COVER INFORMATION Station: VLBA_OV (Code Ov ) Experiment: The Core Shift of Sgr A* Exp. Code: BB230D Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA Notes: Schedule for VLBA_OV (Code Ov ) Page 2 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 08 59 37 3C345 14 19 22 61.9 73.5 -2.4 -83.6 0 1 1 0 08 59 37 09 00 17 --- 14 20 02 62.1 73.6 -2.4 -83.7 40 F 1 1 08 59 55 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 00 21 3C345 14 20 07 62.1 73.6 -2.4 -83.7 0 1 1 1 09 00 17 09 00 41 --- 14 20 27 62.1 73.6 -2.4 -83.7 20 F 1 2 09 00 17 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 00 41 3C345 14 20 27 62.1 73.6 -2.4 -83.7 -4 1 1 2 09 00 41 09 01 01 --- 14 20 47 62.2 73.6 -2.4 -83.8 16 F 1 3 09 00 41 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 01 01 3C345 14 20 47 62.2 73.6 -2.4 -83.8 -4 1 1 3 09 01 01 09 01 21 --- 14 21 07 62.3 73.6 -2.4 -83.8 16 F 1 3 09 01 01 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 01 21 3C345 14 21 07 62.3 73.6 -2.4 -83.8 -4 1 1 3 09 01 21 09 01 41 --- 14 21 27 62.3 73.6 -2.4 -83.8 16 F 1 4 09 01 21 Schedule for VLBA_OV (Code Ov ) Page 3 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 01 41 3C345 14 21 27 62.3 73.6 -2.4 -83.8 -4 1 1 4 09 01 41 09 02 01 --- 14 21 47 62.4 73.7 -2.4 -83.9 16 F 1 5 09 01 41 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 02 01 3C345 14 21 47 62.4 73.7 -2.4 -83.9 -4 1 1 5 09 02 01 09 02 41 --- 14 22 27 62.5 73.7 -2.3 -84.0 36 F 1 6 09 02 01 09 05 17 1749+096 14 25 03 36.0 107.0 -3.4 -50.6 97 1 1 6 09 05 17 09 05 57 --- 14 25 43 36.1 107.1 -3.4 -50.5 40 F 1 7 09 05 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 06 02 1749+096 14 25 48 36.1 107.1 -3.4 -50.5 0 1 1 7 09 05 57 09 06 22 --- 14 26 08 36.2 107.2 -3.4 -50.5 20 F 1 8 09 05 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 06 22 1749+096 14 26 08 36.2 107.2 -3.4 -50.5 -4 1 1 8 09 06 22 09 06 42 --- 14 26 28 36.3 107.3 -3.4 -50.5 16 F 1 9 09 06 22 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 06 42 1749+096 14 26 28 36.3 107.3 -3.4 -50.5 -4 1 1 9 09 06 42 09 07 02 --- 14 26 48 36.3 107.3 -3.4 -50.4 16 F 1 9 09 06 42 Schedule for VLBA_OV (Code Ov ) Page 4 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 07 02 1749+096 14 26 48 36.3 107.3 -3.4 -50.4 -4 1 1 9 09 07 02 09 07 21 --- 14 27 08 36.4 107.4 -3.4 -50.4 16 F 1 10 09 07 02 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 07 21 1749+096 14 27 08 36.4 107.4 -3.4 -50.4 -4 1 1 10 09 07 21 09 07 41 --- 14 27 28 36.5 107.4 -3.4 -50.4 16 F 1 11 09 07 21 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 07 41 1749+096 14 27 28 36.5 107.4 -3.4 -50.4 -4 1 1 11 09 07 41 09 08 21 --- 14 28 08 36.6 107.6 -3.4 -50.3 36 F 1 12 09 07 41 09 08 54 1741-038 14 28 41 28.8 120.9 -3.3 -43.2 12 1 1 12 09 08 54 09 09 34 --- 14 29 21 28.9 121.0 -3.3 -43.1 40 F 1 13 09 09 12 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 09 39 1741-038 14 29 26 28.9 121.0 -3.2 -43.1 0 1 1 13 09 09 34 09 09 59 --- 14 29 46 29.0 121.1 -3.2 -43.1 20 F 1 14 09 09 34 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 09 59 1741-038 14 29 46 29.0 121.1 -3.2 -43.1 -4 1 1 14 09 09 59 09 10 19 --- 14 30 06 29.0 121.2 -3.2 -43.1 16 F 1 15 09 09 59 Schedule for VLBA_OV (Code Ov ) Page 5 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 10 19 1741-038 14 30 06 29.0 121.2 -3.2 -43.1 -4 1 1 15 09 10 19 09 10 39 --- 14 30 26 29.1 121.3 -3.2 -43.0 16 F 1 15 09 10 19 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 10 39 1741-038 14 30 26 29.1 121.3 -3.2 -43.0 -4 1 1 15 09 10 39 09 10 59 --- 14 30 46 29.1 121.3 -3.2 -43.0 16 F 1 16 09 10 39 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 10 59 1741-038 14 30 46 29.1 121.3 -3.2 -43.0 -4 1 1 16 09 10 59 09 11 19 --- 14 31 06 29.2 121.4 -3.2 -42.9 16 F 1 17 09 10 59 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 11 19 1741-038 14 31 06 29.2 121.4 -3.2 -42.9 -4 1 1 17 09 11 19 09 11 58 --- 14 31 46 29.3 121.5 -3.2 -42.9 36 F 1 18 09 11 19 09 13 44 J1753+2848 14 33 32 47.6 86.3 -3.3 -65.0 63 1 1 18 09 13 44 09 14 24 --- 14 34 12 47.8 86.4 -3.3 -65.1 40 F 1 19 09 14 02 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 14 29 J1753+2848 14 34 16 47.8 86.4 -3.3 -65.1 0 1 1 19 09 14 24 09 14 48 --- 14 34 36 47.8 86.4 -3.3 -65.1 20 F 1 20 09 14 24 Schedule for VLBA_OV (Code Ov ) Page 6 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 14 48 J1753+2848 14 34 36 47.8 86.4 -3.3 -65.1 -4 1 1 20 09 14 48 09 15 08 --- 14 34 56 47.9 86.5 -3.3 -65.1 16 F 1 21 09 14 48 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 15 08 J1753+2848 14 34 56 47.9 86.5 -3.3 -65.1 -4 1 1 21 09 15 08 09 15 28 --- 14 35 16 48.0 86.5 -3.3 -65.1 16 F 1 21 09 15 08 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 15 28 J1753+2848 14 35 16 48.0 86.5 -3.3 -65.1 -4 1 1 21 09 15 28 09 15 48 --- 14 35 36 48.0 86.6 -3.3 -65.1 16 F 1 22 09 15 28 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 15 48 J1753+2848 14 35 36 48.0 86.6 -3.3 -65.1 -4 1 1 22 09 15 48 09 16 08 --- 14 35 56 48.1 86.6 -3.3 -65.1 16 F 1 22 09 15 48 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 16 13 J1753+2848 14 36 01 48.1 86.6 -3.3 -65.1 0 1 1 22 09 16 08 09 16 53 --- 14 36 41 48.3 86.7 -3.3 -65.1 40 F 1 24 09 16 08 09 17 59 3C345 14 37 47 65.5 74.3 -2.1 -85.9 26 1 1 24 09 17 59 09 19 59 --- 14 39 47 65.8 74.3 -2.1 -86.1 120 F 1 28 09 18 17 Schedule for VLBA_OV (Code Ov ) Page 7 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 20 03 3C345 14 39 52 65.8 74.3 -2.1 -86.2 0 1 1 28 09 19 59 09 22 03 --- 14 41 52 66.2 74.4 -2.0 -86.4 120 F 1 32 09 19 59 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 22 08 3C345 14 41 57 66.2 74.4 -2.0 -86.4 0 1 1 32 09 22 03 09 24 07 --- 14 43 57 66.6 74.5 -2.0 -86.7 120 F 1 36 09 22 03 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 26 39 J1826-2924 14 46 29 5.7 134.1 -3.7 -41.0 24 1 1 36 09 26 39 09 27 19 --- 14 47 09 5.8 134.2 -3.7 -40.9 40 F 1 37 09 26 57 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 27 37 SGRA 14 47 27 11.6 141.1 -3.0 -34.9 0 1 1 37 09 27 19 09 27 56 --- 14 47 47 11.7 141.2 -3.0 -34.8 20 F 1 38 09 27 19 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 27 56 SGRA 14 47 47 11.7 141.2 -3.0 -34.8 -4 1 1 38 09 27 56 09 28 16 --- 14 48 07 11.7 141.2 -3.0 -34.8 16 F 1 39 09 27 56 Schedule for VLBA_OV (Code Ov ) Page 8 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 28 16 SGRA 14 48 07 11.7 141.2 -3.0 -34.8 -4 1 1 39 09 28 16 09 28 36 --- 14 48 27 11.8 141.3 -3.0 -34.7 16 F 1 40 09 28 16 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 28 36 SGRA 14 48 27 11.8 141.3 -3.0 -34.7 -4 1 1 40 09 28 36 09 28 56 --- 14 48 47 11.8 141.4 -3.0 -34.6 16 F 1 40 09 28 36 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 28 56 SGRA 14 48 47 11.8 141.4 -3.0 -34.6 -4 1 1 40 09 28 56 09 29 16 --- 14 49 07 11.8 141.4 -3.0 -34.6 16 F 1 41 09 28 56 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 29 16 SGRA 14 49 07 11.8 141.4 -3.0 -34.6 -4 1 1 41 09 29 16 09 29 36 --- 14 49 27 11.9 141.5 -2.9 -34.5 16 F 1 42 09 29 16 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 29 36 SGRA 14 49 27 11.9 141.5 -2.9 -34.5 -4 1 1 42 09 29 36 09 29 56 --- 14 49 47 11.9 141.5 -2.9 -34.5 16 F 1 42 09 29 36 Schedule for VLBA_OV (Code Ov ) Page 9 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 29 56 SGRA 14 49 47 11.9 141.5 -2.9 -34.5 -4 1 1 42 09 29 56 09 30 16 --- 14 50 07 12.0 141.6 -2.9 -34.4 16 F 1 43 09 29 56 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 30 16 SGRA 14 50 07 12.0 141.6 -2.9 -34.4 -4 1 1 43 09 30 16 09 30 36 --- 14 50 27 12.0 141.7 -2.9 -34.4 16 F 1 43 09 30 16 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 30 36 SGRA 14 50 27 12.0 141.7 -2.9 -34.4 -4 1 1 43 09 30 36 09 30 56 --- 14 50 47 12.0 141.7 -2.9 -34.3 16 F 1 44 09 30 36 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 30 56 SGRA 14 50 47 12.0 141.7 -2.9 -34.3 -4 1 1 44 09 30 56 09 31 16 --- 14 51 07 12.1 141.8 -2.9 -34.3 16 F 1 45 09 30 56 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 31 33 J1826-2924 14 51 24 6.4 134.9 -3.6 -40.3 0 1 1 45 09 31 16 09 32 13 --- 14 52 04 6.5 135.0 -3.6 -40.2 40 F 1 47 09 31 16 Schedule for VLBA_OV (Code Ov ) Page 10 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 32 31 SGRA 14 52 21 12.2 142.0 -2.9 -34.1 0 1 1 47 09 32 13 09 32 50 --- 14 52 41 12.3 142.1 -2.9 -34.0 20 F 1 48 09 32 13 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 32 50 SGRA 14 52 41 12.3 142.1 -2.9 -34.0 -4 1 1 48 09 32 50 09 33 10 --- 14 53 01 12.3 142.1 -2.9 -34.0 16 F 1 48 09 32 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 33 10 SGRA 14 53 01 12.3 142.1 -2.9 -34.0 -4 1 1 48 09 33 10 09 33 30 --- 14 53 21 12.4 142.2 -2.9 -33.9 16 F 1 49 09 33 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 33 30 SGRA 14 53 21 12.4 142.2 -2.9 -33.9 -4 1 1 49 09 33 30 09 33 50 --- 14 53 41 12.4 142.3 -2.9 -33.9 16 F 1 50 09 33 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 33 50 SGRA 14 53 41 12.4 142.3 -2.9 -33.9 -4 1 1 50 09 33 50 09 34 10 --- 14 54 01 12.4 142.3 -2.9 -33.8 16 F 1 50 09 33 50 Schedule for VLBA_OV (Code Ov ) Page 11 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 34 10 SGRA 14 54 01 12.4 142.3 -2.9 -33.8 -4 1 1 50 09 34 10 09 34 30 --- 14 54 21 12.5 142.4 -2.9 -33.8 16 F 1 51 09 34 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 34 30 SGRA 14 54 21 12.5 142.4 -2.9 -33.8 -4 1 1 51 09 34 30 09 34 50 --- 14 54 41 12.5 142.5 -2.9 -33.7 16 F 1 52 09 34 30 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 34 50 SGRA 14 54 41 12.5 142.5 -2.9 -33.7 -4 1 1 52 09 34 50 09 35 10 --- 14 55 01 12.6 142.5 -2.9 -33.6 16 F 1 52 09 34 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 35 10 SGRA 14 55 01 12.6 142.5 -2.9 -33.6 -4 1 1 52 09 35 10 09 35 30 --- 14 55 21 12.6 142.6 -2.8 -33.6 16 F 1 53 09 35 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 35 30 SGRA 14 55 21 12.6 142.6 -2.8 -33.6 -4 1 1 53 09 35 30 09 35 50 --- 14 55 41 12.6 142.6 -2.8 -33.5 16 F 1 54 09 35 30 Schedule for VLBA_OV (Code Ov ) Page 12 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 35 50 SGRA 14 55 41 12.6 142.6 -2.8 -33.5 -4 1 1 54 09 35 50 09 36 10 --- 14 56 01 12.7 142.7 -2.8 -33.5 16 F 1 54 09 35 50 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 36 27 J1826-2924 14 56 19 7.1 135.8 -3.5 -39.6 0 1 1 54 09 36 10 09 37 07 --- 14 56 59 7.2 135.9 -3.5 -39.5 40 F 1 56 09 36 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 37 24 SGRA 14 57 16 12.8 142.9 -2.8 -33.3 0 1 1 56 09 37 07 09 37 44 --- 14 57 36 12.9 143.0 -2.8 -33.2 20 F 1 57 09 37 07 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 37 44 SGRA 14 57 36 12.9 143.0 -2.8 -33.2 -4 1 1 57 09 37 44 09 38 04 --- 14 57 56 12.9 143.1 -2.8 -33.2 16 F 1 58 09 37 44 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 38 04 SGRA 14 57 56 12.9 143.1 -2.8 -33.2 -4 1 1 58 09 38 04 09 38 24 --- 14 58 16 13.0 143.1 -2.8 -33.1 16 F 1 59 09 38 04 Schedule for VLBA_OV (Code Ov ) Page 13 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 38 24 SGRA 14 58 16 13.0 143.1 -2.8 -33.1 -4 1 1 59 09 38 24 09 38 44 --- 14 58 36 13.0 143.2 -2.8 -33.1 16 F 1 59 09 38 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 38 44 SGRA 14 58 36 13.0 143.2 -2.8 -33.1 -4 1 1 59 09 38 44 09 39 04 --- 14 58 56 13.0 143.2 -2.8 -33.0 16 F 1 60 09 38 44 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 39 04 SGRA 14 58 56 13.0 143.2 -2.8 -33.0 -4 1 1 60 09 39 04 09 39 24 --- 14 59 16 13.1 143.3 -2.8 -33.0 16 F 1 60 09 39 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 39 24 SGRA 14 59 16 13.1 143.3 -2.8 -33.0 -4 1 1 60 09 39 24 09 39 44 --- 14 59 36 13.1 143.4 -2.8 -32.9 16 F 1 61 09 39 24 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 39 44 SGRA 14 59 36 13.1 143.4 -2.8 -32.9 -4 1 1 61 09 39 44 09 40 04 --- 14 59 56 13.2 143.4 -2.8 -32.8 16 F 1 62 09 39 44 Schedule for VLBA_OV (Code Ov ) Page 14 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 40 04 SGRA 14 59 56 13.2 143.4 -2.8 -32.8 -4 1 1 62 09 40 04 09 40 24 --- 15 00 16 13.2 143.5 -2.8 -32.8 16 F 1 62 09 40 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 40 24 SGRA 15 00 16 13.2 143.5 -2.8 -32.8 -4 1 1 62 09 40 24 09 40 44 --- 15 00 36 13.2 143.6 -2.8 -32.7 16 F 1 63 09 40 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 40 44 SGRA 15 00 36 13.2 143.6 -2.8 -32.7 -4 1 1 63 09 40 44 09 41 04 --- 15 00 56 13.3 143.6 -2.8 -32.7 16 F 1 64 09 40 44 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 41 21 J1826-2924 15 01 13 7.8 136.6 -3.4 -38.9 0 1 1 64 09 41 04 09 42 00 --- 15 01 53 7.9 136.7 -3.4 -38.8 40 F 1 66 09 41 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 42 18 SGRA 15 02 10 13.4 143.9 -2.7 -32.5 0 1 1 66 09 42 00 09 42 37 --- 15 02 30 13.5 143.9 -2.7 -32.4 20 F 1 67 09 42 00 Schedule for VLBA_OV (Code Ov ) Page 15 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 42 37 SGRA 15 02 30 13.5 143.9 -2.7 -32.4 -4 1 1 67 09 42 37 09 42 57 --- 15 02 50 13.5 144.0 -2.7 -32.4 16 F 1 67 09 42 37 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 42 57 SGRA 15 02 50 13.5 144.0 -2.7 -32.4 -4 1 1 67 09 42 57 09 43 17 --- 15 03 10 13.5 144.0 -2.7 -32.3 16 F 1 68 09 42 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 43 17 SGRA 15 03 10 13.5 144.0 -2.7 -32.3 -4 1 1 68 09 43 17 09 43 37 --- 15 03 30 13.6 144.1 -2.7 -32.3 16 F 1 69 09 43 17 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 43 37 SGRA 15 03 30 13.6 144.1 -2.7 -32.3 -4 1 1 69 09 43 37 09 43 57 --- 15 03 50 13.6 144.2 -2.7 -32.2 16 F 1 69 09 43 37 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 43 57 SGRA 15 03 50 13.6 144.2 -2.7 -32.2 -4 1 1 69 09 43 57 09 44 17 --- 15 04 10 13.7 144.2 -2.7 -32.1 16 F 1 70 09 43 57 Schedule for VLBA_OV (Code Ov ) Page 16 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 44 17 SGRA 15 04 10 13.7 144.2 -2.7 -32.1 -4 1 1 70 09 44 17 09 44 37 --- 15 04 30 13.7 144.3 -2.7 -32.1 16 F 1 71 09 44 17 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 44 37 SGRA 15 04 30 13.7 144.3 -2.7 -32.1 -4 1 1 71 09 44 37 09 44 57 --- 15 04 50 13.7 144.4 -2.7 -32.0 16 F 1 71 09 44 37 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 44 57 SGRA 15 04 50 13.7 144.4 -2.7 -32.0 -4 1 1 71 09 44 57 09 45 17 --- 15 05 10 13.8 144.4 -2.7 -32.0 16 F 1 72 09 44 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 45 17 SGRA 15 05 10 13.8 144.4 -2.7 -32.0 -4 1 1 72 09 45 17 09 45 37 --- 15 05 30 13.8 144.5 -2.7 -31.9 16 F 1 72 09 45 17 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 45 37 SGRA 15 05 30 13.8 144.5 -2.7 -31.9 -4 1 1 72 09 45 37 09 45 57 --- 15 05 50 13.8 144.6 -2.7 -31.9 16 F 1 73 09 45 37 Schedule for VLBA_OV (Code Ov ) Page 17 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 46 14 J1826-2924 15 06 07 8.5 137.4 -3.3 -38.2 0 1 1 73 09 45 57 09 46 54 --- 15 06 47 8.6 137.5 -3.3 -38.1 40 F 1 75 09 45 57 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 47 10 SGRA 15 07 04 14.0 144.8 -2.7 -31.7 0 1 1 75 09 46 54 09 47 30 --- 15 07 24 14.0 144.9 -2.6 -31.6 20 F 1 76 09 46 54 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 47 30 SGRA 15 07 24 14.0 144.9 -2.6 -31.6 -4 1 1 76 09 47 30 09 47 50 --- 15 07 44 14.1 144.9 -2.6 -31.5 16 F 1 77 09 47 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 47 50 SGRA 15 07 44 14.1 144.9 -2.6 -31.5 -4 1 1 77 09 47 50 09 48 10 --- 15 08 04 14.1 145.0 -2.6 -31.5 16 F 1 77 09 47 50 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 48 10 SGRA 15 08 04 14.1 145.0 -2.6 -31.5 -4 1 1 77 09 48 10 09 48 30 --- 15 08 24 14.1 145.0 -2.6 -31.4 16 F 1 78 09 48 10 Schedule for VLBA_OV (Code Ov ) Page 18 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 48 30 SGRA 15 08 24 14.1 145.0 -2.6 -31.4 -4 1 1 78 09 48 30 09 48 50 --- 15 08 44 14.2 145.1 -2.6 -31.4 16 F 1 79 09 48 30 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 48 50 SGRA 15 08 44 14.2 145.1 -2.6 -31.4 -4 1 1 79 09 48 50 09 49 10 --- 15 09 04 14.2 145.2 -2.6 -31.3 16 F 1 79 09 48 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 49 10 SGRA 15 09 04 14.2 145.2 -2.6 -31.3 -4 1 1 79 09 49 10 09 49 30 --- 15 09 24 14.3 145.2 -2.6 -31.3 16 F 1 80 09 49 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 49 30 SGRA 15 09 24 14.3 145.2 -2.6 -31.3 -4 1 1 80 09 49 30 09 49 50 --- 15 09 44 14.3 145.3 -2.6 -31.2 16 F 1 81 09 49 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 49 50 SGRA 15 09 44 14.3 145.3 -2.6 -31.2 -4 1 1 81 09 49 50 09 50 10 --- 15 10 04 14.3 145.4 -2.6 -31.2 16 F 1 81 09 49 50 Schedule for VLBA_OV (Code Ov ) Page 19 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 50 10 SGRA 15 10 04 14.3 145.4 -2.6 -31.2 -4 1 1 81 09 50 10 09 50 30 --- 15 10 24 14.4 145.4 -2.6 -31.1 16 F 1 82 09 50 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 50 30 SGRA 15 10 24 14.4 145.4 -2.6 -31.1 -4 1 1 82 09 50 30 09 50 50 --- 15 10 44 14.4 145.5 -2.6 -31.0 16 F 1 83 09 50 30 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 51 06 J1826-2924 15 11 00 9.1 138.3 -3.3 -37.5 0 1 1 83 09 50 50 09 51 46 --- 15 11 40 9.2 138.4 -3.3 -37.4 40 F 1 84 09 50 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 52 03 SGRA 15 11 57 14.5 145.7 -2.6 -30.8 0 1 1 84 09 51 46 09 52 23 --- 15 12 17 14.6 145.8 -2.6 -30.8 20 F 1 86 09 51 46 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 52 23 SGRA 15 12 17 14.6 145.8 -2.6 -30.8 -4 1 1 86 09 52 23 09 52 43 --- 15 12 37 14.6 145.9 -2.6 -30.7 16 F 1 86 09 52 23 Schedule for VLBA_OV (Code Ov ) Page 20 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 52 43 SGRA 15 12 37 14.6 145.9 -2.6 -30.7 -4 1 1 86 09 52 43 09 53 03 --- 15 12 57 14.7 145.9 -2.6 -30.7 16 F 1 87 09 52 43 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 53 03 SGRA 15 12 57 14.7 145.9 -2.6 -30.7 -4 1 1 87 09 53 03 09 53 23 --- 15 13 17 14.7 146.0 -2.5 -30.6 16 F 1 88 09 53 03 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 53 23 SGRA 15 13 17 14.7 146.0 -2.5 -30.6 -4 1 1 88 09 53 23 09 53 43 --- 15 13 37 14.7 146.1 -2.5 -30.6 16 F 1 88 09 53 23 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 53 43 SGRA 15 13 37 14.7 146.1 -2.5 -30.6 -4 1 1 88 09 53 43 09 54 03 --- 15 13 57 14.8 146.1 -2.5 -30.5 16 F 1 89 09 53 43 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 54 03 SGRA 15 13 57 14.8 146.1 -2.5 -30.5 -4 1 1 89 09 54 03 09 54 23 --- 15 14 17 14.8 146.2 -2.5 -30.4 16 F 1 89 09 54 03 Schedule for VLBA_OV (Code Ov ) Page 21 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 54 23 SGRA 15 14 17 14.8 146.2 -2.5 -30.4 -4 1 1 89 09 54 23 09 54 43 --- 15 14 37 14.8 146.3 -2.5 -30.4 16 F 1 90 09 54 23 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 54 43 SGRA 15 14 37 14.8 146.3 -2.5 -30.4 -4 1 1 90 09 54 43 09 55 03 --- 15 14 57 14.9 146.3 -2.5 -30.3 16 F 1 91 09 54 43 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 55 03 SGRA 15 14 57 14.9 146.3 -2.5 -30.3 -4 1 1 91 09 55 03 09 55 22 --- 15 15 17 14.9 146.4 -2.5 -30.3 16 F 1 91 09 55 03 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 55 22 SGRA 15 15 17 14.9 146.4 -2.5 -30.3 -4 1 1 91 09 55 22 09 55 42 --- 15 15 37 15.0 146.4 -2.5 -30.2 16 F 1 92 09 55 22 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 55 59 J1826-2924 15 15 54 9.8 139.1 -3.2 -36.7 0 1 1 92 09 55 42 09 56 39 --- 15 16 34 9.8 139.3 -3.2 -36.6 40 F 1 94 09 55 42 Schedule for VLBA_OV (Code Ov ) Page 22 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 56 55 SGRA 15 16 50 15.1 146.7 -2.5 -30.0 0 1 1 94 09 56 39 09 57 15 --- 15 17 10 15.1 146.8 -2.5 -29.9 20 F 1 95 09 56 39 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 57 15 SGRA 15 17 10 15.1 146.8 -2.5 -29.9 -4 1 1 95 09 57 15 09 57 35 --- 15 17 30 15.2 146.8 -2.5 -29.9 16 F 1 96 09 57 15 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 57 35 SGRA 15 17 30 15.2 146.8 -2.5 -29.9 -4 1 1 96 09 57 35 09 57 55 --- 15 17 50 15.2 146.9 -2.5 -29.8 16 F 1 96 09 57 35 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 57 55 SGRA 15 17 50 15.2 146.9 -2.5 -29.8 -4 1 1 96 09 57 55 09 58 15 --- 15 18 10 15.2 146.9 -2.5 -29.8 16 F 1 97 09 57 55 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 58 15 SGRA 15 18 10 15.2 146.9 -2.5 -29.8 -4 1 1 97 09 58 15 09 58 35 --- 15 18 30 15.3 147.0 -2.5 -29.7 16 F 1 98 09 58 15 Schedule for VLBA_OV (Code Ov ) Page 23 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 58 35 SGRA 15 18 30 15.3 147.0 -2.5 -29.7 -4 1 1 98 09 58 35 09 58 55 --- 15 18 50 15.3 147.1 -2.5 -29.7 16 F 1 98 09 58 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 58 55 SGRA 15 18 50 15.3 147.1 -2.5 -29.7 -4 1 1 98 09 58 55 09 59 15 --- 15 19 10 15.3 147.1 -2.4 -29.6 16 F 1 99 09 58 55 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 59 15 SGRA 15 19 10 15.3 147.1 -2.4 -29.6 -4 1 1 99 09 59 15 09 59 35 --- 15 19 30 15.4 147.2 -2.4 -29.5 16 F 1 100 09 59 15 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 59 35 SGRA 15 19 30 15.4 147.2 -2.4 -29.5 -4 1 1 100 09 59 35 09 59 55 --- 15 19 50 15.4 147.3 -2.4 -29.5 16 F 1 100 09 59 35 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 59 55 SGRA 15 19 50 15.4 147.3 -2.4 -29.5 -4 1 1 100 09 59 55 10 00 15 --- 15 20 10 15.4 147.3 -2.4 -29.4 16 F 1 101 09 59 55 Schedule for VLBA_OV (Code Ov ) Page 24 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 00 15 SGRA 15 20 10 15.4 147.3 -2.4 -29.4 -4 1 1 101 10 00 15 10 00 35 --- 15 20 30 15.5 147.4 -2.4 -29.4 16 F 1 101 10 00 15 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 00 51 J1826-2924 15 20 46 10.4 140.0 -3.1 -36.0 0 1 1 101 10 00 35 10 01 31 --- 15 21 26 10.5 140.1 -3.1 -35.9 40 F 1 103 10 00 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 01 47 SGRA 15 21 43 15.6 147.6 -2.4 -29.2 0 1 1 103 10 01 31 10 02 07 --- 15 22 03 15.6 147.7 -2.4 -29.1 20 F 1 104 10 01 31 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 02 07 SGRA 15 22 03 15.6 147.7 -2.4 -29.1 -4 1 1 104 10 02 07 10 02 27 --- 15 22 23 15.7 147.8 -2.4 -29.0 16 F 1 105 10 02 07 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 02 27 SGRA 15 22 23 15.7 147.8 -2.4 -29.0 -4 1 1 105 10 02 27 10 02 47 --- 15 22 43 15.7 147.8 -2.4 -29.0 16 F 1 106 10 02 27 Schedule for VLBA_OV (Code Ov ) Page 25 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 02 47 SGRA 15 22 43 15.7 147.8 -2.4 -29.0 -4 1 1 106 10 02 47 10 03 07 --- 15 23 03 15.8 147.9 -2.4 -28.9 16 F 1 106 10 02 47 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 03 07 SGRA 15 23 03 15.8 147.9 -2.4 -28.9 -4 1 1 106 10 03 07 10 03 27 --- 15 23 23 15.8 148.0 -2.4 -28.9 16 F 1 107 10 03 07 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 03 27 SGRA 15 23 23 15.8 148.0 -2.4 -28.9 -4 1 1 107 10 03 27 10 03 47 --- 15 23 43 15.8 148.0 -2.4 -28.8 16 F 1 108 10 03 27 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 03 47 SGRA 15 23 43 15.8 148.0 -2.4 -28.8 -4 1 1 108 10 03 47 10 04 07 --- 15 24 03 15.9 148.1 -2.4 -28.7 16 F 1 108 10 03 47 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 04 07 SGRA 15 24 03 15.9 148.1 -2.4 -28.7 -4 1 1 108 10 04 07 10 04 26 --- 15 24 23 15.9 148.2 -2.4 -28.7 16 F 1 109 10 04 07 Schedule for VLBA_OV (Code Ov ) Page 26 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 04 26 SGRA 15 24 23 15.9 148.2 -2.4 -28.7 -4 1 1 109 10 04 26 10 04 46 --- 15 24 43 15.9 148.2 -2.4 -28.6 16 F 1 110 10 04 26 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 04 46 SGRA 15 24 43 15.9 148.2 -2.4 -28.6 -4 1 1 110 10 04 46 10 05 06 --- 15 25 03 16.0 148.3 -2.4 -28.6 16 F 1 110 10 04 46 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 05 06 SGRA 15 25 03 16.0 148.3 -2.4 -28.6 -4 1 1 110 10 05 06 10 05 26 --- 15 25 23 16.0 148.4 -2.3 -28.5 16 F 1 111 10 05 06 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 05 42 J1826-2924 15 25 39 11.0 140.9 -3.0 -35.2 0 1 1 111 10 05 26 10 06 22 --- 15 26 19 11.1 141.0 -3.0 -35.1 40 F 1 113 10 05 26 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 06 38 SGRA 15 26 35 16.1 148.6 -2.3 -28.3 0 1 1 113 10 06 22 10 06 58 --- 15 26 55 16.2 148.7 -2.3 -28.2 20 F 1 114 10 06 22 Schedule for VLBA_OV (Code Ov ) Page 27 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 06 58 SGRA 15 26 55 16.2 148.7 -2.3 -28.2 -4 1 1 114 10 06 58 10 07 18 --- 15 27 15 16.2 148.8 -2.3 -28.2 16 F 1 114 10 06 58 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 07 18 SGRA 15 27 15 16.2 148.8 -2.3 -28.2 -4 1 1 114 10 07 18 10 07 38 --- 15 27 35 16.2 148.8 -2.3 -28.1 16 F 1 115 10 07 18 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 07 38 SGRA 15 27 35 16.2 148.8 -2.3 -28.1 -4 1 1 115 10 07 38 10 07 58 --- 15 27 55 16.3 148.9 -2.3 -28.1 16 F 1 116 10 07 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 07 58 SGRA 15 27 55 16.3 148.9 -2.3 -28.1 -4 1 1 116 10 07 58 10 08 18 --- 15 28 15 16.3 149.0 -2.3 -28.0 16 F 1 116 10 07 58 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 08 18 SGRA 15 28 15 16.3 149.0 -2.3 -28.0 -4 1 1 116 10 08 18 10 08 38 --- 15 28 35 16.3 149.0 -2.3 -27.9 16 F 1 117 10 08 18 Schedule for VLBA_OV (Code Ov ) Page 28 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 08 38 SGRA 15 28 35 16.3 149.0 -2.3 -27.9 -4 1 1 117 10 08 38 10 08 58 --- 15 28 55 16.4 149.1 -2.3 -27.9 16 F 1 118 10 08 38 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 08 58 SGRA 15 28 55 16.4 149.1 -2.3 -27.9 -4 1 1 118 10 08 58 10 09 18 --- 15 29 15 16.4 149.2 -2.3 -27.8 16 F 1 118 10 08 58 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 09 18 SGRA 15 29 15 16.4 149.2 -2.3 -27.8 -4 1 1 118 10 09 18 10 09 38 --- 15 29 35 16.4 149.2 -2.3 -27.8 16 F 1 119 10 09 18 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 09 38 SGRA 15 29 35 16.4 149.2 -2.3 -27.8 -4 1 1 119 10 09 38 10 09 58 --- 15 29 55 16.5 149.3 -2.3 -27.7 16 F 1 120 10 09 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 09 58 SGRA 15 29 55 16.5 149.3 -2.3 -27.7 -4 1 1 120 10 09 58 10 10 18 --- 15 30 15 16.5 149.4 -2.3 -27.6 16 F 1 120 10 09 58 Schedule for VLBA_OV (Code Ov ) Page 29 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 10 33 J1826-2924 15 30 31 11.6 141.8 -2.9 -34.4 0 1 1 120 10 10 18 10 11 13 --- 15 31 11 11.7 141.9 -2.9 -34.3 40 F 1 122 10 10 18 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 11 29 SGRA 15 31 26 16.6 149.6 -2.2 -27.4 0 1 1 122 10 11 13 10 11 49 --- 15 31 46 16.7 149.7 -2.2 -27.4 20 F 1 123 10 11 13 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 11 49 SGRA 15 31 46 16.7 149.7 -2.2 -27.4 -4 1 1 123 10 11 49 10 12 09 --- 15 32 06 16.7 149.7 -2.2 -27.3 16 F 1 124 10 11 49 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 12 09 SGRA 15 32 06 16.7 149.7 -2.2 -27.3 -4 1 1 124 10 12 09 10 12 29 --- 15 32 26 16.7 149.8 -2.2 -27.3 16 F 1 124 10 12 09 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 12 29 SGRA 15 32 26 16.7 149.8 -2.2 -27.3 -4 1 1 124 10 12 29 10 12 49 --- 15 32 46 16.8 149.9 -2.2 -27.2 16 F 1 125 10 12 29 Schedule for VLBA_OV (Code Ov ) Page 30 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 12 49 SGRA 15 32 46 16.8 149.9 -2.2 -27.2 -4 1 1 125 10 12 49 10 13 09 --- 15 33 06 16.8 149.9 -2.2 -27.1 16 F 1 126 10 12 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 13 09 SGRA 15 33 06 16.8 149.9 -2.2 -27.1 -4 1 1 126 10 13 09 10 13 29 --- 15 33 26 16.8 150.0 -2.2 -27.1 16 F 1 126 10 13 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 13 29 SGRA 15 33 26 16.8 150.0 -2.2 -27.1 -4 1 1 126 10 13 29 10 13 49 --- 15 33 46 16.9 150.1 -2.2 -27.0 16 F 1 127 10 13 29 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 13 49 SGRA 15 33 46 16.9 150.1 -2.2 -27.0 -4 1 1 127 10 13 49 10 14 09 --- 15 34 06 16.9 150.1 -2.2 -27.0 16 F 1 128 10 13 49 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 14 09 SGRA 15 34 06 16.9 150.1 -2.2 -27.0 -4 1 1 128 10 14 09 10 14 29 --- 15 34 26 16.9 150.2 -2.2 -26.9 16 F 1 128 10 14 09 Schedule for VLBA_OV (Code Ov ) Page 31 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 14 29 SGRA 15 34 26 16.9 150.2 -2.2 -26.9 -4 1 1 128 10 14 29 10 14 49 --- 15 34 46 17.0 150.3 -2.2 -26.8 16 F 1 129 10 14 29 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 14 49 SGRA 15 34 46 17.0 150.3 -2.2 -26.8 -4 1 1 129 10 14 49 10 15 09 --- 15 35 06 17.0 150.3 -2.2 -26.8 16 F 1 130 10 14 49 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 15 24 J1826-2924 15 35 22 12.2 142.7 -2.9 -33.7 0 1 1 130 10 15 09 10 16 04 --- 15 36 02 12.3 142.8 -2.8 -33.5 40 F 1 131 10 15 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 16 20 SGRA 15 36 18 17.1 150.6 -2.2 -26.6 0 1 1 131 10 16 04 10 16 40 --- 15 36 38 17.1 150.7 -2.2 -26.5 20 F 1 133 10 16 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 16 40 SGRA 15 36 38 17.1 150.7 -2.2 -26.5 -4 1 1 133 10 16 40 10 17 00 --- 15 36 58 17.2 150.7 -2.2 -26.4 16 F 1 133 10 16 40 Schedule for VLBA_OV (Code Ov ) Page 32 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 17 00 SGRA 15 36 58 17.2 150.7 -2.2 -26.4 -4 1 1 133 10 17 00 10 17 19 --- 15 37 18 17.2 150.8 -2.1 -26.4 16 F 1 134 10 17 00 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 17 19 SGRA 15 37 18 17.2 150.8 -2.1 -26.4 -4 1 1 134 10 17 19 10 17 39 --- 15 37 38 17.2 150.9 -2.1 -26.3 16 F 1 135 10 17 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 17 39 SGRA 15 37 38 17.2 150.9 -2.1 -26.3 -4 1 1 135 10 17 39 10 17 59 --- 15 37 58 17.3 150.9 -2.1 -26.3 16 F 1 135 10 17 39 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 17 59 SGRA 15 37 58 17.3 150.9 -2.1 -26.3 -4 1 1 135 10 17 59 10 18 19 --- 15 38 18 17.3 151.0 -2.1 -26.2 16 F 1 136 10 17 59 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 18 19 SGRA 15 38 18 17.3 151.0 -2.1 -26.2 -4 1 1 136 10 18 19 10 18 39 --- 15 38 38 17.3 151.1 -2.1 -26.1 16 F 1 136 10 18 19 Schedule for VLBA_OV (Code Ov ) Page 33 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 18 39 SGRA 15 38 38 17.3 151.1 -2.1 -26.1 -4 1 1 136 10 18 39 10 18 59 --- 15 38 58 17.4 151.1 -2.1 -26.1 16 F 1 137 10 18 39 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 18 59 SGRA 15 38 58 17.4 151.1 -2.1 -26.1 -4 1 1 137 10 18 59 10 19 19 --- 15 39 18 17.4 151.2 -2.1 -26.0 16 F 1 138 10 18 59 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 19 19 SGRA 15 39 18 17.4 151.2 -2.1 -26.0 -4 1 1 138 10 19 19 10 19 39 --- 15 39 38 17.4 151.3 -2.1 -26.0 16 F 1 138 10 19 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 19 39 SGRA 15 39 38 17.4 151.3 -2.1 -26.0 -4 1 1 138 10 19 39 10 19 59 --- 15 39 58 17.5 151.3 -2.1 -25.9 16 F 1 139 10 19 39 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 20 14 J1826-2924 15 40 13 12.8 143.6 -2.8 -32.9 0 1 1 139 10 19 59 10 20 54 --- 15 40 53 12.9 143.7 -2.8 -32.7 40 F 1 141 10 19 59 10 23 25 3C345 15 43 24 78.0 73.1 -1.0 -97.6 14 1 1 141 10 23 25 10 24 04 --- 15 44 04 78.2 73.0 -1.0 -97.8 40 F 1 142 10 23 43 Schedule for VLBA_OV (Code Ov ) Page 34 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 24 09 3C345 15 44 09 78.2 73.0 -1.0 -97.8 0 1 1 142 10 24 04 10 24 29 --- 15 44 29 78.2 72.9 -1.0 -97.9 20 F 1 143 10 24 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 24 29 3C345 15 44 29 78.2 72.9 -1.0 -97.9 -4 1 1 143 10 24 29 10 24 49 --- 15 44 49 78.3 72.9 -1.0 -98.0 16 F 1 144 10 24 29 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 24 49 3C345 15 44 49 78.3 72.9 -1.0 -98.0 -4 1 1 144 10 24 49 10 25 09 --- 15 45 09 78.4 72.8 -1.0 -98.1 16 F 1 144 10 24 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 25 09 3C345 15 45 09 78.4 72.8 -1.0 -98.1 -4 1 1 144 10 25 09 10 25 29 --- 15 45 29 78.4 72.8 -1.0 -98.2 16 F 1 145 10 25 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 25 29 3C345 15 45 29 78.4 72.8 -1.0 -98.2 -4 1 1 145 10 25 29 10 25 49 --- 15 45 49 78.5 72.8 -1.0 -98.3 16 F 1 145 10 25 29 Schedule for VLBA_OV (Code Ov ) Page 35 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 25 49 3C345 15 45 49 78.5 72.8 -1.0 -98.3 -4 1 1 145 10 25 49 10 26 29 --- 15 46 29 78.6 72.7 -0.9 -98.5 36 F 1 147 10 25 49 10 28 09 1749+096 15 48 09 50.8 126.7 -2.1 -40.3 38 1 1 147 10 28 09 10 28 49 --- 15 48 49 50.9 126.9 -2.1 -40.2 40 F 1 148 10 28 27 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 28 53 1749+096 15 48 53 50.9 127.0 -2.1 -40.2 0 1 1 148 10 28 49 10 29 13 --- 15 49 13 50.9 127.1 -2.0 -40.1 20 F 1 149 10 28 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 29 13 1749+096 15 49 13 50.9 127.1 -2.0 -40.1 -4 1 1 149 10 29 13 10 29 33 --- 15 49 33 51.0 127.2 -2.0 -40.1 16 F 1 149 10 29 13 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 29 33 1749+096 15 49 33 51.0 127.2 -2.0 -40.1 -4 1 1 149 10 29 33 10 29 53 --- 15 49 53 51.0 127.3 -2.0 -40.0 16 F 1 150 10 29 33 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 29 53 1749+096 15 49 53 51.0 127.3 -2.0 -40.0 -4 1 1 150 10 29 53 10 30 13 --- 15 50 13 51.1 127.4 -2.0 -39.9 16 F 1 151 10 29 53 Schedule for VLBA_OV (Code Ov ) Page 36 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 30 13 1749+096 15 50 13 51.1 127.4 -2.0 -39.9 -4 1 1 151 10 30 13 10 30 33 --- 15 50 33 51.2 127.5 -2.0 -39.9 16 F 1 151 10 30 13 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 30 33 1749+096 15 50 33 51.2 127.5 -2.0 -39.9 -4 1 1 151 10 30 33 10 31 13 --- 15 51 13 51.3 127.7 -2.0 -39.7 36 F 1 153 10 30 33 10 31 46 1741-038 15 51 46 41.3 141.2 -1.9 -30.0 7 1 1 153 10 31 46 10 32 26 --- 15 52 26 41.4 141.4 -1.9 -29.9 40 F 1 154 10 32 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 32 30 1741-038 15 52 31 41.4 141.4 -1.9 -29.8 0 1 1 154 10 32 26 10 32 50 --- 15 52 51 41.4 141.5 -1.9 -29.8 20 F 1 155 10 32 26 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 32 50 1741-038 15 52 51 41.4 141.5 -1.9 -29.8 -4 1 1 155 10 32 50 10 33 10 --- 15 53 11 41.5 141.6 -1.9 -29.7 16 F 1 155 10 32 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 33 10 1741-038 15 53 11 41.5 141.6 -1.9 -29.7 -4 1 1 155 10 33 10 10 33 30 --- 15 53 31 41.5 141.7 -1.8 -29.6 16 F 1 156 10 33 10 Schedule for VLBA_OV (Code Ov ) Page 37 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 33 30 1741-038 15 53 31 41.5 141.7 -1.8 -29.6 -4 1 1 156 10 33 30 10 33 50 --- 15 53 51 41.5 141.8 -1.8 -29.6 16 F 1 157 10 33 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 33 50 1741-038 15 53 51 41.5 141.8 -1.8 -29.6 -4 1 1 157 10 33 50 10 34 10 --- 15 54 11 41.6 141.9 -1.8 -29.5 16 F 1 157 10 33 50 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 34 10 1741-038 15 54 11 41.6 141.9 -1.8 -29.5 -4 1 1 157 10 34 10 10 34 50 --- 15 54 51 41.7 142.1 -1.8 -29.4 36 F 1 159 10 34 10 10 36 01 J1753+2848 15 56 02 64.0 100.3 -2.0 -63.4 20 1 1 159 10 36 01 10 36 40 --- 15 56 42 64.1 100.4 -2.0 -63.3 40 F 1 160 10 36 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 36 45 J1753+2848 15 56 46 64.1 100.4 -2.0 -63.3 0 1 1 160 10 36 40 10 37 05 --- 15 57 06 64.2 100.5 -1.9 -63.3 20 F 1 161 10 36 40 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 37 05 J1753+2848 15 57 06 64.2 100.5 -1.9 -63.3 -4 1 1 161 10 37 05 10 37 25 --- 15 57 26 64.3 100.6 -1.9 -63.3 16 F 1 161 10 37 05 Schedule for VLBA_OV (Code Ov ) Page 38 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 37 25 J1753+2848 15 57 26 64.3 100.6 -1.9 -63.3 -4 1 1 161 10 37 25 10 37 45 --- 15 57 46 64.3 100.6 -1.9 -63.2 16 F 1 162 10 37 25 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 37 45 J1753+2848 15 57 46 64.3 100.6 -1.9 -63.2 -4 1 1 162 10 37 45 10 38 05 --- 15 58 06 64.4 100.7 -1.9 -63.2 16 F 1 163 10 37 45 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 38 05 J1753+2848 15 58 06 64.4 100.7 -1.9 -63.2 -4 1 1 163 10 38 05 10 38 25 --- 15 58 26 64.5 100.8 -1.9 -63.2 16 F 1 163 10 38 05 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 38 29 J1753+2848 15 58 31 64.5 100.8 -1.9 -63.2 0 1 1 163 10 38 25 10 39 09 --- 15 59 11 64.6 101.0 -1.9 -63.1 40 F 1 165 10 38 25 10 40 40 3C345 16 00 42 81.3 69.6 -0.7 -103.7 51 1 1 165 10 40 40 10 42 39 --- 16 02 42 81.7 69.0 -0.7 -104.7 120 F 1 169 10 40 58 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 42 44 3C345 16 02 47 81.7 69.0 -0.7 -104.7 0 1 1 169 10 42 39 10 44 44 --- 16 04 47 82.1 68.3 -0.6 -105.7 120 F 1 173 10 42 39 Schedule for VLBA_OV (Code Ov ) Page 39 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 44 49 3C345 16 04 51 82.1 68.2 -0.6 -105.8 0 1 1 173 10 44 44 10 46 48 --- 16 06 51 82.4 67.4 -0.6 -106.9 120 F 1 177 10 44 44 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 49 20 J1826-2924 16 09 23 16.0 149.2 -2.3 -27.9 12 1 1 177 10 49 20 10 50 00 --- 16 10 03 16.1 149.4 -2.3 -27.7 40 F 1 178 10 49 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 50 22 SGRA 16 10 25 20.1 157.8 -1.6 -20.1 8 1 1 178 10 50 00 10 50 42 --- 16 10 45 20.1 157.9 -1.6 -20.0 20 F 1 179 10 50 00 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 50 42 SGRA 16 10 45 20.1 157.9 -1.6 -20.0 -4 1 1 179 10 50 42 10 51 02 --- 16 11 05 20.1 158.0 -1.6 -20.0 16 F 1 180 10 50 42 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 51 02 SGRA 16 11 05 20.1 158.0 -1.6 -20.0 -4 1 1 180 10 51 02 10 51 21 --- 16 11 25 20.1 158.0 -1.6 -19.9 16 F 1 181 10 51 02 Schedule for VLBA_OV (Code Ov ) Page 40 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 51 21 SGRA 16 11 25 20.1 158.0 -1.6 -19.9 -4 1 1 181 10 51 21 10 51 41 --- 16 11 45 20.2 158.1 -1.6 -19.8 16 F 1 181 10 51 21 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 51 41 SGRA 16 11 45 20.2 158.1 -1.6 -19.8 -4 1 1 181 10 51 41 10 52 01 --- 16 12 05 20.2 158.2 -1.6 -19.8 16 F 1 182 10 51 41 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 52 01 SGRA 16 12 05 20.2 158.2 -1.6 -19.8 -4 1 1 182 10 52 01 10 52 21 --- 16 12 25 20.2 158.3 -1.6 -19.7 16 F 1 182 10 52 01 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 52 21 SGRA 16 12 25 20.2 158.3 -1.6 -19.7 -4 1 1 182 10 52 21 10 52 41 --- 16 12 45 20.2 158.3 -1.6 -19.7 16 F 1 183 10 52 21 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 52 41 SGRA 16 12 45 20.2 158.3 -1.6 -19.7 -4 1 1 183 10 52 41 10 53 01 --- 16 13 05 20.3 158.4 -1.6 -19.6 16 F 1 184 10 52 41 Schedule for VLBA_OV (Code Ov ) Page 41 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 53 01 SGRA 16 13 05 20.3 158.4 -1.6 -19.6 -4 1 1 184 10 53 01 10 53 21 --- 16 13 25 20.3 158.5 -1.5 -19.5 16 F 1 184 10 53 01 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 53 21 SGRA 16 13 25 20.3 158.5 -1.5 -19.5 -4 1 1 184 10 53 21 10 53 41 --- 16 13 45 20.3 158.5 -1.5 -19.5 16 F 1 185 10 53 21 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 53 41 SGRA 16 13 45 20.3 158.5 -1.5 -19.5 -4 1 1 185 10 53 41 10 54 01 --- 16 14 05 20.3 158.6 -1.5 -19.4 16 F 1 186 10 53 41 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 54 23 J1826-2924 16 14 27 16.5 150.3 -2.2 -27.0 8 1 1 186 10 54 01 10 55 03 --- 16 15 07 16.6 150.4 -2.2 -26.8 40 F 1 188 10 54 01 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 55 24 SGRA 16 15 29 20.4 158.9 -1.5 -19.1 8 1 1 188 10 55 03 10 55 44 --- 16 15 49 20.5 159.0 -1.5 -19.0 20 F 1 189 10 55 03 Schedule for VLBA_OV (Code Ov ) Page 42 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 55 44 SGRA 16 15 49 20.5 159.0 -1.5 -19.0 -4 1 1 189 10 55 44 10 56 04 --- 16 16 09 20.5 159.1 -1.5 -19.0 16 F 1 190 10 55 44 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 56 04 SGRA 16 16 09 20.5 159.1 -1.5 -19.0 -4 1 1 190 10 56 04 10 56 24 --- 16 16 29 20.5 159.1 -1.5 -18.9 16 F 1 190 10 56 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 56 24 SGRA 16 16 29 20.5 159.1 -1.5 -18.9 -4 1 1 190 10 56 24 10 56 44 --- 16 16 49 20.5 159.2 -1.5 -18.8 16 F 1 191 10 56 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 56 44 SGRA 16 16 49 20.5 159.2 -1.5 -18.8 -4 1 1 191 10 56 44 10 57 04 --- 16 17 09 20.5 159.3 -1.5 -18.8 16 F 1 192 10 56 44 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 57 04 SGRA 16 17 09 20.5 159.3 -1.5 -18.8 -4 1 1 192 10 57 04 10 57 24 --- 16 17 29 20.6 159.4 -1.5 -18.7 16 F 1 192 10 57 04 Schedule for VLBA_OV (Code Ov ) Page 43 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 57 24 SGRA 16 17 29 20.6 159.4 -1.5 -18.7 -4 1 1 192 10 57 24 10 57 44 --- 16 17 49 20.6 159.4 -1.5 -18.6 16 F 1 193 10 57 24 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 431