.7 -2.7 -93.6 170 F 1 321 14 04 11 14 07 11 J2237+4216 20 03 31 59.0 63.4 -2.6 -92.1 -10 1 1 321 14 07 11 14 08 21 --- 20 04 41 59.3 63.4 -2.5 -92.3 60 F 1 326 14 07 11 14 08 21 J2255+4202 20 04 41 55.8 63.9 -2.9 -88.8 -13 1 1 326 14 08 21 14 09 31 =2253+417 20 05 51 56.0 63.9 -2.8 -89.0 57 F 1 330 14 08 21 14 09 31 J2237+4216 20 05 51 59.5 63.4 -2.5 -92.5 -13 1 1 330 14 09 31 14 10 41 --- 20 07 01 59.7 63.4 -2.5 -92.7 57 F 1 335 14 09 31 14 12 45 J0124+5618 20 09 06 33.8 40.9 -5.3 -77.5 67 1 1 335 14 12 45 14 13 25 =0121+560 20 09 46 33.9 40.9 -5.3 -77.6 40 F 1 337 14 13 03 14 13 25 J0110+5404 20 09 46 35.4 44.1 -5.0 -78.7 -9 1 1 337 14 13 25 14 14 35 --- 20 10 56 35.6 44.1 -5.0 -78.9 61 F 1 342 14 13 25 14 14 35 J0124+5618 20 10 56 34.1 41.0 -5.2 -77.8 -9 1 1 342 14 14 35 14 15 45 =0121+560 20 12 06 34.2 41.0 -5.2 -78.0 61 F 1 346 14 14 35 14 15 45 GJ53B 20 12 06 36.2 43.2 -4.9 -80.1 -10 1 1 346 14 15 45 14 18 45 --- 20 15 07 36.6 43.3 -4.9 -80.6 170 F 1 358 14 15 45 14 18 45 J0124+5618 20 15 07 34.7 41.1 -5.2 -78.6 -10 1 1 358 14 18 45 14 19 55 =0121+560 20 16 17 34.8 41.1 -5.1 -78.8 60 F 1 363 14 18 45 14 19 55 GJ53B 20 16 17 36.8 43.3 -4.9 -80.9 -10 1 1 363 14 19 55 14 22 55 --- 20 19 17 37.2 43.4 -4.8 -81.4 170 F 1 374 14 19 55 14 22 55 J0124+5618 20 19 17 35.2 41.2 -5.1 -79.4 -10 1 1 374 14 22 55 14 24 05 =0121+560 20 20 28 35.4 41.3 -5.1 -79.6 60 F 1 379 14 22 55 14 24 05 GJ53B 20 20 28 37.4 43.4 -4.8 -81.6 -10 1 1 379 14 24 05 14 27 05 --- 20 23 28 37.8 43.5 -4.8 -82.2 170 F 1 390 14 24 05 Schedule for VLBA_PT (Code Pt ) Page 6 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 14 27 05 J0124+5618 20 23 28 35.8 41.4 -5.0 -80.2 -10 1 1 390 14 27 05 14 28 15 =0121+560 20 24 38 35.9 41.4 -5.0 -80.4 60 F 1 395 14 27 05 14 28 15 GJ53B 20 24 38 38.0 43.5 -4.7 -82.4 -10 1 1 395 14 28 15 14 31 15 --- 20 27 39 38.4 43.6 -4.7 -83.0 170 F 1 406 14 28 15 14 31 15 J0124+5618 20 27 39 36.4 41.5 -5.0 -81.0 -10 1 1 406 14 31 15 14 32 25 =0121+560 20 28 49 36.5 41.5 -4.9 -81.2 60 F 1 411 14 31 15 14 32 25 GJ53B 20 28 49 38.6 43.6 -4.7 -83.2 -10 1 1 411 14 32 25 14 35 25 --- 20 31 50 39.0 43.7 -4.6 -83.8 170 F 1 423 14 32 25 14 35 25 J0124+5618 20 31 50 36.9 41.6 -4.9 -81.8 -10 1 1 423 14 35 25 14 36 35 =0121+560 20 33 00 37.1 41.6 -4.9 -82.0 60 F 1 427 14 35 25 14 36 35 J0110+5404 20 33 00 38.8 44.8 -4.6 -83.0 -9 1 1 427 14 36 35 14 37 45 --- 20 34 10 39.0 44.8 -4.6 -83.2 61 F 1 432 14 36 35 14 37 45 J0124+5618 20 34 10 37.3 41.6 -4.8 -82.2 -9 1 1 432 14 37 45 14 38 55 =0121+560 20 35 20 37.4 41.7 -4.8 -82.5 61 F 1 436 14 37 45 14 41 26 J2237+4216 20 37 51 65.4 62.1 -2.0 -99.0 89 1 1 436 14 41 26 14 42 06 --- 20 38 32 65.5 62.1 -2.0 -99.2 40 F 1 439 14 41 44 14 42 06 J2255+4202 20 38 32 62.1 63.5 -2.3 -94.8 -13 1 1 439 14 42 06 14 43 16 =2253+417 20 39 42 62.3 63.5 -2.3 -95.0 57 F 1 443 14 42 06 14 43 16 J2237+4216 20 39 42 65.7 62.0 -2.0 -99.5 -13 1 1 443 14 43 16 14 44 26 --- 20 40 52 65.9 61.9 -1.9 -99.7 57 F 1 448 14 43 16 14 44 26 GJ873 20 40 52 63.8 57.9 -2.1 -101.7 -10 1 1 448 14 44 26 14 47 26 --- 20 43 52 64.3 57.7 -2.1 -102.4 170 F 1 459 14 44 26 14 47 26 J2237+4216 20 43 52 66.5 61.7 -1.9 -100.5 -10 1 1 459 14 47 26 14 48 36 --- 20 45 03 66.7 61.6 -1.9 -100.8 60 F 1 464 14 47 26 14 48 36 GJ873 20 45 03 64.5 57.6 -2.0 -102.7 -10 1 1 464 14 48 36 14 51 36 --- 20 48 03 65.0 57.3 -2.0 -103.5 170 F 1 475 14 48 36 14 51 36 J2237+4216 20 48 03 67.2 61.3 -1.8 -101.5 -10 1 1 475 14 51 36 14 52 46 --- 20 49 13 67.4 61.2 -1.8 -101.8 60 F 1 480 14 51 36 Schedule for VLBA_PT (Code Pt ) Page 7 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 14 52 46 GJ873 20 49 13 65.2 57.2 -2.0 -103.8 -10 1 1 480 14 52 46 14 55 46 --- 20 52 14 65.8 56.8 -1.9 -104.6 170 F 1 492 14 52 46 14 55 46 J2237+4216 20 52 14 68.0 60.9 -1.8 -102.6 -10 1 1 492 14 55 46 14 56 56 --- 20 53 24 68.2 60.7 -1.7 -102.9 60 F 1 496 14 55 46 14 56 56 GJ873 20 53 24 66.0 56.7 -1.9 -105.0 -10 1 1 496 14 56 56 14 59 56 --- 20 56 25 66.5 56.4 -1.8 -105.8 170 F 1 508 14 56 56 14 59 56 J2237+4216 20 56 25 68.7 60.4 -1.7 -103.8 -10 1 1 508 14 59 56 15 01 06 --- 20 57 35 68.9 60.2 -1.7 -104.1 60 F 1 512 14 59 56 15 01 06 GJ873 20 57 35 66.7 56.2 -1.8 -106.2 -10 1 1 512 15 01 06 15 04 06 --- 21 00 35 67.2 55.8 -1.8 -107.0 170 F 1 524 15 01 06 15 04 06 J2237+4216 21 00 35 69.5 59.8 -1.6 -105.0 -11 1 1 524 15 04 06 15 05 16 --- 21 01 45 69.7 59.7 -1.6 -105.3 59 F 1 528 15 04 06 15 05 16 J2255+4202 21 01 45 66.4 62.3 -1.9 -99.8 -13 1 1 528 15 05 16 15 06 26 =2253+417 21 02 56 66.6 62.2 -1.9 -100.1 57 F 1 533 15 05 16 15 06 26 J2237+4216 21 02 56 69.9 59.5 -1.6 -105.7 -13 1 1 533 15 06 26 15 07 36 --- 21 04 06 70.1 59.3 -1.6 -106.0 57 F 1 537 15 06 26 15 10 27 J0124+5618 21 06 58 41.8 42.1 -4.3 -88.8 109 1 1 537 15 10 27 15 11 07 =0121+560 21 07 38 41.9 42.1 -4.3 -88.9 40 F 1 540 15 10 45 15 11 07 J0110+5404 21 07 38 43.9 45.2 -4.1 -89.7 -10 1 1 540 15 11 07 15 12 17 --- 21 08 48 44.0 45.2 -4.0 -89.9 60 F 1 544 15 11 07 15 12 17 J0124+5618 21 08 48 42.0 42.1 -4.3 -89.1 -10 1 1 544 15 12 17 15 13 27 =0121+560 21 09 58 42.2 42.1 -4.2 -89.4 60 F 1 549 15 12 17 15 13 27 GJ53B 21 09 58 44.5 44.0 -4.0 -91.4 -11 1 1 549 15 13 27 15 16 27 --- 21 12 59 44.9 44.0 -3.9 -92.0 169 F 1 561 15 13 27 15 16 27 J0124+5618 21 12 59 42.6 42.1 -4.2 -90.0 -11 1 1 561 15 16 27 15 17 37 =0121+560 21 14 09 42.8 42.1 -4.2 -90.3 59 F 1 565 15 16 27 15 17 37 GJ53B 21 14 09 45.1 44.0 -3.9 -92.3 -11 1 1 565 15 17 37 15 20 37 --- 21 17 09 45.5 44.0 -3.9 -92.9 169 F 1 577 15 17 37 Schedule for VLBA_PT (Code Pt ) Page 8 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 15 20 37 J0124+5618 21 17 09 43.2 42.1 -4.1 -90.9 -11 1 1 577 15 20 37 15 21 47 =0121+560 21 18 20 43.4 42.1 -4.1 -91.1 59 F 1 581 15 20 37 15 21 47 GJ53B 21 18 20 45.7 43.9 -3.8 -93.2 -11 1 1 581 15 21 47 15 24 47 --- 21 21 20 46.1 43.9 -3.8 -93.8 169 F 1 593 15 21 47 15 24 47 J0124+5618 21 21 20 43.8 42.1 -4.1 -91.8 -11 1 1 593 15 24 47 15 25 57 =0121+560 21 22 30 43.9 42.1 -4.0 -92.0 59 F 1 597 15 24 47 15 25 57 GJ53B 21 22 30 46.3 43.9 -3.8 -94.1 -11 1 1 597 15 25 57 15 28 57 --- 21 25 31 46.7 43.8 -3.7 -94.7 169 F 1 609 15 25 57 15 28 57 J0124+5618 21 25 31 44.3 42.1 -4.0 -92.7 -11 1 1 609 15 28 57 15 30 07 =0121+560 21 26 41 44.5 42.0 -4.0 -92.9 59 F 1 614 15 28 57 15 30 07 GJ53B 21 26 41 46.9 43.8 -3.7 -95.0 -11 1 1 614 15 30 07 15 33 07 --- 21 29 42 47.3 43.8 -3.7 -95.6 169 F 1 625 15 30 07 15 33 07 J0124+5618 21 29 42 44.9 42.0 -3.9 -93.6 -11 1 1 625 15 33 07 15 34 17 =0121+560 21 30 52 45.1 42.0 -3.9 -93.8 59 F 1 630 15 33 07 15 34 17 J0110+5404 21 30 52 47.3 45.0 -3.7 -94.5 -10 1 1 630 15 34 17 15 35 27 --- 21 32 02 47.4 45.0 -3.6 -94.8 60 F 1 634 15 34 17 15 35 27 J0124+5618 21 32 02 45.2 42.0 -3.9 -94.1 -10 1 1 634 15 35 27 15 36 37 =0121+560 21 33 12 45.4 42.0 -3.9 -94.3 60 F 1 639 15 35 27 15 40 00 J2237+4216 21 36 35 75.7 51.5 -1.0 -119.0 136 1 1 639 15 40 00 15 40 40 --- 21 37 15 75.8 51.3 -1.0 -119.3 40 F 1 641 15 40 18 15 40 40 J2255+4202 21 37 15 72.7 57.4 -1.3 -110.3 -12 1 1 641 15 40 40 15 41 50 =2253+417 21 38 26 72.9 57.1 -1.3 -110.8 58 F 1 646 15 40 40 15 41 50 J2237+4216 21 38 26 76.0 50.9 -1.0 -120.0 -12 1 1 646 15 41 50 15 43 00 --- 21 39 36 76.1 50.4 -1.0 -120.6 58 F 1 650 15 41 50 15 43 00 GJ873 21 39 36 73.6 47.2 -1.1 -122.0 -11 1 1 650 15 43 00 15 46 00 --- 21 42 36 74.0 46.2 -1.1 -123.5 169 F 1 662 15 43 00 15 46 00 J2237+4216 21 42 36 76.6 49.2 -0.9 -122.3 -11 1 1 662 15 46 00 15 47 10 --- 21 43 46 76.8 48.7 -0.9 -123.0 59 F 1 666 15 46 00 Schedule for VLBA_PT (Code Pt ) Page 9 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 15 47 10 GJ873 21 43 46 74.2 45.7 -1.1 -124.1 -11 1 1 666 15 47 10 15 50 10 --- 21 46 47 74.6 44.6 -1.0 -125.8 169 F 1 678 15 47 10 15 50 10 J2237+4216 21 46 47 77.3 47.3 -0.8 -124.8 -11 1 1 678 15 50 10 15 51 20 --- 21 47 57 77.4 46.7 -0.8 -125.6 59 F 1 683 15 50 10 15 51 20 GJ873 21 47 57 74.8 44.1 -1.0 -126.4 -11 1 1 683 15 51 20 15 54 20 --- 21 50 58 75.2 42.9 -0.9 -128.2 169 F 1 694 15 51 20 15 54 20 J2237+4216 21 50 58 77.9 45.2 -0.8 -127.6 -11 1 1 694 15 54 20 15 55 30 --- 21 52 08 78.1 44.5 -0.8 -128.4 59 F 1 699 15 54 20 15 55 30 GJ873 21 52 08 75.4 42.4 -0.9 -128.9 -11 1 1 699 15 55 30 15 58 30 --- 21 55 08 75.8 41.0 -0.9 -130.7 169 F 1 710 15 55 30 15 58 30 J2237+4216 21 55 08 78.5 42.8 -0.7 -130.6 -11 1 1 710 15 58 30 15 59 40 --- 21 56 18 78.6 42.1 -0.7 -131.5 59 F 1 715 15 58 30 15 59 40 GJ873 21 56 18 76.0 40.4 -0.8 -131.5 -11 1 1 715 15 59 40 16 02 40 --- 21 59 19 76.4 38.9 -0.8 -133.5 169 F 1 726 15 59 40 16 02 40 J2237+4216 21 59 19 79.1 40.1 -0.6 -134.0 -11 1 1 726 16 02 40 16 03 50 --- 22 00 29 79.2 39.3 -0.6 -134.9 59 F 1 731 16 02 40 16 03 50 J2255+4202 22 00 29 76.6 50.3 -0.9 -121.1 -13 1 1 731 16 03 50 16 05 00 =2253+417 22 01 39 76.8 49.8 -0.9 -121.8 57 F 1 735 16 03 50 16 05 00 J2237+4216 22 01 39 79.4 38.5 -0.6 -136.0 -14 1 1 735 16 05 00 16 06 10 --- 22 02 50 79.5 37.6 -0.6 -137.0 56 F 1 740 16 05 00 16 09 30 J0124+5618 22 06 10 49.9 41.0 -3.3 -101.9 134 1 1 740 16 09 30 16 10 10 =0121+560 22 06 50 50.0 41.0 -3.3 -102.1 40 F 1 743 16 09 48 16 10 10 J0110+5404 22 06 50 52.5 43.8 -3.1 -102.8 -11 1 1 743 16 10 10 16 11 20 --- 22 08 00 52.6 43.7 -3.0 -103.1 59 F 1 747 16 10 10 16 11 20 J0124+5618 22 08 00 50.2 40.9 -3.3 -102.3 -11 1 1 747 16 11 20 16 12 30 =0121+560 22 09 10 50.3 40.9 -3.3 -102.6 59 F 1 752 16 11 20 16 12 30 GJ53B 22 09 10 52.9 42.2 -3.0 -104.9 -11 1 1 752 16 12 30 16 15 30 --- 22 12 11 53.3 42.0 -2.9 -105.7 169 F 1 763 16 12 30 Schedule for VLBA_PT (Code Pt ) Page 10 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 16 15 30 J0124+5618 22 12 11 50.7 40.7 -3.2 -103.4 -11 1 1 763 16 15 30 16 16 40 =0121+560 22 13 21 50.9 40.7 -3.2 -103.7 59 F 1 768 16 15 30 16 16 40 GJ53B 22 13 21 53.5 41.9 -2.9 -106.0 -11 1 1 768 16 16 40 16 19 40 --- 22 16 21 53.9 41.7 -2.9 -106.8 169 F 1 779 16 16 40 16 19 40 J0124+5618 22 16 21 51.3 40.5 -3.1 -104.4 -11 1 1 779 16 19 40 16 20 50 =0121+560 22 17 32 51.5 40.4 -3.1 -104.7 59 F 1 784 16 19 40 16 20 50 GJ53B 22 17 32 54.0 41.6 -2.9 -107.1 -11 1 1 784 16 20 50 16 23 50 --- 22 20 32 54.4 41.4 -2.8 -107.9 169 F 1 795 16 20 50 16 23 50 J0124+5618 22 20 32 51.9 40.3 -3.1 -105.5 -11 1 1 795 16 23 50 16 25 00 =0121+560 22 21 42 52.0 40.2 -3.1 -105.8 59 F 1 800 16 23 50 16 25 00 GJ53B 22 21 42 54.6 41.3 -2.8 -108.2 -11 1 1 800 16 25 00 16 28 00 --- 22 24 43 55.0 41.1 -2.7 -109.0 169 F 1 812 16 25 00 16 28 00 J0124+5618 22 24 43 52.4 40.0 -3.0 -106.5 -11 1 1 812 16 28 00 16 29 10 =0121+560 22 25 53 52.6 39.9 -3.0 -106.8 59 F 1 816 16 28 00 16 29 10 GJ53B 22 25 53 55.2 41.0 -2.7 -109.3 -11 1 1 816 16 29 10 16 32 10 --- 22 28 53 55.6 40.7 -2.7 -110.2 169 F 1 828 16 29 10 16 32 10 J0124+5618 22 28 53 53.0 39.7 -2.9 -107.6 -11 1 1 828 16 32 10 16 33 20 =0121+560 22 30 04 53.1 39.6 -2.9 -107.9 59 F 1 832 16 32 10 16 33 20 J0110+5404 22 30 04 55.7 42.2 -2.7 -108.8 -11 1 1 832 16 33 20 16 34 30 --- 22 31 14 55.9 42.1 -2.7 -109.1 59 F 1 837 16 33 20 16 34 30 J0124+5618 22 31 14 53.3 39.6 -2.9 -108.3 -11 1 1 837 16 34 30 16 35 40 =0121+560 22 32 24 53.4 39.5 -2.9 -108.6 59 F 1 841 16 34 30 16 50 19 3C454.3 22 47 06 71.8 174.4 -0.1 -4.8 783 1 1 841 16 50 19 16 52 19 --- 22 49 06 71.9 175.9 -0.1 -3.5 120 F 1 849 16 50 37 16 54 23 J2237+4216 22 51 10 81.5 342.4 0.2 160.3 7 1 1 849 16 54 23 16 55 03 --- 22 51 50 81.5 341.7 0.2 159.4 40 F 1 852 16 54 41 16 55 03 J2255+4202 22 51 50 82.2 365.6 -0.1 -173.7 -22 1 1 852 16 55 03 16 56 13 =2253+417 22 53 01 82.2 364.0 0.0 -175.5 48 F 1 856 16 55 03 Schedule for VLBA_PT (Code Pt ) Page 11 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 16 56 13 J2237+4216 22 53 01 81.4 340.3 0.3 157.9 -22 1 1 856 16 56 13 16 57 23 --- 22 54 11 81.3 339.0 0.3 156.4 48 F 1 861 16 56 13 16 57 23 GJ873 22 54 11 79.8 352.9 0.1 171.8 -15 1 1 861 16 57 23 17 00 23 --- 22 57 11 79.7 349.9 0.2 168.3 165 F 1 872 16 57 23 17 00 23 J2237+4216 22 57 11 81.1 335.7 0.3 152.6 -15 1 1 872 17 00 23 17 01 33 --- 22 58 21 81.0 334.5 0.3 151.2 55 F 1 877 17 00 23 17 01 33 GJ873 22 58 21 79.7 348.7 0.2 167.0 -16 1 1 877 17 01 33 17 04 33 --- 23 01 22 79.6 345.9 0.2 163.6 164 F 1 888 17 01 33 17 04 33 J2237+4216 23 01 22 80.7 331.4 0.4 147.7 -16 1 1 888 17 04 33 17 05 43 --- 23 02 32 80.6 330.3 0.4 146.4 54 F 1 893 17 04 33 17 05 43 GJ873 23 02 32 79.5 344.8 0.3 162.3 -16 1 1 893 17 05 43 17 08 43 --- 23 05 33 79.3 342.0 0.3 159.1 164 F 1 904 17 05 43 17 08 43 J2237+4216 23 05 33 80.3 327.6 0.5 143.2 -16 1 1 904 17 08 43 17 09 53 --- 23 06 43 80.1 326.6 0.5 142.0 54 F 1 909 17 08 43 17 09 53 GJ873 23 06 43 79.2 340.9 0.3 157.8 -16 1 1 909 17 09 53 17 12 53 --- 23 09 43 79.0 338.3 0.4 154.7 164 F 1 921 17 09 53 17 12 53 J2237+4216 23 09 43 79.8 324.1 0.5 139.1 -15 1 1 921 17 12 53 17 14 03 --- 23 10 53 79.6 323.2 0.6 138.0 55 F 1 925 17 12 53 17 14 03 GJ873 23 10 53 78.9 337.4 0.4 153.6 -15 1 1 925 17 14 03 17 17 03 --- 23 13 54 78.7 334.9 0.4 150.6 165 F 1 937 17 14 03 17 17 03 J2237+4216 23 13 54 79.3 321.0 0.6 135.3 -15 1 1 937 17 17 03 17 18 13 --- 23 15 04 79.1 320.2 0.6 134.3 55 F 1 941 17 17 03 17 18 13 J2255+4202 23 15 04 81.4 335.7 0.3 152.8 -16 1 1 941 17 18 13 17 19 23 =2253+417 23 16 14 81.3 334.5 0.3 151.3 54 F 1 946 17 18 13 17 19 23 J2237+4216 23 16 14 79.0 319.4 0.6 133.4 -16 1 1 946 17 19 23 17 20 33 --- 23 17 25 78.8 318.6 0.7 132.4 54 F 1 950 17 19 23 17 23 10 J0124+5618 23 20 02 59.4 394.3 -2.1 -122.8 101 1 1 950 17 23 10 17 23 50 =0121+560 23 20 42 59.5 394.2 -2.1 -123.0 40 F 1 953 17 23 28 Schedule for VLBA_PT (Code Pt ) Page 12 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 17 23 50 J0110+5404 23 20 42 62.4 395.7 -1.8 -124.6 -12 1 1 953 17 23 50 17 25 00 --- 23 21 53 62.5 395.5 -1.8 -125.0 58 F 1 957 17 23 50 17 25 00 J0124+5618 23 21 53 59.6 394.0 -2.1 -123.4 -12 1 1 957 17 25 00 17 26 10 =0121+560 23 23 03 59.7 393.9 -2.0 -123.8 58 F 1 962 17 25 00 17 26 10 GJ53B 23 23 03 62.4 393.5 -1.8 -127.5 -11 1 1 962 17 26 10 17 29 10 --- 23 26 03 62.7 392.9 -1.7 -128.6 169 F 1 973 17 26 10 17 29 10 J0124+5618 23 26 03 60.1 393.4 -2.0 -124.8 -11 1 1 973 17 29 10 17 30 20 =0121+560 23 27 14 60.2 393.2 -2.0 -125.3 59 F 1 978 17 29 10 17 30 20 GJ53B 23 27 14 62.9 392.7 -1.7 -129.1 -11 1 1 978 17 30 20 17 33 20 --- 23 30 14 63.2 392.1 -1.6 -130.2 169 F 1 990 17 30 20 17 33 20 J0124+5618 23 30 14 60.5 392.7 -1.9 -126.3 -11 1 1 990 17 33 20 17 34 30 =0121+560 23 31 24 60.7 392.5 -1.9 -126.7 59 F 1 994 17 33 20 17 34 30 GJ53B 23 31 24 63.3 391.8 -1.6 -130.7 -11 1 1 994 17 34 30 17 37 30 --- 23 34 25 63.6 391.2 -1.6 -131.9 169 F 1 1006 17 34 30 17 37 30 J0124+5618 23 34 25 61.0 392.0 -1.8 -127.8 -11 1 1 1006 17 37 30 17 38 40 =0121+560 23 35 35 61.1 391.8 -1.8 -128.2 59 F 1 1010 17 37 30 17 38 40 GJ53B 23 35 35 63.8 390.9 -1.6 -132.3 -11 1 1 1010 17 38 40 17 41 40 --- 23 38 35 64.1 390.2 -1.5 -133.5 169 F 1 1022 17 38 40 17 41 40 J0124+5618 23 38 35 61.5 391.2 -1.8 -129.3 -11 1 1 1022 17 41 40 17 42 50 =0121+560 23 39 46 61.6 391.0 -1.8 -129.8 59 F 1 1026 17 41 40 17 42 50 GJ53B 23 39 46 64.2 390.0 -1.5 -134.0 -11 1 1 1026 17 42 50 17 45 50 --- 23 42 46 64.5 389.3 -1.4 -135.3 169 F 1 1038 17 42 50 17 45 50 J0124+5618 23 42 46 61.9 390.5 -1.7 -130.9 -11 1 1 1038 17 45 50 17 47 00 =0121+560 23 43 56 62.0 390.2 -1.7 -131.3 59 F 1 1043 17 45 50 17 47 00 J0110+5404 23 43 56 65.0 390.9 -1.4 -133.6 -12 1 1 1043 17 47 00 17 48 10 --- 23 45 06 65.1 390.6 -1.4 -134.1 58 F 1 1047 17 47 00 17 48 10 J0124+5618 23 45 06 62.1 390.0 -1.7 -131.8 -12 1 1 1047 17 48 10 17 49 20 =0121+560 23 46 17 62.3 389.8 -1.6 -132.2 58 F 1 1052 17 48 10 Schedule for VLBA_PT (Code Pt ) Page 13 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 17 51 36 J2237+4216 23 48 33 74.0 305.2 1.2 114.1 73 1 1 1052 17 51 36 17 52 16 --- 23 49 13 73.8 305.0 1.2 113.8 40 F 1 1054 17 51 54 17 52 16 J2255+4202 23 49 13 77.0 310.7 0.9 122.4 -12 1 1 1054 17 52 16 17 53 26 =2253+417 23 50 23 76.8 310.1 0.9 121.7 58 F 1 1059 17 52 16 17 53 26 J2237+4216 23 50 23 73.6 304.7 1.2 113.3 -12 1 1 1059 17 53 26 17 54 36 --- 23 51 33 73.4 304.4 1.2 112.8 58 F 1 1063 17 53 26 17 54 36 GJ873 23 51 33 74.0 313.9 1.1 123.6 -12 1 1 1063 17 54 36 17 57 36 --- 23 54 34 73.6 312.8 1.1 122.1 168 F 1 1075 17 54 36 17 57 36 J2237+4216 23 54 34 72.9 303.7 1.3 111.6 -12 1 1 1075 17 57 36 17 58 46 --- 23 55 44 72.7 303.4 1.3 111.2 58 F 1 1079 17 57 36 17 58 46 GJ873 23 55 44 73.4 312.5 1.1 121.5 -12 1 1 1079 17 58 46 18 01 46 --- 23 58 44 72.9 311.5 1.2 120.1 168 F 1 1091 17 58 46 18 01 46 J2237+4216 23 58 44 72.2 302.8 1.4 110.1 -12 1 1 1091 18 01 46 18 02 56 --- 23 59 54 72.0 302.5 1.4 109.6 58 F 1 1095 18 01 46 18 02 56 GJ873 23 59 54 72.8 311.2 1.2 119.5 -12 1 1 1095 18 02 56 18 05 56 --- 00 02 55 72.3 310.3 1.3 118.2 168 F 1 1107 18 02 56 18 05 56 J2237+4216 00 02 55 71.5 302.0 1.4 108.6 -12 1 1 1107 18 05 56 18 07 06 --- 00 04 05 71.3 301.7 1.4 108.2 58 F 1 1112 18 05 56 18 07 06 GJ873 00 04 05 72.1 310.0 1.3 117.7 -11 1 1 1112 18 07 06 18 10 06 --- 00 07 06 71.6 309.2 1.3 116.4 169 F 1 1123 18 07 06 18 10 06 J2237+4216 00 07 06 70.7 301.2 1.5 107.2 -11 1 1 1123 18 10 06 18 11 16 --- 00 08 16 70.5 301.0 1.5 106.8 59 F 1 1128 18 10 06 18 11 16 GJ873 00 08 16 71.4 308.9 1.4 115.9 -11 1 1 1128 18 11 16 18 14 16 --- 00 11 16 71.0 308.2 1.4 114.7 169 F 1 1139 18 11 16 18 14 16 J2237+4216 00 11 16 70.0 300.6 1.6 105.9 -11 1 1 1139 18 14 16 18 15 26 --- 00 12 27 69.8 300.4 1.6 105.5 59 F 1 1144 18 14 16 18 15 26 J2255+4202 00 12 27 73.1 303.1 1.3 111.2 -13 1 1 1144 18 15 26 18 16 36 =2253+417 00 13 37 72.9 302.9 1.3 110.8 57 F 1 1148 18 15 26 Schedule for VLBA_PT (Code Pt ) Page 14 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 18 16 36 J2237+4216 00 13 37 69.6 300.2 1.6 105.2 -13 1 1 1148 18 16 36 18 17 46 --- 00 14 47 69.4 300.1 1.6 104.8 57 F 1 1153 18 16 36 18 19 46 J0124+5618 00 16 48 65.1 382.6 -1.1 -145.0 60 1 1 1153 18 19 46 18 20 26 =0121+560 00 17 28 65.1 382.4 -1.1 -145.3 40 F 1 1155 18 20 04 18 20 26 J0110+5404 00 17 28 68.1 381.2 -0.9 -149.3 -12 1 1 1155 18 20 26 18 21 36 --- 00 18 38 68.2 380.8 -0.9 -149.9 58 F 1 1160 18 20 26 18 21 36 J0124+5618 00 18 38 65.2 382.1 -1.1 -145.8 -12 1 1 1160 18 21 36 18 22 46 =0121+560 00 19 48 65.3 381.8 -1.1 -146.4 58 F 1 1164 18 21 36 18 22 46 GJ53B 00 19 48 67.7 378.7 -0.8 -152.6 -11 1 1 1164 18 22 46 18 25 46 --- 00 22 49 67.8 377.7 -0.8 -154.1 169 F 1 1176 18 22 46 18 25 46 J0124+5618 00 22 49 65.5 381.0 -1.0 -147.8 -11 1 1 1176 18 25 46 18 26 56 =0121+560 00 23 59 65.6 380.6 -1.0 -148.3 59 F 1 1181 18 25 46 18 26 56 GJ53B 00 23 59 67.9 377.3 -0.7 -154.7 -11 1 1 1181 18 26 56 18 29 56 --- 00 27 00 68.1 376.2 -0.7 -156.3 169 F 1 1192 18 26 56 18 29 56 J0124+5618 00 27 00 65.8 379.8 -1.0 -149.7 -11 1 1 1192 18 29 56 18 31 06 =0121+560 00 28 10 65.9 379.4 -0.9 -150.3 59 F 1 1197 18 29 56 18 31 06 GJ53B 00 28 10 68.2 375.8 -0.7 -156.9 -11 1 1 1197 18 31 06 18 34 06 --- 00 31 10 68.3 374.7 -0.6 -158.6 169 F 1 1208 18 31 06 18 34 06 J0124+5618 00 31 10 66.1 378.5 -0.9 -151.7 -10 1 1 1208 18 34 06 18 35 16 =0121+560 00 32 21 66.2 378.2 -0.9 -152.3 60 F 1 1213 18 34 06 18 35 16 GJ53B 00 32 21 68.4 374.3 -0.6 -159.2 -10 1 1 1213 18 35 16 18 38 16 --- 00 35 21 68.5 373.2 -0.6 -160.8 170 F 1 1224 18 35 16 18 38 16 J0124+5618 00 35 21 66.4 377.3 -0.8 -153.8 -10 1 1 1224 18 38 16 18 39 26 =0121+560 00 36 31 66.4 376.9 -0.8 -154.3 60 F 1 1229 18 38 16 18 39 26 GJ53B 00 36 31 68.6 372.8 -0.5 -161.5 -10 1 1 1229 18 39 26 18 42 26 --- 00 39 32 68.7 371.6 -0.5 -163.1 170 F 1 1241 18 39 26 18 42 26 J0124+5618 00 39 32 66.6 375.9 -0.8 -155.8 -10 1 1 1241 18 42 26 18 43 36 =0121+560 00 40 42 66.7 375.6 -0.7 -156.4 60 F 1 1245 18 42 26 Schedule for VLBA_PT (Code Pt ) Page 15 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 18 43 36 J0110+5404 00 40 42 69.5 372.7 -0.5 -162.0 -12 1 1 1245 18 43 36 18 44 46 --- 00 41 52 69.5 372.2 -0.5 -162.7 58 F 1 1250 18 43 36 18 44 46 J0124+5618 00 41 52 66.7 375.2 -0.7 -157.0 -12 1 1 1250 18 44 46 18 45 56 =0121+560 00 43 02 66.8 374.8 -0.7 -157.6 58 F 1 1254 18 44 46 18 47 46 J2237+4216 00 44 52 63.9 297.4 2.1 97.3 52 1 1 1254 18 47 46 18 48 26 --- 00 45 32 63.8 297.4 2.1 97.1 40 F 1 1257 18 48 04 18 48 26 J2255+4202 00 45 32 67.2 298.1 1.8 100.9 -13 1 1 1257 18 48 26 18 49 36 =2253+417 00 46 42 67.0 298.0 1.8 100.6 57 F 1 1261 18 48 26 18 49 36 J2237+4216 00 46 42 63.6 297.3 2.2 96.9 -13 1 1 1261 18 49 36 18 50 46 --- 00 47 52 63.4 297.2 2.2 96.6 57 F 1 1266 18 49 36 18 50 46 GJ873 00 47 52 64.8 302.6 2.0 103.1 -10 1 1 1266 18 50 46 18 53 46 --- 00 50 53 64.2 302.3 2.1 102.3 170 F 1 1277 18 50 46 18 53 46 J2237+4216 00 50 53 62.8 297.1 2.2 96.0 -9 1 1 1277 18 53 46 18 54 56 --- 00 52 03 62.6 297.1 2.2 95.8 61 F 1 1282 18 53 46 18 54 56 GJ873 00 52 03 64.0 302.2 2.1 102.0 -9 1 1 1282 18 54 56 18 57 56 --- 00 55 03 63.5 301.9 2.1 101.3 171 F 1 1293 18 54 56 18 57 56 J2237+4216 00 55 03 62.0 296.9 2.3 95.2 -9 1 1 1293 18 57 56 18 59 06 --- 00 56 14 61.8 296.9 2.3 94.9 61 F 1 1298 18 57 56 18 59 06 GJ873 00 56 14 63.3 301.9 2.2 101.0 -9 1 1 1298 18 59 06 19 02 06 --- 00 59 14 62.8 301.6 2.2 100.3 171 F 1 1310 18 59 06 19 02 06 J2237+4216 00 59 14 61.3 296.8 2.4 94.3 -9 1 1 1310 19 02 06 19 03 16 --- 01 00 24 61.1 296.8 2.4 94.1 61 F 1 1314 19 02 06 19 03 16 GJ873 01 00 24 62.6 301.6 2.2 100.0 -9 1 1 1314 19 03 16 19 06 16 --- 01 03 25 62.0 301.4 2.3 99.3 171 F 1 1326 19 03 16 19 06 16 J2237+4216 01 03 25 60.5 296.7 2.4 93.5 -9 1 1 1326 19 06 16 19 07 26 --- 01 04 35 60.3 296.7 2.5 93.3 61 F 1 1330 19 06 16 19 07 26 GJ873 01 04 35 61.8 301.3 2.3 99.0 -9 1 1 1330 19 07 26 19 10 26 --- 01 07 36 61.3 301.1 2.3 98.4 171 F 1 1342 19 07 26 Schedule for VLBA_PT (Code Pt ) Page 16 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 19 10 26 J2237+4216 01 07 36 59.7 296.6 2.5 92.8 -9 1 1 1342 19 10 26 19 11 36 --- 01 08 46 59.5 296.6 2.5 92.5 61 F 1 1346 19 10 26 19 11 36 J2255+4202 01 08 46 63.0 296.6 2.2 95.7 -13 1 1 1346 19 11 36 19 12 46 =2253+417 01 09 56 62.7 296.6 2.2 95.5 57 F 1 1351 19 11 36 19 12 46 J2237+4216 01 09 56 59.3 296.6 2.5 92.3 -13 1 1 1351 19 12 46 19 13 56 --- 01 11 06 59.1 296.6 2.6 92.1 57 F 1 1355 19 12 46 19 15 45 J0124+5618 01 12 56 67.8 364.4 -0.2 -173.4 59 1 1 1355 19 15 45 19 16 25 =0121+560 01 13 36 67.9 364.2 -0.2 -173.8 40 F 1 1358 19 16 03 19 16 25 J0110+5404 01 13 36 70.2 358.8 0.0 178.3 -11 1 1 1358 19 16 25 19 17 35 --- 01 14 46 70.2 358.3 0.1 177.6 59 F 1 1362 19 16 25 19 17 35 J0124+5618 01 14 46 67.9 363.7 -0.2 -174.4 -11 1 1 1362 19 17 35 19 18 45 =0121+560 01 15 57 67.9 363.3 -0.1 -175.1 59 F 1 1367 19 17 35 19 18 45 GJ53B 01 15 57 69.3 357.1 0.1 175.8 -10 1 1 1367 19 18 45 19 21 45 --- 01 18 57 69.3 355.9 0.2 174.1 170 F 1 1379 19 18 45 19 21 45 J0124+5618 01 18 57 67.9 362.2 -0.1 -176.7 -10 1 1 1379 19 21 45 19 22 55 =0121+560 01 20 07 67.9 361.8 -0.1 -177.4 60 F 1 1383 19 21 45 19 22 55 GJ53B 01 20 07 69.2 355.4 0.2 173.4 -10 1 1 1383 19 22 55 19 25 55 --- 01 23 08 69.2 354.2 0.2 171.6 170 F 1 1395 19 22 55 19 25 55 J0124+5618 01 23 08 67.9 360.7 0.0 -179.0 -10 1 1 1395 19 25 55 19 27 05 =0121+560 01 24 18 67.9 360.2 0.0 -179.7 60 F 1 1399 19 25 55 19 27 05 GJ53B 01 24 18 69.2 353.7 0.3 171.0 -10 1 1 1399 19 27 05 19 30 05 --- 01 27 19 69.1 352.5 0.3 169.2 170 F 1 1411 19 27 05 19 30 05 J0124+5618 01 27 19 67.9 359.1 0.0 178.7 -10 1 1 1411 19 30 05 19 31 15 =0121+560 01 28 29 67.9 358.7 0.1 178.0 60 F 1 1415 19 30 05 19 31 15 GJ53B 01 28 29 69.1 352.1 0.3 168.6 -10 1 1 1415 19 31 15 19 34 15 --- 01 31 29 69.0 350.9 0.4 166.8 170 F 1 1427 19 31 15 19 34 15 J0124+5618 01 31 29 67.9 357.6 0.1 176.4 -10 1 1 1427 19 34 15 19 35 25 =0121+560 01 32 39 67.9 357.1 0.1 175.7 60 F 1 1432 19 34 15 Schedule for VLBA_PT (Code Pt ) Page 17 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 19 35 25 GJ53B 01 32 39 68.9 350.4 0.4 166.2 -10 1 1 1432 19 35 25 19 38 25 --- 01 35 40 68.8 349.3 0.4 164.5 170 F 1 1443 19 35 25 19 38 25 J0124+5618 01 35 40 67.9 356.0 0.2 174.1 -11 1 1 1443 19 38 25 19 39 35 =0121+560 01 36 50 67.8 355.6 0.2 173.5 59 F 1 1448 19 38 25 19 39 35 J0110+5404 01 36 50 69.7 349.0 0.4 164.4 -10 1 1 1448 19 39 35 19 40 45 --- 01 38 00 69.6 348.5 0.5 163.7 60 F 1 1452 19 39 35 19 40 45 J0124+5618 01 38 00 67.8 355.2 0.2 172.8 -10 1 1 1452 19 40 45 19 41 55 =0121+560 01 39 10 67.8 354.8 0.2 172.2 60 F 1 1457 19 40 45 19 43 52 J2237+4216 01 41 07 53.5 296.6 3.1 87.1 72 1 1 1457 19 43 52 19 44 32 --- 01 41 48 53.4 296.6 3.1 87.0 40 F 1 1459 19 44 10 19 44 32 J2255+4202 01 41 48 56.8 296.1 2.8 89.7 -13 1 1 1459 19 44 32 19 45 42 =2253+417 01 42 58 56.6 296.1 2.8 89.5 57 F 1 1464 19 44 32 19 45 42 J2237+4216 01 42 58 53.2 296.7 3.1 86.8 -13 1 1 1464 19 45 42 19 46 52 --- 01 44 08 53.0 296.7 3.1 86.7 57 F 1 1468 19 45 42 19 46 52 GJ873 01 44 08 54.8 300.1 2.9 91.1 -10 1 1 1468 19 46 52 19 49 52 --- 01 47 08 54.3 300.1 3.0 90.6 170 F 1 1480 19 46 52 19 49 52 J2237+4216 01 47 08 52.4 296.7 3.2 86.2 -10 1 1 1480 19 49 52 19 51 02 --- 01 48 19 52.2 296.8 3.2 86.0 60 F 1 1484 19 49 52 19 51 02 GJ873 01 48 19 54.1 300.1 3.0 90.4 -10 1 1 1484 19 51 02 19 54 02 --- 01 51 19 53.5 300.1 3.1 89.8 170 F 1 1496 19 51 02 19 54 02 J2237+4216 01 51 19 51.7 296.8 3.2 85.6 -10 1 1 1496 19 54 02 19 55 12 --- 01 52 29 51.4 296.9 3.3 85.4 60 F 1 1501 19 54 02 19 55 12 GJ873 01 52 29 53.3 300.1 3.1 89.6 -10 1 1 1501 19 55 12 19 58 12 --- 01 55 30 52.8 300.1 3.1 89.1 170 F 1 1512 19 55 12 19 58 12 J2237+4216 01 55 30 50.9 296.9 3.3 84.9 -10 1 1 1512 19 58 12 19 59 22 --- 01 56 40 50.7 297.0 3.3 84.8 60 F 1 1517 19 58 12 19 59 22 GJ873 01 56 40 52.6 300.1 3.2 88.9 -10 1 1 1517 19 59 22 20 02 22 --- 01 59 41 52.0 300.1 3.2 88.4 170 F 1 1528 19 59 22 Schedule for VLBA_PT (Code Pt ) Page 18 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 20 02 22 J2237+4216 01 59 41 50.1 297.0 3.4 84.3 -10 1 1 1528 20 02 22 20 03 32 --- 02 00 51 49.9 297.1 3.4 84.2 60 F 1 1533 20 02 22 20 03 32 J2255+4202 02 00 51 53.3 296.3 3.1 86.6 -13 1 1 1533 20 03 32 20 04 42 =2253+417 02 02 01 53.1 296.3 3.1 86.5 57 F 1 1537 20 03 32 20 04 42 J2237+4216 02 02 01 49.7 297.1 3.4 84.0 -13 1 1 1537 20 04 42 20 05 52 --- 02 03 11 49.5 297.1 3.4 83.8 57 F 1 1542 20 04 42 20 07 50 J0124+5618 02 05 09 66.9 345.7 0.7 158.4 77 1 1 1542 20 07 50 20 08 30 =0121+560 02 05 50 66.9 345.5 0.7 158.1 40 F 1 1544 20 08 08 20 08 30 J0110+5404 02 05 50 68.0 338.2 0.9 148.4 -11 1 1 1544 20 08 30 20 09 40 --- 02 07 00 67.9 337.8 0.9 147.8 59 F 1 1549 20 08 30 20 09 40 J0124+5618 02 07 00 66.8 345.1 0.7 157.5 -11 1 1 1549 20 09 40 20 10 50 =0121+560 02 08 10 66.7 344.7 0.7 156.9 59 F 1 1553 20 09 40 20 10 50 GJ53B 02 08 10 66.9 338.0 1.0 147.3 -11 1 1 1553 20 10 50 20 13 50 --- 02 11 10 66.7 337.1 1.0 145.9 169 F 1 1565 20 10 50 20 13 50 J0124+5618 02 11 10 66.6 343.8 0.8 155.4 -10 1 1 1565 20 13 50 20 15 00 =0121+560 02 12 21 66.5 343.4 0.8 154.8 60 F 1 1570 20 13 50 20 15 00 GJ53B 02 12 21 66.6 336.7 1.1 145.3 -10 1 1 1570 20 15 00 20 18 00 --- 02 15 21 66.3 335.8 1.1 143.9 170 F 1 1581 20 15 00 20 18 00 J0124+5618 02 15 21 66.3 342.5 0.8 153.3 -10 1 1 1581 20 18 00 20 19 10 =0121+560 02 16 31 66.2 342.1 0.9 152.8 60 F 1 1586 20 18 00 20 19 10 GJ53B 02 16 31 66.2 335.5 1.1 143.4 -10 1 1 1586 20 19 10 20 22 10 --- 02 19 32 66.0 334.6 1.2 142.0 170 F 1 1597 20 19 10 20 22 10 J0124+5618 02 19 32 66.0 341.2 0.9 151.3 -10 1 1 1597 20 22 10 20 23 20 =0121+560 02 20 42 66.0 340.9 0.9 150.7 60 F 1 1602 20 22 10 20 23 20 J0110+5404 02 20 42 66.7 333.6 1.2 141.2 -11 1 1 1602 20 23 20 20 24 30 --- 02 21 52 66.6 333.2 1.2 140.6 59 F 1 1606 20 23 20 20 24 30 J0124+5618 02 21 52 65.9 340.5 0.9 150.2 -11 1 1 1606 20 24 30 20 25 40 =0121+560 02 23 02 65.8 340.2 1.0 149.6 59 F 1 1611 20 24 30 Schedule for VLBA_PT (Code Pt ) Page 19 RIPL: GJ873/GJ53B UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 8 Apr 2008 Day 99 --- 20 28 03 J0237+2848 02 25 25 83.9 152.4 -0.2 -25.9 11 1 1 1611 20 28 03 20 30 03 =0234+285 02 27 26 84.1 156.2 -0.2 -22.4 120 F 1 1619 20 28 21 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ873/GJ53B Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * J2237+4216 22 34 52.107085 * 22 37 04.209769 22 37 24.788184 0.00 42 01 12.91202 * 42 16 48.26264 42 19 09.79269 0.00 From catalog imbedded in main SCHED input file. 1.158 scan hours, 47.999 baseline hours above horizon. * GJ873 22 44 36.101499 * 22 46 49.189275 22 47 09.807039 0.00 44 04 08.81156 * 44 19 58.56934 44 22 23.12630 0.00 From catalog imbedded in main SCHED input file. 1.950 scan hours, 95.850 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 22 46 49.732300 Dec = 44 20 02.36800 Rates: RA = -704.65 mas/yr Dec = -459.41 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54564.5264 Rates: RA = -0.17981E-03 s/day Dec = -0.12578E-02 arcsec/day * J0110+5404 01 07 18.696120 * 01 10 19.597690 01 10 47.429568 0.00 53 48 29.02621 * 54 04 26.05910 54 07 04.66732 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 12.458 baseline hours above horizon. * GJ53B 01 05 18.711966 * 01 08 19.679916 01 08 47.459105 0.00 54 39 00.18922 * 54 54 59.76783 54 57 38.70311 0.00 From catalog imbedded in main SCHED input file. 1.900 scan hours, 90.607 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 01 08 16.400000 Dec = 54 55 13.00000 Rates: RA = 3420.00 mas/yr Dec = -1600.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54564.5264 Rates: RA = 0.10861E-02 s/day Dec = -0.43806E-02 arcsec/day * J0124+5618 01 21 16.790767 * 01 24 25.826999 01 24 54.884253 1.41 0121+560 56 03 14.82821 * 56 18 51.91807 56 21 28.73064 1.29 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.139 scan hours, 46.923 baseline hours above horizon. * J0237+2848 02 34 55.589592 * 02 37 52.405679 02 38 20.736658 0.23 0234+285 28 35 11.40780 * 28 48 08.99005 28 50 20.89452 0.40 J0237+28 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 21.568616 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 23.04623 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 7.833 baseline hours above horizon. * J2255+4202 22 53 19.843692 * 22 55 36.707844 22 55 58.008942 0.28 2253+417 41 46 51.26609 * 42 02 52.53271 42 05 19.81321 0.41 J2255+42 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.311 scan hours, 12.143 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) J2237+4216 48.5 GJ873 48.3 J0110+5404 46.6 GJ53B 47.4 J0124+5618 48.9 J0237+2848 29.6 3C454.3 34.5 J2255+4202 45.6 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg