VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BO026C Observer: OBrien, T. Project type: VLBA Obs filename: bo026ccrd.* Date/Day: 2006APR02/092 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= 0645 Begin file, staggered start/stop times VCLOCK check ok. SC at -0.202 UT1-UTC check ok (0.27) GPS delta < 10 us Mark5 recording status: SC bank B pack NRAO-043 HN bank B pack NRAO-015 NL bank A pack NRAO-078 FD bank B pack NRAO-083 LA bank A pack NRAO-045 PT bank B pack NRAO-088 KP bank B pack NRAO-165 OV bank B pack JIVE-014 BR bank A pack NRAO-150 MK bank B pack NRAO-129 Operator: T. Perreault 0645 Begin observing at SC,HN,NL,FD,LA,PT 0702 KP joins 0717-0730 *FD autostowed. Loss of commercial power. COM 100 13 On generator power. Can't point antenna, will remove from observing until commercial power is restored. 0726 OV joins 0746 BR joins 0946 MK joins 0959 %NL seeing elevated system temperatures at 20cm INT for channels 7 & 8 (1679.49 MHz RCP/LCP). Suspect RFI 1025 FD Mark5 recording bank A pack NRAO-116 1144 NL wea: raining 1218 PT Mark5 recording bank A pack NRAO-118 1250 HN Mark5 recording bank A pack NRAO-085 and 1251 LA Mark5 recording bank B pack NRAO-067 1252 SC Mark5 recording bank A pack NRAO-164 1254 NL Mark5 recording bank B pack NRAO-106 1312 KP Mark5 recording bank A pack NRAO-198 1404 BR Mark5 recording bank B pack NRAO-199 1502 OV Mark5 recording bank B pack NRAO-020 1335 New operator is Brian Willard. 1503 SC observing ends 1524 HN observing ends 1638 NL observing ends 1725 MK writing on NRAO-057, Bank A. 1729 End. Downtime Summary: Total downtime : 13 min Percentage downtime of observing: 0.2% Average downtime per hour : 0.1 min Total scheduled observing time (# Antennas): 6440 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.