COVER INFORMATION Station: VLBA_FD (Code Fd ) Experiment: The Core Shift of Sgr A* Exp. Code: BB230C Schedule Version: 1.00 Processed by SCHED version: 6.05 June 2006 PI: Andreas Brunthaler Address: MPIfR Auf dem Huegel 69 53121 Bonn Germany Phone: +49 228 525 377 EMAIL: brunthal@mpifr-bonn.mpg.de Fax: +49 228 525 229 Phone during observation: +49 228 525 377 Observing mode: VLBA Notes: Schedule for VLBA_FD (Code Fd ) Page 2 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 09 31 04 3C345 15 16 42 70.2 56.6 -1.4 -110.8 0 1 1 0 09 31 04 09 31 44 --- 15 17 22 70.3 56.5 -1.4 -111.0 40 F 1 1 09 31 22 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 31 48 3C345 15 17 26 70.3 56.5 -1.4 -111.0 0 1 1 1 09 31 44 09 32 08 --- 15 17 46 70.4 56.4 -1.4 -111.1 20 F 1 2 09 31 44 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 32 08 3C345 15 17 46 70.4 56.4 -1.4 -111.1 -4 1 1 2 09 32 08 09 32 28 --- 15 18 06 70.4 56.3 -1.4 -111.3 16 F 1 3 09 32 08 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 32 28 3C345 15 18 06 70.4 56.3 -1.4 -111.3 -4 1 1 3 09 32 28 09 32 48 --- 15 18 26 70.5 56.3 -1.4 -111.4 16 F 1 3 09 32 28 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 32 48 3C345 15 18 26 70.5 56.3 -1.4 -111.4 -4 1 1 3 09 32 48 09 33 08 --- 15 18 46 70.5 56.2 -1.4 -111.5 16 F 1 4 09 32 48 Schedule for VLBA_FD (Code Fd ) Page 3 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 33 08 3C345 15 18 46 70.5 56.2 -1.4 -111.5 -4 1 1 4 09 33 08 09 33 28 --- 15 19 06 70.6 56.1 -1.4 -111.6 16 F 1 5 09 33 08 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 09 33 28 3C345 15 19 06 70.6 56.1 -1.4 -111.6 -4 1 1 5 09 33 28 09 34 08 --- 15 19 46 70.7 56.0 -1.4 -111.9 36 F 1 6 09 33 28 09 36 44 1749+096 15 22 23 49.4 113.1 -2.5 -53.4 108 1 1 6 09 36 44 09 37 24 --- 15 23 03 49.5 113.2 -2.5 -53.3 40 F 1 7 09 37 02 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 37 29 1749+096 15 23 08 49.6 113.3 -2.5 -53.3 0 1 1 7 09 37 24 09 37 49 --- 15 23 28 49.6 113.3 -2.5 -53.3 20 F 1 8 09 37 24 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 37 49 1749+096 15 23 28 49.6 113.3 -2.5 -53.3 -4 1 1 8 09 37 49 09 38 09 --- 15 23 48 49.7 113.4 -2.5 -53.2 16 F 1 9 09 37 49 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 38 09 1749+096 15 23 48 49.7 113.4 -2.5 -53.2 -4 1 1 9 09 38 09 09 38 29 --- 15 24 08 49.8 113.5 -2.5 -53.2 16 F 1 9 09 38 09 Schedule for VLBA_FD (Code Fd ) Page 4 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 38 29 1749+096 15 24 08 49.8 113.5 -2.5 -53.2 -4 1 1 9 09 38 29 09 38 49 --- 15 24 28 49.8 113.6 -2.5 -53.1 16 F 1 10 09 38 29 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 38 49 1749+096 15 24 28 49.8 113.6 -2.5 -53.1 -4 1 1 10 09 38 49 09 39 09 --- 15 24 48 49.9 113.6 -2.5 -53.1 16 F 1 11 09 38 49 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 09 39 09 1749+096 15 24 48 49.9 113.6 -2.5 -53.1 -4 1 1 11 09 39 09 09 39 49 --- 15 25 28 50.0 113.8 -2.4 -53.0 36 F 1 12 09 39 09 09 40 22 1741-038 15 26 01 42.3 130.1 -2.3 -41.3 12 1 1 12 09 39 49 09 41 02 --- 15 26 41 42.4 130.2 -2.3 -41.2 40 F 1 14 09 39 49 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 41 06 1741-038 15 26 46 42.4 130.2 -2.3 -41.2 0 1 1 14 09 41 02 09 41 26 --- 15 27 06 42.4 130.3 -2.3 -41.1 20 F 1 15 09 41 02 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 41 26 1741-038 15 27 06 42.4 130.3 -2.3 -41.1 -4 1 1 15 09 41 26 09 41 46 --- 15 27 26 42.5 130.4 -2.3 -41.0 16 F 1 16 09 41 26 Schedule for VLBA_FD (Code Fd ) Page 5 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 41 46 1741-038 15 27 26 42.5 130.4 -2.3 -41.0 -4 1 1 16 09 41 46 09 42 06 --- 15 27 46 42.6 130.5 -2.3 -41.0 16 F 1 16 09 41 46 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 42 06 1741-038 15 27 46 42.6 130.5 -2.3 -41.0 -4 1 1 16 09 42 06 09 42 26 --- 15 28 06 42.6 130.6 -2.3 -40.9 16 F 1 17 09 42 06 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 42 26 1741-038 15 28 06 42.6 130.6 -2.3 -40.9 -4 1 1 17 09 42 26 09 42 46 --- 15 28 26 42.7 130.7 -2.3 -40.9 16 F 1 18 09 42 26 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 09 42 46 1741-038 15 28 26 42.7 130.7 -2.3 -40.9 -4 1 1 18 09 42 46 09 43 26 --- 15 29 06 42.8 130.8 -2.3 -40.7 36 F 1 19 09 42 46 09 45 11 J1753+2848 15 30 52 59.0 84.2 -2.4 -77.6 67 1 1 19 09 45 11 09 45 51 --- 15 31 32 59.1 84.2 -2.4 -77.7 40 F 1 20 09 45 29 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 45 56 J1753+2848 15 31 36 59.2 84.3 -2.4 -77.7 0 1 1 20 09 45 51 09 46 16 --- 15 31 56 59.2 84.3 -2.4 -77.7 20 F 1 21 09 45 51 Schedule for VLBA_FD (Code Fd ) Page 6 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 46 16 J1753+2848 15 31 56 59.2 84.3 -2.4 -77.7 -4 1 1 21 09 46 16 09 46 36 --- 15 32 16 59.3 84.3 -2.4 -77.7 16 F 1 22 09 46 16 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 46 36 J1753+2848 15 32 16 59.3 84.3 -2.4 -77.7 -4 1 1 22 09 46 36 09 46 56 --- 15 32 36 59.4 84.3 -2.4 -77.7 16 F 1 22 09 46 36 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 46 56 J1753+2848 15 32 36 59.4 84.3 -2.4 -77.7 -4 1 1 22 09 46 56 09 47 16 --- 15 32 56 59.4 84.4 -2.4 -77.7 16 F 1 23 09 46 56 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 47 16 J1753+2848 15 32 56 59.4 84.4 -2.4 -77.7 -4 1 1 23 09 47 16 09 47 36 --- 15 33 16 59.5 84.4 -2.3 -77.7 16 F 1 24 09 47 16 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 09 47 40 J1753+2848 15 33 21 59.5 84.4 -2.3 -77.7 0 1 1 24 09 47 36 09 48 20 --- 15 34 01 59.7 84.5 -2.3 -77.8 40 F 1 25 09 47 36 09 49 26 3C345 15 35 07 73.4 51.9 -1.1 -118.2 33 1 1 25 09 49 26 09 51 26 --- 15 37 07 73.7 51.3 -1.1 -119.1 120 F 1 29 09 49 44 Schedule for VLBA_FD (Code Fd ) Page 7 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 51 31 3C345 15 37 12 73.7 51.3 -1.1 -119.2 0 1 1 29 09 51 26 09 53 30 --- 15 39 12 74.1 50.6 -1.1 -120.1 120 F 1 33 09 51 26 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 53 35 3C345 15 39 17 74.1 50.5 -1.1 -120.2 0 1 1 33 09 53 30 09 55 35 --- 15 41 17 74.4 49.8 -1.0 -121.2 120 F 1 37 09 53 30 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 09 58 06 J1826-2924 15 43 49 18.5 143.1 -2.7 -36.3 34 1 1 37 09 58 06 09 58 46 --- 15 44 29 18.6 143.3 -2.7 -36.2 40 F 1 38 09 58 24 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 59 04 SGRA 15 44 46 23.7 151.1 -2.0 -28.3 1 1 1 38 09 58 46 09 59 24 --- 15 45 06 23.8 151.2 -2.0 -28.3 20 F 1 39 09 58 46 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 09 59 24 SGRA 15 45 06 23.8 151.2 -2.0 -28.3 -4 1 1 39 09 59 24 09 59 44 --- 15 45 26 23.8 151.3 -2.0 -28.2 16 F 1 40 09 59 24 Schedule for VLBA_FD (Code Fd ) Page 8 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 09 59 44 SGRA 15 45 26 23.8 151.3 -2.0 -28.2 -4 1 1 40 09 59 44 10 00 04 --- 15 45 46 23.8 151.4 -2.0 -28.1 16 F 1 41 09 59 44 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 00 04 SGRA 15 45 46 23.8 151.4 -2.0 -28.1 -4 1 1 41 10 00 04 10 00 24 --- 15 46 06 23.9 151.4 -2.0 -28.1 16 F 1 41 10 00 04 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 00 24 SGRA 15 46 06 23.9 151.4 -2.0 -28.1 -4 1 1 41 10 00 24 10 00 44 --- 15 46 26 23.9 151.5 -2.0 -28.0 16 F 1 42 10 00 24 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 00 44 SGRA 15 46 26 23.9 151.5 -2.0 -28.0 -4 1 1 42 10 00 44 10 01 03 --- 15 46 46 23.9 151.6 -2.0 -27.9 16 F 1 43 10 00 44 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 01 03 SGRA 15 46 46 23.9 151.6 -2.0 -27.9 -4 1 1 43 10 01 03 10 01 23 --- 15 47 06 24.0 151.6 -2.0 -27.9 16 F 1 43 10 01 03 Schedule for VLBA_FD (Code Fd ) Page 9 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 01 23 SGRA 15 47 06 24.0 151.6 -2.0 -27.9 -4 1 1 43 10 01 23 10 01 43 --- 15 47 26 24.0 151.7 -2.0 -27.8 16 F 1 44 10 01 23 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 01 43 SGRA 15 47 26 24.0 151.7 -2.0 -27.8 -4 1 1 44 10 01 43 10 02 03 --- 15 47 46 24.0 151.8 -2.0 -27.7 16 F 1 45 10 01 43 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 02 03 SGRA 15 47 46 24.0 151.8 -2.0 -27.7 -4 1 1 45 10 02 03 10 02 23 --- 15 48 06 24.1 151.9 -2.0 -27.7 16 F 1 45 10 02 03 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 02 23 SGRA 15 48 06 24.1 151.9 -2.0 -27.7 -4 1 1 45 10 02 23 10 02 43 --- 15 48 26 24.1 151.9 -2.0 -27.6 16 F 1 46 10 02 23 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 03 00 J1826-2924 15 48 44 19.1 144.1 -2.6 -35.4 1 1 1 46 10 02 43 10 03 40 --- 15 49 24 19.2 144.2 -2.6 -35.3 40 F 1 48 10 02 43 Schedule for VLBA_FD (Code Fd ) Page 10 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 03 58 SGRA 15 49 41 24.2 152.2 -1.9 -27.3 1 1 1 48 10 03 40 10 04 18 --- 15 50 01 24.3 152.3 -1.9 -27.3 20 F 1 49 10 03 40 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 04 18 SGRA 15 50 01 24.3 152.3 -1.9 -27.3 -4 1 1 49 10 04 18 10 04 38 --- 15 50 21 24.3 152.3 -1.9 -27.2 16 F 1 49 10 04 18 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 04 38 SGRA 15 50 21 24.3 152.3 -1.9 -27.2 -4 1 1 49 10 04 38 10 04 58 --- 15 50 41 24.3 152.4 -1.9 -27.1 16 F 1 50 10 04 38 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 04 58 SGRA 15 50 41 24.3 152.4 -1.9 -27.1 -4 1 1 50 10 04 58 10 05 18 --- 15 51 01 24.4 152.5 -1.9 -27.0 16 F 1 51 10 04 58 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 05 18 SGRA 15 51 01 24.4 152.5 -1.9 -27.0 -4 1 1 51 10 05 18 10 05 38 --- 15 51 21 24.4 152.5 -1.9 -27.0 16 F 1 51 10 05 18 Schedule for VLBA_FD (Code Fd ) Page 11 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 05 38 SGRA 15 51 21 24.4 152.5 -1.9 -27.0 -4 1 1 51 10 05 38 10 05 57 --- 15 51 41 24.4 152.6 -1.9 -26.9 16 F 1 52 10 05 38 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 05 57 SGRA 15 51 41 24.4 152.6 -1.9 -26.9 -4 1 1 52 10 05 57 10 06 17 --- 15 52 01 24.5 152.7 -1.9 -26.8 16 F 1 53 10 05 57 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 06 17 SGRA 15 52 01 24.5 152.7 -1.9 -26.8 -4 1 1 53 10 06 17 10 06 37 --- 15 52 21 24.5 152.8 -1.9 -26.8 16 F 1 53 10 06 17 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 06 37 SGRA 15 52 21 24.5 152.8 -1.9 -26.8 -4 1 1 53 10 06 37 10 06 57 --- 15 52 41 24.5 152.8 -1.9 -26.7 16 F 1 54 10 06 37 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 06 57 SGRA 15 52 41 24.5 152.8 -1.9 -26.7 -4 1 1 54 10 06 57 10 07 17 --- 15 53 01 24.6 152.9 -1.9 -26.6 16 F 1 55 10 06 57 Schedule for VLBA_FD (Code Fd ) Page 12 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 07 17 SGRA 15 53 01 24.6 152.9 -1.9 -26.6 -4 1 1 55 10 07 17 10 07 37 --- 15 53 21 24.6 153.0 -1.9 -26.6 16 F 1 55 10 07 17 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 07 54 J1826-2924 15 53 38 19.8 145.0 -2.6 -34.5 1 1 1 55 10 07 37 10 08 34 --- 15 54 18 19.8 145.1 -2.5 -34.4 40 F 1 57 10 07 37 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 08 51 SGRA 15 54 36 24.7 153.2 -1.9 -26.3 2 1 1 57 10 08 34 10 09 11 --- 15 54 56 24.7 153.3 -1.9 -26.2 20 F 1 58 10 08 34 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 09 11 SGRA 15 54 56 24.7 153.3 -1.9 -26.2 -4 1 1 58 10 09 11 10 09 31 --- 15 55 16 24.8 153.4 -1.8 -26.2 16 F 1 59 10 09 11 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 09 31 SGRA 15 55 16 24.8 153.4 -1.8 -26.2 -4 1 1 59 10 09 31 10 09 51 --- 15 55 36 24.8 153.5 -1.8 -26.1 16 F 1 60 10 09 31 Schedule for VLBA_FD (Code Fd ) Page 13 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 09 51 SGRA 15 55 36 24.8 153.5 -1.8 -26.1 -4 1 1 60 10 09 51 10 10 11 --- 15 55 56 24.8 153.5 -1.8 -26.0 16 F 1 60 10 09 51 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 10 11 SGRA 15 55 56 24.8 153.5 -1.8 -26.0 -4 1 1 60 10 10 11 10 10 31 --- 15 56 16 24.9 153.6 -1.8 -25.9 16 F 1 61 10 10 11 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 10 31 SGRA 15 56 16 24.9 153.6 -1.8 -25.9 -4 1 1 61 10 10 31 10 10 51 --- 15 56 36 24.9 153.7 -1.8 -25.9 16 F 1 62 10 10 31 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 10 51 SGRA 15 56 36 24.9 153.7 -1.8 -25.9 -4 1 1 62 10 10 51 10 11 11 --- 15 56 56 24.9 153.7 -1.8 -25.8 16 F 1 62 10 10 51 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 11 11 SGRA 15 56 56 24.9 153.7 -1.8 -25.8 -4 1 1 62 10 11 11 10 11 31 --- 15 57 16 25.0 153.8 -1.8 -25.7 16 F 1 63 10 11 11 Schedule for VLBA_FD (Code Fd ) Page 14 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 11 31 SGRA 15 57 16 25.0 153.8 -1.8 -25.7 -4 1 1 63 10 11 31 10 11 51 --- 15 57 36 25.0 153.9 -1.8 -25.7 16 F 1 63 10 11 31 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 11 51 SGRA 15 57 36 25.0 153.9 -1.8 -25.7 -4 1 1 63 10 11 51 10 12 11 --- 15 57 56 25.0 154.0 -1.8 -25.6 16 F 1 64 10 11 51 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 12 11 SGRA 15 57 56 25.0 154.0 -1.8 -25.6 -4 1 1 64 10 12 11 10 12 31 --- 15 58 16 25.1 154.0 -1.8 -25.5 16 F 1 65 10 12 11 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 12 48 J1826-2924 15 58 33 20.4 145.9 -2.5 -33.6 2 1 1 65 10 12 31 10 13 28 --- 15 59 13 20.4 146.1 -2.5 -33.5 40 F 1 67 10 12 31 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 13 45 SGRA 15 59 30 25.2 154.3 -1.8 -25.3 2 1 1 67 10 13 28 10 14 05 --- 15 59 50 25.2 154.4 -1.8 -25.2 20 F 1 68 10 13 28 Schedule for VLBA_FD (Code Fd ) Page 15 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 14 05 SGRA 15 59 50 25.2 154.4 -1.8 -25.2 -4 1 1 68 10 14 05 10 14 25 --- 16 00 10 25.2 154.5 -1.8 -25.1 16 F 1 68 10 14 05 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 14 25 SGRA 16 00 10 25.2 154.5 -1.8 -25.1 -4 1 1 68 10 14 25 10 14 45 --- 16 00 30 25.3 154.5 -1.8 -25.0 16 F 1 69 10 14 25 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 14 45 SGRA 16 00 30 25.3 154.5 -1.8 -25.0 -4 1 1 69 10 14 45 10 15 05 --- 16 00 50 25.3 154.6 -1.8 -25.0 16 F 1 70 10 14 45 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 15 05 SGRA 16 00 50 25.3 154.6 -1.8 -25.0 -4 1 1 70 10 15 05 10 15 25 --- 16 01 10 25.3 154.7 -1.7 -24.9 16 F 1 70 10 15 05 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 15 25 SGRA 16 01 10 25.3 154.7 -1.7 -24.9 -4 1 1 70 10 15 25 10 15 44 --- 16 01 30 25.4 154.7 -1.7 -24.8 16 F 1 71 10 15 25 Schedule for VLBA_FD (Code Fd ) Page 16 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 15 44 SGRA 16 01 30 25.4 154.7 -1.7 -24.8 -4 1 1 71 10 15 44 10 16 04 --- 16 01 50 25.4 154.8 -1.7 -24.8 16 F 1 72 10 15 44 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 16 04 SGRA 16 01 50 25.4 154.8 -1.7 -24.8 -4 1 1 72 10 16 04 10 16 24 --- 16 02 10 25.4 154.9 -1.7 -24.7 16 F 1 72 10 16 04 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 16 24 SGRA 16 02 10 25.4 154.9 -1.7 -24.7 -4 1 1 72 10 16 24 10 16 44 --- 16 02 30 25.4 155.0 -1.7 -24.6 16 F 1 73 10 16 24 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 16 44 SGRA 16 02 30 25.4 155.0 -1.7 -24.6 -4 1 1 73 10 16 44 10 17 04 --- 16 02 50 25.5 155.0 -1.7 -24.5 16 F 1 74 10 16 44 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 17 04 SGRA 16 02 50 25.5 155.0 -1.7 -24.5 -4 1 1 74 10 17 04 10 17 24 --- 16 03 10 25.5 155.1 -1.7 -24.5 16 F 1 74 10 17 04 Schedule for VLBA_FD (Code Fd ) Page 17 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 17 41 J1826-2924 16 03 27 20.9 146.9 -2.4 -32.6 2 1 1 74 10 17 24 10 18 21 --- 16 04 07 21.0 147.0 -2.4 -32.5 40 F 1 76 10 17 24 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 18 38 SGRA 16 04 23 25.6 155.4 -1.7 -24.2 2 1 1 76 10 18 21 10 18 58 --- 16 04 43 25.6 155.5 -1.7 -24.1 20 F 1 77 10 18 21 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 18 58 SGRA 16 04 43 25.6 155.5 -1.7 -24.1 -4 1 1 77 10 18 58 10 19 18 --- 16 05 03 25.7 155.5 -1.7 -24.1 16 F 1 78 10 18 58 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 19 18 SGRA 16 05 03 25.7 155.5 -1.7 -24.1 -4 1 1 78 10 19 18 10 19 38 --- 16 05 23 25.7 155.6 -1.7 -24.0 16 F 1 79 10 19 18 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 19 38 SGRA 16 05 23 25.7 155.6 -1.7 -24.0 -4 1 1 79 10 19 38 10 19 58 --- 16 05 43 25.7 155.7 -1.7 -23.9 16 F 1 79 10 19 38 Schedule for VLBA_FD (Code Fd ) Page 18 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 19 58 SGRA 16 05 43 25.7 155.7 -1.7 -23.9 -4 1 1 79 10 19 58 10 20 17 --- 16 06 03 25.8 155.8 -1.7 -23.8 16 F 1 80 10 19 58 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 20 17 SGRA 16 06 03 25.8 155.8 -1.7 -23.8 -4 1 1 80 10 20 17 10 20 37 --- 16 06 23 25.8 155.8 -1.7 -23.8 16 F 1 80 10 20 17 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 20 37 SGRA 16 06 23 25.8 155.8 -1.7 -23.8 -4 1 1 80 10 20 37 10 20 57 --- 16 06 43 25.8 155.9 -1.7 -23.7 16 F 1 81 10 20 37 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 20 57 SGRA 16 06 43 25.8 155.9 -1.7 -23.7 -4 1 1 81 10 20 57 10 21 17 --- 16 07 03 25.9 156.0 -1.7 -23.6 16 F 1 82 10 20 57 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 21 17 SGRA 16 07 03 25.9 156.0 -1.7 -23.6 -4 1 1 82 10 21 17 10 21 37 --- 16 07 23 25.9 156.0 -1.6 -23.5 16 F 1 82 10 21 17 Schedule for VLBA_FD (Code Fd ) Page 19 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 21 37 SGRA 16 07 23 25.9 156.0 -1.6 -23.5 -4 1 1 82 10 21 37 10 21 57 --- 16 07 43 25.9 156.1 -1.6 -23.5 16 F 1 83 10 21 37 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 21 57 SGRA 16 07 43 25.9 156.1 -1.6 -23.5 -4 1 1 83 10 21 57 10 22 17 --- 16 08 03 25.9 156.2 -1.6 -23.4 16 F 1 84 10 21 57 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 22 34 J1826-2924 16 08 20 21.5 147.9 -2.3 -31.7 2 1 1 84 10 22 17 10 23 14 --- 16 09 00 21.6 148.0 -2.3 -31.6 40 F 1 85 10 22 17 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 23 30 SGRA 16 09 17 26.0 156.5 -1.6 -23.1 2 1 1 85 10 23 14 10 23 50 --- 16 09 37 26.1 156.5 -1.6 -23.1 20 F 1 87 10 23 14 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 23 50 SGRA 16 09 37 26.1 156.5 -1.6 -23.1 -4 1 1 87 10 23 50 10 24 10 --- 16 09 57 26.1 156.6 -1.6 -23.0 16 F 1 87 10 23 50 Schedule for VLBA_FD (Code Fd ) Page 20 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 24 10 SGRA 16 09 57 26.1 156.6 -1.6 -23.0 -4 1 1 87 10 24 10 10 24 30 --- 16 10 17 26.1 156.7 -1.6 -22.9 16 F 1 88 10 24 10 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 24 30 SGRA 16 10 17 26.1 156.7 -1.6 -22.9 -4 1 1 88 10 24 30 10 24 50 --- 16 10 37 26.2 156.8 -1.6 -22.8 16 F 1 89 10 24 30 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 24 50 SGRA 16 10 37 26.2 156.8 -1.6 -22.8 -4 1 1 89 10 24 50 10 25 10 --- 16 10 57 26.2 156.8 -1.6 -22.8 16 F 1 89 10 24 50 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 25 10 SGRA 16 10 57 26.2 156.8 -1.6 -22.8 -4 1 1 89 10 25 10 10 25 30 --- 16 11 17 26.2 156.9 -1.6 -22.7 16 F 1 90 10 25 10 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 25 30 SGRA 16 11 17 26.2 156.9 -1.6 -22.7 -4 1 1 90 10 25 30 10 25 50 --- 16 11 37 26.2 157.0 -1.6 -22.6 16 F 1 91 10 25 30 Schedule for VLBA_FD (Code Fd ) Page 21 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 25 50 SGRA 16 11 37 26.2 157.0 -1.6 -22.6 -4 1 1 91 10 25 50 10 26 10 --- 16 11 57 26.3 157.1 -1.6 -22.5 16 F 1 91 10 25 50 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 26 10 SGRA 16 11 57 26.3 157.1 -1.6 -22.5 -4 1 1 91 10 26 10 10 26 30 --- 16 12 17 26.3 157.1 -1.6 -22.5 16 F 1 92 10 26 10 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 26 30 SGRA 16 12 17 26.3 157.1 -1.6 -22.5 -4 1 1 92 10 26 30 10 26 50 --- 16 12 37 26.3 157.2 -1.6 -22.4 16 F 1 92 10 26 30 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 26 50 SGRA 16 12 37 26.3 157.2 -1.6 -22.4 -4 1 1 92 10 26 50 10 27 10 --- 16 12 57 26.4 157.3 -1.6 -22.3 16 F 1 93 10 26 50 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 27 26 J1826-2924 16 13 13 22.1 148.8 -2.2 -30.7 2 1 1 93 10 27 10 10 28 06 --- 16 13 53 22.1 149.0 -2.2 -30.6 40 F 1 95 10 27 10 Schedule for VLBA_FD (Code Fd ) Page 22 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 28 22 SGRA 16 14 10 26.5 157.6 -1.5 -22.1 2 1 1 95 10 28 06 10 28 42 --- 16 14 30 26.5 157.6 -1.5 -22.0 20 F 1 96 10 28 06 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 28 42 SGRA 16 14 30 26.5 157.6 -1.5 -22.0 -4 1 1 96 10 28 42 10 29 02 --- 16 14 50 26.5 157.7 -1.5 -21.9 16 F 1 97 10 28 42 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 29 02 SGRA 16 14 50 26.5 157.7 -1.5 -21.9 -4 1 1 97 10 29 02 10 29 22 --- 16 15 10 26.5 157.8 -1.5 -21.8 16 F 1 97 10 29 02 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 29 22 SGRA 16 15 10 26.5 157.8 -1.5 -21.8 -4 1 1 97 10 29 22 10 29 42 --- 16 15 30 26.6 157.9 -1.5 -21.8 16 F 1 98 10 29 22 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 29 42 SGRA 16 15 30 26.6 157.9 -1.5 -21.8 -4 1 1 98 10 29 42 10 30 02 --- 16 15 50 26.6 157.9 -1.5 -21.7 16 F 1 99 10 29 42 Schedule for VLBA_FD (Code Fd ) Page 23 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 30 02 SGRA 16 15 50 26.6 157.9 -1.5 -21.7 -4 1 1 99 10 30 02 10 30 22 --- 16 16 10 26.6 158.0 -1.5 -21.6 16 F 1 99 10 30 02 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 30 22 SGRA 16 16 10 26.6 158.0 -1.5 -21.6 -4 1 1 99 10 30 22 10 30 42 --- 16 16 30 26.6 158.1 -1.5 -21.5 16 F 1 100 10 30 22 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 30 42 SGRA 16 16 30 26.6 158.1 -1.5 -21.5 -4 1 1 100 10 30 42 10 31 02 --- 16 16 50 26.7 158.2 -1.5 -21.5 16 F 1 101 10 30 42 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 31 02 SGRA 16 16 50 26.7 158.2 -1.5 -21.5 -4 1 1 101 10 31 02 10 31 22 --- 16 17 10 26.7 158.2 -1.5 -21.4 16 F 1 101 10 31 02 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 31 22 SGRA 16 17 10 26.7 158.2 -1.5 -21.4 -4 1 1 101 10 31 22 10 31 42 --- 16 17 30 26.7 158.3 -1.5 -21.3 16 F 1 102 10 31 22 Schedule for VLBA_FD (Code Fd ) Page 24 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 31 42 SGRA 16 17 30 26.7 158.3 -1.5 -21.3 -4 1 1 102 10 31 42 10 32 02 --- 16 17 50 26.8 158.4 -1.5 -21.2 16 F 1 103 10 31 42 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 32 18 J1826-2924 16 18 06 22.6 149.8 -2.1 -29.8 2 1 1 103 10 32 02 10 32 58 --- 16 18 46 22.7 150.0 -2.1 -29.6 40 F 1 104 10 32 02 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 33 14 SGRA 16 19 02 26.8 158.7 -1.5 -21.0 2 1 1 104 10 32 58 10 33 34 --- 16 19 22 26.9 158.8 -1.4 -20.9 20 F 1 105 10 32 58 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 33 34 SGRA 16 19 22 26.9 158.8 -1.4 -20.9 -4 1 1 105 10 33 34 10 33 54 --- 16 19 42 26.9 158.8 -1.4 -20.8 16 F 1 106 10 33 34 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 33 54 SGRA 16 19 42 26.9 158.8 -1.4 -20.8 -4 1 1 106 10 33 54 10 34 14 --- 16 20 02 26.9 158.9 -1.4 -20.7 16 F 1 107 10 33 54 Schedule for VLBA_FD (Code Fd ) Page 25 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 34 14 SGRA 16 20 02 26.9 158.9 -1.4 -20.7 -4 1 1 107 10 34 14 10 34 34 --- 16 20 22 27.0 159.0 -1.4 -20.7 16 F 1 107 10 34 14 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 34 34 SGRA 16 20 22 27.0 159.0 -1.4 -20.7 -4 1 1 107 10 34 34 10 34 54 --- 16 20 42 27.0 159.1 -1.4 -20.6 16 F 1 108 10 34 34 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 34 54 SGRA 16 20 42 27.0 159.1 -1.4 -20.6 -4 1 1 108 10 34 54 10 35 14 --- 16 21 02 27.0 159.1 -1.4 -20.5 16 F 1 109 10 34 54 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 35 14 SGRA 16 21 02 27.0 159.1 -1.4 -20.5 -4 1 1 109 10 35 14 10 35 34 --- 16 21 22 27.0 159.2 -1.4 -20.4 16 F 1 109 10 35 14 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 35 34 SGRA 16 21 22 27.0 159.2 -1.4 -20.4 -4 1 1 109 10 35 34 10 35 54 --- 16 21 42 27.1 159.3 -1.4 -20.4 16 F 1 110 10 35 34 Schedule for VLBA_FD (Code Fd ) Page 26 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 35 54 SGRA 16 21 42 27.1 159.3 -1.4 -20.4 -4 1 1 110 10 35 54 10 36 14 --- 16 22 02 27.1 159.4 -1.4 -20.3 16 F 1 111 10 35 54 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 36 14 SGRA 16 22 02 27.1 159.4 -1.4 -20.3 -4 1 1 111 10 36 14 10 36 34 --- 16 22 22 27.1 159.4 -1.4 -20.2 16 F 1 111 10 36 14 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 36 34 SGRA 16 22 22 27.1 159.4 -1.4 -20.2 -4 1 1 111 10 36 34 10 36 54 --- 16 22 42 27.1 159.5 -1.4 -20.1 16 F 1 112 10 36 34 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 37 10 J1826-2924 16 22 58 23.1 150.8 -2.1 -28.8 2 1 1 112 10 36 54 10 37 49 --- 16 23 38 23.2 151.0 -2.1 -28.6 40 F 1 114 10 36 54 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 38 06 SGRA 16 23 54 27.2 159.8 -1.4 -19.9 2 1 1 114 10 37 49 10 38 25 --- 16 24 14 27.2 159.9 -1.4 -19.8 20 F 1 115 10 37 49 Schedule for VLBA_FD (Code Fd ) Page 27 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 38 25 SGRA 16 24 14 27.2 159.9 -1.4 -19.8 -4 1 1 115 10 38 25 10 38 45 --- 16 24 34 27.3 160.0 -1.4 -19.7 16 F 1 116 10 38 25 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 38 45 SGRA 16 24 34 27.3 160.0 -1.4 -19.7 -4 1 1 116 10 38 45 10 39 05 --- 16 24 54 27.3 160.0 -1.4 -19.6 16 F 1 116 10 38 45 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 39 05 SGRA 16 24 54 27.3 160.0 -1.4 -19.6 -4 1 1 116 10 39 05 10 39 25 --- 16 25 14 27.3 160.1 -1.3 -19.6 16 F 1 117 10 39 05 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 39 25 SGRA 16 25 14 27.3 160.1 -1.3 -19.6 -4 1 1 117 10 39 25 10 39 45 --- 16 25 34 27.3 160.2 -1.3 -19.5 16 F 1 117 10 39 25 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 39 45 SGRA 16 25 34 27.3 160.2 -1.3 -19.5 -4 1 1 117 10 39 45 10 40 05 --- 16 25 54 27.4 160.3 -1.3 -19.4 16 F 1 118 10 39 45 Schedule for VLBA_FD (Code Fd ) Page 28 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 40 05 SGRA 16 25 54 27.4 160.3 -1.3 -19.4 -4 1 1 118 10 40 05 10 40 25 --- 16 26 14 27.4 160.3 -1.3 -19.3 16 F 1 119 10 40 05 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 40 25 SGRA 16 26 14 27.4 160.3 -1.3 -19.3 -4 1 1 119 10 40 25 10 40 45 --- 16 26 34 27.4 160.4 -1.3 -19.3 16 F 1 119 10 40 25 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 40 45 SGRA 16 26 34 27.4 160.4 -1.3 -19.3 -4 1 1 119 10 40 45 10 41 05 --- 16 26 54 27.4 160.5 -1.3 -19.2 16 F 1 120 10 40 45 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 41 05 SGRA 16 26 54 27.4 160.5 -1.3 -19.2 -4 1 1 120 10 41 05 10 41 25 --- 16 27 14 27.5 160.6 -1.3 -19.1 16 F 1 121 10 41 05 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 41 25 SGRA 16 27 14 27.5 160.6 -1.3 -19.1 -4 1 1 121 10 41 25 10 41 45 --- 16 27 34 27.5 160.6 -1.3 -19.0 16 F 1 121 10 41 25 Schedule for VLBA_FD (Code Fd ) Page 29 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 42 01 J1826-2924 16 27 50 23.6 151.9 -2.0 -27.8 2 1 1 121 10 41 45 10 42 41 --- 16 28 30 23.7 152.0 -2.0 -27.6 40 F 1 123 10 41 45 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 42 56 SGRA 16 28 46 27.6 160.9 -1.3 -18.8 2 1 1 123 10 42 41 10 43 16 --- 16 29 06 27.6 161.0 -1.3 -18.7 20 F 1 124 10 42 41 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 43 16 SGRA 16 29 06 27.6 161.0 -1.3 -18.7 -4 1 1 124 10 43 16 10 43 36 --- 16 29 26 27.6 161.1 -1.3 -18.6 16 F 1 125 10 43 16 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 43 36 SGRA 16 29 26 27.6 161.1 -1.3 -18.6 -4 1 1 125 10 43 36 10 43 56 --- 16 29 46 27.6 161.2 -1.3 -18.5 16 F 1 126 10 43 36 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 43 56 SGRA 16 29 46 27.6 161.2 -1.3 -18.5 -4 1 1 126 10 43 56 10 44 16 --- 16 30 06 27.7 161.2 -1.3 -18.4 16 F 1 126 10 43 56 Schedule for VLBA_FD (Code Fd ) Page 30 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 44 16 SGRA 16 30 06 27.7 161.2 -1.3 -18.4 -4 1 1 126 10 44 16 10 44 36 --- 16 30 26 27.7 161.3 -1.3 -18.4 16 F 1 127 10 44 16 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 44 36 SGRA 16 30 26 27.7 161.3 -1.3 -18.4 -4 1 1 127 10 44 36 10 44 56 --- 16 30 46 27.7 161.4 -1.3 -18.3 16 F 1 127 10 44 36 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 44 56 SGRA 16 30 46 27.7 161.4 -1.3 -18.3 -4 1 1 127 10 44 56 10 45 16 --- 16 31 06 27.7 161.5 -1.3 -18.2 16 F 1 128 10 44 56 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 45 16 SGRA 16 31 06 27.7 161.5 -1.3 -18.2 -4 1 1 128 10 45 16 10 45 36 --- 16 31 26 27.8 161.6 -1.2 -18.1 16 F 1 129 10 45 16 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 45 36 SGRA 16 31 26 27.8 161.6 -1.2 -18.1 -4 1 1 129 10 45 36 10 45 56 --- 16 31 46 27.8 161.6 -1.2 -18.1 16 F 1 129 10 45 36 Schedule for VLBA_FD (Code Fd ) Page 31 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 45 56 SGRA 16 31 46 27.8 161.6 -1.2 -18.1 -4 1 1 129 10 45 56 10 46 16 --- 16 32 06 27.8 161.7 -1.2 -18.0 16 F 1 130 10 45 56 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 46 16 SGRA 16 32 06 27.8 161.7 -1.2 -18.0 -4 1 1 130 10 46 16 10 46 36 --- 16 32 26 27.8 161.8 -1.2 -17.9 16 F 1 131 10 46 16 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 46 51 J1826-2924 16 32 42 24.1 152.9 -1.9 -26.8 2 1 1 131 10 46 36 10 47 31 --- 16 33 22 24.2 153.0 -1.9 -26.6 40 F 1 132 10 46 36 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 47 47 SGRA 16 33 37 27.9 162.1 -1.2 -17.6 2 1 1 132 10 47 31 10 48 07 --- 16 33 57 27.9 162.1 -1.2 -17.6 20 F 1 134 10 47 31 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 48 07 SGRA 16 33 57 27.9 162.1 -1.2 -17.6 -4 1 1 134 10 48 07 10 48 27 --- 16 34 17 27.9 162.2 -1.2 -17.5 16 F 1 134 10 48 07 Schedule for VLBA_FD (Code Fd ) Page 32 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 48 27 SGRA 16 34 17 27.9 162.2 -1.2 -17.5 -4 1 1 134 10 48 27 10 48 47 --- 16 34 37 28.0 162.3 -1.2 -17.4 16 F 1 135 10 48 27 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 48 47 SGRA 16 34 37 28.0 162.3 -1.2 -17.4 -4 1 1 135 10 48 47 10 49 07 --- 16 34 57 28.0 162.4 -1.2 -17.3 16 F 1 136 10 48 47 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 49 07 SGRA 16 34 57 28.0 162.4 -1.2 -17.3 -4 1 1 136 10 49 07 10 49 27 --- 16 35 17 28.0 162.5 -1.2 -17.2 16 F 1 136 10 49 07 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 49 27 SGRA 16 35 17 28.0 162.5 -1.2 -17.2 -4 1 1 136 10 49 27 10 49 47 --- 16 35 37 28.0 162.5 -1.2 -17.2 16 F 1 137 10 49 27 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 49 47 SGRA 16 35 37 28.0 162.5 -1.2 -17.2 -4 1 1 137 10 49 47 10 50 07 --- 16 35 57 28.1 162.6 -1.2 -17.1 16 F 1 138 10 49 47 Schedule for VLBA_FD (Code Fd ) Page 33 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 50 07 SGRA 16 35 57 28.1 162.6 -1.2 -17.1 -4 1 1 138 10 50 07 10 50 26 --- 16 36 17 28.1 162.7 -1.2 -17.0 16 F 1 138 10 50 07 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 50 26 SGRA 16 36 17 28.1 162.7 -1.2 -17.0 -4 1 1 138 10 50 26 10 50 46 --- 16 36 37 28.1 162.8 -1.2 -16.9 16 F 1 139 10 50 26 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 50 46 SGRA 16 36 37 28.1 162.8 -1.2 -16.9 -4 1 1 139 10 50 46 10 51 06 --- 16 36 57 28.1 162.9 -1.2 -16.9 16 F 1 139 10 50 46 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 51 06 SGRA 16 36 57 28.1 162.9 -1.2 -16.9 -4 1 1 139 10 51 06 10 51 26 --- 16 37 17 28.1 162.9 -1.1 -16.8 16 F 1 140 10 51 06 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 51 42 J1826-2924 16 37 33 24.6 153.9 -1.8 -25.7 2 1 1 140 10 51 26 10 52 22 --- 16 38 13 24.6 154.1 -1.8 -25.6 40 F 1 142 10 51 26 10 54 52 3C345 16 40 44 80.8 3.0 0.0 -176.6 32 1 1 142 10 54 52 10 55 32 --- 16 41 24 80.8 2.2 0.0 -177.5 40 F 1 143 10 55 10 Schedule for VLBA_FD (Code Fd ) Page 34 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 55 37 3C345 16 41 28 80.8 2.1 0.0 -177.6 0 1 1 143 10 55 32 10 55 57 --- 16 41 48 80.8 1.7 0.0 -178.1 20 F 1 144 10 55 32 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 55 57 3C345 16 41 48 80.8 1.7 0.0 -178.1 -4 1 1 144 10 55 57 10 56 16 --- 16 42 08 80.8 1.3 0.0 -178.5 16 F 1 145 10 55 57 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 56 16 3C345 16 42 08 80.8 1.3 0.0 -178.5 -4 1 1 145 10 56 16 10 56 36 --- 16 42 28 80.8 0.9 0.0 -179.0 16 F 1 145 10 56 16 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 10 56 36 3C345 16 42 28 80.8 0.9 0.0 -179.0 -4 1 1 145 10 56 36 10 56 56 --- 16 42 48 80.8 0.5 0.0 -179.4 16 F 1 146 10 56 36 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 10 56 56 3C345 16 42 48 80.8 0.5 0.0 -179.4 -4 1 1 146 10 56 56 10 57 16 --- 16 43 08 80.8 0.1 0.0 -179.9 16 F 1 147 10 56 56 Schedule for VLBA_FD (Code Fd ) Page 35 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 10 57 16 3C345 16 43 08 80.8 0.1 0.0 -179.9 -4 1 1 147 10 57 16 10 57 56 --- 16 43 48 80.8 -0.7 0.0 179.2 36 F 1 148 10 57 16 10 59 36 1749+096 16 45 29 63.9 140.1 -1.1 -34.0 0 1 1 148 10 59 36 11 00 16 --- 16 46 09 64.0 140.4 -1.1 -33.8 40 F 1 149 10 59 54 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 00 20 1749+096 16 46 13 64.0 140.5 -1.1 -33.7 0 1 1 149 11 00 16 11 00 40 --- 16 46 33 64.1 140.6 -1.1 -33.6 20 F 1 150 11 00 16 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 00 40 1749+096 16 46 33 64.1 140.6 -1.1 -33.6 -4 1 1 150 11 00 40 11 01 00 --- 16 46 53 64.1 140.8 -1.1 -33.5 16 F 1 151 11 00 40 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 01 00 1749+096 16 46 53 64.1 140.8 -1.1 -33.5 -4 1 1 151 11 01 00 11 01 20 --- 16 47 13 64.2 140.9 -1.1 -33.4 16 F 1 151 11 01 00 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 01 20 1749+096 16 47 13 64.2 140.9 -1.1 -33.4 -4 1 1 151 11 01 20 11 01 40 --- 16 47 33 64.2 141.1 -1.1 -33.2 16 F 1 152 11 01 20 Schedule for VLBA_FD (Code Fd ) Page 36 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 01 40 1749+096 16 47 33 64.2 141.1 -1.1 -33.2 -4 1 1 152 11 01 40 11 02 00 --- 16 47 53 64.3 141.3 -1.1 -33.1 16 F 1 152 11 01 40 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 11 02 00 1749+096 16 47 53 64.3 141.3 -1.1 -33.1 -4 1 1 152 11 02 00 11 02 40 --- 16 48 33 64.3 141.6 -1.1 -32.8 36 F 1 154 11 02 00 11 03 13 1741-038 16 49 06 53.1 156.6 -0.9 -20.0 4 1 1 154 11 02 40 11 03 53 --- 16 49 46 53.1 156.9 -0.9 -19.8 40 F 1 156 11 02 40 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 03 57 1741-038 16 49 51 53.1 156.9 -0.9 -19.8 0 1 1 156 11 03 53 11 04 17 --- 16 50 11 53.2 157.0 -0.9 -19.7 20 F 1 157 11 03 53 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 04 17 1741-038 16 50 11 53.2 157.0 -0.9 -19.7 -4 1 1 157 11 04 17 11 04 37 --- 16 50 31 53.2 157.2 -0.9 -19.5 16 F 1 158 11 04 17 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 04 37 1741-038 16 50 31 53.2 157.2 -0.9 -19.5 -4 1 1 158 11 04 37 11 04 57 --- 16 50 51 53.2 157.3 -0.9 -19.4 16 F 1 158 11 04 37 Schedule for VLBA_FD (Code Fd ) Page 37 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 04 57 1741-038 16 50 51 53.2 157.3 -0.9 -19.4 -4 1 1 158 11 04 57 11 05 17 --- 16 51 11 53.3 157.4 -0.9 -19.3 16 F 1 159 11 04 57 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 05 17 1741-038 16 51 11 53.3 157.4 -0.9 -19.3 -4 1 1 159 11 05 17 11 05 37 --- 16 51 31 53.3 157.6 -0.9 -19.2 16 F 1 159 11 05 17 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 11 05 37 1741-038 16 51 31 53.3 157.6 -0.9 -19.2 -4 1 1 159 11 05 37 11 06 17 --- 16 52 11 53.3 157.8 -0.9 -19.0 36 F 1 161 11 05 37 11 07 28 J1753+2848 16 53 22 76.7 94.1 -1.0 -78.3 18 1 1 161 11 07 28 11 08 08 --- 16 54 02 76.9 94.3 -1.0 -78.3 40 F 1 162 11 07 46 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 08 12 J1753+2848 16 54 06 76.9 94.3 -1.0 -78.3 0 1 1 162 11 08 08 11 08 32 --- 16 54 26 76.9 94.4 -1.0 -78.2 20 F 1 163 11 08 08 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 08 32 J1753+2848 16 54 26 76.9 94.4 -1.0 -78.2 -4 1 1 163 11 08 32 11 08 52 --- 16 54 46 77.0 94.4 -1.0 -78.2 16 F 1 163 11 08 32 Schedule for VLBA_FD (Code Fd ) Page 38 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 08 52 J1753+2848 16 54 46 77.0 94.4 -1.0 -78.2 -4 1 1 163 11 08 52 11 09 12 --- 16 55 06 77.1 94.5 -1.0 -78.2 16 F 1 164 11 08 52 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 09 12 J1753+2848 16 55 06 77.1 94.5 -1.0 -78.2 -4 1 1 164 11 09 12 11 09 32 --- 16 55 26 77.2 94.6 -1.0 -78.2 16 F 1 165 11 09 12 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 09 32 J1753+2848 16 55 26 77.2 94.6 -1.0 -78.2 -4 1 1 165 11 09 32 11 09 52 --- 16 55 46 77.2 94.6 -1.0 -78.1 16 F 1 165 11 09 32 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 11 09 57 J1753+2848 16 55 51 77.2 94.6 -1.0 -78.1 0 1 1 165 11 09 52 11 10 37 --- 16 56 31 77.4 94.8 -1.0 -78.1 40 F 1 167 11 09 52 11 12 07 3C345 16 58 01 80.4 -17.2 0.2 160.7 10 1 1 167 11 12 07 11 14 07 --- 17 00 01 80.2 -19.3 0.3 158.2 120 F 1 171 11 12 25 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 14 11 3C345 17 00 06 80.2 -19.4 0.3 158.1 0 1 1 171 11 14 07 11 16 11 --- 17 02 06 80.1 -21.5 0.3 155.8 120 F 1 175 11 14 07 Schedule for VLBA_FD (Code Fd ) Page 39 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 16 16 3C345 17 02 11 80.1 -21.6 0.3 155.7 0 1 1 175 11 16 11 11 18 16 --- 17 04 11 79.9 -23.6 0.3 153.4 120 F 1 179 11 16 11 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 11 20 47 J1826-2924 17 06 43 27.0 160.4 -1.3 -19.3 23 1 1 179 11 20 47 11 21 27 --- 17 07 23 27.1 160.6 -1.3 -19.2 40 F 1 180 11 21 05 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 21 49 SGRA 17 07 45 29.7 170.3 -0.6 -9.5 10 1 1 180 11 21 27 11 22 09 --- 17 08 05 29.7 170.4 -0.6 -9.4 20 F 1 181 11 21 27 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 22 09 SGRA 17 08 05 29.7 170.4 -0.6 -9.4 -4 1 1 181 11 22 09 11 22 29 --- 17 08 25 29.7 170.5 -0.6 -9.3 16 F 1 182 11 22 09 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 22 29 SGRA 17 08 25 29.7 170.5 -0.6 -9.3 -4 1 1 182 11 22 29 11 22 49 --- 17 08 45 29.7 170.6 -0.6 -9.3 16 F 1 183 11 22 29 Schedule for VLBA_FD (Code Fd ) Page 40 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 22 49 SGRA 17 08 45 29.7 170.6 -0.6 -9.3 -4 1 1 183 11 22 49 11 23 09 --- 17 09 05 29.7 170.7 -0.6 -9.2 16 F 1 183 11 22 49 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 23 09 SGRA 17 09 05 29.7 170.7 -0.6 -9.2 -4 1 1 183 11 23 09 11 23 29 --- 17 09 25 29.7 170.8 -0.6 -9.1 16 F 1 184 11 23 09 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 23 29 SGRA 17 09 25 29.7 170.8 -0.6 -9.1 -4 1 1 184 11 23 29 11 23 49 --- 17 09 45 29.7 170.8 -0.6 -9.0 16 F 1 185 11 23 29 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 23 49 SGRA 17 09 45 29.7 170.8 -0.6 -9.0 -4 1 1 185 11 23 49 11 24 09 --- 17 10 05 29.7 170.9 -0.6 -8.9 16 F 1 185 11 23 49 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 24 09 SGRA 17 10 05 29.7 170.9 -0.6 -8.9 -4 1 1 185 11 24 09 11 24 28 --- 17 10 25 29.7 171.0 -0.6 -8.8 16 F 1 186 11 24 09 Schedule for VLBA_FD (Code Fd ) Page 41 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 24 28 SGRA 17 10 25 29.7 171.0 -0.6 -8.8 -4 1 1 186 11 24 28 11 24 48 --- 17 10 45 29.8 171.1 -0.6 -8.8 16 F 1 187 11 24 28 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 24 48 SGRA 17 10 45 29.8 171.1 -0.6 -8.8 -4 1 1 187 11 24 48 11 25 08 --- 17 11 05 29.8 171.2 -0.6 -8.7 16 F 1 187 11 24 48 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 25 08 SGRA 17 11 05 29.8 171.2 -0.6 -8.7 -4 1 1 187 11 25 08 11 25 28 --- 17 11 25 29.8 171.3 -0.6 -8.6 16 F 1 188 11 25 08 Next scan frequencies: 2263.01 2263.01 2271.01 2271.01 8412.99 8412.99 8420.99 8420.99 Next BBC frequencies: 836.99 836.99 828.99 828.99 812.99 812.99 820.99 820.99 11 25 50 J1826-2924 17 11 47 27.4 161.6 -1.3 -18.2 9 1 1 188 11 25 28 11 26 30 --- 17 12 27 27.4 161.8 -1.2 -18.0 40 F 1 190 11 25 28 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 26 52 SGRA 17 12 49 29.8 171.6 -0.6 -8.3 9 1 1 190 11 26 30 11 27 12 --- 17 13 09 29.8 171.7 -0.5 -8.2 20 F 1 191 11 26 30 Schedule for VLBA_FD (Code Fd ) Page 42 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 27 12 SGRA 17 13 09 29.8 171.7 -0.5 -8.2 -4 1 1 191 11 27 12 11 27 32 --- 17 13 29 29.8 171.8 -0.5 -8.1 16 F 1 192 11 27 12 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 27 32 SGRA 17 13 29 29.8 171.8 -0.5 -8.1 -4 1 1 192 11 27 32 11 27 52 --- 17 13 49 29.9 171.9 -0.5 -8.0 16 F 1 192 11 27 32 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 27 52 SGRA 17 13 49 29.9 171.9 -0.5 -8.0 -4 1 1 192 11 27 52 11 28 12 --- 17 14 09 29.9 171.9 -0.5 -7.9 16 F 1 193 11 27 52 Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 28 12 SGRA 17 14 09 29.9 171.9 -0.5 -7.9 -4 1 1 193 11 28 12 11 28 31 --- 17 14 29 29.9 172.0 -0.5 -7.9 16 F 1 194 11 28 12 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 43128.99 43128.99 43136.99 43136.99 Next BBC frequencies: 712.99 712.99 720.99 720.99 728.99 728.99 736.99 736.99 11 28 31 SGRA 17 14 29 29.9 172.0 -0.5 -7.9 -4 1 1 194 11 28 31 11 28 51 --- 17 14 49 29.9 172.1 -0.5 -7.8 16 F 1 194 11 28 31 Schedule for VLBA_FD (Code Fd ) Page 43 The Core Shift of Sgr A* UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Mon 2 Apr 2007 Day 92 --- Next scan frequencies: 21538.99 21538.99 21554.99 21554.99 21570.99 21570.99 21586.99 21586.99 Next BBC frequencies: 538.99 538.99 554.99 554.99 570.99 570.99 586.99 586.99 11 28 51 SGRA 17 14 49 29.9 172.1 -0.5 -7.8 -4 1 1 194 11 28 51 11 29 11 --- 17 15 09 29.9 172.2 -0.5 -7.7 16 F 1 195 11 28 51 Next scan frequencies: 43112.99 43112.99 43120.99 43120.99 431