COVER INFORMATION Station: GBT_VLBA (Code Gb ) Experiment: RIPL: GJ4360/GJ65A Exp. Code: BB240AA Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Geoffrey Bower Address: 601 Campbell Hall UC Berkeley Astronomy Berkeley CA 94720 Phone: 510 643-4704 EMAIL: gbower@astro.berkeley.edu Fax: 510 642 3411 Phone during observation: 510 847-1722 Observing mode: VLBA 512-8-2 4cm Notes: Schedule for GBT_VLBA (Code Gb ) Page 2 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- Next scan frequencies: 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 Next BBC frequencies: 715.51 715.51 699.51 699.51 683.51 683.51 667.51 667.51 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 12 45 00 3C454.3 21 01 49 56.8 124.2 -1.9 -42.4 0 1 1 0 12 45 00 12 53 00 --- 21 09 51 58.1 126.9 -1.7 -40.7 480 F 1 31 12 45 18 ---------- GBT pointing scan. ---------- 12 53 23 3C454.3 21 10 14 58.1 127.0 -1.7 -40.6 0 1 1 31 Stopped 13 01 23 --- 21 18 15 59.4 129.9 -1.6 -38.7 480 S 1 62 13 03 40 J2345-1555 21 20 33 25.9 140.7 -2.4 -31.0 0 1 1 62 13 03 40 13 04 20 --- 21 21 13 26.0 140.9 -2.4 -30.9 40 F 1 65 13 03 58 13 04 20 J2348-1631 21 21 13 25.2 140.6 -2.5 -31.2 -28 1 1 65 13 04 20 13 05 30 =2345-167 21 22 23 25.3 140.9 -2.4 -31.0 42 F 1 69 13 04 20 13 05 30 J2345-1555 21 22 23 26.2 141.2 -2.4 -30.7 -28 1 1 69 13 05 30 13 06 40 --- 21 23 33 26.3 141.4 -2.4 -30.5 42 F 1 74 13 05 30 13 06 40 GJ4360 21 23 33 26.1 141.5 -2.4 -30.5 -25 1 1 74 13 06 40 13 09 40 --- 21 26 34 26.4 142.2 -2.3 -30.0 155 F 1 85 13 06 40 13 09 40 J2345-1555 21 26 34 26.7 142.1 -2.3 -30.0 -25 1 1 85 13 09 40 13 10 50 --- 21 27 44 26.8 142.4 -2.3 -29.8 45 F 1 90 13 09 40 13 10 50 GJ4360 21 27 44 26.6 142.5 -2.3 -29.8 -25 1 1 90 13 10 50 13 13 50 --- 21 30 45 26.9 143.2 -2.3 -29.3 155 F 1 101 13 10 50 13 13 50 J2345-1555 21 30 45 27.2 143.1 -2.2 -29.3 -25 1 1 101 13 13 50 13 15 00 --- 21 31 55 27.3 143.4 -2.2 -29.1 45 F 1 106 13 13 50 13 15 00 GJ4360 21 31 55 27.1 143.5 -2.2 -29.0 -25 1 1 106 13 15 00 13 18 00 --- 21 34 55 27.4 144.2 -2.2 -28.5 155 F 1 117 13 15 00 13 18 00 J2345-1555 21 34 55 27.7 144.1 -2.2 -28.5 -25 1 1 117 13 18 00 13 19 10 --- 21 36 06 27.8 144.4 -2.2 -28.3 45 F 1 122 13 18 00 Schedule for GBT_VLBA (Code Gb ) Page 3 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 13 19 10 GJ4360 21 36 06 27.5 144.4 -2.2 -28.3 -25 1 1 122 13 19 10 13 22 10 --- 21 39 06 27.9 145.2 -2.1 -27.8 155 F 1 134 13 19 10 13 22 10 J2345-1555 21 39 06 28.1 145.1 -2.1 -27.8 -25 1 1 134 13 22 10 13 23 20 --- 21 40 16 28.3 145.4 -2.1 -27.6 45 F 1 138 13 22 10 13 23 20 GJ4360 21 40 16 28.0 145.4 -2.1 -27.5 -25 1 1 138 13 23 20 13 26 20 --- 21 43 17 28.3 146.2 -2.0 -27.0 155 F 1 150 13 23 20 13 26 20 J2345-1555 21 43 17 28.6 146.1 -2.0 -27.0 -25 1 1 150 13 26 20 13 27 30 --- 21 44 27 28.7 146.4 -2.0 -26.8 45 F 1 154 13 26 20 13 27 30 J2348-1631 21 44 27 27.9 146.0 -2.1 -27.2 -28 1 1 154 13 27 30 13 28 40 =2345-167 21 45 37 28.0 146.3 -2.0 -26.9 42 F 1 159 13 27 30 13 29 09 J2345-1555 21 46 06 28.9 146.8 -2.0 -26.5 0 1 1 159 13 29 09 13 29 49 --- 21 46 46 29.0 147.0 -2.0 -26.3 40 F 1 161 13 29 27 13 29 49 J2348-1631 21 46 46 28.1 146.6 -2.0 -26.7 -28 1 1 161 13 29 49 13 30 59 =2345-167 21 47 56 28.3 146.9 -2.0 -26.5 42 F 1 166 13 29 49 13 30 59 J2345-1555 21 47 56 29.1 147.3 -2.0 -26.1 -28 1 1 166 13 30 59 13 32 09 --- 21 49 06 29.2 147.6 -1.9 -25.9 42 F 1 170 13 30 59 13 32 09 GJ4360 21 49 06 29.0 147.6 -1.9 -25.9 -25 1 1 170 13 32 09 13 35 09 --- 21 52 07 29.3 148.3 -1.9 -25.3 155 F 1 182 13 32 09 13 35 09 J2345-1555 21 52 07 29.5 148.3 -1.9 -25.3 -25 1 1 182 13 35 09 13 36 19 --- 21 53 17 29.7 148.6 -1.9 -25.1 45 F 1 186 13 35 09 13 36 19 GJ4360 21 53 17 29.4 148.6 -1.9 -25.1 -25 1 1 186 13 36 19 13 39 19 --- 21 56 17 29.7 149.4 -1.8 -24.5 155 F 1 198 13 36 19 13 39 19 J2345-1555 21 56 17 30.0 149.4 -1.8 -24.5 -25 1 1 198 13 39 19 13 40 29 --- 21 57 27 30.1 149.6 -1.8 -24.3 45 F 1 203 13 39 19 13 40 29 GJ4360 21 57 27 29.8 149.7 -1.8 -24.3 -25 1 1 203 13 40 29 13 43 29 --- 22 00 28 30.1 150.5 -1.8 -23.7 155 F 1 214 13 40 29 13 43 29 J2345-1555 22 00 28 30.4 150.4 -1.8 -23.7 -25 1 1 214 13 43 29 13 44 39 --- 22 01 38 30.5 150.7 -1.7 -23.5 45 F 1 219 13 43 29 Schedule for GBT_VLBA (Code Gb ) Page 4 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 13 44 39 GJ4360 22 01 38 30.2 150.7 -1.7 -23.5 -25 1 1 219 13 44 39 13 47 39 --- 22 04 39 30.5 151.5 -1.7 -22.9 155 F 1 230 13 44 39 13 47 39 J2345-1555 22 04 39 30.8 151.5 -1.7 -22.9 -25 1 1 230 13 47 39 13 48 49 --- 22 05 49 30.9 151.8 -1.7 -22.6 45 F 1 235 13 47 39 13 48 49 GJ4360 22 05 49 30.6 151.8 -1.7 -22.6 -25 1 1 235 13 48 49 13 51 49 --- 22 08 49 30.9 152.6 -1.6 -22.0 155 F 1 246 13 48 49 13 51 49 J2345-1555 22 08 49 31.1 152.6 -1.6 -22.0 -25 1 1 246 13 51 49 13 52 59 --- 22 10 00 31.3 152.9 -1.6 -21.8 45 F 1 251 13 51 49 13 52 59 J2348-1631 22 10 00 30.4 152.4 -1.6 -22.2 -28 1 1 251 13 52 59 13 54 09 =2345-167 22 11 10 30.5 152.7 -1.6 -22.0 42 F 1 255 13 52 59 13 54 37 J2345-1555 22 11 38 31.4 153.3 -1.6 -21.5 0 1 1 255 13 54 37 13 55 17 --- 22 12 18 31.5 153.5 -1.6 -21.3 40 F 1 258 13 54 55 13 55 17 J2348-1631 22 12 18 30.6 153.0 -1.6 -21.8 -28 1 1 258 13 55 17 13 56 27 =2345-167 22 13 28 30.8 153.3 -1.6 -21.5 42 F 1 263 13 55 17 13 56 27 J2345-1555 22 13 28 31.6 153.8 -1.5 -21.1 -28 1 1 263 13 56 27 13 57 37 --- 22 14 39 31.7 154.1 -1.5 -20.8 42 F 1 267 13 56 27 13 57 37 GJ4360 22 14 39 31.4 154.1 -1.5 -20.9 -25 1 1 267 13 57 37 14 00 37 --- 22 17 39 31.6 154.9 -1.5 -20.2 155 F 1 279 13 57 37 14 00 37 J2345-1555 22 17 39 31.9 154.9 -1.5 -20.2 -25 1 1 279 14 00 37 14 01 47 --- 22 18 49 32.0 155.2 -1.4 -20.0 45 F 1 283 14 00 37 14 01 47 GJ4360 22 18 49 31.7 155.2 -1.5 -20.0 -25 1 1 283 14 01 47 14 04 47 --- 22 21 50 32.0 156.0 -1.4 -19.4 155 F 1 295 14 01 47 14 04 47 J2345-1555 22 21 50 32.3 156.0 -1.4 -19.3 -25 1 1 295 14 04 47 14 05 57 --- 22 23 00 32.3 156.3 -1.4 -19.1 45 F 1 299 14 04 47 14 05 57 GJ4360 22 23 00 32.1 156.3 -1.4 -19.1 -25 1 1 299 14 05 57 14 08 57 --- 22 26 00 32.3 157.1 -1.3 -18.5 155 F 1 311 14 05 57 14 08 57 J2345-1555 22 26 00 32.6 157.1 -1.3 -18.5 -25 1 1 311 14 08 57 14 10 07 --- 22 27 11 32.7 157.4 -1.3 -18.2 45 F 1 315 14 08 57 Schedule for GBT_VLBA (Code Gb ) Page 5 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 14 10 07 GJ4360 22 27 11 32.4 157.5 -1.3 -18.2 -25 1 1 315 14 10 07 14 13 07 --- 22 30 11 32.6 158.3 -1.3 -17.6 155 F 1 327 14 10 07 14 13 07 J2345-1555 22 30 11 32.9 158.3 -1.3 -17.6 -25 1 1 327 14 13 07 14 14 17 --- 22 31 21 33.0 158.6 -1.2 -17.3 45 F 1 332 14 13 07 14 14 17 GJ4360 22 31 21 32.7 158.6 -1.2 -17.3 -25 1 1 332 14 14 17 14 17 17 --- 22 34 22 32.9 159.4 -1.2 -16.7 155 F 1 343 14 14 17 14 17 17 J2345-1555 22 34 22 33.2 159.4 -1.2 -16.6 -25 1 1 343 14 17 17 14 18 27 --- 22 35 32 33.3 159.7 -1.2 -16.4 45 F 1 348 14 17 17 14 18 27 J2348-1631 22 35 32 32.5 159.2 -1.2 -16.9 -28 1 1 348 14 18 27 14 19 37 =2345-167 22 36 42 32.6 159.5 -1.2 -16.6 42 F 1 352 14 18 27 14 20 05 J2345-1555 22 37 10 33.4 160.2 -1.1 -16.0 0 1 1 352 14 20 05 14 20 45 --- 22 37 50 33.4 160.4 -1.1 -15.9 40 F 1 355 14 20 23 14 20 45 J2348-1631 22 37 50 32.7 159.8 -1.2 -16.4 -28 1 1 355 14 20 45 14 21 55 =2345-167 22 39 01 32.7 160.1 -1.2 -16.1 42 F 1 359 14 20 45 14 21 55 J2345-1555 22 39 01 33.5 160.7 -1.1 -15.6 -28 1 1 359 14 21 55 14 23 05 --- 22 40 11 33.6 161.0 -1.1 -15.4 42 F 1 364 14 21 55 14 23 05 GJ4360 22 40 11 33.3 161.0 -1.1 -15.4 -25 1 1 364 14 23 05 14 26 05 --- 22 43 11 33.5 161.9 -1.0 -14.7 155 F 1 375 14 23 05 14 26 05 J2345-1555 22 43 11 33.8 161.9 -1.0 -14.7 -25 1 1 375 14 26 05 14 27 15 --- 22 44 21 33.8 162.2 -1.0 -14.4 45 F 1 380 14 26 05 14 27 15 GJ4360 22 44 21 33.6 162.2 -1.0 -14.5 -25 1 1 380 14 27 15 14 30 15 --- 22 47 22 33.7 163.0 -1.0 -13.8 155 F 1 392 14 27 15 14 30 15 J2345-1555 22 47 22 34.0 163.0 -1.0 -13.7 -25 1 1 392 14 30 15 14 31 25 --- 22 48 32 34.1 163.4 -1.0 -13.5 45 F 1 396 14 30 15 14 31 25 GJ4360 22 48 32 33.8 163.3 -1.0 -13.5 -25 1 1 396 14 31 25 14 34 25 --- 22 51 33 34.0 164.2 -0.9 -12.8 155 F 1 408 14 31 25 14 34 25 J2345-1555 22 51 33 34.2 164.2 -0.9 -12.8 -25 1 1 408 14 34 25 14 35 35 --- 22 52 43 34.3 164.5 -0.9 -12.5 45 F 1 412 14 34 25 Schedule for GBT_VLBA (Code Gb ) Page 6 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 14 35 35 GJ4360 22 52 43 34.0 164.5 -0.9 -12.6 -25 1 1 412 14 35 35 14 38 35 --- 22 55 43 34.2 165.4 -0.8 -11.9 155 F 1 424 14 35 35 14 38 35 J2345-1555 22 55 43 34.4 165.4 -0.8 -11.8 -25 1 1 424 14 38 35 14 39 45 --- 22 56 53 34.5 165.7 -0.8 -11.6 45 F 1 428 14 38 35 14 39 45 GJ4360 22 56 53 34.2 165.7 -0.8 -11.6 -25 1 1 428 14 39 45 14 42 45 --- 22 59 54 34.4 166.6 -0.8 -10.9 155 F 1 440 14 39 45 14 42 45 J2345-1555 22 59 54 34.6 166.6 -0.8 -10.9 -25 1 1 440 14 42 45 14 43 55 --- 23 01 04 34.7 166.9 -0.7 -10.6 45 F 1 444 14 42 45 14 43 55 J2348-1631 23 01 04 34.0 166.3 -0.8 -11.2 -28 1 1 444 14 43 55 14 45 05 =2345-167 23 02 14 34.0 166.6 -0.8 -10.9 42 F 1 449 14 43 55 14 45 33 J2345-1555 23 02 42 34.8 167.4 -0.7 -10.2 0 1 1 449 14 45 33 14 46 13 --- 23 03 23 34.8 167.6 -0.7 -10.1 40 F 1 452 14 45 51 14 46 13 J2348-1631 23 03 23 34.1 166.9 -0.8 -10.7 -28 1 1 452 14 46 13 14 47 23 =2345-167 23 04 33 34.1 167.3 -0.7 -10.4 42 F 1 456 14 46 13 14 47 23 J2345-1555 23 04 33 34.8 167.9 -0.7 -9.8 -28 1 1 456 14 47 23 14 48 33 --- 23 05 43 34.9 168.3 -0.7 -9.5 42 F 1 461 14 47 23 14 48 33 GJ4360 23 05 43 34.6 168.2 -0.7 -9.6 -25 1 1 461 14 48 33 14 51 33 --- 23 08 43 34.7 169.1 -0.6 -8.9 155 F 1 472 14 48 33 14 51 33 J2345-1555 23 08 43 35.0 169.1 -0.6 -8.8 -25 1 1 472 14 51 33 14 52 43 --- 23 09 54 35.1 169.5 -0.6 -8.5 45 F 1 477 14 51 33 14 52 43 GJ4360 23 09 54 34.8 169.4 -0.6 -8.6 -25 1 1 477 14 52 43 14 55 43 --- 23 12 54 34.9 170.3 -0.6 -7.9 155 F 1 488 14 52 43 14 55 43 J2345-1555 23 12 54 35.2 170.4 -0.5 -7.8 -25 1 1 488 14 55 43 14 56 53 --- 23 14 04 35.2 170.7 -0.5 -7.6 45 F 1 493 14 55 43 14 56 53 GJ4360 23 14 04 34.9 170.7 -0.5 -7.6 -25 1 1 493 14 56 53 14 59 53 --- 23 17 05 35.0 171.5 -0.5 -6.9 155 F 1 504 14 56 53 14 59 53 J2345-1555 23 17 05 35.3 171.6 -0.5 -6.8 -25 1 1 504 14 59 53 15 01 03 --- 23 18 15 35.3 171.9 -0.5 -6.6 45 F 1 509 14 59 53 Schedule for GBT_VLBA (Code Gb ) Page 7 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 15 01 03 GJ4360 23 18 15 35.1 171.9 -0.5 -6.6 -25 1 1 509 15 01 03 15 04 03 --- 23 21 16 35.1 172.7 -0.4 -5.9 155 F 1 521 15 01 03 15 04 03 J2345-1555 23 21 16 35.4 172.8 -0.4 -5.9 -25 1 1 521 15 04 03 15 05 13 --- 23 22 26 35.4 173.1 -0.4 -5.6 45 F 1 525 15 04 03 15 05 13 GJ4360 23 22 26 35.2 173.1 -0.4 -5.6 -25 1 1 525 15 05 13 15 08 13 --- 23 25 26 35.2 174.0 -0.3 -4.9 155 F 1 537 15 05 13 15 08 13 J2345-1555 23 25 26 35.5 174.0 -0.3 -4.9 -25 1 1 537 15 08 13 15 09 23 --- 23 26 36 35.5 174.4 -0.3 -4.6 45 F 1 541 15 08 13 15 09 23 J2348-1631 23 26 36 34.9 173.6 -0.4 -5.2 -28 1 1 541 15 09 23 15 10 33 =2345-167 23 27 47 34.9 174.0 -0.3 -4.9 42 F 1 546 15 09 23 15 11 02 J2345-1555 23 28 15 35.5 174.9 -0.3 -4.2 0 1 1 546 15 11 02 15 11 42 --- 23 28 55 35.6 175.1 -0.3 -4.0 40 F 1 548 15 11 20 15 11 42 J2348-1631 23 28 55 34.9 174.3 -0.3 -4.7 -28 1 1 548 15 11 42 15 12 52 =2345-167 23 30 05 34.9 174.6 -0.3 -4.4 42 F 1 553 15 11 42 15 12 52 J2345-1555 23 30 05 35.6 175.4 -0.3 -3.7 -28 1 1 553 15 12 52 15 14 02 --- 23 31 16 35.6 175.8 -0.2 -3.5 42 F 1 557 15 12 52 15 14 02 GJ4360 23 31 16 35.3 175.7 -0.2 -3.5 -25 1 1 557 15 14 02 15 17 02 --- 23 34 16 35.4 176.6 -0.2 -2.8 155 F 1 569 15 14 02 15 17 02 J2345-1555 23 34 16 35.6 176.6 -0.2 -2.7 -25 1 1 569 15 17 02 15 18 12 --- 23 35 26 35.6 177.0 -0.2 -2.5 45 F 1 574 15 17 02 15 18 12 GJ4360 23 35 26 35.4 176.9 -0.2 -2.5 -25 1 1 574 15 18 12 15 21 12 --- 23 38 27 35.4 177.8 -0.1 -1.8 155 F 1 585 15 18 12 15 21 12 J2345-1555 23 38 27 35.7 177.9 -0.1 -1.7 -25 1 1 585 15 21 12 15 22 22 --- 23 39 37 35.7 178.2 -0.1 -1.4 45 F 1 590 15 21 12 15 22 22 GJ4360 23 39 37 35.4 178.1 -0.1 -1.5 -25 1 1 590 15 22 22 15 25 22 --- 23 42 38 35.4 179.0 -0.1 -0.8 155 F 1 601 15 22 22 15 25 22 J2345-1555 23 42 38 35.7 179.1 -0.1 -0.7 -25 1 1 601 15 25 22 15 26 32 --- 23 43 48 35.7 179.5 0.0 -0.4 45 F 1 606 15 25 22 Schedule for GBT_VLBA (Code Gb ) Page 8 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 15 26 32 GJ4360 23 43 48 35.4 179.4 0.0 -0.5 -25 1 1 606 15 26 32 15 29 32 --- 23 46 48 35.4 180.3 0.0 0.2 155 F 1 617 15 26 32 15 29 32 J2345-1555 23 46 48 35.7 180.3 0.0 0.3 -25 1 1 617 15 29 32 15 30 42 --- 23 47 58 35.7 180.7 0.0 0.6 45 F 1 622 15 29 32 15 30 42 GJ4360 23 47 58 35.4 180.6 0.0 0.5 -25 1 1 622 15 30 42 15 33 42 --- 23 50 59 35.4 181.5 0.1 1.2 155 F 1 634 15 30 42 15 33 42 J2345-1555 23 50 59 35.7 181.6 0.1 1.3 -24 1 1 634 15 33 42 15 34 52 --- 23 52 09 35.7 181.9 0.1 1.6 46 F 1 638 15 33 42 15 34 52 J2348-1631 23 52 09 35.1 181.1 0.1 0.9 -28 1 1 638 15 34 52 15 36 02 =2345-167 23 53 19 35.1 181.4 0.1 1.2 42 F 1 643 15 34 52 15 36 31 J2345-1555 23 53 48 35.7 182.4 0.1 2.0 0 1 1 643 15 36 31 15 37 11 --- 23 54 28 35.7 182.6 0.1 2.1 40 F 1 645 15 36 49 15 37 11 J2348-1631 23 54 28 35.1 181.8 0.1 1.4 -28 1 1 645 15 37 11 15 38 21 =2345-167 23 55 39 35.1 182.1 0.1 1.7 42 F 1 650 15 37 11 15 38 21 J2345-1555 23 55 39 35.6 183.0 0.2 2.4 -28 1 1 650 15 38 21 15 39 31 --- 23 56 49 35.6 183.3 0.2 2.7 42 F 1 654 15 38 21 15 39 31 GJ4360 23 56 49 35.4 183.2 0.2 2.6 -24 1 1 654 15 39 31 15 42 31 --- 23 59 49 35.3 184.1 0.2 3.3 156 F 1 666 15 39 31 15 42 31 J2345-1555 23 59 49 35.6 184.2 0.2 3.4 -24 1 1 666 15 42 31 15 43 41 --- 00 00 59 35.6 184.5 0.3 3.7 46 F 1 670 15 42 31 15 43 41 GJ4360 00 00 59 35.3 184.4 0.3 3.6 -24 1 1 670 15 43 41 15 46 41 --- 00 04 00 35.3 185.3 0.3 4.3 156 F 1 682 15 43 41 15 46 41 J2345-1555 00 04 00 35.5 185.4 0.3 4.4 -24 1 1 682 15 46 41 15 47 51 --- 00 05 10 35.5 185.8 0.3 4.7 46 F 1 686 15 46 41 15 47 51 GJ4360 00 05 10 35.3 185.7 0.3 4.6 -24 1 1 686 15 47 51 15 50 51 --- 00 08 11 35.2 186.5 0.4 5.3 156 F 1 698 15 47 51 15 50 51 J2345-1555 00 08 11 35.4 186.7 0.4 5.4 -24 1 1 698 15 50 51 15 52 01 --- 00 09 21 35.4 187.0 0.4 5.7 46 F 1 703 15 50 51 Schedule for GBT_VLBA (Code Gb ) Page 9 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 15 52 01 GJ4360 00 09 21 35.2 186.9 0.4 5.6 -24 1 1 703 15 52 01 15 55 01 --- 00 12 21 35.1 187.8 0.4 6.3 156 F 1 714 15 52 01 15 55 01 J2345-1555 00 12 21 35.3 187.9 0.4 6.4 -24 1 1 714 15 55 01 15 56 11 --- 00 13 32 35.3 188.2 0.5 6.7 46 F 1 719 15 55 01 15 56 11 GJ4360 00 13 32 35.1 188.1 0.5 6.6 -24 1 1 719 15 56 11 15 59 11 --- 00 16 32 35.0 189.0 0.5 7.3 156 F 1 730 15 56 11 15 59 11 J2345-1555 00 16 32 35.2 189.1 0.5 7.4 -24 1 1 730 15 59 11 16 00 21 --- 00 17 42 35.2 189.4 0.5 7.7 46 F 1 735 15 59 11 16 00 21 J2348-1631 00 17 42 34.7 188.5 0.5 7.0 -29 1 1 735 16 00 21 16 01 31 =2345-167 00 18 52 34.6 188.9 0.5 7.2 41 F 1 739 16 00 21 16 01 31 J2345-1555 00 18 52 35.1 189.8 0.6 8.0 -29 1 1 739 16 01 31 16 02 41 --- 00 20 03 35.1 190.1 0.6 8.2 41 F 1 744 16 01 31 16 04 03 J0132-1654 00 21 26 32.2 159.6 -1.2 -16.6 0 1 1 744 16 04 03 16 04 43 =0130-171 00 22 06 32.2 159.8 -1.2 -16.4 40 F 1 746 16 04 21 16 04 43 J0142-1633 00 22 06 31.9 157.0 -1.4 -18.6 -35 1 1 746 16 04 43 16 05 53 --- 00 23 16 32.0 157.3 -1.3 -18.4 35 F 1 751 16 04 43 16 05 53 J0132-1654 00 23 16 32.3 160.1 -1.2 -16.2 -35 1 1 751 16 05 53 16 07 03 =0130-171 00 24 26 32.4 160.5 -1.1 -15.9 35 F 1 755 16 05 53 16 07 03 GJ65A 00 24 26 31.0 159.1 -1.3 -17.1 -31 1 1 755 16 07 03 16 10 03 --- 00 27 27 31.2 159.9 -1.2 -16.4 149 F 1 767 16 07 03 16 10 03 J0132-1654 00 27 27 32.6 161.3 -1.1 -15.2 -31 1 1 767 16 10 03 16 11 13 =0130-171 00 28 37 32.7 161.6 -1.1 -15.0 39 F 1 772 16 10 03 16 11 13 GJ65A 00 28 37 31.3 160.2 -1.2 -16.2 -31 1 1 772 16 11 13 16 14 13 --- 00 31 37 31.5 161.0 -1.1 -15.5 149 F 1 783 16 11 13 16 14 13 J0132-1654 00 31 37 32.8 162.4 -1.0 -14.3 -31 1 1 783 16 14 13 16 15 23 =0130-171 00 32 47 32.9 162.7 -1.0 -14.1 39 F 1 788 16 14 13 16 15 23 GJ65A 00 32 47 31.5 161.3 -1.1 -15.3 -31 1 1 788 16 15 23 16 18 23 --- 00 35 48 31.7 162.1 -1.1 -14.6 149 F 1 799 16 15 23 Schedule for GBT_VLBA (Code Gb ) Page 10 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 16 18 23 J0132-1654 00 35 48 33.1 163.6 -1.0 -13.4 -31 1 1 799 16 18 23 16 19 33 =0130-171 00 36 58 33.2 163.9 -0.9 -13.1 39 F 1 804 16 18 23 16 19 33 GJ65A 00 36 58 31.8 162.5 -1.0 -14.4 -31 1 1 804 16 19 33 16 22 33 --- 00 39 59 32.0 163.3 -1.0 -13.7 149 F 1 815 16 19 33 16 22 33 J0132-1654 00 39 59 33.3 164.7 -0.9 -12.4 -31 1 1 815 16 22 33 16 23 43 =0130-171 00 41 09 33.4 165.1 -0.9 -12.2 39 F 1 820 16 22 33 16 23 43 GJ65A 00 41 09 32.0 163.6 -1.0 -13.4 -31 1 1 820 16 23 43 16 26 43 --- 00 44 09 32.2 164.4 -0.9 -12.8 149 F 1 832 16 23 43 16 26 43 J0132-1654 00 44 09 33.5 165.9 -0.8 -11.5 -31 1 1 832 16 26 43 16 27 53 =0130-171 00 45 20 33.6 166.2 -0.8 -11.2 39 F 1 836 16 26 43 16 27 53 J0142-1633 00 45 20 33.4 163.3 -1.0 -13.5 -35 1 1 836 16 27 53 16 29 03 --- 00 46 30 33.5 163.7 -0.9 -13.3 35 F 1 841 16 27 53 16 29 39 J0132-1654 00 47 06 33.7 166.7 -0.8 -10.8 0 1 1 841 16 29 39 16 30 19 =0130-171 00 47 46 33.7 166.9 -0.8 -10.7 40 F 1 843 16 29 57 16 30 19 J0142-1633 00 47 46 33.5 164.0 -0.9 -13.0 -35 1 1 843 16 30 19 16 31 29 --- 00 48 56 33.6 164.3 -0.9 -12.7 35 F 1 848 16 30 19 16 31 29 J0132-1654 00 48 56 33.7 167.3 -0.7 -10.4 -35 1 1 848 16 31 29 16 32 39 =0130-171 00 50 06 33.8 167.6 -0.7 -10.1 35 F 1 852 16 31 29 16 32 39 GJ65A 00 50 06 32.5 166.1 -0.8 -11.4 -31 1 1 852 16 32 39 16 35 39 --- 00 53 06 32.6 166.9 -0.8 -10.8 149 F 1 864 16 32 39 16 35 39 J0132-1654 00 53 06 33.9 168.4 -0.7 -9.4 -31 1 1 864 16 35 39 16 36 49 =0130-171 00 54 17 34.0 168.8 -0.6 -9.2 39 F 1 868 16 35 39 16 36 49 GJ65A 00 54 17 32.7 167.2 -0.8 -10.5 -31 1 1 868 16 36 49 16 39 49 --- 00 57 17 32.8 168.0 -0.7 -9.8 149 F 1 880 16 36 49 16 39 49 J0132-1654 00 57 17 34.1 169.6 -0.6 -8.5 -31 1 1 880 16 39 49 16 40 59 =0130-171 00 58 27 34.1 170.0 -0.6 -8.2 39 F 1 884 16 39 49 16 40 59 GJ65A 00 58 27 32.8 168.4 -0.7 -9.5 -31 1 1 884 16 40 59 16 43 59 --- 01 01 28 33.0 169.2 -0.6 -8.9 149 F 1 896 16 40 59 Schedule for GBT_VLBA (Code Gb ) Page 11 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 16 43 59 J0132-1654 01 01 28 34.2 170.8 -0.5 -7.5 -31 1 1 896 16 43 59 16 45 09 =0130-171 01 02 38 34.2 171.2 -0.5 -7.2 39 F 1 901 16 43 59 16 45 09 GJ65A 01 02 38 33.0 169.5 -0.6 -8.6 -31 1 1 901 16 45 09 16 48 09 --- 01 05 39 33.1 170.4 -0.6 -7.9 149 F 1 912 16 45 09 16 48 09 J0132-1654 01 05 39 34.3 172.0 -0.5 -6.5 -31 1 1 912 16 48 09 16 49 19 =0130-171 01 06 49 34.4 172.4 -0.4 -6.2 39 F 1 917 16 48 09 16 49 19 GJ65A 01 06 49 33.1 170.7 -0.5 -7.6 -31 1 1 917 16 49 19 16 52 19 --- 01 09 49 33.2 171.6 -0.5 -6.9 149 F 1 928 16 49 19 16 52 19 J0132-1654 01 09 49 34.4 173.2 -0.4 -5.5 -32 1 1 928 16 52 19 16 53 29 =0130-171 01 10 59 34.5 173.6 -0.4 -5.3 38 F 1 933 16 52 19 16 53 29 J0142-1633 01 10 59 34.5 170.6 -0.5 -7.6 -35 1 1 933 16 53 29 16 54 39 --- 01 12 10 34.6 171.0 -0.5 -7.4 35 F 1 937 16 53 29 16 54 39 J0132-1654 01 12 10 34.5 173.9 -0.3 -5.0 -35 1 1 937 16 54 39 16 55 49 =0130-171 01 13 20 34.5 174.3 -0.3 -4.7 35 F 1 942 16 54 39 ---------- GBT pointing scan. ---------- 16 58 18 3C454.3 01 15 49 51.9 244.2 2.4 47.3 0 1 1 942 Stopped 17 06 18 --- 01 23 50 50.5 246.3 2.5 48.3 480 S 1 973 17 06 40 3C454.3 01 24 13 50.4 246.4 2.5 48.4 0 1 1 973 17 06 40 17 08 40 --- 01 26 13 50.0 246.9 2.5 48.6 120 F 1 981 17 06 58 17 10 16 J2345-1555 01 27 49 30.6 208.8 1.7 23.1 0 1 1 981 17 10 16 17 10 56 --- 01 28 29 30.6 209.0 1.7 23.3 40 F 1 983 17 10 34 17 10 56 J2348-1631 01 28 29 30.3 208.0 1.7 22.5 -29 1 1 983 17 10 56 17 12 06 =2345-167 01 29 39 30.2 208.3 1.7 22.8 41 F 1 988 17 10 56 17 12 06 J2345-1555 01 29 39 30.5 209.3 1.7 23.5 -29 1 1 988 17 12 06 17 13 16 --- 01 30 49 30.4 209.6 1.8 23.7 41 F 1 992 17 12 06 17 13 16 GJ4360 01 30 49 30.2 209.4 1.7 23.6 -24 1 1 992 17 13 16 17 16 16 --- 01 33 50 29.9 210.2 1.8 24.2 156 F 1 1004 17 13 16 17 16 16 J2345-1555 01 33 50 30.1 210.4 1.8 24.3 -24 1 1 1004 17 16 16 17 17 26 --- 01 35 00 30.0 210.7 1.8 24.5 46 F 1 1008 17 16 16 Schedule for GBT_VLBA (Code Gb ) Page 12 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 17 17 26 GJ4360 01 35 00 29.8 210.5 1.8 24.4 -24 1 1 1008 17 17 26 17 20 26 --- 01 38 00 29.4 211.2 1.9 25.0 156 F 1 1020 17 17 26 17 20 26 J2345-1555 01 38 00 29.6 211.4 1.9 25.1 -24 1 1 1020 17 20 26 17 21 36 --- 01 39 11 29.5 211.7 1.9 25.3 46 F 1 1024 17 20 26 17 21 36 GJ4360 01 39 11 29.3 211.5 1.9 25.2 -24 1 1 1024 17 21 36 17 24 36 --- 01 42 11 29.0 212.3 1.9 25.8 156 F 1 1036 17 21 36 17 24 36 J2345-1555 01 42 11 29.2 212.5 1.9 25.9 -24 1 1 1036 17 24 36 17 25 46 --- 01 43 21 29.1 212.7 2.0 26.1 46 F 1 1041 17 24 36 17 25 46 GJ4360 01 43 21 28.9 212.5 2.0 26.0 -24 1 1 1041 17 25 46 17 28 46 --- 01 46 22 28.6 213.3 2.0 26.6 156 F 1 1052 17 25 46 17 28 46 J2345-1555 01 46 22 28.8 213.5 2.0 26.7 -24 1 1 1052 17 28 46 17 29 56 --- 01 47 32 28.6 213.8 2.0 26.9 46 F 1 1057 17 28 46 17 29 56 GJ4360 01 47 32 28.4 213.6 2.0 26.8 -24 1 1 1057 17 29 56 17 32 56 --- 01 50 33 28.1 214.3 2.1 27.4 156 F 1 1068 17 29 56 17 32 56 J2345-1555 01 50 33 28.3 214.5 2.1 27.5 -24 1 1 1068 17 32 56 17 34 06 --- 01 51 43 28.2 214.8 2.1 27.7 46 F 1 1073 17 32 56 17 34 06 J2348-1631 01 51 43 28.0 213.8 2.1 27.0 -29 1 1 1073 17 34 06 17 35 16 =2345-167 01 52 53 27.8 214.1 2.1 27.2 41 F 1 1077 17 34 06 17 35 16 J2345-1555 01 52 53 28.1 215.1 2.1 27.9 -29 1 1 1077 17 35 16 17 36 26 --- 01 54 03 27.9 215.3 2.1 28.1 41 F 1 1082 17 35 16 17 37 46 J0132-1654 01 55 23 34.4 186.5 0.4 5.3 0 1 1 1082 17 37 46 17 38 26 =0130-171 01 56 04 34.4 186.7 0.4 5.4 40 F 1 1084 17 38 04 17 38 26 J0142-1633 01 56 04 35.0 183.8 0.2 3.1 -35 1 1 1084 17 38 26 17 39 36 --- 01 57 14 35.0 184.1 0.2 3.4 35 F 1 1089 17 38 26 17 39 36 J0132-1654 01 57 14 34.4 187.0 0.4 5.7 -35 1 1 1089 17 39 36 17 40 46 =0130-171 01 58 24 34.4 187.3 0.4 6.0 35 F 1 1093 17 39 36 17 40 46 GJ65A 01 58 24 33.5 185.4 0.3 4.4 -32 1 1 1093 17 40 46 17 43 46 --- 02 01 24 33.4 186.3 0.4 5.2 148 F 1 1105 17 40 46 Schedule for GBT_VLBA (Code Gb ) Page 13 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 17 43 46 J0132-1654 02 01 24 34.3 188.2 0.5 6.7 -32 1 1 1105 17 43 46 17 44 56 =0130-171 02 02 35 34.3 188.5 0.5 7.0 38 F 1 1110 17 43 46 17 44 56 GJ65A 02 02 35 33.4 186.6 0.4 5.4 -32 1 1 1110 17 44 56 17 47 56 --- 02 05 35 33.3 187.4 0.4 6.1 148 F 1 1121 17 44 56 17 47 56 J0132-1654 02 05 35 34.2 189.4 0.5 7.7 -32 1 1 1121 17 47 56 17 49 06 =0130-171 02 06 45 34.1 189.7 0.6 8.0 38 F 1 1126 17 47 56 17 49 06 GJ65A 02 06 45 33.3 187.8 0.5 6.4 -33 1 1 1126 17 49 06 17 52 06 --- 02 09 46 33.2 188.6 0.5 7.1 147 F 1 1137 17 49 06 17 52 06 J0132-1654 02 09 46 34.0 190.6 0.6 8.7 -33 1 1 1137 17 52 06 17 53 16 =0130-171 02 10 56 34.0 190.9 0.6 8.9 37 F 1 1142 17 52 06 17 53 16 GJ65A 02 10 56 33.2 189.0 0.5 7.4 -33 1 1 1142 17 53 16 17 56 16 --- 02 13 56 33.1 189.8 0.6 8.1 147 F 1 1153 17 53 16 17 56 16 J0132-1654 02 13 56 33.9 191.8 0.7 9.6 -33 1 1 1153 17 56 16 17 57 26 =0130-171 02 15 07 33.8 192.1 0.7 9.9 37 F 1 1158 17 56 16 17 57 26 GJ65A 02 15 07 33.0 190.1 0.6 8.3 -33 1 1 1158 17 57 26 18 00 26 --- 02 18 07 32.9 191.0 0.6 9.0 147 F 1 1170 17 57 26 18 00 26 J0132-1654 02 18 07 33.7 193.0 0.8 10.6 -33 1 1 1170 18 00 26 18 01 36 =0130-171 02 19 17 33.6 193.3 0.8 10.9 37 F 1 1174 18 00 26 18 01 36 J0142-1633 02 19 17 34.4 190.5 0.6 8.6 -35 1 1 1174 18 01 36 18 02 46 --- 02 20 28 34.4 190.9 0.6 8.8 35 F 1 1179 18 01 36 18 02 46 J0132-1654 02 20 28 33.6 193.6 0.8 11.1 -35 1 1 1179 18 02 46 18 03 56 =0130-171 02 21 38 33.5 194.0 0.8 11.4 35 F 1 1183 18 02 46 18 05 15 J2345-1555 02 22 57 24.4 222.0 2.6 33.0 0 1 1 1183 18 05 15 18 05 55 --- 02 23 37 24.3 222.2 2.6 33.1 40 F 1 1186 18 05 33 18 05 55 J2348-1631 02 23 37 24.2 221.2 2.6 32.5 -29 1 1 1186 18 05 55 18 07 05 =2345-167 02 24 47 24.0 221.4 2.6 32.7 41 F 1 1190 18 05 55 18 07 05 J2345-1555 02 24 47 24.1 222.4 2.7 33.3 -29 1 1 1190 18 07 05 18 08 15 --- 02 25 57 24.0 222.7 2.7 33.5 41 F 1 1195 18 07 05 Schedule for GBT_VLBA (Code Gb ) Page 14 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 18 08 15 GJ4360 02 25 57 23.8 222.5 2.7 33.4 -24 1 1 1195 18 08 15 18 11 15 --- 02 28 58 23.4 223.1 2.7 33.9 156 F 1 1206 18 08 15 18 11 15 J2345-1555 02 28 58 23.6 223.3 2.7 34.0 -24 1 1 1206 18 11 15 18 12 25 --- 02 30 08 23.4 223.6 2.7 34.2 46 F 1 1211 18 11 15 18 12 25 GJ4360 02 30 08 23.3 223.4 2.7 34.0 -24 1 1 1211 18 12 25 18 15 25 --- 02 33 08 22.8 224.0 2.8 34.5 156 F 1 1223 18 12 25 18 15 25 J2345-1555 02 33 08 23.0 224.2 2.8 34.6 -24 1 1 1223 18 15 25 18 16 35 --- 02 34 19 22.9 224.5 2.8 34.8 46 F 1 1227 18 15 25 18 16 35 GJ4360 02 34 19 22.7 224.3 2.8 34.7 -24 1 1 1227 18 16 35 18 19 35 --- 02 37 19 22.3 224.9 2.9 35.1 156 F 1 1239 18 16 35 18 19 35 J2345-1555 02 37 19 22.4 225.1 2.9 35.3 -24 1 1 1239 18 19 35 18 20 45 --- 02 38 29 22.3 225.4 2.9 35.4 46 F 1 1243 18 19 35 18 20 45 GJ4360 02 38 29 22.1 225.2 2.9 35.3 -24 1 1 1243 18 20 45 18 23 45 --- 02 41 30 21.7 225.8 2.9 35.8 156 F 1 1255 18 20 45 18 23 45 J2345-1555 02 41 30 21.9 226.0 2.9 35.9 -24 1 1 1255 18 23 45 18 24 55 --- 02 42 40 21.7 226.3 3.0 36.0 46 F 1 1259 18 23 45 18 24 55 J2348-1631 02 42 40 21.6 225.3 2.9 35.5 -29 1 1 1259 18 24 55 18 26 05 =2345-167 02 43 50 21.4 225.5 2.9 35.7 41 F 1 1264 18 24 55 18 26 05 J2345-1555 02 43 50 21.5 226.5 3.0 36.2 -29 1 1 1264 18 26 05 18 27 15 --- 02 45 00 21.4 226.7 3.0 36.4 41 F 1 1268 18 26 05 18 28 30 J0132-1654 02 46 16 32.1 200.8 1.2 16.9 0 1 1 1268 18 28 30 18 29 10 =0130-171 02 46 56 32.1 200.9 1.2 17.0 40 F 1 1271 18 28 48 18 29 10 J0142-1633 02 46 56 33.1 198.3 1.1 14.9 -34 1 1 1271 18 29 10 18 30 20 --- 02 48 06 33.0 198.6 1.1 15.1 36 F 1 1275 18 29 10 18 30 20 J0132-1654 02 48 06 32.0 201.3 1.2 17.3 -34 1 1 1275 18 30 20 18 31 30 =0130-171 02 49 16 31.9 201.6 1.3 17.5 36 F 1 1280 18 30 20 18 31 30 GJ65A 02 49 16 31.3 199.5 1.2 16.0 -33 1 1 1280 18 31 30 18 34 30 --- 02 52 17 31.1 200.3 1.2 16.6 147 F 1 1292 18 31 30 Schedule for GBT_VLBA (Code Gb ) Page 15 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 18 34 30 J0132-1654 02 52 17 31.7 202.4 1.3 18.2 -33 1 1 1292 18 34 30 18 35 40 =0130-171 02 53 27 31.6 202.7 1.3 18.4 37 F 1 1296 18 34 30 18 35 40 GJ65A 02 53 27 31.0 200.6 1.2 16.9 -33 1 1 1296 18 35 40 18 38 40 --- 02 56 28 30.8 201.4 1.3 17.5 147 F 1 1308 18 35 40 18 38 40 J0132-1654 02 56 28 31.3 203.5 1.4 19.0 -33 1 1 1308 18 38 40 18 39 50 =0130-171 02 57 38 31.3 203.8 1.4 19.3 37 F 1 1312 18 38 40 18 39 50 GJ65A 02 57 38 30.8 201.7 1.3 17.8 -33 1 1 1312 18 39 50 18 42 50 --- 03 00 38 30.5 202.5 1.4 18.4 147 F 1 1324 18 39 50 18 42 50 J0132-1654 03 00 38 31.0 204.6 1.5 19.9 -33 1 1 1324 18 42 50 18 44 00 =0130-171 03 01 48 30.9 204.9 1.5 20.2 37 F 1 1328 18 42 50 18 44 00 GJ65A 03 01 48 30.4 202.8 1.4 18.6 -33 1 1 1328 18 44 00 18 47 00 --- 03 04 49 30.2 203.6 1.4 19.3 147 F 1 1340 18 44 00 18 47 00 J0132-1654 03 04 49 30.7 205.7 1.5 20.8 -33 1 1 1340 18 47 00 18 48 10 =0130-171 03 05 59 30.6 206.0 1.5 21.0 37 F 1 1344 18 47 00 18 48 10 GJ65A 03 05 59 30.1 203.9 1.4 19.5 -33 1 1 1344 18 48 10 18 51 10 --- 03 09 00 29.9 204.7 1.5 20.1 147 F 1 1356 18 48 10 18 51 10 J0132-1654 03 09 00 30.3 206.8 1.6 21.6 -33 1 1 1356 18 51 10 18 52 20 =0130-171 03 10 10 30.2 207.1 1.6 21.9 37 F 1 1361 18 51 10 18 52 20 J0142-1633 03 10 10 31.4 204.6 1.5 19.9 -34 1 1 1361 18 52 20 18 53 30 --- 03 11 20 31.3 204.9 1.5 20.1 36 F 1 1365 18 52 20 18 53 30 J0132-1654 03 11 20 30.1 207.4 1.6 22.1 -34 1 1 1365 18 53 30 18 54 40 =0130-171 03 12 30 30.0 207.7 1.7 22.3 36 F 1 1370 18 53 30 18 57 45 J0237+2848 03 15 36 77.7 221.6 0.6 36.4 0 1 1 1370 18 57 45 18 59 45 =0234+285 03 17 36 77.4 223.3 0.7 37.8 120 F 1 1377 18 58 03 19 02 52 J0132-1654 03 20 43 29.2 209.7 1.8 24.0 0 1 1 1377 19 02 52 19 03 32 =0130-171 03 21 23 29.2 209.9 1.8 24.1 40 F 1 1380 19 03 10 19 03 32 J0142-1633 03 21 23 30.4 207.5 1.6 22.2 -34 1 1 1380 19 03 32 19 04 42 --- 03 22 33 30.3 207.8 1.7 22.4 36 F 1 1384 19 03 32 Schedule for GBT_VLBA (Code Gb ) Page 16 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 19 04 42 J0132-1654 03 22 33 29.0 210.2 1.8 24.3 -34 1 1 1384 19 04 42 19 05 52 =0130-171 03 23 44 28.9 210.5 1.8 24.5 36 F 1 1389 19 04 42 19 05 52 GJ65A 03 23 44 28.6 208.4 1.7 23.1 -33 1 1 1389 19 05 52 19 08 52 --- 03 26 44 28.3 209.2 1.8 23.7 147 F 1 1401 19 05 52 19 08 52 J0132-1654 03 26 44 28.6 211.2 1.9 25.1 -33 1 1 1401 19 08 52 19 10 02 =0130-171 03 27 54 28.5 211.5 1.9 25.3 37 F 1 1405 19 08 52 19 10 02 GJ65A 03 27 54 28.2 209.5 1.8 23.9 -33 1 1 1405 19 10 02 19 13 02 --- 03 30 55 27.9 210.2 1.9 24.5 147 F 1 1417 19 10 02 19 13 02 J0132-1654 03 30 55 28.2 212.3 2.0 25.9 -33 1 1 1417 19 13 02 19 14 12 =0130-171 03 32 05 28.1 212.5 2.0 26.1 37 F 1 1421 19 13 02 19 14 12 GJ65A 03 32 05 27.8 210.5 1.9 24.7 -33 1 1 1421 19 14 12 19 17 12 --- 03 35 05 27.5 211.2 1.9 25.3 147 F 1 1433 19 14 12 19 17 12 J0132-1654 03 35 05 27.7 213.3 2.0 26.7 -33 1 1 1433 19 17 12 19 18 22 =0130-171 03 36 16 27.6 213.6 2.1 26.9 37 F 1 1437 19 17 12 19 18 22 GJ65A 03 36 16 27.4 211.5 1.9 25.5 -33 1 1 1437 19 18 22 19 21 22 --- 03 39 16 27.0 212.2 2.0 26.1 147 F 1 1449 19 18 22 19 21 22 J0132-1654 03 39 16 27.3 214.3 2.1 27.5 -33 1 1 1449 19 21 22 19 22 32 =0130-171 03 40 26 27.2 214.6 2.1 27.7 37 F 1 1453 19 21 22 19 22 32 GJ65A 03 40 26 26.9 212.5 2.0 26.3 -33 1 1 1453 19 22 32 19 25 32 --- 03 43 27 26.6 213.2 2.1 26.8 147 F 1 1465 19 22 32 19 25 32 J0132-1654 03 43 27 26.8 215.3 2.2 28.2 -33 1 1 1465 19 25 32 19 26 42 =0130-171 03 44 37 26.7 215.5 2.2 28.4 37 F 1 1470 19 25 32 19 26 42 J0142-1633 03 44 37 28.1 213.3 2.0 26.7 -33 1 1 1470 19 26 42 19 27 52 --- 03 45 47 28.0 213.6 2.0 26.9 37 F 1 1474 19 26 42 19 28 25 J0132-1654 03 46 21 26.5 216.0 2.2 28.7 0 1 1 1474 19 28 25 19 29 05 =0130-171 03 47 01 26.4 216.1 2.2 28.8 40 F 1 1477 19 28 43 19 29 05 J0142-1633 03 47 01 27.9 213.9 2.1 27.1 -33 1 1 1477 19 29 05 19 30 15 --- 03 48 11 27.7 214.2 2.1 27.3 37 F 1 1481 19 29 05 Schedule for GBT_VLBA (Code Gb ) Page 17 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 19 30 15 J0132-1654 03 48 11 26.3 216.4 2.3 29.1 -33 1 1 1481 19 30 15 19 31 25 =0130-171 03 49 21 26.1 216.7 2.3 29.3 37 F 1 1486 19 30 15 19 31 25 GJ65A 03 49 21 26.0 214.6 2.2 27.9 -33 1 1 1486 19 31 25 19 34 25 --- 03 52 22 25.6 215.3 2.2 28.4 147 F 1 1497 19 31 25 19 34 25 J0132-1654 03 52 22 25.8 217.4 2.3 29.8 -33 1 1 1497 19 34 25 19 35 35 =0130-171 03 53 32 25.6 217.6 2.3 30.0 37 F 1 1502 19 34 25 19 35 35 GJ65A 03 53 32 25.5 215.6 2.2 28.6 -33 1 1 1502 19 35 35 19 38 35 --- 03 56 33 25.1 216.3 2.3 29.2 147 F 1 1513 19 35 35 19 38 35 J0132-1654 03 56 33 25.3 218.3 2.4 30.5 -33 1 1 1513 19 38 35 19 39 45 =0130-171 03 57 43 25.1 218.6 2.4 30.7 37 F 1 1518 19 38 35 19 39 45 GJ65A 03 57 43 25.0 216.6 2.3 29.4 -33 1 1 1518 19 39 45 19 42 45 --- 04 00 43 24.6 217.2 2.4 29.9 147 F 1 1530 19 39 45 19 42 45 J0132-1654 04 00 43 24.8 219.3 2.5 31.2 -33 1 1 1530 19 42 45 19 43 55 =0130-171 04 01 54 24.6 219.5 2.5 31.4 37 F 1 1534 19 42 45 19 43 55 GJ65A 04 01 54 24.5 217.5 2.4 30.1 -33 1 1 1534 19 43 55 19 46 55 --- 04 04 54 24.1 218.2 2.4 30.6 147 F 1 1546 19 43 55 19 46 55 J0132-1654 04 04 54 24.3 220.2 2.5 31.9 -33 1 1 1546 19 46 55 19 48 05 =0130-171 04 06 04 24.1 220.5 2.5 32.1 37 F 1 1550 19 46 55 19 48 05 GJ65A 04 06 04 24.0 218.5 2.4 30.8 -33 1 1 1550 19 48 05 19 51 05 --- 04 09 05 23.6 219.1 2.5 31.3 147 F 1 1562 19 48 05 19 51 05 J0132-1654 04 09 05 23.7 221.1 2.6 32.6 -33 1 1 1562 19 51 05 19 52 15 =0130-171 04 10 15 23.6 221.4 2.6 32.8 37 F 1 1566 19 51 05 19 52 15 J0142-1633 04 10 15 25.1 219.4 2.5 31.2 -33 1 1 1566 19 52 15 19 53 25 --- 04 11 25 25.0 219.6 2.5 31.4 37 F 1 1571 19 52 15 19 53 58 J0132-1654 04 11 58 23.3 221.8 2.6 33.0 0 1 1 1571 19 53 58 19 54 38 =0130-171 04 12 38 23.3 221.9 2.7 33.1 40 F 1 1573 19 54 16 19 54 38 J0142-1633 04 12 38 24.8 219.9 2.5 31.6 -33 1 1 1573 19 54 38 19 55 48 --- 04 13 49 24.7 220.2 2.5 31.8 37 F 1 1578 19 54 38 Schedule for GBT_VLBA (Code Gb ) Page 18 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 19 55 48 J0132-1654 04 13 49 23.1 222.2 2.7 33.3 -33 1 1 1578 19 55 48 19 56 58 =0130-171 04 14 59 22.9 222.4 2.7 33.5 37 F 1 1582 19 55 48 19 56 58 GJ65A 04 14 59 22.9 220.4 2.6 32.3 -33 1 1 1582 19 56 58 19 59 58 --- 04 17 59 22.5 221.1 2.6 32.7 147 F 1 1594 19 56 58 19 59 58 J0132-1654 04 17 59 22.5 223.1 2.7 34.0 -33 1 1 1594 19 59 58 20 01 08 =0130-171 04 19 09 22.4 223.3 2.8 34.2 37 F 1 1599 19 59 58 20 01 08 GJ65A 04 19 09 22.4 221.3 2.7 32.9 -33 1 1 1599 20 01 08 20 04 08 --- 04 22 10 22.0 222.0 2.7 33.4 147 F 1 1610 20 01 08 20 04 08 J0132-1654 04 22 10 22.0 224.0 2.8 34.6 -33 1 1 1610 20 04 08 20 05 18 =0130-171 04 23 20 21.8 224.2 2.8 34.8 37 F 1 1615 20 04 08 20 05 18 GJ65A 04 23 20 21.8 222.2 2.7 33.6 -33 1 1 1615 20 05 18 20 08 18 --- 04 26 21 21.4 222.9 2.8 34.1 147 F 1 1626 20 05 18 20 08 18 J0132-1654 04 26 21 21.4 224.8 2.9 35.2 -33 1 1 1626 20 08 18 20 09 28 =0130-171 04 27 31 21.3 225.1 2.9 35.4 37 F 1 1631 20 08 18 20 09 28 GJ65A 04 27 31 21.3 223.1 2.8 34.2 -33 1 1 1631 20 09 28 20 12 28 --- 04 30 31 20.9 223.7 2.9 34.7 147 F 1 1642 20 09 28 20 12 28 J0132-1654 04 30 31 20.8 225.7 3.0 35.9 -33 1 1 1642 20 12 28 20 13 38 =0130-171 04 31 41 20.7 225.9 3.0 36.0 37 F 1 1647 20 12 28 20 13 38 GJ65A 04 31 41 20.7 224.0 2.9 34.9 -33 1 1 1647 20 13 38 20 16 38 --- 04 34 42 20.3 224.6 2.9 35.3 147 F 1 1659 20 13 38 20 16 38 J0132-1654 04 34 42 20.2 226.6 3.0 36.5 -32 1 1 1659 20 16 38 20 17 48 =0130-171 04 35 52 20.1 226.8 3.0 36.6 38 F 1 1663 20 16 38 20 17 48 J0142-1633 04 35 52 21.8 225.0 2.9 35.3 -32 1 1 1663 20 17 48 20 18 58 --- 04 37 02 21.6 225.2 2.9 35.4 38 F 1 1668 20 17 48 20 19 31 J0132-1654 04 37 35 19.8 227.2 3.1 36.9 0 1 1 1668 20 19 31 20 20 11 =0130-171 04 38 15 19.7 227.3 3.1 37.0 40 F 1 1670 20 19 49 20 20 11 J0142-1633 04 38 15 21.4 225.5 2.9 35.6 -32 1 1 1670 20 20 11 20 21 21 --- 04 39 25 21.3 225.7 2.9 35.8 38 F 1 1675 20 20 11 Schedule for GBT_VLBA (Code Gb ) Page 19 RIPL: GJ4360/GJ65A UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 15 Apr 2008 Day 106 --- 20 21 21 J0132-1654 04 39 25 19.6 227.5 3.1 37.1 -32 1 1 1675 20 21 21 20 22 31 =0130-171 04 40 35 19.4 227.8 3.1 37.3 38 F 1 1679 20 21 21 20 22 31 GJ65A 04 40 35 19.5 225.8 3.0 36.2 -32 1 1 1679 20 22 31 20 25 31 --- 04 43 36 19.0 226.4 3.1 36.6 148 F 1 1691 20 22 31 20 25 31 J0132-1654 04 43 36 19.0 228.4 3.2 37.7 -32 1 1 1691 20 25 31 20 26 41 =0130-171 04 44 46 18.8 228.6 3.2 37.9 38 F 1 1695 20 25 31 20 26 41 GJ65A 04 44 46 18.9 226.7 3.1 36.8 -32 1 1 1695 20 26 41 20 29 41 --- 04 47 47 18.4 227.3 3.1 37.2 148 F 1 1707 20 26 41 20 29 41 J0132-1654 04 47 47 18.3 229.2 3.2 38.3 -32 1 1 1707 20 29 41 20 30 51 =0130-171 04 48 57 18.2 229.4 3.3 38.4 38 F 1 1712 20 29 41 20 30 51 GJ65A 04 48 57 18.3 227.5 3.2 37.4 -32 1 1 1712 20 30 51 20 33 51 --- 04 51 57 17.8 228.1 3.2 37.8 148 F 1 1723 20 30 51 20 33 51 J0132-1654 04 51 57 17.7 230.0 3.3 38.8 -32 1 1 1723 20 33 51 20 35 01 =0130-171 04 53 07 17.5 230.3 3.3 39.0 38 F 1 1728 20 33 51 20 35 01 GJ65A 04 53 07 17.7 228.3 3.2 37.9 -32 1 1 1728 20 35 01 20 38 01 --- 04 56 08 17.2 228.9 3.3 38.4 148 F 1 1739 20 35 01 20 38 01 J0132-1654 04 56 08 17.1 230.8 3.4 39.4 -32 1 1 1739 20 38 01 20 39 11 =0130-171 04 57 18 16.9 231.1 3.4 39.5 38 F 1 1744 20 38 01 20 39 11 GJ65A 04 57 18 17.1 229.2 3.3 38.5 -32 1 1 1744 20 39 11 20 42 11 --- 05 00 19 16.6 229.7 3.3 38.9 148 F 1 1755 20 39 11 20 42 11 J0132-1654 05 00 19 16.5 231.6 3.5 39.9 -32 1 1 1755 20 42 11 20 43 21 =0130-171 05 01 29 16.3 231.9 3.5 40.1 38 F 1 1760 20 42 11 20 43 21 J0142-1633 05 01 29 18.1 230.2 3.3 38.9 -32 1 1 1760 20 43 21 20 44 31 --- 05 02 39 17.9 230.4 3.3 39.0 38 F 1 1764 20 43 21 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v4cm-512-8-2.set Matches group gbt4cmb in /home/arana/cwalker/sched/catalogs/freq.dat LO1=11.350, LO2=12.75, LO3=10.5 Setup group: 11 Station: GBT_VLBA Total bit rate: 512 Format: VLBA1:4 Bits per sample: 2 Sample rate: 32.000 Number of channels: 8 Speedup factor: 1.00 Disk used to record data. 1st LO= 9100.00 9100.00 9100.00 9100.00 9100.00 9100.00 9100.00 9100.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= L L L L L L L L IF = B D B D B D B D The following frequency sets based on this setup were used. Frequency Set: 10 Setup file default. Used pcal sets: 1 LO sum= 8384.49 8384.49 8400.49 8400.49 8416.49 8416.49 8432.49 8432.49 BBC fr= 715.51 715.51 699.51 699.51 683.51 683.51 667.51 667.51 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 13510 13510 13510 13510 PCALFR2= 510 510 510 510 13510 13510 13510 13510 Track assignments are: track1= 2, 18, 3, 19, 66, 82, 67, 83 barrel=roll_off SOURCE LIST -- RIPL: GJ4360/GJ65A Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * GJ4360 23 42 55.926404 * 23 45 31.042767 23 45 56.303536 0.00 -16 27 03.80296 *-16 10 23.92446 -16 07 39.38634 0.00 From catalog imbedded in main SCHED input file. 2.200 scan hours, 97.786 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 23 45 31.270000 Dec = -16 10 19.30000 Rates: RA = -395.00 mas/yr Dec = -558.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54571.5368 Rates: RA = -0.75068E-04 s/day Dec = -0.15277E-02 arcsec/day * GJ65A 01 36 38.724071 * 01 39 03.454321 01 39 26.783709 0.00 -18 12 09.43493 *-17 56 57.13351 -17 54 26.54288 0.00 From catalog imbedded in main SCHED input file. 2.000 scan hours, 97.401 baseline hours above horizon. Proper motion used. Reference epoch: 2000.00000 At epoch: RA = 01 39 01.540100 Dec = -17 57 01.80000 Rates: RA = 3296.00 mas/yr Dec = 563.00 mas/yr Paralax: 0.0000 mas. Planetary motion (includes proper motion). Ref. MJD: 54571.5368 Rates: RA = 0.63237E-03 s/day Dec = 0.15414E-02 arcsec/day * J0142-1633 01 40 20.082497 * 01 42 45.261200 01 43 08.664164 0.00 -16 48 12.68526 *-16 33 07.19690 -16 30 37.81758 0.00 From catalog imbedded in main SCHED input file. 0.311 scan hours, 13.195 baseline hours above horizon. * J0132-1654 01 30 17.688187 * 01 32 43.487468 01 33 06.999485 0.23 0130-171 -17 10 11.95078 *-16 54 48.52205 -16 52 16.12155 0.33 J0132-16 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.081 scan hours, 47.102 baseline hours above horizon. * J0237+2848 02 34 55.589592 * 02 37 52.405679 02 38 20.776935 0.23 0234+285 28 35 11.40780 * 28 48 08.99005 28 50 20.53107 0.40 J0237+28 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.033 scan hours, 1.833 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 21.754074 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 23.41127 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.167 scan hours, 7.833 baseline hours above horizon. * J2345-1555 23 42 37.342144 * 23 45 12.462326 23 45 37.723866 0.25 -16 11 47.61719 *-15 55 07.83414 -15 52 23.36521 0.43 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.189 scan hours, 48.841 baseline hours above horizon. * J2348-1631 23 45 27.682207 * 23 48 02.608533 23 48 27.831265 0.22 2345-167 -16 47 52.60228 *-16 31 12.02227 -16 28 27.27425 0.32 J2348-16 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.350 scan hours, 13.741 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) GJ4360 37.9 GJ65A 28.0 J0142-1633 26.6 J0132-1654 27.0 J0237+2848 23.7 3C454.3 39.9 J2345-1555 37.8 J2348-1631 37.7 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg