From observe@aoc.nrao.eduTue Apr 27 08:16:37 2004 Date: Tue, 27 Apr 2004 05:48:27 +0000 From: observe To: vlbiobs@nrao.edu, pkondrat@cfa.harvard.edu Subject: 2004-04-26_2250_BK110.txt ************************************************************************ Filename: 2004-04-26_2250_BK110 Program: BK110 Subarray(s): 1 Observer(s): Kondratko Operator(s): Larry Brothers Date: 04/26/04 Configuration: Cs User #: 600 Decommissioned: 14 Source File(s): 839K110A VLBI Ref. Ant: 6 Observing Mode: Phased Array VLBI Antenna Pad: CW4 Email Address: vlbiobs@nrao.edu, pkondrat@cfa.harvard.edu API (Atmospheric Phase Interferometer) information can be found at: http://www.vla.nrao.edu/astro/guides/api/ Adobe PDF version of this log is located at: http://www.vla.nrao.edu/operators/logs/ ** Weather Information ** Time (IAT) Dew Pt Temp Wind Bar. Press API 04/26/04 22:50 3.1 20.1 E at 3 m/sec 795.5 3.2 04/27/04 03:55 -6.2 10.8 SSE at 3.5 m/sec 796.5 2.1 Operator comments for the above weather entries 04/26/04 22:50 Sky cover 20%. Stratiform clouds. 04/27/04 03:55 Sky clear. ** Visibility Tape Information ** Tape # Time of Final Record: N20263 ** Monitor Tape Information ** Tape # File # Time of Final Record: N20260 1 04/27/04 00:00:00 N20260 2 Total # of antennas used = 27 ** Operator Comments ** Start Time End Time Form # #Ants Downtime (in minutes) 26Apr 22:50:00 Starting program BK110. 26Apr 22:53:00 On source 0059+581 with all available antennas. The band(s) used is(are) K Antenna(s) : 10 do not have good baseline positions determined for them because they were moved to their present location recently. Please check for any significant errors and let the Data Analysts (email - analysts@nrao.edu) know what you find. Thank you. 04/26/04 22:50:00 04/27/04 05:47:40 C112151 1.00 417.7 Antenna(s) 13 (Data: Lost): EVLA Antenna is on Master Pad for EVLA tests. 26Apr 23:05:00 Inspected the VLB instrumentation. No problems found. 27Apr 0:05:00 Inspected the VLB instrumentation. No problems found. 27Apr 1:08:00 Inspected the VLB instrumentation. No problems found. 27Apr 2:01:00 Inspected the VLB instrumentation. No problems found. 27Apr 3:02:00 Inspected the VLB instrumentation. No problems found. 27Apr 4:10:00 Inspected the VLB instrumentation. No problems found. 27Apr 5:06:00 Inspected the VLB instrumentation. No problems found. End Time Total Program Time % Downtime Total Downtime (in minutes) (in minutes) 04/27/04 05:47:40 11277.0 3.7% 417.7 [Part 2, Text 342 lines] [Unable to print this part]