COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: RIPL: GJ4360/GJ65A Exp. Code: BB240AA Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for VLBA_PT (Code Pt ) Page 2 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 12 45 00 3C454.3 19 08 42 36.6 94.9 -3.8 -59.0 0 1 1 0 12 45 00 12 53 00 --- 19 16 44 38.2 96.2 -3.6 -58.8 480 F 1 31 12 45 18 13 03 40 J2345-1555 19 27 26 10.8 117.8 -4.3 -49.4 580 1 1 31 13 03 40 13 04 20 --- 19 28 06 10.9 118.0 -4.3 -49.3 40 F 1 34 13 03 58 13 04 20 J2348-1631 19 28 06 10.0 118.0 -4.3 -49.5 -8 1 1 34 13 04 20 13 05 30 =2345-167 19 29 16 10.2 118.2 -4.3 -49.4 62 F 1 38 13 04 20 13 05 30 J2345-1555 19 29 16 11.1 118.1 -4.3 -49.2 -8 1 1 38 13 05 30 13 06 40 --- 19 30 26 11.3 118.3 -4.3 -49.1 62 F 1 43 13 05 30 13 06 40 GJ4360 19 30 26 11.1 118.5 -4.3 -49.1 -6 1 1 43 13 06 40 13 09 40 --- 19 33 27 11.7 119.0 -4.2 -48.8 174 F 1 54 13 06 40 13 09 40 J2345-1555 19 33 27 11.9 118.8 -4.2 -48.8 -6 1 1 54 13 09 40 13 10 50 --- 19 34 37 12.1 119.0 -4.2 -48.7 64 F 1 59 13 09 40 13 10 50 GJ4360 19 34 37 11.9 119.2 -4.2 -48.7 -6 1 1 59 13 10 50 13 13 50 --- 19 37 38 12.4 119.6 -4.1 -48.4 174 F 1 70 13 10 50 13 13 50 J2345-1555 19 37 38 12.6 119.5 -4.1 -48.4 -6 1 1 70 13 13 50 13 15 00 --- 19 38 48 12.9 119.7 -4.1 -48.3 64 F 1 75 13 13 50 13 15 00 GJ4360 19 38 48 12.6 119.8 -4.1 -48.2 -6 1 1 75 13 15 00 13 18 00 --- 19 41 48 13.2 120.3 -4.1 -47.9 174 F 1 86 13 15 00 13 18 00 J2345-1555 19 41 48 13.4 120.2 -4.1 -47.9 -6 1 1 86 13 18 00 13 19 10 --- 19 42 58 13.6 120.4 -4.0 -47.8 64 F 1 91 13 18 00 13 19 10 GJ4360 19 42 58 13.4 120.5 -4.0 -47.8 -6 1 1 91 13 19 10 13 22 10 --- 19 45 59 13.9 121.0 -4.0 -47.5 174 F 1 103 13 19 10 13 22 10 J2345-1555 19 45 59 14.1 120.9 -4.0 -47.5 -6 1 1 103 13 22 10 13 23 20 --- 19 47 09 14.3 121.1 -4.0 -47.4 64 F 1 107 13 22 10 Schedule for VLBA_PT (Code Pt ) Page 3 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 13 23 20 GJ4360 19 47 09 14.1 121.2 -4.0 -47.3 -6 1 1 107 13 23 20 13 26 20 --- 19 50 10 14.6 121.7 -3.9 -47.0 174 F 1 119 13 23 20 13 26 20 J2345-1555 19 50 10 14.9 121.6 -3.9 -47.0 -6 1 1 119 13 26 20 13 27 30 --- 19 51 20 15.1 121.8 -3.9 -46.9 64 F 1 123 13 26 20 13 27 30 J2348-1631 19 51 20 14.2 121.8 -4.0 -47.1 -8 1 1 123 13 27 30 13 28 40 =2345-167 19 52 30 14.4 122.0 -3.9 -47.0 62 F 1 128 13 27 30 13 29 09 J2345-1555 19 52 59 15.4 122.1 -3.9 -46.7 20 1 1 128 13 29 09 13 29 49 --- 19 53 39 15.5 122.2 -3.9 -46.6 40 F 1 130 13 29 27 13 29 49 J2348-1631 19 53 39 14.6 122.1 -3.9 -46.8 -8 1 1 130 13 29 49 13 30 59 =2345-167 19 54 49 14.8 122.3 -3.9 -46.7 62 F 1 135 13 29 49 13 30 59 J2345-1555 19 54 49 15.7 122.4 -3.8 -46.5 -8 1 1 135 13 30 59 13 32 09 --- 19 55 59 15.9 122.6 -3.8 -46.4 62 F 1 139 13 30 59 13 32 09 GJ4360 19 55 59 15.7 122.7 -3.8 -46.3 -6 1 1 139 13 32 09 13 35 09 --- 19 59 00 16.2 123.2 -3.8 -46.0 174 F 1 151 13 32 09 13 35 09 J2345-1555 19 59 00 16.4 123.1 -3.8 -46.0 -6 1 1 151 13 35 09 13 36 19 --- 20 00 10 16.6 123.3 -3.8 -45.9 64 F 1 155 13 35 09 13 36 19 GJ4360 20 00 10 16.4 123.4 -3.8 -45.9 -6 1 1 155 13 36 19 13 39 19 --- 20 03 10 16.9 124.0 -3.7 -45.5 174 F 1 167 13 36 19 13 39 19 J2345-1555 20 03 10 17.1 123.8 -3.7 -45.5 -6 1 1 167 13 39 19 13 40 29 --- 20 04 20 17.3 124.0 -3.7 -45.4 64 F 1 172 13 39 19 13 40 29 GJ4360 20 04 20 17.1 124.2 -3.7 -45.4 -6 1 1 172 13 40 29 13 43 29 --- 20 07 21 17.6 124.7 -3.6 -45.0 174 F 1 183 13 40 29 13 43 29 J2345-1555 20 07 21 17.8 124.6 -3.6 -45.0 -6 1 1 183 13 43 29 13 44 39 --- 20 08 31 18.0 124.8 -3.6 -44.9 64 F 1 188 13 43 29 13 44 39 GJ4360 20 08 31 17.8 124.9 -3.6 -44.8 -6 1 1 188 13 44 39 13 47 39 --- 20 11 32 18.3 125.5 -3.6 -44.5 174 F 1 199 13 44 39 13 47 39 J2345-1555 20 11 32 18.6 125.3 -3.6 -44.5 -6 1 1 199 13 47 39 13 48 49 --- 20 12 42 18.8 125.5 -3.5 -44.3 64 F 1 204 13 47 39 Schedule for VLBA_PT (Code Pt ) Page 4 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 13 48 49 GJ4360 20 12 42 18.5 125.7 -3.6 -44.3 -6 1 1 204 13 48 49 13 51 49 --- 20 15 42 19.0 126.2 -3.5 -43.9 174 F 1 215 13 48 49 13 51 49 J2345-1555 20 15 42 19.3 126.1 -3.5 -44.0 -6 1 1 215 13 51 49 13 52 59 --- 20 16 52 19.5 126.3 -3.5 -43.8 64 F 1 220 13 51 49 13 52 59 J2348-1631 20 16 52 18.5 126.2 -3.5 -44.0 -8 1 1 220 13 52 59 13 54 09 =2345-167 20 18 03 18.7 126.4 -3.5 -43.9 62 F 1 225 13 52 59 13 54 37 J2345-1555 20 18 31 19.7 126.6 -3.5 -43.6 20 1 1 225 13 54 37 13 55 17 --- 20 19 11 19.8 126.7 -3.4 -43.5 40 F 1 227 13 54 55 13 55 17 J2348-1631 20 19 11 18.9 126.6 -3.5 -43.7 -8 1 1 227 13 55 17 13 56 27 =2345-167 20 20 21 19.1 126.9 -3.5 -43.6 62 F 1 232 13 55 17 13 56 27 J2345-1555 20 20 21 20.0 126.9 -3.4 -43.3 -8 1 1 232 13 56 27 13 57 37 --- 20 21 32 20.2 127.2 -3.4 -43.2 62 F 1 236 13 56 27 13 57 37 GJ4360 20 21 32 20.0 127.3 -3.4 -43.2 -6 1 1 236 13 57 37 14 00 37 --- 20 24 32 20.5 127.9 -3.4 -42.8 174 F 1 248 13 57 37 14 00 37 J2345-1555 20 24 32 20.7 127.7 -3.4 -42.8 -6 1 1 248 14 00 37 14 01 47 --- 20 25 42 20.9 128.0 -3.3 -42.6 64 F 1 252 14 00 37 14 01 47 GJ4360 20 25 42 20.7 128.1 -3.3 -42.6 -6 1 1 252 14 01 47 14 04 47 --- 20 28 43 21.2 128.6 -3.3 -42.2 174 F 1 264 14 01 47 14 04 47 J2345-1555 20 28 43 21.4 128.5 -3.3 -42.2 -6 1 1 264 14 04 47 14 05 57 --- 20 29 53 21.6 128.7 -3.3 -42.1 64 F 1 268 14 04 47 14 05 57 GJ4360 20 29 53 21.3 128.9 -3.3 -42.0 -6 1 1 268 14 05 57 14 08 57 --- 20 32 53 21.8 129.5 -3.2 -41.6 174 F 1 280 14 05 57 14 08 57 J2345-1555 20 32 53 22.1 129.3 -3.2 -41.6 -6 1 1 280 14 08 57 14 10 07 --- 20 34 04 22.3 129.6 -3.2 -41.5 64 F 1 284 14 08 57 14 10 07 GJ4360 20 34 04 22.0 129.7 -3.2 -41.4 -6 1 1 284 14 10 07 14 13 07 --- 20 37 04 22.5 130.3 -3.1 -41.0 174 F 1 296 14 10 07 14 13 07 J2345-1555 20 37 04 22.7 130.1 -3.1 -41.0 -6 1 1 296 14 13 07 14 14 17 --- 20 38 14 22.9 130.4 -3.1 -40.9 64 F 1 301 14 13 07 Schedule for VLBA_PT (Code Pt ) Page 5 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 14 14 17 GJ4360 20 38 14 22.7 130.5 -3.1 -40.8 -6 1 1 301 14 14 17 14 17 17 --- 20 41 15 23.1 131.1 -3.1 -40.4 174 F 1 312 14 14 17 14 17 17 J2345-1555 20 41 15 23.4 131.0 -3.1 -40.4 -6 1 1 312 14 17 17 14 18 27 --- 20 42 25 23.6 131.2 -3.1 -40.3 64 F 1 317 14 17 17 14 18 27 J2348-1631 20 42 25 22.7 131.1 -3.1 -40.5 -8 1 1 317 14 18 27 14 19 37 =2345-167 20 43 35 22.8 131.3 -3.1 -40.3 62 F 1 321 14 18 27 14 20 05 J2345-1555 20 44 03 23.8 131.5 -3.0 -40.0 20 1 1 321 14 20 05 14 20 45 --- 20 44 43 23.9 131.7 -3.0 -39.9 40 F 1 324 14 20 23 14 20 45 J2348-1631 20 44 43 23.0 131.5 -3.1 -40.2 -8 1 1 324 14 20 45 14 21 55 =2345-167 20 45 53 23.2 131.8 -3.0 -40.0 62 F 1 328 14 20 45 14 21 55 J2345-1555 20 45 53 24.1 131.9 -3.0 -39.7 -8 1 1 328 14 21 55 14 23 05 --- 20 47 04 24.3 132.1 -3.0 -39.6 62 F 1 333 14 21 55 14 23 05 GJ4360 20 47 04 24.0 132.3 -3.0 -39.5 -6 1 1 333 14 23 05 14 26 05 --- 20 50 04 24.5 132.9 -2.9 -39.1 174 F 1 344 14 23 05 14 26 05 J2345-1555 20 50 04 24.7 132.8 -2.9 -39.1 -6 1 1 344 14 26 05 14 27 15 --- 20 51 14 24.9 133.0 -2.9 -38.9 64 F 1 349 14 26 05 14 27 15 GJ4360 20 51 14 24.7 133.1 -2.9 -38.9 -6 1 1 349 14 27 15 14 30 15 --- 20 54 15 25.1 133.7 -2.9 -38.4 174 F 1 361 14 27 15 14 30 15 J2345-1555 20 54 15 25.4 133.6 -2.9 -38.4 -6 1 1 361 14 30 15 14 31 25 --- 20 55 25 25.5 133.9 -2.8 -38.3 64 F 1 365 14 30 15 14 31 25 GJ4360 20 55 25 25.3 134.0 -2.8 -38.2 -6 1 1 365 14 31 25 14 34 25 --- 20 58 26 25.7 134.6 -2.8 -37.7 174 F 1 377 14 31 25 14 34 25 J2345-1555 20 58 26 26.0 134.5 -2.8 -37.8 -6 1 1 377 14 34 25 14 35 35 --- 20 59 36 26.2 134.7 -2.8 -37.6 64 F 1 381 14 34 25 14 35 35 GJ4360 20 59 36 25.9 134.9 -2.8 -37.6 -6 1 1 381 14 35 35 14 38 35 --- 21 02 36 26.4 135.5 -2.7 -37.1 174 F 1 393 14 35 35 14 38 35 J2345-1555 21 02 36 26.6 135.4 -2.7 -37.1 -6 1 1 393 14 38 35 14 39 45 --- 21 03 46 26.8 135.6 -2.7 -36.9 64 F 1 397 14 38 35 Schedule for VLBA_PT (Code Pt ) Page 6 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 14 39 45 GJ4360 21 03 46 26.5 135.7 -2.7 -36.9 -6 1 1 397 14 39 45 14 42 45 --- 21 06 47 27.0 136.4 -2.7 -36.4 174 F 1 409 14 39 45 14 42 45 J2345-1555 21 06 47 27.2 136.3 -2.6 -36.4 -6 1 1 409 14 42 45 14 43 55 --- 21 07 57 27.4 136.5 -2.6 -36.2 64 F 1 414 14 42 45 14 43 55 J2348-1631 21 07 57 26.5 136.3 -2.7 -36.5 -8 1 1 414 14 43 55 14 45 05 =2345-167 21 09 07 26.6 136.6 -2.7 -36.3 62 F 1 418 14 43 55 14 45 33 J2345-1555 21 09 35 27.6 136.9 -2.6 -35.9 20 1 1 418 14 45 33 14 46 13 --- 21 10 16 27.7 137.1 -2.6 -35.8 40 F 1 421 14 45 51 14 46 13 J2348-1631 21 10 16 26.8 136.8 -2.6 -36.1 -8 1 1 421 14 46 13 14 47 23 =2345-167 21 11 26 27.0 137.1 -2.6 -35.9 62 F 1 425 14 46 13 14 47 23 J2345-1555 21 11 26 27.9 137.3 -2.6 -35.6 -8 1 1 425 14 47 23 14 48 33 --- 21 12 36 28.0 137.6 -2.6 -35.4 62 F 1 430 14 47 23 14 48 33 GJ4360 21 12 36 27.8 137.7 -2.6 -35.4 -6 1 1 430 14 48 33 14 51 33 --- 21 15 36 28.2 138.3 -2.5 -34.9 174 F 1 441 14 48 33 14 51 33 J2345-1555 21 15 36 28.4 138.2 -2.5 -34.9 -6 1 1 441 14 51 33 14 52 43 --- 21 16 47 28.6 138.5 -2.5 -34.7 64 F 1 446 14 51 33 14 52 43 GJ4360 21 16 47 28.3 138.6 -2.5 -34.7 -6 1 1 446 14 52 43 14 55 43 --- 21 19 47 28.8 139.3 -2.4 -34.1 174 F 1 457 14 52 43 14 55 43 J2345-1555 21 19 47 29.0 139.2 -2.4 -34.1 -6 1 1 457 14 55 43 14 56 53 --- 21 20 57 29.2 139.5 -2.4 -33.9 64 F 1 462 14 55 43 14 56 53 GJ4360 21 20 57 28.9 139.5 -2.4 -33.9 -6 1 1 462 14 56 53 14 59 53 --- 21 23 58 29.3 140.2 -2.4 -33.4 174 F 1 474 14 56 53 14 59 53 J2345-1555 21 23 58 29.6 140.1 -2.4 -33.4 -6 1 1 474 14 59 53 15 01 03 --- 21 25 08 29.7 140.4 -2.3 -33.2 64 F 1 478 14 59 53 15 01 03 GJ4360 21 25 08 29.5 140.5 -2.3 -33.2 -6 1 1 478 15 01 03 15 04 03 --- 21 28 08 29.9 141.2 -2.3 -32.6 174 F 1 490 15 01 03 15 04 03 J2345-1555 21 28 08 30.1 141.1 -2.3 -32.6 -6 1 1 490 15 04 03 15 05 13 --- 21 29 19 30.3 141.4 -2.3 -32.4 64 F 1 494 15 04 03 Schedule for VLBA_PT (Code Pt ) Page 7 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 15 05 13 GJ4360 21 29 19 30.0 141.5 -2.3 -32.4 -6 1 1 494 15 05 13 15 08 13 --- 21 32 19 30.4 142.2 -2.2 -31.8 174 F 1 506 15 05 13 15 08 13 J2345-1555 21 32 19 30.6 142.1 -2.2 -31.8 -6 1 1 506 15 08 13 15 09 23 --- 21 33 29 30.8 142.4 -2.2 -31.6 64 F 1 510 15 08 13 15 09 23 J2348-1631 21 33 29 29.9 142.1 -2.2 -32.0 -8 1 1 510 15 09 23 15 10 33 =2345-167 21 34 40 30.1 142.3 -2.2 -31.7 62 F 1 515 15 09 23 15 11 02 J2345-1555 21 35 08 31.0 142.8 -2.2 -31.3 21 1 1 515 15 11 02 15 11 42 --- 21 35 48 31.1 142.9 -2.2 -31.2 40 F 1 517 15 11 20 15 11 42 J2348-1631 21 35 48 30.2 142.6 -2.2 -31.5 -8 1 1 517 15 11 42 15 12 52 =2345-167 21 36 58 30.4 142.9 -2.2 -31.3 62 F 1 522 15 11 42 15 12 52 J2345-1555 21 36 58 31.2 143.2 -2.1 -31.0 -8 1 1 522 15 12 52 15 14 02 --- 21 38 09 31.4 143.5 -2.1 -30.7 62 F 1 526 15 12 52 15 14 02 GJ4360 21 38 09 31.1 143.6 -2.1 -30.7 -6 1 1 526 15 14 02 15 17 02 --- 21 41 09 31.5 144.3 -2.1 -30.1 174 F 1 538 15 14 02 15 17 02 J2345-1555 21 41 09 31.7 144.2 -2.1 -30.1 -6 1 1 538 15 17 02 15 18 12 --- 21 42 19 31.9 144.5 -2.1 -29.9 64 F 1 543 15 17 02 15 18 12 GJ4360 21 42 19 31.6 144.6 -2.1 -29.9 -6 1 1 543 15 18 12 15 21 12 --- 21 45 20 32.0 145.3 -2.0 -29.3 174 F 1 554 15 18 12 15 21 12 J2345-1555 21 45 20 32.2 145.3 -2.0 -29.3 -6 1 1 554 15 21 12 15 22 22 --- 21 46 30 32.4 145.5 -2.0 -29.1 64 F 1 559 15 21 12 15 22 22 GJ4360 21 46 30 32.1 145.6 -2.0 -29.1 -6 1 1 559 15 22 22 15 25 22 --- 21 49 30 32.5 146.4 -1.9 -28.4 174 F 1 570 15 22 22 15 25 22 J2345-1555 21 49 30 32.7 146.3 -1.9 -28.5 -6 1 1 570 15 25 22 15 26 32 --- 21 50 41 32.9 146.6 -1.9 -28.2 64 F 1 575 15 25 22 15 26 32 GJ4360 21 50 41 32.6 146.7 -1.9 -28.2 -6 1 1 575 15 26 32 15 29 32 --- 21 53 41 32.9 147.4 -1.9 -27.6 174 F 1 586 15 26 32 15 29 32 J2345-1555 21 53 41 33.2 147.4 -1.9 -27.6 -6 1 1 586 15 29 32 15 30 42 --- 21 54 51 33.3 147.7 -1.8 -27.4 64 F 1 591 15 29 32 Schedule for VLBA_PT (Code Pt ) Page 8 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 15 30 42 GJ4360 21 54 51 33.1 147.7 -1.9 -27.3 -6 1 1 591 15 30 42 15 33 42 --- 21 57 52 33.4 148.5 -1.8 -26.7 174 F 1 603 15 30 42 15 33 42 J2345-1555 21 57 52 33.7 148.4 -1.8 -26.7 -6 1 1 603 15 33 42 15 34 52 --- 21 59 02 33.8 148.7 -1.8 -26.5 64 F 1 607 15 33 42 15 34 52 J2348-1631 21 59 02 32.9 148.3 -1.8 -26.9 -8 1 1 607 15 34 52 15 36 02 =2345-167 22 00 12 33.1 148.6 -1.8 -26.6 62 F 1 612 15 34 52 15 36 31 J2345-1555 22 00 41 34.0 149.2 -1.7 -26.1 21 1 1 612 15 36 31 15 37 11 --- 22 01 21 34.0 149.3 -1.7 -26.0 40 F 1 614 15 36 49 15 37 11 J2348-1631 22 01 21 33.2 148.9 -1.8 -26.4 -8 1 1 614 15 37 11 15 38 21 =2345-167 22 02 32 33.3 149.2 -1.8 -26.2 62 F 1 619 15 37 11 15 38 21 J2345-1555 22 02 32 34.2 149.6 -1.7 -25.7 -8 1 1 619 15 38 21 15 39 31 --- 22 03 42 34.3 149.9 -1.7 -25.5 62 F 1 623 15 38 21 15 39 31 GJ4360 22 03 42 34.0 150.0 -1.7 -25.5 -6 1 1 623 15 39 31 15 42 31 --- 22 06 42 34.3 150.8 -1.7 -24.8 174 F 1 635 15 39 31 15 42 31 J2345-1555 22 06 42 34.6 150.7 -1.6 -24.8 -6 1 1 635 15 42 31 15 43 41 --- 22 07 52 34.7 151.1 -1.6 -24.6 64 F 1 639 15 42 31 15 43 41 GJ4360 22 07 52 34.4 151.1 -1.6 -24.6 -6 1 1 639 15 43 41 15 46 41 --- 22 10 53 34.7 151.9 -1.6 -23.9 174 F 1 651 15 43 41 15 46 41 J2345-1555 22 10 53 35.0 151.9 -1.6 -23.9 -6 1 1 651 15 46 41 15 47 51 --- 22 12 03 35.1 152.2 -1.6 -23.6 64 F 1 655 15 46 41 15 47 51 GJ4360 22 12 03 34.8 152.2 -1.6 -23.6 -6 1 1 655 15 47 51 15 50 51 --- 22 15 04 35.1 153.0 -1.5 -23.0 174 F 1 667 15 47 51 15 50 51 J2345-1555 22 15 04 35.4 153.0 -1.5 -23.0 -6 1 1 667 15 50 51 15 52 01 --- 22 16 14 35.5 153.3 -1.5 -22.7 64 F 1 672 15 50 51 15 52 01 GJ4360 22 16 14 35.2 153.3 -1.5 -22.7 -6 1 1 672 15 52 01 15 55 01 --- 22 19 14 35.5 154.2 -1.4 -22.0 174 F 1 683 15 52 01 15 55 01 J2345-1555 22 19 14 35.8 154.1 -1.4 -22.0 -6 1 1 683 15 55 01 15 56 11 --- 22 20 24 35.9 154.4 -1.4 -21.7 64 F 1 688 15 55 01 Schedule for VLBA_PT (Code Pt ) Page 9 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 15 56 11 GJ4360 22 20 24 35.6 154.5 -1.4 -21.7 -6 1 1 688 15 56 11 15 59 11 --- 22 23 25 35.9 155.3 -1.4 -21.1 174 F 1 699 15 56 11 15 59 11 J2345-1555 22 23 25 36.1 155.3 -1.4 -21.0 -6 1 1 699 15 59 11 16 00 21 --- 22 24 35 36.2 155.6 -1.4 -20.8 64 F 1 704 15 59 11 16 00 21 J2348-1631 22 24 35 35.4 155.1 -1.4 -21.3 -8 1 1 704 16 00 21 16 01 31 =2345-167 22 25 45 35.5 155.4 -1.4 -21.0 62 F 1 708 16 00 21 16 01 31 J2345-1555 22 25 45 36.3 155.9 -1.3 -20.5 -8 1 1 708 16 01 31 16 02 41 --- 22 26 56 36.4 156.3 -1.3 -20.2 62 F 1 713 16 01 31 16 04 03 J0132-1654 22 28 19 22.6 131.6 -3.1 -40.2 49 1 1 713 16 04 03 16 04 43 =0130-171 22 28 59 22.7 131.7 -3.1 -40.1 40 F 1 715 16 04 21 16 04 43 J0142-1633 22 28 59 21.4 129.5 -3.2 -41.7 -9 1 1 715 16 04 43 16 05 53 --- 22 30 09 21.5 129.7 -3.2 -41.5 61 F 1 720 16 04 43 16 05 53 J0132-1654 22 30 09 22.8 132.0 -3.0 -39.9 -9 1 1 720 16 05 53 16 07 03 =0130-171 22 31 19 23.0 132.2 -3.0 -39.8 61 F 1 724 16 05 53 16 07 03 GJ65A 22 31 19 21.3 131.7 -3.1 -40.4 -10 1 1 724 16 07 03 16 10 03 --- 22 34 20 21.7 132.2 -3.1 -40.0 170 F 1 736 16 07 03 16 10 03 J0132-1654 22 34 20 23.5 132.8 -3.0 -39.3 -10 1 1 736 16 10 03 16 11 13 =0130-171 22 35 30 23.7 133.0 -3.0 -39.1 60 F 1 741 16 10 03 16 11 13 GJ65A 22 35 30 21.9 132.5 -3.1 -39.8 -10 1 1 741 16 11 13 16 14 13 --- 22 38 30 22.4 133.1 -3.0 -39.4 170 F 1 752 16 11 13 16 14 13 J0132-1654 22 38 30 24.1 133.6 -2.9 -38.7 -10 1 1 752 16 14 13 16 15 23 =0130-171 22 39 40 24.3 133.9 -2.9 -38.5 60 F 1 757 16 14 13 16 15 23 GJ65A 22 39 40 22.5 133.3 -3.0 -39.2 -10 1 1 757 16 15 23 16 18 23 --- 22 42 41 23.0 133.9 -2.9 -38.7 170 F 1 768 16 15 23 16 18 23 J0132-1654 22 42 41 24.7 134.5 -2.8 -38.0 -9 1 1 768 16 18 23 16 19 33 =0130-171 22 43 51 24.9 134.7 -2.8 -37.8 61 F 1 773 16 18 23 16 19 33 GJ65A 22 43 51 23.1 134.1 -2.9 -38.5 -9 1 1 773 16 19 33 16 22 33 --- 22 46 52 23.6 134.8 -2.9 -38.1 171 F 1 784 16 19 33 Schedule for VLBA_PT (Code Pt ) Page 10 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 16 22 33 J0132-1654 22 46 52 25.3 135.4 -2.8 -37.3 -9 1 1 784 16 22 33 16 23 43 =0130-171 22 48 02 25.5 135.6 -2.8 -37.1 61 F 1 789 16 22 33 16 23 43 GJ65A 22 48 02 23.8 135.0 -2.9 -37.9 -9 1 1 789 16 23 43 16 26 43 --- 22 51 02 24.2 135.6 -2.8 -37.4 171 F 1 801 16 23 43 16 26 43 J0132-1654 22 51 02 25.9 136.3 -2.7 -36.6 -9 1 1 801 16 26 43 16 27 53 =0130-171 22 52 12 26.1 136.5 -2.7 -36.4 61 F 1 805 16 26 43 16 27 53 J0142-1633 22 52 12 24.9 134.2 -2.8 -38.2 -8 1 1 805 16 27 53 16 29 03 --- 22 53 23 25.1 134.4 -2.8 -38.0 62 F 1 810 16 27 53 16 29 39 J0132-1654 22 53 58 26.4 136.9 -2.7 -36.2 27 1 1 810 16 29 39 16 30 19 =0130-171 22 54 39 26.4 137.0 -2.6 -36.0 40 F 1 812 16 29 57 16 30 19 J0142-1633 22 54 39 25.3 134.7 -2.8 -37.8 -8 1 1 812 16 30 19 16 31 29 --- 22 55 49 25.5 134.9 -2.8 -37.6 62 F 1 817 16 30 19 16 31 29 J0132-1654 22 55 49 26.6 137.3 -2.6 -35.8 -8 1 1 817 16 31 29 16 32 39 =0130-171 22 56 59 26.8 137.5 -2.6 -35.6 62 F 1 821 16 31 29 16 32 39 GJ65A 22 56 59 25.1 136.9 -2.7 -36.4 -9 1 1 821 16 32 39 16 35 39 --- 22 59 59 25.5 137.5 -2.7 -35.9 171 F 1 833 16 32 39 16 35 39 J0132-1654 22 59 59 27.2 138.2 -2.6 -35.1 -9 1 1 833 16 35 39 16 36 49 =0130-171 23 01 10 27.4 138.5 -2.5 -34.9 61 F 1 837 16 35 39 16 36 49 GJ65A 23 01 10 25.6 137.8 -2.6 -35.7 -9 1 1 837 16 36 49 16 39 49 --- 23 04 10 26.1 138.4 -2.6 -35.2 171 F 1 849 16 36 49 16 39 49 J0132-1654 23 04 10 27.8 139.1 -2.5 -34.4 -9 1 1 849 16 39 49 16 40 59 =0130-171 23 05 20 27.9 139.4 -2.5 -34.2 61 F 1 853 16 39 49 16 40 59 GJ65A 23 05 20 26.2 138.7 -2.6 -35.0 -9 1 1 853 16 40 59 16 43 59 --- 23 08 21 26.6 139.3 -2.5 -34.5 171 F 1 865 16 40 59 16 43 59 J0132-1654 23 08 21 28.3 140.1 -2.4 -33.7 -9 1 1 865 16 43 59 16 45 09 =0130-171 23 09 31 28.5 140.3 -2.4 -33.4 61 F 1 870 16 43 59 16 45 09 GJ65A 23 09 31 26.8 139.6 -2.5 -34.3 -9 1 1 870 16 45 09 16 48 09 --- 23 12 32 27.2 140.2 -2.4 -33.7 171 F 1 881 16 45 09 Schedule for VLBA_PT (Code Pt ) Page 11 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 16 48 09 J0132-1654 23 12 32 28.9 141.0 -2.3 -32.9 -9 1 1 881 16 48 09 16 49 19 =0130-171 23 13 42 29.0 141.3 -2.3 -32.7 61 F 1 886 16 48 09 16 49 19 GJ65A 23 13 42 27.3 140.5 -2.4 -33.5 -9 1 1 886 16 49 19 16 52 19 --- 23 16 42 27.7 141.2 -2.4 -33.0 171 F 1 897 16 49 19 16 52 19 J0132-1654 23 16 42 29.4 142.0 -2.3 -32.1 -9 1 1 897 16 52 19 16 53 29 =0130-171 23 17 52 29.6 142.3 -2.3 -31.9 61 F 1 902 16 52 19 16 53 29 J0142-1633 23 17 52 28.6 139.7 -2.4 -33.9 -8 1 1 902 16 53 29 16 54 39 --- 23 19 03 28.7 140.0 -2.4 -33.6 62 F 1 906 16 53 29 16 54 39 J0132-1654 23 19 03 29.7 142.5 -2.2 -31.7 -8 1 1 906 16 54 39 16 55 49 =0130-171 23 20 13 29.9 142.8 -2.2 -31.5 62 F 1 911 16 54 39 17 06 40 3C454.3 23 31 06 70.1 206.8 0.6 22.8 565 1 1 911 17 06 40 17 08 40 --- 23 33 06 69.9 208.1 0.6 23.9 120 F 1 919 17 06 58 17 10 16 J2345-1555 23 34 42 39.8 176.6 -0.2 -2.9 29 1 1 919 17 10 16 17 10 56 --- 23 35 22 39.8 176.8 -0.2 -2.8 40 F 1 921 17 10 34 17 10 56 J2348-1631 23 35 22 39.1 176.0 -0.2 -3.5 -7 1 1 921 17 10 56 17 12 06 =2345-167 23 36 32 39.1 176.3 -0.2 -3.2 63 F 1 926 17 10 56 17 12 06 J2345-1555 23 36 32 39.8 177.2 -0.2 -2.4 -7 1 1 926 17 12 06 17 13 16 --- 23 37 42 39.8 177.5 -0.1 -2.1 63 F 1 930 17 12 06 17 13 16 GJ4360 23 37 42 39.5 177.4 -0.1 -2.2 -6 1 1 930 17 13 16 17 16 16 --- 23 40 43 39.6 178.4 -0.1 -1.4 174 F 1 942 17 13 16 17 16 16 J2345-1555 23 40 43 39.8 178.5 -0.1 -1.3 -6 1 1 942 17 16 16 17 17 26 --- 23 41 53 39.8 178.8 -0.1 -1.0 64 F 1 946 17 16 16 17 17 26 GJ4360 23 41 53 39.6 178.7 -0.1 -1.1 -6 1 1 946 17 17 26 17 20 26 --- 23 44 53 39.6 179.7 0.0 -0.3 174 F 1 958 17 17 26 17 20 26 J2345-1555 23 44 53 39.8 179.8 0.0 -0.2 -6 1 1 958 17 20 26 17 21 36 --- 23 46 04 39.8 180.1 0.0 0.1 64 F 1 963 17 20 26 17 21 36 GJ4360 23 46 04 39.6 180.0 0.0 0.0 -6 1 1 963 17 21 36 17 24 36 --- 23 49 04 39.6 181.0 0.1 0.8 174 F 1 974 17 21 36 Schedule for VLBA_PT (Code Pt ) Page 12 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 17 24 36 J2345-1555 23 49 04 39.8 181.1 0.1 0.9 -6 1 1 974 17 24 36 17 25 46 --- 23 50 14 39.8 181.4 0.1 1.2 64 F 1 979 17 24 36 17 25 46 GJ4360 23 50 14 39.6 181.3 0.1 1.2 -6 1 1 979 17 25 46 17 28 46 --- 23 53 15 39.5 182.3 0.1 2.0 174 F 1 990 17 25 46 17 28 46 J2345-1555 23 53 15 39.8 182.4 0.1 2.0 -6 1 1 990 17 28 46 17 29 56 --- 23 54 25 39.8 182.8 0.1 2.4 64 F 1 995 17 28 46 17 29 56 GJ4360 23 54 25 39.5 182.6 0.1 2.3 -6 1 1 995 17 29 56 17 32 56 --- 23 57 25 39.5 183.6 0.2 3.1 174 F 1 1006 17 29 56 17 32 56 J2345-1555 23 57 25 39.7 183.7 0.2 3.2 -6 1 1 1006 17 32 56 17 34 06 --- 23 58 36 39.7 184.1 0.2 3.5 64 F 1 1011 17 32 56 17 34 06 J2348-1631 23 58 36 39.2 183.1 0.2 2.7 -7 1 1 1011 17 34 06 17 35 16 =2345-167 23 59 46 39.2 183.5 0.2 3.0 63 F 1 1015 17 34 06 17 35 16 J2345-1555 23 59 46 39.7 184.4 0.2 3.8 -7 1 1 1015 17 35 16 17 36 26 --- 00 00 56 39.7 184.8 0.3 4.1 63 F 1 1020 17 35 16 17 37 46 J0132-1654 00 02 16 34.5 153.4 -1.5 -22.8 53 1 1 1020 17 37 46 17 38 26 =0130-171 00 02 57 34.5 153.6 -1.5 -22.6 40 F 1 1023 17 38 04 17 38 26 J0142-1633 00 02 57 33.9 150.7 -1.7 -24.9 -8 1 1 1023 17 38 26 17 39 36 --- 00 04 07 34.0 151.0 -1.7 -24.7 62 F 1 1027 17 38 26 17 39 36 J0132-1654 00 04 07 34.6 153.9 -1.5 -22.3 -8 1 1 1027 17 39 36 17 40 46 =0130-171 00 05 17 34.7 154.2 -1.5 -22.1 62 F 1 1032 17 39 36 17 40 46 GJ65A 00 05 17 33.2 153.0 -1.6 -23.2 -9 1 1 1032 17 40 46 17 43 46 --- 00 08 17 33.5 153.8 -1.5 -22.6 171 F 1 1043 17 40 46 17 43 46 J0132-1654 00 08 17 35.0 155.0 -1.4 -21.4 -9 1 1 1043 17 43 46 17 44 56 =0130-171 00 09 28 35.1 155.3 -1.4 -21.1 61 F 1 1048 17 43 46 17 44 56 GJ65A 00 09 28 33.6 154.1 -1.5 -22.3 -9 1 1 1048 17 44 56 17 47 56 --- 00 12 28 33.8 154.9 -1.4 -21.6 171 F 1 1059 17 44 56 17 47 56 J0132-1654 00 12 28 35.3 156.1 -1.3 -20.4 -9 1 1 1059 17 47 56 17 49 06 =0130-171 00 13 38 35.4 156.5 -1.3 -20.2 61 F 1 1064 17 47 56 Schedule for VLBA_PT (Code Pt ) Page 13 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 17 49 06 GJ65A 00 13 38 33.9 155.2 -1.4 -21.4 -9 1 1 1064 17 49 06 17 52 06 --- 00 16 39 34.2 156.0 -1.4 -20.7 171 F 1 1075 17 49 06 17 52 06 J0132-1654 00 16 39 35.7 157.3 -1.3 -19.5 -9 1 1 1075 17 52 06 17 53 16 =0130-171 00 17 49 35.8 157.6 -1.3 -19.2 61 F 1 1080 17 52 06 17 53 16 GJ65A 00 17 49 34.3 156.3 -1.4 -20.4 -9 1 1 1080 17 53 16 17 56 16 --- 00 20 49 34.5 157.1 -1.3 -19.7 171 F 1 1092 17 53 16 17 56 16 J0132-1654 00 20 49 36.0 158.5 -1.2 -18.5 -9 1 1 1092 17 56 16 17 57 26 =0130-171 00 22 00 36.1 158.8 -1.2 -18.2 61 F 1 1096 17 56 16 17 57 26 GJ65A 00 22 00 34.6 157.5 -1.3 -19.4 -9 1 1 1096 17 57 26 18 00 26 --- 00 25 00 34.9 158.3 -1.2 -18.7 171 F 1 1108 17 57 26 18 00 26 J0132-1654 00 25 00 36.3 159.6 -1.1 -17.5 -9 1 1 1108 18 00 26 18 01 36 =0130-171 00 26 10 36.4 160.0 -1.1 -17.2 61 F 1 1112 18 00 26 18 01 36 J0142-1633 00 26 10 36.0 157.0 -1.3 -19.7 -8 1 1 1112 18 01 36 18 02 46 --- 00 27 21 36.1 157.3 -1.3 -19.4 62 F 1 1117 18 01 36 18 02 46 J0132-1654 00 27 21 36.5 160.3 -1.1 -16.9 -8 1 1 1117 18 02 46 18 03 56 =0130-171 00 28 31 36.6 160.6 -1.1 -16.6 62 F 1 1121 18 02 46 18 05 15 J2345-1555 00 29 50 38.7 193.7 0.7 11.7 51 1 1 1121 18 05 15 18 05 55 --- 00 30 30 38.7 193.9 0.7 11.9 40 F 1 1124 18 05 33 18 05 55 J2348-1631 00 30 30 38.2 192.9 0.7 11.1 -7 1 1 1124 18 05 55 18 07 05 =2345-167 00 31 40 38.2 193.2 0.7 11.4 63 F 1 1128 18 05 55 18 07 05 J2345-1555 00 31 40 38.6 194.2 0.8 12.2 -7 1 1 1128 18 07 05 18 08 15 --- 00 32 50 38.6 194.6 0.8 12.5 63 F 1 1133 18 07 05 18 08 15 GJ4360 00 32 50 38.4 194.4 0.8 12.4 -6 1 1 1133 18 08 15 18 11 15 --- 00 35 51 38.2 195.3 0.8 13.1 174 F 1 1144 18 08 15 18 11 15 J2345-1555 00 35 51 38.4 195.5 0.8 13.2 -6 1 1 1144 18 11 15 18 12 25 --- 00 37 01 38.4 195.8 0.9 13.5 64 F 1 1149 18 11 15 18 12 25 GJ4360 00 37 01 38.1 195.7 0.9 13.4 -6 1 1 1149 18 12 25 18 15 25 --- 00 40 01 38.0 196.5 0.9 14.2 174 F 1 1161 18 12 25 Schedule for VLBA_PT (Code Pt ) Page 14 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 18 15 25 J2345-1555 00 40 01 38.2 196.7 0.9 14.3 -6 1 1 1161 18 15 25 18 16 35 --- 00 41 12 38.1 197.1 0.9 14.6 64 F 1 1165 18 15 25 18 16 35 GJ4360 00 41 12 37.9 196.9 0.9 14.5 -6 1 1 1165 18 16 35 18 19 35 --- 00 44 12 37.7 197.8 1.0 15.2 174 F 1 1177 18 16 35 18 19 35 J2345-1555 00 44 12 37.9 198.0 1.0 15.4 -6 1 1 1177 18 19 35 18 20 45 --- 00 45 22 37.9 198.3 1.0 15.6 64 F 1 1181 18 19 35 18 20 45 GJ4360 00 45 22 37.6 198.1 1.0 15.5 -6 1 1 1181 18 20 45 18 23 45 --- 00 48 23 37.4 199.0 1.0 16.3 174 F 1 1193 18 20 45 18 23 45 J2345-1555 00 48 23 37.7 199.2 1.0 16.4 -6 1 1 1193 18 23 45 18 24 55 --- 00 49 33 37.6 199.5 1.1 16.7 64 F 1 1197 18 23 45 18 24 55 J2348-1631 00 49 33 37.2 198.5 1.0 15.8 -6 1 1 1197 18 24 55 18 26 05 =2345-167 00 50 43 37.1 198.8 1.0 16.1 64 F 1 1202 18 24 55 18 26 05 J2345-1555 00 50 43 37.5 199.9 1.1 17.0 -6 1 1 1202 18 26 05 18 27 15 --- 00 51 53 37.4 200.2 1.1 17.2 64 F 1 1206 18 26 05 18 28 30 J0132-1654 00 53 09 38.0 167.8 -0.7 -10.5 48 1 1 1206 18 28 30 18 29 10 =0130-171 00 53 49 38.0 168.0 -0.7 -10.3 40 F 1 1209 18 28 48 18 29 10 J0142-1633 00 53 49 37.9 165.0 -0.8 -12.9 -8 1 1 1209 18 29 10 18 30 20 --- 00 54 59 37.9 165.3 -0.8 -12.6 62 F 1 1213 18 29 10 18 30 20 J0132-1654 00 54 59 38.0 168.4 -0.6 -10.0 -8 1 1 1213 18 30 20 18 31 30 =0130-171 00 56 09 38.1 168.7 -0.6 -9.7 62 F 1 1218 18 30 20 18 31 30 GJ65A 00 56 09 36.8 167.1 -0.7 -11.2 -9 1 1 1218 18 31 30 18 34 30 --- 00 59 10 36.9 168.0 -0.7 -10.4 171 F 1 1230 18 31 30 18 34 30 J0132-1654 00 59 10 38.2 169.6 -0.6 -8.9 -9 1 1 1230 18 34 30 18 35 40 =0130-171 01 00 20 38.2 170.0 -0.5 -8.6 61 F 1 1234 18 34 30 18 35 40 GJ65A 01 00 20 37.0 168.3 -0.7 -10.1 -9 1 1 1234 18 35 40 18 38 40 --- 01 03 20 37.1 169.2 -0.6 -9.4 171 F 1 1246 18 35 40 18 38 40 J0132-1654 01 03 20 38.3 170.9 -0.5 -7.8 -9 1 1 1246 18 38 40 18 39 50 =0130-171 01 04 31 38.4 171.3 -0.5 -7.5 61 F 1 1250 18 38 40 Schedule for VLBA_PT (Code Pt ) Page 15 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 18 39 50 GJ65A 01 04 31 37.1 169.6 -0.6 -9.1 -8 1 1 1250 18 39 50 18 42 50 --- 01 07 31 37.2 170.4 -0.5 -8.3 172 F 1 1262 18 39 50 18 42 50 J0132-1654 01 07 31 38.5 172.2 -0.4 -6.8 -8 1 1 1262 18 42 50 18 44 00 =0130-171 01 08 41 38.5 172.5 -0.4 -6.4 62 F 1 1266 18 42 50 18 44 00 GJ65A 01 08 41 37.3 170.8 -0.5 -8.0 -8 1 1 1266 18 44 00 18 47 00 --- 01 11 42 37.4 171.7 -0.5 -7.2 172 F 1 1278 18 44 00 18 47 00 J0132-1654 01 11 42 38.6 173.4 -0.4 -5.7 -8 1 1 1278 18 47 00 18 48 10 =0130-171 01 12 52 38.6 173.8 -0.3 -5.4 62 F 1 1283 18 47 00 18 48 10 GJ65A 01 12 52 37.4 172.0 -0.4 -6.9 -8 1 1 1283 18 48 10 18 51 10 --- 01 15 53 37.5 172.9 -0.4 -6.1 172 F 1 1294 18 48 10 18 51 10 J0132-1654 01 15 53 38.7 174.7 -0.3 -4.6 -8 1 1 1294 18 51 10 18 52 20 =0130-171 01 17 03 38.7 175.1 -0.3 -4.3 62 F 1 1299 18 51 10 18 52 20 J0142-1633 01 17 03 38.8 172.0 -0.4 -6.9 -8 1 1 1299 18 52 20 18 53 30 --- 01 18 13 38.8 172.3 -0.4 -6.6 62 F 1 1303 18 52 20 18 53 30 J0132-1654 01 18 13 38.7 175.4 -0.2 -3.9 -8 1 1 1303 18 53 30 18 54 40 =0130-171 01 19 23 38.7 175.8 -0.2 -3.6 62 F 1 1308 18 53 30 18 57 45 J0237+2848 01 22 29 73.0 103.5 -1.3 -66.5 110 1 1 1308 18 57 45 18 59 45 =0234+285 01 24 29 73.4 104.1 -1.2 -66.1 120 F 1 1315 18 58 03 19 02 52 J0132-1654 01 27 36 38.8 178.3 -0.1 -1.5 112 1 1 1315 19 02 52 19 03 32 =0130-171 01 28 16 38.8 178.5 -0.1 -1.3 40 F 1 1318 19 03 10 19 03 32 J0142-1633 01 28 16 39.1 175.4 -0.2 -4.0 -8 1 1 1318 19 03 32 19 04 42 --- 01 29 26 39.1 175.8 -0.2 -3.6 62 F 1 1322 19 03 32 19 04 42 J0132-1654 01 29 26 38.8 178.9 -0.1 -1.0 -8 1 1 1322 19 04 42 19 05 52 =0130-171 01 30 37 38.8 179.2 0.0 -0.7 62 F 1 1327 19 04 42 19 05 52 GJ65A 01 30 37 37.7 177.3 -0.1 -2.3 -8 1 1 1327 19 05 52 19 08 52 --- 01 33 37 37.8 178.2 -0.1 -1.5 172 F 1 1339 19 05 52 19 08 52 J0132-1654 01 33 37 38.8 180.2 0.0 0.1 -8 1 1 1339 19 08 52 19 10 02 =0130-171 01 34 47 38.8 180.5 0.0 0.4 62 F 1 1343 19 08 52 Schedule for VLBA_PT (Code Pt ) Page 16 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 19 10 02 GJ65A 01 34 47 37.8 178.6 -0.1 -1.2 -8 1 1 1343 19 10 02 19 13 02 --- 01 37 48 37.8 179.5 0.0 -0.4 172 F 1 1355 19 10 02 19 13 02 J0132-1654 01 37 48 38.8 181.4 0.1 1.2 -8 1 1 1355 19 13 02 19 14 12 =0130-171 01 38 58 38.8 181.8 0.1 1.6 62 F 1 1359 19 13 02 19 14 12 GJ65A 01 38 58 37.8 179.9 0.0 -0.1 -8 1 1 1359 19 14 12 19 17 12 --- 01 41 58 37.8 180.8 0.0 0.7 172 F 1 1371 19 14 12 19 17 12 J0132-1654 01 41 58 38.8 182.7 0.1 2.3 -8 1 1 1371 19 17 12 19 18 22 =0130-171 01 43 09 38.8 183.1 0.2 2.7 62 F 1 1375 19 17 12 19 18 22 GJ65A 01 43 09 37.8 181.1 0.1 1.0 -8 1 1 1375 19 18 22 19 21 22 --- 01 46 09 37.8 182.0 0.1 1.8 172 F 1 1387 19 18 22 19 21 22 J0132-1654 01 46 09 38.7 184.0 0.2 3.5 -8 1 1 1387 19 21 22 19 22 32 =0130-171 01 47 19 38.7 184.4 0.2 3.8 62 F 1 1392 19 21 22 19 22 32 GJ65A 01 47 19 37.8 182.4 0.1 2.1 -8 1 1 1392 19 22 32 19 25 32 --- 01 50 20 37.7 183.3 0.2 2.8 172 F 1 1403 19 22 32 19 25 32 J0132-1654 01 50 20 38.7 185.3 0.3 4.6 -8 1 1 1403 19 25 32 19 26 42 =0130-171 01 51 30 38.6 185.6 0.3 4.9 62 F 1 1408 19 25 32 19 26 42 J0142-1633 01 51 30 39.1 182.6 0.1 2.2 -8 1 1 1408 19 26 42 19 27 52 --- 01 52 40 39.1 182.9 0.2 2.5 62 F 1 1412 19 26 42 19 28 25 J0132-1654 01 53 14 38.6 186.2 0.3 5.3 26 1 1 1412 19 28 25 19 29 05 =0130-171 01 53 54 38.6 186.4 0.3 5.5 40 F 1 1415 19 28 43 19 29 05 J0142-1633 01 53 54 39.1 183.3 0.2 2.9 -8 1 1 1415 19 29 05 19 30 15 --- 01 55 04 39.1 183.7 0.2 3.2 62 F 1 1419 19 29 05 19 30 15 J0132-1654 01 55 04 38.6 186.7 0.4 5.8 -8 1 1 1419 19 30 15 19 31 25 =0130-171 01 56 14 38.5 187.1 0.4 6.1 62 F 1 1424 19 30 15 19 31 25 GJ65A 01 56 14 37.6 185.0 0.3 4.4 -8 1 1 1424 19 31 25 19 34 25 --- 01 59 15 37.6 185.9 0.3 5.2 172 F 1 1435 19 31 25 19 34 25 J0132-1654 01 59 15 38.5 188.0 0.4 6.9 -8 1 1 1435 19 34 25 19 35 35 =0130-171 02 00 25 38.4 188.3 0.5 7.2 62 F 1 1440 19 34 25 Schedule for VLBA_PT (Code Pt ) Page 17 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 19 35 35 GJ65A 02 00 25 37.6 186.3 0.3 5.5 -8 1 1 1440 19 35 35 19 38 35 --- 02 03 26 37.5 187.2 0.4 6.2 172 F 1 1452 19 35 35 19 38 35 J0132-1654 02 03 26 38.3 189.3 0.5 8.0 -8 1 1 1452 19 38 35 19 39 45 =0130-171 02 04 36 38.3 189.6 0.5 8.3 62 F 1 1456 19 38 35 19 39 45 GJ65A 02 04 36 37.4 187.5 0.4 6.5 -8 1 1 1456 19 39 45 19 42 45 --- 02 07 36 37.4 188.4 0.5 7.3 172 F 1 1468 19 39 45 19 42 45 J0132-1654 02 07 36 38.2 190.5 0.6 9.1 -8 1 1 1468 19 42 45 19 43 55 =0130-171 02 08 46 38.1 190.9 0.6 9.4 62 F 1 1472 19 42 45 19 43 55 GJ65A 02 08 46 37.3 188.8 0.5 7.6 -8 1 1 1472 19 43 55 19 46 55 --- 02 11 47 37.2 189.7 0.5 8.4 172 F 1 1484 19 43 55 19 46 55 J0132-1654 02 11 47 38.0 191.8 0.6 10.1 -8 1 1 1484 19 46 55 19 48 05 =0130-171 02 12 57 38.0 192.1 0.7 10.4 62 F 1 1488 19 46 55 19 48 05 GJ65A 02 12 57 37.2 190.0 0.6 8.7 -8 1 1 1488 19 48 05 19 51 05 --- 02 15 58 37.1 190.9 0.6 9.5 172 F 1 1500 19 48 05 19 51 05 J0132-1654 02 15 58 37.8 193.0 0.7 11.2 -7 1 1 1500 19 51 05 19 52 15 =0130-171 02 17 08 37.8 193.4 0.7 11.5 63 F 1 1504 19 51 05 19 52 15 J0142-1633 02 17 08 38.5 190.4 0.6 9.0 -8 1 1 1504 19 52 15 19 53 25 --- 02 18 18 38.5 190.8 0.6 9.3 62 F 1 1509 19 52 15 19 53 58 J0132-1654 02 18 51 37.7 193.9 0.8 11.9 25 1 1 1509 19 53 58 19 54 38 =0130-171 02 19 31 37.6 194.1 0.8 12.1 40 F 1 1512 19 54 16 19 54 38 J0142-1633 02 19 31 38.5 191.2 0.6 9.6 -8 1 1 1512 19 54 38 19 55 48 --- 02 20 41 38.4 191.5 0.6 9.9 62 F 1 1516 19 54 38 19 55 48 J0132-1654 02 20 41 37.6 194.4 0.8 12.4 -8 1 1 1516 19 55 48 19 56 58 =0130-171 02 21 52 37.5 194.8 0.8 12.7 62 F 1 1521 19 55 48 19 56 58 GJ65A 02 21 52 36.8 192.6 0.7 10.9 -7 1 1 1521 19 56 58 19 59 58 --- 02 24 52 36.7 193.5 0.8 11.7 173 F 1 1532 19 56 58 19 59 58 J0132-1654 02 24 52 37.4 195.6 0.9 13.5 -7 1 1 1532 19 59 58 20 01 08 =0130-171 02 26 02 37.3 196.0 0.9 13.7 63 F 1 1537 19 59 58 Schedule for VLBA_PT (Code Pt ) Page 18 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 20 01 08 GJ65A 02 26 02 36.6 193.9 0.8 12.0 -7 1 1 1537 20 01 08 20 04 08 --- 02 29 03 36.5 194.7 0.8 12.7 173 F 1 1548 20 01 08 20 04 08 J0132-1654 02 29 03 37.1 196.9 0.9 14.5 -7 1 1 1548 20 04 08 20 05 18 =0130-171 02 30 13 37.1 197.2 1.0 14.8 63 F 1 1553 20 04 08 20 05 18 GJ65A 02 30 13 36.4 195.1 0.8 13.0 -7 1 1 1553 20 05 18 20 08 18 --- 02 33 14 36.2 195.9 0.9 13.8 173 F 1 1564 20 05 18 20 08 18 J0132-1654 02 33 14 36.9 198.1 1.0 15.5 -7 1 1 1564 20 08 18 20 09 28 =0130-171 02 34 24 36.8 198.4 1.0 15.8 63 F 1 1569 20 08 18 20 09 28 GJ65A 02 34 24 36.2 196.3 0.9 14.1 -7 1 1 1569 20 09 28 20 12 28 --- 02 37 24 36.0 197.1 1.0 14.8 173 F 1 1581 20 09 28 20 12 28 J0132-1654 02 37 24 36.6 199.3 1.1 16.5 -7 1 1 1581 20 12 28 20 13 38 =0130-171 02 38 34 36.5 199.6 1.1 16.8 63 F 1 1585 20 12 28 20 13 38 GJ65A 02 38 34 35.9 197.4 1.0 15.1 -7 1 1 1585 20 13 38 20 16 38 --- 02 41 35 35.7 198.3 1.0 15.8 173 F 1 1597 20 13 38 20 16 38 J0132-1654 02 41 35 36.3 200.5 1.1 17.6 -7 1 1 1597 20 16 38 20 17 48 =0130-171 02 42 45 36.2 200.8 1.2 17.8 63 F 1 1601 20 16 38 20 17 48 J0142-1633 02 42 45 37.2 198.0 1.0 15.5 -8 1 1 1601 20 17 48 20 18 58 --- 02 43 55 37.2 198.4 1.0 15.8 62 F 1 1606 20 17 48 20 19 31 J0132-1654 02 44 28 36.1 201.3 1.2 18.2 24 1 1 1606 20 19 31 20 20 11 =0130-171 02 45 08 36.0 201.5 1.2 18.4 40 F 1 1608 20 19 49 20 20 11 J0142-1633 02 45 08 37.1 198.7 1.0 16.1 -8 1 1 1608 20 20 11 20 21 21 --- 02 46 18 37.0 199.1 1.1 16.4 62 F 1 1613 20 20 11 20 21 21 J0132-1654 02 46 18 35.9 201.8 1.2 18.7 -8 1 1 1613 20 21 21 20 22 31 =0130-171 02 47 28 35.9 202.1 1.2 19.0 62 F 1 1617 20 21 21 20 22 31 GJ65A 02 47 28 35.3 199.9 1.1 17.2 -7 1 1 1617 20 22 31 20 25 31 --- 02 50 29 35.1 200.8 1.2 17.9 173 F 1 1629 20 22 31 20 25 31 J0132-1654 02 50 29 35.6 202.9 1.3 19.7 -7 1 1 1629 20 25 31 20 26 41 =0130-171 02 51 39 35.5 203.3 1.3 19.9 63 F 1 1633 20 25 31 Schedule for VLBA_PT (Code Pt ) Page 19 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 20 26 41 GJ65A 02 51 39 35.0 201.1 1.2 18.2 -7 1 1 1633 20 26 41 20 29 41 --- 02 54 40 34.8 201.9 1.3 18.9 173 F 1 1645 20 26 41 20 29 41 J0132-1654 02 54 40 35.3 204.1 1.4 20.6 -7 1 1 1645 20 29 41 20 30 51 =0130-171 02 55 50 35.2 204.4 1.4 20.9 63 F 1 1650 20 29 41 20 30 51 GJ65A 02 55 50 34.7 202.3 1.3 19.2 -7 1 1 1650 20 30 51 20 33 51 --- 02 58 50 34.5 203.1 1.3 19.9 173 F 1 1661 20 30 51 20 33 51 J0132-1654 02 58 50 34.9 205.2 1.4 21.6 -7 1 1 1661 20 33 51 20 35 01 =0130-171 03 00 00 34.8 205.6 1.4 21.9 63 F 1 1666 20 33 51 20 35 01 GJ65A 03 00 00 34.4 203.4 1.3 20.2 -7 1 1 1666 20 35 01 20 38 01 --- 03 03 01 34.1 204.2 1.4 20.8 173 F 1 1677 20 35 01 20 38 01 J0132-1654 03 03 01 34.5 206.4 1.5 22.5 -7 1 1 1677 20 38 01 20 39 11 =0130-171 03 04 11 34.4 206.7 1.5 22.8 63 F 1 1682 20 38 01 20 39 11 GJ65A 03 04 11 34.0 204.5 1.4 21.1 -7 1 1 1682 20 39 11 20 42 11 --- 03 07 12 33.8 205.3 1.5 21.8 173 F 1 1693 20 39 11 20 42 11 J0132-1654 03 07 12 34.1 207.5 1.6 23.5 -7 1 1 1693 20 42 11 20 43 21 =0130-171 03 08 22 34.0 207.8 1.6 23.7 63 F 1 1698 20 42 11 20 43 21 J0142-1633 03 08 22 35.3 205.3 1.4 21.6 -9 1 1 1698 20 43 21 20 44 31 --- 03 09 32 35.2 205.6 1.4 21.8 61 F 1 1702 20 43 21 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group v4cm_3 in /home/arana/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 7600.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = B D B D B D B D VLBA FE= omit 4cm omit 4cm VLBA Synth= 7.6 15.4 15.4 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 784.49 784.49 800.49 800.49 816.49 816.49 832.49 832.49 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ4360/GJ65A Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ4360 23 42 55.926404 * 23 45 31.042767 23 45 56.303536 0.00 -16 27 03.80296 *-16 10 23.92446 -16 07 39.38634 0.00 From catalog imbedded in main SCHED input file. 2.200 scan hours, 97.786 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 23 45 31.270000 Dec = -16 10 19.30000 Rates: RA = -395.00 mas/yr Dec = -558.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54571.5368 Rates: RA = -0.75068E-04 s/day Dec = -0.15277E-02 arcsec/day * GJ65A 01 36 38.724071 * 01 39 03.454321 01 39 26.783709 0.00 -18 12 09.43493 *-17 56 57.13351 -17 54 26.54288 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 97.401 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 01 39 01.540100 Dec = -17 57 01.80000 Rates: RA = 3296.00 mas/yr Dec = 563.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54571.5368 Rates: RA = 0.63237E-03 s/day Dec = 0.15414E-02 arcsec/day * J0142-1633 01 40 20.082497 * 01 42 45.261200 01 43 08.664164 0.00 -16 48 12.68526 *-16 33 07.19690 -16 30 37.81758 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 13.195 baseline hours above horizon. * J0132-1654 01 30 17.688187 * 01 32 43.487468 01 33 06.999485 0.23 0130-171 -17 10 11.95078 *-16 54 48.52205 -16 52 16.12155 0.33 J0132-16 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.081 scan hours, 47.102 baseline hours above horizon. * J0237+2848 02 34 55.589592 * 02 37 52.405679 02 38 20.776935 0.23 0234+285 28 35 11.40780 * 28 48 08.99005 28 50 20.53107 0.40 J0237+28 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 21.754074 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 23.41127 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 7.833 baseline hours above horizon. * J2345-1555 23 42 37.342144 * 23 45 12.462326 23 45 37.723866 0.25 -16 11 47.61719 *-15 55 07.83414 -15 52 23.36521 0.43 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.189 scan hours, 48.841 baseline hours above horizon. * J2348-1631 23 45 27.682207 * 23 48 02.608533 23 48 27.831265 0.22 2345-167 -16 47 52.60228 *-16 31 12.02227 -16 28 27.27425 0.32 J2348-16 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.350 scan hours, 13.741 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ4360 37.9 GJ65A 28.0 J0142-1633 26.6 J0132-1654 27.0 J0237+2848 23.7 3C454.3 39.9 J2345-1555 37.8 J2348-1631 37.7 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg