VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BK114G Observer: Kondratko, P. Project type: VLBA Obs filename: bk114gcrd.* Date/Day: 2006APR29/119 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK Y GB =UT-Time===Comment===============================================MF#===%AD==AMD= 1630 Begin file VCLOCK check ok. SC at -0.168 UT1-UTC check ok. (0.24) GPS delta < 10 us Mark 5 recording status: SC: bank A, pack NRAO-087 HN: bank B, pack NRAO-139 NL: bank A, pack NRAO-164 FD: bank B, pack NRAO-064 LA: bank B, pack NRAO-100 PT: bank B, pack NRAO-150 KP: bank A, pack NRAO-123 OV: bank A, pack NRAO-091 BR: bank A, pack NRAO-140 MK: bank B, pack NRAO-133 Operator: T. Perreault 1630 %NL rain: elevated system temperatures 0000 Date is 2006APR30/120. 0013-0350 *MK Getting no response on the MCB (Master Control 18137 100 217 Bus) - BBCs can't be commanded, there are also MCB errors for IFD1, IFD2, and the Weather station. Contacted oncall site tech, he will go to the site. OV Mark5 recording bank B pack NRAO-015 LA Mark5 recording bank A pack NRAO-052 FD Mark5 recording bank A pack NRAO-129 NL Mark5 recording bank B pack NRAO-048 BR Mark5 recording bank B pack NRAO-126 KP Mark5 recording bank B pack NRAO-153 0148 New operator is Brian Willard. 0229 OV writing on NRAO-015, Bank B. 0250 NL writing on NRAO-048, Bank B. 0250 LA writing on NRAO-052, Bank A. 0257 BR writing on NRAO-126, Bank B. 0301 KP writing on NRAO-153, Bank B. 0318 %BR: quite windy. 0323 HN writing on NRAO-095, Bank A. 0358 %NL: rain. 0350-0730 *MK: no RCP data. IF DIST-1. T-121. LOIF 100 220 0417 SC writing on NRAO-077, Bank B. 0519 %NL: rain. 0627 %NL: rain. 0730 Note Cable cal discontinuity at FD. 0730 End. Downtime Summary: Total downtime : 437 min Percentage downtime of observing: 4.4% Average downtime per hour : 2.6 min Total scheduled observing time (# Antennas): 9900 min (11) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.