COVER INFORMATION Station: GBT_VLBA (Code Gb ) Experiment: RIPL: GJ686/GJ1224 Exp. Code: BB240AB Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for GBT_VLBA (Code Gb ) Page 2 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 715.51 715.51 699.51 699.51 683.51 683.51 667.51 667.51 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 06 15 00 J1743-0350 15 02 18 33.5 128.9 -2.7 -37.6 0 1 1 0 06 15 00 06 23 00 =1741-038 15 10 19 34.7 130.9 -2.6 -36.4 480 F 1 31 06 15 18 ---------- GBT pointing scan. ---------- 06 23 23 J1743-0350 15 10 42 34.8 131.0 -2.6 -36.4 0 1 1 31 Stopped 06 31 23 =1741-038 15 18 43 36.0 132.9 -2.4 -35.1 480 S 1 62 06 32 47 J1742+1904 15 20 08 53.6 112.0 -2.4 -50.2 0 1 1 62 06 32 47 06 33 27 =1739+190 15 20 48 53.7 112.1 -2.4 -50.1 40 F 1 65 06 33 05 06 33 27 J1745+1814 15 20 48 52.5 112.2 -2.4 -49.8 -30 1 1 65 06 33 27 06 34 37 =1743+182 15 21 59 52.7 112.5 -2.4 -49.6 40 F 1 69 06 33 27 06 34 37 J1742+1904 15 21 59 54.0 112.4 -2.3 -50.0 -30 1 1 69 06 34 37 06 35 47 =1739+190 15 23 09 54.2 112.7 -2.3 -49.8 40 F 1 74 06 34 37 06 35 47 GJ686 15 23 09 54.6 114.5 -2.3 -48.8 -32 1 1 74 06 35 47 06 38 47 --- 15 26 09 55.1 115.3 -2.2 -48.3 148 F 1 85 06 35 47 06 38 47 J1742+1904 15 26 09 54.7 113.5 -2.3 -49.5 -32 1 1 85 06 38 47 06 39 57 =1739+190 15 27 19 54.9 113.9 -2.3 -49.3 38 F 1 90 06 38 47 06 39 57 GJ686 15 27 19 55.3 115.6 -2.2 -48.2 -32 1 1 90 06 39 57 06 42 57 --- 15 30 20 55.9 116.5 -2.1 -47.7 148 F 1 101 06 39 57 06 42 57 J1742+1904 15 30 20 55.5 114.7 -2.2 -48.9 -32 1 1 101 06 42 57 06 44 07 =1739+190 15 31 30 55.7 115.0 -2.2 -48.7 38 F 1 106 06 42 57 06 44 07 GJ686 15 31 30 56.1 116.8 -2.1 -47.5 -32 1 1 106 06 44 07 06 47 07 --- 15 34 31 56.6 117.7 -2.1 -47.0 148 F 1 117 06 44 07 06 47 07 J1742+1904 15 34 31 56.2 115.8 -2.1 -48.2 -32 1 1 117 06 47 07 06 48 17 =1739+190 15 35 41 56.4 116.2 -2.1 -48.1 38 F 1 122 06 47 07 Schedule for GBT_VLBA (Code Gb ) Page 3 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 06 48 17 GJ686 15 35 41 56.8 118.0 -2.0 -46.8 -32 1 1 122 06 48 17 06 51 17 --- 15 38 41 57.3 118.9 -2.0 -46.3 148 F 1 134 06 48 17 06 51 17 J1742+1904 15 38 41 56.9 117.0 -2.1 -47.6 -32 1 1 134 06 51 17 06 52 27 =1739+190 15 39 51 57.1 117.4 -2.0 -47.4 38 F 1 138 06 51 17 06 52 27 GJ686 15 39 51 57.5 119.3 -2.0 -46.1 -32 1 1 138 06 52 27 06 55 27 --- 15 42 52 58.0 120.2 -1.9 -45.6 148 F 1 150 06 52 27 06 55 27 J1742+1904 15 42 52 57.7 118.3 -2.0 -46.9 -32 1 1 150 06 55 27 06 56 37 =1739+190 15 44 02 57.9 118.6 -2.0 -46.7 38 F 1 154 06 55 27 06 56 37 J1745+1814 15 44 02 56.6 118.6 -2.0 -46.4 -30 1 1 154 06 56 37 06 57 47 =1743+182 15 45 12 56.8 118.9 -2.0 -46.2 40 F 1 159 06 56 37 06 58 18 J1742+1904 15 45 43 58.1 119.1 -1.9 -46.4 0 1 1 159 06 58 18 06 58 58 =1739+190 15 46 23 58.3 119.3 -1.9 -46.3 40 F 1 161 06 58 36 06 58 58 J1745+1814 15 46 23 57.0 119.3 -2.0 -46.0 -30 1 1 161 06 58 58 07 00 08 =1743+182 15 47 33 57.2 119.6 -2.0 -45.8 40 F 1 166 06 58 58 07 00 08 J1742+1904 15 47 33 58.5 119.7 -1.9 -46.0 -30 1 1 166 07 00 08 07 01 18 =1739+190 15 48 43 58.7 120.1 -1.9 -45.8 40 F 1 170 07 00 08 07 01 18 GJ686 15 48 43 59.0 122.1 -1.8 -44.4 -33 1 1 170 07 01 18 07 04 18 --- 15 51 44 59.5 123.1 -1.8 -43.8 147 F 1 182 07 01 18 07 04 18 J1742+1904 15 51 44 59.2 121.0 -1.8 -45.2 -33 1 1 182 07 04 18 07 05 28 =1739+190 15 52 54 59.4 121.4 -1.8 -45.0 37 F 1 186 07 04 18 07 05 28 GJ686 15 52 54 59.7 123.5 -1.8 -43.6 -33 1 1 186 07 05 28 07 08 28 --- 15 55 54 60.2 124.5 -1.7 -42.9 147 F 1 198 07 05 28 07 08 28 J1742+1904 15 55 54 59.9 122.4 -1.8 -44.4 -33 1 1 198 07 08 28 07 09 38 =1739+190 15 57 05 60.1 122.8 -1.8 -44.1 37 F 1 203 07 08 28 07 09 38 GJ686 15 57 05 60.4 124.9 -1.7 -42.6 -33 1 1 203 07 09 38 07 12 38 --- 16 00 05 60.9 126.0 -1.6 -41.9 147 F 1 214 07 09 38 07 12 38 J1742+1904 16 00 05 60.5 123.9 -1.7 -43.5 -33 1 1 214 07 12 38 07 13 48 =1739+190 16 01 15 60.7 124.3 -1.7 -43.2 37 F 1 219 07 12 38 Schedule for GBT_VLBA (Code Gb ) Page 4 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 07 13 48 GJ686 16 01 15 61.0 126.4 -1.6 -41.7 -33 1 1 219 07 13 48 07 16 48 --- 16 04 16 61.5 127.6 -1.6 -40.9 147 F 1 230 07 13 48 07 16 48 J1742+1904 16 04 16 61.2 125.3 -1.6 -42.5 -33 1 1 230 07 16 48 07 17 58 =1739+190 16 05 26 61.4 125.8 -1.6 -42.3 37 F 1 235 07 16 48 07 17 58 GJ686 16 05 26 61.7 128.0 -1.5 -40.6 -33 1 1 235 07 17 58 07 20 58 --- 16 08 26 62.2 129.2 -1.5 -39.9 147 F 1 246 07 17 58 07 20 58 J1742+1904 16 08 26 61.9 126.9 -1.6 -41.5 -33 1 1 246 07 20 58 07 22 08 =1739+190 16 09 37 62.1 127.3 -1.5 -41.2 37 F 1 251 07 20 58 07 22 08 J1745+1814 16 09 37 60.8 127.0 -1.6 -41.2 -30 1 1 251 07 22 08 07 23 18 =1743+182 16 10 47 61.0 127.5 -1.6 -40.9 40 F 1 255 07 22 08 07 23 48 J1742+1904 16 11 17 62.3 128.0 -1.5 -40.8 0 1 1 255 07 23 48 07 24 28 =1739+190 16 11 57 62.4 128.2 -1.5 -40.6 40 F 1 258 07 24 06 07 24 28 J1745+1814 16 11 57 61.2 127.9 -1.6 -40.6 -30 1 1 258 07 24 28 07 25 38 =1743+182 16 13 07 61.4 128.3 -1.6 -40.3 40 F 1 263 07 24 28 07 25 38 J1742+1904 16 13 07 62.6 128.7 -1.5 -40.3 -30 1 1 263 07 25 38 07 26 48 =1739+190 16 14 18 62.8 129.1 -1.5 -40.0 40 F 1 267 07 25 38 07 26 48 GJ686 16 14 18 63.0 131.5 -1.4 -38.2 -34 1 1 267 07 26 48 07 29 48 --- 16 17 18 63.5 132.7 -1.3 -37.4 146 F 1 279 07 26 48 07 29 48 J1742+1904 16 17 18 63.2 130.3 -1.4 -39.2 -34 1 1 279 07 29 48 07 30 58 =1739+190 16 18 28 63.4 130.8 -1.4 -38.8 36 F 1 283 07 29 48 07 30 58 GJ686 16 18 28 63.6 133.2 -1.3 -37.0 -34 1 1 283 07 30 58 07 33 58 --- 16 21 29 64.1 134.5 -1.3 -36.1 146 F 1 295 07 30 58 07 33 58 J1742+1904 16 21 29 63.9 132.1 -1.3 -38.0 -34 1 1 295 07 33 58 07 35 08 =1739+190 16 22 39 64.0 132.6 -1.3 -37.6 36 F 1 299 07 33 58 07 35 08 GJ686 16 22 39 64.2 135.1 -1.3 -35.7 -34 1 1 299 07 35 08 07 38 08 --- 16 25 39 64.6 136.4 -1.2 -34.7 146 F 1 311 07 35 08 07 38 08 J1742+1904 16 25 39 64.5 133.9 -1.3 -36.7 -34 1 1 311 07 38 08 07 39 18 =1739+190 16 26 50 64.6 134.4 -1.3 -36.3 36 F 1 315 07 38 08 Schedule for GBT_VLBA (Code Gb ) Page 5 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 07 39 18 GJ686 16 26 50 64.8 136.9 -1.2 -34.4 -34 1 1 315 07 39 18 07 42 18 --- 16 29 50 65.2 138.3 -1.1 -33.3 146 F 1 327 07 39 18 07 42 18 J1742+1904 16 29 50 65.0 135.7 -1.2 -35.3 -34 1 1 327 07 42 18 07 43 28 =1739+190 16 31 00 65.2 136.3 -1.2 -34.9 36 F 1 332 07 42 18 07 43 28 GJ686 16 31 00 65.3 138.9 -1.1 -32.9 -34 1 1 332 07 43 28 07 46 28 --- 16 34 01 65.7 140.3 -1.1 -31.8 146 F 1 343 07 43 28 07 46 28 J1742+1904 16 34 01 65.6 137.7 -1.1 -33.9 -35 1 1 343 07 46 28 07 47 38 =1739+190 16 35 11 65.7 138.3 -1.1 -33.5 35 F 1 348 07 46 28 07 47 38 J1745+1814 16 35 11 64.6 137.5 -1.2 -33.8 -30 1 1 348 07 47 38 07 48 48 =1743+182 16 36 21 64.7 138.1 -1.2 -33.4 40 F 1 352 07 47 38 07 48 48 J1742+1904 16 36 21 65.9 138.8 -1.1 -33.1 -30 1 1 352 07 48 48 07 49 58 =1739+190 16 37 31 66.0 139.4 -1.1 -32.7 40 F 1 357 07 48 48 07 52 12 J1805-1408 16 39 46 33.7 154.6 -1.4 -20.2 0 1 1 357 07 52 12 07 52 52 --- 16 40 26 33.7 154.8 -1.4 -20.1 40 F 1 359 07 52 30 07 52 52 J1753-1843 16 40 26 30.3 159.8 -1.2 -16.6 -40 1 1 359 07 52 52 07 54 02 --- 16 41 36 30.4 160.2 -1.2 -16.3 30 F 1 364 07 52 52 07 54 02 J1805-1408 16 41 36 33.8 155.1 -1.4 -19.8 -40 1 1 364 07 54 02 07 55 12 --- 16 42 46 33.9 155.5 -1.4 -19.6 30 F 1 368 07 54 02 07 55 12 GJ1224 16 42 46 32.0 155.6 -1.4 -19.6 -32 1 1 368 07 55 12 07 58 12 --- 16 45 47 32.3 156.5 -1.4 -19.0 148 F 1 380 07 55 12 07 58 12 J1805-1408 16 45 47 34.2 156.3 -1.3 -18.9 -32 1 1 380 07 58 12 07 59 22 --- 16 46 57 34.3 156.6 -1.3 -18.7 38 F 1 384 07 58 12 07 59 22 GJ1224 16 46 57 32.4 156.8 -1.4 -18.7 -32 1 1 384 07 59 22 08 02 22 --- 16 49 57 32.6 157.6 -1.3 -18.1 148 F 1 396 07 59 22 08 02 22 J1805-1408 16 49 57 34.5 157.5 -1.3 -18.0 -32 1 1 396 08 02 22 08 03 32 --- 16 51 08 34.6 157.8 -1.2 -17.8 38 F 1 401 08 02 22 08 03 32 GJ1224 16 51 08 32.7 157.9 -1.3 -17.9 -32 1 1 401 08 03 32 08 06 32 --- 16 54 08 32.9 158.7 -1.2 -17.2 148 F 1 412 08 03 32 Schedule for GBT_VLBA (Code Gb ) Page 6 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 08 06 32 J1805-1408 16 54 08 34.8 158.6 -1.2 -17.1 -32 1 1 412 08 06 32 08 07 42 --- 16 55 18 34.9 159.0 -1.2 -16.9 38 F 1 417 08 06 32 08 07 42 GJ1224 16 55 18 33.0 159.0 -1.2 -16.9 -32 1 1 417 08 07 42 08 10 42 --- 16 58 19 33.2 159.9 -1.2 -16.3 148 F 1 428 08 07 42 08 10 42 J1805-1408 16 58 19 35.1 159.8 -1.1 -16.2 -32 1 1 428 08 10 42 08 11 52 --- 16 59 29 35.2 160.2 -1.1 -15.9 38 F 1 433 08 10 42 08 11 52 GJ1224 16 59 29 33.3 160.2 -1.1 -16.0 -32 1 1 433 08 11 52 08 14 52 --- 17 02 29 33.5 161.0 -1.1 -15.4 148 F 1 444 08 11 52 08 14 52 J1805-1408 17 02 29 35.4 161.0 -1.1 -15.2 -32 1 1 444 08 14 52 08 16 02 --- 17 03 40 35.4 161.3 -1.0 -15.0 38 F 1 449 08 14 52 08 16 02 J1753-1843 17 03 40 31.6 166.1 -0.8 -11.5 -39 1 1 449 08 16 02 08 17 12 --- 17 04 50 31.7 166.4 -0.8 -11.2 31 F 1 454 08 16 02 08 17 12 J1805-1408 17 04 50 35.5 161.7 -1.0 -14.7 -39 1 1 454 08 17 12 08 18 22 --- 17 06 00 35.6 162.0 -1.0 -14.4 31 F 1 458 08 17 12 08 20 40 J1742+1904 17 08 19 69.3 156.6 -0.6 -19.2 0 1 1 458 08 20 40 08 21 20 =1739+190 17 08 59 69.3 157.1 -0.6 -18.8 40 F 1 461 08 20 58 08 21 20 J1745+1814 17 08 59 68.2 155.5 -0.6 -20.0 -31 1 1 461 08 21 20 08 22 30 =1743+182 17 10 09 68.3 156.2 -0.6 -19.5 39 F 1 465 08 21 20 08 22 30 J1742+1904 17 10 09 69.4 157.8 -0.5 -18.2 -31 1 1 465 08 22 30 08 23 40 =1739+190 17 11 19 69.5 158.6 -0.5 -17.6 39 F 1 470 08 22 30 08 23 40 GJ686 17 11 19 69.3 161.7 -0.4 -15.1 -36 1 1 470 08 23 40 08 26 40 --- 17 14 20 69.5 163.6 -0.4 -13.5 144 F 1 481 08 23 40 08 26 40 J1742+1904 17 14 20 69.7 160.5 -0.5 -16.0 -36 1 1 481 08 26 40 08 27 50 =1739+190 17 15 30 69.8 161.3 -0.4 -15.4 34 F 1 486 08 26 40 08 27 50 GJ686 17 15 30 69.5 164.4 -0.4 -12.9 -36 1 1 486 08 27 50 08 30 50 --- 17 18 30 69.7 166.4 -0.3 -11.2 144 F 1 497 08 27 50 08 30 50 J1742+1904 17 18 30 69.9 163.3 -0.4 -13.8 -36 1 1 497 08 30 50 08 32 00 =1739+190 17 19 40 70.0 164.1 -0.4 -13.2 34 F 1 502 08 30 50 Schedule for GBT_VLBA (Code Gb ) Page 7 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 08 32 00 GJ686 17 19 40 69.7 167.2 -0.3 -10.6 -36 1 1 502 08 32 00 08 35 00 --- 17 22 41 69.9 169.2 -0.3 -8.9 144 F 1 514 08 32 00 08 35 00 J1742+1904 17 22 41 70.2 166.1 -0.3 -11.5 -36 1 1 514 08 35 00 08 36 10 =1739+190 17 23 51 70.2 166.9 -0.3 -10.8 34 F 1 518 08 35 00 08 36 10 GJ686 17 23 51 69.9 170.0 -0.2 -8.2 -36 1 1 518 08 36 10 08 39 10 --- 17 26 52 70.0 172.1 -0.2 -6.6 144 F 1 530 08 36 10 08 39 10 J1742+1904 17 26 52 70.3 169.0 -0.3 -9.1 -36 1 1 530 08 39 10 08 40 20 =1739+190 17 28 02 70.4 169.8 -0.2 -8.4 34 F 1 534 08 39 10 08 40 20 GJ686 17 28 02 70.0 172.9 -0.2 -5.9 -36 1 1 534 08 40 20 08 43 20 --- 17 31 02 70.1 175.0 -0.1 -4.2 144 F 1 546 08 40 20 08 43 20 J1742+1904 17 31 02 70.5 171.9 -0.2 -6.7 -36 1 1 546 08 43 20 08 44 30 =1739+190 17 32 13 70.5 172.7 -0.2 -6.0 34 F 1 550 08 43 20 08 44 30 J1745+1814 17 32 13 69.6 170.4 -0.2 -7.9 -34 1 1 550 08 44 30 08 45 40 =1743+182 17 33 23 69.6 171.2 -0.2 -7.3 36 F 1 555 08 44 30 08 45 40 J1742+1904 17 33 23 70.5 173.5 -0.2 -5.3 -34 1 1 555 08 45 40 08 46 50 =1739+190 17 34 33 70.6 174.4 -0.1 -4.7 36 F 1 559 08 45 40 08 49 08 J1805-1408 17 36 51 37.0 171.1 -0.5 -7.1 0 1 1 559 08 49 08 08 49 48 --- 17 37 31 37.0 171.3 -0.5 -7.0 40 F 1 562 08 49 26 08 49 48 J1753-1843 17 37 31 32.7 175.5 -0.3 -3.8 -40 1 1 562 08 49 48 08 50 58 --- 17 38 42 32.7 175.8 -0.2 -3.5 30 F 1 566 08 49 48 08 50 58 J1805-1408 17 38 42 37.0 171.7 -0.5 -6.7 -40 1 1 566 08 50 58 08 52 08 --- 17 39 52 37.1 172.0 -0.4 -6.4 30 F 1 571 08 50 58 08 52 08 GJ1224 17 39 52 35.2 171.7 -0.5 -6.8 -32 1 1 571 08 52 08 08 55 08 --- 17 42 52 35.3 172.6 -0.4 -6.0 148 F 1 583 08 52 08 08 55 08 J1805-1408 17 42 52 37.1 173.0 -0.4 -5.7 -32 1 1 583 08 55 08 08 56 18 --- 17 44 02 37.2 173.3 -0.4 -5.4 38 F 1 587 08 55 08 08 56 18 GJ1224 17 44 02 35.3 172.9 -0.4 -5.8 -32 1 1 587 08 56 18 08 59 18 --- 17 47 03 35.4 173.8 -0.3 -5.0 148 F 1 599 08 56 18 Schedule for GBT_VLBA (Code Gb ) Page 8 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 08 59 18 J1805-1408 17 47 03 37.2 174.2 -0.3 -4.7 -32 1 1 599 08 59 18 09 00 28 --- 17 48 13 37.3 174.6 -0.3 -4.4 38 F 1 603 08 59 18 09 00 28 GJ1224 17 48 13 35.4 174.2 -0.3 -4.8 -32 1 1 603 09 00 28 09 03 28 --- 17 51 14 35.5 175.0 -0.3 -4.0 148 F 1 615 09 00 28 09 03 28 J1805-1408 17 51 14 37.3 175.5 -0.2 -3.6 -32 1 1 615 09 03 28 09 04 38 --- 17 52 24 37.3 175.8 -0.2 -3.4 38 F 1 619 09 03 28 09 04 38 GJ1224 17 52 24 35.5 175.4 -0.3 -3.8 -32 1 1 619 09 04 38 09 07 38 --- 17 55 24 35.5 176.3 -0.2 -3.0 148 F 1 631 09 04 38 09 07 38 J1805-1408 17 55 24 37.4 176.8 -0.2 -2.6 -32 1 1 631 09 07 38 09 08 48 --- 17 56 34 37.4 177.1 -0.2 -2.3 38 F 1 635 09 07 38 09 08 48 GJ1224 17 56 34 35.5 176.6 -0.2 -2.8 -32 1 1 635 09 08 48 09 11 48 --- 17 59 35 35.6 177.5 -0.1 -2.0 148 F 1 647 09 08 48 09 11 48 J1805-1408 17 59 35 37.4 178.0 -0.1 -1.6 -32 1 1 647 09 11 48 09 12 58 --- 18 00 45 37.4 178.4 -0.1 -1.3 38 F 1 652 09 11 48 09 12 58 J1753-1843 18 00 45 32.8 182.0 0.1 1.7 -41 1 1 652 09 12 58 09 14 08 --- 18 01 55 32.8 182.3 0.1 1.9 29 F 1 656 09 12 58 09 14 08 J1805-1408 18 01 55 37.4 178.8 -0.1 -1.0 -41 1 1 656 09 14 08 09 15 18 --- 18 03 06 37.4 179.1 0.0 -0.7 29 F 1 661 09 14 08 09 17 33 J1742+1904 18 05 21 70.0 196.0 0.4 13.2 0 1 1 661 09 17 33 09 18 13 =1739+190 18 06 01 70.0 196.4 0.4 13.6 40 F 1 663 09 17 51 09 18 13 J1745+1814 18 06 01 69.4 193.4 0.3 11.0 -36 1 1 663 09 18 13 09 19 23 =1743+182 18 07 11 69.3 194.1 0.3 11.6 34 F 1 668 09 18 13 09 19 23 J1742+1904 18 07 11 69.9 197.2 0.4 14.2 -36 1 1 668 09 19 23 09 20 33 =1739+190 18 08 21 69.8 198.0 0.4 14.8 34 F 1 672 09 19 23 09 20 33 GJ686 18 08 21 69.1 200.3 0.5 16.7 -34 1 1 672 09 20 33 09 23 33 --- 18 11 22 68.9 202.2 0.6 18.2 146 F 1 684 09 20 33 09 23 33 J1742+1904 18 11 22 69.6 200.0 0.5 16.4 -33 1 1 684 09 23 33 09 24 43 =1739+190 18 12 32 69.6 200.7 0.5 17.1 37 F 1 688 09 23 33 Schedule for GBT_VLBA (Code Gb ) Page 9 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 09 24 43 GJ686 18 12 32 68.8 203.0 0.6 18.8 -33 1 1 688 09 24 43 09 27 43 --- 18 15 32 68.6 204.8 0.6 20.3 147 F 1 700 09 24 43 09 27 43 J1742+1904 18 15 32 69.3 202.7 0.6 18.6 -33 1 1 700 09 27 43 09 28 53 =1739+190 18 16 42 69.3 203.4 0.6 19.2 37 F 1 704 09 27 43 09 28 53 GJ686 18 16 42 68.5 205.5 0.6 20.9 -33 1 1 704 09 28 53 09 31 53 --- 18 19 43 68.2 207.3 0.7 22.3 147 F 1 716 09 28 53 09 31 53 J1742+1904 18 19 43 69.0 205.3 0.6 20.7 -33 1 1 716 09 31 53 09 33 03 =1739+190 18 20 53 68.9 206.0 0.6 21.3 37 F 1 721 09 31 53 09 33 03 GJ686 18 20 53 68.1 208.0 0.7 22.8 -33 1 1 721 09 33 03 09 36 03 --- 18 23 54 67.8 209.7 0.8 24.2 147 F 1 732 09 33 03 09 36 03 J1742+1904 18 23 54 68.6 207.8 0.7 22.8 -32 1 1 732 09 36 03 09 37 13 =1739+190 18 25 04 68.5 208.5 0.7 23.3 38 F 1 737 09 36 03 09 37 13 GJ686 18 25 04 67.7 210.4 0.8 24.7 -32 1 1 737 09 37 13 09 40 13 --- 18 28 04 67.4 212.1 0.8 26.0 148 F 1 748 09 37 13 09 40 13 J1742+1904 18 28 04 68.3 210.3 0.8 24.7 -32 1 1 748 09 40 13 09 41 23 =1739+190 18 29 14 68.1 211.0 0.8 25.2 38 F 1 753 09 40 13 09 41 23 J1745+1814 18 29 14 67.7 207.8 0.7 22.7 -36 1 1 753 09 41 23 09 42 33 =1743+182 18 30 25 67.6 208.5 0.7 23.2 34 F 1 757 09 41 23 09 42 33 J1742+1904 18 30 25 68.0 211.6 0.8 25.8 -36 1 1 757 09 42 33 09 43 43 =1739+190 18 31 35 67.9 212.3 0.8 26.3 34 F 1 762 09 42 33 09 45 52 J1805-1408 18 33 44 37.0 188.4 0.5 6.8 0 1 1 762 09 45 52 09 46 32 --- 18 34 24 37.0 188.6 0.5 7.0 40 F 1 764 09 46 10 09 46 32 J1753-1843 18 34 24 32.0 191.4 0.7 9.4 -43 1 1 764 09 46 32 09 47 42 --- 18 35 34 32.0 191.7 0.7 9.7 27 F 1 769 09 46 32 09 47 42 J1805-1408 18 35 34 37.0 189.0 0.5 7.2 -43 1 1 769 09 47 42 09 48 52 --- 18 36 45 36.9 189.3 0.5 7.5 27 F 1 773 09 47 42 09 48 52 GJ1224 18 36 45 35.2 188.4 0.5 6.9 -32 1 1 773 09 48 52 09 51 52 --- 18 39 45 35.1 189.3 0.5 7.6 148 F 1 785 09 48 52 Schedule for GBT_VLBA (Code Gb ) Page 10 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 09 51 52 J1805-1408 18 39 45 36.8 190.2 0.6 8.3 -32 1 1 785 09 51 52 09 53 02 --- 18 40 55 36.8 190.6 0.6 8.5 38 F 1 790 09 51 52 09 53 02 GJ1224 18 40 55 35.1 189.7 0.5 7.9 -32 1 1 790 09 53 02 09 56 02 --- 18 43 56 35.0 190.5 0.6 8.6 148 F 1 801 09 53 02 09 56 02 J1805-1408 18 43 56 36.7 191.5 0.6 9.3 -32 1 1 801 09 56 02 09 57 12 --- 18 45 06 36.6 191.8 0.7 9.5 38 F 1 806 09 56 02 09 57 12 GJ1224 18 45 06 34.9 190.9 0.6 8.8 -32 1 1 806 09 57 12 10 00 12 --- 18 48 06 34.8 191.7 0.7 9.6 148 F 1 817 09 57 12 10 00 12 J1805-1408 18 48 06 36.5 192.7 0.7 10.3 -32 1 1 817 10 00 12 10 01 22 --- 18 49 17 36.5 193.1 0.7 10.5 38 F 1 822 10 00 12 10 01 22 GJ1224 18 49 17 34.7 192.1 0.7 9.8 -32 1 1 822 10 01 22 10 04 22 --- 18 52 17 34.6 193.0 0.7 10.5 148 F 1 833 10 01 22 10 04 22 J1805-1408 18 52 17 36.3 194.0 0.8 11.2 -32 1 1 833 10 04 22 10 05 32 --- 18 53 27 36.3 194.3 0.8 11.5 38 F 1 838 10 04 22 10 05 32 GJ1224 18 53 27 34.6 193.3 0.8 10.8 -32 1 1 838 10 05 32 10 08 32 --- 18 56 28 34.4 194.1 0.8 11.5 148 F 1 850 10 05 32 10 08 32 J1805-1408 18 56 28 36.1 195.2 0.8 12.2 -32 1 1 850 10 08 32 10 09 42 --- 18 57 38 36.0 195.5 0.9 12.5 38 F 1 854 10 08 32 10 09 42 J1753-1843 18 57 38 30.9 197.7 1.1 14.6 -43 1 1 854 10 09 42 10 10 52 --- 18 58 48 30.8 198.0 1.1 14.8 27 F 1 859 10 09 42 10 10 52 J1805-1408 18 58 48 36.0 195.9 0.9 12.8 -43 1 1 859 10 10 52 10 12 02 --- 18 59 58 35.9 196.2 0.9 13.0 27 F 1 863 10 10 52 ---------- GBT pointing scan. ---------- 10 12 55 J1743-0350 19 00 52 44.2 207.1 1.3 20.9 0 1 1 863 Stopped 10 20 55 =1741-038 19 08 53 43.4 209.7 1.4 22.9 480 S 1 894 10 21 18 J1743-0350 19 09 16 43.4 209.8 1.4 23.0 0 1 1 894 10 21 18 10 23 18 =1741-038 19 11 17 43.2 210.4 1.4 23.4 120 F 1 902 10 21 36 10 24 48 J1742+1904 19 12 47 62.5 231.7 1.5 40.6 0 1 1 902 10 24 48 10 25 28 =1739+190 19 13 27 62.4 232.0 1.5 40.8 40 F 1 904 10 25 06 Schedule for GBT_VLBA (Code Gb ) Page 11 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 10 25 28 J1745+1814 19 13 27 62.3 229.3 1.5 38.7 -35 1 1 904 10 25 28 10 26 38 =1743+182 19 14 37 62.1 229.8 1.5 39.0 35 F 1 909 10 25 28 10 26 38 J1742+1904 19 14 37 62.2 232.4 1.5 41.1 -35 1 1 909 10 26 38 10 27 48 =1739+190 19 15 48 62.0 232.9 1.6 41.4 35 F 1 913 10 26 38 10 27 48 GJ686 19 15 48 61.0 233.7 1.6 41.8 -29 1 1 913 10 27 48 10 30 48 --- 19 18 48 60.5 234.8 1.7 42.5 151 F 1 925 10 27 48 10 30 48 J1742+1904 19 18 48 61.5 234.0 1.6 42.1 -29 1 1 925 10 30 48 10 31 58 =1739+190 19 19 58 61.3 234.4 1.6 42.4 41 F 1 930 10 30 48 10 31 58 GJ686 19 19 58 60.3 235.2 1.7 42.8 -29 1 1 930 10 31 58 10 34 58 --- 19 22 59 59.8 236.3 1.7 43.4 151 F 1 941 10 31 58 10 34 58 J1742+1904 19 22 59 60.9 235.5 1.7 43.1 -29 1 1 941 10 34 58 10 36 08 =1739+190 19 24 09 60.7 235.9 1.7 43.3 41 F 1 946 10 34 58 10 36 08 GJ686 19 24 09 59.6 236.7 1.8 43.7 -29 1 1 946 10 36 08 10 39 08 --- 19 27 09 59.1 237.7 1.8 44.3 151 F 1 957 10 36 08 10 39 08 J1742+1904 19 27 09 60.2 236.9 1.7 44.0 -29 1 1 957 10 39 08 10 40 18 =1739+190 19 28 20 60.0 237.3 1.8 44.2 41 F 1 962 10 39 08 10 40 18 GJ686 19 28 20 58.9 238.1 1.8 44.5 -29 1 1 962 10 40 18 10 43 18 --- 19 31 20 58.4 239.0 1.9 45.1 151 F 1 973 10 40 18 10 43 18 J1742+1904 19 31 20 59.5 238.3 1.8 44.9 -29 1 1 973 10 43 18 10 44 28 =1739+190 19 32 30 59.3 238.7 1.8 45.1 41 F 1 978 10 43 18 10 44 28 GJ686 19 32 30 58.2 239.4 1.9 45.3 -29 1 1 978 10 44 28 10 47 28 --- 19 35 31 57.7 240.3 2.0 45.9 151 F 1 990 10 44 28 10 47 28 J1742+1904 19 35 31 58.8 239.7 1.9 45.7 -29 1 1 990 10 47 28 10 48 38 =1739+190 19 36 41 58.6 240.1 1.9 45.9 41 F 1 994 10 47 28 10 48 38 J1745+1814 19 36 41 58.6 237.7 1.8 44.2 -34 1 1 994 10 48 38 10 49 48 =1743+182 19 37 51 58.4 238.1 1.9 44.4 36 F 1 999 10 48 38 10 49 48 J1742+1904 19 37 51 58.4 240.4 1.9 46.1 -34 1 1 999 10 49 48 10 50 58 =1739+190 19 39 01 58.2 240.8 1.9 46.3 36 F 1 1003 10 49 48 Schedule for GBT_VLBA (Code Gb ) Page 12 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 10 52 48 J1805-1408 19 40 52 32.9 207.7 1.6 22.0 0 1 1 1003 10 52 48 10 53 28 --- 19 41 32 32.9 207.9 1.6 22.2 40 F 1 1006 10 53 06 10 53 28 J1753-1843 19 41 32 27.5 209.0 1.8 23.6 -44 1 1 1006 10 53 28 10 54 38 --- 19 42 42 27.4 209.2 1.8 23.8 26 F 1 1010 10 53 28 10 54 38 J1805-1408 19 42 42 32.8 208.2 1.6 22.4 -44 1 1 1010 10 54 38 10 55 48 --- 19 43 52 32.6 208.5 1.6 22.7 26 F 1 1015 10 54 38 10 55 48 GJ1224 19 43 52 31.1 207.1 1.6 21.8 -31 1 1 1015 10 55 48 10 58 48 --- 19 46 53 30.9 207.9 1.6 22.4 149 F 1 1026 10 55 48 10 58 48 J1805-1408 19 46 53 32.4 209.3 1.7 23.3 -31 1 1 1026 10 58 48 10 59 58 --- 19 48 03 32.2 209.6 1.7 23.5 39 F 1 1031 10 58 48 10 59 58 GJ1224 19 48 03 30.8 208.2 1.7 22.7 -31 1 1 1031 10 59 58 11 02 58 --- 19 51 04 30.5 209.0 1.7 23.3 149 F 1 1043 10 59 58 11 02 58 J1805-1408 19 51 04 32.0 210.4 1.8 24.1 -31 1 1 1043 11 02 58 11 04 08 --- 19 52 14 31.8 210.7 1.8 24.3 39 F 1 1047 11 02 58 11 04 08 GJ1224 19 52 14 30.4 209.3 1.7 23.5 -31 1 1 1047 11 04 08 11 07 08 --- 19 55 14 30.1 210.1 1.8 24.1 149 F 1 1059 11 04 08 11 07 08 J1805-1408 19 55 14 31.5 211.5 1.8 24.9 -31 1 1 1059 11 07 08 11 08 18 --- 19 56 24 31.4 211.8 1.8 25.2 39 F 1 1063 11 07 08 11 08 18 GJ1224 19 56 24 30.0 210.4 1.8 24.3 -31 1 1 1063 11 08 18 11 11 18 --- 19 59 25 29.7 211.1 1.9 24.9 149 F 1 1075 11 08 18 11 11 18 J1805-1408 19 59 25 31.1 212.5 1.9 25.7 -31 1 1 1075 11 11 18 11 12 28 --- 20 00 35 31.0 212.8 1.9 26.0 39 F 1 1079 11 11 18 11 12 28 GJ1224 20 00 35 29.5 211.4 1.9 25.1 -31 1 1 1079 11 12 28 11 15 28 --- 20 03 36 29.2 212.2 1.9 25.7 149 F 1 1091 11 12 28 11 15 28 J1805-1408 20 03 36 30.7 213.6 2.0 26.5 -31 1 1 1091 11 15 28 11 16 38 --- 20 04 46 30.5 213.9 2.0 26.8 39 F 1 1095 11 15 28 11 16 38 J1753-1843 20 04 46 25.1 214.5 2.2 27.9 -44 1 1 1095 11 16 38 11 17 48 --- 20 05 56 25.0 214.7 2.2 28.1 26 F 1 1100 11 16 38 Schedule for GBT_VLBA (Code Gb ) Page 13 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 11 17 48 J1805-1408 20 05 56 30.4 214.2 2.0 27.0 -44 1 1 1100 11 17 48 11 18 58 --- 20 07 06 30.3 214.5 2.0 27.2 26 F 1 1104 11 17 48 11 20 40 J1742+1904 20 08 48 52.9 249.0 2.4 50.7 0 1 1 1104 11 20 40 11 21 20 =1739+190 20 09 28 52.8 249.2 2.4 50.8 40 F 1 1107 11 20 58 11 21 20 J1745+1814 20 09 28 52.9 247.2 2.4 49.5 -33 1 1 1107 11 21 20 11 22 30 =1743+182 20 10 38 52.7 247.5 2.4 49.6 37 F 1 1112 11 21 20 11 22 30 J1742+1904 20 10 38 52.6 249.5 2.5 50.9 -33 1 1 1112 11 22 30 11 23 40 =1739+190 20 11 48 52.3 249.8 2.5 51.0 37 F 1 1116 11 22 30 11 23 40 GJ686 20 11 48 51.3 250.2 2.6 51.0 -29 1 1 1116 11 23 40 11 26 40 --- 20 14 49 50.7 250.9 2.6 51.3 151 F 1 1128 11 23 40 11 26 40 J1742+1904 20 14 49 51.8 250.5 2.5 51.4 -29 1 1 1128 11 26 40 11 27 50 =1739+190 20 15 59 51.6 250.8 2.6 51.5 41 F 1 1132 11 26 40 11 27 50 GJ686 20 15 59 50.5 251.2 2.6 51.5 -29 1 1 1132 11 27 50 11 30 50 --- 20 19 00 49.9 251.8 2.7 51.7 151 F 1 1144 11 27 50 11 30 50 J1742+1904 20 19 00 51.0 251.5 2.6 51.8 -29 1 1 1144 11 30 50 11 32 00 =1739+190 20 20 10 50.8 251.8 2.6 51.9 41 F 1 1148 11 30 50 11 32 00 GJ686 20 20 10 49.7 252.1 2.7 51.9 -29 1 1 1148 11 32 00 11 35 00 --- 20 23 10 49.2 252.8 2.7 52.1 151 F 1 1160 11 32 00 11 35 00 J1742+1904 20 23 10 50.2 252.4 2.7 52.2 -29 1 1 1160 11 35 00 11 36 10 =1739+190 20 24 20 50.0 252.7 2.7 52.3 41 F 1 1164 11 35 00 11 36 10 GJ686 20 24 20 48.9 253.0 2.8 52.2 -29 1 1 1164 11 36 10 11 39 10 --- 20 27 21 48.4 253.7 2.8 52.5 151 F 1 1176 11 36 10 11 39 10 J1742+1904 20 27 21 49.5 253.4 2.7 52.6 -29 1 1 1176 11 39 10 11 40 20 =1739+190 20 28 31 49.2 253.6 2.8 52.7 41 F 1 1181 11 39 10 11 40 20 GJ686 20 28 31 48.2 254.0 2.8 52.6 -29 1 1 1181 11 40 20 11 43 20 --- 20 31 32 47.6 254.6 2.9 52.8 151 F 1 1192 11 40 20 11 43 20 J1742+1904 20 31 32 48.7 254.3 2.8 52.9 -29 1 1 1192 11 43 20 11 44 30 =1739+190 20 32 42 48.5 254.5 2.8 53.0 41 F 1 1197 11 43 20 Schedule for GBT_VLBA (Code Gb ) Page 14 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 11 44 30 J1745+1814 20 32 42 48.7 252.7 2.8 52.0 -32 1 1 1197 11 44 30 11 45 40 =1743+182 20 33 52 48.5 253.0 2.8 52.1 38 F 1 1201 11 44 30 11 45 40 J1742+1904 20 33 52 48.2 254.8 2.9 53.1 -32 1 1 1201 11 45 40 11 46 50 =1739+190 20 35 02 48.0 255.0 2.9 53.2 38 F 1 1206 11 45 40 11 48 27 J1805-1408 20 36 40 26.7 221.5 2.5 32.4 0 1 1 1206 11 48 27 11 49 07 --- 20 37 20 26.6 221.7 2.5 32.5 40 F 1 1208 11 48 45 11 49 07 J1753-1843 20 37 20 21.2 221.7 2.7 33.4 -44 1 1 1208 11 49 07 11 50 17 --- 20 38 30 21.0 221.9 2.7 33.6 26 F 1 1213 11 49 07 11 50 17 J1805-1408 20 38 30 26.5 222.0 2.5 32.7 -44 1 1 1213 11 50 17 11 51 27 --- 20 39 40 26.3 222.2 2.6 32.9 26 F 1 1217 11 50 17 11 51 27 GJ1224 20 39 40 25.0 220.7 2.5 32.1 -31 1 1 1217 11 51 27 11 54 27 --- 20 42 40 24.7 221.4 2.6 32.6 149 F 1 1229 11 51 27 11 54 27 J1805-1408 20 42 40 25.9 222.9 2.6 33.4 -31 1 1 1229 11 54 27 11 55 37 --- 20 43 51 25.8 223.2 2.6 33.6 39 F 1 1233 11 54 27 11 55 37 GJ1224 20 43 51 24.5 221.6 2.6 32.8 -31 1 1 1233 11 55 37 11 58 37 --- 20 46 51 24.1 222.3 2.6 33.2 149 F 1 1245 11 55 37 11 58 37 J1805-1408 20 46 51 25.4 223.8 2.7 34.0 -31 1 1 1245 11 58 37 11 59 47 --- 20 48 01 25.2 224.1 2.7 34.2 39 F 1 1250 11 58 37 11 59 47 GJ1224 20 48 01 24.0 222.5 2.7 33.4 -31 1 1 1250 11 59 47 12 02 47 --- 20 51 02 23.6 223.2 2.7 33.9 149 F 1 1261 11 59 47 12 02 47 J1805-1408 20 51 02 24.8 224.8 2.8 34.7 -31 1 1 1261 12 02 47 12 03 57 --- 20 52 12 24.6 225.0 2.8 34.9 39 F 1 1266 12 02 47 12 03 57 GJ1224 20 52 12 23.4 223.5 2.7 34.1 -31 1 1 1266 12 03 57 12 06 57 --- 20 55 13 23.0 224.1 2.8 34.5 149 F 1 1277 12 03 57 12 06 57 J1805-1408 20 55 13 24.2 225.7 2.8 35.3 -31 1 1 1277 12 06 57 12 08 07 --- 20 56 23 24.0 225.9 2.8 35.5 39 F 1 1282 12 06 57 12 08 07 GJ1224 20 56 23 22.8 224.4 2.8 34.7 -31 1 1 1282 12 08 07 12 11 07 --- 20 59 23 22.4 225.0 2.9 35.2 149 F 1 1293 12 08 07 Schedule for GBT_VLBA (Code Gb ) Page 15 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 12 11 07 J1805-1408 20 59 23 23.6 226.6 2.9 35.9 -31 1 1 1293 12 11 07 12 12 17 --- 21 00 33 23.4 226.8 2.9 36.1 39 F 1 1298 12 11 07 12 12 17 J1753-1843 21 00 33 18.0 226.5 3.1 36.8 -44 1 1 1298 12 12 17 12 13 27 --- 21 01 44 17.8 226.7 3.1 37.0 26 F 1 1303 12 12 17 12 13 27 J1805-1408 21 01 44 23.3 227.1 2.9 36.3 -44 1 1 1303 12 13 27 12 14 37 --- 21 02 54 23.1 227.3 2.9 36.4 26 F 1 1307 12 13 27 12 15 21 J1733-1304 21 03 38 18.9 234.8 3.5 41.1 0 1 1 1307 12 15 21 12 17 21 =1730-130 21 05 39 18.5 235.2 3.5 41.3 120 F 1 1315 12 15 39 12 19 05 J1742+1904 21 07 22 41.8 261.4 3.4 55.0 0 1 1 1315 12 19 05 12 19 45 =1739+190 21 08 03 41.7 261.5 3.4 55.1 40 F 1 1317 12 19 23 12 19 45 J1745+1814 21 08 03 41.9 259.9 3.4 54.3 -31 1 1 1317 12 19 45 12 20 55 =1743+182 21 09 13 41.7 260.1 3.4 54.3 39 F 1 1322 12 19 45 12 20 55 J1742+1904 21 09 13 41.5 261.7 3.4 55.1 -31 1 1 1322 12 20 55 12 22 05 =1739+190 21 10 23 41.2 261.9 3.5 55.1 39 F 1 1326 12 20 55 12 22 05 GJ686 21 10 23 40.1 262.1 3.5 54.9 -29 1 1 1326 12 22 05 12 25 05 --- 21 13 23 39.6 262.7 3.6 55.0 151 F 1 1338 12 22 05 12 25 05 J1742+1904 21 13 23 40.6 262.4 3.5 55.2 -29 1 1 1338 12 25 05 12 26 15 =1739+190 21 14 34 40.4 262.6 3.5 55.3 41 F 1 1342 12 25 05 12 26 15 GJ686 21 14 34 39.3 262.9 3.6 55.1 -29 1 1 1342 12 26 15 12 29 15 --- 21 17 34 38.7 263.4 3.7 55.2 151 F 1 1354 12 26 15 12 29 15 J1742+1904 21 17 34 39.8 263.2 3.6 55.4 -29 1 1 1354 12 29 15 12 30 25 =1739+190 21 18 44 39.6 263.4 3.6 55.4 41 F 1 1359 12 29 15 12 30 25 GJ686 21 18 44 38.5 263.6 3.7 55.2 -29 1 1 1359 12 30 25 12 33 25 --- 21 21 45 37.9 264.1 3.7 55.3 151 F 1 1370 12 30 25 12 33 25 J1742+1904 21 21 45 39.0 263.9 3.7 55.5 -29 1 1 1370 12 33 25 12 34 35 =1739+190 21 22 55 38.8 264.1 3.7 55.5 41 F 1 1375 12 33 25 12 34 35 GJ686 21 22 55 37.7 264.3 3.7 55.3 -29 1 1 1375 12 34 35 12 37 35 --- 21 25 56 37.1 264.8 3.8 55.4 151 F 1 1386 12 34 35 Schedule for GBT_VLBA (Code Gb ) Page 16 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 12 37 35 J1742+1904 21 25 56 38.2 264.6 3.7 55.6 -29 1 1 1386 12 37 35 12 38 45 =1739+190 21 27 06 38.0 264.8 3.7 55.6 41 F 1 1391 12 37 35 12 38 45 GJ686 21 27 06 36.9 265.0 3.8 55.4 -29 1 1 1391 12 38 45 12 41 45 --- 21 30 06 36.3 265.5 3.9 55.5 151 F 1 1402 12 38 45 12 41 45 J1742+1904 21 30 06 37.4 265.3 3.8 55.7 -29 1 1 1402 12 41 45 12 42 55 =1739+190 21 31 16 37.2 265.5 3.8 55.7 41 F 1 1407 12 41 45 12 42 55 J1745+1814 21 31 16 37.4 264.0 3.7 55.1 -31 1 1 1407 12 42 55 12 44 05 =1743+182 21 32 27 37.2 264.2 3.8 55.1 39 F 1 1412 12 42 55 12 44 05 J1742+1904 21 32 27 36.9 265.7 3.8 55.7 -31 1 1 1412 12 44 05 12 45 15 =1739+190 21 33 37 36.7 265.9 3.9 55.8 39 F 1 1416 12 44 05 12 46 42 J1805-1408 21 35 05 18.2 233.8 3.5 40.7 0 1 1 1416 12 46 42 12 47 22 --- 21 35 45 18.1 234.0 3.5 40.8 40 F 1 1419 12 47 00 12 47 22 J1753-1843 21 35 45 12.7 233.2 3.7 41.5 -44 1 1 1419 12 47 22 12 48 32 --- 21 36 55 12.5 233.4 3.7 41.6 26 F 1 1423 12 47 22 12 48 32 J1805-1408 21 36 55 17.9 234.2 3.5 40.9 -44 1 1 1423 12 48 32 12 49 42 --- 21 38 05 17.8 234.4 3.5 41.1 26 F 1 1428 12 48 32 12 49 42 GJ1224 21 38 05 16.7 232.8 3.5 40.5 -31 1 1 1428 12 49 42 12 52 42 --- 21 41 06 16.2 233.4 3.6 40.8 149 F 1 1439 12 49 42 12 52 42 J1805-1408 21 41 06 17.3 235.0 3.6 41.4 -31 1 1 1439 12 52 42 12 53 52 --- 21 42 16 17.1 235.2 3.6 41.6 39 F 1 1444 12 52 42 12 53 52 GJ1224 21 42 16 16.0 233.6 3.6 41.0 -31 1 1 1444 12 53 52 12 56 52 --- 21 45 16 15.6 234.2 3.6 41.3 149 F 1 1455 12 53 52 12 56 52 J1805-1408 21 45 16 16.6 235.8 3.7 41.9 -31 1 1 1455 12 56 52 12 58 02 --- 21 46 26 16.4 236.0 3.7 42.1 39 F 1 1460 12 56 52 12 58 02 GJ1224 21 46 26 15.4 234.4 3.6 41.5 -31 1 1 1460 12 58 02 13 01 02 --- 21 49 27 14.9 234.9 3.7 41.8 149 F 1 1472 12 58 02 13 01 02 J1805-1408 21 49 27 15.9 236.6 3.7 42.4 -31 1 1 1472 13 01 02 13 02 12 --- 21 50 37 15.7 236.8 3.7 42.5 39 F 1 1476 13 01 02 Schedule for GBT_VLBA (Code Gb ) Page 17 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 13 02 12 GJ1224 21 50 37 14.7 235.1 3.7 42.0 -31 1 1 1476 13 02 12 13 05 12 --- 21 53 38 14.2 235.7 3.8 42.3 149 F 1 1488 13 02 12 13 05 12 J1805-1408 21 53 38 15.2 237.3 3.8 42.9 -31 1 1 1488 13 05 12 13 06 22 --- 21 54 48 15.0 237.6 3.8 43.0 39 F 1 1492 13 05 12 13 06 22 GJ1224 21 54 48 14.0 235.9 3.8 42.4 -31 1 1 1492 13 06 22 13 09 22 --- 21 57 48 13.6 236.5 3.8 42.8 149 F 1 1504 13 06 22 13 09 22 J1805-1408 21 57 48 14.5 238.1 3.9 43.3 -31 1 1 1504 13 09 22 13 10 32 --- 21 58 59 14.4 238.3 3.9 43.4 39 F 1 1508 13 09 22 13 10 32 J1753-1843 21 58 59 9.0 237.3 4.1 44.1 -44 1 1 1508 13 10 32 13 11 42 --- 22 00 09 8.8 237.5 4.1 44.2 26 F 1 1513 13 10 32 13 12 26 J1805-1408 22 00 52 14.0 238.7 3.9 43.6 0 1 1 1513 13 12 26 13 13 06 --- 22 01 32 13.9 238.8 3.9 43.7 40 F 1 1515 13 12 44 13 13 06 J1753-1843 22 01 32 8.6 237.7 4.1 44.4 -44 1 1 1515 13 13 06 13 14 16 --- 22 02 43 8.4 237.9 4.2 44.5 26 F 1 1520 13 13 06 13 14 16 J1805-1408 22 02 43 13.7 239.0 3.9 43.8 -44 1 1 1520 13 14 16 13 15 26 --- 22 03 53 13.5 239.2 4.0 43.9 26 F 1 1524 13 14 16 13 15 26 GJ1224 22 03 53 12.6 237.6 3.9 43.4 -31 1 1 1524 13 15 26 13 18 26 --- 22 06 53 12.1 238.1 4.0 43.8 149 F 1 1536 13 15 26 13 18 26 J1805-1408 22 06 53 13.0 239.7 4.0 44.3 -32 1 1 1536 13 18 26 13 19 36 --- 22 08 03 12.8 240.0 4.0 44.4 38 F 1 1541 13 18 26 13 19 36 GJ1224 22 08 03 11.9 238.3 4.0 43.9 -32 1 1 1541 13 19 36 13 22 36 --- 22 11 04 11.4 238.8 4.1 44.2 148 F 1 1552 13 19 36 13 22 36 J1805-1408 22 11 04 12.3 240.5 4.1 44.7 -32 1 1 1552 13 22 36 13 23 46 --- 22 12 14 12.1 240.7 4.1 44.8 38 F 1 1557 13 22 36 13 23 46 GJ1224 22 12 14 11.2 239.0 4.1 44.3 -32 1 1 1557 13 23 46 13 26 46 --- 22 15 15 10.7 239.6 4.1 44.6 148 F 1 1568 13 23 46 13 26 46 J1805-1408 22 15 15 11.6 241.2 4.2 45.1 -32 1 1 1568 13 26 46 13 27 56 --- 22 16 25 11.4 241.4 4.2 45.2 38 F 1 1573 13 26 46 Schedule for GBT_VLBA (Code Gb ) Page 18 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 13 27 56 GJ1224 22 16 25 10.5 239.8 4.1 44.7 -32 1 1 1573 13 27 56 13 30 56 --- 22 19 25 9.9 240.3 4.2 45.0 148 F 1 1584 13 27 56 13 30 56 J1805-1408 22 19 25 10.9 241.9 4.2 45.5 -32 1 1 1584 13 30 56 13 32 06 --- 22 20 35 10.7 242.2 4.2 45.6 38 F 1 1589 13 30 56 13 32 06 GJ1224 22 20 35 9.7 240.5 4.2 45.2 -32 1 1 1589 13 32 06 13 35 06 --- 22 23 36 9.2 241.0 4.3 45.4 148 F 1 1601 13 32 06 13 35 06 J1805-1408 22 23 36 10.2 242.7 4.3 45.9 -32 1 1 1601 13 35 06 13 36 16 --- 22 24 46 10.0 242.9 4.3 46.0 38 F 1 1605 13 35 06 13 37 43 J1805-1408 22 26 13 9.7 243.1 4.3 46.1 62 1 1 1605 13 37 43 13 38 23 --- 22 26 53 9.6 243.2 4.3 46.2 40 F 1 1608 13 38 01 13 39 33 J1805-1408 22 28 04 9.4 243.4 4.4 46.3 46 1 1 1608 13 39 33 13 40 43 --- 22 29 14 9.2 243.6 4.4 46.4 70 F 1 1612 13 39 51 13 40 43 GJ1224 22 29 14 8.3 242.0 4.4 46.0 -32 1 1 1612 13 40 43 13 43 43 --- 22 32 14 7.7 242.5 4.4 46.3 148 F 1 1624 13 40 43 13 43 43 J1805-1408 22 32 14 8.6 244.1 4.4 46.6 -32 1 1 1624 13 43 43 13 44 53 --- 22 33 24 8.4 244.3 4.5 46.7 38 F 1 1628 13 43 43 13 44 53 GJ1224 22 33 24 7.5 242.7 4.4 46.4 -32 1 1 1628 13 44 53 13 47 53 --- 22 36 25 7.0 243.2 4.5 46.6 148 F 1 1640 13 44 53 13 47 53 J1805-1408 22 36 25 7.9 244.8 4.5 47.0 -32 1 1 1640 13 47 53 13 49 03 --- 22 37 35 7.7 245.0 4.5 47.1 38 F 1 1644 13 47 53 13 49 03 GJ1224 22 37 35 6.8 243.4 4.5 46.7 -32 1 1 1644 13 49 03 13 52 03 --- 22 40 36 6.3 243.9 4.5 47.0 148 F 1 1656 13 49 03 13 52 03 J1805-1408 22 40 36 7.2 245.5 4.6 47.3 -32 1 1 1656 13 52 03 13 53 13 --- 22 41 46 7.0 245.7 4.6 47.4 38 F 1 1661 13 52 03 13 53 13 GJ1224 22 41 46 6.1 244.0 4.6 47.1 -32 1 1 1661 13 53 13 13 56 13 --- 22 44 46 5.5 244.5 4.6 47.4 148 F 1 1672 13 53 13 13 56 13 J1805-1408 22 44 46 6.4 246.2 4.6 47.7 -32 1 1 1672 13 56 13 13 57 23 --- 22 45 56 6.2 246.4 4.7 47.8 38 F 1 1677 13 56 13 Schedule for GBT_VLBA (Code Gb ) Page 19 RIPL: GJ686/GJ1224 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 23 Apr 2008 Day 114 --- 13 57 23 GJ1224 22 45 56 5.3 244.7 4.6 47.5 -32 1 1 1677 13 57 23 14 00 23 --- 22 48 57 4.8 245.2 4.7 D 47.7 0 F 1 1688 13 57 23 14 00 23 J1805-1408 22 48 57 5.7 246.9 4.7 48.0 -32 1 1 1688 14 00 23 14 01 33 --- 22 50 07 5.5 247.1 4.7 48.1 38 F 1 1693 14 00 23 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group gbt4cmb in /home/arana/cwalker/sched/catalogs/freq.dat LO1=11.350, LO2=12.75, LO3=10.5 Setup group: 11 Station: GBT_VLBA Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 9100.00 9100.00 9100.00 9100.00 9100.00 9100.00 9100.00 9100.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= L L L L L L L L IF = B D B D B D B D The following frequency sets based on this setup were used. Frequency Set: 10 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 715.51 715.51 699.51 699.51 683.51 683.51 667.51 667.51 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ686/GJ1224 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ686 17 35 42.479419 * 17 37 53.888665 17 38 17.057888 0.00 18 37 19.51990 * 18 35 38.32094 18 35 03.38059 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 96.404 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 17 37 53.347000 Dec = 18 35 30.15200 Rates: RA = 926.84 mas/yr Dec = 983.18 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54579.2660 Rates: RA = 0.17849E-03 s/day Dec = 0.26918E-02 arcsec/day * GJ1224 18 04 39.596468 * 18 07 32.494525 18 08 02.534192 0.00 -15 58 16.62501 *-15 57 49.94057 -15 57 53.90048 0.00 From catalog imbedded in main SCHED input file. 2.150 scan hours, 94.139 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 18 07 32.850000 Dec = -15 57 47.09900 Rates: RA = -617.00 mas/yr Dec = -342.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54579.2660 Rates: RA = -0.11713E-03 s/day Dec = -0.93634E-03 arcsec/day * J1733-1304 17 30 13.535187 * 17 33 02.705785 17 33 32.251159 0.21 1730-130 -13 02 45.83975 *-13 04 49.54823 -13 05 20.26401 0.30 J1733-13 /home/arana/cwalker/sched/catalogs/sources.vlba NRAO530 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. * J1742+1904 17 39 54.360726 * 17 42 05.109000 17 42 28.146588 0.00 1739+190 19 05 59.93578 * 19 04 36.99000 19 04 04.95858 0.00 /home/arana/cwalker/sched/catalogs/sources.vlba JVAS - Browne et al. 1998, mnras, 293, 257; S8.4GHz= 199 mJy 1.139 scan hours, 49.402 baseline hours above horizon. * J1743-0350 17 41 20.616010 * 17 43 58.856134 17 44 26.488226 0.20 1741-038 -03 48 48.89989 *-03 50 04.61669 -03 50 29.72036 0.30 J1743-03 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 6.633 baseline hours above horizon. * J1745+1814 17 43 44.129494 * 17 45 55.927430 17 46 19.117575 0.61 1743+182 18 15 56.63237 * 18 14 50.42003 18 14 21.33589 1.36 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.311 scan hours, 13.141 baseline hours above horizon. * J1753-1843 17 50 12.672464 * 17 53 09.088756 17 53 39.799798 2.09 -18 43 02.15812 *-18 43 38.52321 -18 43 52.52797 3.74 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.311 scan hours, 10.316 baseline hours above horizon. * J1805-1408 18 02 40.609014 * 18 05 31.235733 18 06 00.892772 19.91 -14 09 02.65128 *-14 08 44.71754 -14 08 50.75279 13.28 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.197 scan hours, 46.684 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ686 118.9 GJ1224 121.4 J1733-1304 129.4 J1742+1904 117.8 J1743-0350 125.2 J1745+1814 117.4 J1753-1843 125.0 J1805-1408 121.7 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg