COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: The Core Shift of Sgr A* Exp. Code: BB230D Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA Notes: Schedule for VLBA_PT (Code Pt ) Page 2 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 08 59 37 3C345 15 00 00 68.8 67.5 -1.7 -96.8 0 1 1 0 08 59 37 09 00 17 --- 15 00 40 68.9 67.4 -1.7 -96.9 40 F 1 1 08 59 55 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 00 21 3C345 15 00 44 68.9 67.4 -1.7 -97.0 0 1 1 1 09 00 17 09 00 41 --- 15 01 04 69.0 67.4 -1.7 -97.0 20 F 1 2 09 00 17 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 00 41 3C345 15 01 04 69.0 67.4 -1.7 -97.0 -4 1 1 2 09 00 41 09 01 01 --- 15 01 24 69.0 67.4 -1.7 -97.1 16 F 1 3 09 00 41 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 01 01 3C345 15 01 24 69.0 67.4 -1.7 -97.1 -4 1 1 3 09 01 01 09 01 21 --- 15 01 44 69.1 67.3 -1.7 -97.2 16 F 1 3 09 01 01 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 01 21 3C345 15 01 44 69.1 67.3 -1.7 -97.2 -4 1 1 3 09 01 21 09 01 41 --- 15 02 04 69.2 67.3 -1.7 -97.3 16 F 1 4 09 01 21 Schedule for VLBA_PT (Code Pt ) Page 3 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 01 41 3C345 15 02 04 69.2 67.3 -1.7 -97.3 -4 1 1 4 09 01 41 09 02 01 --- 15 02 24 69.2 67.3 -1.7 -97.3 16 F 1 5 09 01 41 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 02 01 3C345 15 02 24 69.2 67.3 -1.7 -97.3 -4 1 1 5 09 02 01 09 02 41 --- 15 03 04 69.3 67.3 -1.7 -97.5 36 F 1 6 09 02 01 09 05 17 1749+096 15 05 41 44.7 113.0 -2.8 -50.5 101 1 1 6 09 05 17 09 05 57 --- 15 06 21 44.9 113.1 -2.8 -50.4 40 F 1 7 09 05 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 06 02 1749+096 15 06 26 44.9 113.1 -2.8 -50.4 0 1 1 7 09 05 57 09 06 22 --- 15 06 46 44.9 113.2 -2.8 -50.4 20 F 1 8 09 05 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 06 22 1749+096 15 06 46 44.9 113.2 -2.8 -50.4 -4 1 1 8 09 06 22 09 06 42 --- 15 07 06 45.0 113.3 -2.7 -50.3 16 F 1 9 09 06 22 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 06 42 1749+096 15 07 06 45.0 113.3 -2.7 -50.3 -4 1 1 9 09 06 42 09 07 02 --- 15 07 26 45.1 113.4 -2.7 -50.3 16 F 1 9 09 06 42 Schedule for VLBA_PT (Code Pt ) Page 4 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 07 02 1749+096 15 07 26 45.1 113.4 -2.7 -50.3 -4 1 1 9 09 07 02 09 07 21 --- 15 07 46 45.1 113.4 -2.7 -50.2 16 F 1 10 09 07 02 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 07 21 1749+096 15 07 46 45.1 113.4 -2.7 -50.2 -4 1 1 10 09 07 21 09 07 41 --- 15 08 06 45.2 113.5 -2.7 -50.2 16 F 1 11 09 07 21 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 07 41 1749+096 15 08 06 45.2 113.5 -2.7 -50.2 -4 1 1 11 09 07 41 09 08 21 --- 15 08 46 45.3 113.7 -2.7 -50.1 36 F 1 12 09 07 41 09 08 54 1741-038 15 09 19 37.2 128.3 -2.6 -40.5 11 1 1 12 09 08 54 09 09 34 --- 15 09 59 37.3 128.5 -2.6 -40.4 40 F 1 13 09 09 12 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 09 39 1741-038 15 10 04 37.3 128.5 -2.6 -40.4 0 1 1 13 09 09 34 09 09 59 --- 15 10 24 37.4 128.6 -2.6 -40.3 20 F 1 14 09 09 34 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 09 59 1741-038 15 10 24 37.4 128.6 -2.6 -40.3 -4 1 1 14 09 09 59 09 10 19 --- 15 10 44 37.5 128.7 -2.6 -40.3 16 F 1 15 09 09 59 Schedule for VLBA_PT (Code Pt ) Page 5 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 10 19 1741-038 15 10 44 37.5 128.7 -2.6 -40.3 -4 1 1 15 09 10 19 09 10 39 --- 15 11 04 37.5 128.7 -2.6 -40.2 16 F 1 15 09 10 19 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 10 39 1741-038 15 11 04 37.5 128.7 -2.6 -40.2 -4 1 1 15 09 10 39 09 10 59 --- 15 11 24 37.6 128.8 -2.5 -40.2 16 F 1 16 09 10 39 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 10 59 1741-038 15 11 24 37.6 128.8 -2.5 -40.2 -4 1 1 16 09 10 59 09 11 19 --- 15 11 44 37.6 128.9 -2.5 -40.1 16 F 1 17 09 10 59 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 11 19 1741-038 15 11 44 37.6 128.9 -2.5 -40.1 -4 1 1 17 09 11 19 09 11 58 --- 15 12 24 37.7 129.1 -2.5 -40.0 36 F 1 18 09 11 19 09 13 44 J1753+2848 15 14 10 55.7 88.0 -2.7 -70.4 64 1 1 18 09 13 44 09 14 24 --- 15 14 50 55.9 88.1 -2.7 -70.4 40 F 1 19 09 14 02 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 14 29 J1753+2848 15 14 54 55.9 88.1 -2.7 -70.4 0 1 1 19 09 14 24 09 14 48 --- 15 15 14 55.9 88.2 -2.6 -70.4 20 F 1 20 09 14 24 Schedule for VLBA_PT (Code Pt ) Page 6 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 14 48 J1753+2848 15 15 14 55.9 88.2 -2.6 -70.4 -4 1 1 20 09 14 48 09 15 08 --- 15 15 34 56.0 88.2 -2.6 -70.4 16 F 1 21 09 14 48 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 15 08 J1753+2848 15 15 34 56.0 88.2 -2.6 -70.4 -4 1 1 21 09 15 08 09 15 28 --- 15 15 54 56.1 88.3 -2.6 -70.4 16 F 1 21 09 15 08 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 15 28 J1753+2848 15 15 54 56.1 88.3 -2.6 -70.4 -4 1 1 21 09 15 28 09 15 48 --- 15 16 14 56.2 88.3 -2.6 -70.4 16 F 1 22 09 15 28 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 15 48 J1753+2848 15 16 14 56.2 88.3 -2.6 -70.4 -4 1 1 22 09 15 48 09 16 08 --- 15 16 34 56.2 88.3 -2.6 -70.4 16 F 1 22 09 15 48 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 16 13 J1753+2848 15 16 39 56.2 88.4 -2.6 -70.4 0 1 1 22 09 16 08 09 16 53 --- 15 17 19 56.4 88.4 -2.6 -70.4 40 F 1 24 09 16 08 09 17 59 3C345 15 18 25 72.3 65.8 -1.4 -101.3 28 1 1 24 09 17 59 09 19 59 --- 15 20 25 72.6 65.5 -1.4 -101.9 120 F 1 28 09 18 17 Schedule for VLBA_PT (Code Pt ) Page 7 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 20 03 3C345 15 20 30 72.6 65.5 -1.4 -101.9 0 1 1 28 09 19 59 09 22 03 --- 15 22 30 73.0 65.2 -1.3 -102.5 120 F 1 32 09 19 59 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 22 08 3C345 15 22 35 73.0 65.2 -1.3 -102.5 0 1 1 32 09 22 03 09 24 07 --- 15 24 35 73.4 64.9 -1.3 -103.1 120 F 1 36 09 22 03 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 26 39 J1826-2924 15 27 07 13.5 140.8 -3.0 -36.9 26 1 1 36 09 26 39 09 27 19 --- 15 27 47 13.6 140.9 -3.0 -36.8 40 F 1 37 09 26 57 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 27 37 SGRA 15 28 04 18.8 148.4 -2.3 -29.6 1 1 1 37 09 27 19 09 27 56 --- 15 28 24 18.8 148.5 -2.3 -29.6 20 F 1 38 09 27 19 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 27 56 SGRA 15 28 24 18.8 148.5 -2.3 -29.6 -4 1 1 38 09 27 56 09 28 16 --- 15 28 44 18.9 148.6 -2.3 -29.5 16 F 1 39 09 27 56 Schedule for VLBA_PT (Code Pt ) Page 8 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 28 16 SGRA 15 28 44 18.9 148.6 -2.3 -29.5 -4 1 1 39 09 28 16 09 28 36 --- 15 29 04 18.9 148.6 -2.3 -29.4 16 F 1 40 09 28 16 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 28 36 SGRA 15 29 04 18.9 148.6 -2.3 -29.4 -4 1 1 40 09 28 36 09 28 56 --- 15 29 24 18.9 148.7 -2.3 -29.4 16 F 1 40 09 28 36 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 28 56 SGRA 15 29 24 18.9 148.7 -2.3 -29.4 -4 1 1 40 09 28 56 09 29 16 --- 15 29 44 19.0 148.8 -2.3 -29.3 16 F 1 41 09 28 56 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 29 16 SGRA 15 29 44 19.0 148.8 -2.3 -29.3 -4 1 1 41 09 29 16 09 29 36 --- 15 30 04 19.0 148.8 -2.3 -29.3 16 F 1 42 09 29 16 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 29 36 SGRA 15 30 04 19.0 148.8 -2.3 -29.3 -4 1 1 42 09 29 36 09 29 56 --- 15 30 24 19.0 148.9 -2.3 -29.2 16 F 1 42 09 29 36 Schedule for VLBA_PT (Code Pt ) Page 9 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 29 56 SGRA 15 30 24 19.0 148.9 -2.3 -29.2 -4 1 1 42 09 29 56 09 30 16 --- 15 30 44 19.1 149.0 -2.3 -29.1 16 F 1 43 09 29 56 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 30 16 SGRA 15 30 44 19.1 149.0 -2.3 -29.1 -4 1 1 43 09 30 16 09 30 36 --- 15 31 04 19.1 149.0 -2.3 -29.1 16 F 1 43 09 30 16 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 30 36 SGRA 15 31 04 19.1 149.0 -2.3 -29.1 -4 1 1 43 09 30 36 09 30 56 --- 15 31 24 19.1 149.1 -2.2 -29.0 16 F 1 44 09 30 36 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 30 56 SGRA 15 31 24 19.1 149.1 -2.2 -29.0 -4 1 1 44 09 30 56 09 31 16 --- 15 31 44 19.2 149.2 -2.2 -28.9 16 F 1 45 09 30 56 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 31 33 J1826-2924 15 32 02 14.1 141.6 -2.9 -36.0 1 1 1 45 09 31 16 09 32 13 --- 15 32 42 14.2 141.8 -2.9 -35.9 40 F 1 47 09 31 16 Schedule for VLBA_PT (Code Pt ) Page 10 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 32 31 SGRA 15 32 59 19.3 149.4 -2.2 -28.7 1 1 1 47 09 32 13 09 32 50 --- 15 33 19 19.3 149.5 -2.2 -28.6 20 F 1 48 09 32 13 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 32 50 SGRA 15 33 19 19.3 149.5 -2.2 -28.6 -4 1 1 48 09 32 50 09 33 10 --- 15 33 39 19.4 149.6 -2.2 -28.6 16 F 1 48 09 32 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 33 10 SGRA 15 33 39 19.4 149.6 -2.2 -28.6 -4 1 1 48 09 33 10 09 33 30 --- 15 33 59 19.4 149.6 -2.2 -28.5 16 F 1 49 09 33 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 33 30 SGRA 15 33 59 19.4 149.6 -2.2 -28.5 -4 1 1 49 09 33 30 09 33 50 --- 15 34 19 19.4 149.7 -2.2 -28.5 16 F 1 50 09 33 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 33 50 SGRA 15 34 19 19.4 149.7 -2.2 -28.5 -4 1 1 50 09 33 50 09 34 10 --- 15 34 39 19.5 149.8 -2.2 -28.4 16 F 1 50 09 33 50 Schedule for VLBA_PT (Code Pt ) Page 11 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 34 10 SGRA 15 34 39 19.5 149.8 -2.2 -28.4 -4 1 1 50 09 34 10 09 34 30 --- 15 34 59 19.5 149.8 -2.2 -28.3 16 F 1 51 09 34 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 34 30 SGRA 15 34 59 19.5 149.8 -2.2 -28.3 -4 1 1 51 09 34 30 09 34 50 --- 15 35 19 19.5 149.9 -2.2 -28.3 16 F 1 52 09 34 30 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 34 50 SGRA 15 35 19 19.5 149.9 -2.2 -28.3 -4 1 1 52 09 34 50 09 35 10 --- 15 35 39 19.6 150.0 -2.2 -28.2 16 F 1 52 09 34 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 35 10 SGRA 15 35 39 19.6 150.0 -2.2 -28.2 -4 1 1 52 09 35 10 09 35 30 --- 15 35 59 19.6 150.0 -2.2 -28.1 16 F 1 53 09 35 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 35 30 SGRA 15 35 59 19.6 150.0 -2.2 -28.1 -4 1 1 53 09 35 30 09 35 50 --- 15 36 19 19.6 150.1 -2.2 -28.1 16 F 1 54 09 35 30 Schedule for VLBA_PT (Code Pt ) Page 12 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 35 50 SGRA 15 36 19 19.6 150.1 -2.2 -28.1 -4 1 1 54 09 35 50 09 36 10 --- 15 36 39 19.7 150.2 -2.2 -28.0 16 F 1 54 09 35 50 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 36 27 J1826-2924 15 36 56 14.7 142.5 -2.8 -35.2 1 1 1 54 09 36 10 09 37 07 --- 15 37 36 14.8 142.7 -2.8 -35.1 40 F 1 56 09 36 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 37 24 SGRA 15 37 54 19.8 150.4 -2.1 -27.8 1 1 1 56 09 37 07 09 37 44 --- 15 38 14 19.8 150.5 -2.1 -27.7 20 F 1 57 09 37 07 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 37 44 SGRA 15 38 14 19.8 150.5 -2.1 -27.7 -4 1 1 57 09 37 44 09 38 04 --- 15 38 34 19.9 150.6 -2.1 -27.7 16 F 1 58 09 37 44 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 38 04 SGRA 15 38 34 19.9 150.6 -2.1 -27.7 -4 1 1 58 09 38 04 09 38 24 --- 15 38 54 19.9 150.6 -2.1 -27.6 16 F 1 59 09 38 04 Schedule for VLBA_PT (Code Pt ) Page 13 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 38 24 SGRA 15 38 54 19.9 150.6 -2.1 -27.6 -4 1 1 59 09 38 24 09 38 44 --- 15 39 14 19.9 150.7 -2.1 -27.5 16 F 1 59 09 38 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 38 44 SGRA 15 39 14 19.9 150.7 -2.1 -27.5 -4 1 1 59 09 38 44 09 39 04 --- 15 39 34 20.0 150.8 -2.1 -27.5 16 F 1 60 09 38 44 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 39 04 SGRA 15 39 34 20.0 150.8 -2.1 -27.5 -4 1 1 60 09 39 04 09 39 24 --- 15 39 54 20.0 150.8 -2.1 -27.4 16 F 1 60 09 39 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 39 24 SGRA 15 39 54 20.0 150.8 -2.1 -27.4 -4 1 1 60 09 39 24 09 39 44 --- 15 40 14 20.0 150.9 -2.1 -27.3 16 F 1 61 09 39 24 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 39 44 SGRA 15 40 14 20.0 150.9 -2.1 -27.3 -4 1 1 61 09 39 44 09 40 04 --- 15 40 34 20.1 151.0 -2.1 -27.3 16 F 1 62 09 39 44 Schedule for VLBA_PT (Code Pt ) Page 14 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 40 04 SGRA 15 40 34 20.1 151.0 -2.1 -27.3 -4 1 1 62 09 40 04 09 40 24 --- 15 40 54 20.1 151.1 -2.1 -27.2 16 F 1 62 09 40 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 40 24 SGRA 15 40 54 20.1 151.1 -2.1 -27.2 -4 1 1 62 09 40 24 09 40 44 --- 15 41 14 20.1 151.1 -2.1 -27.1 16 F 1 63 09 40 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 40 44 SGRA 15 41 14 20.1 151.1 -2.1 -27.1 -4 1 1 63 09 40 44 09 41 04 --- 15 41 34 20.2 151.2 -2.1 -27.1 16 F 1 64 09 40 44 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 41 21 J1826-2924 15 41 51 15.3 143.4 -2.7 -34.4 1 1 1 64 09 41 04 09 42 00 --- 15 42 31 15.4 143.6 -2.7 -34.3 40 F 1 66 09 41 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 42 18 SGRA 15 42 48 20.3 151.4 -2.1 -26.8 1 1 1 66 09 42 00 09 42 37 --- 15 43 08 20.3 151.5 -2.1 -26.8 20 F 1 67 09 42 00 Schedule for VLBA_PT (Code Pt ) Page 15 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 42 37 SGRA 15 43 08 20.3 151.5 -2.1 -26.8 -4 1 1 67 09 42 37 09 42 57 --- 15 43 28 20.4 151.6 -2.0 -26.7 16 F 1 67 09 42 37 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 42 57 SGRA 15 43 28 20.4 151.6 -2.0 -26.7 -4 1 1 67 09 42 57 09 43 17 --- 15 43 48 20.4 151.7 -2.0 -26.6 16 F 1 68 09 42 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 43 17 SGRA 15 43 48 20.4 151.7 -2.0 -26.6 -4 1 1 68 09 43 17 09 43 37 --- 15 44 08 20.4 151.7 -2.0 -26.6 16 F 1 69 09 43 17 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 43 37 SGRA 15 44 08 20.4 151.7 -2.0 -26.6 -4 1 1 69 09 43 37 09 43 57 --- 15 44 28 20.5 151.8 -2.0 -26.5 16 F 1 69 09 43 37 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 43 57 SGRA 15 44 28 20.5 151.8 -2.0 -26.5 -4 1 1 69 09 43 57 09 44 17 --- 15 44 48 20.5 151.9 -2.0 -26.5 16 F 1 70 09 43 57 Schedule for VLBA_PT (Code Pt ) Page 16 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 44 17 SGRA 15 44 48 20.5 151.9 -2.0 -26.5 -4 1 1 70 09 44 17 09 44 37 --- 15 45 08 20.5 151.9 -2.0 -26.4 16 F 1 71 09 44 17 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 44 37 SGRA 15 45 08 20.5 151.9 -2.0 -26.4 -4 1 1 71 09 44 37 09 44 57 --- 15 45 28 20.6 152.0 -2.0 -26.3 16 F 1 71 09 44 37 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 44 57 SGRA 15 45 28 20.6 152.0 -2.0 -26.3 -4 1 1 71 09 44 57 09 45 17 --- 15 45 48 20.6 152.1 -2.0 -26.3 16 F 1 72 09 44 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 45 17 SGRA 15 45 48 20.6 152.1 -2.0 -26.3 -4 1 1 72 09 45 17 09 45 37 --- 15 46 08 20.6 152.1 -2.0 -26.2 16 F 1 72 09 45 17 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 45 37 SGRA 15 46 08 20.6 152.1 -2.0 -26.2 -4 1 1 72 09 45 37 09 45 57 --- 15 46 28 20.7 152.2 -2.0 -26.1 16 F 1 73 09 45 37 Schedule for VLBA_PT (Code Pt ) Page 17 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 46 14 J1826-2924 15 46 45 15.9 144.4 -2.7 -33.5 1 1 1 73 09 45 57 09 46 54 --- 15 47 25 16.0 144.5 -2.7 -33.4 40 F 1 75 09 45 57 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 47 10 SGRA 15 47 42 20.8 152.5 -2.0 -25.9 1 1 1 75 09 46 54 09 47 30 --- 15 48 02 20.8 152.5 -2.0 -25.8 20 F 1 76 09 46 54 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 47 30 SGRA 15 48 02 20.8 152.5 -2.0 -25.8 -4 1 1 76 09 47 30 09 47 50 --- 15 48 22 20.8 152.6 -2.0 -25.8 16 F 1 77 09 47 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 47 50 SGRA 15 48 22 20.8 152.6 -2.0 -25.8 -4 1 1 77 09 47 50 09 48 10 --- 15 48 42 20.9 152.7 -2.0 -25.7 16 F 1 77 09 47 50 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 48 10 SGRA 15 48 42 20.9 152.7 -2.0 -25.7 -4 1 1 77 09 48 10 09 48 30 --- 15 49 02 20.9 152.8 -2.0 -25.6 16 F 1 78 09 48 10 Schedule for VLBA_PT (Code Pt ) Page 18 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 48 30 SGRA 15 49 02 20.9 152.8 -2.0 -25.6 -4 1 1 78 09 48 30 09 48 50 --- 15 49 22 20.9 152.8 -1.9 -25.6 16 F 1 79 09 48 30 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 48 50 SGRA 15 49 22 20.9 152.8 -1.9 -25.6 -4 1 1 79 09 48 50 09 49 10 --- 15 49 42 21.0 152.9 -1.9 -25.5 16 F 1 79 09 48 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 49 10 SGRA 15 49 42 21.0 152.9 -1.9 -25.5 -4 1 1 79 09 49 10 09 49 30 --- 15 50 02 21.0 153.0 -1.9 -25.4 16 F 1 80 09 49 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 49 30 SGRA 15 50 02 21.0 153.0 -1.9 -25.4 -4 1 1 80 09 49 30 09 49 50 --- 15 50 22 21.0 153.0 -1.9 -25.4 16 F 1 81 09 49 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 49 50 SGRA 15 50 22 21.0 153.0 -1.9 -25.4 -4 1 1 81 09 49 50 09 50 10 --- 15 50 42 21.1 153.1 -1.9 -25.3 16 F 1 81 09 49 50 Schedule for VLBA_PT (Code Pt ) Page 19 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 50 10 SGRA 15 50 42 21.1 153.1 -1.9 -25.3 -4 1 1 81 09 50 10 09 50 30 --- 15 51 02 21.1 153.2 -1.9 -25.2 16 F 1 82 09 50 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 50 30 SGRA 15 51 02 21.1 153.2 -1.9 -25.2 -4 1 1 82 09 50 30 09 50 50 --- 15 51 22 21.1 153.2 -1.9 -25.2 16 F 1 83 09 50 30 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 51 06 J1826-2924 15 51 38 16.5 145.3 -2.6 -32.7 1 1 1 83 09 50 50 09 51 46 --- 15 52 18 16.6 145.4 -2.6 -32.6 40 F 1 84 09 50 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 52 03 SGRA 15 52 35 21.2 153.5 -1.9 -24.9 1 1 1 84 09 51 46 09 52 23 --- 15 52 55 21.3 153.6 -1.9 -24.9 20 F 1 86 09 51 46 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 52 23 SGRA 15 52 55 21.3 153.6 -1.9 -24.9 -4 1 1 86 09 52 23 09 52 43 --- 15 53 15 21.3 153.6 -1.9 -24.8 16 F 1 86 09 52 23 Schedule for VLBA_PT (Code Pt ) Page 20 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 52 43 SGRA 15 53 15 21.3 153.6 -1.9 -24.8 -4 1 1 86 09 52 43 09 53 03 --- 15 53 35 21.3 153.7 -1.9 -24.7 16 F 1 87 09 52 43 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 53 03 SGRA 15 53 35 21.3 153.7 -1.9 -24.7 -4 1 1 87 09 53 03 09 53 23 --- 15 53 55 21.4 153.8 -1.9 -24.7 16 F 1 88 09 53 03 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 53 23 SGRA 15 53 55 21.4 153.8 -1.9 -24.7 -4 1 1 88 09 53 23 09 53 43 --- 15 54 15 21.4 153.9 -1.9 -24.6 16 F 1 88 09 53 23 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 53 43 SGRA 15 54 15 21.4 153.9 -1.9 -24.6 -4 1 1 88 09 53 43 09 54 03 --- 15 54 35 21.4 153.9 -1.9 -24.5 16 F 1 89 09 53 43 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 54 03 SGRA 15 54 35 21.4 153.9 -1.9 -24.5 -4 1 1 89 09 54 03 09 54 23 --- 15 54 55 21.4 154.0 -1.9 -24.5 16 F 1 89 09 54 03 Schedule for VLBA_PT (Code Pt ) Page 21 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 54 23 SGRA 15 54 55 21.4 154.0 -1.9 -24.5 -4 1 1 89 09 54 23 09 54 43 --- 15 55 15 21.5 154.1 -1.8 -24.4 16 F 1 90 09 54 23 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 54 43 SGRA 15 55 15 21.5 154.1 -1.8 -24.4 -4 1 1 90 09 54 43 09 55 03 --- 15 55 35 21.5 154.1 -1.8 -24.3 16 F 1 91 09 54 43 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 55 03 SGRA 15 55 35 21.5 154.1 -1.8 -24.3 -4 1 1 91 09 55 03 09 55 22 --- 15 55 55 21.5 154.2 -1.8 -24.3 16 F 1 91 09 55 03 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 55 22 SGRA 15 55 55 21.5 154.2 -1.8 -24.3 -4 1 1 91 09 55 22 09 55 42 --- 15 56 15 21.6 154.3 -1.8 -24.2 16 F 1 92 09 55 22 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 55 59 J1826-2924 15 56 31 17.1 146.2 -2.5 -31.8 1 1 1 92 09 55 42 09 56 39 --- 15 57 11 17.2 146.4 -2.5 -31.7 40 F 1 94 09 55 42 Schedule for VLBA_PT (Code Pt ) Page 22 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 56 55 SGRA 15 57 28 21.7 154.6 -1.8 -23.9 1 1 1 94 09 56 39 09 57 15 --- 15 57 48 21.7 154.6 -1.8 -23.9 20 F 1 95 09 56 39 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 57 15 SGRA 15 57 48 21.7 154.6 -1.8 -23.9 -4 1 1 95 09 57 15 09 57 35 --- 15 58 08 21.7 154.7 -1.8 -23.8 16 F 1 96 09 57 15 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 57 35 SGRA 15 58 08 21.7 154.7 -1.8 -23.8 -4 1 1 96 09 57 35 09 57 55 --- 15 58 28 21.8 154.8 -1.8 -23.7 16 F 1 96 09 57 35 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 57 55 SGRA 15 58 28 21.8 154.8 -1.8 -23.7 -4 1 1 96 09 57 55 09 58 15 --- 15 58 48 21.8 154.8 -1.8 -23.7 16 F 1 97 09 57 55 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 58 15 SGRA 15 58 48 21.8 154.8 -1.8 -23.7 -4 1 1 97 09 58 15 09 58 35 --- 15 59 08 21.8 154.9 -1.8 -23.6 16 F 1 98 09 58 15 Schedule for VLBA_PT (Code Pt ) Page 23 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 58 35 SGRA 15 59 08 21.8 154.9 -1.8 -23.6 -4 1 1 98 09 58 35 09 58 55 --- 15 59 28 21.9 155.0 -1.8 -23.5 16 F 1 98 09 58 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 58 55 SGRA 15 59 28 21.9 155.0 -1.8 -23.5 -4 1 1 98 09 58 55 09 59 15 --- 15 59 48 21.9 155.1 -1.8 -23.5 16 F 1 99 09 58 55 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 59 15 SGRA 15 59 48 21.9 155.1 -1.8 -23.5 -4 1 1 99 09 59 15 09 59 35 --- 16 00 08 21.9 155.1 -1.8 -23.4 16 F 1 100 09 59 15 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 59 35 SGRA 16 00 08 21.9 155.1 -1.8 -23.4 -4 1 1 100 09 59 35 09 59 55 --- 16 00 28 21.9 155.2 -1.8 -23.3 16 F 1 100 09 59 35 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 59 55 SGRA 16 00 28 21.9 155.2 -1.8 -23.3 -4 1 1 100 09 59 55 10 00 15 --- 16 00 48 22.0 155.3 -1.8 -23.3 16 F 1 101 09 59 55 Schedule for VLBA_PT (Code Pt ) Page 24 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 00 15 SGRA 16 00 48 22.0 155.3 -1.8 -23.3 -4 1 1 101 10 00 15 10 00 35 --- 16 01 08 22.0 155.3 -1.8 -23.2 16 F 1 101 10 00 15 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 00 51 J1826-2924 16 01 24 17.6 147.2 -2.4 -30.9 1 1 1 101 10 00 35 10 01 31 --- 16 02 04 17.7 147.3 -2.4 -30.8 40 F 1 103 10 00 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 01 47 SGRA 16 02 20 22.1 155.6 -1.7 -23.0 1 1 1 103 10 01 31 10 02 07 --- 16 02 40 22.1 155.7 -1.7 -22.9 20 F 1 104 10 01 31 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 02 07 SGRA 16 02 40 22.1 155.7 -1.7 -22.9 -4 1 1 104 10 02 07 10 02 27 --- 16 03 00 22.2 155.7 -1.7 -22.8 16 F 1 105 10 02 07 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 02 27 SGRA 16 03 00 22.2 155.7 -1.7 -22.8 -4 1 1 105 10 02 27 10 02 47 --- 16 03 20 22.2 155.8 -1.7 -22.8 16 F 1 106 10 02 27 Schedule for VLBA_PT (Code Pt ) Page 25 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 02 47 SGRA 16 03 20 22.2 155.8 -1.7 -22.8 -4 1 1 106 10 02 47 10 03 07 --- 16 03 40 22.2 155.9 -1.7 -22.7 16 F 1 106 10 02 47 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 03 07 SGRA 16 03 40 22.2 155.9 -1.7 -22.7 -4 1 1 106 10 03 07 10 03 27 --- 16 04 00 22.2 156.0 -1.7 -22.6 16 F 1 107 10 03 07 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 03 27 SGRA 16 04 00 22.2 156.0 -1.7 -22.6 -4 1 1 107 10 03 27 10 03 47 --- 16 04 20 22.3 156.0 -1.7 -22.6 16 F 1 108 10 03 27 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 03 47 SGRA 16 04 20 22.3 156.0 -1.7 -22.6 -4 1 1 108 10 03 47 10 04 07 --- 16 04 40 22.3 156.1 -1.7 -22.5 16 F 1 108 10 03 47 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 04 07 SGRA 16 04 40 22.3 156.1 -1.7 -22.5 -4 1 1 108 10 04 07 10 04 26 --- 16 05 00 22.3 156.2 -1.7 -22.4 16 F 1 109 10 04 07 Schedule for VLBA_PT (Code Pt ) Page 26 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 04 26 SGRA 16 05 00 22.3 156.2 -1.7 -22.4 -4 1 1 109 10 04 26 10 04 46 --- 16 05 20 22.4 156.3 -1.7 -22.4 16 F 1 110 10 04 26 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 04 46 SGRA 16 05 20 22.4 156.3 -1.7 -22.4 -4 1 1 110 10 04 46 10 05 06 --- 16 05 40 22.4 156.3 -1.7 -22.3 16 F 1 110 10 04 46 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 05 06 SGRA 16 05 40 22.4 156.3 -1.7 -22.3 -4 1 1 110 10 05 06 10 05 26 --- 16 06 00 22.4 156.4 -1.7 -22.2 16 F 1 111 10 05 06 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 05 42 J1826-2924 16 06 17 18.2 148.2 -2.3 -30.0 2 1 1 111 10 05 26 10 06 22 --- 16 06 57 18.2 148.3 -2.3 -29.9 40 F 1 113 10 05 26 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 06 38 SGRA 16 07 13 22.5 156.7 -1.6 -22.0 2 1 1 113 10 06 22 10 06 58 --- 16 07 33 22.5 156.7 -1.6 -21.9 20 F 1 114 10 06 22 Schedule for VLBA_PT (Code Pt ) Page 27 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 06 58 SGRA 16 07 33 22.5 156.7 -1.6 -21.9 -4 1 1 114 10 06 58 10 07 18 --- 16 07 53 22.6 156.8 -1.6 -21.8 16 F 1 114 10 06 58 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 07 18 SGRA 16 07 53 22.6 156.8 -1.6 -21.8 -4 1 1 114 10 07 18 10 07 38 --- 16 08 13 22.6 156.9 -1.6 -21.8 16 F 1 115 10 07 18 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 07 38 SGRA 16 08 13 22.6 156.9 -1.6 -21.8 -4 1 1 115 10 07 38 10 07 58 --- 16 08 33 22.6 157.0 -1.6 -21.7 16 F 1 116 10 07 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 07 58 SGRA 16 08 33 22.6 157.0 -1.6 -21.7 -4 1 1 116 10 07 58 10 08 18 --- 16 08 53 22.6 157.0 -1.6 -21.6 16 F 1 116 10 07 58 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 08 18 SGRA 16 08 53 22.6 157.0 -1.6 -21.6 -4 1 1 116 10 08 18 10 08 38 --- 16 09 13 22.7 157.1 -1.6 -21.6 16 F 1 117 10 08 18 Schedule for VLBA_PT (Code Pt ) Page 28 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 08 38 SGRA 16 09 13 22.7 157.1 -1.6 -21.6 -4 1 1 117 10 08 38 10 08 58 --- 16 09 33 22.7 157.2 -1.6 -21.5 16 F 1 118 10 08 38 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 08 58 SGRA 16 09 33 22.7 157.2 -1.6 -21.5 -4 1 1 118 10 08 58 10 09 18 --- 16 09 53 22.7 157.3 -1.6 -21.4 16 F 1 118 10 08 58 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 09 18 SGRA 16 09 53 22.7 157.3 -1.6 -21.4 -4 1 1 118 10 09 18 10 09 38 --- 16 10 13 22.8 157.3 -1.6 -21.4 16 F 1 119 10 09 18 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 09 38 SGRA 16 10 13 22.8 157.3 -1.6 -21.4 -4 1 1 119 10 09 38 10 09 58 --- 16 10 33 22.8 157.4 -1.6 -21.3 16 F 1 120 10 09 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 09 58 SGRA 16 10 33 22.8 157.4 -1.6 -21.3 -4 1 1 120 10 09 58 10 10 18 --- 16 10 53 22.8 157.5 -1.6 -21.2 16 F 1 120 10 09 58 Schedule for VLBA_PT (Code Pt ) Page 29 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 10 33 J1826-2924 16 11 08 18.7 149.1 -2.3 -29.1 2 1 1 120 10 10 18 10 11 13 --- 16 11 48 18.8 149.3 -2.3 -29.0 40 F 1 122 10 10 18 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 11 29 SGRA 16 12 04 22.9 157.7 -1.6 -21.0 2 1 1 122 10 11 13 10 11 49 --- 16 12 24 22.9 157.8 -1.6 -20.9 20 F 1 123 10 11 13 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 11 49 SGRA 16 12 24 22.9 157.8 -1.6 -20.9 -4 1 1 123 10 11 49 10 12 09 --- 16 12 44 23.0 157.9 -1.6 -20.8 16 F 1 124 10 11 49 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 12 09 SGRA 16 12 44 23.0 157.9 -1.6 -20.8 -4 1 1 124 10 12 09 10 12 29 --- 16 13 04 23.0 158.0 -1.6 -20.8 16 F 1 124 10 12 09 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 12 29 SGRA 16 13 04 23.0 158.0 -1.6 -20.8 -4 1 1 124 10 12 29 10 12 49 --- 16 13 24 23.0 158.0 -1.5 -20.7 16 F 1 125 10 12 29 Schedule for VLBA_PT (Code Pt ) Page 30 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 12 49 SGRA 16 13 24 23.0 158.0 -1.5 -20.7 -4 1 1 125 10 12 49 10 13 09 --- 16 13 44 23.0 158.1 -1.5 -20.6 16 F 1 126 10 12 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 13 09 SGRA 16 13 44 23.0 158.1 -1.5 -20.6 -4 1 1 126 10 13 09 10 13 29 --- 16 14 04 23.1 158.2 -1.5 -20.6 16 F 1 126 10 13 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 13 29 SGRA 16 14 04 23.1 158.2 -1.5 -20.6 -4 1 1 126 10 13 29 10 13 49 --- 16 14 24 23.1 158.3 -1.5 -20.5 16 F 1 127 10 13 29 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 13 49 SGRA 16 14 24 23.1 158.3 -1.5 -20.5 -4 1 1 127 10 13 49 10 14 09 --- 16 14 44 23.1 158.3 -1.5 -20.4 16 F 1 128 10 13 49 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 14 09 SGRA 16 14 44 23.1 158.3 -1.5 -20.4 -4 1 1 128 10 14 09 10 14 29 --- 16 15 04 23.1 158.4 -1.5 -20.3 16 F 1 128 10 14 09 Schedule for VLBA_PT (Code Pt ) Page 31 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 14 29 SGRA 16 15 04 23.1 158.4 -1.5 -20.3 -4 1 1 128 10 14 29 10 14 49 --- 16 15 24 23.2 158.5 -1.5 -20.3 16 F 1 129 10 14 29 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 14 49 SGRA 16 15 24 23.2 158.5 -1.5 -20.3 -4 1 1 129 10 14 49 10 15 09 --- 16 15 44 23.2 158.6 -1.5 -20.2 16 F 1 130 10 14 49 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 15 24 J1826-2924 16 16 00 19.2 150.1 -2.2 -28.2 2 1 1 130 10 15 09 10 16 04 --- 16 16 40 19.3 150.2 -2.2 -28.1 40 F 1 131 10 15 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 16 20 SGRA 16 16 56 23.3 158.8 -1.5 -20.0 2 1 1 131 10 16 04 10 16 40 --- 16 17 16 23.3 158.9 -1.5 -19.9 20 F 1 133 10 16 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 16 40 SGRA 16 17 16 23.3 158.9 -1.5 -19.9 -4 1 1 133 10 16 40 10 17 00 --- 16 17 36 23.3 159.0 -1.5 -19.8 16 F 1 133 10 16 40 Schedule for VLBA_PT (Code Pt ) Page 32 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 17 00 SGRA 16 17 36 23.3 159.0 -1.5 -19.8 -4 1 1 133 10 17 00 10 17 19 --- 16 17 56 23.3 159.0 -1.5 -19.7 16 F 1 134 10 17 00 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 17 19 SGRA 16 17 56 23.3 159.0 -1.5 -19.7 -4 1 1 134 10 17 19 10 17 39 --- 16 18 16 23.4 159.1 -1.5 -19.7 16 F 1 135 10 17 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 17 39 SGRA 16 18 16 23.4 159.1 -1.5 -19.7 -4 1 1 135 10 17 39 10 17 59 --- 16 18 36 23.4 159.2 -1.5 -19.6 16 F 1 135 10 17 39 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 17 59 SGRA 16 18 36 23.4 159.2 -1.5 -19.6 -4 1 1 135 10 17 59 10 18 19 --- 16 18 56 23.4 159.3 -1.5 -19.5 16 F 1 136 10 17 59 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 18 19 SGRA 16 18 56 23.4 159.3 -1.5 -19.5 -4 1 1 136 10 18 19 10 18 39 --- 16 19 16 23.4 159.3 -1.4 -19.5 16 F 1 136 10 18 19 Schedule for VLBA_PT (Code Pt ) Page 33 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 18 39 SGRA 16 19 16 23.4 159.3 -1.4 -19.5 -4 1 1 136 10 18 39 10 18 59 --- 16 19 36 23.5 159.4 -1.4 -19.4 16 F 1 137 10 18 39 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 18 59 SGRA 16 19 36 23.5 159.4 -1.4 -19.4 -4 1 1 137 10 18 59 10 19 19 --- 16 19 56 23.5 159.5 -1.4 -19.3 16 F 1 138 10 18 59 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 19 19 SGRA 16 19 56 23.5 159.5 -1.4 -19.3 -4 1 1 138 10 19 19 10 19 39 --- 16 20 16 23.5 159.6 -1.4 -19.3 16 F 1 138 10 19 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 19 39 SGRA 16 20 16 23.5 159.6 -1.4 -19.3 -4 1 1 138 10 19 39 10 19 59 --- 16 20 36 23.5 159.6 -1.4 -19.2 16 F 1 139 10 19 39 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 20 14 J1826-2924 16 20 51 19.7 151.1 -2.1 -27.3 2 1 1 139 10 19 59 10 20 54 --- 16 21 31 19.8 151.2 -2.1 -27.2 40 F 1 141 10 19 59 10 23 25 3C345 16 24 02 83.3 33.5 -0.3 -143.6 17 1 1 141 10 23 25 10 24 04 --- 16 24 42 83.4 32.6 -0.3 -144.6 40 F 1 142 10 23 43 Schedule for VLBA_PT (Code Pt ) Page 34 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 24 09 3C345 16 24 47 83.4 32.5 -0.3 -144.7 0 1 1 142 10 24 04 10 24 29 --- 16 25 07 83.4 32.1 -0.3 -145.2 20 F 1 143 10 24 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 24 29 3C345 16 25 07 83.4 32.1 -0.3 -145.2 -4 1 1 143 10 24 29 10 24 49 --- 16 25 27 83.5 31.6 -0.3 -145.7 16 F 1 144 10 24 29 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 24 49 3C345 16 25 27 83.5 31.6 -0.3 -145.7 -4 1 1 144 10 24 49 10 25 09 --- 16 25 47 83.5 31.1 -0.3 -146.2 16 F 1 144 10 24 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 25 09 3C345 16 25 47 83.5 31.1 -0.3 -146.2 -4 1 1 144 10 25 09 10 25 29 --- 16 26 07 83.5 30.7 -0.3 -146.8 16 F 1 145 10 25 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 25 29 3C345 16 26 07 83.5 30.7 -0.3 -146.8 -4 1 1 145 10 25 29 10 25 49 --- 16 26 27 83.6 30.2 -0.3 -147.3 16 F 1 145 10 25 29 Schedule for VLBA_PT (Code Pt ) Page 35 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 25 49 3C345 16 26 27 83.6 30.2 -0.3 -147.3 -4 1 1 145 10 25 49 10 26 29 --- 16 27 07 83.6 29.2 -0.3 -148.4 36 F 1 147 10 25 49 10 28 09 1749+096 16 28 47 58.9 137.4 -1.4 -34.5 22 1 1 147 10 28 09 10 28 49 --- 16 29 27 58.9 137.7 -1.4 -34.3 40 F 1 148 10 28 27 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 28 53 1749+096 16 29 31 59.0 137.7 -1.4 -34.3 0 1 1 148 10 28 49 10 29 13 --- 16 29 51 59.0 137.9 -1.4 -34.2 20 F 1 149 10 28 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 29 13 1749+096 16 29 51 59.0 137.9 -1.4 -34.2 -4 1 1 149 10 29 13 10 29 33 --- 16 30 11 59.0 138.0 -1.4 -34.1 16 F 1 149 10 29 13 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 29 33 1749+096 16 30 11 59.0 138.0 -1.4 -34.1 -4 1 1 149 10 29 33 10 29 53 --- 16 30 31 59.1 138.1 -1.4 -34.0 16 F 1 150 10 29 33 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 29 53 1749+096 16 30 31 59.1 138.1 -1.4 -34.0 -4 1 1 150 10 29 53 10 30 13 --- 16 30 51 59.1 138.3 -1.4 -33.9 16 F 1 151 10 29 53 Schedule for VLBA_PT (Code Pt ) Page 36 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 30 13 1749+096 16 30 51 59.1 138.3 -1.4 -33.9 -4 1 1 151 10 30 13 10 30 33 --- 16 31 11 59.2 138.4 -1.3 -33.8 16 F 1 151 10 30 13 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 30 33 1749+096 16 31 11 59.2 138.4 -1.3 -33.8 -4 1 1 151 10 30 33 10 31 13 --- 16 31 51 59.3 138.7 -1.3 -33.6 36 F 1 153 10 30 33 10 31 46 1741-038 16 32 24 48.3 152.4 -1.2 -22.5 5 1 1 153 10 31 46 10 32 26 --- 16 33 04 48.3 152.7 -1.2 -22.4 40 F 1 154 10 32 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 32 30 1741-038 16 33 09 48.3 152.7 -1.2 -22.3 0 1 1 154 10 32 26 10 32 50 --- 16 33 29 48.4 152.8 -1.2 -22.2 20 F 1 155 10 32 26 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 32 50 1741-038 16 33 29 48.4 152.8 -1.2 -22.2 -4 1 1 155 10 32 50 10 33 10 --- 16 33 49 48.4 152.9 -1.2 -22.1 16 F 1 155 10 32 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 33 10 1741-038 16 33 49 48.4 152.9 -1.2 -22.1 -4 1 1 155 10 33 10 10 33 30 --- 16 34 09 48.4 153.0 -1.2 -22.1 16 F 1 156 10 33 10 Schedule for VLBA_PT (Code Pt ) Page 37 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 33 30 1741-038 16 34 09 48.4 153.0 -1.2 -22.1 -4 1 1 156 10 33 30 10 33 50 --- 16 34 29 48.5 153.1 -1.2 -22.0 16 F 1 157 10 33 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 33 50 1741-038 16 34 29 48.5 153.1 -1.2 -22.0 -4 1 1 157 10 33 50 10 34 10 --- 16 34 49 48.5 153.3 -1.2 -21.9 16 F 1 157 10 33 50 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 34 10 1741-038 16 34 49 48.5 153.3 -1.2 -21.9 -4 1 1 157 10 34 10 10 34 50 --- 16 35 29 48.5 153.5 -1.1 -21.7 36 F 1 159 10 34 10 10 36 01 J1753+2848 16 36 40 72.7 103.2 -1.3 -66.6 17 1 1 159 10 36 01 10 36 40 --- 16 37 20 72.8 103.4 -1.3 -66.5 40 F 1 160 10 36 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 36 45 J1753+2848 16 37 24 72.8 103.4 -1.3 -66.5 0 1 1 160 10 36 40 10 37 05 --- 16 37 44 72.9 103.5 -1.3 -66.4 20 F 1 161 10 36 40 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 37 05 J1753+2848 16 37 44 72.9 103.5 -1.3 -66.4 -4 1 1 161 10 37 05 10 37 25 --- 16 38 04 72.9 103.6 -1.3 -66.4 16 F 1 161 10 37 05 Schedule for VLBA_PT (Code Pt ) Page 38 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 37 25 J1753+2848 16 38 04 72.9 103.6 -1.3 -66.4 -4 1 1 161 10 37 25 10 37 45 --- 16 38 24 73.0 103.7 -1.3 -66.3 16 F 1 162 10 37 25 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 37 45 J1753+2848 16 38 24 73.0 103.7 -1.3 -66.3 -4 1 1 162 10 37 45 10 38 05 --- 16 38 44 73.1 103.8 -1.3 -66.2 16 F 1 163 10 37 45 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 38 05 J1753+2848 16 38 44 73.1 103.8 -1.3 -66.2 -4 1 1 163 10 38 05 10 38 25 --- 16 39 04 73.1 103.9 -1.2 -66.2 16 F 1 163 10 38 05 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 38 29 J1753+2848 16 39 09 73.2 104.0 -1.2 -66.2 0 1 1 163 10 38 25 10 39 09 --- 16 39 49 73.3 104.2 -1.2 -66.1 40 F 1 165 10 38 25 10 40 40 3C345 16 41 20 84.5 3.9 0.0 -175.9 17 1 1 165 10 40 40 10 42 39 --- 16 43 20 84.5 -0.2 0.0 179.8 120 F 1 169 10 40 58 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 42 44 3C345 16 43 24 84.5 -0.3 0.0 179.7 0 1 1 169 10 42 39 10 44 44 --- 16 45 24 84.5 -4.3 0.0 175.3 120 F 1 173 10 42 39 Schedule for VLBA_PT (Code Pt ) Page 39 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 44 49 3C345 16 45 29 84.5 -4.5 0.0 175.2 0 1 1 173 10 44 44 10 46 48 --- 16 47 29 84.4 -8.4 0.1 170.9 120 F 1 177 10 44 44 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 49 20 J1826-2924 16 50 01 22.3 157.3 -1.6 -21.5 21 1 1 177 10 49 20 10 50 00 --- 16 50 41 22.4 157.4 -1.6 -21.3 40 F 1 178 10 49 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 50 22 SGRA 16 51 03 25.4 166.7 -0.9 -12.6 10 1 1 178 10 50 00 10 50 42 --- 16 51 23 25.4 166.8 -0.9 -12.5 20 F 1 179 10 50 00 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 50 42 SGRA 16 51 23 25.4 166.8 -0.9 -12.5 -4 1 1 179 10 50 42 10 51 02 --- 16 51 43 25.4 166.8 -0.9 -12.4 16 F 1 180 10 50 42 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 51 02 SGRA 16 51 43 25.4 166.8 -0.9 -12.4 -4 1 1 180 10 51 02 10 51 21 --- 16 52 03 25.4 166.9 -0.9 -12.3 16 F 1 181 10 51 02 Schedule for VLBA_PT (Code Pt ) Page 40 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 51 21 SGRA 16 52 03 25.4 166.9 -0.9 -12.3 -4 1 1 181 10 51 21 10 51 41 --- 16 52 23 25.4 167.0 -0.9 -12.3 16 F 1 181 10 51 21 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 51 41 SGRA 16 52 23 25.4 167.0 -0.9 -12.3 -4 1 1 181 10 51 41 10 52 01 --- 16 52 43 25.4 167.1 -0.9 -12.2 16 F 1 182 10 51 41 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 52 01 SGRA 16 52 43 25.4 167.1 -0.9 -12.2 -4 1 1 182 10 52 01 10 52 21 --- 16 53 03 25.5 167.2 -0.9 -12.1 16 F 1 182 10 52 01 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 52 21 SGRA 16 53 03 25.5 167.2 -0.9 -12.1 -4 1 1 182 10 52 21 10 52 41 --- 16 53 23 25.5 167.2 -0.9 -12.1 16 F 1 183 10 52 21 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 52 41 SGRA 16 53 23 25.5 167.2 -0.9 -12.1 -4 1 1 183 10 52 41 10 53 01 --- 16 53 43 25.5 167.3 -0.9 -12.0 16 F 1 184 10 52 41 Schedule for VLBA_PT (Code Pt ) Page 41 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 53 01 SGRA 16 53 43 25.5 167.3 -0.9 -12.0 -4 1 1 184 10 53 01 10 53 21 --- 16 54 03 25.5 167.4 -0.9 -11.9 16 F 1 184 10 53 01 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 53 21 SGRA 16 54 03 25.5 167.4 -0.9 -11.9 -4 1 1 184 10 53 21 10 53 41 --- 16 54 23 25.5 167.5 -0.9 -11.8 16 F 1 185 10 53 21 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 53 41 SGRA 16 54 23 25.5 167.5 -0.9 -11.8 -4 1 1 185 10 53 41 10 54 01 --- 16 54 43 25.5 167.5 -0.9 -11.8 16 F 1 186 10 53 41 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 54 23 J1826-2924 16 55 05 22.7 158.4 -1.5 -20.4 10 1 1 186 10 54 01 10 55 03 --- 16 55 45 22.8 158.6 -1.5 -20.3 40 F 1 188 10 54 01 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 55 24 SGRA 16 56 07 25.6 167.9 -0.8 -11.4 10 1 1 188 10 55 03 10 55 44 --- 16 56 27 25.6 168.0 -0.8 -11.4 20 F 1 189 10 55 03 Schedule for VLBA_PT (Code Pt ) Page 42 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 55 44 SGRA 16 56 27 25.6 168.0 -0.8 -11.4 -4 1 1 189 10 55 44 10 56 04 --- 16 56 47 25.6 168.0 -0.8 -11.3 16 F 1 190 10 55 44 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 56 04 SGRA 16 56 47 25.6 168.0 -0.8 -11.3 -4 1 1 190 10 56 04 10 56 24 --- 16 57 07 25.6 168.1 -0.8 -11.2 16 F 1 190 10 56 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 56 24 SGRA 16 57 07 25.6 168.1 -0.8 -11.2 -4 1 1 190 10 56 24 10 56 44 --- 16 57 27 25.6 168.2 -0.8 -11.1 16 F 1 191 10 56 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 56 44 SGRA 16 57 27 25.6 168.2 -0.8 -11.1 -4 1 1 191 10 56 44 10 57 04 --- 16 57 47 25.7 168.3 -0.8 -11.1 16 F 1 192 10 56 44 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 57 04 SGRA 16 57 47 25.7 168.3 -0.8 -11.1 -4 1 1 192 10 57 04 10 57 24 --- 16 58 07 25.7 168.4 -0.8 -11.0 16 F 1 192 10 57 04 Schedule for VLBA_PT (Code Pt ) Page 43 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 57 24 SGRA 16 58 07 25.7 168.4 -0.8 -11.0 -4 1 1 192 10 57 24 10 57 44 --- 16 58 27 25.7 168.4 -0.8 -10.9 16 F 1 193 10 57 24 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 431