COVER INFORMATION Station: VLBA_LA (Code La ) Experiment: The Core Shift of Sgr A* Exp. Code: BB230D Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA Notes: Schedule for VLBA_LA (Code La ) Page 2 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 08 59 37 3C345 15 07 30 70.7 70.8 -1.6 -94.4 0 1 1 0 08 59 37 09 00 17 --- 15 08 10 70.8 70.8 -1.6 -94.5 40 F 1 1 08 59 55 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 00 21 3C345 15 08 14 70.9 70.8 -1.6 -94.6 0 1 1 1 09 00 17 09 00 41 --- 15 08 34 70.9 70.7 -1.6 -94.6 20 F 1 2 09 00 17 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 00 41 3C345 15 08 34 70.9 70.7 -1.6 -94.6 -4 1 1 2 09 00 41 09 01 01 --- 15 08 54 71.0 70.7 -1.6 -94.7 16 F 1 3 09 00 41 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 01 01 3C345 15 08 54 71.0 70.7 -1.6 -94.7 -4 1 1 3 09 01 01 09 01 21 --- 15 09 14 71.1 70.7 -1.6 -94.8 16 F 1 3 09 01 01 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 01 21 3C345 15 09 14 71.1 70.7 -1.6 -94.8 -4 1 1 3 09 01 21 09 01 41 --- 15 09 34 71.1 70.7 -1.6 -94.8 16 F 1 4 09 01 21 Schedule for VLBA_LA (Code La ) Page 3 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 01 41 3C345 15 09 34 71.1 70.7 -1.6 -94.8 -4 1 1 4 09 01 41 09 02 01 --- 15 09 54 71.2 70.7 -1.6 -94.9 16 F 1 5 09 01 41 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 02 01 3C345 15 09 54 71.2 70.7 -1.6 -94.9 -4 1 1 5 09 02 01 09 02 41 --- 15 10 34 71.3 70.6 -1.5 -95.0 36 F 1 6 09 02 01 09 05 17 1749+096 15 13 11 45.5 116.0 -2.6 -47.7 99 1 1 6 09 05 17 09 05 57 --- 15 13 51 45.6 116.2 -2.6 -47.6 40 F 1 7 09 05 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 06 02 1749+096 15 13 56 45.7 116.2 -2.6 -47.6 0 1 1 7 09 05 57 09 06 22 --- 15 14 16 45.7 116.3 -2.6 -47.5 20 F 1 8 09 05 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 06 22 1749+096 15 14 16 45.7 116.3 -2.6 -47.5 -4 1 1 8 09 06 22 09 06 42 --- 15 14 36 45.8 116.4 -2.6 -47.5 16 F 1 9 09 06 22 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 06 42 1749+096 15 14 36 45.8 116.4 -2.6 -47.5 -4 1 1 9 09 06 42 09 07 02 --- 15 14 56 45.8 116.5 -2.6 -47.5 16 F 1 9 09 06 42 Schedule for VLBA_LA (Code La ) Page 4 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 07 02 1749+096 15 14 56 45.8 116.5 -2.6 -47.5 -4 1 1 9 09 07 02 09 07 21 --- 15 15 16 45.9 116.5 -2.6 -47.4 16 F 1 10 09 07 02 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 07 21 1749+096 15 15 16 45.9 116.5 -2.6 -47.4 -4 1 1 10 09 07 21 09 07 41 --- 15 15 36 46.0 116.6 -2.6 -47.4 16 F 1 11 09 07 21 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 07 41 1749+096 15 15 36 46.0 116.6 -2.6 -47.4 -4 1 1 11 09 07 41 09 08 21 --- 15 16 16 46.1 116.8 -2.6 -47.3 36 F 1 12 09 07 41 09 08 54 1741-038 15 16 49 37.5 131.0 -2.5 -37.8 10 1 1 12 09 08 54 09 09 34 --- 15 17 29 37.6 131.2 -2.4 -37.7 40 F 1 13 09 09 12 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 09 39 1741-038 15 17 34 37.6 131.2 -2.4 -37.7 0 1 1 13 09 09 34 09 09 59 --- 15 17 54 37.6 131.3 -2.4 -37.7 20 F 1 14 09 09 34 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 09 59 1741-038 15 17 54 37.6 131.3 -2.4 -37.7 -4 1 1 14 09 09 59 09 10 19 --- 15 18 14 37.7 131.4 -2.4 -37.6 16 F 1 15 09 09 59 Schedule for VLBA_LA (Code La ) Page 5 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 10 19 1741-038 15 18 14 37.7 131.4 -2.4 -37.6 -4 1 1 15 09 10 19 09 10 39 --- 15 18 34 37.7 131.4 -2.4 -37.6 16 F 1 15 09 10 19 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 10 39 1741-038 15 18 34 37.7 131.4 -2.4 -37.6 -4 1 1 15 09 10 39 09 10 59 --- 15 18 54 37.8 131.5 -2.4 -37.5 16 F 1 16 09 10 39 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 10 59 1741-038 15 18 54 37.8 131.5 -2.4 -37.5 -4 1 1 16 09 10 59 09 11 19 --- 15 19 14 37.8 131.6 -2.4 -37.4 16 F 1 17 09 10 59 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 11 19 1741-038 15 19 14 37.8 131.6 -2.4 -37.4 -4 1 1 17 09 11 19 09 11 58 --- 15 19 54 37.9 131.8 -2.4 -37.3 36 F 1 18 09 11 19 09 13 44 J1753+2848 15 21 39 57.3 91.3 -2.5 -67.7 61 1 1 18 09 13 44 09 14 24 --- 15 22 19 57.4 91.4 -2.5 -67.7 40 F 1 19 09 14 02 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 14 29 J1753+2848 15 22 24 57.4 91.4 -2.5 -67.7 0 1 1 19 09 14 24 09 14 48 --- 15 22 44 57.5 91.5 -2.5 -67.7 20 F 1 20 09 14 24 Schedule for VLBA_LA (Code La ) Page 6 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 14 48 J1753+2848 15 22 44 57.5 91.5 -2.5 -67.7 -4 1 1 20 09 14 48 09 15 08 --- 15 23 04 57.6 91.5 -2.5 -67.7 16 F 1 21 09 14 48 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 15 08 J1753+2848 15 23 04 57.6 91.5 -2.5 -67.7 -4 1 1 21 09 15 08 09 15 28 --- 15 23 24 57.6 91.6 -2.5 -67.7 16 F 1 21 09 15 08 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 15 28 J1753+2848 15 23 24 57.6 91.6 -2.5 -67.7 -4 1 1 21 09 15 28 09 15 48 --- 15 23 44 57.7 91.6 -2.5 -67.7 16 F 1 22 09 15 28 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 15 48 J1753+2848 15 23 44 57.7 91.6 -2.5 -67.7 -4 1 1 22 09 15 48 09 16 08 --- 15 24 04 57.8 91.7 -2.5 -67.7 16 F 1 22 09 15 48 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 16 13 J1753+2848 15 24 09 57.8 91.7 -2.5 -67.7 0 1 1 22 09 16 08 09 16 53 --- 15 24 49 57.9 91.8 -2.5 -67.7 40 F 1 24 09 16 08 09 17 59 3C345 15 25 55 74.2 69.5 -1.3 -98.6 27 1 1 24 09 17 59 09 19 59 --- 15 27 55 74.6 69.2 -1.3 -99.2 120 F 1 28 09 18 17 Schedule for VLBA_LA (Code La ) Page 7 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 20 03 3C345 15 28 00 74.6 69.2 -1.3 -99.2 0 1 1 28 09 19 59 09 22 03 --- 15 30 00 75.0 69.0 -1.2 -99.7 120 F 1 32 09 19 59 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 22 08 3C345 15 30 05 75.0 69.0 -1.2 -99.8 0 1 1 32 09 22 03 09 24 07 --- 15 32 05 75.4 68.7 -1.2 -100.3 120 F 1 36 09 22 03 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 26 39 J1826-2924 15 34 36 13.3 142.3 -2.9 -34.7 21 1 1 36 09 26 39 09 27 19 --- 15 35 16 13.3 142.5 -2.9 -34.6 40 F 1 37 09 26 57 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 27 37 SGRA 15 35 34 18.3 150.2 -2.2 -27.4 2 1 1 37 09 27 19 09 27 56 --- 15 35 54 18.3 150.3 -2.2 -27.4 20 F 1 38 09 27 19 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 27 56 SGRA 15 35 54 18.3 150.3 -2.2 -27.4 -4 1 1 38 09 27 56 09 28 16 --- 15 36 14 18.4 150.3 -2.2 -27.3 16 F 1 39 09 27 56 Schedule for VLBA_LA (Code La ) Page 8 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 28 16 SGRA 15 36 14 18.4 150.3 -2.2 -27.3 -4 1 1 39 09 28 16 09 28 36 --- 15 36 34 18.4 150.4 -2.2 -27.3 16 F 1 40 09 28 16 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 28 36 SGRA 15 36 34 18.4 150.4 -2.2 -27.3 -4 1 1 40 09 28 36 09 28 56 --- 15 36 54 18.4 150.5 -2.2 -27.2 16 F 1 40 09 28 36 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 28 56 SGRA 15 36 54 18.4 150.5 -2.2 -27.2 -4 1 1 40 09 28 56 09 29 16 --- 15 37 14 18.5 150.6 -2.1 -27.1 16 F 1 41 09 28 56 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 29 16 SGRA 15 37 14 18.5 150.6 -2.1 -27.1 -4 1 1 41 09 29 16 09 29 36 --- 15 37 34 18.5 150.6 -2.1 -27.1 16 F 1 42 09 29 16 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 29 36 SGRA 15 37 34 18.5 150.6 -2.1 -27.1 -4 1 1 42 09 29 36 09 29 56 --- 15 37 54 18.5 150.7 -2.1 -27.0 16 F 1 42 09 29 36 Schedule for VLBA_LA (Code La ) Page 9 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 29 56 SGRA 15 37 54 18.5 150.7 -2.1 -27.0 -4 1 1 42 09 29 56 09 30 16 --- 15 38 14 18.6 150.8 -2.1 -27.0 16 F 1 43 09 29 56 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 30 16 SGRA 15 38 14 18.6 150.8 -2.1 -27.0 -4 1 1 43 09 30 16 09 30 36 --- 15 38 34 18.6 150.8 -2.1 -26.9 16 F 1 43 09 30 16 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 30 36 SGRA 15 38 34 18.6 150.8 -2.1 -26.9 -4 1 1 43 09 30 36 09 30 56 --- 15 38 54 18.6 150.9 -2.1 -26.8 16 F 1 44 09 30 36 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 30 56 SGRA 15 38 54 18.6 150.9 -2.1 -26.8 -4 1 1 44 09 30 56 09 31 16 --- 15 39 14 18.7 151.0 -2.1 -26.8 16 F 1 45 09 30 56 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 31 33 J1826-2924 15 39 31 13.9 143.2 -2.8 -33.9 2 1 1 45 09 31 16 09 32 13 --- 15 40 11 13.9 143.4 -2.8 -33.8 40 F 1 47 09 31 16 Schedule for VLBA_LA (Code La ) Page 10 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 32 31 SGRA 15 40 29 18.8 151.2 -2.1 -26.5 2 1 1 47 09 32 13 09 32 50 --- 15 40 49 18.8 151.3 -2.1 -26.5 20 F 1 48 09 32 13 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 32 50 SGRA 15 40 49 18.8 151.3 -2.1 -26.5 -4 1 1 48 09 32 50 09 33 10 --- 15 41 09 18.8 151.4 -2.1 -26.4 16 F 1 48 09 32 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 33 10 SGRA 15 41 09 18.8 151.4 -2.1 -26.4 -4 1 1 48 09 33 10 09 33 30 --- 15 41 29 18.9 151.4 -2.1 -26.3 16 F 1 49 09 33 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 33 30 SGRA 15 41 29 18.9 151.4 -2.1 -26.3 -4 1 1 49 09 33 30 09 33 50 --- 15 41 49 18.9 151.5 -2.1 -26.3 16 F 1 50 09 33 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 33 50 SGRA 15 41 49 18.9 151.5 -2.1 -26.3 -4 1 1 50 09 33 50 09 34 10 --- 15 42 09 18.9 151.6 -2.1 -26.2 16 F 1 50 09 33 50 Schedule for VLBA_LA (Code La ) Page 11 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 34 10 SGRA 15 42 09 18.9 151.6 -2.1 -26.2 -4 1 1 50 09 34 10 09 34 30 --- 15 42 29 19.0 151.6 -2.1 -26.2 16 F 1 51 09 34 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 34 30 SGRA 15 42 29 19.0 151.6 -2.1 -26.2 -4 1 1 51 09 34 30 09 34 50 --- 15 42 49 19.0 151.7 -2.1 -26.1 16 F 1 52 09 34 30 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 34 50 SGRA 15 42 49 19.0 151.7 -2.1 -26.1 -4 1 1 52 09 34 50 09 35 10 --- 15 43 09 19.0 151.8 -2.0 -26.0 16 F 1 52 09 34 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 35 10 SGRA 15 43 09 19.0 151.8 -2.0 -26.0 -4 1 1 52 09 35 10 09 35 30 --- 15 43 29 19.1 151.8 -2.0 -26.0 16 F 1 53 09 35 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 35 30 SGRA 15 43 29 19.1 151.8 -2.0 -26.0 -4 1 1 53 09 35 30 09 35 50 --- 15 43 49 19.1 151.9 -2.0 -25.9 16 F 1 54 09 35 30 Schedule for VLBA_LA (Code La ) Page 12 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 35 50 SGRA 15 43 49 19.1 151.9 -2.0 -25.9 -4 1 1 54 09 35 50 09 36 10 --- 15 44 09 19.1 152.0 -2.0 -25.8 16 F 1 54 09 35 50 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 36 27 J1826-2924 15 44 26 14.5 144.2 -2.7 -33.0 2 1 1 54 09 36 10 09 37 07 --- 15 45 06 14.5 144.3 -2.7 -32.9 40 F 1 56 09 36 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 37 24 SGRA 15 45 23 19.3 152.2 -2.0 -25.6 2 1 1 56 09 37 07 09 37 44 --- 15 45 43 19.3 152.3 -2.0 -25.5 20 F 1 57 09 37 07 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 37 44 SGRA 15 45 43 19.3 152.3 -2.0 -25.5 -4 1 1 57 09 37 44 09 38 04 --- 15 46 03 19.3 152.4 -2.0 -25.5 16 F 1 58 09 37 44 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 38 04 SGRA 15 46 03 19.3 152.4 -2.0 -25.5 -4 1 1 58 09 38 04 09 38 24 --- 15 46 23 19.3 152.4 -2.0 -25.4 16 F 1 59 09 38 04 Schedule for VLBA_LA (Code La ) Page 13 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 38 24 SGRA 15 46 23 19.3 152.4 -2.0 -25.4 -4 1 1 59 09 38 24 09 38 44 --- 15 46 43 19.4 152.5 -2.0 -25.3 16 F 1 59 09 38 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 38 44 SGRA 15 46 43 19.4 152.5 -2.0 -25.3 -4 1 1 59 09 38 44 09 39 04 --- 15 47 03 19.4 152.6 -2.0 -25.3 16 F 1 60 09 38 44 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 39 04 SGRA 15 47 03 19.4 152.6 -2.0 -25.3 -4 1 1 60 09 39 04 09 39 24 --- 15 47 23 19.4 152.7 -2.0 -25.2 16 F 1 60 09 39 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 39 24 SGRA 15 47 23 19.4 152.7 -2.0 -25.2 -4 1 1 60 09 39 24 09 39 44 --- 15 47 43 19.5 152.7 -2.0 -25.2 16 F 1 61 09 39 24 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 39 44 SGRA 15 47 43 19.5 152.7 -2.0 -25.2 -4 1 1 61 09 39 44 09 40 04 --- 15 48 03 19.5 152.8 -2.0 -25.1 16 F 1 62 09 39 44 Schedule for VLBA_LA (Code La ) Page 14 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 40 04 SGRA 15 48 03 19.5 152.8 -2.0 -25.1 -4 1 1 62 09 40 04 09 40 24 --- 15 48 23 19.5 152.9 -2.0 -25.0 16 F 1 62 09 40 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 40 24 SGRA 15 48 23 19.5 152.9 -2.0 -25.0 -4 1 1 62 09 40 24 09 40 44 --- 15 48 43 19.6 152.9 -2.0 -25.0 16 F 1 63 09 40 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 40 44 SGRA 15 48 43 19.6 152.9 -2.0 -25.0 -4 1 1 63 09 40 44 09 41 04 --- 15 49 03 19.6 153.0 -2.0 -24.9 16 F 1 64 09 40 44 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 41 21 J1826-2924 15 49 20 15.0 145.1 -2.6 -32.2 2 1 1 64 09 41 04 09 42 00 --- 15 50 00 15.1 145.2 -2.6 -32.1 40 F 1 66 09 41 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 42 18 SGRA 15 50 18 19.7 153.3 -1.9 -24.7 2 1 1 66 09 42 00 09 42 37 --- 15 50 38 19.7 153.3 -1.9 -24.6 20 F 1 67 09 42 00 Schedule for VLBA_LA (Code La ) Page 15 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 42 37 SGRA 15 50 38 19.7 153.3 -1.9 -24.6 -4 1 1 67 09 42 37 09 42 57 --- 15 50 58 19.8 153.4 -1.9 -24.5 16 F 1 67 09 42 37 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 42 57 SGRA 15 50 58 19.8 153.4 -1.9 -24.5 -4 1 1 67 09 42 57 09 43 17 --- 15 51 18 19.8 153.5 -1.9 -24.5 16 F 1 68 09 42 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 43 17 SGRA 15 51 18 19.8 153.5 -1.9 -24.5 -4 1 1 68 09 43 17 09 43 37 --- 15 51 38 19.8 153.5 -1.9 -24.4 16 F 1 69 09 43 17 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 43 37 SGRA 15 51 38 19.8 153.5 -1.9 -24.4 -4 1 1 69 09 43 37 09 43 57 --- 15 51 58 19.9 153.6 -1.9 -24.3 16 F 1 69 09 43 37 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 43 57 SGRA 15 51 58 19.9 153.6 -1.9 -24.3 -4 1 1 69 09 43 57 09 44 17 --- 15 52 18 19.9 153.7 -1.9 -24.3 16 F 1 70 09 43 57 Schedule for VLBA_LA (Code La ) Page 16 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 44 17 SGRA 15 52 18 19.9 153.7 -1.9 -24.3 -4 1 1 70 09 44 17 09 44 37 --- 15 52 38 19.9 153.8 -1.9 -24.2 16 F 1 71 09 44 17 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 44 37 SGRA 15 52 38 19.9 153.8 -1.9 -24.2 -4 1 1 71 09 44 37 09 44 57 --- 15 52 58 19.9 153.8 -1.9 -24.2 16 F 1 71 09 44 37 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 44 57 SGRA 15 52 58 19.9 153.8 -1.9 -24.2 -4 1 1 71 09 44 57 09 45 17 --- 15 53 18 20.0 153.9 -1.9 -24.1 16 F 1 72 09 44 57 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 45 17 SGRA 15 53 18 20.0 153.9 -1.9 -24.1 -4 1 1 72 09 45 17 09 45 37 --- 15 53 38 20.0 154.0 -1.9 -24.0 16 F 1 72 09 45 17 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 45 37 SGRA 15 53 38 20.0 154.0 -1.9 -24.0 -4 1 1 72 09 45 37 09 45 57 --- 15 53 58 20.0 154.0 -1.9 -24.0 16 F 1 73 09 45 37 Schedule for VLBA_LA (Code La ) Page 17 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 46 14 J1826-2924 15 54 14 15.6 146.0 -2.5 -31.3 2 1 1 73 09 45 57 09 46 54 --- 15 54 54 15.7 146.2 -2.5 -31.2 40 F 1 75 09 45 57 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 47 10 SGRA 15 55 11 20.1 154.3 -1.8 -23.7 2 1 1 75 09 46 54 09 47 30 --- 15 55 31 20.2 154.4 -1.8 -23.7 20 F 1 76 09 46 54 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 47 30 SGRA 15 55 31 20.2 154.4 -1.8 -23.7 -4 1 1 76 09 47 30 09 47 50 --- 15 55 51 20.2 154.4 -1.8 -23.6 16 F 1 77 09 47 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 47 50 SGRA 15 55 51 20.2 154.4 -1.8 -23.6 -4 1 1 77 09 47 50 09 48 10 --- 15 56 11 20.2 154.5 -1.8 -23.5 16 F 1 77 09 47 50 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 48 10 SGRA 15 56 11 20.2 154.5 -1.8 -23.5 -4 1 1 77 09 48 10 09 48 30 --- 15 56 31 20.3 154.6 -1.8 -23.5 16 F 1 78 09 48 10 Schedule for VLBA_LA (Code La ) Page 18 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 48 30 SGRA 15 56 31 20.3 154.6 -1.8 -23.5 -4 1 1 78 09 48 30 09 48 50 --- 15 56 51 20.3 154.7 -1.8 -23.4 16 F 1 79 09 48 30 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 48 50 SGRA 15 56 51 20.3 154.7 -1.8 -23.4 -4 1 1 79 09 48 50 09 49 10 --- 15 57 11 20.3 154.7 -1.8 -23.3 16 F 1 79 09 48 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 49 10 SGRA 15 57 11 20.3 154.7 -1.8 -23.3 -4 1 1 79 09 49 10 09 49 30 --- 15 57 31 20.4 154.8 -1.8 -23.3 16 F 1 80 09 49 10 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 49 30 SGRA 15 57 31 20.4 154.8 -1.8 -23.3 -4 1 1 80 09 49 30 09 49 50 --- 15 57 51 20.4 154.9 -1.8 -23.2 16 F 1 81 09 49 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 49 50 SGRA 15 57 51 20.4 154.9 -1.8 -23.2 -4 1 1 81 09 49 50 09 50 10 --- 15 58 11 20.4 154.9 -1.8 -23.1 16 F 1 81 09 49 50 Schedule for VLBA_LA (Code La ) Page 19 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 50 10 SGRA 15 58 11 20.4 154.9 -1.8 -23.1 -4 1 1 81 09 50 10 09 50 30 --- 15 58 31 20.4 155.0 -1.8 -23.1 16 F 1 82 09 50 10 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 50 30 SGRA 15 58 31 20.4 155.0 -1.8 -23.1 -4 1 1 82 09 50 30 09 50 50 --- 15 58 51 20.5 155.1 -1.8 -23.0 16 F 1 83 09 50 30 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 51 06 J1826-2924 15 59 08 16.1 147.0 -2.5 -30.5 2 1 1 83 09 50 50 09 51 46 --- 15 59 48 16.2 147.1 -2.5 -30.4 40 F 1 84 09 50 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 52 03 SGRA 16 00 05 20.6 155.4 -1.8 -22.8 2 1 1 84 09 51 46 09 52 23 --- 16 00 25 20.6 155.4 -1.8 -22.7 20 F 1 86 09 51 46 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 52 23 SGRA 16 00 25 20.6 155.4 -1.8 -22.7 -4 1 1 86 09 52 23 09 52 43 --- 16 00 45 20.6 155.5 -1.8 -22.6 16 F 1 86 09 52 23 Schedule for VLBA_LA (Code La ) Page 20 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 52 43 SGRA 16 00 45 20.6 155.5 -1.8 -22.6 -4 1 1 86 09 52 43 09 53 03 --- 16 01 05 20.7 155.6 -1.8 -22.6 16 F 1 87 09 52 43 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 53 03 SGRA 16 01 05 20.7 155.6 -1.8 -22.6 -4 1 1 87 09 53 03 09 53 23 --- 16 01 25 20.7 155.6 -1.7 -22.5 16 F 1 88 09 53 03 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 53 23 SGRA 16 01 25 20.7 155.6 -1.7 -22.5 -4 1 1 88 09 53 23 09 53 43 --- 16 01 45 20.7 155.7 -1.7 -22.4 16 F 1 88 09 53 23 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 53 43 SGRA 16 01 45 20.7 155.7 -1.7 -22.4 -4 1 1 88 09 53 43 09 54 03 --- 16 02 05 20.7 155.8 -1.7 -22.4 16 F 1 89 09 53 43 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 54 03 SGRA 16 02 05 20.7 155.8 -1.7 -22.4 -4 1 1 89 09 54 03 09 54 23 --- 16 02 25 20.8 155.9 -1.7 -22.3 16 F 1 89 09 54 03 Schedule for VLBA_LA (Code La ) Page 21 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 54 23 SGRA 16 02 25 20.8 155.9 -1.7 -22.3 -4 1 1 89 09 54 23 09 54 43 --- 16 02 45 20.8 155.9 -1.7 -22.2 16 F 1 90 09 54 23 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 54 43 SGRA 16 02 45 20.8 155.9 -1.7 -22.2 -4 1 1 90 09 54 43 09 55 03 --- 16 03 05 20.8 156.0 -1.7 -22.2 16 F 1 91 09 54 43 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 55 03 SGRA 16 03 05 20.8 156.0 -1.7 -22.2 -4 1 1 91 09 55 03 09 55 22 --- 16 03 25 20.8 156.1 -1.7 -22.1 16 F 1 91 09 55 03 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 55 22 SGRA 16 03 25 20.8 156.1 -1.7 -22.1 -4 1 1 91 09 55 22 09 55 42 --- 16 03 45 20.9 156.1 -1.7 -22.0 16 F 1 92 09 55 22 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 09 55 59 J1826-2924 16 04 01 16.7 147.9 -2.4 -29.6 2 1 1 92 09 55 42 09 56 39 --- 16 04 41 16.7 148.1 -2.4 -29.5 40 F 1 94 09 55 42 Schedule for VLBA_LA (Code La ) Page 22 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 56 55 SGRA 16 04 58 21.0 156.4 -1.7 -21.8 2 1 1 94 09 56 39 09 57 15 --- 16 05 18 21.0 156.5 -1.7 -21.7 20 F 1 95 09 56 39 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 57 15 SGRA 16 05 18 21.0 156.5 -1.7 -21.7 -4 1 1 95 09 57 15 09 57 35 --- 16 05 38 21.0 156.6 -1.7 -21.7 16 F 1 96 09 57 15 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 57 35 SGRA 16 05 38 21.0 156.6 -1.7 -21.7 -4 1 1 96 09 57 35 09 57 55 --- 16 05 58 21.1 156.6 -1.7 -21.6 16 F 1 96 09 57 35 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 57 55 SGRA 16 05 58 21.1 156.6 -1.7 -21.6 -4 1 1 96 09 57 55 09 58 15 --- 16 06 18 21.1 156.7 -1.7 -21.5 16 F 1 97 09 57 55 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 58 15 SGRA 16 06 18 21.1 156.7 -1.7 -21.5 -4 1 1 97 09 58 15 09 58 35 --- 16 06 38 21.1 156.8 -1.7 -21.5 16 F 1 98 09 58 15 Schedule for VLBA_LA (Code La ) Page 23 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 58 35 SGRA 16 06 38 21.1 156.8 -1.7 -21.5 -4 1 1 98 09 58 35 09 58 55 --- 16 06 58 21.1 156.8 -1.7 -21.4 16 F 1 98 09 58 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 58 55 SGRA 16 06 58 21.1 156.8 -1.7 -21.4 -4 1 1 98 09 58 55 09 59 15 --- 16 07 18 21.2 156.9 -1.6 -21.3 16 F 1 99 09 58 55 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 59 15 SGRA 16 07 18 21.2 156.9 -1.6 -21.3 -4 1 1 99 09 59 15 09 59 35 --- 16 07 38 21.2 157.0 -1.6 -21.3 16 F 1 100 09 59 15 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 09 59 35 SGRA 16 07 38 21.2 157.0 -1.6 -21.3 -4 1 1 100 09 59 35 09 59 55 --- 16 07 58 21.2 157.1 -1.6 -21.2 16 F 1 100 09 59 35 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 09 59 55 SGRA 16 07 58 21.2 157.1 -1.6 -21.2 -4 1 1 100 09 59 55 10 00 15 --- 16 08 18 21.2 157.1 -1.6 -21.1 16 F 1 101 09 59 55 Schedule for VLBA_LA (Code La ) Page 24 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 00 15 SGRA 16 08 18 21.2 157.1 -1.6 -21.1 -4 1 1 101 10 00 15 10 00 35 --- 16 08 38 21.3 157.2 -1.6 -21.1 16 F 1 101 10 00 15 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 00 51 J1826-2924 16 08 54 17.2 148.9 -2.3 -28.7 2 1 1 101 10 00 35 10 01 31 --- 16 09 34 17.3 149.1 -2.3 -28.6 40 F 1 103 10 00 35 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 01 47 SGRA 16 09 50 21.4 157.5 -1.6 -20.8 2 1 1 103 10 01 31 10 02 07 --- 16 10 10 21.4 157.5 -1.6 -20.8 20 F 1 104 10 01 31 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 02 07 SGRA 16 10 10 21.4 157.5 -1.6 -20.8 -4 1 1 104 10 02 07 10 02 27 --- 16 10 30 21.4 157.6 -1.6 -20.7 16 F 1 105 10 02 07 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 02 27 SGRA 16 10 30 21.4 157.6 -1.6 -20.7 -4 1 1 105 10 02 27 10 02 47 --- 16 10 50 21.4 157.7 -1.6 -20.6 16 F 1 106 10 02 27 Schedule for VLBA_LA (Code La ) Page 25 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 02 47 SGRA 16 10 50 21.4 157.7 -1.6 -20.6 -4 1 1 106 10 02 47 10 03 07 --- 16 11 10 21.5 157.8 -1.6 -20.5 16 F 1 106 10 02 47 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 03 07 SGRA 16 11 10 21.5 157.8 -1.6 -20.5 -4 1 1 106 10 03 07 10 03 27 --- 16 11 30 21.5 157.8 -1.6 -20.5 16 F 1 107 10 03 07 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 03 27 SGRA 16 11 30 21.5 157.8 -1.6 -20.5 -4 1 1 107 10 03 27 10 03 47 --- 16 11 50 21.5 157.9 -1.6 -20.4 16 F 1 108 10 03 27 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 03 47 SGRA 16 11 50 21.5 157.9 -1.6 -20.4 -4 1 1 108 10 03 47 10 04 07 --- 16 12 10 21.5 158.0 -1.6 -20.3 16 F 1 108 10 03 47 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 04 07 SGRA 16 12 10 21.5 158.0 -1.6 -20.3 -4 1 1 108 10 04 07 10 04 26 --- 16 12 30 21.6 158.1 -1.6 -20.3 16 F 1 109 10 04 07 Schedule for VLBA_LA (Code La ) Page 26 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 04 26 SGRA 16 12 30 21.6 158.1 -1.6 -20.3 -4 1 1 109 10 04 26 10 04 46 --- 16 12 50 21.6 158.1 -1.6 -20.2 16 F 1 110 10 04 26 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 04 46 SGRA 16 12 50 21.6 158.1 -1.6 -20.2 -4 1 1 110 10 04 46 10 05 06 --- 16 13 10 21.6 158.2 -1.5 -20.1 16 F 1 110 10 04 46 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 05 06 SGRA 16 13 10 21.6 158.2 -1.5 -20.1 -4 1 1 110 10 05 06 10 05 26 --- 16 13 30 21.6 158.3 -1.5 -20.1 16 F 1 111 10 05 06 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 05 42 J1826-2924 16 13 46 17.7 149.9 -2.2 -27.8 2 1 1 111 10 05 26 10 06 22 --- 16 14 26 17.8 150.0 -2.2 -27.7 40 F 1 113 10 05 26 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 06 38 SGRA 16 14 42 21.7 158.5 -1.5 -19.8 2 1 1 113 10 06 22 10 06 58 --- 16 15 02 21.8 158.6 -1.5 -19.8 20 F 1 114 10 06 22 Schedule for VLBA_LA (Code La ) Page 27 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 06 58 SGRA 16 15 02 21.8 158.6 -1.5 -19.8 -4 1 1 114 10 06 58 10 07 18 --- 16 15 22 21.8 158.7 -1.5 -19.7 16 F 1 114 10 06 58 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 07 18 SGRA 16 15 22 21.8 158.7 -1.5 -19.7 -4 1 1 114 10 07 18 10 07 38 --- 16 15 42 21.8 158.8 -1.5 -19.6 16 F 1 115 10 07 18 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 07 38 SGRA 16 15 42 21.8 158.8 -1.5 -19.6 -4 1 1 115 10 07 38 10 07 58 --- 16 16 02 21.8 158.8 -1.5 -19.6 16 F 1 116 10 07 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 07 58 SGRA 16 16 02 21.8 158.8 -1.5 -19.6 -4 1 1 116 10 07 58 10 08 18 --- 16 16 22 21.9 158.9 -1.5 -19.5 16 F 1 116 10 07 58 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 08 18 SGRA 16 16 22 21.9 158.9 -1.5 -19.5 -4 1 1 116 10 08 18 10 08 38 --- 16 16 42 21.9 159.0 -1.5 -19.4 16 F 1 117 10 08 18 Schedule for VLBA_LA (Code La ) Page 28 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 08 38 SGRA 16 16 42 21.9 159.0 -1.5 -19.4 -4 1 1 117 10 08 38 10 08 58 --- 16 17 02 21.9 159.1 -1.5 -19.4 16 F 1 118 10 08 38 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 08 58 SGRA 16 17 02 21.9 159.1 -1.5 -19.4 -4 1 1 118 10 08 58 10 09 18 --- 16 17 22 21.9 159.1 -1.5 -19.3 16 F 1 118 10 08 58 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 09 18 SGRA 16 17 22 21.9 159.1 -1.5 -19.3 -4 1 1 118 10 09 18 10 09 38 --- 16 17 42 22.0 159.2 -1.5 -19.2 16 F 1 119 10 09 18 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 09 38 SGRA 16 17 42 22.0 159.2 -1.5 -19.2 -4 1 1 119 10 09 38 10 09 58 --- 16 18 02 22.0 159.3 -1.5 -19.2 16 F 1 120 10 09 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 09 58 SGRA 16 18 02 22.0 159.3 -1.5 -19.2 -4 1 1 120 10 09 58 10 10 18 --- 16 18 22 22.0 159.4 -1.5 -19.1 16 F 1 120 10 09 58 Schedule for VLBA_LA (Code La ) Page 29 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 10 33 J1826-2924 16 18 38 18.2 150.9 -2.1 -26.9 2 1 1 120 10 10 18 10 11 13 --- 16 19 18 18.3 151.0 -2.1 -26.8 40 F 1 122 10 10 18 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 11 29 SGRA 16 19 34 22.1 159.6 -1.4 -18.8 2 1 1 122 10 11 13 10 11 49 --- 16 19 54 22.1 159.7 -1.4 -18.8 20 F 1 123 10 11 13 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 11 49 SGRA 16 19 54 22.1 159.7 -1.4 -18.8 -4 1 1 123 10 11 49 10 12 09 --- 16 20 14 22.1 159.8 -1.4 -18.7 16 F 1 124 10 11 49 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 12 09 SGRA 16 20 14 22.1 159.8 -1.4 -18.7 -4 1 1 124 10 12 09 10 12 29 --- 16 20 34 22.2 159.9 -1.4 -18.6 16 F 1 124 10 12 09 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 12 29 SGRA 16 20 34 22.2 159.9 -1.4 -18.6 -4 1 1 124 10 12 29 10 12 49 --- 16 20 54 22.2 159.9 -1.4 -18.6 16 F 1 125 10 12 29 Schedule for VLBA_LA (Code La ) Page 30 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 12 49 SGRA 16 20 54 22.2 159.9 -1.4 -18.6 -4 1 1 125 10 12 49 10 13 09 --- 16 21 14 22.2 160.0 -1.4 -18.5 16 F 1 126 10 12 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 13 09 SGRA 16 21 14 22.2 160.0 -1.4 -18.5 -4 1 1 126 10 13 09 10 13 29 --- 16 21 34 22.2 160.1 -1.4 -18.4 16 F 1 126 10 13 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 13 29 SGRA 16 21 34 22.2 160.1 -1.4 -18.4 -4 1 1 126 10 13 29 10 13 49 --- 16 21 54 22.2 160.2 -1.4 -18.4 16 F 1 127 10 13 29 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 13 49 SGRA 16 21 54 22.2 160.2 -1.4 -18.4 -4 1 1 127 10 13 49 10 14 09 --- 16 22 14 22.3 160.2 -1.4 -18.3 16 F 1 128 10 13 49 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 14 09 SGRA 16 22 14 22.3 160.2 -1.4 -18.3 -4 1 1 128 10 14 09 10 14 29 --- 16 22 34 22.3 160.3 -1.4 -18.2 16 F 1 128 10 14 09 Schedule for VLBA_LA (Code La ) Page 31 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 14 29 SGRA 16 22 34 22.3 160.3 -1.4 -18.2 -4 1 1 128 10 14 29 10 14 49 --- 16 22 54 22.3 160.4 -1.4 -18.2 16 F 1 129 10 14 29 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 14 49 SGRA 16 22 54 22.3 160.4 -1.4 -18.2 -4 1 1 129 10 14 49 10 15 09 --- 16 23 14 22.3 160.5 -1.4 -18.1 16 F 1 130 10 14 49 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 15 24 J1826-2924 16 23 30 18.7 151.9 -2.1 -26.0 2 1 1 130 10 15 09 10 16 04 --- 16 24 10 18.7 152.0 -2.0 -25.9 40 F 1 131 10 15 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 16 20 SGRA 16 24 25 22.4 160.7 -1.4 -17.8 2 1 1 131 10 16 04 10 16 40 --- 16 24 45 22.4 160.8 -1.4 -17.8 20 F 1 133 10 16 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 16 40 SGRA 16 24 45 22.4 160.8 -1.4 -17.8 -4 1 1 133 10 16 40 10 17 00 --- 16 25 05 22.5 160.9 -1.4 -17.7 16 F 1 133 10 16 40 Schedule for VLBA_LA (Code La ) Page 32 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 17 00 SGRA 16 25 05 22.5 160.9 -1.4 -17.7 -4 1 1 133 10 17 00 10 17 19 --- 16 25 25 22.5 160.9 -1.3 -17.6 16 F 1 134 10 17 00 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 17 19 SGRA 16 25 25 22.5 160.9 -1.3 -17.6 -4 1 1 134 10 17 19 10 17 39 --- 16 25 45 22.5 161.0 -1.3 -17.6 16 F 1 135 10 17 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 17 39 SGRA 16 25 45 22.5 161.0 -1.3 -17.6 -4 1 1 135 10 17 39 10 17 59 --- 16 26 05 22.5 161.1 -1.3 -17.5 16 F 1 135 10 17 39 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 17 59 SGRA 16 26 05 22.5 161.1 -1.3 -17.5 -4 1 1 135 10 17 59 10 18 19 --- 16 26 25 22.5 161.2 -1.3 -17.4 16 F 1 136 10 17 59 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 18 19 SGRA 16 26 25 22.5 161.2 -1.3 -17.4 -4 1 1 136 10 18 19 10 18 39 --- 16 26 45 22.6 161.2 -1.3 -17.4 16 F 1 136 10 18 19 Schedule for VLBA_LA (Code La ) Page 33 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 18 39 SGRA 16 26 45 22.6 161.2 -1.3 -17.4 -4 1 1 136 10 18 39 10 18 59 --- 16 27 05 22.6 161.3 -1.3 -17.3 16 F 1 137 10 18 39 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 18 59 SGRA 16 27 05 22.6 161.3 -1.3 -17.3 -4 1 1 137 10 18 59 10 19 19 --- 16 27 25 22.6 161.4 -1.3 -17.2 16 F 1 138 10 18 59 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 19 19 SGRA 16 27 25 22.6 161.4 -1.3 -17.2 -4 1 1 138 10 19 19 10 19 39 --- 16 27 45 22.6 161.5 -1.3 -17.1 16 F 1 138 10 19 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 19 39 SGRA 16 27 45 22.6 161.5 -1.3 -17.1 -4 1 1 138 10 19 39 10 19 59 --- 16 28 05 22.7 161.5 -1.3 -17.1 16 F 1 139 10 19 39 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 20 14 J1826-2924 16 28 21 19.1 152.9 -2.0 -25.1 2 1 1 139 10 19 59 10 20 54 --- 16 29 01 19.2 153.0 -2.0 -25.0 40 F 1 141 10 19 59 10 23 25 3C345 16 31 31 85.4 29.1 -0.2 -149.1 12 1 1 141 10 23 25 10 24 04 --- 16 32 11 85.4 27.7 -0.2 -150.6 40 F 1 142 10 23 43 Schedule for VLBA_LA (Code La ) Page 34 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 24 09 3C345 16 32 16 85.4 27.5 -0.2 -150.8 0 1 1 142 10 24 04 10 24 29 --- 16 32 36 85.5 26.8 -0.2 -151.5 20 F 1 143 10 24 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 24 29 3C345 16 32 36 85.5 26.8 -0.2 -151.5 -4 1 1 143 10 24 29 10 24 49 --- 16 32 56 85.5 26.1 -0.2 -152.3 16 F 1 144 10 24 29 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 24 49 3C345 16 32 56 85.5 26.1 -0.2 -152.3 -4 1 1 144 10 24 49 10 25 09 --- 16 33 16 85.5 25.4 -0.2 -153.1 16 F 1 144 10 24 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 25 09 3C345 16 33 16 85.5 25.4 -0.2 -153.1 -4 1 1 144 10 25 09 10 25 29 --- 16 33 36 85.6 24.7 -0.2 -153.9 16 F 1 145 10 25 09 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 25 29 3C345 16 33 36 85.6 24.7 -0.2 -153.9 -4 1 1 145 10 25 29 10 25 49 --- 16 33 56 85.6 23.9 -0.2 -154.7 16 F 1 145 10 25 29 Schedule for VLBA_LA (Code La ) Page 35 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 25 49 3C345 16 33 56 85.6 23.9 -0.2 -154.7 -4 1 1 145 10 25 49 10 26 29 --- 16 34 36 85.6 22.4 -0.1 -156.3 36 F 1 147 10 25 49 10 28 09 1749+096 16 36 16 58.7 142.0 -1.3 -30.4 14 1 1 147 10 28 09 10 28 49 --- 16 36 56 58.8 142.3 -1.2 -30.2 40 F 1 148 10 28 27 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 28 53 1749+096 16 37 01 58.8 142.3 -1.2 -30.2 0 1 1 148 10 28 49 10 29 13 --- 16 37 21 58.9 142.5 -1.2 -30.1 20 F 1 149 10 28 49 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 29 13 1749+096 16 37 21 58.9 142.5 -1.2 -30.1 -4 1 1 149 10 29 13 10 29 33 --- 16 37 41 58.9 142.6 -1.2 -30.0 16 F 1 149 10 29 13 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 29 33 1749+096 16 37 41 58.9 142.6 -1.2 -30.0 -4 1 1 149 10 29 33 10 29 53 --- 16 38 01 58.9 142.7 -1.2 -29.9 16 F 1 150 10 29 33 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 29 53 1749+096 16 38 01 58.9 142.7 -1.2 -29.9 -4 1 1 150 10 29 53 10 30 13 --- 16 38 21 59.0 142.9 -1.2 -29.8 16 F 1 151 10 29 53 Schedule for VLBA_LA (Code La ) Page 36 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 30 13 1749+096 16 38 21 59.0 142.9 -1.2 -29.8 -4 1 1 151 10 30 13 10 30 33 --- 16 38 41 59.0 143.0 -1.2 -29.7 16 F 1 151 10 30 13 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 30 33 1749+096 16 38 41 59.0 143.0 -1.2 -29.7 -4 1 1 151 10 30 33 10 31 13 --- 16 39 21 59.1 143.3 -1.2 -29.5 36 F 1 153 10 30 33 10 31 46 1741-038 16 39 54 47.6 155.7 -1.1 -19.5 4 1 1 153 10 31 46 10 32 26 --- 16 40 34 47.7 156.0 -1.1 -19.3 40 F 1 154 10 32 04 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 32 30 1741-038 16 40 38 47.7 156.0 -1.1 -19.3 0 1 1 154 10 32 26 10 32 50 --- 16 40 58 47.7 156.1 -1.1 -19.2 20 F 1 155 10 32 26 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 32 50 1741-038 16 40 58 47.7 156.1 -1.1 -19.2 -4 1 1 155 10 32 50 10 33 10 --- 16 41 18 47.7 156.2 -1.1 -19.1 16 F 1 155 10 32 50 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 33 10 1741-038 16 41 18 47.7 156.2 -1.1 -19.1 -4 1 1 155 10 33 10 10 33 30 --- 16 41 38 47.7 156.4 -1.0 -19.0 16 F 1 156 10 33 10 Schedule for VLBA_LA (Code La ) Page 37 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 33 30 1741-038 16 41 38 47.7 156.4 -1.0 -19.0 -4 1 1 156 10 33 30 10 33 50 --- 16 41 58 47.8 156.5 -1.0 -18.9 16 F 1 157 10 33 30 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 33 50 1741-038 16 41 58 47.8 156.5 -1.0 -18.9 -4 1 1 157 10 33 50 10 34 10 --- 16 42 18 47.8 156.6 -1.0 -18.9 16 F 1 157 10 33 50 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 34 10 1741-038 16 42 18 47.8 156.6 -1.0 -18.9 -4 1 1 157 10 34 10 10 34 50 --- 16 42 58 47.9 156.8 -1.0 -18.7 36 F 1 159 10 34 10 10 36 01 J1753+2848 16 44 09 73.7 110.4 -1.2 -60.2 13 1 1 159 10 36 01 10 36 40 --- 16 44 49 73.8 110.7 -1.2 -60.0 40 F 1 160 10 36 19 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 36 45 J1753+2848 16 44 54 73.8 110.7 -1.2 -60.0 0 1 1 160 10 36 40 10 37 05 --- 16 45 14 73.9 110.9 -1.1 -59.9 20 F 1 161 10 36 40 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 37 05 J1753+2848 16 45 14 73.9 110.9 -1.1 -59.9 -4 1 1 161 10 37 05 10 37 25 --- 16 45 34 74.0 111.0 -1.1 -59.8 16 F 1 161 10 37 05 Schedule for VLBA_LA (Code La ) Page 38 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 37 25 J1753+2848 16 45 34 74.0 111.0 -1.1 -59.8 -4 1 1 161 10 37 25 10 37 45 --- 16 45 54 74.0 111.1 -1.1 -59.7 16 F 1 162 10 37 25 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 37 45 J1753+2848 16 45 54 74.0 111.1 -1.1 -59.7 -4 1 1 162 10 37 45 10 38 05 --- 16 46 14 74.1 111.3 -1.1 -59.6 16 F 1 163 10 37 45 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 38 05 J1753+2848 16 46 14 74.1 111.3 -1.1 -59.6 -4 1 1 163 10 38 05 10 38 25 --- 16 46 34 74.2 111.4 -1.1 -59.5 16 F 1 163 10 38 05 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 38 29 J1753+2848 16 46 39 74.2 111.4 -1.1 -59.5 0 1 1 163 10 38 25 10 39 09 --- 16 47 19 74.3 111.7 -1.1 -59.3 40 F 1 165 10 38 25 10 40 40 3C345 16 48 49 85.8 -14.9 0.1 164.2 0 1 1 165 10 40 40 10 42 39 --- 16 50 49 85.7 -19.9 0.1 159.0 120 F 1 169 10 40 58 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 42 44 3C345 16 50 54 85.7 -20.1 0.1 158.8 0 1 1 169 10 42 39 10 44 44 --- 16 52 54 85.6 -24.7 0.2 153.8 120 F 1 173 10 42 39 Schedule for VLBA_LA (Code La ) Page 39 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 44 49 3C345 16 52 59 85.5 -24.9 0.2 153.6 0 1 1 173 10 44 44 10 46 48 --- 16 54 59 85.4 -29.1 0.2 149.1 120 F 1 177 10 44 44 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 49 20 J1826-2924 16 57 31 21.5 159.2 -1.5 -19.3 18 1 1 177 10 49 20 10 50 00 --- 16 58 11 21.6 159.3 -1.5 -19.2 40 F 1 178 10 49 38 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 50 22 SGRA 16 58 33 24.3 168.6 -0.8 -10.6 10 1 1 178 10 50 00 10 50 42 --- 16 58 53 24.3 168.7 -0.8 -10.5 20 F 1 179 10 50 00 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 50 42 SGRA 16 58 53 24.3 168.7 -0.8 -10.5 -4 1 1 179 10 50 42 10 51 02 --- 16 59 13 24.3 168.8 -0.8 -10.4 16 F 1 180 10 50 42 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 51 02 SGRA 16 59 13 24.3 168.8 -0.8 -10.4 -4 1 1 180 10 51 02 10 51 21 --- 16 59 33 24.3 168.8 -0.8 -10.4 16 F 1 181 10 51 02 Schedule for VLBA_LA (Code La ) Page 40 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 51 21 SGRA 16 59 33 24.3 168.8 -0.8 -10.4 -4 1 1 181 10 51 21 10 51 41 --- 16 59 53 24.3 168.9 -0.8 -10.3 16 F 1 181 10 51 21 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 51 41 SGRA 16 59 53 24.3 168.9 -0.8 -10.3 -4 1 1 181 10 51 41 10 52 01 --- 17 00 13 24.3 169.0 -0.8 -10.2 16 F 1 182 10 51 41 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 52 01 SGRA 17 00 13 24.3 169.0 -0.8 -10.2 -4 1 1 182 10 52 01 10 52 21 --- 17 00 33 24.3 169.1 -0.8 -10.1 16 F 1 182 10 52 01 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 52 21 SGRA 17 00 33 24.3 169.1 -0.8 -10.1 -4 1 1 182 10 52 21 10 52 41 --- 17 00 53 24.3 169.1 -0.8 -10.1 16 F 1 183 10 52 21 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 52 41 SGRA 17 00 53 24.3 169.1 -0.8 -10.1 -4 1 1 183 10 52 41 10 53 01 --- 17 01 13 24.4 169.2 -0.7 -10.0 16 F 1 184 10 52 41 Schedule for VLBA_LA (Code La ) Page 41 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 53 01 SGRA 17 01 13 24.4 169.2 -0.7 -10.0 -4 1 1 184 10 53 01 10 53 21 --- 17 01 33 24.4 169.3 -0.7 -9.9 16 F 1 184 10 53 01 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 53 21 SGRA 17 01 33 24.4 169.3 -0.7 -9.9 -4 1 1 184 10 53 21 10 53 41 --- 17 01 53 24.4 169.4 -0.7 -9.8 16 F 1 185 10 53 21 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 53 41 SGRA 17 01 53 24.4 169.4 -0.7 -9.8 -4 1 1 185 10 53 41 10 54 01 --- 17 02 13 24.4 169.5 -0.7 -9.8 16 F 1 186 10 53 41 Next scan frequencies: 2262.51 2262.51 2270.51 2270.51 8412.49 8412.49 8420.49 8420.49 Next BBC frequencies: 837.49 837.49 829.49 829.49 812.49 812.49 820.49 820.49 10 54 23 J1826-2924 17 02 35 21.9 160.3 -1.4 -18.3 10 1 1 186 10 54 01 10 55 03 --- 17 03 15 21.9 160.4 -1.4 -18.2 40 F 1 188 10 54 01 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 55 24 SGRA 17 03 37 24.4 169.8 -0.7 -9.5 10 1 1 188 10 55 03 10 55 44 --- 17 03 57 24.5 169.9 -0.7 -9.4 20 F 1 189 10 55 03 Schedule for VLBA_LA (Code La ) Page 42 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 55 44 SGRA 17 03 57 24.5 169.9 -0.7 -9.4 -4 1 1 189 10 55 44 10 56 04 --- 17 04 17 24.5 169.9 -0.7 -9.3 16 F 1 190 10 55 44 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 56 04 SGRA 17 04 17 24.5 169.9 -0.7 -9.3 -4 1 1 190 10 56 04 10 56 24 --- 17 04 37 24.5 170.0 -0.7 -9.2 16 F 1 190 10 56 04 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 56 24 SGRA 17 04 37 24.5 170.0 -0.7 -9.2 -4 1 1 190 10 56 24 10 56 44 --- 17 04 57 24.5 170.1 -0.7 -9.2 16 F 1 191 10 56 24 Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 56 44 SGRA 17 04 57 24.5 170.1 -0.7 -9.2 -4 1 1 191 10 56 44 10 57 04 --- 17 05 17 24.5 170.2 -0.7 -9.1 16 F 1 192 10 56 44 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 43129.49 43129.49 43137.49 43137.49 Next BBC frequencies: 713.49 713.49 721.49 721.49 729.49 729.49 737.49 737.49 10 57 04 SGRA 17 05 17 24.5 170.2 -0.7 -9.1 -4 1 1 192 10 57 04 10 57 24 --- 17 05 37 24.5 170.3 -0.7 -9.0 16 F 1 192 10 57 04 Schedule for VLBA_LA (Code La ) Page 43 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 10 Apr 2007 Day 100 --- Next scan frequencies: 14340.49 14340.49 14364.49 14364.49 14388.49 14388.49 14412.49 14412.49 Next BBC frequencies: 740.49 740.49 764.49 764.49 788.49 788.49 812.49 812.49 10 57 24 SGRA 17 05 37 24.5 170.3 -0.7 -9.0 -4 1 1 192 10 57 24 10 57 44 --- 17 05 57 24.5 170.3 -0.7 -9.0 16 F 1 193 10 57 24 Next scan frequencies: 43113.49 43113.49 43121.49 43121.49 431