COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours Exp. Code: BM247H Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Alan P. Marscher Address: Dept. of Astronomy, Boston University 725 Commonwealth Ave. Boston, MA 02215 Phone: (617)353-5029 (office) or (508)788-8317 (home) EMAIL: marscher@bu.edu Fax: (617)353-5704 Phone during observation: (617)353-5029 (office) or (508)788-8317 (home) Observing mode: continuum Notes: Use all available antennas Program sources: 3C111, 3C120, 3C273, 3C279, 1510-089, BL Lac Calibrators: 0336-019, 0420-014, OJ287, 1156+295, CTA102, 3C446, Fringe finder: 3C279, 3C273, or 3C454.3 Schedule for VLBA_PT (Code Pt ) Page 2 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 11 Apr 2007 Day 101 --- Next scan frequencies: 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 Next BBC frequencies: 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 17 54 12 0420-014 00 00 00 18.9 105.3 -4.4 -52.9 0 1 1 0 17 54 12 17 59 11 --- 00 05 00 19.9 106.1 -4.3 -52.6 299 F 1 5 17 54 35 17 59 11 3C120 00 05 00 21.9 98.7 -4.5 -55.1 -11 1 1 5 17 59 11 18 04 11 --- 00 10 00 22.9 99.5 -4.4 -54.9 288 F 1 10 17 59 11 18 04 11 3C111 00 10 00 40.6 66.6 -4.1 -74.2 -41 1 1 10 18 04 11 18 10 10 --- 00 16 00 41.7 67.0 -4.0 -74.9 318 F 1 15 18 04 11 18 10 10 0336-019 00 16 00 30.2 116.1 -3.4 -47.9 -39 1 1 15 18 10 10 18 14 09 --- 00 20 00 30.9 116.9 -3.3 -47.5 201 F 1 19 18 10 10 18 14 09 0420-014 00 20 00 22.9 108.5 -4.1 -51.6 -22 1 1 19 18 14 09 18 19 08 --- 00 25 00 23.8 109.4 -4.0 -51.2 277 F 1 24 18 14 09 18 19 08 3C120 00 25 00 25.9 101.9 -4.1 -54.3 -11 1 1 24 18 19 08 18 24 07 --- 00 30 00 26.9 102.7 -4.1 -54.0 288 F 1 29 18 19 08 18 24 07 3C111 00 30 00 44.4 67.9 -3.8 -76.4 -41 1 1 29 18 24 07 18 30 06 --- 00 36 00 45.5 68.3 -3.7 -77.1 318 F 1 35 18 24 07 18 30 06 0336-019 00 36 00 33.8 120.1 -3.1 -45.6 -41 1 1 35 18 30 06 18 34 06 --- 00 40 00 34.5 121.0 -3.0 -45.1 199 F 1 39 18 30 06 18 34 06 3C454.3 00 40 00 60.2 239.2 1.8 47.7 -85 1 1 39 18 34 06 18 40 05 --- 00 46 00 59.1 241.1 1.9 48.9 274 F 1 44 18 34 06 18 40 05 CTA102 00 46 00 52.3 241.4 2.2 47.8 -20 1 1 44 18 40 05 18 44 04 --- 00 50 00 51.6 242.4 2.3 48.4 220 F 1 48 18 40 05 18 44 04 BLLAC 00 50 00 56.6 296.5 2.8 89.8 -42 1 1 48 18 44 04 18 52 03 --- 00 58 00 55.1 296.5 2.9 88.5 437 F 1 56 18 44 04 18 52 03 0420-014 00 58 00 30.1 115.4 -3.4 -48.3 -127 1 1 56 18 52 03 18 59 02 --- 01 05 00 31.4 116.7 -3.3 -47.6 292 F 1 63 18 52 03 Schedule for VLBA_PT (Code Pt ) Page 3 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 11 Apr 2007 Day 101 --- 18 59 02 3C120 01 05 00 33.9 108.8 -3.5 -51.8 -11 1 1 63 18 59 02 19 04 01 --- 01 10 00 34.9 109.7 -3.4 -51.4 288 F 1 68 18 59 02 19 04 01 3C111 01 10 00 52.1 70.2 -3.1 -80.8 -41 1 1 68 19 04 01 19 10 00 --- 01 16 00 53.3 70.5 -3.0 -81.5 318 F 1 73 19 04 01 19 10 00 0420-014 01 16 00 33.4 119.0 -3.1 -46.3 -46 1 1 73 19 10 00 19 13 59 --- 01 20 00 34.2 119.8 -3.1 -45.8 194 F 1 77 19 10 00 19 13 59 3C120 01 20 00 36.8 111.6 -3.2 -50.5 -11 1 1 77 19 13 59 19 18 58 --- 01 25 00 37.7 112.6 -3.1 -50.0 288 F 1 82 19 13 59 19 18 58 3C111 01 25 00 55.0 71.0 -2.9 -82.6 -41 1 1 82 19 18 58 19 23 58 --- 01 30 00 56.0 71.2 -2.8 -83.2 259 F 1 87 19 18 58 19 23 58 0336-019 01 30 00 42.8 133.0 -2.2 -37.2 -47 1 1 87 19 23 58 19 27 57 --- 01 34 00 43.4 134.1 -2.1 -36.4 192 F 1 91 19 23 58 19 27 57 0420-014 01 34 00 36.6 122.8 -2.8 -44.0 -20 1 1 91 19 27 57 19 32 56 --- 01 39 00 37.5 124.0 -2.7 -43.3 280 F 1 96 19 27 57 19 32 56 3C120 01 39 00 40.4 115.6 -2.9 -48.5 -12 1 1 96 19 32 56 19 37 55 --- 01 44 00 41.3 116.7 -2.8 -47.9 287 F 1 100 19 32 56 19 37 55 3C111 01 44 00 58.8 71.7 -2.6 -84.9 -41 1 1 100 19 37 55 19 43 54 --- 01 50 00 59.9 71.9 -2.5 -85.6 318 F 1 106 19 37 55 19 43 54 0420-014 01 50 00 39.4 126.6 -2.6 -41.6 -47 1 1 106 19 43 54 19 48 53 --- 01 55 00 40.2 127.8 -2.5 -40.8 252 F 1 111 19 43 54 19 48 53 3C120 01 55 00 43.3 119.2 -2.6 -46.4 -12 1 1 111 19 48 53 19 53 53 --- 02 00 00 44.2 120.4 -2.6 -45.7 287 F 1 116 19 48 53 19 53 53 3C111 02 00 00 61.9 72.2 -2.3 -86.9 -41 1 1 116 19 53 53 19 59 52 --- 02 06 00 63.1 72.3 -2.2 -87.7 318 F 1 122 19 53 53 19 59 52 0336-019 02 06 00 47.7 143.7 -1.6 -29.3 -54 1 1 122 19 59 52 20 03 51 --- 02 10 00 48.2 145.0 -1.5 -28.3 186 F 1 125 19 59 52 20 05 51 0420-014 02 12 00 42.9 132.2 -2.2 -37.8 103 1 1 125 20 05 51 20 10 50 --- 02 17 00 43.6 133.5 -2.1 -36.8 299 F 1 130 20 06 14 Schedule for VLBA_PT (Code Pt ) Page 4 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 11 Apr 2007 Day 101 --- 20 10 50 3C120 02 17 00 47.2 124.7 -2.3 -43.0 -13 1 1 130 20 10 50 20 15 49 --- 02 22 00 48.0 126.1 -2.2 -42.1 286 F 1 135 20 10 50 20 15 49 3C111 02 22 00 66.2 72.4 -1.9 -90.1 -42 1 1 135 20 15 49 20 21 48 --- 02 28 00 67.4 72.4 -1.8 -91.0 317 F 1 141 20 15 49 20 21 48 0420-014 02 28 00 45.2 136.7 -1.9 -34.5 -50 1 1 141 20 21 48 20 26 47 --- 02 33 00 45.9 138.2 -1.8 -33.5 249 F 1 146 20 21 48 20 26 47 3C120 02 33 00 49.8 129.2 -2.0 -40.0 -14 1 1 146 20 26 47 20 31 46 --- 02 38 00 50.6 130.7 -1.9 -39.0 285 F 1 151 20 26 47 20 31 46 3C111 02 38 00 69.4 72.2 -1.7 -92.7 -45 1 1 151 20 31 46 20 37 45 --- 02 44 00 70.6 72.0 -1.6 -93.9 314 F 1 156 20 31 46 20 37 45 0336-019 02 44 00 51.6 157.1 -0.9 -18.7 -63 1 1 156 20 37 45 20 41 45 --- 02 48 00 51.9 158.7 -0.9 -17.5 177 F 1 160 20 37 45 20 41 45 0420-014 02 48 00 47.9 142.8 -1.6 -30.0 -17 1 1 160 20 41 45 20 46 44 --- 02 53 00 48.5 144.5 -1.5 -28.7 283 F 1 165 20 41 45 20 46 44 3C120 02 53 00 52.9 135.5 -1.7 -35.6 -15 1 1 165 20 46 44 20 51 43 --- 02 58 00 53.6 137.2 -1.6 -34.3 284 F 1 170 20 46 44 20 51 43 3C111 02 58 00 73.3 71.2 -1.3 -96.8 -50 1 1 170 20 51 43 20 57 42 --- 03 04 00 74.5 70.6 -1.2 -98.3 309 F 1 176 20 51 43 20 57 42 0420-014 03 04 00 49.8 148.2 -1.3 -25.8 -58 1 1 176 20 57 42 21 01 41 --- 03 08 00 50.2 149.6 -1.3 -24.7 182 F 1 179 20 57 42 21 01 41 3C120 03 08 00 54.9 140.8 -1.4 -31.6 -15 1 1 179 21 01 41 21 06 41 --- 03 13 00 55.6 142.7 -1.3 -30.2 284 F 1 184 21 01 41 21 06 41 3C111 03 13 00 76.2 69.5 -1.1 -100.8 -55 1 1 184 21 06 41 21 11 40 --- 03 18 00 77.2 68.6 -1.0 -102.4 244 F 1 189 21 06 41 21 11 40 0336-019 03 18 00 53.6 170.8 -0.4 -7.6 -74 1 1 189 21 11 40 21 15 39 --- 03 22 00 53.7 172.4 -0.3 -6.2 165 F 1 193 21 11 40 21 15 39 OJ287 03 22 00 16.5 76.6 -5.6 -58.8 -80 1 1 193 21 15 39 21 18 39 --- 03 25 00 17.1 77.0 -5.5 -59.0 99 F 1 196 21 15 39 Schedule for VLBA_PT (Code Pt ) Page 5 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 11 Apr 2007 Day 101 --- 21 18 39 0420-014 03 25 00 51.8 155.9 -1.0 -19.8 -75 1 1 196 21 18 39 21 22 38 --- 03 29 00 52.1 157.4 -0.9 -18.5 164 F 1 200 21 18 39 21 22 38 3C120 03 29 00 57.4 149.1 -1.1 -25.3 -17 1 1 200 21 22 38 21 26 37 --- 03 33 00 57.8 150.7 -1.0 -23.9 223 F 1 204 21 22 38 21 26 37 3C111 03 33 00 80.0 64.6 -0.8 -108.6 -63 1 1 204 21 26 37 21 30 37 --- 03 37 00 80.8 63.0 -0.7 -110.8 176 F 1 207 21 26 37 21 30 37 OJ287 03 37 00 19.5 78.5 -5.3 -59.5 -129 1 1 207 21 30 37 21 33 36 --- 03 40 00 20.1 78.9 -5.3 -59.7 51 F 1 210 21 30 37 21 33 36 0420-014 03 40 00 52.9 161.7 -0.7 -15.0 -72 1 1 210 21 33 36 21 37 36 --- 03 44 00 53.2 163.3 -0.7 -13.7 168 F 1 214 21 33 36 21 37 36 3C120 03 44 00 58.9 155.6 -0.8 -20.1 -17 1 1 214 21 37 36 21 41 35 --- 03 48 00 59.2 157.4 -0.8 -18.6 222 F 1 218 21 37 36 21 41 35 3C111 03 48 00 82.7 56.7 -0.5 -118.7 -73 1 1 218 21 41 35 21 45 34 --- 03 52 00 83.4 53.4 -0.4 -122.7 166 F 1 222 21 41 35 21 45 34 0336-019 03 52 00 53.8 185.1 0.2 4.2 -94 1 1 222 21 45 34 21 49 34 --- 03 56 00 53.7 186.8 0.3 5.6 145 F 1 226 21 45 34 21 49 34 OJ287 03 56 00 23.4 80.9 -5.0 -60.3 -77 1 1 226 21 49 34 21 52 33 --- 03 59 00 24.0 81.3 -4.9 -60.4 103 F 1 229 21 49 34 21 52 33 0420-014 03 59 00 53.9 169.5 -0.4 -8.6 -66 1 1 229 21 52 33 21 56 32 --- 04 03 00 54.0 171.2 -0.3 -7.3 174 F 1 233 21 52 33 21 56 32 3C120 04 03 00 60.2 164.5 -0.5 -12.8 -18 1 1 233 21 56 32 22 00 32 --- 04 07 00 60.4 166.5 -0.4 -11.2 221 F 1 236 21 56 32 22 00 32 3C111 04 07 00 85.6 31.6 -0.2 -146.6 -96 1 1 236 22 00 32 22 04 31 --- 04 11 00 85.9 22.3 -0.1 -156.6 143 F 1 240 22 00 32 22 06 31 OJ287 04 13 00 26.9 83.1 -4.7 -60.8 -4 1 1 240 22 06 31 22 09 30 --- 04 16 00 27.5 83.5 -4.7 -60.9 175 F 1 243 22 06 54 22 09 30 0420-014 04 16 00 54.3 176.7 -0.1 -2.7 -68 1 1 243 22 09 30 22 13 30 --- 04 20 00 54.4 178.4 -0.1 -1.3 171 F 1 247 22 09 30 Schedule for VLBA_PT (Code Pt ) Page 6 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 11 Apr 2007 Day 101 --- 22 13 30 3C120 04 20 00 60.9 173.0 -0.2 -5.8 -19 1 1 247 22 13 30 22 17 29 --- 04 24 00 61.0 175.1 -0.2 -4.1 220 F 1 251 22 13 30 22 17 29 3C111 04 24 00 86.1 344.8 0.1 164.0 -119 1 1 251 22 17 29 22 21 28 --- 04 28 00 85.8 334.4 0.2 153.0 120 F 1 255 22 17 29 22 21 28 0336-019 04 28 00 52.2 199.9 0.8 16.3 -96 1 1 255 22 21 28 22 25 28 --- 04 32 00 51.9 201.4 0.9 17.6 144 F 1 259 22 21 28 22 25 28 OJ287 04 32 00 30.8 85.5 -4.4 -61.3 -83 1 1 259 22 25 28 22 28 27 --- 04 35 00 31.4 85.9 -4.3 -61.3 96 F 1 262 22 25 28 22 28 27 0420-014 04 35 00 54.3 184.9 0.2 4.0 -72 1 1 262 22 28 27 22 32 27 --- 04 39 00 54.2 186.6 0.3 5.4 167 F 1 265 22 28 27 22 32 27 3C120 04 39 00 61.0 182.8 0.1 2.3 -20 1 1 265 22 32 27 22 36 26 --- 04 43 00 61.0 184.8 0.2 4.0 220 F 1 269 22 32 27 22 36 26 3C111 04 43 00 83.9 309.3 0.4 125.7 -89 1 1 269 22 36 26 22 40 25 --- 04 47 00 83.2 305.4 0.5 121.3 150 F 1 273 22 36 26 22 40 25 OJ287 04 47 00 33.8 447.5 -4.1 -61.5 -105 1 1 273 22 40 25 22 44 25 --- 04 51 00 34.7 448.1 -4.1 -61.5 135 F 1 277 22 40 25 22 44 25 0420-014 04 51 00 53.8 191.6 0.5 9.6 -177 1 1 277 22 44 25 22 48 24 --- 04 55 00 53.6 193.3 0.5 11.0 62 F 1 281 22 44 25 22 48 24 3C120 04 55 00 60.6 190.9 0.4 9.1 -20 1 1 281 22 48 24 22 52 23 --- 04 59 00 60.5 192.9 0.4 10.7 219 F 1 285 22 48 24 22 52 23 3C111 04 59 00 81.1 297.7 0.7 111.8 -76 1 1 285 22 52 23 22 56 23 --- 05 03 00 80.3 296.0 0.7 109.5 163 F 1 289 22 52 23 22 56 23 0336-019 05 03 00 49.0 212.7 1.4 26.5 -69 1 1 289 22 56 23 23 00 22 --- 05 07 00 48.5 214.1 1.5 27.6 171 F 1 292 22 56 23 23 00 22 OJ287 05 07 00 38.0 90.3 -3.8 -61.6 -89 1 1 292 23 00 22 23 05 21 --- 05 12 00 39.0 91.0 -3.7 -61.6 211 F 1 297 23 00 22 23 05 21 0420-014 05 12 00 52.6 200.2 0.8 16.6 -79 1 1 297 23 05 21 23 09 20 --- 05 16 00 52.3 201.7 0.9 17.8 161 F 1 301 23 05 21 Schedule for VLBA_PT (Code Pt ) Page 7 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Wed 11 Apr 2007 Day 101 --- 23 09 20 3C120 05 16 00 59.4 201.1 0.7 17.4 -20 1 1 301 23 09 20 23 13 20 --- 05 20 00 59.1 203.0 0.8 18.9 219 F 1 305 23 09 20 23 13 20 3C111 05 20 00 77.1 291.3 1.0 102.2 -65 1 1 305 23 13 20 23 17 19 --- 05 24 00 76.3 290.6 1.1 101.0 174 F 1 309 23 13 20 23 17 19 OJ287 05 24 00 41.5 92.8 -3.5 -61.5 -138 1 1 309 23 17 19 23 22 18 --- 05 29 00 42.5 93.5 -3.4 -61.4 161 F 1 314 23 17 19 23 22 18 0420-014 05 29 00 51.2 206.7 1.1 21.8 -81 1 1 314 23 22 18 23 26 18 --- 05 33 00 50.8 208.2 1.2 22.9 158 F 1 317 23 22 18 23 26 18 3C120 05 33 00 58.0 208.8 1.0 23.5 -20 1 1 317 23 26 18 23 30 17 --- 05 37 00 57.6 210.5 1.1 24.9 219 F 1 321 23 26 18 23 30 17 3C111 05 37 00 73.8 289.0 1.3 97.4 -58 1 1 321 23 30 17 23 34 16 --- 05 41 00 73.0 288.7 1.4 96.5 181 F 1 325 23 30 17 23 34 16 0336-019 05 41 00 44.1 224.6 2.0 35.4 -64 1 1 325 23 34 16 23 38 16 --- 05 45 00 43.5 225.7 2.1 36.3 175 F 1 329 23 34 16 23 38 16 OJ287 05 45 00 45.8 96.1 -3.2 -61.0 -92 1 1 329 23 38 16 23 43 15 --- 05 50 00 46.8 96.9 -3.1 -60.8 207 F 1 334 23 38 16 23 43 15 0420-014 05 50 00 49.0 214.1 1.4 27.6 -84 1 1 334 23 43 15 23 47 14 --- 05 54 00 48.5 215.5 1.5 28.6 155 F 1 338 23 43 15 23 47 14 3C120 05 54 00 55.6 217.3 1.3 30.2 -20 1 1 338 23 47 14 23 51 14 --- 05 58 00 55.1 218.8 1.4 31.3 219 F 1 342 23 47 14 23 51 14 3C111 05 58 00 69.7 287.8 1.7 93.0 -52 1 1 342 23 51 14 23 55 13 --- 06 02 00 68.9 287.7 1.7 92.3 187 F 1 345 23 51 14 --- Start: Wed 11 Apr 2007 Day 101 -- Stop: Thu 12 Apr 2007 Day 102 --- 23 55 13 OJ287 06 02 00 49.3 99.0 -2.9 -60.3 -132 1 1 345 23 55 13 00 00 12 --- 06 07 00 50.3 99.9 -2.8 -60.1 167 F 1 350 23 55 13 00 00 12 0420-014 06 07 00 46.9 219.6 1.7 31.8 -86 1 1 350 00 00 12 00 04 11 --- 06 11 00 46.4 220.9 1.8 32.7 153 F 1 354 00 00 12 00 04 11 3C120 06 11 00 53.3 223.4 1.6 34.8 -20 1 1 354 00 04 11 00 08 11 --- 06 15 00 52.7 224.8 1.7 35.8 219 F 1 358 00 04 11 Schedule for VLBA_PT (Code Pt ) Page 8 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 00 08 11 3C111 06 15 00 66.4 287.6 1.9 90.2 -48 1 1 358 00 08 11 00 12 10 --- 06 19 00 65.6 287.6 2.0 89.6 191 F 1 362 00 08 11 00 14 10 0336-019 06 21 00 37.8 234.9 2.7 42.5 58 1 1 362 00 14 10 00 18 09 --- 06 25 00 37.1 235.8 2.8 43.1 239 F 1 366 00 14 33 00 18 09 OJ287 06 25 00 54.0 103.4 -2.5 -58.8 -94 1 1 366 00 18 09 00 23 08 --- 06 30 00 55.0 104.4 -2.4 -58.4 205 F 1 371 00 18 09 00 23 08 0420-014 06 30 00 43.7 226.4 2.1 36.7 -87 1 1 371 00 23 08 00 27 08 --- 06 34 00 43.1 227.5 2.2 37.5 152 F 1 374 00 23 08 00 27 08 3C120 06 34 00 49.8 230.8 2.0 40.0 -20 1 1 374 00 27 08 00 31 07 --- 06 38 00 49.2 231.9 2.1 40.8 220 F 1 378 00 27 08 00 31 07 3C111 06 38 00 61.8 287.8 2.3 86.9 -43 1 1 378 00 31 07 00 35 06 --- 06 42 00 61.0 287.9 2.4 86.3 196 F 1 382 00 31 07 00 35 06 OJ287 06 42 00 57.3 107.1 -2.2 -57.2 -127 1 1 382 00 35 06 00 40 06 --- 06 47 00 58.3 108.3 -2.1 -56.6 173 F 1 387 00 35 06 00 40 06 0420-014 06 47 00 41.0 230.9 2.4 39.9 -88 1 1 387 00 40 06 00 44 05 --- 06 51 00 40.4 231.9 2.5 40.6 152 F 1 391 00 40 06 00 44 05 3C120 06 51 00 47.0 235.5 2.3 43.2 -19 1 1 391 00 44 05 00 48 04 --- 06 55 00 46.3 236.6 2.4 43.8 220 F 1 395 00 44 05 00 48 04 3C111 06 55 00 58.5 288.3 2.6 84.7 -41 1 1 395 00 48 04 00 52 04 --- 06 59 00 57.7 288.5 2.7 84.2 199 F 1 399 00 48 04 00 52 04 OJ287 06 59 00 60.7 111.4 -1.9 -55.0 -124 1 1 399 00 52 04 00 57 03 --- 07 04 00 61.6 112.8 -1.9 -54.2 175 F 1 403 00 52 04 00 57 03 0420-014 07 04 00 38.2 235.0 2.7 42.6 -87 1 1 403 00 57 03 01 01 02 --- 07 08 00 37.5 236.0 2.7 43.2 152 F 1 407 00 57 03 01 01 02 3C120 07 08 00 44.1 239.8 2.6 45.8 -19 1 1 407 01 01 02 01 06 01 --- 07 13 00 43.2 241.0 2.7 46.5 280 F 1 412 01 01 02 01 06 01 3C111 07 13 00 55.0 289.1 2.9 82.5 -38 1 1 412 01 06 01 01 12 00 --- 07 19 00 53.8 289.3 3.0 81.8 321 F 1 418 01 06 01 Schedule for VLBA_PT (Code Pt ) Page 9 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 01 12 00 OJ287 07 19 00 64.4 117.5 -1.6 -51.3 -121 1 1 418 01 12 00 01 17 00 --- 07 24 00 65.3 119.3 -1.5 -50.1 179 F 1 423 01 12 00 01 17 00 0420-014 07 24 00 34.7 239.5 3.0 45.4 -86 1 1 423 01 17 00 01 20 59 --- 07 28 00 34.0 240.4 3.1 45.9 153 F 1 427 01 17 00 01 20 59 3C120 07 28 00 40.4 244.4 2.9 48.4 -19 1 1 427 01 20 59 01 25 58 --- 07 33 00 39.5 245.5 3.0 49.0 280 F 1 431 01 20 59 01 25 58 3C111 07 33 00 51.1 290.0 3.2 80.2 -36 1 1 431 01 25 58 01 31 57 --- 07 39 00 49.9 290.4 3.3 79.5 323 F 1 437 01 25 58 01 31 57 OJ287 07 39 00 67.9 125.2 -1.3 -45.9 -116 1 1 437 01 31 57 01 36 56 --- 07 44 00 68.8 127.5 -1.2 -44.3 183 F 1 442 01 31 57 01 36 56 0420-014 07 44 00 31.1 243.6 3.3 47.7 -83 1 1 442 01 36 56 01 40 56 --- 07 48 00 30.4 244.4 3.4 48.2 156 F 1 446 01 36 56 01 40 56 3C120 07 48 00 36.6 248.5 3.2 50.6 -18 1 1 446 01 40 56 01 45 55 --- 07 53 00 35.7 249.5 3.3 51.0 281 F 1 451 01 40 56 01 45 55 3C111 07 53 00 47.2 291.2 3.6 78.0 -34 1 1 451 01 45 55 01 51 54 --- 07 59 00 46.1 291.5 3.7 77.3 325 F 1 456 01 45 55 01 51 54 OJ287 07 59 00 71.1 135.2 -0.9 -38.3 -110 1 1 456 01 51 54 01 56 53 --- 08 04 00 71.8 138.1 -0.9 -35.9 189 F 1 461 01 51 54 01 56 53 0420-014 08 04 00 27.4 247.4 3.7 49.7 -95 1 1 461 01 56 53 02 00 52 --- 08 08 00 26.6 248.1 3.7 50.1 144 F 1 465 01 56 53 02 00 52 3C120 08 08 00 32.7 252.3 3.6 52.2 -18 1 1 465 02 00 52 02 05 51 --- 08 13 00 31.7 253.2 3.7 52.6 281 F 1 470 02 00 52 02 05 51 3C111 08 13 00 43.4 292.4 3.9 75.8 -32 1 1 470 02 05 51 02 11 51 --- 08 19 00 42.2 292.9 4.0 75.2 327 F 1 476 02 05 51 02 11 51 OJ287 08 19 00 73.7 148.2 -0.6 -27.6 -102 1 1 476 02 11 51 02 16 50 --- 08 24 00 74.2 152.1 -0.5 -24.3 197 F 1 481 02 11 51 02 16 50 0420-014 08 24 00 23.5 250.9 4.0 51.3 -107 1 1 481 02 16 50 02 20 49 --- 08 28 00 22.7 251.6 4.1 51.6 132 F 1 484 02 16 50 Schedule for VLBA_PT (Code Pt ) Page 10 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 02 20 49 3C120 08 28 00 28.8 255.8 3.9 53.6 -18 1 1 484 02 20 49 02 25 48 --- 08 33 00 27.8 256.6 4.0 53.8 281 F 1 489 02 20 49 02 25 48 3C111 08 33 00 39.6 293.8 4.2 73.6 -31 1 1 489 02 25 48 02 31 47 --- 08 39 00 38.4 294.3 4.3 73.0 328 F 1 495 02 25 48 02 33 47 1156+295 08 41 00 47.8 442.7 -3.3 -69.8 15 1 1 495 02 33 47 02 39 46 --- 08 47 00 49.0 443.4 -3.2 -70.1 359 F 1 501 02 34 10 02 39 46 3C273 08 47 00 29.1 109.3 -3.7 -51.3 -229 1 1 501 02 39 46 02 44 45 --- 08 52 00 30.0 110.2 -3.6 -50.9 70 F 1 506 02 39 46 02 44 45 3C279 08 52 00 19.8 112.1 -4.1 -50.3 -26 1 1 506 02 44 45 02 49 44 --- 08 57 00 20.8 113.0 -4.0 -49.9 273 F 1 511 02 44 45 02 49 44 OJ287 08 57 00 75.8 181.7 0.0 1.5 -116 1 1 511 02 49 44 02 53 44 --- 09 01 00 75.7 185.5 0.1 4.8 123 F 1 514 02 49 44 02 53 44 3C111 09 01 00 34.3 295.9 4.7 70.6 -89 1 1 514 02 53 44 02 59 43 --- 09 07 00 33.2 296.4 4.8 69.9 270 F 1 520 02 53 44 02 59 43 1156+295 09 07 00 53.2 445.7 -2.9 -70.7 -106 1 1 520 02 59 43 03 05 42 --- 09 13 00 54.4 446.5 -2.8 -70.8 253 F 1 526 02 59 43 03 05 42 3C273 09 13 00 34.1 114.2 -3.3 -48.9 -228 1 1 526 03 05 42 03 10 41 --- 09 18 00 35.0 115.2 -3.2 -48.4 72 F 1 531 03 05 42 03 10 41 3C279 09 18 00 24.7 116.7 -3.6 -47.9 -27 1 1 531 03 10 41 03 15 40 --- 09 23 00 25.6 117.6 -3.6 -47.4 273 F 1 536 03 10 41 03 15 40 OJ287 09 23 00 74.5 205.1 0.5 21.9 -104 1 1 536 03 15 40 03 19 39 --- 09 27 00 74.1 208.3 0.5 24.7 136 F 1 539 03 15 40 03 19 39 3C111 09 27 00 29.5 298.1 5.1 67.7 -95 1 1 539 03 19 39 03 25 38 --- 09 33 00 28.5 298.6 5.2 67.1 264 F 1 545 03 19 39 03 25 38 1156+295 09 33 00 58.5 449.0 -2.4 -71.1 -106 1 1 545 03 25 38 03 31 37 --- 09 39 00 59.8 449.9 -2.3 -71.2 253 F 1 551 03 25 38 03 31 37 3C273 09 39 00 38.8 119.7 -2.8 -45.9 -226 1 1 551 03 31 37 03 36 37 --- 09 44 00 39.7 120.8 -2.8 -45.2 73 F 1 556 03 31 37 Schedule for VLBA_PT (Code Pt ) Page 11 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 03 36 37 3C279 09 44 00 29.4 121.7 -3.2 -44.9 -27 1 1 556 03 36 37 03 41 36 --- 09 49 00 30.3 122.7 -3.1 -44.3 273 F 1 561 03 36 37 03 41 36 OJ287 09 49 00 71.5 223.4 0.9 37.1 -88 1 1 561 03 41 36 03 45 35 --- 09 53 00 70.9 225.7 1.0 39.0 151 F 1 565 03 41 36 03 45 35 1156+295 09 53 00 62.7 91.9 -2.1 -71.1 -95 1 1 565 03 45 35 03 51 34 --- 09 59 00 63.9 92.9 -2.0 -70.9 264 F 1 570 03 45 35 03 51 34 3C273 09 59 00 42.3 124.4 -2.5 -43.0 -49 1 1 570 03 51 34 03 56 33 --- 10 04 00 43.2 125.6 -2.4 -42.2 250 F 1 575 03 51 34 03 56 33 3C279 10 04 00 32.8 125.9 -2.9 -42.3 -27 1 1 575 03 56 33 04 01 32 --- 10 09 00 33.7 127.0 -2.8 -41.5 272 F 1 580 03 56 33 04 01 32 OJ287 10 09 00 68.4 233.7 1.2 45.1 -77 1 1 580 04 01 32 04 05 32 --- 10 13 00 67.7 235.4 1.3 46.4 162 F 1 584 04 01 32 04 05 32 1156+295 10 13 00 66.8 95.3 -1.8 -70.5 -99 1 1 584 04 05 32 04 11 31 --- 10 19 00 68.0 96.4 -1.7 -70.1 260 F 1 590 04 05 32 04 11 31 3C273 10 19 00 45.6 129.6 -2.2 -39.6 -51 1 1 590 04 11 31 04 16 30 --- 10 24 00 46.4 131.0 -2.1 -38.6 248 F 1 594 04 11 31 04 16 30 3C279 10 24 00 36.1 130.5 -2.5 -39.2 -27 1 1 594 04 16 30 04 21 29 --- 10 29 00 36.9 131.7 -2.5 -38.3 272 F 1 599 04 16 30 04 21 29 OJ287 10 29 00 64.9 241.6 1.6 50.7 -79 1 1 599 04 21 29 04 25 29 --- 10 33 00 64.1 243.0 1.6 51.6 160 F 1 603 04 21 29 04 25 29 1156+295 10 33 00 70.9 99.5 -1.4 -69.0 -102 1 1 603 04 25 29 04 31 28 --- 10 39 00 72.1 101.0 -1.3 -68.3 257 F 1 609 04 25 29 04 31 28 3C273 10 39 00 48.7 135.4 -1.8 -35.5 -53 1 1 609 04 31 28 04 36 27 --- 10 44 00 49.4 137.0 -1.8 -34.3 246 F 1 614 04 31 28 04 36 27 3C279 10 44 00 39.1 135.5 -2.2 -35.6 -27 1 1 614 04 36 27 04 41 26 --- 10 49 00 39.8 136.8 -2.1 -34.6 273 F 1 619 04 36 27 04 41 26 OJ287 10 49 00 61.1 247.9 1.9 54.6 -80 1 1 619 04 41 26 04 45 25 --- 10 53 00 60.4 249.0 2.0 55.2 159 F 1 622 04 41 26 Schedule for VLBA_PT (Code Pt ) Page 12 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 04 47 25 3C273 10 55 00 50.9 140.6 -1.6 -31.7 41 1 1 622 04 47 25 04 53 24 --- 11 01 00 51.7 142.6 -1.5 -30.1 359 F 1 628 04 47 48 04 53 24 3C279 11 01 00 41.5 140.1 -1.9 -32.2 -26 1 1 628 04 53 24 04 59 23 --- 11 07 00 42.3 141.8 -1.8 -30.9 333 F 1 634 04 53 24 04 59 23 1510-089 11 07 00 17.4 114.5 -4.1 -49.6 -56 1 1 634 04 59 23 05 05 22 --- 11 13 00 18.5 115.5 -4.0 -49.0 303 F 1 640 04 59 23 05 05 22 1156+295 11 13 00 78.8 113.9 -0.8 -59.9 -127 1 1 640 05 05 22 05 10 21 --- 11 18 00 79.7 116.9 -0.7 -57.6 173 F 1 645 05 05 22 05 10 21 3C273 11 18 00 53.7 148.8 -1.2 -25.3 -58 1 1 645 05 10 21 05 15 20 --- 11 23 00 54.2 150.8 -1.1 -23.8 241 F 1 649 05 10 21 05 15 20 3C279 11 23 00 44.2 146.6 -1.6 -27.2 -26 1 1 649 05 15 20 05 20 20 --- 11 28 00 44.7 148.1 -1.5 -26.0 273 F 1 654 05 15 20 05 20 20 1510-089 11 28 00 21.3 118.2 -3.8 -47.5 -53 1 1 654 05 20 20 05 25 19 --- 11 33 00 22.2 119.1 -3.7 -47.0 246 F 1 659 05 20 20 05 25 19 3C273 11 33 00 55.1 154.8 -0.9 -20.6 -72 1 1 659 05 25 19 05 30 18 --- 11 38 00 55.5 156.8 -0.9 -19.0 227 F 1 664 05 25 19 05 30 18 3C279 11 38 00 45.8 151.3 -1.3 -23.5 -26 1 1 664 05 30 18 05 35 17 --- 11 43 00 46.3 153.0 -1.2 -22.2 274 F 1 669 05 30 18 05 35 17 1510-089 11 43 00 24.0 120.9 -3.5 -45.9 -51 1 1 669 05 35 17 05 40 16 --- 11 48 00 24.9 121.9 -3.4 -45.3 249 F 1 674 05 35 17 05 40 16 1156+295 11 48 00 84.3 152.7 -0.2 -25.7 -125 1 1 674 05 40 16 05 45 15 --- 11 53 00 84.7 163.4 -0.1 -15.7 174 F 1 678 05 40 16 05 45 15 3C273 11 53 00 56.6 163.3 -0.6 -13.8 -62 1 1 678 05 45 15 05 50 15 --- 11 58 00 56.9 165.5 -0.5 -12.0 237 F 1 683 05 45 15 05 50 15 3C279 11 58 00 47.5 158.1 -1.0 -18.0 -25 1 1 683 05 50 15 05 55 14 --- 12 03 00 47.9 159.9 -0.9 -16.6 275 F 1 688 05 50 15 05 55 14 1510-089 12 03 00 27.4 124.8 -3.2 -43.4 -47 1 1 688 05 55 14 06 00 13 --- 12 08 00 28.3 125.8 -3.1 -42.7 252 F 1 693 05 55 14 Schedule for VLBA_PT (Code Pt ) Page 13 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 06 00 13 3C273 12 08 00 57.3 170.0 -0.4 -8.2 -64 1 1 693 06 00 13 06 05 12 --- 12 13 00 57.5 172.3 -0.3 -6.3 235 F 1 698 06 00 13 06 05 12 3C279 12 13 00 48.6 163.5 -0.7 -13.6 -24 1 1 698 06 05 12 06 10 11 --- 12 18 00 48.8 165.3 -0.6 -12.1 275 F 1 703 06 05 12 06 10 11 1510-089 12 18 00 29.9 127.9 -2.9 -41.3 -44 1 1 703 06 10 11 06 15 11 --- 12 23 00 30.7 129.0 -2.8 -40.6 255 F 1 707 06 10 11 06 15 11 1156+295 12 23 00 82.9 225.4 0.4 42.4 -110 1 1 707 06 15 11 06 20 10 --- 12 28 00 82.2 231.4 0.5 47.7 189 F 1 712 06 15 11 06 20 10 3C273 12 28 00 57.7 179.3 0.0 -0.6 -55 1 1 712 06 20 10 06 25 09 --- 12 33 00 57.7 181.6 0.1 1.3 244 F 1 717 06 20 10 06 25 09 3C279 12 33 00 49.5 170.9 -0.4 -7.5 -22 1 1 717 06 25 09 06 30 08 --- 12 38 00 49.6 172.9 -0.3 -5.9 277 F 1 722 06 25 09 06 30 08 1510-089 12 38 00 33.1 132.4 -2.6 -38.2 -39 1 1 722 06 30 08 06 35 07 --- 12 43 00 33.9 133.5 -2.5 -37.3 260 F 1 727 06 30 08 06 37 07 3C273 12 45 00 57.5 187.2 0.3 6.0 66 1 1 727 06 37 07 06 43 06 --- 12 51 00 57.3 190.0 0.4 8.2 359 F 1 732 06 37 30 06 43 06 3C279 12 51 00 49.8 177.8 -0.1 -1.8 -21 1 1 732 06 43 06 06 49 05 --- 12 57 00 49.9 180.2 0.0 0.1 338 F 1 738 06 43 06 06 49 05 1510-089 12 57 00 35.9 137.0 -2.3 -34.8 -35 1 1 738 06 49 05 06 55 04 --- 13 03 00 36.7 138.5 -2.2 -33.7 324 F 1 744 06 49 05 06 55 04 1156+295 13 03 00 75.7 253.5 1.1 65.1 -84 1 1 744 06 55 04 07 00 03 --- 13 08 00 74.7 255.2 1.1 66.2 215 F 1 749 06 55 04 07 00 03 3C273 13 08 00 56.5 197.6 0.6 14.5 -44 1 1 749 07 00 03 07 05 02 --- 13 13 00 56.2 199.8 0.7 16.2 255 F 1 754 07 00 03 07 05 02 3C279 13 13 00 49.7 186.3 0.3 5.2 -19 1 1 754 07 05 02 07 10 02 --- 13 18 00 49.5 188.2 0.4 6.8 280 F 1 759 07 05 02 07 10 02 1510-089 13 18 00 38.7 142.4 -1.9 -30.7 -37 1 1 759 07 10 02 07 15 01 --- 13 23 00 39.3 143.8 -1.8 -29.6 263 F 1 763 07 10 02 Schedule for VLBA_PT (Code Pt ) Page 14 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 07 15 01 3C273 13 23 00 55.4 204.0 0.9 19.7 -46 1 1 763 07 15 01 07 20 00 --- 13 28 00 54.9 206.1 1.0 21.3 253 F 1 768 07 15 01 07 20 00 3C279 13 28 00 49.2 192.0 0.5 9.9 -18 1 1 768 07 20 00 07 24 59 --- 13 33 00 49.0 193.9 0.6 11.5 282 F 1 773 07 20 00 07 24 59 1510-089 13 33 00 40.5 146.6 -1.7 -27.4 -37 1 1 773 07 24 59 07 29 58 --- 13 38 00 41.1 148.1 -1.6 -26.3 262 F 1 778 07 24 59 07 29 58 1156+295 13 38 00 68.6 263.0 1.6 69.9 -83 1 1 778 07 29 58 07 34 57 --- 13 43 00 67.6 264.0 1.7 70.3 217 F 1 783 07 29 58 07 34 57 3C273 13 43 00 53.4 211.9 1.2 25.9 -41 1 1 783 07 34 57 07 39 57 --- 13 48 00 52.9 213.8 1.3 27.4 258 F 1 787 07 34 57 07 39 57 3C279 13 48 00 48.1 199.3 0.9 16.0 -16 1 1 787 07 39 57 07 44 56 --- 13 53 00 47.7 201.1 0.9 17.4 284 F 1 792 07 39 57 07 44 56 1510-089 13 53 00 42.6 152.6 -1.3 -22.6 -38 1 1 792 07 44 56 07 49 55 --- 13 58 00 43.0 154.2 -1.3 -21.4 261 F 1 797 07 44 56 07 49 55 3C273 13 58 00 51.7 217.4 1.5 30.1 -48 1 1 797 07 49 55 07 54 54 --- 14 03 00 51.0 219.1 1.6 31.4 251 F 1 802 07 49 55 07 54 54 3C279 14 03 00 46.9 204.6 1.1 20.2 -16 1 1 802 07 54 54 07 59 53 --- 14 08 00 46.5 206.3 1.2 21.6 284 F 1 807 07 54 54 07 59 53 1510-089 14 08 00 43.9 157.4 -1.1 -18.8 -39 1 1 807 07 59 53 08 04 53 --- 14 13 00 44.3 159.0 -1.0 -17.5 261 F 1 812 07 59 53 08 04 53 1156+295 14 13 00 61.4 269.0 2.2 71.1 -79 1 1 812 08 04 53 08 09 52 --- 14 18 00 60.4 269.7 2.3 71.2 220 F 1 816 08 04 53 08 09 52 3C273 14 18 00 49.0 224.0 1.8 35.0 -37 1 1 816 08 09 52 08 14 51 --- 14 23 00 48.3 225.5 1.9 36.1 263 F 1 821 08 09 52 08 14 51 3C279 14 23 00 45.0 211.2 1.4 25.5 -16 1 1 821 08 14 51 08 19 50 --- 14 28 00 44.4 212.8 1.5 26.7 284 F 1 826 08 14 51 08 19 50 1510-089 14 28 00 45.3 164.0 -0.8 -13.3 -38 1 1 826 08 19 50 08 24 49 --- 14 33 00 45.5 165.7 -0.7 -11.9 261 F 1 831 08 19 50 Schedule for VLBA_PT (Code Pt ) Page 15 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 08 26 49 3C273 14 35 00 46.4 229.0 2.1 38.6 71 1 1 831 08 26 49 08 32 48 --- 14 41 00 45.5 230.7 2.2 39.8 359 F 1 837 08 27 12 08 32 48 3C279 14 41 00 42.9 216.7 1.7 29.7 -15 1 1 837 08 32 48 08 38 47 --- 14 47 00 42.1 218.4 1.8 31.1 344 F 1 842 08 32 48 08 38 47 1510-089 14 47 00 46.1 170.6 -0.4 -7.8 -38 1 1 842 08 38 47 08 44 46 --- 14 53 00 46.3 172.8 -0.3 -6.1 321 F 1 848 08 38 47 08 44 46 1156+295 14 53 00 53.1 274.3 2.9 70.7 -74 1 1 848 08 44 46 08 49 45 --- 14 58 00 52.1 274.9 3.0 70.6 225 F 1 853 08 44 46 08 49 45 3C273 14 58 00 42.7 235.1 2.5 42.7 -32 1 1 853 08 49 45 08 54 44 --- 15 03 00 41.8 236.4 2.6 43.5 267 F 1 858 08 49 45 08 54 44 3C279 15 03 00 40.0 222.9 2.1 34.4 -15 1 1 858 08 54 44 08 59 44 --- 15 08 00 39.3 224.2 2.2 35.4 284 F 1 863 08 54 44 08 59 44 1510-089 15 08 00 46.6 178.1 -0.1 -1.6 -37 1 1 863 08 59 44 09 04 43 --- 15 13 00 46.6 179.9 0.0 -0.1 262 F 1 868 08 59 44 09 04 43 3C273 15 13 00 40.1 238.7 2.7 45.0 -45 1 1 868 09 04 43 09 09 42 --- 15 18 00 39.2 239.9 2.8 45.6 254 F 1 872 09 04 43 09 09 42 3C279 15 18 00 37.8 226.8 2.4 37.2 -15 1 1 872 09 09 42 09 14 41 --- 15 23 00 37.0 228.0 2.4 38.1 284 F 1 877 09 09 42 09 14 41 1510-089 15 23 00 46.5 183.5 0.2 2.9 -36 1 1 877 09 14 41 09 19 40 --- 15 28 00 46.4 185.3 0.2 4.4 264 F 1 882 09 14 41 09 19 40 1156+295 15 28 00 46.0 278.3 3.5 69.5 -68 1 1 882 09 19 40 09 24 39 --- 15 33 00 44.9 278.8 3.6 69.2 231 F 1 887 09 19 40 09 24 39 3C273 15 33 00 36.5 243.1 3.1 47.5 -30 1 1 887 09 24 39 09 29 39 --- 15 38 00 35.6 244.2 3.1 48.1 269 F 1 892 09 24 39 09 29 39 3C279 15 38 00 34.7 231.6 2.7 40.6 -14 1 1 892 09 29 39 09 34 38 --- 15 43 00 33.9 232.7 2.8 41.3 285 F 1 897 09 29 39 09 34 38 1510-089 15 43 00 46.0 190.6 0.5 8.9 -34 1 1 897 09 34 38 09 39 37 --- 15 48 00 45.8 192.3 0.6 10.3 265 F 1 901 09 34 38 Schedule for VLBA_PT (Code Pt ) Page 16 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 09 39 37 3C273 15 48 00 33.7 246.2 3.3 49.1 -42 1 1 901 09 39 37 09 44 36 --- 15 53 00 32.7 247.2 3.4 49.6 257 F 1 906 09 39 37 09 44 36 3C279 15 53 00 32.2 234.9 2.9 42.8 -14 1 1 906 09 44 36 09 49 35 --- 15 58 00 31.3 236.0 3.0 43.5 285 F 1 911 09 44 36 09 49 35 1510-089 15 58 00 45.3 195.8 0.7 13.2 -34 1 1 911 09 49 35 09 54 34 --- 16 03 00 45.0 197.5 0.8 14.6 265 F 1 916 09 49 35 09 54 34 1156+295 16 03 00 38.8 282.1 4.1 67.7 -62 1 1 916 09 54 34 09 59 34 --- 16 08 00 37.8 282.6 4.1 67.5 237 F 1 921 09 54 34 09 59 34 3C273 16 08 00 29.9 250.0 3.6 50.9 -28 1 1 921 09 59 34 10 04 33 --- 16 13 00 28.9 250.9 3.7 51.3 271 F 1 925 09 59 34 10 04 33 3C279 16 13 00 28.7 239.0 3.3 45.4 -14 1 1 925 10 04 33 10 09 32 --- 16 18 00 27.8 240.0 3.4 46.0 285 F 1 930 10 04 33 10 09 32 1510-089 16 18 00 43.9 202.5 1.1 18.6 -38 1 1 930 10 09 32 10 14 31 --- 16 23 00 43.5 204.1 1.2 20.0 261 F 1 935 10 09 32 10 16 31 BLLAC 16 25 00 26.0 55.0 -5.6 -66.2 14 1 1 935 10 16 31 10 24 30 --- 16 33 00 27.3 55.6 -5.5 -67.2 479 F 1 943 10 16 54 10 24 30 1510-089 16 33 00 42.6 207.2 1.3 22.5 -107 1 1 943 10 24 30 10 34 28 --- 16 43 00 41.6 210.3 1.5 25.0 491 F 1 952 10 24 30 10 34 28 BLLAC 16 43 00 29.0 56.4 -5.3 -68.5 -109 1 1 952 10 34 28 10 44 26 --- 16 53 00 30.8 57.2 -5.2 -69.8 490 F 1 962 10 34 28 10 44 26 1510-089 16 53 00 40.6 213.2 1.7 27.3 -110 1 1 962 10 44 26 10 54 25 --- 17 03 00 39.4 216.1 1.8 29.5 488 F 1 972 10 44 26 10 54 25 BLLAC 17 03 00 32.5 57.9 -5.0 -71.1 -111 1 1 972 10 54 25 11 04 23 --- 17 13 00 34.3 58.6 -4.8 -72.4 487 F 1 981 10 54 25 11 04 23 1510-089 17 13 00 38.1 218.8 2.0 31.6 -113 1 1 981 11 04 23 11 14 21 --- 17 23 00 36.8 221.4 2.2 33.6 486 F 1 991 11 04 23 11 14 21 BLLAC 17 23 00 36.0 59.2 -4.7 -73.7 -114 1 1 991 11 14 21 11 20 20 --- 17 29 00 37.1 59.6 -4.6 -74.5 245 F 1 997 11 14 21 Schedule for VLBA_PT (Code Pt ) Page 17 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 11 20 20 CTA102 17 29 00 18.1 87.9 -5.1 -57.5 -44 1 1 997 11 20 20 11 23 20 --- 17 32 00 18.7 88.3 -5.0 -57.5 136 F 1 1000 11 20 20 11 23 20 1510-089 17 32 00 35.5 223.7 2.3 35.3 -96 1 1 1000 11 23 20 11 31 19 --- 17 40 00 34.4 225.6 2.4 36.7 382 F 1 1007 11 23 20 11 31 19 BLLAC 17 40 00 39.1 60.3 -4.4 -76.0 -116 1 1 1007 11 31 19 11 37 18 --- 17 46 00 40.1 60.6 -4.3 -76.8 243 F 1 1013 11 31 19 11 37 18 3C446 17 46 00 13.5 105.7 -4.7 -53.0 -59 1 1 1013 11 37 18 11 40 17 --- 17 49 00 14.1 106.1 -4.6 -52.8 120 F 1 1016 11 37 18 11 40 17 CTA102 17 49 00 22.2 90.7 -4.7 -57.5 -22 1 1 1016 11 40 17 11 43 17 --- 17 52 00 22.9 91.1 -4.7 -57.5 157 F 1 1019 11 40 17 11 43 17 1510-089 17 52 00 32.6 228.4 2.6 38.7 -98 1 1 1019 11 43 17 11 51 15 --- 18 00 00 31.3 230.2 2.8 40.0 381 F 1 1027 11 43 17 11 53 15 BLLAC 18 02 00 43.0 61.5 -4.0 -78.9 1 1 1 1027 11 53 15 12 01 14 --- 18 10 00 44.5 61.8 -3.9 -80.0 479 F 1 1035 11 53 38 12 01 14 1510-089 18 10 00 29.7 232.4 2.9 41.5 -120 1 1 1035 12 01 14 12 11 12 --- 18 20 00 28.0 234.5 3.1 42.9 479 F 1 1044 12 01 14 12 11 12 BLLAC 18 20 00 46.3 62.3 -3.7 -81.4 -121 1 1 1044 12 11 12 12 17 11 --- 18 26 00 47.4 62.5 -3.6 -82.2 238 F 1 1050 12 11 12 12 17 11 3C446 18 26 00 21.3 112.1 -4.0 -50.2 -58 1 1 1050 12 17 11 12 20 11 --- 18 29 00 21.8 112.7 -4.0 -49.9 121 F 1 1053 12 17 11 12 20 11 CTA102 18 29 00 30.5 96.6 -4.1 -57.0 -23 1 1 1053 12 20 11 12 23 10 --- 18 32 00 31.1 97.1 -4.0 -56.9 156 F 1 1056 12 20 11 12 23 10 1510-089 18 32 00 26.0 236.9 3.3 44.5 -99 1 1 1056 12 23 10 12 31 09 --- 18 40 00 24.6 238.4 3.4 45.5 379 F 1 1063 12 23 10 12 31 09 BLLAC 18 40 00 50.0 63.0 -3.4 -84.2 -123 1 1 1063 12 31 09 12 41 07 --- 18 50 00 51.8 63.2 -3.2 -85.7 475 F 1 1073 12 31 09 12 41 07 1510-089 18 50 00 22.8 240.3 3.6 46.6 -124 1 1 1073 12 41 07 12 51 05 --- 19 00 00 21.0 242.1 3.8 47.7 474 F 1 1083 12 41 07 Schedule for VLBA_PT (Code Pt ) Page 18 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 12 51 05 BLLAC 19 00 00 53.7 63.4 -3.0 -87.2 -125 1 1 1083 12 51 05 12 59 04 --- 19 08 00 55.1 63.5 -2.9 -88.5 354 F 1 1090 12 51 05 12 59 04 3C446 19 08 00 29.1 119.9 -3.3 -46.0 -58 1 1 1090 12 59 04 13 03 04 --- 19 12 00 29.8 120.7 -3.2 -45.5 181 F 1 1094 12 59 04 13 03 04 CTA102 19 12 00 39.2 103.8 -3.3 -55.0 -25 1 1 1094 13 03 04 13 07 03 --- 19 16 00 40.0 104.5 -3.3 -54.8 214 F 1 1098 13 03 04 13 07 03 3C454.3 19 16 00 38.1 96.1 -3.6 -58.8 -12 1 1 1098 13 07 03 13 11 02 --- 19 20 00 38.9 96.7 -3.6 -58.7 228 F 1 1102 13 07 03 13 11 02 BLLAC 19 20 00 57.4 63.5 -2.7 -90.5 -43 1 1 1102 13 11 02 13 19 01 --- 19 28 00 58.8 63.5 -2.6 -91.9 436 F 1 1110 13 11 02 13 19 01 CTA102 19 28 00 42.4 106.8 -3.1 -53.9 -39 1 1 1110 13 19 01 13 23 00 --- 19 32 00 43.2 107.6 -3.0 -53.6 200 F 1 1114 13 19 01 13 23 00 3C454.3 19 32 00 41.4 98.7 -3.4 -58.2 -12 1 1 1114 13 23 00 13 27 00 --- 19 36 00 42.2 99.4 -3.3 -58.1 227 F 1 1118 13 23 00 13 27 00 BLLAC 19 36 00 60.3 63.3 -2.4 -93.3 -42 1 1 1118 13 27 00 13 34 58 --- 19 44 00 61.8 63.1 -2.3 -94.9 436 F 1 1125 13 27 00 13 34 58 3C446 19 44 00 35.3 127.5 -2.7 -41.1 -59 1 1 1125 13 34 58 13 38 58 --- 19 48 00 35.9 128.5 -2.6 -40.5 180 F 1 1129 13 34 58 13 38 58 CTA102 19 48 00 46.3 110.9 -2.7 -52.0 -27 1 1 1129 13 38 58 13 42 57 --- 19 52 00 47.1 111.8 -2.7 -51.6 213 F 1 1133 13 38 58 13 42 57 3C454.3 19 52 00 45.4 102.2 -3.0 -57.2 -12 1 1 1133 13 42 57 13 46 56 --- 19 56 00 46.2 103.0 -3.0 -57.0 227 F 1 1137 13 42 57 13 46 56 BLLAC 19 56 00 64.0 62.6 -2.1 -97.4 -42 1 1 1137 13 46 56 13 54 55 --- 20 04 00 65.5 62.1 -2.0 -99.1 437 F 1 1145 13 46 56 13 54 55 CTA102 20 04 00 49.4 114.6 -2.5 -50.1 -41 1 1 1145 13 54 55 13 58 54 --- 20 08 00 50.1 115.5 -2.4 -49.6 198 F 1 1148 13 54 55 13 58 54 3C454.3 20 08 00 48.6 105.3 -2.8 -56.1 -13 1 1 1148 13 58 54 14 02 54 --- 20 12 00 49.4 106.1 -2.7 -55.7 227 F 1 1152 13 58 54 Schedule for VLBA_PT (Code Pt ) Page 19 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 14 04 53 BLLAC 20 14 00 67.3 61.3 -1.8 -101.6 78 1 1 1152 14 04 53 14 12 52 --- 20 22 00 68.7 60.4 -1.7 -103.7 479 F 1 1160 14 05 16 14 12 52 3C446 20 22 00 41.1 137.0 -2.1 -34.4 -61 1 1 1160 14 12 52 14 15 52 --- 20 25 00 41.5 137.9 -2.0 -33.8 118 F 1 1163 14 12 52 14 15 52 CTA102 20 25 00 53.2 120.0 -2.1 -46.9 -29 1 1 1163 14 15 52 14 18 51 --- 20 28 00 53.7 120.9 -2.1 -46.4 150 F 1 1166 14 15 52 14 18 51 3C454.3 20 28 00 52.6 109.7 -2.4 -54.1 -13 1 1 1166 14 18 51 14 22 50 --- 20 32 00 53.4 110.6 -2.4 -53.6 226 F 1 1170 14 18 51 14 22 50 BLLAC 20 32 00 70.5 59.0 -1.5 -106.7 -40 1 1 1170 14 22 50 14 30 49 --- 20 40 00 71.9 57.6 -1.4 -109.4 438 F 1 1177 14 22 50 14 30 49 CTA102 20 40 00 55.8 124.4 -1.9 -44.1 -51 1 1 1177 14 30 49 14 34 48 --- 20 44 00 56.5 125.7 -1.8 -43.2 189 F 1 1181 14 30 49 14 34 48 3C454.3 20 44 00 55.7 113.6 -2.2 -52.0 -14 1 1 1181 14 34 48 14 38 48 --- 20 48 00 56.4 114.7 -2.1 -51.4 225 F 1 1185 14 34 48 14 38 48 BLLAC 20 48 00 73.3 55.8 -1.2 -112.5 -45 1 1 1185 14 38 48 14 46 46 --- 20 56 00 74.7 53.6 -1.1 -115.9 433 F 1 1193 14 38 48 14 46 46 3C446 20 56 00 45.4 147.1 -1.5 -26.8 -68 1 1 1193 14 46 46 14 50 46 --- 21 00 00 45.8 148.3 -1.4 -25.8 171 F 1 1197 14 46 46 14 50 46 CTA102 21 00 00 59.1 131.2 -1.5 -39.4 -33 1 1 1197 14 50 46 14 54 45 --- 21 04 00 59.7 132.7 -1.5 -38.3 207 F 1 1201 14 50 46 14 54 45 3C454.3 21 04 00 59.3 119.3 -1.8 -48.6 -15 1 1 1201 14 54 45 14 58 45 --- 21 08 00 60.1 120.6 -1.8 -47.8 224 F 1 1204 14 54 45 14 58 45 BLLAC 21 08 00 76.6 49.3 -0.9 -122.1 -54 1 1 1204 14 58 45 15 06 43 --- 21 16 00 77.8 45.5 -0.8 -127.2 425 F 1 1212 14 58 45 15 06 43 CTA102 21 16 00 61.5 137.5 -1.3 -34.7 -67 1 1 1212 15 06 43 15 10 43 --- 21 20 00 62.0 139.2 -1.2 -33.4 172 F 1 1216 15 06 43 15 10 43 3C454.3 21 20 00 62.2 124.7 -1.6 -45.0 -16 1 1 1216 15 10 43 15 14 42 --- 21 24 00 62.8 126.2 -1.5 -44.0 224 F 1 1220 15 10 43 Schedule for VLBA_PT (Code Pt ) Page 20 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 15 14 42 BLLAC 21 24 00 78.9 40.8 -0.6 -133.2 -63 1 1 1220 15 14 42 15 22 41 --- 21 32 00 80.0 34.9 -0.5 -140.3 416 F 1 1228 15 14 42 15 22 41 3C446 21 32 00 48.8 159.3 -0.9 -17.1 -89 1 1 1228 15 22 41 15 26 40 --- 21 36 00 49.0 160.7 -0.8 -15.9 150 F 1 1231 15 22 41 15 26 40 CTA102 21 36 00 64.0 146.7 -0.9 -27.6 -36 1 1 1231 15 26 40 15 30 39 --- 21 40 00 64.4 148.7 -0.9 -26.0 203 F 1 1235 15 26 40 15 30 39 3C454.3 21 40 00 65.4 132.7 -1.2 -39.2 -17 1 1 1235 15 30 39 15 34 39 --- 21 44 00 66.0 134.6 -1.2 -37.8 223 F 1 1239 15 30 39 15 34 39 BLLAC 21 44 00 81.2 23.5 -0.3 -153.5 -80 1 1 1239 15 34 39 15 42 37 --- 21 52 00 81.7 14.2 -0.2 -164.0 399 F 1 1247 15 34 39 15 42 37 CTA102 21 52 00 65.6 155.1 -0.7 -20.8 -100 1 1 1247 15 42 37 15 46 37 --- 21 56 00 65.9 157.3 -0.6 -19.0 139 F 1 1251 15 42 37 15 46 37 3C454.3 21 56 00 67.7 140.5 -1.0 -33.1 -17 1 1 1251 15 46 37 15 50 36 --- 22 00 00 68.2 142.7 -0.9 -31.4 222 F 1 1255 15 46 37 15 52 36 BLLAC 22 02 00 82.0 1.3 0.0 -178.5 19 1 1 1255 15 52 36 16 00 34 --- 22 10 00 81.9 -9.2 0.1 169.7 479 F 1 1262 15 52 59 16 00 34 3C446 22 10 00 50.6 173.7 -0.3 -5.3 -128 1 1 1262 16 00 34 16 04 34 --- 22 14 00 50.7 175.2 -0.2 -4.0 111 F 1 1266 16 00 34 16 04 34 CTA102 22 14 00 67.1 168.0 -0.3 -10.1 -39 1 1 1266 16 04 34 16 08 33 --- 22 18 00 67.2 170.5 -0.2 -8.0 201 F 1 1270 16 04 34 16 08 33 3C454.3 22 18 00 70.1 153.5 -0.6 -22.5 -17 1 1 1270 16 08 33 16 12 32 --- 22 22 00 70.5 156.2 -0.5 -20.3 222 F 1 1274 16 08 33 16 12 32 BLLAC 22 22 00 81.2 -23.5 0.3 153.5 -126 1 1 1274 16 12 32 16 20 31 --- 22 30 00 80.4 -31.4 0.5 144.4 353 F 1 1282 16 12 32 16 20 31 CTA102 22 30 00 67.5 178.1 0.0 -1.6 -146 1 1 1282 16 20 31 16 24 30 --- 22 34 00 67.5 180.7 0.0 0.6 94 F 1 1285 16 20 31 16 24 30 3C454.3 22 34 00 71.3 164.6 -0.3 -13.2 -17 1 1 1285 16 24 30 16 28 30 --- 22 38 00 71.5 167.6 -0.3 -10.7 223 F 1 1289 16 24 30 Schedule for VLBA_PT (Code Pt ) Page 21 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 16 28 30 BLLAC 22 38 00 79.5 322.0 0.6 136.6 -109 1 1 1289 16 28 30 16 36 28 --- 22 46 00 78.4 316.7 0.7 130.1 370 F 1 1297 16 28 30 16 36 28 3C446 22 46 00 50.5 187.8 0.3 6.4 -92 1 1 1297 16 36 28 16 40 28 --- 22 50 00 50.4 189.3 0.4 7.7 147 F 1 1301 16 36 28 16 40 28 CTA102 22 50 00 67.1 190.8 0.3 9.1 -40 1 1 1301 16 40 28 16 44 27 --- 22 54 00 67.0 193.3 0.4 11.2 200 F 1 1305 16 40 28 16 44 27 3C454.3 22 54 00 71.9 179.8 0.0 -0.2 -16 1 1 1305 16 44 27 16 48 27 --- 22 58 00 71.9 182.9 0.1 2.5 223 F 1 1309 16 44 27 16 48 27 BLLAC 22 58 00 76.6 310.7 0.9 122.1 -91 1 1 1309 16 48 27 16 56 25 --- 23 06 00 75.3 307.7 1.1 117.8 387 F 1 1316 16 48 27 16 56 25 CTA102 23 06 00 66.2 200.4 0.6 17.1 -77 1 1 1316 16 56 25 17 00 25 --- 23 10 00 65.9 202.7 0.6 19.0 162 F 1 1320 16 56 25 17 00 25 3C454.3 23 10 00 71.5 192.0 0.3 10.3 -17 1 1 1320 17 00 25 17 04 24 --- 23 14 00 71.4 194.9 0.3 12.8 222 F 1 1324 17 00 25 17 04 24 BLLAC 23 14 00 74.0 305.2 1.2 114.1 -80 1 1 1324 17 04 24 17 12 23 --- 23 22 00 72.6 303.2 1.3 110.9 399 F 1 1332 17 04 24 17 12 23 3C446 23 22 00 48.6 201.3 0.9 17.6 -74 1 1 1332 17 12 23 17 16 22 --- 23 26 00 48.3 202.8 1.0 18.7 165 F 1 1336 17 12 23 17 16 22 CTA102 23 26 00 64.4 211.4 0.9 26.0 -38 1 1 1336 17 16 22 17 20 21 --- 23 30 00 64.0 213.4 1.0 27.6 201 F 1 1339 17 16 22 17 20 21 3C454.3 23 30 00 70.2 206.1 0.6 22.2 -18 1 1 1339 17 20 21 17 24 21 --- 23 34 00 69.8 208.7 0.7 24.4 221 F 1 1343 17 20 21 17 24 21 BLLAC 23 34 00 70.5 301.0 1.5 106.7 -68 1 1 1343 17 24 21 17 32 19 --- 23 42 00 69.1 299.8 1.7 104.3 411 F 1 1351 17 24 21 17 32 19 CTA102 23 42 00 62.5 219.0 1.2 32.1 -60 1 1 1351 17 32 19 17 36 19 --- 23 46 00 62.0 220.8 1.2 33.5 179 F 1 1355 17 32 19 17 36 19 3C454.3 23 46 00 68.5 215.9 0.9 30.3 -19 1 1 1355 17 36 19 17 40 18 --- 23 50 00 68.0 218.1 0.9 32.0 220 F 1 1359 17 36 19 Schedule for VLBA_PT (Code Pt ) Page 22 Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Thu 12 Apr 2007 Day 102 --- 17 40 18 3C446 23 50 00 46.1 210.9 1.4 25.2 -50 1 1 1359 17 40 18 17 44 17 --- 23 54 00 45.6 212.2 1.5 26.2 190 F 1 1363 17 40 18 17 44 17 BLLAC 23 54 00 66.9 298.5 1.9 101.1 -64 1 1 1363 17 44 17 17 54 16 --- 00 04 00 65.1 297.8 2.0 98.7 535 F 1 1372 17 44 17 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: /home/arana/cwalker/sched/setups/v7mm-128-8-1.set Matches group v7mm_c8 in /home/filehost/cwalker/sched/catalogs/freq.dat Setup group: 6 Station: VLBA_PT Total bit rate: 128 Format: VLBA1:4 Bits per sample: 1 Sample rate: 16.000 Number of channels: 8 Speedup factor: 2.00 Disk used to record data. 1st LO= 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 42400.00 Net SB= U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 3 4 5 6 7 8 BBC SB= U U U U U U U U IF = A C A C A C A C VLBA FE= 7mm omit 7mm omit VLBA Synth= 15.4 7.6 11.6 The following frequency sets based on this setup were used. Frequency Set: 6 Setup file default. Used pcal sets: 1 LO sum= 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 BBC fr= 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Bandwd= 8.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S1 S3 S5 S7 PCALXB2= S2 S4 S6 S8 S2 S4 S6 S8 PCALFR1= 510 510 510 510 6510 6510 6510 6510 PCALFR2= 510 510 510 510 6510 6510 6510 6510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27 barrel=roll_off SOURCE LIST -- Combined BM247 and BM248 VLBA format 7 mm ~ 24 hours Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * 3C111 04 15 00.613041 * 04 18 21.280000 04 18 49.453186 0.00 37 54 19.24071 * 38 01 35.76000 38 02 49.06200 0.00 From catalog imbedded in main SCHED input file. 2.460 scan hours, 82.682 baseline hours above horizon. J0339-0146 03 36 58.953150 * 03 39 30.937790 03 39 52.251479 0.20 * 0336-019 -01 56 16.89652 *-01 46 35.80412 -01 45 11.53549 0.30 CTA26 /home/arana/cwalker/sched/catalogs/sources.vlba J0339-01 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.731 scan hours, 21.862 baseline hours above horizon. J0423-0120 04 20 43.539852 * 04 23 15.800729 04 23 37.297826 0.20 * 0420-014 -01 27 28.70007 *-01 20 33.06537 -01 19 32.34827 0.30 J0423-01 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.961 scan hours, 54.535 baseline hours above horizon. J0433+0521 04 30 31.602060 * 04 33 11.095529 04 33 33.666842 0.30 0430+052 05 14 59.61640 * 05 21 15.61918 05 22 12.22609 0.20 * 3C120 /home/arana/cwalker/sched/catalogs/sources.vlba J0433+05 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 2.044 scan hours, 79.016 baseline hours above horizon. J0854+2006 08 51 57.250618 * 08 54 48.874930 08 55 14.736551 0.21 0851+202 20 17 58.41741 * 20 06 30.64086 20 04 54.22052 0.40 J0854+20 /home/arana/cwalker/sched/catalogs/sources.vlba * OJ287 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.629 scan hours, 40.758 baseline hours above horizon. J1159+2914 11 56 57.786209 * 11 59 31.833910 11 59 56.137601 0.23 * 1156+295 29 31 25.73874 * 29 14 43.82684 29 12 13.28340 0.40 J1159+29 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.346 scan hours, 42.514 baseline hours above horizon. J1229+0203 12 26 33.245836 * 12 29 06.699732 12 29 30.513794 0.30 1226+023 02 19 43.30565 * 02 03 08.59815 02 00 33.79032 0.20 * 3C273 /home/arana/cwalker/sched/catalogs/sources.vlba 3C273B VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro J1229+02 2.044 scan hours, 67.717 baseline hours above horizon. J1256-0547 12 53 35.831291 * 12 56 11.166559 12 56 35.221989 0.20 1253-055 -05 31 07.99586 *-05 47 21.52472 -05 49 54.56546 0.30 * 3C279 /home/arana/cwalker/sched/catalogs/sources.vlba J1256-05 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 2.044 scan hours, 78.641 baseline hours above horizon. J1512-0905 15 10 08.900180 * 15 12 50.532928 15 13 15.407114 0.20 * 1510-089 -08 54 47.61950 *-09 05 59.82965 -09 07 50.99492 0.30 J1512-09 /home/arana/cwalker/sched/catalogs/sources.vlba VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 2.776 scan hours, 89.813 baseline hours above horizon. J2202+4216 22 00 39.362507 * 22 02 43.291374 22 02 59.979568 0.27 2200+420 42 02 08.59081 * 42 16 39.97995 42 18 28.44565 0.40 * BLLAC /home/arana/cwalker/sched/catalogs/sources.vlba J2202+42 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro VR42220 3.490 scan hours, 127.719 baseline hours above horizon. J2225-0457 22 23 11.077768 * 22 25 47.259295 22 26 09.370572 0.20 2223-052 -05 12 17.79946 *-04 57 01.39082 -04 54 56.31230 0.30 * 3C446 /home/arana/cwalker/sched/catalogs/sources.vlba J2225-04 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 0.681 scan hours, 16.519 baseline hours above horizon. J2232+1143 22 30 07.803949 * 22 32 36.408907 22 32 57.213698 0.31 2230+114 11 28 22.81081 * 11 43 50.90409 11 45 54.21021 0.20 * CTA102 /home/arana/cwalker/sched/catalogs/sources.vlba J2232+11 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.263 scan hours, 41.898 baseline hours above horizon. J2253+1608 22 51 29.519744 * 22 53 57.747943 22 54 18.353501 0.31 2251+158 15 52 54.34806 * 16 08 53.56089 16 11 01.70284 0.20 * 3C454.3 /home/arana/cwalker/sched/catalogs/sources.vlba J2253+16 VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro 1.163 scan hours, 46.624 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) 3C111 49.6 0336-019 36.1 0420-014 46.5 3C120 47.8 OJ287 108.6 1156+295 137.5 3C273 163.3 3C279 173.3 1510-089 152.3 BLLAC 54.9 3C446 45.7 CTA102 41.5 3C454.3 36.6 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg