VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: BC152R Observer: Claussen,M. Project type: VLBA Obs filename: bc152rcrd.* Date/Day: 2006APR13/103 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator is Brian Willard. Vclock, UT1-UTC, GPS Delta, values good. SC writing on NRAO-032, Bank B. HN writing on NRAO-038, Bank A. NL writing on NRAO-155, Bank B. LA writing on VIPSK-13, Bank B. PT writing on NRAO=093, Bank A. KP writing on VIPSU-03, Bank A. Ov writing on NRAO-037, Bank A. BR writing on NRAO-138, Bank B. MK writing on NRAO-053, Bank B. 0747-1246 *FD: not observing due to profound antenna issues. OTHER 100 299 0747 Begin, all except FD on source. 1129 %HN: high Tsys due to low elevation. 1151 %SC: rain. 1243 %SC: more rain. 1246 End. Downtime Summary: Total downtime : 299 min Percentage downtime of observing: 10.0% Average downtime per hour : 6.0 min Total scheduled observing time (# Antennas): 2990 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.