COVER LETTER: BH126 SUMMARY (as of 11 Jan 2005): We request within 1 week to 10 days coordination with planned Chandra X-ray Observatory observations at 4 epochs: 1. 2Jan05 (VLBA 90cm, 90/50cm, L band for 8 hrs/run = BH126 A, B, C). Coordinated also with VLA observation AH862 on 31Dec04. 2. Anytime after 20Apr05 until the end of B array, 23May (VLBA 90cm, 90/50cm, L band for 8 hrs/run = BH126 D, E, F). Coordinated also with VLA observation AH862. 3. 1Jun05 (VLBA L-band for 8 hrs = BH126 G). 4. 6Aug05 (VLBA L band for 8 hrs = BH126 H). -------------------------------------------------------------------- Here is the official dynamic scheduling sheet: ================================================================ Preferred Dynamic Contraints. Alter [defaults] as desired. ================================================================ Equipment constraints: Stations. Below each station code, the "o" indicates an [optional] station that is to be used if it is available. Change "o" to "r" if the station is required or change "o" to "n" if the station is not to be used. SC HN NL FD LA PT KP OV BR MK o o o o o o o o o r Minimum number of stations [7]: May we swap PT for a single VLA antenna? [yes] Consult http://www.aoc.nrao.edu/~gtaylor/y1gotcha.html to decide. If you adopt the default, then both PT and VLA1 must be in the stations list in the keyin file. Bands and polarizations. Below each band code, insert "R" if the righthand polarization is to be used, "L" if the lefthand polarization is to be used, "d" if dual polarizations are to be used, or "o" if the band is in your setups but scheduling should not be constrained by its availability. 90cm 50cm 20cm 13cm 6cm 4cm 2cm 1cm 7mm 3mm d Weather constraints: [appropriate for bands marked "L", "R", or "d" above and for at least the minimum number of stations] Date constraints: Preferred date(s), usually a series start [none]: Anytime after 20Apr05 until the end of B array, 23May Excluded dates plus reason [none]: Too close to Sun. Preferred interval between segments in days [none]: Special conditions (e.g., a series with different spacings in time) [See the comments at the top.]: BEGIN = PROJECT_INFO PROJECT_CODE = BH126D TITLE = Monitoring Knot HST-1 in M87 Jet PI_NAME = D.E. Harris PI_ADDRESS = MS-3, CfA, 60 Garden St PI_ADDRESS = Cambridge, MA 02138 PI_ADDRESS = U.S.A. PI_PHONE = 617 495 7148 PI_OBS_PHONE = 617 495 7148 PI_EMAIL = harris@cfa.harvard.edu PI_FAX = 617 495 7356 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 CORRELATOR = SOCORRO END = PROJECT_INFO BEGIN = STATION_SETUP STATION = VLBA RECORD_SCANS = 24 RECORD_HOURS = 7.40 FE = omit 90cm omit 90cm NUM_CHANNELS = 4 FORMAT = VLBA1:4 SPEEDUP = 2.00 IF = B D B D BBC_SB = U U U U NET_SB = U U U U POL = R L R L BEGIN = FREQUENCY_SET LO_SUM = 324.49 324.49 332.49 332.49 BBC_FREQUENCY = 824.49 824.49 832.49 832.49 BANDWIDTH = 8.000 8.000 8.000 8.000 END = FREQUENCY_SET END = STATION_SETUP BEGIN = STATION_INFO STATION_ID = SC STATION_NAME = VLBA_SC AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 8 START = 2005-109/01:53:23 STOP = 2005-109/08:03:40 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = HN STATION_NAME = VLBA_HN AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 9 START = 2005-109/01:53:23 STOP = 2005-109/08:40:34 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = NL STATION_NAME = VLBA_NL AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 11 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = FD STATION_NAME = VLBA_FD AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 11 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = LA STATION_NAME = VLBA_LA AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 11 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = PT STATION_NAME = VLBA_PT AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 11 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = KP STATION_NAME = VLBA_KP AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 11 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = OV STATION_NAME = VLBA_OV AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 11 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = BR STATION_NAME = VLBA_BR AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 11 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = STATION_INFO STATION_ID = MK STATION_NAME = VLBA_MK AUTO_ALLOCATE = ON AUTO_REVERSE = ON TAPES = 1 PASSES = 9 START = 2005-109/01:53:23 STOP = 2005-109/09:48:23 END = STATION_INFO BEGIN = SOURCE_INFO SOURCE_NAME = 3C147 SOURCE_RA = 05h42m36.137904s SOURCE_DEC = 49d51'07.23373" END = SOURCE_INFO BEGIN = SOURCE_INFO SOURCE_NAME = 1148-001 SOURCE_RA = 11h50m43.870748s SOURCE_DEC = 00d23'54.20538" END = SOURCE_INFO BEGIN = SOURCE_INFO SOURCE_NAME = 3C274 SOURCE_RA = 12h30m49.423381s SOURCE_DEC = 12d23'28.04382" END = SOURCE_INFO BEGIN = CORRELATOR_PARAMETERS POLARIZATION = YES TIME_AVERAGE = 1.050 FFT_SIZE = 256 SPECTRAL_AVERAGE = 2 WINDOW = UNIFORM OUTPUT_TAPE = DAT SHIPPING = Teddy Cheung SHIPPING = MIT Center for Space Research, NE80-6083 SHIPPING = 77 Massachusetts Ave SHIPPING = Cambridge, MA 02139 NOTE = (617)258-5928 no charge for tapes, Teddy is a Jansky DATA_OUTPUT_RATE = 429.10 DATA_SET_SIZE = 5055.8 SOURCE_POS_ORIGIN = STANDARD END = CORRELATOR_PARAMETERS