VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BB231E Observer: Braatz, J.A. Project type: VLBI Obs filename: bb231ecrd.* Date/Day: 2007APR07/097 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK GB EB =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Alan Kerr WEA: Overcast at FD,LA,PT. Windy at NL,KP,OV,MK GPSdelta ok (NL 8.7). vclock OK. Clk-UTC -0.07 0315 Begin at all sites except MK 0315-0446 *FD Subreflector error (4mm). Masterclear. normal. FRM 100 91 very strange. Peggy had to track this one down. 0330 Begin at MK. 0605 New operator is Betty Ragan. 1239-1241 *PT autostowed. Probably a power glitch. COM 100 2 1247-1249 *PT autostowed again. COM 100 2 1250 SC cloudy, tsys a little high. 1320-1321 *PT stowed again. COM 100 1 1332 New operator: T. Perreault 1336-1339 *PT autostowed. Power glitch. Repointed. COM 100 3 1357-1405 *PT autostowed. Power glitch. Repointed. COM 100 8 1402 FD wea: overcast, patchy freezing fog, ice on surface of buildings & grounds 1405-1407 *FD EL#1 armature/electronic circuit breaker ACU 100 2 fault condition; cleared by momentarily disabling the EL axis. 1512 End. Downtime Summary: Total downtime : 109 min Percentage downtime of observing: 1.5% Average downtime per hour : 0.9 min Total scheduled observing time (# Antennas): 7170 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.