VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: AE153A Observer: Owen, F. Project type: OTHER Obs filename: ae153acrd.pt Date/Day: 2006APR29/119 Ants Scheduled: PT =UT-Time===Comment===============================================MF#===%AD==AMD= On duty operator: Peggy Perley Weather: High, thin clouds, winds ~1-5 m/s 0312 Begin Observations Clock checks OK D-rack temps cycling ~ 1d C/hr On source VLA op confirmed fringes on PT baselines 0535 New operator is Brian Willard. 0542 D-Rack temp is 25.7C. 0848-0904 *PT: power hit autostow, repointed. COM 100 16 1308 D-Rack temp is 26.1C. 1311 End. Downtime Summary: Total downtime : 16 min Percentage downtime of observing: 2.7% Average downtime per hour : 1.6 min Total scheduled observing time (# Antennas): 599 min (1) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.