VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BR100BB Observer: Reid, M. Project type: VLBA Obs filename: br100bbcrd.* Date/Day: 2006APR06/096 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 1957 Begin file VCLOCK check ok. SC at -0.184 UT1-UTC check ok (0.26) GPS delta < 10 us Mark5 recording status: SC bank B pack VIPSK-15 HN bank A pack NRAO-050 NL bank A pack NRAO-068 FD bank A pack NRAO-146 LA bank B pack NRAO-025 PT bank A pack VIPSU-04 KP bank A pack NRAO-131 OV bank B pack NRAO-114 BR bank B pack NRAO-145 MK bank B pack NRAO-101 Operator: T. Perreault 2101 KP wea: clear, no precipitation 2128 Operator is Anthony Sowinski. 2200 High winds at LA. 2258 OV reports clear, no precipitation, dry. 2317 MK now recording on NRAO-166, bank A. 0000 Date is 2006APR07/097. 0302 %BR Stuck on back-up contempo. Maser temp unstable. 0458 NL now recording on NRAO-075, bank B. 0500-0501 *HN AZ axis disabled to clear over-current fault. ACU 100 1 0553 Operator is Sonja Mendoza. 0601 End. Downtime Summary: Total downtime : 1 min Percentage downtime of observing: 0.0% Average downtime per hour : 0.0 min Total scheduled observing time (# Antennas): 6040 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.