COVER INFORMATION Station: VLBA_MK (Code Mk ) Experiment: VLBA format test phase referencing H2O Exp. Code: bc139b Schedule Version: 1.00 Processed by SCHED version: Release of 18 Sept. 2003 PI: M. Claussen Address: NRAO-AOC P.O. Box O Socorro, NM 87801 Phone: 505-835-7284 EMAIL: mclausse@nrao.edu Fax: 505-835-7027 Phone during observation: 505-835-4071 Observing mode: Notes: Use all available antennas. Schedule for VLBA_MK (Code Mk ) Page 2 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- Next scan frequencies: 22009.12 22023.22 22065.43 22142.94 22234.23 22417.68 22460.98 22488.19 Next BBC frequencies: 509.12 523.22 565.43 642.94 734.23 917.68 960.98 988.19 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 01 58 46 VXUMA 05 50 39 23.0 19.2 -5.1 -96.6 0 1 1 0 01 58 46 01 59 06 --- 05 50 59 23.0 19.2 -5.1 -96.7 20 F 1 133 01 59 13 J1048+7143 05 51 06 23.6 19.3 -5.0 -98.4 0 1 1 133 01 59 06 01 59 33 =1044+719 05 51 26 23.7 19.3 -5.0 -98.5 20 F 1 313 01 59 40 VXUMA 05 51 33 23.1 19.2 -5.1 -96.8 0 1 1 313 01 59 33 01 59 59 --- 05 51 53 23.1 19.2 -5.1 -96.9 20 F 1 493 02 00 07 J1048+7143 05 52 00 23.7 19.3 -4.9 -98.6 0 1 1 493 01 59 59 02 00 26 =1044+719 05 52 20 23.7 19.3 -4.9 -98.7 20 F 1 673 02 00 34 VXUMA 05 52 28 23.2 19.2 -5.1 -97.0 0 1 1 673 02 00 26 02 00 53 --- 05 52 48 23.2 19.2 -5.1 -97.1 20 F 1 853 02 01 01 J1048+7143 05 52 55 23.8 19.2 -4.9 -98.8 0 1 1 853 02 00 53 02 01 20 =1044+719 05 53 15 23.8 19.2 -4.9 -98.9 20 F 1 1033 02 01 27 VXUMA 05 53 22 23.2 19.2 -5.0 -97.2 0 1 1 1033 02 01 20 02 01 47 --- 05 53 42 23.3 19.2 -5.0 -97.3 20 F 1 1212 02 01 54 J1048+7143 05 53 49 23.8 19.2 -4.9 -99.0 0 1 1 1212 02 01 47 02 02 14 =1044+719 05 54 09 23.9 19.2 -4.9 -99.1 20 F 1 1393 02 02 21 VXUMA 05 54 16 23.3 19.2 -5.0 -97.5 0 1 1 1393 02 02 14 02 02 41 --- 05 54 36 23.3 19.2 -5.0 -97.5 20 F 1 1572 02 02 48 J1048+7143 05 54 43 23.9 19.2 -4.9 -99.3 0 1 1 1572 02 02 41 02 03 08 =1044+719 05 55 03 23.9 19.2 -4.9 -99.3 20 F 1 1752 02 03 15 VXUMA 05 55 10 23.4 19.2 -5.0 -97.7 0 1 1 1752 02 03 08 02 03 35 --- 05 55 30 23.4 19.1 -5.0 -97.8 20 F 1 1932 02 03 42 J1048+7143 05 55 37 24.0 19.2 -4.9 -99.5 0 1 1 1932 02 03 35 02 04 02 =1044+719 05 55 57 24.0 19.2 -4.9 -99.6 20 F 1 2112 Schedule for VLBA_MK (Code Mk ) Page 3 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 04 09 VXUMA 05 56 04 23.4 19.1 -5.0 -97.9 0 1 1 2112 02 04 02 02 04 29 --- 05 56 24 23.5 19.1 -5.0 -98.0 20 F 1 2292 02 04 36 J1048+7143 05 56 31 24.1 19.2 -4.9 -99.7 0 1 1 2292 02 04 29 02 04 56 =1044+719 05 56 51 24.1 19.2 -4.9 -99.8 20 F 1 2472 02 05 03 VXUMA 05 56 58 23.5 19.1 -5.0 -98.1 0 1 1 2472 02 04 56 02 05 23 --- 05 57 18 23.5 19.1 -5.0 -98.2 20 F 1 2652 02 05 30 J1048+7143 05 57 25 24.1 19.2 -4.9 -99.9 0 1 1 2652 02 05 23 02 05 50 =1044+719 05 57 45 24.2 19.2 -4.9 -100.0 20 F 1 2832 02 05 57 VXUMA 05 57 52 23.6 19.1 -5.0 -98.3 0 1 1 2832 02 05 50 02 06 17 --- 05 58 12 23.6 19.1 -5.0 -98.4 20 F 1 3012 02 06 24 J1048+7143 05 58 19 24.2 19.2 -4.8 -100.1 0 1 1 3012 02 06 17 02 06 44 =1044+719 05 58 39 24.2 19.2 -4.8 -100.2 20 F 1 3192 02 06 51 VXUMA 05 58 46 23.6 19.1 -5.0 -98.6 0 1 1 3192 02 06 44 02 07 11 --- 05 59 06 23.7 19.1 -4.9 -98.6 20 F 1 3372 02 07 18 J1048+7143 05 59 13 24.3 19.2 -4.8 -100.4 0 1 1 3372 02 07 11 02 07 38 =1044+719 05 59 33 24.3 19.2 -4.8 -100.4 20 F 1 3552 02 07 45 VXUMA 05 59 41 23.7 19.1 -4.9 -98.8 0 1 1 3552 02 07 38 02 08 05 --- 06 00 01 23.7 19.1 -4.9 -98.9 20 F 1 3731 02 08 12 J1048+7143 06 00 08 24.3 19.1 -4.8 -100.6 0 1 1 3731 02 08 05 02 08 32 =1044+719 06 00 28 24.4 19.1 -4.8 -100.7 20 F 1 3912 02 08 39 VXUMA 06 00 35 23.8 19.1 -4.9 -99.0 0 1 1 3912 02 08 32 02 08 59 --- 06 00 55 23.8 19.1 -4.9 -99.1 20 F 1 4091 02 09 06 J1048+7143 06 01 02 24.4 19.1 -4.8 -100.8 0 1 1 4091 02 08 59 02 09 26 =1044+719 06 01 22 24.4 19.1 -4.8 -100.9 20 F 1 4271 02 09 33 VXUMA 06 01 29 23.9 19.1 -4.9 -99.2 0 1 1 4271 02 09 26 02 09 53 --- 06 01 49 23.9 19.1 -4.9 -99.3 20 F 1 4451 02 10 00 J1048+7143 06 01 56 24.5 19.1 -4.8 -101.0 0 1 1 4451 02 09 53 02 10 20 =1044+719 06 02 16 24.5 19.1 -4.8 -101.1 20 F 1 4631 Schedule for VLBA_MK (Code Mk ) Page 4 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 10 27 VXUMA 06 02 23 23.9 19.1 -4.9 -99.4 0 1 1 4631 02 10 20 02 10 47 --- 06 02 43 24.0 19.1 -4.9 -99.5 20 F 1 4811 02 10 54 J1048+7143 06 02 50 24.5 19.1 -4.8 -101.2 0 1 1 4811 02 10 47 02 11 14 =1044+719 06 03 10 24.6 19.1 -4.8 -101.3 20 F 1 4991 02 11 21 VXUMA 06 03 17 24.0 19.0 -4.9 -99.6 0 1 1 4991 02 11 14 02 11 41 --- 06 03 37 24.0 19.0 -4.9 -99.7 20 F 1 5171 02 11 48 J1048+7143 06 03 44 24.6 19.1 -4.8 -101.5 0 1 1 5171 02 11 41 02 12 08 =1044+719 06 04 04 24.6 19.1 -4.7 -101.5 20 F 1 5351 02 12 15 VXUMA 06 04 11 24.1 19.0 -4.9 -99.9 0 1 1 5351 02 12 08 02 12 35 --- 06 04 31 24.1 19.0 -4.9 -99.9 20 F 1 5531 02 12 42 J1048+7143 06 04 38 24.7 19.1 -4.7 -101.7 0 1 1 5531 02 12 35 02 13 02 =1044+719 06 04 58 24.7 19.1 -4.7 -101.8 20 F 1 5711 02 13 09 VXUMA 06 05 05 24.1 19.0 -4.8 -100.1 0 1 1 5711 02 13 02 02 13 29 --- 06 05 25 24.2 19.0 -4.8 -100.2 20 F 1 5891 02 13 36 J1048+7143 06 05 32 24.8 19.1 -4.7 -101.9 0 1 1 5891 02 13 29 02 13 56 =1044+719 06 05 52 24.8 19.0 -4.7 -102.0 20 F 1 6071 02 14 03 VXUMA 06 05 59 24.2 19.0 -4.8 -100.3 0 1 1 6071 02 13 56 02 14 23 --- 06 06 19 24.2 19.0 -4.8 -100.4 20 F 1 6251 02 14 30 J1048+7143 06 06 27 24.8 19.0 -4.7 -102.1 0 1 1 6251 02 14 23 02 14 50 =1044+719 06 06 47 24.8 19.0 -4.7 -102.2 20 F 1 6431 02 14 57 VXUMA 06 06 54 24.3 19.0 -4.8 -100.5 0 1 1 6431 02 14 50 02 15 17 --- 06 07 14 24.3 19.0 -4.8 -100.6 20 F 1 6611 02 15 24 J1048+7143 06 07 21 24.9 19.0 -4.7 -102.3 0 1 1 6611 02 15 17 02 15 44 =1044+719 06 07 41 24.9 19.0 -4.7 -102.4 20 F 1 6791 02 15 51 VXUMA 06 07 48 24.3 19.0 -4.8 -100.7 0 1 1 6791 02 15 44 02 16 11 --- 06 08 08 24.4 19.0 -4.8 -100.8 20 F 1 6971 02 16 18 J1048+7143 06 08 15 25.0 19.0 -4.7 -102.6 0 1 1 6971 02 16 11 02 16 38 =1044+719 06 08 35 25.0 19.0 -4.7 -102.6 20 F 1 7151 Schedule for VLBA_MK (Code Mk ) Page 5 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 16 45 VXUMA 06 08 42 24.4 19.0 -4.8 -101.0 0 1 1 7151 02 16 38 02 17 05 --- 06 09 02 24.4 19.0 -4.8 -101.0 20 F 1 7331 02 17 12 J1048+7143 06 09 09 25.0 19.0 -4.7 -102.8 0 1 1 7331 02 17 05 02 17 32 =1044+719 06 09 29 25.1 19.0 -4.7 -102.9 20 F 1 7511 02 17 39 VXUMA 06 09 36 24.5 19.0 -4.8 -101.2 0 1 1 7511 02 17 32 02 17 59 --- 06 09 56 24.5 18.9 -4.8 -101.3 20 F 1 7690 02 18 06 J1048+7143 06 10 03 25.1 19.0 -4.6 -103.0 0 1 1 7690 02 17 59 02 18 26 =1044+719 06 10 23 25.1 19.0 -4.6 -103.1 20 F 1 7871 02 18 33 VXUMA 06 10 30 24.5 18.9 -4.8 -101.4 0 1 1 7871 02 18 26 02 18 53 --- 06 10 50 24.6 18.9 -4.8 -101.5 20 F 1 8050 02 19 00 J1048+7143 06 10 57 25.2 18.9 -4.6 -103.2 0 1 1 8050 02 18 53 02 19 20 =1044+719 06 11 17 25.2 18.9 -4.6 -103.3 20 F 1 8231 02 19 27 VXUMA 06 11 24 24.6 18.9 -4.7 -101.6 0 1 1 8231 02 19 20 02 19 47 --- 06 11 44 24.6 18.9 -4.7 -101.7 20 F 1 8410 02 19 54 J1048+7143 06 11 51 25.2 18.9 -4.6 -103.4 0 1 1 8410 02 19 47 02 20 14 =1044+719 06 12 11 25.3 18.9 -4.6 -103.5 20 F 1 8590 02 20 21 VXUMA 06 12 18 24.7 18.9 -4.7 -101.9 0 1 1 8590 02 20 14 02 20 41 --- 06 12 38 24.7 18.9 -4.7 -101.9 20 F 1 8770 02 20 48 J1048+7143 06 12 46 25.3 18.9 -4.6 -103.7 0 1 1 8770 02 20 41 02 21 08 =1044+719 06 13 06 25.3 18.9 -4.6 -103.7 20 F 1 8950 02 21 15 VXUMA 06 13 13 24.8 18.9 -4.7 -102.1 0 1 1 8950 02 21 08 02 21 35 --- 06 13 33 24.8 18.9 -4.7 -102.2 20 F 1 9130 02 21 42 J1048+7143 06 13 40 25.4 18.9 -4.6 -103.9 0 1 1 9130 02 21 35 02 22 02 =1044+719 06 14 00 25.4 18.9 -4.6 -104.0 20 F 1 9310 02 22 09 VXUMA 06 14 07 24.8 18.9 -4.7 -102.3 0 1 1 9310 02 22 02 02 22 29 --- 06 14 27 24.8 18.9 -4.7 -102.4 20 F 1 9490 02 22 36 J1101+7225 06 14 34 24.3 18.4 -4.8 -101.2 0 1 1 9490 02 22 29 02 22 56 =1058+726 06 14 54 24.3 18.4 -4.8 -101.2 20 F 1 9672 Schedule for VLBA_MK (Code Mk ) Page 6 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 23 04 VXUMA 06 15 02 24.9 18.9 -4.7 -102.5 0 1 1 9672 02 22 56 02 23 24 --- 06 15 22 24.9 18.8 -4.7 -102.6 20 F 1 9855 02 23 31 J1101+7225 06 15 29 24.4 18.4 -4.8 -101.4 0 1 1 9855 02 23 24 02 23 51 =1058+726 06 15 49 24.4 18.3 -4.8 -101.5 20 F 1 10037 02 23 59 VXUMA 06 15 56 25.0 18.8 -4.7 -102.7 0 1 1 10037 02 23 51 02 24 19 --- 06 16 16 25.0 18.8 -4.7 -102.8 20 F 1 10220 02 24 26 J1101+7225 06 16 24 24.4 18.3 -4.8 -101.6 0 1 1 10220 02 24 19 02 24 46 =1058+726 06 16 44 24.4 18.3 -4.8 -101.7 20 F 1 10402 02 24 53 VXUMA 06 16 51 25.0 18.8 -4.7 -103.0 0 1 1 10402 02 24 46 02 25 13 --- 06 17 11 25.1 18.8 -4.6 -103.0 20 F 1 10584 02 25 21 J1101+7225 06 17 19 24.5 18.3 -4.7 -101.8 0 1 1 10584 02 25 13 02 25 41 =1058+726 06 17 39 24.5 18.3 -4.7 -101.9 20 F 1 10767 02 25 48 VXUMA 06 17 46 25.1 18.8 -4.6 -103.2 0 1 1 10767 02 25 41 02 26 08 --- 06 18 06 25.1 18.8 -4.6 -103.3 20 F 1 10949 02 26 15 J1101+7225 06 18 14 24.6 18.3 -4.7 -102.0 0 1 1 10949 02 26 08 02 26 35 =1058+726 06 18 34 24.6 18.3 -4.7 -102.1 20 F 1 11131 02 26 43 VXUMA 06 18 41 25.2 18.8 -4.6 -103.4 0 1 1 11131 02 26 35 02 27 03 --- 06 19 01 25.2 18.8 -4.6 -103.5 20 F 1 11314 02 27 10 J1101+7225 06 19 08 24.6 18.3 -4.7 -102.3 0 1 1 11314 02 27 03 02 27 30 =1058+726 06 19 28 24.6 18.3 -4.7 -102.4 20 F 1 11496 02 27 37 VXUMA 06 19 36 25.2 18.8 -4.6 -103.6 0 1 1 11496 02 27 30 02 27 57 --- 06 19 56 25.3 18.8 -4.6 -103.7 20 F 1 11679 02 28 05 J1101+7225 06 20 03 24.7 18.3 -4.7 -102.5 0 1 1 11679 02 27 57 02 28 25 =1058+726 06 20 23 24.7 18.3 -4.7 -102.6 20 F 1 11861 02 28 32 VXUMA 06 20 31 25.3 18.7 -4.6 -103.9 0 1 1 11861 02 28 25 02 28 52 --- 06 20 51 25.3 18.7 -4.6 -103.9 20 F 1 12044 02 28 59 J1101+7225 06 20 58 24.8 18.3 -4.7 -102.7 0 1 1 12044 02 28 52 02 29 19 =1058+726 06 21 18 24.8 18.3 -4.7 -102.8 20 F 1 12226 Schedule for VLBA_MK (Code Mk ) Page 7 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 29 27 VXUMA 06 21 26 25.4 18.7 -4.6 -104.1 0 1 1 12226 02 29 19 02 29 47 --- 06 21 46 25.4 18.7 -4.6 -104.2 20 F 1 12408 02 29 54 J1101+7225 06 21 53 24.8 18.2 -4.7 -102.9 0 1 1 12408 02 29 47 02 30 14 =1058+726 06 22 13 24.8 18.2 -4.7 -103.0 20 F 1 12591 02 30 22 VXUMA 06 22 20 25.4 18.7 -4.6 -104.3 0 1 1 12591 02 30 14 02 30 42 --- 06 22 40 25.5 18.7 -4.6 -104.4 20 F 1 12773 02 30 49 J1101+7225 06 22 48 24.9 18.2 -4.7 -103.2 0 1 1 12773 02 30 42 02 31 09 =1058+726 06 23 08 24.9 18.2 -4.7 -103.3 20 F 1 12955 02 31 16 VXUMA 06 23 15 25.5 18.7 -4.5 -104.5 0 1 1 12955 02 31 09 02 31 36 --- 06 23 35 25.5 18.7 -4.5 -104.6 20 F 1 13138 02 31 44 J1101+7225 06 23 43 25.0 18.2 -4.6 -103.4 0 1 1 13138 02 31 36 02 32 04 =1058+726 06 24 03 25.0 18.2 -4.6 -103.5 20 F 1 13320 02 32 11 VXUMA 06 24 10 25.6 18.7 -4.5 -104.8 0 1 1 13320 02 32 04 02 32 31 --- 06 24 30 25.6 18.7 -4.5 -104.9 20 F 1 13503 02 32 38 J1101+7225 06 24 38 25.0 18.2 -4.6 -103.6 0 1 1 13503 02 32 31 02 32 58 =1058+726 06 24 58 25.1 18.2 -4.6 -103.7 20 F 1 13685 02 33 06 VXUMA 06 25 05 25.7 18.6 -4.5 -105.0 0 1 1 13685 02 32 58 02 33 26 --- 06 25 25 25.7 18.6 -4.5 -105.1 20 F 1 13867 02 33 33 J1101+7225 06 25 33 25.1 18.2 -4.6 -103.8 0 1 1 13867 02 33 26 02 33 53 =1058+726 06 25 53 25.1 18.2 -4.6 -103.9 20 F 1 14050 02 34 00 VXUMA 06 26 00 25.7 18.6 -4.5 -105.2 0 1 1 14050 02 33 53 02 34 20 --- 06 26 20 25.7 18.6 -4.5 -105.3 20 F 1 14232 02 34 28 J1101+7225 06 26 27 25.2 18.2 -4.6 -104.1 0 1 1 14232 02 34 20 02 34 48 =1058+726 06 26 47 25.2 18.1 -4.6 -104.2 20 F 1 14415 02 34 55 VXUMA 06 26 55 25.8 18.6 -4.5 -105.4 0 1 1 14415 02 34 48 02 35 15 --- 06 27 15 25.8 18.6 -4.5 -105.5 20 F 1 14597 02 35 23 J1101+7225 06 27 22 25.2 18.1 -4.6 -104.3 0 1 1 14597 02 35 15 02 35 42 =1058+726 06 27 42 25.3 18.1 -4.6 -104.4 20 F 1 14779 Schedule for VLBA_MK (Code Mk ) Page 8 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 35 50 VXUMA 06 27 50 25.9 18.6 -4.5 -105.7 0 1 1 14779 02 35 42 02 36 10 --- 06 28 10 25.9 18.6 -4.5 -105.8 20 F 1 14962 02 36 17 J1101+7225 06 28 17 25.3 18.1 -4.6 -104.5 0 1 1 14962 02 36 10 02 36 37 =1058+726 06 28 37 25.3 18.1 -4.6 -104.6 20 F 1 15144 02 36 45 VXUMA 06 28 45 25.9 18.6 -4.5 -105.9 0 1 1 15144 02 36 37 02 37 05 --- 06 29 05 26.0 18.6 -4.4 -106.0 20 F 1 15327 02 37 12 J1101+7225 06 29 12 25.4 18.1 -4.5 -104.8 0 1 1 15327 02 37 05 02 37 32 =1058+726 06 29 32 25.4 18.1 -4.5 -104.8 20 F 1 15509 02 37 39 VXUMA 06 29 39 26.0 18.5 -4.4 -106.1 0 1 1 15509 02 37 32 02 37 59 --- 06 29 59 26.0 18.5 -4.4 -106.2 20 F 1 15692 02 38 07 J1101+7225 06 30 07 25.4 18.1 -4.5 -105.0 0 1 1 15692 02 37 59 02 38 27 =1058+726 06 30 27 25.5 18.1 -4.5 -105.1 20 F 1 15874 02 38 34 VXUMA 06 30 34 26.1 18.5 -4.4 -106.4 0 1 1 15874 02 38 27 02 38 54 --- 06 30 54 26.1 18.5 -4.4 -106.4 20 F 1 16056 02 39 01 J1101+7225 06 31 02 25.5 18.1 -4.5 -105.2 0 1 1 16056 02 38 54 02 39 21 =1058+726 06 31 22 25.5 18.0 -4.5 -105.3 20 F 1 16239 02 39 29 VXUMA 06 31 29 26.1 18.5 -4.4 -106.6 0 1 1 16239 02 39 21 02 39 49 --- 06 31 49 26.2 18.5 -4.4 -106.7 20 F 1 16421 02 39 56 J1101+7225 06 31 57 25.6 18.0 -4.5 -105.4 0 1 1 16421 02 39 49 02 40 16 =1058+726 06 32 17 25.6 18.0 -4.5 -105.5 20 F 1 16604 02 40 24 VXUMA 06 32 24 26.2 18.5 -4.4 -106.8 0 1 1 16604 02 40 16 02 40 43 --- 06 32 44 26.2 18.5 -4.4 -106.9 20 F 1 16786 02 40 51 J1101+7225 06 32 52 25.6 18.0 -4.5 -105.7 0 1 1 16786 02 40 43 02 41 11 =1058+726 06 33 12 25.7 18.0 -4.5 -105.7 20 F 1 16968 02 41 18 VXUMA 06 33 19 26.3 18.5 -4.4 -107.0 0 1 1 16968 02 41 11 02 41 38 --- 06 33 39 26.3 18.4 -4.4 -107.1 20 F 1 17151 02 41 46 J1101+7225 06 33 46 25.7 18.0 -4.5 -105.9 0 1 2 17151 02 41 38 02 42 06 =1058+726 06 34 06 25.7 18.0 -4.5 -106.0 20 R 1 16969 Schedule for VLBA_MK (Code Mk ) Page 9 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 42 13 VXUMA 06 34 14 26.3 18.4 -4.4 -107.3 0 1 2 16969 02 42 06 02 42 33 --- 06 34 34 26.4 18.4 -4.4 -107.3 20 R 1 16786 02 42 40 J1101+7225 06 34 41 25.8 18.0 -4.5 -106.1 0 1 2 16786 02 42 33 02 43 00 =1058+726 06 35 01 25.8 18.0 -4.5 -106.2 20 R 1 16604 02 43 08 VXUMA 06 35 09 26.4 18.4 -4.3 -107.5 0 1 2 16604 02 43 00 02 43 28 --- 06 35 29 26.4 18.4 -4.3 -107.6 20 R 1 16421 02 43 35 J1101+7225 06 35 36 25.8 18.0 -4.4 -106.3 0 1 2 16421 02 43 28 02 43 55 =1058+726 06 35 56 25.9 17.9 -4.4 -106.4 20 R 1 16239 02 44 02 VXUMA 06 36 04 26.5 18.4 -4.3 -107.7 0 1 2 16239 02 43 55 02 44 22 --- 06 36 24 26.5 18.4 -4.3 -107.8 20 R 1 16056 02 44 30 J1101+7225 06 36 31 25.9 17.9 -4.4 -106.6 0 1 2 16056 02 44 22 02 44 50 =1058+726 06 36 51 25.9 17.9 -4.4 -106.7 20 R 1 15874 02 44 57 VXUMA 06 36 58 26.5 18.4 -4.3 -107.9 0 1 2 15874 02 44 50 02 45 17 --- 06 37 18 26.6 18.3 -4.3 -108.0 20 R 1 15692 02 45 24 J1101+7225 06 37 26 26.0 17.9 -4.4 -106.8 0 1 2 15692 02 45 17 02 45 44 =1058+726 06 37 46 26.0 17.9 -4.4 -106.9 20 R 1 15509 02 45 52 VXUMA 06 37 53 26.6 18.3 -4.3 -108.2 0 1 2 15509 02 45 44 02 46 12 --- 06 38 13 26.6 18.3 -4.3 -108.3 20 R 1 15327 02 46 19 J1048+7143 06 38 20 27.2 18.3 -4.2 -110.0 0 1 2 15327 02 46 12 02 46 39 =1044+719 06 38 40 27.2 18.3 -4.2 -110.1 20 R 1 15147 02 46 46 VXUMA 06 38 47 26.7 18.3 -4.3 -108.4 0 1 2 15147 02 46 39 02 47 06 --- 06 39 07 26.7 18.3 -4.3 -108.5 20 R 1 14967 02 47 13 J1048+7143 06 39 15 27.3 18.2 -4.2 -110.3 0 1 2 14967 02 47 06 02 47 33 =1044+719 06 39 35 27.3 18.2 -4.2 -110.3 20 R 1 14787 02 47 40 VXUMA 06 39 42 26.7 18.3 -4.3 -108.6 0 1 2 14787 02 47 33 02 48 00 --- 06 40 02 26.8 18.3 -4.3 -108.7 20 R 1 14607 02 48 07 J1048+7143 06 40 09 27.4 18.2 -4.1 -110.5 0 1 2 14607 02 48 00 02 48 27 =1044+719 06 40 29 27.4 18.2 -4.1 -110.6 20 R 1 14427 Schedule for VLBA_MK (Code Mk ) Page 10 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 48 34 VXUMA 06 40 36 26.8 18.3 -4.3 -108.9 0 1 2 14427 02 48 27 02 48 54 --- 06 40 56 26.8 18.2 -4.3 -108.9 20 R 1 14247 02 49 01 J1048+7143 06 41 03 27.4 18.2 -4.1 -110.7 0 1 2 14247 02 48 54 02 49 21 =1044+719 06 41 23 27.4 18.2 -4.1 -110.8 20 R 1 14067 02 49 28 VXUMA 06 41 30 26.9 18.2 -4.2 -109.1 0 1 2 14067 02 49 21 02 49 48 --- 06 41 50 26.9 18.2 -4.2 -109.2 20 R 1 13887 02 49 55 J1048+7143 06 41 57 27.5 18.2 -4.1 -110.9 0 1 2 13887 02 49 48 02 50 15 =1044+719 06 42 17 27.5 18.1 -4.1 -111.0 20 R 1 13707 02 50 22 VXUMA 06 42 24 26.9 18.2 -4.2 -109.3 0 1 2 13707 02 50 15 02 50 42 --- 06 42 44 27.0 18.2 -4.2 -109.4 20 R 1 13528 02 50 49 J1048+7143 06 42 51 27.6 18.1 -4.1 -111.2 0 1 2 13528 02 50 42 02 51 09 =1044+719 06 43 11 27.6 18.1 -4.1 -111.2 20 R 1 13347 02 51 16 VXUMA 06 43 18 27.0 18.2 -4.2 -109.5 0 1 2 13347 02 51 09 02 51 36 --- 06 43 38 27.0 18.2 -4.2 -109.6 20 R 1 13168 02 51 43 J1048+7143 06 43 45 27.6 18.1 -4.1 -111.4 0 1 2 13168 02 51 36 02 52 03 =1044+719 06 44 05 27.6 18.1 -4.1 -111.5 20 R 1 12988 02 52 10 VXUMA 06 44 12 27.1 18.2 -4.2 -109.8 0 1 2 12988 02 52 03 02 52 30 --- 06 44 32 27.1 18.1 -4.2 -109.8 20 R 1 12808 02 52 37 J1048+7143 06 44 39 27.7 18.1 -4.1 -111.6 0 1 2 12808 02 52 30 02 52 57 =1044+719 06 44 59 27.7 18.1 -4.1 -111.7 20 R 1 12628 02 53 04 VXUMA 06 45 06 27.1 18.1 -4.2 -110.0 0 1 2 12628 02 52 57 02 53 24 --- 06 45 26 27.2 18.1 -4.2 -110.1 20 R 1 12448 02 53 31 J1048+7143 06 45 33 27.8 18.0 -4.1 -111.8 0 1 2 12448 02 53 24 02 53 51 =1044+719 06 45 53 27.8 18.0 -4.0 -111.9 20 R 1 12268 02 53 58 VXUMA 06 46 00 27.2 18.1 -4.2 -110.2 0 1 2 12268 02 53 51 02 54 18 --- 06 46 20 27.2 18.1 -4.2 -110.3 20 R 1 12088 02 54 25 J1048+7143 06 46 27 27.8 18.0 -4.0 -112.1 0 1 2 12088 02 54 18 02 54 45 =1044+719 06 46 47 27.8 18.0 -4.0 -112.2 20 R 1 11908 Schedule for VLBA_MK (Code Mk ) Page 11 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 02 54 52 VXUMA 06 46 55 27.3 18.1 -4.2 -110.4 0 1 2 11908 02 54 45 02 55 12 --- 06 47 15 27.3 18.1 -4.1 -110.5 20 R 1 11728 02 55 19 J1048+7143 06 47 22 27.9 18.0 -4.0 -112.3 0 1 2 11728 02 55 12 02 55 39 =1044+719 06 47 42 27.9 18.0 -4.0 -112.4 20 R 1 11548 02 55 46 VXUMA 06 47 49 27.3 18.0 -4.1 -110.7 0 1 2 11548 02 55 39 02 56 06 --- 06 48 09 27.4 18.0 -4.1 -110.7 20 R 1 11369 02 56 13 J1048+7143 06 48 16 27.9 17.9 -4.0 -112.5 0 1 2 11369 02 56 06 02 56 33 =1044+719 06 48 36 28.0 17.9 -4.0 -112.6 20 R 1 11189 02 56 40 VXUMA 06 48 43 27.4 18.0 -4.1 -110.9 0 1 2 11189 02 56 33 02 56 59 --- 06 49 03 27.4 18.0 -4.1 -111.0 20 R 1 11009 02 57 07 J1048+7143 06 49 10 28.0 17.9 -4.0 -112.8 0 1 2 11009 02 56 59 02 57 26 =1044+719 06 49 30 28.0 17.9 -4.0 -112.8 20 R 1 10829 02 57 33 VXUMA 06 49 37 27.5 18.0 -4.1 -111.1 0 1 2 10829 02 57 26 02 57 53 --- 06 49 57 27.5 18.0 -4.1 -111.2 20 R 1 10649 02 58 00 J1048+7143 06 50 04 28.1 17.9 -4.0 -113.0 0 1 2 10649 02 57 53 02 58 20 =1044+719 06 50 24 28.1 17.9 -4.0 -113.1 20 R 1 10469 02 58 27 VXUMA 06 50 31 27.5 18.0 -4.1 -111.3 0 1 2 10469 02 58 20 02 58 47 --- 06 50 51 27.6 17.9 -4.1 -111.4 20 R 1 10289 02 58 54 J1048+7143 06 50 58 28.1 17.9 -4.0 -113.2 0 1 2 10289 02 58 47 02 59 14 =1044+719 06 51 18 28.2 17.8 -4.0 -113.3 20 R 1 10109 02 59 21 VXUMA 06 51 25 27.6 17.9 -4.1 -111.6 0 1 2 10109 02 59 14 02 59 41 --- 06 51 45 27.6 17.9 -4.1 -111.7 20 R 1 9930 02 59 48 J1048+7143 06 51 52 28.2 17.8 -3.9 -113.4 0 1 2 9930 02 59 41 03 00 08 =1044+719 06 52 12 28.2 17.8 -3.9 -113.5 20 R 1 9750 03 00 15 VXUMA 06 52 19 27.7 17.9 -4.1 -111.8 0 1 2 9750 03 00 08 03 00 35 --- 06 52 39 27.7 17.9 -4.1 -111.9 20 R 1 9570 03 00 42 J1048+7143 06 52 46 28.3 17.8 -3.9 -113.7 0 1 2 9570 03 00 35 03 01 02 =1044+719 06 53 06 28.3 17.8 -3.9 -113.8 20 R 1 9390 Schedule for VLBA_MK (Code Mk ) Page 12 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 03 01 09 VXUMA 06 53 13 27.7 17.9 -4.0 -112.0 0 1 2 9390 03 01 02 03 01 29 --- 06 53 33 27.8 17.9 -4.0 -112.1 20 R 1 9210 03 01 36 J1048+7143 06 53 40 28.3 17.8 -3.9 -113.9 0 1 2 9210 03 01 29 03 01 56 =1044+719 06 54 00 28.4 17.7 -3.9 -114.0 20 R 1 9030 03 02 03 VXUMA 06 54 07 27.8 17.8 -4.0 -112.3 0 1 2 9030 03 01 56 03 02 23 --- 06 54 27 27.8 17.8 -4.0 -112.3 20 R 1 8851 03 02 30 J1048+7143 06 54 34 28.4 17.7 -3.9 -114.1 0 1 2 8851 03 02 23 03 02 50 =1044+719 06 54 54 28.4 17.7 -3.9 -114.2 20 R 1 8671 03 02 57 VXUMA 06 55 02 27.9 17.8 -4.0 -112.5 0 1 2 8671 03 02 50 03 03 17 --- 06 55 22 27.9 17.8 -4.0 -112.6 20 R 1 8491 03 03 24 J1048+7143 06 55 29 28.5 17.7 -3.9 -114.4 0 1 2 8491 03 03 17 03 03 44 =1044+719 06 55 49 28.5 17.7 -3.9 -114.4 20 R 1 8311 03 03 51 VXUMA 06 55 56 27.9 17.8 -4.0 -112.7 0 1 2 8311 03 03 44 03 04 11 --- 06 56 16 27.9 17.8 -4.0 -112.8 20 R 1 8131 03 04 18 J1048+7143 06 56 23 28.5 17.7 -3.9 -114.6 0 1 2 8131 03 04 11 03 04 38 =1044+719 06 56 43 28.6 17.6 -3.9 -114.7 20 R 1 7951 03 04 45 VXUMA 06 56 50 28.0 17.8 -4.0 -112.9 0 1 2 7951 03 04 38 03 05 05 --- 06 57 10 28.0 17.7 -4.0 -113.0 20 R 1 7771 03 05 12 J1048+7143 06 57 17 28.6 17.6 -3.9 -114.8 0 1 2 7771 03 05 05 03 05 32 =1044+719 06 57 37 28.6 17.6 -3.9 -114.9 20 R 1 7592 03 05 39 VXUMA 06 57 44 28.1 17.7 -4.0 -113.2 0 1 2 7592 03 05 32 03 05 59 --- 06 58 04 28.1 17.7 -4.0 -113.3 20 R 1 7412 03 06 06 J1048+7143 06 58 11 28.7 17.6 -3.8 -115.1 0 1 2 7412 03 05 59 03 06 26 =1044+719 06 58 31 28.7 17.6 -3.8 -115.1 20 R 1 7232 03 06 33 VXUMA 06 58 38 28.1 17.7 -4.0 -113.4 0 1 2 7232 03 06 26 03 06 53 --- 06 58 58 28.1 17.7 -4.0 -113.5 20 R 1 7052 03 07 00 J1048+7143 06 59 05 28.7 17.6 -3.8 -115.3 0 1 2 7052 03 06 53 03 07 20 =1044+719 06 59 25 28.7 17.5 -3.8 -115.4 20 R 1 6872 Schedule for VLBA_MK (Code Mk ) Page 13 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 03 07 27 VXUMA 06 59 32 28.2 17.7 -3.9 -113.6 0 1 2 6872 03 07 20 03 07 47 --- 06 59 52 28.2 17.6 -3.9 -113.7 20 R 1 6693 03 07 54 J1048+7143 06 59 59 28.8 17.5 -3.8 -115.5 0 1 2 6693 03 07 47 03 08 14 =1044+719 07 00 19 28.8 17.5 -3.8 -115.6 20 R 1 6513 03 08 21 VXUMA 07 00 26 28.2 17.6 -3.9 -113.9 0 1 2 6513 03 08 14 03 08 41 --- 07 00 46 28.3 17.6 -3.9 -113.9 20 R 1 6333 03 08 48 J1048+7143 07 00 53 28.9 17.5 -3.8 -115.7 0 1 2 6333 03 08 41 03 09 08 =1044+719 07 01 13 28.9 17.5 -3.8 -115.8 20 R 1 6153 03 09 15 VXUMA 07 01 20 28.3 17.6 -3.9 -114.1 0 1 2 6153 03 09 08 03 09 35 --- 07 01 40 28.3 17.6 -3.9 -114.2 20 R 1 5973 03 09 42 J1101+7225 07 01 48 27.7 17.2 -4.0 -112.9 0 1 2 5973 03 09 35 03 10 02 =1058+726 07 02 08 27.7 17.2 -4.0 -113.0 20 R 1 5791 03 10 10 VXUMA 07 02 15 28.4 17.6 -3.9 -114.3 0 1 2 5791 03 10 02 03 10 30 --- 07 02 35 28.4 17.5 -3.9 -114.4 20 R 1 5609 03 10 37 J1101+7225 07 02 42 27.8 17.2 -4.0 -113.1 0 1 2 5609 03 10 30 03 10 57 =1058+726 07 03 02 27.8 17.2 -4.0 -113.2 20 R 1 5426 03 11 04 VXUMA 07 03 10 28.4 17.5 -3.9 -114.6 0 1 2 5426 03 10 57 03 11 24 --- 07 03 30 28.5 17.5 -3.9 -114.6 20 R 1 5244 03 11 32 J1101+7225 07 03 37 27.8 17.1 -4.0 -113.4 0 1 2 5244 03 11 24 03 11 52 =1058+726 07 03 57 27.8 17.1 -4.0 -113.5 20 R 1 5062 03 11 59 VXUMA 07 04 05 28.5 17.5 -3.9 -114.8 0 1 2 5062 03 11 52 03 12 19 --- 07 04 25 28.5 17.5 -3.9 -114.9 20 R 1 4879 03 12 26 J1101+7225 07 04 32 27.9 17.1 -4.0 -113.6 0 1 2 4879 03 12 19 03 12 46 =1058+726 07 04 52 27.9 17.1 -4.0 -113.7 20 R 1 4697 03 12 54 VXUMA 07 05 00 28.6 17.5 -3.9 -115.0 0 1 2 4697 03 12 46 03 13 14 --- 07 05 20 28.6 17.4 -3.8 -115.1 20 R 1 4514 03 13 21 J1101+7225 07 05 27 27.9 17.1 -3.9 -113.8 0 1 2 4514 03 13 14 03 13 41 =1058+726 07 05 47 28.0 17.1 -3.9 -113.9 20 R 1 4332 Schedule for VLBA_MK (Code Mk ) Page 14 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 03 13 48 VXUMA 07 05 54 28.6 17.4 -3.8 -115.3 0 1 2 4332 03 13 41 03 14 08 --- 07 06 14 28.7 17.4 -3.8 -115.3 20 R 1 4150 03 14 16 J1101+7225 07 06 22 28.0 17.1 -3.9 -114.1 0 1 2 4150 03 14 08 03 14 36 =1058+726 07 06 42 28.0 17.0 -3.9 -114.2 20 R 1 3967 03 14 43 VXUMA 07 06 49 28.7 17.4 -3.8 -115.5 0 1 2 3967 03 14 36 03 15 03 --- 07 07 09 28.7 17.4 -3.8 -115.6 20 R 1 3785 03 15 10 J1101+7225 07 07 17 28.1 17.0 -3.9 -114.3 0 1 2 3785 03 15 03 03 15 30 =1058+726 07 07 37 28.1 17.0 -3.9 -114.4 20 R 1 3603 03 15 38 VXUMA 07 07 44 28.8 17.4 -3.8 -115.7 0 1 2 3603 03 15 30 03 15 58 --- 07 08 04 28.8 17.3 -3.8 -115.8 20 R 1 3420 03 16 05 J1101+7225 07 08 12 28.1 17.0 -3.9 -114.5 0 1 2 3420 03 15 58 03 16 25 =1058+726 07 08 32 28.2 17.0 -3.9 -114.6 20 R 1 3238 03 16 33 VXUMA 07 08 39 28.8 17.3 -3.8 -116.0 0 1 2 3238 03 16 25 03 16 52 --- 07 08 59 28.9 17.3 -3.8 -116.0 20 R 1 3055 03 17 00 J1101+7225 07 09 06 28.2 17.0 -3.9 -114.8 0 1 2 3055 03 16 52 03 17 20 =1058+726 07 09 26 28.2 16.9 -3.9 -114.9 20 R 1 2873 03 17 27 VXUMA 07 09 34 28.9 17.3 -3.8 -116.2 0 1 2 2873 03 17 20 03 17 47 --- 07 09 54 28.9 17.3 -3.8 -116.3 20 R 1 2691 03 17 55 J1101+7225 07 10 01 28.3 16.9 -3.9 -115.0 0 1 2 2691 03 17 47 03 18 15 =1058+726 07 10 21 28.3 16.9 -3.9 -115.1 20 R 1 2508 03 18 22 VXUMA 07 10 29 29.0 17.2 -3.8 -116.4 0 1 2 2508 03 18 15 03 18 42 --- 07 10 49 29.0 17.2 -3.8 -116.5 20 R 1 2326 03 18 49 J1101+7225 07 10 56 28.3 16.9 -3.9 -115.2 0 1 2 2326 03 18 42 03 19 09 =1058+726 07 11 16 28.3 16.9 -3.8 -115.3 20 R 1 2144 03 19 17 VXUMA 07 11 24 29.0 17.2 -3.7 -116.7 0 1 2 2144 03 19 09 03 19 37 --- 07 11 44 29.0 17.2 -3.7 -116.7 20 R 1 1961 03 19 44 J1101+7225 07 11 51 28.4 16.9 -3.8 -115.5 0 1 2 1961 03 19 37 03 20 04 =1058+726 07 12 11 28.4 16.8 -3.8 -115.6 20 R 1 1779 Schedule for VLBA_MK (Code Mk ) Page 15 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 03 20 11 VXUMA 07 12 18 29.1 17.2 -3.7 -116.9 0 1 2 1779 03 20 04 03 20 31 --- 07 12 38 29.1 17.2 -3.7 -117.0 20 R 1 1597 03 20 39 J1101+7225 07 12 46 28.4 16.8 -3.8 -115.7 0 1 2 1597 03 20 31 03 20 59 =1058+726 07 13 06 28.5 16.8 -3.8 -115.8 20 R 1 1414 03 21 06 VXUMA 07 13 13 29.1 17.1 -3.7 -117.1 0 1 2 1414 03 20 59 03 21 26 --- 07 13 33 29.2 17.1 -3.7 -117.2 20 R 1 1232 03 21 33 J1101+7225 07 13 41 28.5 16.8 -3.8 -115.9 0 1 2 1232 03 21 26 03 21 53 =1058+726 07 14 01 28.5 16.8 -3.8 -116.0 20 R 1 1050 03 22 01 VXUMA 07 14 08 29.2 17.1 -3.7 -117.4 0 1 2 1050 03 21 53 03 22 21 --- 07 14 28 29.2 17.1 -3.7 -117.5 20 R 1 867 03 22 28 J1101+7225 07 14 36 28.6 16.8 -3.8 -116.2 0 1 2 867 03 22 21 03 22 48 =1058+726 07 14 56 28.6 16.7 -3.8 -116.3 20 R 1 685 03 22 55 VXUMA 07 15 03 29.3 17.1 -3.7 -117.6 0 1 2 685 03 22 48 03 23 15 --- 07 15 23 29.3 17.0 -3.7 -117.7 20 R 1 503 03 23 23 J1101+7225 07 15 30 28.6 16.7 -3.8 -116.4 0 1 2 503 03 23 15 03 23 43 =1058+726 07 15 50 28.7 16.7 -3.8 -116.5 20 R 1 321 03 23 50 VXUMA 07 15 58 29.3 17.0 -3.7 -117.8 0 1 3 321 03 23 43 03 24 10 --- 07 16 18 29.4 17.0 -3.7 -117.9 20 F 1 503 03 24 17 J1101+7225 07 16 25 28.7 16.7 -3.8 -116.7 0 1 3 503 03 24 10 03 24 37 =1058+726 07 16 45 28.7 16.7 -3.8 -116.7 20 F 1 685 03 24 45 VXUMA 07 16 53 29.4 17.0 -3.7 -118.1 0 1 3 685 03 24 37 03 25 05 --- 07 17 13 29.4 17.0 -3.6 -118.2 20 F 1 868 03 25 12 J1101+7225 07 17 20 28.8 16.6 -3.7 -116.9 0 1 3 868 03 25 05 03 25 32 =1058+726 07 17 40 28.8 16.6 -3.7 -117.0 20 F 1 1050 03 25 39 VXUMA 07 17 47 29.5 16.9 -3.6 -118.3 0 1 3 1050 03 25 32 03 25 59 --- 07 18 07 29.5 16.9 -3.6 -118.4 20 F 1 1232 03 26 07 J1101+7225 07 18 15 28.8 16.6 -3.7 -117.1 0 1 3 1232 03 25 59 03 26 27 =1058+726 07 18 35 28.8 16.6 -3.7 -117.2 20 F 1 1414 Schedule for VLBA_MK (Code Mk ) Page 16 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 03 26 34 VXUMA 07 18 42 29.5 16.9 -3.6 -118.5 0 1 3 1414 03 26 27 03 26 54 --- 07 19 02 29.5 16.9 -3.6 -118.6 20 F 1 1597 03 27 01 J1101+7225 07 19 10 28.9 16.6 -3.7 -117.4 0 1 3 1597 03 26 54 03 27 21 =1058+726 07 19 30 28.9 16.6 -3.7 -117.4 20 F 1 1779 03 27 29 VXUMA 07 19 37 29.6 16.9 -3.6 -118.8 0 1 3 1779 03 27 21 03 27 49 --- 07 19 57 29.6 16.9 -3.6 -118.9 20 F 1 1961 03 27 56 J1101+7225 07 20 05 28.9 16.5 -3.7 -117.6 0 1 3 1961 03 27 49 03 28 16 =1058+726 07 20 25 29.0 16.5 -3.7 -117.7 20 F 1 2143 03 28 24 VXUMA 07 20 32 29.6 16.8 -3.6 -119.0 0 1 3 2143 03 28 16 03 28 43 --- 07 20 52 29.7 16.8 -3.6 -119.1 20 F 1 2326 03 28 51 J1101+7225 07 20 59 29.0 16.5 -3.7 -117.8 0 1 3 2326 03 28 43 03 29 11 =1058+726 07 21 19 29.0 16.5 -3.7 -117.9 20 F 1 2508 03 29 18 VXUMA 07 21 27 29.7 16.8 -3.6 -119.3 0 1 3 2508 03 29 11 03 29 38 --- 07 21 47 29.7 16.8 -3.6 -119.3 20 F 1 2690 03 29 45 J1101+7225 07 21 54 29.1 16.5 -3.7 -118.1 0 1 3 2690 03 29 38 03 30 05 =1058+726 07 22 14 29.1 16.5 -3.7 -118.1 20 F 1 2872 03 30 13 VXUMA 07 22 22 29.8 16.7 -3.6 -119.5 0 1 3 2872 03 30 05 03 30 33 --- 07 22 42 29.8 16.7 -3.6 -119.6 20 F 1 3054 03 30 40 J1101+7225 07 22 49 29.1 16.4 -3.7 -118.3 0 1 3 3054 03 30 33 03 31 00 =1058+726 07 23 09 29.1 16.4 -3.7 -118.4 20 F 1 3237 03 31 07 VXUMA 07 23 16 29.8 16.7 -3.5 -119.7 0 1 3 3237 03 31 00 03 31 27 --- 07 23 36 29.9 16.7 -3.5 -119.8 20 F 1 3419 03 31 35 J1101+7225 07 23 44 29.2 16.4 -3.6 -118.5 0 1 3 3419 03 31 27 03 31 55 =1058+726 07 24 04 29.2 16.4 -3.6 -118.6 20 F 1 3601 03 32 02 VXUMA 07 24 11 29.9 16.7 -3.5 -120.0 0 1 3 3601 03 31 55 03 32 22 --- 07 24 31 29.9 16.7 -3.5 -120.1 20 F 1 3783 03 32 29 J1101+7225 07 24 39 29.2 16.4 -3.6 -118.8 0 1 3 3783 03 32 22 03 32 49 =1058+726 07 24 59 29.3 16.3 -3.6 -118.9 20 F 1 3965 Schedule for VLBA_MK (Code Mk ) Page 17 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 03 35 17 3C279 07 27 27 5.3 98.1 -5.5 -69.4 87 1 3 3965 03 35 17 03 40 16 --- 07 32 27 6.4 98.6 -5.4 -69.3 299 F 1 5960 Next scan frequencies: 22010.00 22024.10 22066.30 22143.80 22235.08 22418.50 22461.80 22490.00 Next BBC frequencies: 510.00 524.10 566.30 643.80 735.08 918.50 961.80 990.00 03 42 16 1324+224 07 34 27 8.9 69.6 -5.9 -72.2 94 1 3 5960 03 42 16 03 45 16 --- 07 37 27 9.6 69.8 -5.8 -72.4 180 F 1 7157 03 47 15 1213+350 07 39 27 27.9 60.3 -4.6 -84.3 77 1 3 7157 03 47 15 03 50 15 --- 07 42 27 28.5 60.4 -4.6 -84.7 180 F 1 8353 03 52 15 1144+402 07 44 27 34.8 54.5 -4.0 -92.5 101 1 3 8353 03 52 15 03 55 14 --- 07 47 27 35.4 54.4 -4.0 -93.0 180 F 1 9550 03 57 14 1130+009 07 49 27 32.0 102.1 -3.7 -66.9 82 1 3 9550 03 57 14 04 00 13 --- 07 52 27 32.7 102.5 -3.7 -66.7 180 F 1 10747 04 02 13 1020+400 07 54 27 52.4 49.7 -2.5 -111.0 74 1 3 10747 04 02 13 04 05 12 --- 07 57 27 52.9 49.3 -2.4 -111.8 180 F 1 11943 04 07 12 1128+385 07 59 27 40.9 56.1 -3.5 -96.5 90 1 3 11943 04 07 12 04 10 12 --- 08 02 27 41.5 56.0 -3.5 -97.0 180 F 1 13140 04 12 11 1030+415 08 04 27 51.9 47.4 -2.5 -112.8 93 1 3 13140 04 12 11 04 15 11 --- 08 07 27 52.4 47.1 -2.4 -113.6 180 F 1 14337 04 17 10 1101+384 08 09 27 48.0 54.4 -2.9 -103.3 105 1 3 14337 04 17 10 04 20 10 --- 08 12 27 48.6 54.2 -2.9 -103.9 180 F 1 15534 04 22 10 1034-293 08 14 27 29.8 144.2 -2.4 -39.3 54 1 3 15534 04 22 10 04 25 09 --- 08 17 27 30.2 144.8 -2.3 -38.6 180 F 1 16730 04 27 09 1048-313 08 19 27 27.0 144.0 -2.5 -40.5 107 1 4 16730 04 27 09 04 30 08 --- 08 22 27 27.4 144.6 -2.5 -39.8 180 R 1 17273 Schedule for VLBA_MK (Code Mk ) Page 18 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- Next scan frequencies: 22006.47 22020.57 22062.77 22140.27 22231.55 22414.98 22458.28 22485.48 Next BBC frequencies: 506.47 520.57 562.77 640.27 731.55 914.98 958.28 985.48 04 32 08 3C279 08 24 27 18.4 103.5 -4.5 -66.9 86 1 4 17273 04 32 08 04 37 07 --- 08 29 27 19.6 104.0 -4.4 -66.6 299 R 1 15278 04 38 31 RXBOO 08 30 51 9.8 66.1 -5.9 -72.7 53 1 4 15278 04 38 31 04 38 51 --- 08 31 11 9.9 66.1 -5.9 -72.7 20 R 1 15145 04 39 00 J1419+2706 08 31 20 11.2 65.0 -5.8 -73.4 1 1 4 15145 04 38 51 04 39 20 =1417+273 08 31 40 11.3 65.1 -5.8 -73.4 20 R 1 14950 04 39 29 RXBOO 08 31 50 10.0 66.2 -5.9 -72.7 1 1 4 14950 04 39 20 04 39 49 --- 08 32 10 10.1 66.2 -5.9 -72.8 20 R 1 14755 04 39 59 J1419+2706 08 32 19 11.5 65.1 -5.8 -73.5 1 1 4 14755 04 39 49 04 40 19 =1417+273 08 32 39 11.5 65.1 -5.8 -73.5 20 R 1 14560 04 40 28 RXBOO 08 32 48 10.2 66.2 -5.9 -72.8 1 1 4 14560 04 40 19 04 40 48 --- 08 33 08 10.3 66.3 -5.9 -72.9 20 R 1 14365 04 40 57 J1419+2706 08 33 18 11.7 65.2 -5.8 -73.6 1 1 4 14365 04 40 48 04 41 17 =1417+273 08 33 38 11.7 65.2 -5.8 -73.6 20 R 1 14170 04 41 27 RXBOO 08 33 47 10.5 66.3 -5.8 -72.9 1 1 4 14170 04 41 17 04 41 46 --- 08 34 07 10.5 66.3 -5.8 -73.0 20 R 1 13975 04 41 56 J1419+2706 08 34 16 11.9 65.2 -5.8 -73.7 1 1 4 13975 04 41 46 04 42 16 =1417+273 08 34 36 11.9 65.3 -5.8 -73.7 20 R 1 13780 04 42 25 RXBOO 08 34 46 10.7 66.4 -5.8 -73.0 1 1 4 13780 04 42 16 04 42 45 --- 08 35 06 10.7 66.4 -5.8 -73.1 20 R 1 13585 04 42 54 J1419+2706 08 35 15 12.1 65.3 -5.7 -73.8 1 1 4 13585 04 42 45 04 43 14 =1417+273 08 35 35 12.1 65.3 -5.7 -73.8 20 R 1 13389 04 43 24 RXBOO 08 35 44 10.9 66.4 -5.8 -73.1 1 1 4 13389 04 43 14 04 43 44 --- 08 36 04 11.0 66.5 -5.8 -73.2 20 R 1 13194 04 43 53 J1419+2706 08 36 14 12.3 65.4 -5.7 -73.9 1 1 4 13194 04 43 44 04 44 13 =1417+273 08 36 34 12.4 65.4 -5.7 -73.9 20 R 1 12999 Schedule for VLBA_MK (Code Mk ) Page 19 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 04 44 22 RXBOO 08 36 43 11.1 66.5 -5.8 -73.2 1 1 4 12999 04 44 13 04 44 42 --- 08 37 03 11.2 66.5 -5.8 -73.2 20 R 1 12804 04 44 52 J1419+2706 08 37 13 12.5 65.4 -5.7 -74.0 1 1 4 12804 04 44 42 04 45 12 =1417+273 08 37 33 12.6 65.4 -5.7 -74.0 20 R 1 12608 04 45 21 RXBOO 08 37 42 11.3 66.6 -5.8 -73.3 1 1 4 12608 04 45 12 04 45 41 --- 08 38 02 11.4 66.6 -5.8 -73.3 20 R 1 12413 04 45 50 J1419+2706 08 38 11 12.7 65.5 -5.7 -74.1 1 1 4 12413 04 45 41 04 46 10 =1417+273 08 38 31 12.8 65.5 -5.7 -74.1 20 R 1 12217 04 46 19 RXBOO 08 38 41 11.5 66.6 -5.8 -73.4 1 1 4 12217 04 46 10 04 46 39 --- 08 39 01 11.6 66.6 -5.8 -73.4 20 R 1 12022 04 46 49 J1419+2706 08 39 10 12.9 65.5 -5.7 -74.2 1 1 4 12022 04 46 39 04 47 09 =1417+273 08 39 30 13.0 65.6 -5.7 -74.2 20 R 1 11826 04 47 18 RXBOO 08 39 40 11.7 66.7 -5.7 -73.5 1 1 4 11826 04 47 09 04 47 38 --- 08 40 00 11.8 66.7 -5.7 -73.5 20 R 1 11631 04 47 47 J1419+2706 08 40 09 13.1 65.6 -5.7 -74.2 1 1 4 11631 04 47 38 04 48 07 =1417+273 08 40 29 13.2 65.6 -5.7 -74.3 20 R 1 11435 04 48 17 RXBOO 08 40 38 11.9 66.8 -5.7 -73.6 1 1 4 11435 04 48 07 04 48 37 --- 08 40 58 12.0 66.8 -5.7 -73.6 20 R 1 11240 04 48 46 J1419+2706 08 41 08 13.3 65.7 -5.7 -74.3 1 1 4 11240 04 48 37 04 49 06 =1417+273 08 41 28 13.4 65.7 -5.6 -74.4 20 R 1 11044 04 49 15 RXBOO 08 41 37 12.1 66.8 -5.7 -73.7 1 1 4 11044 04 49 06 04 49 35 --- 08 41 57 12.2 66.8 -5.7 -73.7 20 R 1 10849 04 49 45 J1419+2706 08 42 07 13.5 65.7 -5.6 -74.4 1 1 4 10849 04 49 35 04 50 05 =1417+273 08 42 27 13.6 65.8 -5.6 -74.5 20 R 1 10653 04 50 14 RXBOO 08 42 36 12.4 66.9 -5.7 -73.8 1 1 4 10653 04 50 05 04 50 34 --- 08 42 56 12.4 66.9 -5.7 -73.8 20 R 1 10458 04 50 43 J1419+2706 08 43 05 13.8 65.8 -5.6 -74.5 1 1 4 10458 04 50 34 04 51 03 =1417+273 08 43 25 13.8 65.8 -5.6 -74.6 20 R 1 10262 Schedule for VLBA_MK (Code Mk ) Page 20 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 04 51 13 RXBOO 08 43 35 12.6 66.9 -5.7 -73.9 1 1 4 10262 04 51 03 04 51 33 --- 08 43 55 12.6 67.0 -5.7 -73.9 20 R 1 10067 04 51 42 J1419+2706 08 44 04 14.0 65.8 -5.6 -74.6 1 1 4 10067 04 51 33 04 52 02 =1417+273 08 44 24 14.0 65.9 -5.6 -74.7 20 R 1 9871 04 52 11 RXBOO 08 44 34 12.8 67.0 -5.7 -74.0 1 1 4 9871 04 52 02 04 52 31 --- 08 44 54 12.9 67.0 -5.7 -74.0 20 R 1 9676 04 52 41 J1419+2706 08 45 03 14.2 65.9 -5.6 -74.7 1 1 4 9676 04 52 31 04 53 01 =1417+273 08 45 23 14.2 65.9 -5.6 -74.8 20 R 1 9480 04 53 10 RXBOO 08 45 32 13.0 67.1 -5.6 -74.1 1 1 4 9480 04 53 01 04 53 30 --- 08 45 52 13.1 67.1 -5.6 -74.1 20 R 1 9285 04 53 39 J1419+2706 08 46 02 14.4 66.0 -5.6 -74.8 1 1 4 9285 04 53 30 04 53 59 =1417+273 08 46 22 14.5 66.0 -5.6 -74.9 20 R 1 9089 04 54 09 RXBOO 08 46 31 13.2 67.1 -5.6 -74.1 1 1 4 9089 04 53 59 04 54 29 --- 08 46 51 13.3 67.2 -5.6 -74.2 20 R 1 8894 04 54 38 J1419+2706 08 47 01 14.6 66.0 -5.6 -74.9 1 1 4 8894 04 54 29 04 54 58 =1417+273 08 47 21 14.7 66.0 -5.5 -75.0 20 R 1 8699 04 55 07 RXBOO 08 47 30 13.4 67.2 -5.6 -74.2 1 1 4 8699 04 54 58 04 55 27 --- 08 47 50 13.5 67.2 -5.6 -74.3 20 R 1 8503 04 55 37 J1419+2706 08 47 59 14.8 66.1 -5.5 -75.0 1 1 4 8503 04 55 27 04 55 57 =1417+273 08 48 19 14.9 66.1 -5.5 -75.1 20 R 1 8308 04 56 06 RXBOO 08 48 29 13.6 67.3 -5.6 -74.3 1 1 4 8308 04 55 57 04 56 26 --- 08 48 49 13.7 67.3 -5.6 -74.4 20 R 1 8113 04 56 35 J1419+2706 08 48 58 15.0 66.1 -5.5 -75.1 1 1 4 8113 04 56 26 04 56 55 =1417+273 08 49 18 15.1 66.2 -5.5 -75.2 20 R 1 7917 04 57 04 RXBOO 08 49 27 13.8 67.3 -5.6 -74.4 1 1 4 7917 04 56 55 04 57 24 --- 08 49 47 13.9 67.3 -5.6 -74.4 20 R 1 7722 04 57 34 J1419+2706 08 49 57 15.2 66.2 -5.5 -75.2 1 1 4 7722 04 57 24 04 57 54 =1417+273 08 50 17 15.3 66.2 -5.5 -75.3 20 R 1 7526 Schedule for VLBA_MK (Code Mk ) Page 21 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 04 58 03 RXBOO 08 50 26 14.1 67.4 -5.6 -74.5 1 1 4 7526 04 57 54 04 58 23 --- 08 50 46 14.1 67.4 -5.6 -74.5 20 R 1 7331 04 58 32 J1419+2706 08 50 56 15.4 66.3 -5.5 -75.3 1 1 4 7331 04 58 23 04 58 52 =1417+273 08 51 16 15.5 66.3 -5.5 -75.3 20 R 1 7136 04 59 02 RXBOO 08 51 25 14.3 67.4 -5.5 -74.6 1 1 4 7136 04 58 52 04 59 22 --- 08 51 45 14.3 67.5 -5.5 -74.6 20 R 1 6941 04 59 31 J1419+2706 08 51 54 15.7 66.3 -5.5 -75.4 1 1 4 6941 04 59 22 04 59 51 =1417+273 08 52 14 15.7 66.3 -5.5 -75.4 20 R 1 6745 05 00 00 RXBOO 08 52 24 14.5 67.5 -5.5 -74.7 1 1 4 6745 04 59 51 05 00 20 --- 08 52 44 14.6 67.5 -5.5 -74.7 20 R 1 6550 05 00 30 J1419+2706 08 52 53 15.9 66.4 -5.5 -75.5 1 1 4 6550 05 00 20 05 00 50 =1417+273 08 53 13 15.9 66.4 -5.4 -75.5 20 R 1 6354 05 00 59 RXBOO 08 53 23 14.7 67.6 -5.5 -74.8 1 1 4 6354 05 00 50 05 01 19 --- 08 53 43 14.8 67.6 -5.5 -74.8 20 R 1 6159 05 01 28 J1419+2706 08 53 52 16.1 66.4 -5.4 -75.6 1 1 4 6159 05 01 19 05 01 48 =1417+273 08 54 12 16.1 66.4 -5.4 -75.6 20 R 1 5963 05 01 58 RXBOO 08 54 21 14.9 67.6 -5.5 -74.9 1 1 4 5963 05 01 48 05 02 17 --- 08 54 41 15.0 67.6 -5.5 -74.9 20 R 1 5768 05 02 27 J1419+2706 08 54 51 16.3 66.5 -5.4 -75.7 1 1 4 5768 05 02 17 05 02 47 =1417+273 08 55 11 16.4 66.5 -5.4 -75.7 20 R 1 5573 05 02 56 RXBOO 08 55 20 15.1 67.7 -5.5 -75.0 1 1 4 5573 05 02 47 05 03 16 --- 08 55 40 15.2 67.7 -5.5 -75.0 20 R 1 5378 05 03 25 J1419+2706 08 55 50 16.5 66.5 -5.4 -75.8 1 1 4 5378 05 03 16 05 03 45 =1417+273 08 56 10 16.6 66.6 -5.4 -75.8 20 R 1 5182 05 03 55 RXBOO 08 56 19 15.3 67.7 -5.5 -75.1 1 1 4 5182 05 03 45 05 04 15 --- 08 56 39 15.4 67.8 -5.5 -75.1 20 R 1 4987 05 04 25 J1427+2348 08 56 49 14.3 69.5 -5.5 -74.4 2 1 4 4987 05 04 15 05 04 45 =1424+240 08 57 09 14.4 69.5 -5.5 -74.4 20 R 1 4787 Schedule for VLBA_MK (Code Mk ) Page 22 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 04 54 RXBOO 08 57 19 15.6 67.8 -5.5 -75.1 2 1 4 4787 05 04 45 05 05 14 --- 08 57 39 15.6 67.8 -5.4 -75.2 20 R 1 4589 05 05 24 J1427+2348 08 57 49 14.5 69.6 -5.5 -74.4 2 1 4 4589 05 05 14 05 05 44 =1424+240 08 58 09 14.6 69.6 -5.5 -74.5 20 R 1 4389 05 05 54 RXBOO 08 58 19 15.8 67.9 -5.4 -75.2 2 1 4 4389 05 05 44 05 06 14 --- 08 58 39 15.8 67.9 -5.4 -75.3 20 R 1 4190 05 06 24 J1427+2348 08 58 49 14.8 69.6 -5.5 -74.5 2 1 4 4190 05 06 14 05 06 44 =1424+240 08 59 09 14.8 69.6 -5.5 -74.6 20 R 1 3991 05 06 54 RXBOO 08 59 19 16.0 67.9 -5.4 -75.3 2 1 4 3991 05 06 44 05 07 14 --- 08 59 39 16.1 67.9 -5.4 -75.4 20 R 1 3792 05 07 24 J1427+2348 08 59 49 15.0 69.7 -5.5 -74.6 2 1 4 3792 05 07 14 05 07 44 =1424+240 09 00 09 15.1 69.7 -5.5 -74.6 20 R 1 3592 05 07 54 RXBOO 09 00 19 16.2 68.0 -5.4 -75.4 2 1 4 3592 05 07 44 05 08 14 --- 09 00 39 16.3 68.0 -5.4 -75.5 20 R 1 3393 05 08 24 J1427+2348 09 00 49 15.2 69.7 -5.4 -74.7 2 1 4 3393 05 08 14 05 08 44 =1424+240 09 01 09 15.3 69.8 -5.4 -74.7 20 R 1 3194 05 08 54 RXBOO 09 01 19 16.4 68.0 -5.4 -75.5 2 1 4 3194 05 08 44 05 09 14 --- 09 01 39 16.5 68.1 -5.4 -75.5 20 R 1 2995 05 09 24 J1427+2348 09 01 49 15.4 69.8 -5.4 -74.8 2 1 4 2995 05 09 14 05 09 43 =1424+240 09 02 09 15.5 69.8 -5.4 -74.8 20 R 1 2795 05 09 53 RXBOO 09 02 18 16.6 68.1 -5.4 -75.6 2 1 4 2795 05 09 43 05 10 13 --- 09 02 38 16.7 68.1 -5.4 -75.6 20 R 1 2596 05 10 23 J1427+2348 09 02 49 15.7 69.9 -5.4 -74.9 2 1 4 2596 05 10 13 05 10 43 =1424+240 09 03 09 15.7 69.9 -5.4 -74.9 20 R 1 2396 05 10 53 RXBOO 09 03 18 16.9 68.1 -5.4 -75.7 2 1 4 2396 05 10 43 05 11 13 --- 09 03 38 16.9 68.2 -5.3 -75.7 20 R 1 2197 05 11 23 J1427+2348 09 03 49 15.9 69.9 -5.4 -75.0 2 1 4 2197 05 11 13 05 11 43 =1424+240 09 04 09 15.9 70.0 -5.4 -75.0 20 R 1 1997 Schedule for VLBA_MK (Code Mk ) Page 23 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 11 53 RXBOO 09 04 18 17.1 68.2 -5.3 -75.8 2 1 4 1997 05 11 43 05 12 13 --- 09 04 38 17.2 68.2 -5.3 -75.8 20 R 1 1798 05 12 23 J1427+2348 09 04 49 16.1 70.0 -5.4 -75.0 2 1 4 1798 05 12 13 05 12 43 =1424+240 09 05 09 16.2 70.0 -5.4 -75.1 20 R 1 1598 05 12 53 RXBOO 09 05 18 17.3 68.3 -5.3 -75.9 2 1 4 1598 05 12 43 05 13 13 --- 09 05 38 17.4 68.3 -5.3 -75.9 20 R 1 1399 05 13 23 J1427+2348 09 05 49 16.3 70.1 -5.4 -75.1 2 1 4 1399 05 13 13 05 13 43 =1424+240 09 06 09 16.4 70.1 -5.4 -75.2 20 R 1 1199 05 13 53 RXBOO 09 06 18 17.5 68.3 -5.3 -76.0 2 1 4 1199 05 13 43 05 14 13 --- 09 06 38 17.6 68.3 -5.3 -76.0 20 R 1 1000 05 14 23 J1427+2348 09 06 49 16.5 70.1 -5.3 -75.2 2 1 4 1000 05 14 13 05 14 43 =1424+240 09 07 09 16.6 70.1 -5.3 -75.2 20 R 1 801 05 14 53 RXBOO 09 07 18 17.7 68.4 -5.3 -76.1 2 1 4 801 05 14 43 05 15 13 --- 09 07 38 17.8 68.4 -5.3 -76.1 20 R 1 601 05 15 23 J1427+2348 09 07 49 16.8 70.2 -5.3 -75.3 2 1 4 601 05 15 13 05 15 42 =1424+240 09 08 09 16.8 70.2 -5.3 -75.3 20 R 1 402 05 15 52 RXBOO 09 08 18 18.0 68.4 -5.3 -76.2 2 1 5 402 05 15 42 05 16 12 --- 09 08 38 18.0 68.5 -5.3 -76.2 20 F 1 601 05 16 22 J1427+2348 09 08 49 17.0 70.2 -5.3 -75.4 2 1 5 601 05 16 12 05 16 42 =1424+240 09 09 09 17.1 70.3 -5.3 -75.4 20 F 1 800 05 16 52 RXBOO 09 09 18 18.2 68.5 -5.3 -76.2 2 1 5 800 05 16 42 05 17 12 --- 09 09 38 18.2 68.5 -5.2 -76.3 20 F 1 1000 05 17 22 J1427+2348 09 09 48 17.2 70.3 -5.3 -75.5 2 1 5 1000 05 17 12 05 17 42 =1424+240 09 10 08 17.3 70.3 -5.3 -75.5 20 F 1 1199 05 17 52 RXBOO 09 10 18 18.4 68.5 -5.2 -76.3 2 1 5 1199 05 17 42 05 18 12 --- 09 10 38 18.5 68.6 -5.2 -76.4 20 F 1 1398 05 18 22 J1427+2348 09 10 48 17.4 70.4 -5.3 -75.5 2 1 5 1398 05 18 12 05 18 42 =1424+240 09 11 08 17.5 70.4 -5.3 -75.6 20 F 1 1598 Schedule for VLBA_MK (Code Mk ) Page 24 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 18 52 RXBOO 09 11 18 18.6 68.6 -5.2 -76.4 2 1 5 1598 05 18 42 05 19 12 --- 09 11 38 18.7 68.6 -5.2 -76.5 20 F 1 1797 05 19 22 J1427+2348 09 11 48 17.6 70.4 -5.3 -75.6 2 1 5 1797 05 19 12 05 19 42 =1424+240 09 12 08 17.7 70.4 -5.3 -75.6 20 F 1 1996 05 19 52 RXBOO 09 12 18 18.8 68.7 -5.2 -76.5 2 1 5 1996 05 19 42 05 20 12 --- 09 12 38 18.9 68.7 -5.2 -76.5 20 F 1 2196 05 20 22 J1427+2348 09 12 48 17.9 70.5 -5.2 -75.7 2 1 5 2196 05 20 12 05 20 41 =1424+240 09 13 08 17.9 70.5 -5.2 -75.7 20 F 1 2395 05 20 51 RXBOO 09 13 18 19.0 68.7 -5.2 -76.6 2 1 5 2395 05 20 41 05 21 11 --- 09 13 38 19.1 68.7 -5.2 -76.6 20 F 1 2594 05 21 21 J1427+2348 09 13 48 18.1 70.5 -5.2 -75.8 2 1 5 2594 05 21 11 05 21 41 =1424+240 09 14 08 18.2 70.6 -5.2 -75.8 20 F 1 2793 05 21 51 RXBOO 09 14 18 19.3 68.8 -5.2 -76.7 2 1 5 2793 05 21 41 05 22 11 --- 09 14 38 19.3 68.8 -5.2 -76.7 20 F 1 2993 05 22 21 J1427+2348 09 14 48 18.3 70.6 -5.2 -75.9 2 1 5 2993 05 22 11 05 22 41 =1424+240 09 15 08 18.4 70.6 -5.2 -75.9 20 F 1 3192 05 22 51 RXBOO 09 15 18 19.5 68.8 -5.2 -76.8 2 1 5 3192 05 22 41 05 23 11 --- 09 15 38 19.6 68.8 -5.1 -76.8 20 F 1 3391 05 23 21 J1427+2348 09 15 48 18.5 70.7 -5.2 -76.0 2 1 5 3391 05 23 11 05 23 41 =1424+240 09 16 08 18.6 70.7 -5.2 -76.0 20 F 1 3590 05 23 51 RXBOO 09 16 18 19.7 68.9 -5.1 -76.9 2 1 5 3590 05 23 41 05 24 11 --- 09 16 38 19.8 68.9 -5.1 -76.9 20 F 1 3790 05 24 21 J1427+2348 09 16 48 18.7 70.7 -5.2 -76.0 2 1 5 3790 05 24 11 05 24 40 =1424+240 09 17 08 18.8 70.7 -5.2 -76.1 20 F 1 3989 05 24 50 RXBOO 09 17 18 19.9 68.9 -5.1 -77.0 2 1 5 3989 05 24 40 05 25 10 --- 09 17 38 20.0 69.0 -5.1 -77.0 20 F 1 4188 05 25 20 J1427+2348 09 17 48 19.0 70.8 -5.2 -76.1 2 1 5 4188 05 25 10 05 25 40 =1424+240 09 18 08 19.0 70.8 -5.2 -76.1 20 F 1 4387 Schedule for VLBA_MK (Code Mk ) Page 25 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 25 50 RXBOO 09 18 18 20.1 69.0 -5.1 -77.1 2 1 5 4387 05 25 40 05 26 10 --- 09 18 38 20.2 69.0 -5.1 -77.1 20 F 1 4587 05 26 20 J1427+2348 09 18 48 19.2 70.8 -5.1 -76.2 2 1 5 4587 05 26 10 05 26 40 =1424+240 09 19 08 19.3 70.8 -5.1 -76.2 20 F 1 4786 05 26 50 RXBOO 09 19 18 20.4 69.0 -5.1 -77.1 2 1 5 4786 05 26 40 05 27 10 --- 09 19 38 20.4 69.1 -5.1 -77.2 20 F 1 4985 05 27 20 J1427+2348 09 19 48 19.4 70.9 -5.1 -76.3 2 1 5 4985 05 27 10 05 27 40 =1424+240 09 20 08 19.5 70.9 -5.1 -76.3 20 F 1 5184 05 27 50 RXBOO 09 20 18 20.6 69.1 -5.1 -77.2 2 1 5 5184 05 27 40 05 28 10 --- 09 20 38 20.7 69.1 -5.1 -77.3 20 F 1 5384 05 28 20 J1427+2348 09 20 48 19.6 70.9 -5.1 -76.4 2 1 5 5384 05 28 10 05 28 40 =1424+240 09 21 08 19.7 71.0 -5.1 -76.4 20 F 1 5583 05 28 50 RXBOO 09 21 18 20.8 69.1 -5.1 -77.3 2 1 5 5583 05 28 40 05 29 10 --- 09 21 38 20.9 69.2 -5.0 -77.4 20 F 1 5783 05 29 20 J1427+2348 09 21 48 19.9 71.0 -5.1 -76.4 2 1 5 5783 05 29 10 05 29 39 =1424+240 09 22 08 19.9 71.0 -5.1 -76.5 20 F 1 5982 05 29 49 RXBOO 09 22 18 21.0 69.2 -5.0 -77.4 2 1 5 5982 05 29 39 05 30 09 --- 09 22 38 21.1 69.2 -5.0 -77.4 20 F 1 6182 05 30 19 J1419+2706 09 22 47 22.3 68.0 -5.0 -78.4 1 1 5 6182 05 30 09 05 30 39 =1417+273 09 23 07 22.4 68.0 -5.0 -78.4 20 F 1 6377 05 30 48 RXBOO 09 23 17 21.2 69.3 -5.0 -77.5 1 1 5 6377 05 30 39 05 31 08 --- 09 23 37 21.3 69.3 -5.0 -77.5 20 F 1 6572 05 31 17 J1419+2706 09 23 46 22.6 68.0 -4.9 -78.5 1 1 5 6572 05 31 08 05 31 37 =1417+273 09 24 06 22.6 68.0 -4.9 -78.5 20 F 1 6768 05 31 47 RXBOO 09 24 15 21.5 69.3 -5.0 -77.6 1 1 5 6768 05 31 37 05 32 07 --- 09 24 35 21.5 69.3 -5.0 -77.6 20 F 1 6963 05 32 16 J1419+2706 09 24 45 22.8 68.1 -4.9 -78.6 1 1 5 6963 05 32 07 05 32 36 =1417+273 09 25 05 22.8 68.1 -4.9 -78.6 20 F 1 7159 Schedule for VLBA_MK (Code Mk ) Page 26 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 32 45 RXBOO 09 25 14 21.7 69.4 -5.0 -77.7 1 1 5 7159 05 32 36 05 33 05 --- 09 25 34 21.7 69.4 -5.0 -77.7 20 F 1 7354 05 33 15 J1419+2706 09 25 44 23.0 68.1 -4.9 -78.7 1 1 5 7354 05 33 05 05 33 35 =1417+273 09 26 04 23.1 68.1 -4.9 -78.7 20 F 1 7549 05 33 44 RXBOO 09 26 13 21.9 69.4 -5.0 -77.8 1 1 5 7549 05 33 35 05 34 04 --- 09 26 33 22.0 69.4 -5.0 -77.8 20 F 1 7744 05 34 13 J1419+2706 09 26 42 23.2 68.1 -4.9 -78.8 1 1 5 7744 05 34 04 05 34 33 =1417+273 09 27 02 23.3 68.2 -4.9 -78.8 20 F 1 7940 05 34 42 RXBOO 09 27 12 22.1 69.5 -5.0 -77.9 1 1 5 7940 05 34 33 05 35 02 --- 09 27 32 22.2 69.5 -4.9 -77.9 20 F 1 8135 05 35 12 J1419+2706 09 27 41 23.4 68.2 -4.9 -78.9 1 1 5 8135 05 35 02 05 35 32 =1417+273 09 28 01 23.5 68.2 -4.9 -78.9 20 F 1 8330 05 35 41 RXBOO 09 28 10 22.3 69.5 -4.9 -77.9 1 1 5 8330 05 35 32 05 36 01 --- 09 28 30 22.4 69.5 -4.9 -78.0 20 F 1 8525 05 36 10 J1419+2706 09 28 40 23.6 68.2 -4.9 -79.0 1 1 5 8525 05 36 01 05 36 30 =1417+273 09 29 00 23.7 68.3 -4.9 -79.0 20 F 1 8721 05 36 40 RXBOO 09 29 09 22.5 69.6 -4.9 -78.0 1 1 5 8721 05 36 30 05 37 00 --- 09 29 29 22.6 69.6 -4.9 -78.1 20 F 1 8916 05 37 09 J1419+2706 09 29 39 23.8 68.3 -4.8 -79.0 1 1 5 8916 05 37 00 05 37 29 =1417+273 09 29 59 23.9 68.3 -4.8 -79.1 20 F 1 9111 05 37 38 RXBOO 09 30 08 22.7 69.6 -4.9 -78.1 1 1 5 9111 05 37 29 05 37 58 --- 09 30 28 22.8 69.6 -4.9 -78.1 20 F 1 9306 05 38 08 J1419+2706 09 30 37 24.1 68.3 -4.8 -79.1 1 1 5 9306 05 37 58 05 38 27 =1417+273 09 30 57 24.1 68.3 -4.8 -79.2 20 F 1 9502 05 38 37 RXBOO 09 31 07 23.0 69.7 -4.9 -78.2 1 1 5 9502 05 38 27 05 38 57 --- 09 31 27 23.0 69.7 -4.9 -78.2 20 F 1 9697 05 39 06 J1419+2706 09 31 36 24.3 68.4 -4.8 -79.2 1 1 5 9697 05 38 57 05 39 26 =1417+273 09 31 56 24.3 68.4 -4.8 -79.3 20 F 1 9892 Schedule for VLBA_MK (Code Mk ) Page 27 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 39 35 RXBOO 09 32 05 23.2 69.7 -4.9 -78.3 1 1 5 9892 05 39 26 05 39 55 --- 09 32 25 23.3 69.7 -4.9 -78.3 20 F 1 10087 05 40 05 J1419+2706 09 32 35 24.5 68.4 -4.8 -79.3 1 1 5 10087 05 39 55 05 40 25 =1417+273 09 32 55 24.6 68.4 -4.8 -79.4 20 F 1 10283 05 40 34 RXBOO 09 33 04 23.4 69.8 -4.9 -78.4 1 1 5 10283 05 40 25 05 40 54 --- 09 33 24 23.5 69.8 -4.9 -78.4 20 F 1 10478 05 41 03 J1419+2706 09 33 33 24.7 68.5 -4.8 -79.4 1 1 5 10478 05 40 54 05 41 23 =1417+273 09 33 53 24.8 68.5 -4.8 -79.5 20 F 1 10673 05 41 32 RXBOO 09 34 03 23.6 69.8 -4.8 -78.5 1 1 5 10673 05 41 23 05 41 52 --- 09 34 23 23.7 69.8 -4.8 -78.5 20 F 1 10868 05 42 02 J1419+2706 09 34 32 24.9 68.5 -4.8 -79.5 1 1 5 10868 05 41 52 05 42 22 =1417+273 09 34 52 25.0 68.5 -4.8 -79.5 20 F 1 11064 05 42 31 RXBOO 09 35 02 23.8 69.8 -4.8 -78.5 1 1 5 11064 05 42 22 05 42 51 --- 09 35 22 23.9 69.9 -4.8 -78.6 20 F 1 11259 05 43 00 J1419+2706 09 35 31 25.1 68.6 -4.7 -79.6 1 1 5 11259 05 42 51 05 43 20 =1417+273 09 35 51 25.2 68.6 -4.7 -79.6 20 F 1 11454 05 43 30 RXBOO 09 36 00 24.0 69.9 -4.8 -78.6 1 1 5 11454 05 43 20 05 43 50 --- 09 36 20 24.1 69.9 -4.8 -78.7 20 F 1 11649 05 43 59 J1419+2706 09 36 30 25.3 68.6 -4.7 -79.7 1 1 5 11649 05 43 50 05 44 19 =1417+273 09 36 50 25.4 68.6 -4.7 -79.7 20 F 1 11845 05 44 28 RXBOO 09 36 59 24.3 69.9 -4.8 -78.7 1 1 5 11845 05 44 19 05 44 48 --- 09 37 19 24.3 70.0 -4.8 -78.8 20 F 1 12040 05 44 58 J1419+2706 09 37 28 25.6 68.6 -4.7 -79.8 1 1 5 12040 05 44 48 05 45 17 =1417+273 09 37 48 25.6 68.7 -4.7 -79.8 20 F 1 12235 05 45 27 RXBOO 09 37 58 24.5 70.0 -4.8 -78.8 1 1 5 12235 05 45 17 05 45 47 --- 09 38 18 24.5 70.0 -4.8 -78.8 20 F 1 12430 05 45 56 J1419+2706 09 38 27 25.8 68.7 -4.7 -79.9 1 1 5 12430 05 45 47 05 46 16 =1417+273 09 38 47 25.8 68.7 -4.7 -79.9 20 F 1 12626 Schedule for VLBA_MK (Code Mk ) Page 28 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 46 25 RXBOO 09 38 56 24.7 70.0 -4.8 -78.9 1 1 5 12626 05 46 16 05 46 45 --- 09 39 16 24.8 70.1 -4.8 -78.9 20 F 1 12821 05 46 55 J1419+2706 09 39 26 26.0 68.7 -4.7 -80.0 1 1 5 12821 05 46 45 05 47 15 =1417+273 09 39 46 26.1 68.7 -4.7 -80.0 20 F 1 13016 05 47 24 RXBOO 09 39 55 24.9 70.1 -4.7 -79.0 1 1 5 13016 05 47 15 05 47 44 --- 09 40 15 25.0 70.1 -4.7 -79.0 20 F 1 13211 05 47 53 J1419+2706 09 40 25 26.2 68.8 -4.7 -80.1 1 1 5 13211 05 47 44 05 48 13 =1417+273 09 40 45 26.3 68.8 -4.7 -80.1 20 F 1 13407 05 48 23 RXBOO 09 40 54 25.1 70.1 -4.7 -79.1 1 1 5 13407 05 48 13 05 48 42 --- 09 41 14 25.2 70.1 -4.7 -79.1 20 F 1 13602 05 48 52 J1419+2706 09 41 23 26.4 68.8 -4.6 -80.2 1 1 5 13602 05 48 42 05 49 12 =1417+273 09 41 43 26.5 68.8 -4.6 -80.2 20 F 1 13797 05 49 21 RXBOO 09 41 53 25.3 70.2 -4.7 -79.2 1 1 5 13797 05 49 12 05 49 41 --- 09 42 13 25.4 70.2 -4.7 -79.2 20 F 1 13992 05 49 50 J1419+2706 09 42 22 26.6 68.8 -4.6 -80.3 1 1 5 13992 05 49 41 05 50 10 =1417+273 09 42 42 26.7 68.9 -4.6 -80.3 20 F 1 14188 05 50 20 RXBOO 09 42 51 25.6 70.2 -4.7 -79.2 1 1 5 14188 05 50 10 05 50 40 --- 09 43 11 25.6 70.2 -4.7 -79.3 20 F 1 14383 05 50 49 J1419+2706 09 43 21 26.8 68.9 -4.6 -80.4 1 1 5 14383 05 50 40 05 51 09 =1417+273 09 43 41 26.9 68.9 -4.6 -80.4 20 F 1 14579 05 51 18 RXBOO 09 43 50 25.8 70.3 -4.7 -79.3 1 1 5 14579 05 51 09 05 51 38 --- 09 44 10 25.8 70.3 -4.7 -79.4 20 F 1 14774 05 51 48 J1419+2706 09 44 20 27.1 68.9 -4.6 -80.4 1 1 5 14774 05 51 38 05 52 08 =1417+273 09 44 40 27.1 68.9 -4.6 -80.5 20 F 1 14969 05 52 17 RXBOO 09 44 49 26.0 70.3 -4.7 -79.4 1 1 5 14969 05 52 08 05 52 37 --- 09 45 09 26.1 70.3 -4.7 -79.4 20 F 1 15164 05 52 46 J1419+2706 09 45 18 27.3 69.0 -4.6 -80.5 1 1 5 15164 05 52 37 05 53 06 =1417+273 09 45 38 27.3 69.0 -4.6 -80.6 20 F 1 15360 Schedule for VLBA_MK (Code Mk ) Page 29 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 05 53 15 RXBOO 09 45 48 26.2 70.4 -4.6 -79.5 1 1 5 15360 05 53 06 05 53 35 --- 09 46 08 26.3 70.4 -4.6 -79.5 20 F 1 15555 05 53 45 J1419+2706 09 46 17 27.5 69.0 -4.6 -80.6 1 1 5 15555 05 53 35 05 54 05 =1417+273 09 46 37 27.6 69.0 -4.6 -80.7 20 F 1 15751 05 54 14 RXBOO 09 46 46 26.4 70.4 -4.6 -79.6 1 1 5 15751 05 54 05 05 54 34 --- 09 47 06 26.5 70.4 -4.6 -79.6 20 F 1 15946 05 54 43 J1419+2706 09 47 16 27.7 69.1 -4.5 -80.7 1 1 5 15946 05 54 34 05 55 03 =1417+273 09 47 36 27.8 69.1 -4.5 -80.8 20 F 1 16141 05 55 13 RXBOO 09 47 45 26.6 70.4 -4.6 -79.7 1 1 5 16141 05 55 03 05 55 33 --- 09 48 05 26.7 70.5 -4.6 -79.7 20 F 1 16336 05 55 43 J1427+2348 09 48 15 25.8 72.4 -4.6 -78.6 2 1 5 16336 05 55 33 05 56 03 =1424+240 09 48 35 25.8 72.4 -4.6 -78.6 20 F 1 16536 05 56 13 RXBOO 09 48 45 26.9 70.5 -4.6 -79.8 2 1 5 16536 05 56 03 05 56 33 --- 09 49 05 26.9 70.5 -4.6 -79.8 20 F 1 16736 05 56 43 J1427+2348 09 49 15 26.0 72.5 -4.6 -78.6 2 1 5 16736 05 56 33 05 57 02 =1424+240 09 49 35 26.1 72.5 -4.6 -78.7 20 F 1 16935 05 57 12 RXBOO 09 49 45 27.1 70.5 -4.6 -79.8 2 1 5 16935 05 57 02 05 57 32 --- 09 50 05 27.2 70.6 -4.6 -79.9 20 F 1 17135 05 57 42 J1427+2348 09 50 15 26.2 72.5 -4.6 -78.7 2 1 5 17135 05 57 32 05 58 02 =1424+240 09 50 35 26.3 72.5 -4.6 -78.7 20 F 1 17334 05 58 12 RXBOO 09 50 45 27.3 70.6 -4.6 -79.9 2 1 6 17334 05 58 02 05 58 32 --- 09 51 05 27.4 70.6 -4.6 -80.0 20 R 1 17135 05 58 42 J1427+2348 09 51 15 26.4 72.6 -4.6 -78.8 2 1 6 17135 05 58 32 05 59 02 =1424+240 09 51 35 26.5 72.6 -4.6 -78.8 20 R 1 16935 05 59 12 RXBOO 09 51 45 27.5 70.6 -4.5 -80.0 2 1 6 16935 05 59 02 05 59 32 --- 09 52 05 27.6 70.6 -4.5 -80.1 20 R 1 16735 05 59 42 J1427+2348 09 52 15 26.7 72.6 -4.6 -78.9 2 1 6 16735 05 59 32 06 00 02 =1424+240 09 52 35 26.7 72.6 -4.6 -78.9 20 R 1 16536 Schedule for VLBA_MK (Code Mk ) Page 30 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 00 12 RXBOO 09 52 45 27.8 70.7 -4.5 -80.1 2 1 6 16536 06 00 02 06 00 32 --- 09 53 05 27.8 70.7 -4.5 -80.1 20 R 1 16336 06 00 42 J1427+2348 09 53 15 26.9 72.7 -4.6 -79.0 2 1 6 16336 06 00 32 06 01 02 =1424+240 09 53 35 27.0 72.7 -4.6 -79.0 20 R 1 16137 06 01 12 RXBOO 09 53 45 28.0 70.7 -4.5 -80.2 2 1 6 16137 06 01 02 06 01 32 --- 09 54 05 28.0 70.7 -4.5 -80.2 20 R 1 15937 06 01 42 J1427+2348 09 54 15 27.1 72.7 -4.5 -79.0 2 1 6 15937 06 01 32 06 02 02 =1424+240 09 54 35 27.2 72.7 -4.5 -79.1 20 R 1 15738 06 02 12 RXBOO 09 54 45 28.2 70.8 -4.5 -80.3 2 1 6 15738 06 02 02 06 02 32 --- 09 55 05 28.3 70.8 -4.5 -80.3 20 R 1 15539 06 02 42 J1427+2348 09 55 15 27.3 72.8 -4.5 -79.1 2 1 6 15539 06 02 32 06 03 02 =1424+240 09 55 35 27.4 72.8 -4.5 -79.1 20 R 1 15339 06 03 12 RXBOO 09 55 45 28.4 70.8 -4.5 -80.4 2 1 6 15339 06 03 02 06 03 31 --- 09 56 05 28.5 70.8 -4.5 -80.4 20 R 1 15140 06 03 41 J1427+2348 09 56 15 27.6 72.8 -4.5 -79.2 2 1 6 15140 06 03 31 06 04 01 =1424+240 09 56 35 27.6 72.8 -4.5 -79.2 20 R 1 14940 06 04 11 RXBOO 09 56 45 28.6 70.8 -4.5 -80.5 2 1 6 14940 06 04 01 06 04 31 --- 09 57 05 28.7 70.9 -4.5 -80.5 20 R 1 14741 06 04 41 J1427+2348 09 57 15 27.8 72.9 -4.5 -79.3 2 1 6 14741 06 04 31 06 05 01 =1424+240 09 57 35 27.9 72.9 -4.5 -79.3 20 R 1 14542 06 05 11 RXBOO 09 57 45 28.9 70.9 -4.4 -80.6 2 1 6 14542 06 05 01 06 05 31 --- 09 58 05 28.9 70.9 -4.4 -80.6 20 R 1 14342 06 05 41 J1427+2348 09 58 15 28.0 72.9 -4.5 -79.3 2 1 6 14342 06 05 31 06 06 01 =1424+240 09 58 35 28.1 72.9 -4.5 -79.4 20 R 1 14143 06 06 11 RXBOO 09 58 45 29.1 70.9 -4.4 -80.6 2 1 6 14143 06 06 01 06 06 31 --- 09 59 05 29.2 70.9 -4.4 -80.7 20 R 1 13944 06 06 41 J1427+2348 09 59 15 28.2 73.0 -4.5 -79.4 2 1 6 13944 06 06 31 06 07 01 =1424+240 09 59 35 28.3 73.0 -4.5 -79.4 20 R 1 13745 Schedule for VLBA_MK (Code Mk ) Page 31 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 07 11 RXBOO 09 59 45 29.3 71.0 -4.4 -80.7 2 1 6 13745 06 07 01 06 07 31 --- 10 00 05 29.4 71.0 -4.4 -80.8 20 R 1 13546 06 07 41 J1427+2348 10 00 15 28.5 73.0 -4.4 -79.5 2 1 6 13546 06 07 31 06 08 00 =1424+240 10 00 35 28.5 73.0 -4.4 -79.5 20 R 1 13347 06 08 10 RXBOO 10 00 45 29.5 71.0 -4.4 -80.8 2 1 6 13347 06 08 00 06 08 30 --- 10 01 05 29.6 71.0 -4.4 -80.8 20 R 1 13147 06 08 40 J1427+2348 10 01 15 28.7 73.1 -4.4 -79.6 2 1 6 13147 06 08 30 06 09 00 =1424+240 10 01 35 28.8 73.1 -4.4 -79.6 20 R 1 12948 06 09 10 RXBOO 10 01 45 29.8 71.0 -4.4 -80.9 2 1 6 12948 06 09 00 06 09 30 --- 10 02 05 29.8 71.1 -4.4 -80.9 20 R 1 12749 06 09 40 J1427+2348 10 02 15 28.9 73.1 -4.4 -79.7 2 1 6 12749 06 09 30 06 10 00 =1424+240 10 02 35 29.0 73.1 -4.4 -79.7 20 R 1 12550 06 10 10 RXBOO 10 02 45 30.0 71.1 -4.4 -81.0 2 1 6 12550 06 10 00 06 10 30 --- 10 03 05 30.0 71.1 -4.4 -81.0 20 R 1 12351 06 10 40 J1427+2348 10 03 15 29.1 73.1 -4.4 -79.7 2 1 6 12351 06 10 30 06 11 00 =1424+240 10 03 35 29.2 73.2 -4.4 -79.8 20 R 1 12152 06 11 10 RXBOO 10 03 45 30.2 71.1 -4.3 -81.1 2 1 6 12152 06 11 00 06 11 29 --- 10 04 05 30.3 71.1 -4.3 -81.1 20 R 1 11953 06 11 39 J1427+2348 10 04 15 29.4 73.2 -4.4 -79.8 2 1 6 11953 06 11 29 06 11 59 =1424+240 10 04 35 29.4 73.2 -4.4 -79.8 20 R 1 11754 06 12 09 RXBOO 10 04 45 30.4 71.2 -4.3 -81.2 2 1 6 11754 06 11 59 06 12 29 --- 10 05 05 30.5 71.2 -4.3 -81.2 20 R 1 11556 06 12 39 J1427+2348 10 05 14 29.6 73.2 -4.4 -79.9 2 1 6 11556 06 12 29 06 12 59 =1424+240 10 05 34 29.7 73.3 -4.4 -79.9 20 R 1 11356 06 13 09 RXBOO 10 05 44 30.6 71.2 -4.3 -81.3 2 1 6 11356 06 12 59 06 13 29 --- 10 06 04 30.7 71.2 -4.3 -81.3 20 R 1 11158 06 13 39 J1427+2348 10 06 14 29.8 73.3 -4.3 -80.0 2 1 6 11158 06 13 29 06 13 59 =1424+240 10 06 34 29.9 73.3 -4.3 -80.0 20 R 1 10958 Schedule for VLBA_MK (Code Mk ) Page 32 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 14 09 RXBOO 10 06 44 30.9 71.3 -4.3 -81.3 2 1 6 10958 06 13 59 06 14 29 --- 10 07 04 30.9 71.3 -4.3 -81.4 20 R 1 10759 06 14 39 J1427+2348 10 07 14 30.0 73.3 -4.3 -80.0 2 1 6 10759 06 14 29 06 14 59 =1424+240 10 07 34 30.1 73.3 -4.3 -80.1 20 R 1 10560 06 15 08 RXBOO 10 07 44 31.1 71.3 -4.3 -81.4 2 1 6 10560 06 14 59 06 15 28 --- 10 08 04 31.2 71.3 -4.3 -81.5 20 R 1 10361 06 15 38 J1427+2348 10 08 14 30.3 73.4 -4.3 -80.1 2 1 6 10361 06 15 28 06 15 58 =1424+240 10 08 34 30.3 73.4 -4.3 -80.2 20 R 1 10161 06 16 08 RXBOO 10 08 44 31.3 71.3 -4.3 -81.5 2 1 6 10161 06 15 58 06 16 28 --- 10 09 04 31.4 71.3 -4.3 -81.5 20 R 1 9962 06 16 38 J1427+2348 10 09 14 30.5 73.4 -4.3 -80.2 2 1 6 9962 06 16 28 06 16 58 =1424+240 10 09 34 30.6 73.4 -4.3 -80.2 20 R 1 9762 06 17 08 RXBOO 10 09 44 31.5 71.4 -4.2 -81.6 2 1 6 9762 06 16 58 06 17 28 --- 10 10 04 31.6 71.4 -4.2 -81.6 20 R 1 9562 06 17 38 J1427+2348 10 10 14 30.7 73.5 -4.3 -80.3 2 1 6 9562 06 17 28 06 17 58 =1424+240 10 10 34 30.8 73.5 -4.3 -80.3 20 R 1 9362 06 18 08 RXBOO 10 10 44 31.8 71.4 -4.2 -81.7 2 1 6 9362 06 17 58 06 18 28 --- 10 11 04 31.8 71.4 -4.2 -81.7 20 R 1 9162 06 18 38 J1427+2348 10 11 15 30.9 73.5 -4.3 -80.4 2 1 6 9162 06 18 28 06 18 58 =1424+240 10 11 35 31.0 73.5 -4.3 -80.4 20 R 1 8962 06 19 08 RXBOO 10 11 45 32.0 71.4 -4.2 -81.8 2 1 6 8962 06 18 58 06 19 28 --- 10 12 05 32.1 71.5 -4.2 -81.8 20 R 1 8762 06 19 38 J1427+2348 10 12 15 31.2 73.6 -4.2 -80.4 2 1 6 8762 06 19 28 06 19 58 =1424+240 10 12 35 31.2 73.6 -4.2 -80.5 20 R 1 8562 06 20 08 RXBOO 10 12 45 32.2 71.5 -4.2 -81.9 2 1 6 8562 06 19 58 06 20 28 --- 10 13 05 32.3 71.5 -4.2 -81.9 20 R 1 8362 06 20 38 J1427+2348 10 13 15 31.4 73.6 -4.2 -80.5 2 1 6 8362 06 20 28 06 20 58 =1424+240 10 13 35 31.5 73.6 -4.2 -80.5 20 R 1 8161 Schedule for VLBA_MK (Code Mk ) Page 33 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- Next scan frequencies: 22007.12 22021.22 22063.42 22140.93 22232.21 22415.64 22458.94 22486.15 Next BBC frequencies: 507.12 521.22 563.42 640.93 732.21 915.64 958.94 986.15 06 22 58 3C345 10 15 35 7.5 50.3 -6.5 -70.4 66 1 6 8161 06 22 58 06 27 57 --- 10 20 35 8.4 50.6 -6.4 -71.2 299 R 1 6166 06 29 15 SCRB 10 21 54 22.7 63.3 -5.0 -79.9 44 1 6 6166 06 29 15 06 29 35 --- 10 22 14 22.7 63.3 -5.0 -79.9 20 R 1 6033 06 29 42 J1522+3144 10 22 20 22.7 62.9 -5.0 -80.0 1 1 6 6033 06 29 35 06 30 02 =1520+319 10 22 40 22.7 62.9 -5.0 -80.0 20 R 1 5855 06 30 09 SCRB 10 22 47 22.8 63.4 -5.0 -80.0 1 1 6 5855 06 30 02 06 30 29 --- 10 23 07 22.9 63.4 -5.0 -80.0 20 R 1 5676 06 30 36 J1522+3144 10 23 14 22.8 63.0 -5.0 -80.1 1 1 6 5676 06 30 29 06 30 56 =1520+319 10 23 34 22.9 63.0 -5.0 -80.1 20 R 1 5498 06 31 03 SCRB 10 23 41 23.0 63.4 -5.0 -80.1 1 1 6 5498 06 30 56 06 31 23 --- 10 24 01 23.1 63.4 -5.0 -80.1 20 R 1 5319 06 31 29 J1522+3144 10 24 08 23.0 63.0 -5.0 -80.2 1 1 6 5319 06 31 23 06 31 49 =1520+319 10 24 28 23.1 63.0 -5.0 -80.3 20 R 1 5141 06 31 56 SCRB 10 24 35 23.2 63.4 -5.0 -80.2 1 1 6 5141 06 31 49 06 32 16 --- 10 24 55 23.3 63.4 -4.9 -80.2 20 R 1 4961 06 32 23 J1522+3144 10 25 02 23.2 63.0 -5.0 -80.3 1 1 6 4961 06 32 16 06 32 43 =1520+319 10 25 22 23.3 63.0 -4.9 -80.4 20 R 1 4783 06 32 50 SCRB 10 25 29 23.4 63.5 -4.9 -80.3 1 1 6 4783 06 32 43 06 33 10 --- 10 25 49 23.5 63.5 -4.9 -80.3 20 R 1 4604 06 33 17 J1522+3144 10 25 55 23.4 63.1 -4.9 -80.4 1 1 6 4604 06 33 10 06 33 36 =1520+319 10 26 15 23.5 63.1 -4.9 -80.5 20 R 1 4426 06 33 43 SCRB 10 26 22 23.6 63.5 -4.9 -80.4 1 1 6 4426 06 33 36 06 34 03 --- 10 26 42 23.7 63.5 -4.9 -80.4 20 R 1 4247 06 34 10 J1522+3144 10 26 49 23.6 63.1 -4.9 -80.5 1 1 6 4247 06 34 03 06 34 30 =1520+319 10 27 09 23.7 63.1 -4.9 -80.6 20 R 1 4068 Schedule for VLBA_MK (Code Mk ) Page 34 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 34 37 SCRB 10 27 16 23.8 63.5 -4.9 -80.5 1 1 6 4068 06 34 30 06 34 57 --- 10 27 36 23.9 63.6 -4.9 -80.5 20 R 1 3889 06 35 04 J1522+3144 10 27 43 23.8 63.1 -4.9 -80.6 1 1 6 3889 06 34 57 06 35 24 =1520+319 10 28 03 23.9 63.1 -4.9 -80.7 20 R 1 3711 06 35 31 SCRB 10 28 10 24.0 63.6 -4.9 -80.6 1 1 6 3711 06 35 24 06 35 51 --- 10 28 30 24.0 63.6 -4.9 -80.6 20 R 1 3531 06 35 57 J1522+3144 10 28 37 24.0 63.2 -4.9 -80.7 1 1 6 3531 06 35 51 06 36 17 =1520+319 10 28 57 24.0 63.2 -4.9 -80.8 20 R 1 3353 06 36 24 SCRB 10 29 04 24.2 63.6 -4.9 -80.7 1 1 6 3353 06 36 17 06 36 44 --- 10 29 24 24.2 63.6 -4.9 -80.7 20 R 1 3174 06 36 51 J1522+3144 10 29 30 24.2 63.2 -4.9 -80.8 1 1 6 3174 06 36 44 06 37 11 =1520+319 10 29 50 24.2 63.2 -4.9 -80.9 20 R 1 2996 06 37 18 SCRB 10 29 57 24.4 63.6 -4.9 -80.8 1 1 6 2996 06 37 11 06 37 38 --- 10 30 17 24.4 63.7 -4.9 -80.9 20 R 1 2816 06 37 45 J1522+3144 10 30 24 24.3 63.2 -4.9 -80.9 1 1 6 2816 06 37 38 06 38 05 =1520+319 10 30 44 24.4 63.2 -4.9 -81.0 20 R 1 2638 06 38 12 SCRB 10 30 51 24.5 63.7 -4.8 -80.9 1 1 6 2638 06 38 05 06 38 32 --- 10 31 11 24.6 63.7 -4.8 -81.0 20 R 1 2458 06 38 38 J1522+3144 10 31 18 24.5 63.3 -4.9 -81.0 1 1 6 2458 06 38 32 06 38 58 =1520+319 10 31 38 24.6 63.3 -4.8 -81.1 20 R 1 2280 06 39 05 SCRB 10 31 45 24.7 63.7 -4.8 -81.0 1 1 6 2280 06 38 58 06 39 25 --- 10 32 05 24.8 63.7 -4.8 -81.1 20 R 1 2101 06 39 32 J1522+3144 10 32 12 24.7 63.3 -4.8 -81.2 1 1 6 2101 06 39 25 06 39 52 =1520+319 10 32 32 24.8 63.3 -4.8 -81.2 20 R 1 1923 06 39 59 SCRB 10 32 39 24.9 63.7 -4.8 -81.1 1 1 6 1923 06 39 52 06 40 19 --- 10 32 59 25.0 63.8 -4.8 -81.2 20 R 1 1743 06 40 26 J1522+3144 10 33 06 24.9 63.3 -4.8 -81.3 1 1 6 1743 06 40 19 06 40 46 =1520+319 10 33 26 25.0 63.3 -4.8 -81.3 20 R 1 1565 Schedule for VLBA_MK (Code Mk ) Page 35 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 40 53 SCRB 10 33 33 25.1 63.8 -4.8 -81.2 1 1 6 1565 06 40 46 06 41 13 --- 10 33 53 25.2 63.8 -4.8 -81.3 20 R 1 1385 06 41 19 J1522+3144 10 33 59 25.1 63.4 -4.8 -81.4 1 1 6 1385 06 41 13 06 41 39 =1520+319 10 34 19 25.2 63.4 -4.8 -81.4 20 R 1 1207 06 41 46 SCRB 10 34 26 25.3 63.8 -4.8 -81.3 1 1 6 1207 06 41 39 06 42 06 --- 10 34 46 25.4 63.8 -4.8 -81.4 20 R 1 1028 06 42 13 J1522+3144 10 34 53 25.3 63.4 -4.8 -81.5 1 1 6 1028 06 42 06 06 42 33 =1520+319 10 35 13 25.4 63.4 -4.8 -81.5 20 R 1 850 06 42 40 SCRB 10 35 20 25.5 63.8 -4.8 -81.4 1 1 6 850 06 42 33 06 43 00 --- 10 35 40 25.6 63.8 -4.8 -81.5 20 R 1 670 06 43 07 J1522+3144 10 35 47 25.5 63.4 -4.8 -81.6 1 1 6 670 06 43 00 06 43 27 =1520+319 10 36 07 25.5 63.4 -4.8 -81.6 20 R 1 492 06 43 34 SCRB 10 36 14 25.7 63.9 -4.8 -81.5 1 1 6 492 06 43 27 06 43 53 --- 10 36 34 25.7 63.9 -4.8 -81.6 20 R 1 312 06 44 00 J1522+3144 10 36 41 25.7 63.5 -4.8 -81.7 1 1 7 312 06 43 53 06 44 20 =1520+319 10 37 01 25.7 63.5 -4.8 -81.7 20 F 1 491 06 44 27 SCRB 10 37 08 25.9 63.9 -4.7 -81.6 1 1 7 491 06 44 20 06 44 47 --- 10 37 28 25.9 63.9 -4.7 -81.7 20 F 1 670 06 44 54 J1522+3144 10 37 35 25.9 63.5 -4.7 -81.8 1 1 7 670 06 44 47 06 45 14 =1520+319 10 37 55 25.9 63.5 -4.7 -81.8 20 F 1 848 06 45 21 SCRB 10 38 02 26.1 63.9 -4.7 -81.7 1 1 7 848 06 45 14 06 45 41 --- 10 38 22 26.1 63.9 -4.7 -81.8 20 F 1 1028 06 45 48 J1522+3144 10 38 28 26.0 63.5 -4.7 -81.9 1 1 7 1028 06 45 41 06 46 07 =1520+319 10 38 48 26.1 63.5 -4.7 -81.9 20 F 1 1206 06 46 14 SCRB 10 38 55 26.2 64.0 -4.7 -81.8 1 1 7 1206 06 46 07 06 46 34 --- 10 39 15 26.3 64.0 -4.7 -81.9 20 F 1 1385 06 46 41 J1522+3144 10 39 22 26.2 63.5 -4.7 -82.0 1 1 7 1385 06 46 34 06 47 01 =1520+319 10 39 42 26.3 63.6 -4.7 -82.0 20 F 1 1563 Schedule for VLBA_MK (Code Mk ) Page 36 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 47 08 SCRB 10 39 49 26.4 64.0 -4.7 -81.9 1 1 7 1563 06 47 01 06 47 28 --- 10 40 09 26.5 64.0 -4.7 -82.0 20 F 1 1743 06 47 35 J1522+3144 10 40 16 26.4 63.6 -4.7 -82.1 1 1 7 1743 06 47 28 06 47 55 =1520+319 10 40 36 26.5 63.6 -4.7 -82.1 20 F 1 1921 06 48 02 SCRB 10 40 43 26.6 64.0 -4.7 -82.0 1 1 7 1921 06 47 55 06 48 22 --- 10 41 03 26.7 64.0 -4.7 -82.1 20 F 1 2100 06 48 28 J1522+3144 10 41 10 26.6 63.6 -4.7 -82.2 1 1 7 2100 06 48 22 06 48 48 =1520+319 10 41 30 26.7 63.6 -4.7 -82.2 20 F 1 2278 06 48 55 SCRB 10 41 37 26.8 64.1 -4.7 -82.2 1 1 7 2278 06 48 48 06 49 15 --- 10 41 57 26.9 64.1 -4.7 -82.2 20 F 1 2457 06 49 22 J1522+3144 10 42 03 26.8 63.6 -4.7 -82.3 1 1 7 2457 06 49 15 06 49 42 =1520+319 10 42 23 26.9 63.6 -4.7 -82.3 20 F 1 2635 06 49 49 SCRB 10 42 30 27.0 64.1 -4.7 -82.3 1 1 7 2635 06 49 42 06 50 09 --- 10 42 50 27.1 64.1 -4.6 -82.3 20 F 1 2814 06 50 15 J1522+3144 10 42 57 27.0 63.7 -4.7 -82.4 1 1 7 2814 06 50 09 06 50 35 =1520+319 10 43 17 27.1 63.7 -4.7 -82.4 20 F 1 2992 06 50 42 SCRB 10 43 24 27.2 64.1 -4.6 -82.4 1 1 7 2992 06 50 35 06 51 02 --- 10 43 44 27.3 64.1 -4.6 -82.4 20 F 1 3171 06 51 09 J1522+3144 10 43 51 27.2 63.7 -4.6 -82.5 1 1 7 3171 06 51 02 06 51 29 =1520+319 10 44 11 27.2 63.7 -4.6 -82.5 20 F 1 3349 06 51 36 SCRB 10 44 18 27.4 64.1 -4.6 -82.5 1 1 7 3349 06 51 29 06 51 56 --- 10 44 38 27.5 64.1 -4.6 -82.5 20 F 1 3528 06 52 03 J1522+3144 10 44 45 27.4 63.7 -4.6 -82.6 1 1 7 3528 06 51 56 06 52 23 =1520+319 10 45 05 27.4 63.7 -4.6 -82.7 20 F 1 3706 06 52 29 SCRB 10 45 11 27.6 64.2 -4.6 -82.6 1 1 7 3706 06 52 23 06 52 49 --- 10 45 31 27.6 64.2 -4.6 -82.6 20 F 1 3886 06 52 56 J1522+3144 10 45 38 27.6 63.7 -4.6 -82.7 1 1 7 3886 06 52 49 06 53 16 =1520+319 10 45 58 27.6 63.8 -4.6 -82.8 20 F 1 4064 Schedule for VLBA_MK (Code Mk ) Page 37 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 53 23 SCRB 10 46 05 27.8 64.2 -4.6 -82.7 1 1 7 4064 06 53 16 06 53 43 --- 10 46 25 27.8 64.2 -4.6 -82.7 20 F 1 4243 06 53 50 J1522+3144 10 46 32 27.7 63.8 -4.6 -82.8 1 1 7 4243 06 53 43 06 54 10 =1520+319 10 46 52 27.8 63.8 -4.6 -82.9 20 F 1 4421 06 54 17 SCRB 10 46 59 28.0 64.2 -4.6 -82.8 1 1 7 4421 06 54 10 06 54 37 --- 10 47 19 28.0 64.2 -4.6 -82.8 20 F 1 4600 06 54 43 J1522+3144 10 47 26 27.9 63.8 -4.6 -82.9 1 1 7 4600 06 54 37 06 55 03 =1520+319 10 47 46 28.0 63.8 -4.6 -83.0 20 F 1 4778 06 55 10 SCRB 10 47 53 28.1 64.2 -4.6 -82.9 1 1 7 4778 06 55 03 06 55 30 --- 10 48 13 28.2 64.3 -4.6 -82.9 20 F 1 4957 06 55 37 J1522+3144 10 48 19 28.1 63.8 -4.6 -83.0 1 1 7 4957 06 55 30 06 55 57 =1520+319 10 48 39 28.2 63.8 -4.6 -83.1 20 F 1 5136 06 56 04 SCRB 10 48 46 28.3 64.3 -4.5 -83.0 1 1 7 5136 06 55 57 06 56 24 --- 10 49 06 28.4 64.3 -4.5 -83.0 20 F 1 5314 06 56 31 J1522+3144 10 49 13 28.3 63.8 -4.6 -83.1 1 1 7 5314 06 56 24 06 56 51 =1520+319 10 49 33 28.4 63.9 -4.5 -83.2 20 F 1 5493 06 56 57 SCRB 10 49 40 28.5 64.3 -4.5 -83.1 1 1 7 5493 06 56 51 06 57 17 --- 10 50 00 28.6 64.3 -4.5 -83.1 20 F 1 5672 06 57 24 J1522+3144 10 50 07 28.5 63.9 -4.5 -83.2 1 1 7 5672 06 57 17 06 57 44 =1520+319 10 50 27 28.6 63.9 -4.5 -83.3 20 F 1 5850 06 57 51 SCRB 10 50 34 28.7 64.3 -4.5 -83.2 1 1 7 5850 06 57 44 06 58 11 --- 10 50 54 28.8 64.3 -4.5 -83.2 20 F 1 6029 06 58 18 J1522+3144 10 51 01 28.7 63.9 -4.5 -83.4 1 1 7 6029 06 58 11 06 58 38 =1520+319 10 51 21 28.8 63.9 -4.5 -83.4 20 F 1 6208 06 58 45 SCRB 10 51 28 28.9 64.4 -4.5 -83.3 1 1 7 6208 06 58 38 06 59 05 --- 10 51 48 29.0 64.4 -4.5 -83.3 20 F 1 6387 06 59 11 J1522+3144 10 51 55 28.9 63.9 -4.5 -83.5 1 1 7 6387 06 59 05 06 59 31 =1520+319 10 52 15 28.9 63.9 -4.5 -83.5 20 F 1 6565 Schedule for VLBA_MK (Code Mk ) Page 38 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 06 59 38 SCRB 10 52 21 29.1 64.4 -4.5 -83.4 1 1 7 6565 06 59 31 06 59 58 --- 10 52 41 29.2 64.4 -4.5 -83.4 20 F 1 6744 07 00 05 J1522+3144 10 52 48 29.1 63.9 -4.5 -83.6 1 1 7 6744 06 59 58 07 00 25 =1520+319 10 53 08 29.1 64.0 -4.5 -83.6 20 F 1 6923 07 00 32 SCRB 10 53 15 29.3 64.4 -4.5 -83.5 1 1 7 6923 07 00 25 07 00 52 --- 10 53 35 29.4 64.4 -4.5 -83.5 20 F 1 7102 07 00 59 J1522+3144 10 53 42 29.3 64.0 -4.5 -83.7 1 1 7 7102 07 00 52 07 01 19 =1520+319 10 54 02 29.3 64.0 -4.5 -83.7 20 F 1 7282 07 01 26 SCRB 10 54 09 29.5 64.4 -4.5 -83.6 1 1 7 7282 07 01 19 07 01 46 --- 10 54 29 29.5 64.4 -4.5 -83.6 20 F 1 7461 07 01 53 J1522+3144 10 54 36 29.4 64.0 -4.5 -83.8 1 1 7 7461 07 01 46 07 02 13 =1520+319 10 54 56 29.5 64.0 -4.5 -83.8 20 F 1 7640 07 02 20 SCRB 10 55 03 29.7 64.5 -4.4 -83.7 1 1 7 7640 07 02 13 07 02 40 --- 10 55 23 29.7 64.5 -4.4 -83.8 20 F 1 7819 07 02 46 J1522+3144 10 55 30 29.6 64.0 -4.4 -83.9 1 1 7 7819 07 02 40 07 03 06 =1520+319 10 55 50 29.7 64.0 -4.4 -83.9 20 F 1 7999 07 03 13 SCRB 10 55 57 29.9 64.5 -4.4 -83.8 1 1 7 7999 07 03 06 07 03 33 --- 10 56 17 29.9 64.5 -4.4 -83.9 20 F 1 8178 07 03 40 J1522+3144 10 56 24 29.8 64.0 -4.4 -84.0 1 1 7 8178 07 03 33 07 04 00 =1520+319 10 56 44 29.9 64.1 -4.4 -84.0 20 F 1 8358 07 04 07 SCRB 10 56 51 30.0 64.5 -4.4 -83.9 1 1 7 8358 07 04 00 07 04 27 --- 10 57 11 30.1 64.5 -4.4 -84.0 20 F 1 8537 07 04 34 J1522+3144 10 57 18 30.0 64.1 -4.4 -84.1 1 1 7 8537 07 04 27 07 04 54 =1520+319 10 57 38 30.1 64.1 -4.4 -84.1 20 F 1 8717 07 05 01 SCRB 10 57 45 30.2 64.5 -4.4 -84.0 1 1 7 8717 07 04 54 07 05 21 --- 10 58 05 30.3 64.5 -4.4 -84.1 20 F 1 8897 07 05 28 J1522+3144 10 58 12 30.2 64.1 -4.4 -84.2 1 1 7 8897 07 05 21 07 05 48 =1520+319 10 58 32 30.3 64.1 -4.4 -84.2 20 F 1 9077 Schedule for VLBA_MK (Code Mk ) Page 39 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 07 05 55 SCRB 10 58 39 30.4 64.5 -4.4 -84.1 1 1 7 9077 07 05 48 07 06 15 --- 10 58 59 30.5 64.6 -4.4 -84.2 20 F 1 9257 07 06 22 J1522+3144 10 59 06 30.4 64.1 -4.4 -84.3 2 1 7 9257 07 06 15 07 06 42 =1520+319 10 59 26 30.5 64.1 -4.4 -84.4 20 F 1 9436 07 06 49 SCRB 10 59 33 30.6 64.6 -4.4 -84.2 2 1 7 9436 07 06 42 07 07 09 --- 10 59 53 30.7 64.6 -4.4 -84.3 20 F 1 9617 07 07 16 J1522+3144 11 00 01 30.6 64.1 -4.4 -84.4 2 1 7 9617 07 07 09 07 07 36 =1520+319 11 00 21 30.7 64.1 -4.4 -84.5 20 F 1 9797 07 07 43 SCRB 11 00 28 30.8 64.6 -4.4 -84.3 2 1 7 9797 07 07 36 07 08 03 --- 11 00 48 30.9 64.6 -4.3 -84.4 20 F 1 9977 07 08 10 J1522+3144 11 00 55 30.8 64.2 -4.4 -84.5 2 1 7 9977 07 08 03 07 08 30 =1520+319 11 01 15 30.9 64.2 -4.4 -84.6 20 F 1 10157 07 08 37 SCRB 11 01 22 31.0 64.6 -4.3 -84.5 2 1 7 10157 07 08 30 07 08 57 --- 11 01 42 31.1 64.6 -4.3 -84.5 20 F 1 10337 07 09 04 J1522+3144 11 01 49 31.0 64.2 -4.3 -84.6 2 1 7 10337 07 08 57 07 09 24 =1520+319 11 02 09 31.0 64.2 -4.3 -84.7 20 F 1 10518 07 09 31 SCRB 11 02 16 31.2 64.6 -4.3 -84.6 2 1 7 10518 07 09 24 07 09 51 --- 11 02 36 31.3 64.6 -4.3 -84.6 20 F 1 10698 07 09 58 J1522+3144 11 02 43 31.2 64.2 -4.3 -84.7 2 1 7 10698 07 09 51 07 10 18 =1520+319 11 03 03 31.2 64.2 -4.3 -84.8 20 F 1 10879 07 10 26 SCRB 11 03 11 31.4 64.7 -4.3 -84.7 2 1 7 10879 07 10 18 07 10 46 --- 11 03 31 31.5 64.7 -4.3 -84.7 20 F 1 11060 07 10 53 J1522+3144 11 03 38 31.4 64.2 -4.3 -84.9 2 1 7 11060 07 10 46 07 11 13 =1520+319 11 03 58 31.4 64.2 -4.3 -84.9 20 F 1 11240 07 11 20 SCRB 11 04 05 31.6 64.7 -4.3 -84.8 2 1 7 11240 07 11 13 07 11 40 --- 11 04 25 31.7 64.7 -4.3 -84.8 20 F 1 11421 07 11 47 J1522+3144 11 04 32 31.5 64.2 -4.3 -85.0 2 1 7 11421 07 11 40 07 12 07 =1520+319 11 04 52 31.6 64.2 -4.3 -85.0 20 F 1 11602 Schedule for VLBA_MK (Code Mk ) Page 40 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 07 12 14 SCRB 11 04 59 31.8 64.7 -4.3 -84.9 2 1 7 11602 07 12 07 07 12 34 --- 11 05 19 31.8 64.7 -4.3 -84.9 20 F 1 11783 07 12 41 J1522+3144 11 05 27 31.7 64.3 -4.3 -85.1 2 1 7 11783 07 12 34 07 13 01 =1520+319 11 05 47 31.8 64.3 -4.3 -85.1 20 F 1 11964 07 13 08 SCRB 11 05 54 32.0 64.7 -4.3 -85.0 2 1 7 11964 07 13 01 07 13 28 --- 11 06 14 32.0 64.7 -4.3 -85.0 20 F 1 12145 07 13 36 J1522+3144 11 06 21 31.9 64.3 -4.3 -85.2 2 1 7 12145 07 13 28 07 13 56 =1520+319 11 06 41 32.0 64.3 -4.3 -85.2 20 F 1 12327 07 14 03 SCRB 11 06 48 32.2 64.7 -4.2 -85.1 2 1 7 12327 07 13 56 07 14 23 --- 11 07 08 32.2 64.7 -4.2 -85.1 20 F 1 12508 07 14 30 J1522+3144 11 07 16 32.1 64.3 -4.3 -85.3 2 1 7 12508 07 14 23 07 14 50 =1520+319 11 07 36 32.2 64.3 -4.2 -85.3 20 F 1 12689 07 14 57 SCRB 11 07 43 32.4 64.8 -4.2 -85.2 2 1 7 12689 07 14 50 07 15 17 --- 11 08 03 32.4 64.8 -4.2 -85.2 20 F 1 12871 07 15 25 J1522+3144 11 08 10 32.3 64.3 -4.2 -85.4 2 1 7 12871 07 15 17 07 15 44 =1520+319 11 08 30 32.4 64.3 -4.2 -85.4 20 F 1 13053 07 15 52 SCRB 11 08 38 32.5 64.8 -4.2 -85.3 2 1 7 13053 07 15 44 07 16 12 --- 11 08 58 32.6 64.8 -4.2 -85.3 20 F 1 13234 07 16 19 J1522+3144 11 09 05 32.5 64.3 -4.2 -85.5 2 1 7 13234 07 16 12 07 16 39 =1520+319 11 09 25 32.6 64.3 -4.2 -85.5 20 F 1 13416 07 16 46 SCRB 11 09 32 32.7 64.8 -4.2 -85.4 2 1 7 13416 07 16 39 07 17 06 --- 11 09 52 32.8 64.8 -4.2 -85.5 20 F 1 13598 07 17 14 J1522+3144 11 10 00 32.7 64.3 -4.2 -85.6 2 1 7 13598 07 17 06 07 17 34 =1520+319 11 10 20 32.8 64.4 -4.2 -85.7 20 F 1 13780 07 17 41 SCRB 11 10 27 32.9 64.8 -4.2 -85.5 2 1 7 13780 07 17 34 07 18 01 --- 11 10 47 33.0 64.8 -4.2 -85.6 20 F 1 13962 07 18 08 J1522+3144 11 10 55 32.9 64.4 -4.2 -85.7 2 1 7 13962 07 18 01 07 18 28 =1520+319 11 11 15 33.0 64.4 -4.2 -85.8 20 F 1 14145 Schedule for VLBA_MK (Code Mk ) Page 41 VLBA format test phase referencing H2O UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 25 Apr 2004 Day 116 --- 07 18 36 SCRB 11 11 22 33.1 64.8 -4.2 -85.6 2 1 7 14145 07 18 28 07 18 56 --- 11 11 42 33.2 64.8 -4.2 -85.7 20 F 1 14327 07 19 03 J1522+3144 11 11 49 33.1 64.4 -4.2 -85.8 2 1 7 14327 07 18 56 07 19 23 =1520+319 11 12 09 33.2 64.4 -4.2 -85.9 20 F 1 14509 07 19 30 SCRB 11 12 17 33.3 64.8 -4.2 -85.7 2 1 7 14509 07 19 23 07 19 50 --- 11 12 37 33.4 64.9 -4.1 -85.8 20 F 1 14692 07 19 58 J1522+3144 11 12 44 33.3 64.4 -4.2 -86.0 2 1 7 14692 07 19 50 07 20 18 =1520+319 11 13 04 33.4 64.4 -4.2 -86.0 20 F 1 14875 07 20 25 SCRB 11 13 12 33.5 64.9 -4.1 -85.9 2 1 7 14875 07 20 18 07 20 45 --- 11 13 32 33.6 64.9 -4.1 -85.9 20 F 1 15057 07 20 53 J1522+3144 11 13 39 33.5 64.4 -4.1 -86.1 2 1 7 15057 07 20 45 07 21 13 =1520+319 11 13 59 33.6 64.4 -4.1 -86.1 20 F 1 15240 07 21 20 SCRB 11 14 07 33.7 64.9 -4.1 -86.0 2 1 7 15240 07 21 13 07 21 40 --- 11 14 27 33.8 64.9 -4.1 -86.0 20 F 1 15423 07 21 48 J1522+3144 11 14 34 33.7 64.4 -4.1 -86.2 2 1 7 15423 07 21 40 07 22 08 =1520+319 11 14 54 33.7 64.4 -4.1 -86.2 20 F 1 15606 07 22 15 SCRB 11 15 02 33.9 64.9 -4.1 -86.1 2 1 7 15606 07 22 08 07 22 35 --- 11 15 22 34.0 64.9 -4.1 -86.1 20 F 1 15790 07 22 43 J1522+3144 11 15 30 33.9 64.4 -4.1 -86.3 2 1 7 15790 07 22 35 07 23 03 =1520+319 11 15 50 33.9 64.5 -4.1 -86.3 20 F 1 15973 07 23 10 SCRB 11 15 57 34.1 64.9 -4.1 -86.2 2 1 7 15973 07 23 03 07 23 30 --- 11 16 17 34.2 64.9 -4.1 -86.2 20 F 1 16157 07 23 38 J1522+3144 11 16 25 34.1 64.5 -4.1 -86.4 2