VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BM230L Observer: Marscher, A. Project type: VLBA Obs filename: bm230lcrd.* Date/Day: 2006APR21/111 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Anthony Sowinski. Vclock and gps delta okay. SC, VIPSK-09, bank B HN, VIPSK-08, bank B NL, NRAO-063, bank A FD, NRAO-082, bank B LA, NRAO-056, bank B PT, NRAO-084, bank A KP, VIPSK-07, bank B OV, NRAO-055, bank B BR, NRAO-144, bank B MK, NRAO-081, bank A 1644 Begin at all sites except MK. 1644-1656 *PT Down for ACU repair work. ACU 100 12 1659 Begin at MK. 1707-1758 *PT Out of point, reason unknown. ACU 100 51 1707-1732 Loss of communications with all sites. 1732 Communications still very unreliable, even on dial-up. 1734-1735 *HN OUt of point after power glitch. COM 100 1 1740-1834 *KP Out of observing. SCH 100 54 1848 KP is now recording on NRAO-171 in bank A. 1940 Gusty winds at OV. 2124 KP reports overcast weather. 2150 New operator is Brian Willard. 0000 Date is 2006APR22/112. 0012-0026 *OV: high wind autostow, repointed. WEA 100 14 0052-0114 *OV: high wind autostow, repointed. WEA 100 22 0228 End SC. 0243 End. Downtime Summary: Total downtime : 154 min Percentage downtime of observing: 2.6% Average downtime per hour : 1.5 min Total scheduled observing time (# Antennas): 5990 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.