COVER INFORMATION Station: VLBA_BR (Code Br ) Experiment: BA068C: 1-cm line and 2-cm continuum observations (multi epoch) Exp. Code: BA068C Schedule Version: 1.00 Processed by SCHED version: Release of 18 Sept. 2003 PI: Yoshinaru Asaki Address: The Institute of Space and Astronautical Science, ISAS 3-1-1, Yoshinidai, Sagamihara, Kanagawa 229-8510 Japan Phone: 81-42-759-8342 EMAIL: asaki@vsop.isas.ac.jp Fax: 81-42-759-8485 Phone during observation: 81-42-759-8342 Observing mode: v1cm/2cm-128-2-2 Notes: Position-switching phase-referencing mode Schedule for VLBA_BR (Code Br ) Page 2 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- Next scan frequencies: 22229.04 22244.02 Next BBC frequencies: 729.04 744.02 Next scan bandwidths: 16.00 16.00 17 22 58 J0102+58 22 13 45 63.2 51.5 -2.8 -93.9 0 1 1 0 17 22 58 17 25 57 --- 22 16 45 63.6 51.4 -2.8 -94.6 180 F 1 2393 17 25 57 S_PER 22 16 45 53.2 49.9 -4.1 -78.7 -27 1 1 2393 17 25 57 17 26 13 --- 22 17 01 53.3 50.0 -4.1 -78.8 -11 F 1 2606 17 26 13 KR143 22 17 01 53.3 49.6 -4.1 -79.1 -5 1 1 2606 17 26 13 17 26 33 --- 22 17 21 53.4 49.6 -4.1 -79.2 15 F 1 2872 17 26 33 S_PER 22 17 21 53.3 50.0 -4.1 -78.8 -5 1 1 2872 17 26 33 17 26 49 --- 22 17 37 53.3 50.0 -4.1 -78.9 11 F 1 3085 17 26 49 KR143 22 17 37 53.4 49.6 -4.1 -79.2 -5 1 1 3085 17 26 49 17 27 09 --- 22 17 57 53.5 49.7 -4.1 -79.3 15 F 1 3351 17 27 09 S_PER 22 17 57 53.4 50.0 -4.1 -79.0 -5 1 1 3351 17 27 09 17 27 25 --- 22 18 13 53.4 50.0 -4.1 -79.0 11 F 1 3564 17 27 25 KR143 22 18 13 53.5 49.7 -4.1 -79.3 -5 1 1 3564 17 27 25 17 27 45 --- 22 18 33 53.5 49.7 -4.1 -79.4 15 F 1 3830 17 27 45 S_PER 22 18 33 53.5 50.0 -4.1 -79.1 -5 1 1 3830 17 27 45 17 28 01 --- 22 18 49 53.5 50.0 -4.1 -79.1 11 F 1 4042 17 28 01 KR143 22 18 49 53.6 49.7 -4.1 -79.5 -5 1 1 4042 17 28 01 17 28 21 --- 22 19 09 53.6 49.7 -4.1 -79.5 15 F 1 4308 17 28 21 S_PER 22 19 09 53.5 50.0 -4.1 -79.2 -5 1 1 4308 17 28 21 17 28 37 --- 22 19 25 53.6 50.1 -4.1 -79.2 11 F 1 4521 17 28 37 KR143 22 19 25 53.7 49.7 -4.1 -79.6 -5 1 1 4521 17 28 37 17 28 57 --- 22 19 45 53.7 49.7 -4.1 -79.6 15 F 1 4787 17 28 57 S_PER 22 19 45 53.6 50.1 -4.1 -79.3 -5 1 1 4787 17 28 57 17 29 13 --- 22 20 01 53.7 50.1 -4.1 -79.3 11 F 1 5000 17 29 13 KR143 22 20 01 53.7 49.7 -4.0 -79.7 -5 1 1 5000 17 29 13 17 29 33 --- 22 20 21 53.8 49.7 -4.0 -79.7 15 F 1 5266 Schedule for VLBA_BR (Code Br ) Page 3 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 17 29 33 S_PER 22 20 21 53.7 50.1 -4.0 -79.4 -5 1 1 5266 17 29 33 17 29 49 --- 22 20 37 53.7 50.1 -4.0 -79.4 11 F 1 5478 17 29 49 KR143 22 20 37 53.8 49.8 -4.0 -79.8 -5 1 1 5478 17 29 49 17 30 09 --- 22 20 57 53.8 49.8 -4.0 -79.8 15 F 1 5744 17 30 09 S_PER 22 20 57 53.8 50.1 -4.0 -79.5 -5 1 1 5744 17 30 09 17 30 25 --- 22 21 13 53.8 50.1 -4.0 -79.5 11 F 1 5957 17 30 25 KR143 22 21 13 53.9 49.8 -4.0 -79.9 -5 1 1 5957 17 30 25 17 30 45 --- 22 21 33 53.9 49.8 -4.0 -80.0 15 F 1 6223 17 30 45 S_PER 22 21 33 53.8 50.1 -4.0 -79.6 -5 1 1 6223 17 30 45 17 31 01 --- 22 21 49 53.9 50.2 -4.0 -79.7 11 F 1 6436 17 31 01 KR143 22 21 49 54.0 49.8 -4.0 -80.0 -5 1 1 6436 17 31 01 17 31 21 --- 22 22 09 54.0 49.8 -4.0 -80.1 15 F 1 6702 17 31 21 S_PER 22 22 09 53.9 50.2 -4.0 -79.7 -5 1 1 6702 17 31 21 17 31 37 --- 22 22 25 54.0 50.2 -4.0 -79.8 11 F 1 6914 17 31 37 KR143 22 22 25 54.0 49.8 -4.0 -80.1 -5 1 1 6914 17 31 37 17 31 56 --- 22 22 45 54.1 49.8 -4.0 -80.2 15 F 1 7180 17 31 56 S_PER 22 22 45 54.0 50.2 -4.0 -79.8 -5 1 1 7180 17 31 56 17 32 12 --- 22 23 01 54.0 50.2 -4.0 -79.9 11 F 1 7393 17 32 12 KR143 22 23 01 54.1 49.9 -4.0 -80.2 -5 1 1 7393 17 32 12 17 32 32 --- 22 23 21 54.2 49.9 -4.0 -80.3 15 F 1 7659 17 32 32 S_PER 22 23 21 54.1 50.2 -4.0 -79.9 -5 1 1 7659 17 32 32 17 32 48 --- 22 23 37 54.1 50.2 -4.0 -80.0 11 F 1 7872 17 32 48 KR143 22 23 37 54.2 49.9 -4.0 -80.3 -5 1 1 7872 17 32 48 17 33 08 --- 22 23 57 54.2 49.9 -4.0 -80.4 15 F 1 8138 17 33 08 S_PER 22 23 57 54.2 50.2 -4.0 -80.0 -5 1 1 8138 17 33 08 17 33 24 --- 22 24 13 54.2 50.3 -4.0 -80.1 11 F 1 8350 17 33 24 KR143 22 24 13 54.3 49.9 -4.0 -80.4 -5 1 1 8350 17 33 24 17 33 44 --- 22 24 33 54.3 49.9 -4.0 -80.5 15 F 1 8616 Schedule for VLBA_BR (Code Br ) Page 4 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 17 33 44 S_PER 22 24 33 54.2 50.3 -4.0 -80.2 -5 1 1 8616 17 33 44 17 34 00 --- 22 24 49 54.3 50.3 -4.0 -80.2 11 F 1 8829 17 34 00 KR143 22 24 49 54.3 49.9 -4.0 -80.6 -5 1 1 8829 17 34 00 17 34 20 --- 22 25 09 54.4 49.9 -4.0 -80.6 15 F 1 9095 17 34 20 S_PER 22 25 09 54.3 50.3 -4.0 -80.3 -5 1 1 9095 17 34 20 17 34 36 --- 22 25 25 54.3 50.3 -4.0 -80.3 11 F 1 9308 17 34 36 KR143 22 25 25 54.4 49.9 -4.0 -80.7 -5 1 1 9308 17 34 36 17 34 56 --- 22 25 45 54.5 50.0 -4.0 -80.7 15 F 1 9574 17 34 56 S_PER 22 25 45 54.4 50.3 -4.0 -80.4 -5 1 1 9574 17 34 56 17 35 12 --- 22 26 01 54.4 50.3 -4.0 -80.4 11 F 1 9787 17 35 12 KR143 22 26 01 54.5 50.0 -3.9 -80.8 -5 1 1 9787 17 35 12 17 35 32 --- 22 26 21 54.5 50.0 -3.9 -80.8 15 F 1 10052 17 35 32 S_PER 22 26 21 54.5 50.3 -3.9 -80.5 -5 1 1 10052 17 35 32 17 35 48 --- 22 26 37 54.5 50.3 -3.9 -80.5 11 F 1 10265 17 35 48 KR143 22 26 37 54.6 50.0 -3.9 -80.9 -5 1 1 10265 17 35 48 17 36 08 --- 22 26 57 54.6 50.0 -3.9 -80.9 15 F 1 10531 17 36 08 S_PER 22 26 57 54.5 50.4 -3.9 -80.6 -5 1 1 10531 17 36 08 17 36 24 --- 22 27 13 54.6 50.4 -3.9 -80.6 11 F 1 10744 17 36 24 KR143 22 27 13 54.6 50.0 -3.9 -81.0 -5 1 1 10744 17 36 24 17 36 44 --- 22 27 33 54.7 50.0 -3.9 -81.1 15 F 1 11010 17 36 44 S_PER 22 27 33 54.6 50.4 -3.9 -80.7 -5 1 1 11010 17 36 44 17 37 00 --- 22 27 49 54.7 50.4 -3.9 -80.8 11 F 1 11223 17 37 00 KR143 22 27 49 54.7 50.0 -3.9 -81.1 -5 1 1 11223 17 37 00 17 37 20 --- 22 28 09 54.8 50.0 -3.9 -81.2 15 F 1 11489 17 37 20 S_PER 22 28 09 54.7 50.4 -3.9 -80.8 -5 1 1 11489 17 37 20 17 37 36 --- 22 28 25 54.7 50.4 -3.9 -80.9 11 F 1 11701 17 37 36 KR143 22 28 25 54.8 50.0 -3.9 -81.2 -5 1 1 11701 17 37 36 17 37 56 --- 22 28 45 54.8 50.1 -3.9 -81.3 15 F 1 11967 Schedule for VLBA_BR (Code Br ) Page 5 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 17 37 56 S_PER 22 28 45 54.8 50.4 -3.9 -80.9 -5 1 1 11967 17 37 56 17 38 11 --- 22 29 01 54.8 50.4 -3.9 -81.0 11 F 1 12180 17 38 11 KR143 22 29 01 54.9 50.1 -3.9 -81.3 -5 1 1 12180 17 38 11 17 38 31 --- 22 29 21 54.9 50.1 -3.9 -81.4 15 F 1 12446 17 38 31 S_PER 22 29 21 54.8 50.4 -3.9 -81.0 -5 1 1 12446 17 38 31 17 38 47 --- 22 29 37 54.9 50.4 -3.9 -81.1 11 F 1 12659 17 38 47 KR143 22 29 37 55.0 50.1 -3.9 -81.4 -5 1 1 12659 17 38 47 17 39 07 --- 22 29 57 55.0 50.1 -3.9 -81.5 15 F 1 12925 17 39 07 S_PER 22 29 57 54.9 50.5 -3.9 -81.1 -5 1 1 12925 17 39 07 17 39 23 --- 22 30 13 55.0 50.5 -3.9 -81.2 11 F 1 13137 17 39 23 KR143 22 30 13 55.0 50.1 -3.9 -81.6 -5 1 1 13137 17 39 23 17 39 43 --- 22 30 33 55.1 50.1 -3.9 -81.6 15 F 1 13403 17 39 43 S_PER 22 30 33 55.0 50.5 -3.9 -81.3 -5 1 1 13403 17 39 43 17 39 59 --- 22 30 49 55.0 50.5 -3.9 -81.3 11 F 1 13616 17 39 59 KR143 22 30 49 55.1 50.1 -3.9 -81.7 -5 1 1 13616 17 39 59 17 40 19 --- 22 31 09 55.2 50.1 -3.9 -81.7 15 F 1 13882 17 40 19 S_PER 22 31 09 55.1 50.5 -3.9 -81.4 -5 1 1 13882 17 40 19 17 40 35 --- 22 31 25 55.1 50.5 -3.9 -81.4 11 F 1 14095 17 40 35 KR143 22 31 25 55.2 50.1 -3.9 -81.8 -5 1 1 14095 17 40 35 17 40 55 --- 22 31 45 55.2 50.2 -3.9 -81.8 15 F 1 14361 17 40 55 S_PER 22 31 45 55.2 50.5 -3.9 -81.5 -5 1 1 14361 17 40 55 17 41 11 --- 22 32 01 55.2 50.5 -3.9 -81.5 11 F 1 14573 17 41 11 KR143 22 32 01 55.3 50.2 -3.8 -81.9 -5 1 1 14573 17 41 11 17 41 31 --- 22 32 21 55.3 50.2 -3.8 -82.0 15 F 1 14839 17 41 31 S_PER 22 32 21 55.2 50.5 -3.8 -81.6 -5 1 1 14839 17 41 31 17 41 47 --- 22 32 37 55.3 50.6 -3.8 -81.6 11 F 1 15052 17 41 47 KR143 22 32 37 55.3 50.2 -3.8 -82.0 -5 1 1 15052 17 41 47 17 42 07 --- 22 32 57 55.4 50.2 -3.8 -82.1 15 F 1 15318 Schedule for VLBA_BR (Code Br ) Page 6 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 17 42 07 S_PER 22 32 57 55.3 50.6 -3.8 -81.7 -5 1 1 15318 17 42 07 17 42 23 --- 22 33 13 55.3 50.6 -3.8 -81.8 11 F 1 15531 17 42 23 KR143 22 33 13 55.4 50.2 -3.8 -82.1 -5 1 1 15531 17 42 23 17 42 43 --- 22 33 33 55.5 50.2 -3.8 -82.2 15 F 1 15797 17 42 43 S_PER 22 33 33 55.4 50.6 -3.8 -81.8 -5 1 1 15797 17 42 43 17 42 59 --- 22 33 49 55.4 50.6 -3.8 -81.9 11 F 1 16010 17 42 59 KR143 22 33 49 55.5 50.2 -3.8 -82.2 -5 1 1 16010 17 42 59 17 43 19 --- 22 34 09 55.5 50.2 -3.8 -82.3 15 F 1 16275 17 43 19 S_PER 22 34 09 55.5 50.6 -3.8 -81.9 -5 1 1 16275 17 43 19 17 43 35 --- 22 34 25 55.5 50.6 -3.8 -82.0 11 F 1 16488 17 43 35 KR143 22 34 25 55.6 50.2 -3.8 -82.3 -5 1 1 16488 17 43 35 17 43 55 --- 22 34 45 55.6 50.2 -3.8 -82.4 15 F 1 16754 17 43 55 S_PER 22 34 45 55.5 50.6 -3.8 -82.0 -5 1 1 16754 17 43 55 17 44 10 --- 22 35 01 55.6 50.6 -3.8 -82.1 11 F 1 16967 17 44 10 KR143 22 35 01 55.6 50.3 -3.8 -82.5 -5 1 1 16967 17 44 10 17 44 30 --- 22 35 21 55.7 50.3 -3.8 -82.5 15 F 1 17233 17 44 30 S_PER 22 35 21 55.6 50.6 -3.8 -82.1 -5 1 2 17233 17 44 30 17 44 46 --- 22 35 37 55.7 50.6 -3.8 -82.2 11 R 1 17020 17 44 46 KR143 22 35 37 55.7 50.3 -3.8 -82.6 -5 1 2 17020 17 44 46 17 45 06 --- 22 35 57 55.8 50.3 -3.8 -82.6 15 R 1 16754 17 45 06 S_PER 22 35 57 55.7 50.7 -3.8 -82.3 -5 1 2 16754 17 45 06 17 45 22 --- 22 36 13 55.7 50.7 -3.8 -82.3 11 R 1 16541 17 45 22 KR143 22 36 13 55.8 50.3 -3.8 -82.7 -5 1 2 16541 17 45 22 17 45 42 --- 22 36 33 55.8 50.3 -3.8 -82.7 15 R 1 16275 17 45 42 S_PER 22 36 33 55.8 50.7 -3.8 -82.4 -5 1 2 16275 17 45 42 17 45 58 --- 22 36 49 55.8 50.7 -3.8 -82.4 11 R 1 16063 17 45 58 KR143 22 36 49 55.9 50.3 -3.8 -82.8 -5 1 2 16063 17 45 58 17 46 18 --- 22 37 09 55.9 50.3 -3.8 -82.9 15 R 1 15797 Schedule for VLBA_BR (Code Br ) Page 7 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 17 46 18 S_PER 22 37 09 55.9 50.7 -3.8 -82.5 -5 1 2 15797 17 46 18 17 46 34 --- 22 37 25 55.9 50.7 -3.8 -82.5 11 R 1 15584 17 46 34 KR143 22 37 25 56.0 50.3 -3.8 -82.9 -5 1 2 15584 17 46 34 17 46 54 --- 22 37 45 56.0 50.3 -3.8 -83.0 15 R 1 15318 17 46 54 S_PER 22 37 45 55.9 50.7 -3.8 -82.6 -5 1 2 15318 17 46 54 17 47 10 --- 22 38 01 56.0 50.7 -3.8 -82.7 11 R 1 15105 17 47 10 KR143 22 38 01 56.0 50.3 -3.7 -83.0 -5 1 2 15105 17 47 10 17 47 30 --- 22 38 21 56.1 50.4 -3.7 -83.1 15 R 1 14839 17 47 30 S_PER 22 38 21 56.0 50.7 -3.7 -82.7 -5 1 2 14839 17 47 30 17 47 46 --- 22 38 37 56.0 50.7 -3.7 -82.8 11 R 1 14627 17 47 46 KR143 22 38 37 56.1 50.4 -3.7 -83.1 -5 1 2 14627 17 47 46 17 48 06 --- 22 38 57 56.2 50.4 -3.7 -83.2 15 R 1 14361 17 48 06 S_PER 22 38 57 56.1 50.7 -3.7 -82.8 -5 1 2 14361 17 48 06 17 48 22 --- 22 39 13 56.1 50.8 -3.7 -82.9 11 R 1 14148 17 48 22 KR143 22 39 13 56.2 50.4 -3.7 -83.3 -5 1 2 14148 17 48 22 17 48 42 --- 22 39 33 56.2 50.4 -3.7 -83.3 15 R 1 13882 17 48 42 S_PER 22 39 33 56.2 50.8 -3.7 -82.9 -5 1 2 13882 17 48 42 17 48 58 --- 22 39 49 56.2 50.8 -3.7 -83.0 11 R 1 13669 17 48 58 KR143 22 39 49 56.3 50.4 -3.7 -83.4 -5 1 2 13669 17 48 58 17 49 18 --- 22 40 09 56.3 50.4 -3.7 -83.4 15 R 1 13403 17 49 18 S_PER 22 40 09 56.2 50.8 -3.7 -83.1 -5 1 2 13403 17 49 18 17 49 34 --- 22 40 25 56.3 50.8 -3.7 -83.1 11 R 1 13191 17 49 34 KR143 22 40 25 56.3 50.4 -3.7 -83.5 -5 1 2 13191 17 49 34 17 49 54 --- 22 40 45 56.4 50.4 -3.7 -83.6 15 R 1 12925 17 49 54 S_PER 22 40 45 56.3 50.8 -3.7 -83.2 -5 1 2 12925 17 49 54 17 50 09 --- 22 41 01 56.4 50.8 -3.7 -83.2 11 R 1 12712 17 50 09 KR143 22 41 01 56.4 50.4 -3.7 -83.6 -5 1 2 12712 17 50 09 17 50 29 --- 22 41 21 56.5 50.4 -3.7 -83.7 15 R 1 12446 Schedule for VLBA_BR (Code Br ) Page 8 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 17 50 29 S_PER 22 41 21 56.4 50.8 -3.7 -83.3 -5 1 2 12446 17 50 29 17 50 45 --- 22 41 37 56.4 50.8 -3.7 -83.3 11 R 1 12233 17 50 45 KR143 22 41 37 56.5 50.4 -3.7 -83.7 -5 1 2 12233 17 50 45 17 51 05 --- 22 41 57 56.5 50.4 -3.7 -83.8 15 R 1 11967 17 51 05 S_PER 22 41 57 56.5 50.8 -3.7 -83.4 -5 1 2 11967 17 51 05 17 51 21 --- 22 42 13 56.5 50.8 -3.7 -83.4 11 R 1 11754 17 51 21 KR143 22 42 13 56.6 50.5 -3.7 -83.8 -5 1 2 11754 17 51 21 17 51 41 --- 22 42 33 56.6 50.5 -3.7 -83.9 15 R 1 11489 17 51 41 S_PER 22 42 33 56.6 50.8 -3.7 -83.5 -5 1 2 11489 17 51 41 17 51 57 --- 22 42 49 56.6 50.9 -3.7 -83.6 11 R 1 11276 17 51 57 KR143 22 42 49 56.6 50.5 -3.7 -83.9 -5 1 2 11276 17 51 57 17 52 17 --- 22 43 09 56.7 50.5 -3.7 -84.0 15 R 1 11010 17 52 17 S_PER 22 43 09 56.6 50.9 -3.7 -83.6 -5 1 2 11010 17 52 17 17 52 33 --- 22 43 25 56.7 50.9 -3.7 -83.7 11 R 1 10797 17 52 33 KR143 22 43 25 56.7 50.5 -3.7 -84.1 -5 1 2 10797 17 52 33 17 52 53 --- 22 43 45 56.8 50.5 -3.7 -84.1 15 R 1 10531 17 52 53 S_PER 22 43 45 56.7 50.9 -3.7 -83.7 -5 1 2 10531 17 52 53 17 53 09 --- 22 44 01 56.7 50.9 -3.7 -83.8 11 R 1 10318 17 53 09 KR143 22 44 01 56.8 50.5 -3.6 -84.2 -5 1 2 10318 17 53 09 17 53 29 --- 22 44 21 56.8 50.5 -3.6 -84.2 15 R 1 10052 17 53 29 S_PER 22 44 21 56.8 50.9 -3.6 -83.9 -5 1 2 10052 17 53 29 17 53 45 --- 22 44 37 56.8 50.9 -3.6 -83.9 11 R 1 9840 17 53 45 KR143 22 44 37 56.9 50.5 -3.6 -84.3 -5 1 2 9840 17 53 45 17 54 05 --- 22 44 57 56.9 50.5 -3.6 -84.4 15 R 1 9574 17 54 05 S_PER 22 44 57 56.9 50.9 -3.6 -84.0 -5 1 2 9574 17 54 05 17 54 21 --- 22 45 13 56.9 50.9 -3.6 -84.0 11 R 1 9361 17 54 21 KR143 22 45 13 57.0 50.5 -3.6 -84.4 -5 1 2 9361 17 54 21 17 54 41 --- 22 45 33 57.0 50.5 -3.6 -84.5 15 R 1 9095 Schedule for VLBA_BR (Code Br ) Page 9 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 17 54 41 S_PER 22 45 33 56.9 50.9 -3.6 -84.1 -5 1 2 9095 17 54 41 17 54 57 --- 22 45 49 57.0 50.9 -3.6 -84.1 11 R 1 8882 17 54 57 KR143 22 45 49 57.0 50.5 -3.6 -84.5 -5 1 2 8882 17 54 57 17 55 17 --- 22 46 09 57.1 50.5 -3.6 -84.6 15 R 1 8616 17 56 16 J0102+58 22 47 09 67.6 50.0 -2.3 -102.4 33 1 2 8616 17 56 16 17 59 16 --- 22 50 09 67.9 49.8 -2.2 -103.2 180 R 1 6223 Next scan frequencies: 15360.00 15376.00 Next BBC frequencies: 760.00 776.00 18 00 16 J0102+58 22 51 09 68.1 49.7 -2.2 -103.5 54 1 2 6223 18 00 16 18 03 15 --- 22 54 09 68.5 49.5 -2.1 -104.4 180 R 1 3830 18 03 15 J0244+62 22 54 09 55.6 43.7 -3.9 -87.1 -32 1 2 3830 18 03 15 18 03 45 --- 22 54 39 55.6 43.7 -3.8 -87.2 -2 R 1 3431 18 03 45 KR143 22 54 39 58.2 50.7 -3.5 -86.3 -11 1 2 3431 18 03 45 18 04 15 --- 22 55 09 58.2 50.7 -3.5 -86.4 19 R 1 3032 18 04 15 J0244+62 22 55 09 55.7 43.7 -3.8 -87.3 -11 1 2 3032 18 04 15 18 04 45 --- 22 55 39 55.7 43.7 -3.8 -87.5 19 R 1 2633 18 04 45 KR143 22 55 39 58.3 50.7 -3.5 -86.5 -11 1 2 2633 18 04 45 18 05 15 --- 22 56 09 58.4 50.7 -3.4 -86.6 19 R 1 2234 18 05 15 J0244+62 22 56 09 55.8 43.7 -3.8 -87.6 -11 1 2 2234 18 05 15 18 05 45 --- 22 56 39 55.9 43.8 -3.8 -87.7 19 R 1 1835 18 05 45 KR143 22 56 39 58.4 50.7 -3.4 -86.7 -11 1 2 1835 18 05 45 18 06 15 --- 22 57 09 58.5 50.8 -3.4 -86.8 19 R 1 1436 18 06 15 J0244+62 22 57 09 55.9 43.8 -3.8 -87.8 -11 1 2 1436 18 06 15 18 06 45 --- 22 57 39 56.0 43.8 -3.8 -87.9 19 R 1 1037 18 06 45 KR143 22 57 39 58.6 50.8 -3.4 -86.9 -11 1 2 1037 18 06 45 18 07 15 --- 22 58 09 58.6 50.8 -3.4 -87.0 19 R 1 638 18 07 15 J0244+62 22 58 09 56.0 43.8 -3.8 -88.0 -11 1 2 638 18 07 15 18 07 45 --- 22 58 39 56.1 43.8 -3.8 -88.1 19 R 1 239 Schedule for VLBA_BR (Code Br ) Page 10 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 07 45 KR143 22 58 39 58.7 50.8 -3.4 -87.1 -11 1 1 239 18 07 45 18 08 15 --- 22 59 09 58.8 50.8 -3.4 -87.2 19 F 2 638 18 08 15 J0244+62 22 59 09 56.2 43.8 -3.8 -88.2 -11 1 1 638 18 08 15 18 08 44 --- 22 59 39 56.2 43.8 -3.8 -88.3 19 F 2 1037 18 08 44 KR143 22 59 39 58.8 50.8 -3.4 -87.3 -11 1 1 1037 18 08 44 18 09 14 --- 23 00 09 58.9 50.8 -3.4 -87.4 19 F 2 1436 18 09 14 J0244+62 23 00 09 56.3 43.8 -3.8 -88.4 -11 1 1 1436 18 09 14 18 09 44 --- 23 00 39 56.3 43.8 -3.7 -88.5 19 F 2 1835 18 09 44 KR143 23 00 39 58.9 50.8 -3.4 -87.5 -11 1 1 1835 18 09 44 18 10 14 --- 23 01 09 59.0 50.8 -3.4 -87.6 19 F 2 2234 18 10 14 J0244+62 23 01 09 56.4 43.8 -3.7 -88.6 -11 1 1 2234 18 10 14 18 10 44 --- 23 01 39 56.4 43.8 -3.7 -88.7 19 F 2 2633 18 10 44 KR143 23 01 39 59.1 50.8 -3.4 -87.7 -11 1 1 2633 18 10 44 18 11 14 --- 23 02 09 59.1 50.8 -3.3 -87.8 19 F 2 3032 18 11 14 J0244+62 23 02 09 56.5 43.8 -3.7 -88.9 -11 1 1 3032 18 11 14 18 11 44 --- 23 02 39 56.6 43.8 -3.7 -89.0 19 F 2 3431 18 11 44 KR143 23 02 39 59.2 50.8 -3.3 -87.9 -11 1 1 3431 18 11 44 18 12 14 --- 23 03 09 59.3 50.8 -3.3 -88.0 19 F 2 3830 18 12 14 J0244+62 23 03 09 56.6 43.8 -3.7 -89.1 -11 1 1 3830 18 12 14 18 12 44 --- 23 03 39 56.7 43.8 -3.7 -89.2 19 F 2 4228 18 12 44 KR143 23 03 39 59.3 50.8 -3.3 -88.1 -11 1 1 4228 18 12 44 18 13 14 --- 23 04 09 59.4 50.8 -3.3 -88.2 19 F 2 4627 18 13 14 J0244+62 23 04 09 56.7 43.8 -3.7 -89.3 -11 1 1 4627 18 13 14 18 13 44 --- 23 04 39 56.8 43.8 -3.7 -89.4 19 F 2 5026 18 13 44 KR143 23 04 39 59.5 50.8 -3.3 -88.3 -11 1 1 5026 18 13 44 18 14 14 --- 23 05 09 59.5 50.8 -3.3 -88.4 19 F 2 5425 18 14 14 J0244+62 23 05 09 56.8 43.8 -3.7 -89.5 -11 1 1 5425 18 14 14 18 14 43 --- 23 05 39 56.9 43.8 -3.7 -89.6 19 F 2 5824 Schedule for VLBA_BR (Code Br ) Page 11 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 14 43 KR143 23 05 39 59.6 50.8 -3.3 -88.5 -11 1 1 5824 18 14 43 18 15 13 --- 23 06 09 59.7 50.8 -3.3 -88.6 19 F 2 6223 18 15 13 J0244+62 23 06 09 57.0 43.8 -3.7 -89.7 -11 1 1 6223 18 15 13 18 15 43 --- 23 06 39 57.0 43.8 -3.6 -89.8 19 F 2 6622 18 15 43 KR143 23 06 39 59.7 50.8 -3.3 -88.7 -11 1 1 6622 18 15 43 18 16 13 --- 23 07 09 59.8 50.8 -3.3 -88.8 19 F 2 7021 18 16 13 J0244+62 23 07 09 57.1 43.8 -3.6 -90.0 -11 1 1 7021 18 16 13 18 16 43 --- 23 07 39 57.1 43.8 -3.6 -90.1 18 F 2 7420 18 16 43 KR143 23 07 39 59.9 50.8 -3.3 -88.9 -11 1 1 7420 18 16 43 18 17 13 --- 23 08 09 59.9 50.9 -3.2 -89.0 18 F 2 7819 18 17 13 J0244+62 23 08 09 57.2 43.8 -3.6 -90.2 -11 1 1 7819 18 17 13 18 17 43 --- 23 08 39 57.3 43.8 -3.6 -90.3 18 F 2 8217 18 17 43 KR143 23 08 39 60.0 50.9 -3.2 -89.2 -11 1 1 8217 18 17 43 18 18 13 --- 23 09 09 60.0 50.9 -3.2 -89.3 18 F 2 8616 18 18 13 J0244+62 23 09 09 57.3 43.8 -3.6 -90.4 -11 1 1 8616 18 18 13 18 18 43 --- 23 09 39 57.4 43.8 -3.6 -90.5 18 F 2 9015 18 18 43 KR143 23 09 39 60.1 50.9 -3.2 -89.4 -11 1 1 9015 18 18 43 18 19 13 --- 23 10 09 60.2 50.9 -3.2 -89.5 18 F 2 9414 18 19 13 J0244+62 23 10 09 57.4 43.8 -3.6 -90.6 -12 1 1 9414 18 19 13 18 19 43 --- 23 10 39 57.5 43.8 -3.6 -90.7 18 F 2 9813 18 19 43 KR143 23 10 39 60.2 50.9 -3.2 -89.6 -12 1 1 9813 18 19 43 18 20 13 --- 23 11 09 60.3 50.9 -3.2 -89.7 18 F 2 10212 18 20 13 J0244+62 23 11 09 57.5 43.8 -3.6 -90.8 -12 1 1 10212 18 20 13 18 20 42 --- 23 11 39 57.6 43.8 -3.6 -91.0 18 F 2 10611 18 20 42 KR143 23 11 39 60.4 50.9 -3.2 -89.8 -12 1 1 10611 18 20 42 18 21 12 --- 23 12 09 60.4 50.9 -3.2 -89.9 18 F 2 11010 18 21 12 J0244+62 23 12 09 57.7 43.8 -3.6 -91.1 -12 1 1 11010 18 21 12 18 21 42 --- 23 12 39 57.7 43.8 -3.5 -91.2 18 F 2 11409 Schedule for VLBA_BR (Code Br ) Page 12 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 21 42 KR143 23 12 39 60.5 50.9 -3.2 -90.0 -12 1 1 11409 18 21 42 18 22 12 --- 23 13 09 60.6 50.9 -3.2 -90.1 18 F 2 11808 18 22 12 J0244+62 23 13 09 57.8 43.8 -3.5 -91.3 -12 1 1 11808 18 22 12 18 22 42 --- 23 13 39 57.8 43.8 -3.5 -91.4 18 F 2 12207 18 22 42 KR143 23 13 39 60.6 50.9 -3.2 -90.2 -12 1 1 12207 18 22 42 18 23 12 --- 23 14 09 60.7 50.9 -3.1 -90.3 18 F 2 12605 18 24 12 J0102+58 23 15 09 71.1 47.0 -1.8 -111.1 33 1 1 12605 18 24 12 18 27 11 --- 23 18 09 71.4 46.6 -1.7 -112.2 180 F 2 14999 Next scan frequencies: 22229.04 22244.02 Next BBC frequencies: 729.04 744.02 18 28 11 J0102+58 23 19 09 71.6 46.4 -1.7 -112.6 54 1 1 14999 18 28 11 18 31 11 --- 23 22 09 71.9 45.9 -1.7 -113.7 180 F 2 17392 18 31 11 S_PER 23 22 09 61.7 51.3 -3.0 -91.6 -26 1 2 17392 18 31 11 18 31 27 --- 23 22 25 61.7 51.3 -3.0 -91.7 -10 R 2 17180 18 31 27 KR143 23 22 25 61.8 50.8 -3.0 -92.1 -6 1 2 17180 18 31 27 18 31 47 --- 23 22 45 61.8 50.8 -3.0 -92.2 14 R 2 16914 18 31 47 S_PER 23 22 45 61.8 51.3 -3.0 -91.7 -6 1 2 16914 18 31 47 18 32 03 --- 23 23 01 61.8 51.3 -3.0 -91.8 10 R 2 16701 18 32 03 KR143 23 23 01 61.8 50.8 -3.0 -92.3 -6 1 2 16701 18 32 03 18 32 23 --- 23 23 21 61.9 50.8 -3.0 -92.3 14 R 2 16435 18 32 23 S_PER 23 23 21 61.9 51.3 -3.0 -91.9 -6 1 2 16435 18 32 23 18 32 39 --- 23 23 37 61.9 51.3 -3.0 -91.9 10 R 2 16222 18 32 39 KR143 23 23 37 61.9 50.8 -3.0 -92.4 -6 1 2 16222 18 32 39 18 32 58 --- 23 23 57 62.0 50.8 -3.0 -92.5 14 R 2 15956 18 32 58 S_PER 23 23 57 61.9 51.3 -3.0 -92.0 -6 1 2 15956 18 32 58 18 33 14 --- 23 24 13 62.0 51.3 -3.0 -92.1 10 R 2 15744 18 33 14 KR143 23 24 13 62.0 50.8 -3.0 -92.5 -6 1 2 15744 18 33 14 18 33 34 --- 23 24 33 62.0 50.8 -3.0 -92.6 14 R 2 15478 Schedule for VLBA_BR (Code Br ) Page 13 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 33 34 S_PER 23 24 33 62.0 51.3 -3.0 -92.1 -6 1 2 15478 18 33 34 18 33 50 --- 23 24 49 62.0 51.3 -3.0 -92.2 10 R 2 15265 18 33 50 KR143 23 24 49 62.1 50.8 -3.0 -92.7 -6 1 2 15265 18 33 50 18 34 10 --- 23 25 09 62.1 50.8 -3.0 -92.7 14 R 2 14999 18 34 10 S_PER 23 25 09 62.1 51.2 -3.0 -92.3 -6 1 2 14999 18 34 10 18 34 26 --- 23 25 25 62.1 51.2 -3.0 -92.3 10 R 2 14786 18 34 26 KR143 23 25 25 62.2 50.8 -3.0 -92.8 -6 1 2 14786 18 34 26 18 34 46 --- 23 25 45 62.2 50.8 -3.0 -92.9 14 R 2 14520 18 34 46 S_PER 23 25 45 62.2 51.2 -3.0 -92.4 -6 1 2 14520 18 34 46 18 35 02 --- 23 26 01 62.2 51.2 -3.0 -92.5 10 R 2 14307 18 35 02 KR143 23 26 01 62.2 50.8 -2.9 -92.9 -6 1 2 14307 18 35 02 18 35 22 --- 23 26 21 62.3 50.8 -2.9 -93.0 14 R 2 14042 18 35 22 S_PER 23 26 21 62.2 51.2 -2.9 -92.5 -6 1 2 14042 18 35 22 18 35 38 --- 23 26 37 62.3 51.2 -2.9 -92.6 10 R 2 13829 18 35 38 KR143 23 26 37 62.3 50.8 -2.9 -93.1 -6 1 2 13829 18 35 38 18 35 58 --- 23 26 57 62.4 50.8 -2.9 -93.2 14 R 2 13563 18 35 58 S_PER 23 26 57 62.3 51.2 -2.9 -92.7 -6 1 2 13563 18 35 58 18 36 14 --- 23 27 13 62.4 51.2 -2.9 -92.7 10 R 2 13350 18 36 14 KR143 23 27 13 62.4 50.8 -2.9 -93.2 -6 1 2 13350 18 36 14 18 36 34 --- 23 27 33 62.4 50.7 -2.9 -93.3 14 R 2 13084 18 36 34 S_PER 23 27 33 62.4 51.2 -2.9 -92.8 -6 1 2 13084 18 36 34 18 36 50 --- 23 27 49 62.4 51.2 -2.9 -92.9 10 R 2 12871 18 36 50 KR143 23 27 49 62.5 50.7 -2.9 -93.3 -6 1 2 12871 18 36 50 18 37 10 --- 23 28 09 62.5 50.7 -2.9 -93.4 14 R 2 12605 18 37 10 S_PER 23 28 09 62.5 51.2 -2.9 -92.9 -6 1 2 12605 18 37 10 18 37 26 --- 23 28 25 62.5 51.2 -2.9 -93.0 10 R 2 12393 18 37 26 KR143 23 28 25 62.5 50.7 -2.9 -93.5 -6 1 2 12393 18 37 26 18 37 46 --- 23 28 45 62.6 50.7 -2.9 -93.6 14 R 2 12127 Schedule for VLBA_BR (Code Br ) Page 14 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 37 46 S_PER 23 28 45 62.6 51.2 -2.9 -93.1 -6 1 2 12127 18 37 46 18 38 02 --- 23 29 01 62.6 51.2 -2.9 -93.1 10 R 2 11914 18 38 02 KR143 23 29 01 62.6 50.7 -2.9 -93.6 -6 1 2 11914 18 38 02 18 38 22 --- 23 29 21 62.7 50.7 -2.9 -93.7 14 R 2 11648 18 38 22 S_PER 23 29 21 62.6 51.2 -2.9 -93.2 -6 1 2 11648 18 38 22 18 38 38 --- 23 29 37 62.7 51.2 -2.9 -93.3 10 R 2 11435 18 38 38 KR143 23 29 37 62.7 50.7 -2.9 -93.8 -6 1 2 11435 18 38 38 18 38 57 --- 23 29 57 62.7 50.7 -2.9 -93.8 14 R 2 11169 18 38 57 S_PER 23 29 57 62.7 51.2 -2.9 -93.3 -6 1 2 11169 18 38 57 18 39 13 --- 23 30 13 62.7 51.2 -2.9 -93.4 10 R 2 10957 18 39 13 KR143 23 30 13 62.8 50.7 -2.9 -93.9 -6 1 2 10957 18 39 13 18 39 33 --- 23 30 33 62.8 50.7 -2.9 -94.0 14 R 2 10691 18 39 33 S_PER 23 30 33 62.8 51.2 -2.9 -93.5 -6 1 2 10691 18 39 33 18 39 49 --- 23 30 49 62.8 51.2 -2.9 -93.5 10 R 2 10478 18 39 49 KR143 23 30 49 62.9 50.7 -2.9 -94.0 -6 1 2 10478 18 39 49 18 40 09 --- 23 31 09 62.9 50.7 -2.9 -94.1 14 R 2 10212 18 40 09 S_PER 23 31 09 62.9 51.2 -2.9 -93.6 -6 1 2 10212 18 40 09 18 40 25 --- 23 31 25 62.9 51.2 -2.9 -93.7 10 R 2 9999 18 40 25 KR143 23 31 25 62.9 50.7 -2.9 -94.2 -6 1 2 9999 18 40 25 18 40 45 --- 23 31 45 63.0 50.7 -2.9 -94.3 14 R 2 9733 18 40 45 S_PER 23 31 45 62.9 51.2 -2.9 -93.8 -6 1 2 9733 18 40 45 18 41 01 --- 23 32 01 63.0 51.1 -2.9 -93.8 10 R 2 9521 18 41 01 KR143 23 32 01 63.0 50.7 -2.8 -94.3 -6 1 2 9521 18 41 01 18 41 21 --- 23 32 21 63.0 50.7 -2.8 -94.4 14 R 2 9255 18 41 21 S_PER 23 32 21 63.0 51.1 -2.8 -93.9 -6 1 2 9255 18 41 21 18 41 37 --- 23 32 37 63.1 51.1 -2.8 -94.0 10 R 2 9042 18 41 37 KR143 23 32 37 63.1 50.6 -2.8 -94.5 -6 1 2 9042 18 41 37 18 41 57 --- 23 32 57 63.1 50.6 -2.8 -94.5 14 R 2 8776 Schedule for VLBA_BR (Code Br ) Page 15 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 41 57 S_PER 23 32 57 63.1 51.1 -2.8 -94.0 -6 1 2 8776 18 41 57 18 42 13 --- 23 33 13 63.1 51.1 -2.8 -94.1 10 R 2 8563 18 42 13 KR143 23 33 13 63.2 50.6 -2.8 -94.6 -6 1 2 8563 18 42 13 18 42 33 --- 23 33 33 63.2 50.6 -2.8 -94.7 14 R 2 8297 18 42 33 S_PER 23 33 33 63.2 51.1 -2.8 -94.2 -6 1 2 8297 18 42 33 18 42 49 --- 23 33 49 63.2 51.1 -2.8 -94.2 10 R 2 8085 18 42 49 KR143 23 33 49 63.2 50.6 -2.8 -94.7 -6 1 2 8085 18 42 49 18 43 09 --- 23 34 09 63.3 50.6 -2.8 -94.8 14 R 2 7819 18 43 09 S_PER 23 34 09 63.3 51.1 -2.8 -94.3 -6 1 2 7819 18 43 09 18 43 25 --- 23 34 25 63.3 51.1 -2.8 -94.4 10 R 2 7606 18 43 25 KR143 23 34 25 63.3 50.6 -2.8 -94.9 -6 1 2 7606 18 43 25 18 43 45 --- 23 34 45 63.4 50.6 -2.8 -95.0 14 R 2 7340 18 43 45 S_PER 23 34 45 63.3 51.1 -2.8 -94.5 -6 1 2 7340 18 43 45 18 44 01 --- 23 35 01 63.4 51.1 -2.8 -94.5 10 R 2 7127 18 44 01 KR143 23 35 01 63.4 50.6 -2.8 -95.0 -6 1 2 7127 18 44 01 18 44 21 --- 23 35 21 63.4 50.6 -2.8 -95.1 14 R 2 6861 18 44 21 S_PER 23 35 21 63.4 51.1 -2.8 -94.6 -6 1 2 6861 18 44 21 18 44 37 --- 23 35 37 63.5 51.1 -2.8 -94.7 10 R 2 6648 18 44 37 KR143 23 35 37 63.5 50.6 -2.8 -95.2 -6 1 2 6648 18 44 37 18 44 56 --- 23 35 57 63.5 50.6 -2.8 -95.2 14 R 2 6383 18 44 56 S_PER 23 35 57 63.5 51.1 -2.8 -94.7 -6 1 2 6383 18 44 56 18 45 12 --- 23 36 13 63.5 51.1 -2.8 -94.8 10 R 2 6170 18 45 12 KR143 23 36 13 63.5 50.6 -2.8 -95.3 -6 1 2 6170 18 45 12 18 45 32 --- 23 36 33 63.6 50.6 -2.8 -95.4 14 R 2 5904 18 45 32 S_PER 23 36 33 63.6 51.0 -2.8 -94.9 -6 1 2 5904 18 45 32 18 45 48 --- 23 36 49 63.6 51.0 -2.8 -94.9 10 R 2 5691 18 45 48 KR143 23 36 49 63.6 50.5 -2.8 -95.5 -6 1 2 5691 18 45 48 18 46 08 --- 23 37 09 63.7 50.5 -2.8 -95.5 14 R 2 5425 Schedule for VLBA_BR (Code Br ) Page 16 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 46 08 S_PER 23 37 09 63.6 51.0 -2.8 -95.0 -6 1 2 5425 18 46 08 18 46 24 --- 23 37 25 63.7 51.0 -2.8 -95.1 10 R 2 5212 18 46 24 KR143 23 37 25 63.7 50.5 -2.8 -95.6 -6 1 2 5212 18 46 24 18 46 44 --- 23 37 45 63.7 50.5 -2.8 -95.7 14 R 2 4946 18 46 44 S_PER 23 37 45 63.7 51.0 -2.8 -95.2 -6 1 2 4946 18 46 44 18 47 00 --- 23 38 01 63.8 51.0 -2.8 -95.2 10 R 2 4734 18 47 00 KR143 23 38 01 63.8 50.5 -2.7 -95.7 -6 1 2 4734 18 47 00 18 47 20 --- 23 38 21 63.8 50.5 -2.7 -95.8 14 R 2 4468 18 47 20 S_PER 23 38 21 63.8 51.0 -2.7 -95.3 -6 1 2 4468 18 47 20 18 47 36 --- 23 38 37 63.8 51.0 -2.7 -95.4 10 R 2 4255 18 47 36 KR143 23 38 37 63.9 50.5 -2.7 -95.9 -6 1 2 4255 18 47 36 18 47 56 --- 23 38 57 63.9 50.5 -2.7 -96.0 14 R 2 3989 18 47 56 S_PER 23 38 57 63.9 51.0 -2.7 -95.4 -6 1 2 3989 18 47 56 18 48 12 --- 23 39 13 63.9 51.0 -2.7 -95.5 10 R 2 3776 18 48 12 KR143 23 39 13 63.9 50.5 -2.7 -96.0 -6 1 2 3776 18 48 12 18 48 32 --- 23 39 33 64.0 50.5 -2.7 -96.1 14 R 2 3510 18 48 32 S_PER 23 39 33 64.0 51.0 -2.7 -95.6 -6 1 2 3510 18 48 32 18 48 48 --- 23 39 49 64.0 51.0 -2.7 -95.7 10 R 2 3298 18 48 48 KR143 23 39 49 64.0 50.5 -2.7 -96.2 -6 1 2 3298 18 48 48 18 49 08 --- 23 40 09 64.1 50.4 -2.7 -96.3 14 R 2 3032 18 49 08 S_PER 23 40 09 64.0 50.9 -2.7 -95.7 -6 1 2 3032 18 49 08 18 49 24 --- 23 40 25 64.1 50.9 -2.7 -95.8 10 R 2 2819 18 49 24 KR143 23 40 25 64.1 50.4 -2.7 -96.3 -6 1 2 2819 18 49 24 18 49 44 --- 23 40 45 64.1 50.4 -2.7 -96.4 14 R 2 2553 18 49 44 S_PER 23 40 45 64.1 50.9 -2.7 -95.9 -6 1 2 2553 18 49 44 18 50 00 --- 23 41 01 64.2 50.9 -2.7 -95.9 10 R 2 2340 18 50 00 KR143 23 41 01 64.2 50.4 -2.7 -96.5 -6 1 2 2340 18 50 00 18 50 20 --- 23 41 21 64.2 50.4 -2.7 -96.5 14 R 2 2074 Schedule for VLBA_BR (Code Br ) Page 17 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 50 20 S_PER 23 41 21 64.2 50.9 -2.7 -96.0 -6 1 2 2074 18 50 20 18 50 36 --- 23 41 37 64.2 50.9 -2.7 -96.1 10 R 2 1862 18 50 36 KR143 23 41 37 64.2 50.4 -2.7 -96.6 -6 1 2 1862 18 50 36 18 50 56 --- 23 41 57 64.3 50.4 -2.7 -96.7 14 R 2 1596 18 50 56 S_PER 23 41 57 64.3 50.9 -2.7 -96.2 -6 1 2 1596 18 50 56 18 51 11 --- 23 42 13 64.3 50.9 -2.7 -96.2 10 R 2 1383 18 51 11 KR143 23 42 13 64.3 50.4 -2.7 -96.8 -6 1 2 1383 18 51 11 18 51 31 --- 23 42 33 64.4 50.4 -2.7 -96.8 14 R 2 1117 18 51 31 S_PER 23 42 33 64.3 50.9 -2.7 -96.3 -6 1 2 1117 18 51 31 18 51 47 --- 23 42 49 64.4 50.9 -2.7 -96.4 10 R 2 904 18 51 47 KR143 23 42 49 64.4 50.4 -2.7 -96.9 -6 1 2 904 18 51 47 18 52 07 --- 23 43 09 64.4 50.3 -2.7 -97.0 14 R 2 638 18 52 07 S_PER 23 43 09 64.4 50.9 -2.7 -96.5 -6 1 2 638 18 52 07 18 52 23 --- 23 43 25 64.5 50.8 -2.7 -96.5 10 R 2 426 18 52 23 KR143 23 43 25 64.5 50.3 -2.7 -97.1 -6 1 3 426 18 52 23 18 52 43 --- 23 43 45 64.5 50.3 -2.7 -97.1 14 F 1 691 18 52 43 S_PER 23 43 45 64.5 50.8 -2.7 -96.6 -6 1 3 691 18 52 43 18 52 59 --- 23 44 01 64.5 50.8 -2.7 -96.7 10 F 1 904 18 52 59 KR143 23 44 01 64.6 50.3 -2.6 -97.2 -6 1 3 904 18 52 59 18 53 19 --- 23 44 21 64.6 50.3 -2.6 -97.3 14 F 1 1170 18 53 19 S_PER 23 44 21 64.6 50.8 -2.6 -96.8 -6 1 3 1170 18 53 19 18 53 35 --- 23 44 37 64.6 50.8 -2.6 -96.8 10 F 1 1383 18 53 35 KR143 23 44 37 64.6 50.3 -2.6 -97.4 -6 1 3 1383 18 53 35 18 53 55 --- 23 44 57 64.7 50.3 -2.6 -97.4 14 F 1 1649 18 53 55 S_PER 23 44 57 64.7 50.8 -2.6 -96.9 -6 1 3 1649 18 53 55 18 54 11 --- 23 45 13 64.7 50.8 -2.6 -97.0 10 F 1 1862 18 54 11 KR143 23 45 13 64.7 50.3 -2.6 -97.5 -6 1 3 1862 18 54 11 18 54 31 --- 23 45 33 64.7 50.2 -2.6 -97.6 14 F 1 2128 Schedule for VLBA_BR (Code Br ) Page 18 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 54 31 S_PER 23 45 33 64.7 50.8 -2.6 -97.1 -6 1 3 2128 18 54 31 18 54 47 --- 23 45 49 64.8 50.8 -2.6 -97.1 10 F 1 2340 18 54 47 KR143 23 45 49 64.8 50.2 -2.6 -97.7 -6 1 3 2340 18 54 47 18 55 07 --- 23 46 09 64.8 50.2 -2.6 -97.7 14 F 1 2606 18 55 07 S_PER 23 46 09 64.8 50.7 -2.6 -97.2 -6 1 3 2606 18 55 07 18 55 23 --- 23 46 25 64.8 50.7 -2.6 -97.3 10 F 1 2819 18 55 23 KR143 23 46 25 64.9 50.2 -2.6 -97.8 -6 1 3 2819 18 55 23 18 55 43 --- 23 46 45 64.9 50.2 -2.6 -97.9 14 F 1 3085 18 55 43 S_PER 23 46 45 64.9 50.7 -2.6 -97.3 -6 1 3 3085 18 55 43 18 55 59 --- 23 47 01 64.9 50.7 -2.6 -97.4 10 F 1 3298 18 55 59 KR143 23 47 01 64.9 50.2 -2.6 -98.0 -6 1 3 3298 18 55 59 18 56 19 --- 23 47 21 65.0 50.2 -2.6 -98.0 14 F 1 3564 18 56 19 S_PER 23 47 21 65.0 50.7 -2.6 -97.5 -6 1 3 3564 18 56 19 18 56 35 --- 23 47 37 65.0 50.7 -2.6 -97.6 10 F 1 3776 18 56 35 KR143 23 47 37 65.0 50.2 -2.6 -98.1 -6 1 3 3776 18 56 35 18 56 55 --- 23 47 57 65.1 50.1 -2.6 -98.2 14 F 1 4042 18 56 55 S_PER 23 47 57 65.0 50.7 -2.6 -97.6 -6 1 3 4042 18 56 55 18 57 10 --- 23 48 13 65.1 50.7 -2.6 -97.7 10 F 1 4255 18 57 10 KR143 23 48 13 65.1 50.1 -2.6 -98.3 -6 1 3 4255 18 57 10 18 57 30 --- 23 48 33 65.1 50.1 -2.6 -98.3 14 F 1 4521 18 57 30 S_PER 23 48 33 65.1 50.6 -2.6 -97.8 -6 1 3 4521 18 57 30 18 57 46 --- 23 48 49 65.2 50.6 -2.6 -97.9 10 F 1 4734 18 57 46 KR143 23 48 49 65.2 50.1 -2.6 -98.4 -6 1 3 4734 18 57 46 18 58 06 --- 23 49 09 65.2 50.1 -2.6 -98.5 14 F 1 5000 18 58 06 S_PER 23 49 09 65.2 50.6 -2.6 -98.0 -6 1 3 5000 18 58 06 18 58 22 --- 23 49 25 65.2 50.6 -2.6 -98.0 10 F 1 5212 18 58 22 KR143 23 49 25 65.2 50.1 -2.6 -98.6 -6 1 3 5212 18 58 22 18 58 42 --- 23 49 45 65.3 50.1 -2.6 -98.6 14 F 1 5478 Schedule for VLBA_BR (Code Br ) Page 19 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 18 58 42 S_PER 23 49 45 65.3 50.6 -2.6 -98.1 -6 1 3 5478 18 58 42 18 58 58 --- 23 50 01 65.3 50.6 -2.6 -98.2 10 F 1 5691 18 58 58 KR143 23 50 01 65.3 50.1 -2.5 -98.7 -6 1 3 5691 18 58 58 18 59 18 --- 23 50 21 65.4 50.0 -2.5 -98.8 14 F 1 5957 18 59 18 S_PER 23 50 21 65.4 50.6 -2.5 -98.3 -6 1 3 5957 18 59 18 18 59 34 --- 23 50 37 65.4 50.6 -2.5 -98.3 10 F 1 6170 18 59 34 KR143 23 50 37 65.4 50.0 -2.5 -98.9 -6 1 3 6170 18 59 34 18 59 54 --- 23 50 57 65.4 50.0 -2.5 -99.0 14 F 1 6436 18 59 54 S_PER 23 50 57 65.4 50.5 -2.5 -98.4 -6 1 3 6436 18 59 54 19 00 10 --- 23 51 13 65.5 50.5 -2.5 -98.5 10 F 1 6648 19 00 10 KR143 23 51 13 65.5 50.0 -2.5 -99.0 -6 1 3 6648 19 00 10 19 00 30 --- 23 51 33 65.5 50.0 -2.5 -99.1 14 F 1 6914 19 01 30 J0102+58 23 52 33 75.4 38.8 -1.2 -127.0 34 1 3 6914 19 01 30 19 04 29 --- 23 55 33 75.7 37.8 -1.1 -128.6 180 F 1 9308 Next scan frequencies: 15360.00 15376.00 Next BBC frequencies: 760.00 776.00 19 05 29 J0102+58 23 56 33 75.8 37.5 -1.1 -129.1 55 1 3 9308 19 05 29 19 08 29 --- 23 59 33 76.1 36.5 -1.1 -130.7 180 F 1 11701 19 08 29 J0244+62 23 59 33 63.1 42.5 -2.8 -102.7 -32 1 3 11701 19 08 29 19 08 59 --- 00 00 03 63.1 42.4 -2.8 -102.9 -2 F 1 12100 19 08 59 KR143 00 00 03 66.6 49.5 -2.4 -101.4 -13 1 3 12100 19 08 59 19 09 28 --- 00 00 33 66.7 49.5 -2.4 -101.5 17 F 1 12499 19 09 28 J0244+62 00 00 33 63.2 42.4 -2.7 -103.0 -13 1 3 12499 19 09 28 19 09 58 --- 00 01 03 63.3 42.4 -2.7 -103.2 17 F 1 12898 19 09 58 KR143 00 01 03 66.7 49.4 -2.4 -101.6 -13 1 3 12898 19 09 58 19 10 28 --- 00 01 33 66.8 49.4 -2.4 -101.8 17 F 1 13297 19 10 28 J0244+62 00 01 33 63.3 42.3 -2.7 -103.3 -13 1 3 13297 19 10 28 19 10 58 --- 00 02 03 63.4 42.3 -2.7 -103.4 17 F 1 13696 Schedule for VLBA_BR (Code Br ) Page 20 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 10 58 KR143 00 02 03 66.9 49.4 -2.3 -101.9 -13 1 3 13696 19 10 58 19 11 28 --- 00 02 33 66.9 49.3 -2.3 -102.1 17 F 1 14095 19 11 28 J0244+62 00 02 33 63.4 42.3 -2.7 -103.6 -13 1 3 14095 19 11 28 19 11 58 --- 00 03 03 63.5 42.3 -2.7 -103.7 17 F 1 14494 19 11 58 KR143 00 03 03 67.0 49.3 -2.3 -102.2 -13 1 3 14494 19 11 58 19 12 28 --- 00 03 33 67.0 49.3 -2.3 -102.3 17 F 1 14893 19 12 28 J0244+62 00 03 33 63.5 42.2 -2.7 -103.8 -13 1 3 14893 19 12 28 19 12 58 --- 00 04 03 63.6 42.2 -2.7 -104.0 17 F 1 15291 19 12 58 KR143 00 04 03 67.1 49.2 -2.3 -102.5 -13 1 3 15291 19 12 58 19 13 28 --- 00 04 33 67.2 49.2 -2.3 -102.6 17 F 1 15690 19 13 28 J0244+62 00 04 33 63.6 42.2 -2.7 -104.1 -13 1 3 15690 19 13 28 19 13 58 --- 00 05 03 63.7 42.1 -2.7 -104.3 17 F 1 16089 19 13 58 KR143 00 05 03 67.2 49.2 -2.3 -102.8 -13 1 3 16089 19 13 58 19 14 28 --- 00 05 33 67.3 49.1 -2.3 -102.9 17 F 1 16488 19 14 28 J0244+62 00 05 33 63.8 42.1 -2.7 -104.4 -13 1 3 16488 19 14 28 19 14 58 --- 00 06 03 63.8 42.1 -2.7 -104.5 17 F 1 16887 19 14 58 KR143 00 06 03 67.4 49.1 -2.3 -103.0 -13 1 3 16887 19 14 58 19 15 27 --- 00 06 33 67.4 49.0 -2.3 -103.2 17 F 1 17286 19 15 27 J0244+62 00 06 33 63.9 42.0 -2.6 -104.7 -13 1 4 17286 19 15 27 19 15 57 --- 00 07 03 63.9 42.0 -2.6 -104.8 17 R 1 16887 19 15 57 KR143 00 07 03 67.5 49.0 -2.3 -103.3 -13 1 4 16887 19 15 57 19 16 27 --- 00 07 33 67.5 49.0 -2.3 -103.5 17 R 1 16488 19 16 27 J0244+62 00 07 33 64.0 42.0 -2.6 -105.0 -13 1 4 16488 19 16 27 19 16 57 --- 00 08 03 64.0 41.9 -2.6 -105.1 17 R 1 16089 19 16 57 KR143 00 08 03 67.6 48.9 -2.2 -103.6 -13 1 4 16089 19 16 57 19 17 27 --- 00 08 33 67.7 48.9 -2.2 -103.8 17 R 1 15690 19 17 27 J0244+62 00 08 33 64.1 41.9 -2.6 -105.2 -13 1 4 15690 19 17 27 19 17 57 --- 00 09 03 64.1 41.9 -2.6 -105.4 17 R 1 15291 Schedule for VLBA_BR (Code Br ) Page 21 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 17 57 KR143 00 09 03 67.7 48.8 -2.2 -103.9 -13 1 4 15291 19 17 57 19 18 27 --- 00 09 33 67.8 48.8 -2.2 -104.0 17 R 1 14893 19 18 27 J0244+62 00 09 33 64.2 41.8 -2.6 -105.5 -13 1 4 14893 19 18 27 19 18 57 --- 00 10 03 64.3 41.8 -2.6 -105.7 17 R 1 14494 19 18 57 KR143 00 10 03 67.9 48.8 -2.2 -104.2 -13 1 4 14494 19 18 57 19 19 27 --- 00 10 33 67.9 48.7 -2.2 -104.3 17 R 1 14095 19 19 27 J0244+62 00 10 33 64.3 41.8 -2.6 -105.8 -13 1 4 14095 19 19 27 19 19 57 --- 00 11 03 64.4 41.7 -2.6 -106.0 17 R 1 13696 19 19 57 KR143 00 11 03 68.0 48.7 -2.2 -104.5 -13 1 4 13696 19 19 57 19 20 27 --- 00 11 33 68.0 48.6 -2.2 -104.6 17 R 1 13297 19 20 27 J0244+62 00 11 33 64.4 41.7 -2.6 -106.1 -13 1 4 13297 19 20 27 19 20 57 --- 00 12 03 64.5 41.6 -2.6 -106.3 17 R 1 12898 19 20 57 KR143 00 12 03 68.1 48.6 -2.2 -104.8 -13 1 4 12898 19 20 57 19 21 26 --- 00 12 33 68.2 48.5 -2.2 -104.9 17 R 1 12499 19 21 26 J0244+62 00 12 33 64.5 41.6 -2.5 -106.4 -13 1 4 12499 19 21 26 19 21 56 --- 00 13 03 64.6 41.6 -2.5 -106.5 17 R 1 12100 19 21 56 KR143 00 13 03 68.2 48.5 -2.2 -105.1 -13 1 4 12100 19 21 56 19 22 26 --- 00 13 33 68.3 48.5 -2.2 -105.2 17 R 1 11701 19 22 26 J0244+62 00 13 33 64.6 41.5 -2.5 -106.7 -13 1 4 11701 19 22 26 19 22 56 --- 00 14 03 64.7 41.5 -2.5 -106.8 17 R 1 11302 19 22 56 KR143 00 14 03 68.4 48.4 -2.1 -105.4 -13 1 4 11302 19 22 56 19 23 26 --- 00 14 33 68.4 48.4 -2.1 -105.5 17 R 1 10903 19 23 26 J0244+62 00 14 33 64.8 41.4 -2.5 -107.0 -13 1 4 10903 19 23 26 19 23 56 --- 00 15 03 64.8 41.4 -2.5 -107.1 17 R 1 10505 19 23 56 KR143 00 15 03 68.5 48.3 -2.1 -105.7 -13 1 4 10505 19 23 56 19 24 26 --- 00 15 33 68.5 48.3 -2.1 -105.8 17 R 1 10106 19 24 26 J0244+62 00 15 33 64.9 41.4 -2.5 -107.3 -13 1 4 10106 19 24 26 19 24 56 --- 00 16 03 64.9 41.3 -2.5 -107.4 17 R 1 9707 Schedule for VLBA_BR (Code Br ) Page 22 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 24 56 KR143 00 16 03 68.6 48.2 -2.1 -106.0 -13 1 4 9707 19 24 56 19 25 26 --- 00 16 33 68.7 48.2 -2.1 -106.1 17 R 1 9308 19 25 26 J0244+62 00 16 33 65.0 41.3 -2.5 -107.6 -13 1 4 9308 19 25 26 19 25 56 --- 00 17 03 65.0 41.2 -2.5 -107.7 17 R 1 8909 19 25 56 KR143 00 17 03 68.7 48.1 -2.1 -106.3 -13 1 4 8909 19 25 56 19 26 26 --- 00 17 33 68.8 48.1 -2.1 -106.4 17 R 1 8510 19 26 26 J0244+62 00 17 33 65.1 41.2 -2.5 -107.9 -13 1 4 8510 19 26 26 19 26 56 --- 00 18 03 65.1 41.2 -2.5 -108.0 16 R 1 8111 19 26 56 KR143 00 18 03 68.9 48.0 -2.1 -106.6 -13 1 4 8111 19 26 56 19 27 26 --- 00 18 33 68.9 48.0 -2.1 -106.7 16 R 1 7712 19 27 26 J0244+62 00 18 33 65.2 41.1 -2.4 -108.2 -13 1 4 7712 19 27 26 19 27 55 --- 00 19 03 65.3 41.1 -2.4 -108.3 16 R 1 7313 19 27 55 KR143 00 19 03 69.0 47.9 -2.1 -106.9 -13 1 4 7313 19 27 55 19 28 25 --- 00 19 33 69.0 47.9 -2.1 -107.1 16 R 1 6914 19 29 25 J0102+58 00 20 33 77.9 27.5 -0.7 -144.0 36 1 4 6914 19 29 25 19 32 25 --- 00 23 33 78.2 25.9 -0.7 -146.2 180 R 1 4521 Next scan frequencies: 22229.04 22244.02 Next BBC frequencies: 729.04 744.02 19 34 24 J0102+58 00 25 33 78.3 24.8 -0.6 -147.6 113 1 4 4521 19 34 24 19 37 24 --- 00 28 33 78.5 23.2 -0.6 -149.9 180 R 1 2128 19 37 24 S_PER 00 28 33 70.2 47.4 -1.9 -109.3 -23 1 4 2128 19 37 24 19 37 40 --- 00 28 49 70.2 47.4 -1.9 -109.4 -7 R 1 1915 19 37 40 KR143 00 28 49 70.2 46.8 -1.9 -110.1 -6 1 4 1915 19 37 40 19 38 00 --- 00 29 09 70.2 46.7 -1.9 -110.2 14 R 1 1649 19 38 00 S_PER 00 29 09 70.3 47.4 -1.9 -109.5 -6 1 4 1649 19 38 00 19 38 16 --- 00 29 25 70.3 47.3 -1.9 -109.6 10 R 1 1436 19 38 16 KR143 00 29 25 70.3 46.7 -1.9 -110.3 -6 1 4 1436 19 38 16 19 38 36 --- 00 29 45 70.3 46.6 -1.9 -110.4 14 R 1 1170 Schedule for VLBA_BR (Code Br ) Page 23 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 38 36 S_PER 00 29 45 70.3 47.3 -1.9 -109.7 -6 1 4 1170 19 38 36 19 38 52 --- 00 30 01 70.4 47.3 -1.9 -109.8 10 R 1 957 19 38 52 KR143 00 30 01 70.3 46.6 -1.9 -110.5 -6 1 4 957 19 38 52 19 39 12 --- 00 30 21 70.4 46.6 -1.9 -110.6 14 R 1 691 19 39 12 S_PER 00 30 21 70.4 47.2 -1.9 -109.9 -6 1 4 691 19 39 12 19 39 28 --- 00 30 37 70.4 47.2 -1.9 -110.0 10 R 1 479 19 39 28 KR143 00 30 37 70.4 46.5 -1.9 -110.7 -6 1 4 479 19 39 28 19 39 47 --- 00 30 57 70.4 46.5 -1.9 -110.8 14 R 1 213 19 39 47 S_PER 00 30 57 70.5 47.1 -1.9 -110.1 -6 1 3 213 19 39 47 19 40 03 --- 00 31 13 70.5 47.1 -1.9 -110.2 10 F 2 426 19 40 03 KR143 00 31 13 70.5 46.4 -1.9 -110.9 -6 1 3 426 19 40 03 19 40 23 --- 00 31 33 70.5 46.4 -1.9 -111.0 14 F 2 691 19 40 23 S_PER 00 31 33 70.6 47.0 -1.9 -110.3 -6 1 3 691 19 40 23 19 40 39 --- 00 31 49 70.6 47.0 -1.9 -110.4 10 F 2 904 19 40 39 KR143 00 31 49 70.5 46.4 -1.8 -111.1 -6 1 3 904 19 40 39 19 40 59 --- 00 32 09 70.6 46.3 -1.8 -111.2 14 F 2 1170 19 40 59 S_PER 00 32 09 70.6 47.0 -1.8 -110.5 -6 1 3 1170 19 40 59 19 41 15 --- 00 32 25 70.7 46.9 -1.8 -110.6 10 F 2 1383 19 41 15 KR143 00 32 25 70.6 46.3 -1.8 -111.3 -6 1 3 1383 19 41 15 19 41 35 --- 00 32 45 70.7 46.2 -1.8 -111.4 14 F 2 1649 19 41 35 S_PER 00 32 45 70.7 46.9 -1.8 -110.7 -6 1 3 1649 19 41 35 19 41 51 --- 00 33 01 70.7 46.8 -1.8 -110.8 10 F 2 1862 19 41 51 KR143 00 33 01 70.7 46.2 -1.8 -111.5 -6 1 3 1862 19 41 51 19 42 11 --- 00 33 21 70.7 46.1 -1.8 -111.6 14 F 2 2128 19 42 11 S_PER 00 33 21 70.8 46.8 -1.8 -110.9 -6 1 3 2128 19 42 11 19 42 27 --- 00 33 37 70.8 46.8 -1.8 -111.0 10 F 2 2340 19 42 27 KR143 00 33 37 70.8 46.1 -1.8 -111.7 -6 1 3 2340 19 42 27 19 42 47 --- 00 33 57 70.8 46.1 -1.8 -111.8 14 F 2 2606 Schedule for VLBA_BR (Code Br ) Page 24 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 42 47 S_PER 00 33 57 70.8 46.7 -1.8 -111.2 -6 1 3 2606 19 42 47 19 43 03 --- 00 34 13 70.9 46.7 -1.8 -111.2 10 F 2 2819 19 43 03 KR143 00 34 13 70.8 46.0 -1.8 -111.9 -6 1 3 2819 19 43 03 19 43 23 --- 00 34 33 70.9 46.0 -1.8 -112.1 14 F 2 3085 19 43 23 S_PER 00 34 33 70.9 46.6 -1.8 -111.4 -6 1 3 3085 19 43 23 19 43 39 --- 00 34 49 71.0 46.6 -1.8 -111.5 10 F 2 3298 19 43 39 KR143 00 34 49 70.9 45.9 -1.8 -112.1 -6 1 3 3298 19 43 39 19 43 59 --- 00 35 09 70.9 45.9 -1.8 -112.3 14 F 2 3564 19 43 59 S_PER 00 35 09 71.0 46.5 -1.8 -111.6 -6 1 3 3564 19 43 59 19 44 15 --- 00 35 25 71.0 46.5 -1.8 -111.7 10 F 2 3776 19 44 15 KR143 00 35 25 71.0 45.8 -1.8 -112.4 -6 1 3 3776 19 44 15 19 44 35 --- 00 35 45 71.0 45.8 -1.8 -112.5 14 F 2 4042 19 44 35 S_PER 00 35 45 71.1 46.4 -1.8 -111.8 -6 1 3 4042 19 44 35 19 44 51 --- 00 36 01 71.1 46.4 -1.8 -111.9 10 F 2 4255 19 44 51 KR143 00 36 01 71.0 45.7 -1.8 -112.6 -6 1 3 4255 19 44 51 19 45 11 --- 00 36 21 71.1 45.7 -1.8 -112.7 14 F 2 4521 19 45 11 S_PER 00 36 21 71.1 46.4 -1.8 -112.0 -6 1 3 4521 19 45 11 19 45 27 --- 00 36 37 71.2 46.3 -1.8 -112.1 10 F 2 4734 19 45 27 KR143 00 36 37 71.1 45.6 -1.8 -112.8 -6 1 3 4734 19 45 27 19 45 47 --- 00 36 57 71.2 45.6 -1.8 -112.9 14 F 2 5000 19 45 47 S_PER 00 36 57 71.2 46.3 -1.8 -112.2 -6 1 3 5000 19 45 47 19 46 02 --- 00 37 13 71.2 46.2 -1.8 -112.3 10 F 2 5212 19 46 02 KR143 00 37 13 71.2 45.6 -1.8 -113.0 -6 1 3 5212 19 46 02 19 46 22 --- 00 37 33 71.2 45.5 -1.8 -113.1 14 F 2 5478 19 46 22 S_PER 00 37 33 71.3 46.2 -1.8 -112.4 -6 1 3 5478 19 46 22 19 46 38 --- 00 37 49 71.3 46.1 -1.8 -112.5 10 F 2 5691 19 46 38 KR143 00 37 49 71.3 45.5 -1.7 -113.2 -6 1 3 5691 19 46 38 19 46 58 --- 00 38 09 71.3 45.4 -1.7 -113.3 14 F 2 5957 Schedule for VLBA_BR (Code Br ) Page 25 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 46 58 S_PER 00 38 09 71.4 46.1 -1.7 -112.6 -6 1 3 5957 19 46 58 19 47 14 --- 00 38 25 71.4 46.0 -1.7 -112.7 10 F 2 6170 19 47 14 KR143 00 38 25 71.3 45.4 -1.7 -113.4 -6 1 3 6170 19 47 14 19 47 34 --- 00 38 45 71.4 45.3 -1.7 -113.6 14 F 2 6436 19 47 34 S_PER 00 38 45 71.4 46.0 -1.7 -112.9 -6 1 3 6436 19 47 34 19 47 50 --- 00 39 01 71.5 45.9 -1.7 -113.0 10 F 2 6648 19 47 50 KR143 00 39 01 71.4 45.3 -1.7 -113.7 -6 1 3 6648 19 47 50 19 48 10 --- 00 39 21 71.4 45.2 -1.7 -113.8 14 F 2 6914 19 48 10 S_PER 00 39 21 71.5 45.9 -1.7 -113.1 -6 1 3 6914 19 48 10 19 48 26 --- 00 39 37 71.5 45.8 -1.7 -113.2 10 F 2 7127 19 48 26 KR143 00 39 37 71.5 45.2 -1.7 -113.9 -6 1 3 7127 19 48 26 19 48 46 --- 00 39 57 71.5 45.1 -1.7 -114.0 14 F 2 7393 19 48 46 S_PER 00 39 57 71.6 45.8 -1.7 -113.3 -6 1 3 7393 19 48 46 19 49 02 --- 00 40 13 71.6 45.7 -1.7 -113.4 10 F 2 7606 19 49 02 KR143 00 40 13 71.5 45.1 -1.7 -114.1 -6 1 3 7606 19 49 02 19 49 22 --- 00 40 33 71.6 45.0 -1.7 -114.2 14 F 2 7872 19 49 22 S_PER 00 40 33 71.6 45.7 -1.7 -113.5 -6 1 3 7872 19 49 22 19 49 38 --- 00 40 49 71.7 45.7 -1.7 -113.6 10 F 2 8085 19 49 38 KR143 00 40 49 71.6 45.0 -1.7 -114.3 -6 1 3 8085 19 49 38 19 49 58 --- 00 41 09 71.7 44.9 -1.7 -114.5 14 F 2 8350 19 49 58 S_PER 00 41 09 71.7 45.6 -1.7 -113.7 -6 1 3 8350 19 49 58 19 50 14 --- 00 41 25 71.7 45.6 -1.7 -113.8 10 F 2 8563 19 50 14 KR143 00 41 25 71.7 44.9 -1.7 -114.6 -6 1 3 8563 19 50 14 19 50 34 --- 00 41 45 71.7 44.8 -1.7 -114.7 14 F 2 8829 19 50 34 S_PER 00 41 45 71.8 45.5 -1.7 -114.0 -6 1 3 8829 19 50 34 19 50 50 --- 00 42 01 71.8 45.4 -1.7 -114.1 10 F 2 9042 19 50 50 KR143 00 42 01 71.8 44.8 -1.7 -114.8 -6 1 3 9042 19 50 50 19 51 10 --- 00 42 21 71.8 44.7 -1.7 -114.9 14 F 2 9308 Schedule for VLBA_BR (Code Br ) Page 26 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 51 10 S_PER 00 42 21 71.9 45.4 -1.7 -114.2 -6 1 3 9308 19 51 10 19 51 26 --- 00 42 37 71.9 45.3 -1.7 -114.3 10 F 2 9521 19 51 26 KR143 00 42 37 71.8 44.7 -1.7 -115.0 -6 1 3 9521 19 51 26 19 51 46 --- 00 42 57 71.9 44.6 -1.7 -115.1 14 F 2 9787 19 51 46 S_PER 00 42 57 71.9 45.3 -1.7 -114.4 -6 1 3 9787 19 51 46 19 52 01 --- 00 43 13 72.0 45.2 -1.7 -114.5 10 F 2 9999 19 52 01 KR143 00 43 13 71.9 44.6 -1.7 -115.2 -6 1 3 9999 19 52 01 19 52 21 --- 00 43 33 71.9 44.5 -1.7 -115.4 14 F 2 10265 19 52 21 S_PER 00 43 33 72.0 45.2 -1.7 -114.6 -6 1 3 10265 19 52 21 19 52 37 --- 00 43 49 72.0 45.1 -1.7 -114.7 10 F 2 10478 19 52 37 KR143 00 43 49 72.0 44.4 -1.6 -115.5 -6 1 3 10478 19 52 37 19 52 57 --- 00 44 09 72.0 44.4 -1.6 -115.6 14 F 2 10744 19 52 57 S_PER 00 44 09 72.1 45.1 -1.6 -114.9 -6 1 3 10744 19 52 57 19 53 13 --- 00 44 25 72.1 45.0 -1.6 -115.0 10 F 2 10957 19 53 13 KR143 00 44 25 72.0 44.3 -1.6 -115.7 -6 1 3 10957 19 53 13 19 53 33 --- 00 44 45 72.1 44.3 -1.6 -115.8 14 F 2 11223 19 53 33 S_PER 00 44 45 72.1 45.0 -1.6 -115.1 -6 1 3 11223 19 53 33 19 53 49 --- 00 45 01 72.2 44.9 -1.6 -115.2 10 F 2 11435 19 53 49 KR143 00 45 01 72.1 44.2 -1.6 -115.9 -6 1 3 11435 19 53 49 19 54 09 --- 00 45 21 72.2 44.2 -1.6 -116.1 14 F 2 11701 19 54 09 S_PER 00 45 21 72.2 44.9 -1.6 -115.3 -6 1 3 11701 19 54 09 19 54 25 --- 00 45 37 72.2 44.8 -1.6 -115.4 10 F 2 11914 19 54 25 KR143 00 45 37 72.2 44.1 -1.6 -116.2 -6 1 3 11914 19 54 25 19 54 45 --- 00 45 57 72.2 44.1 -1.6 -116.3 14 F 2 12180 19 54 45 S_PER 00 45 57 72.3 44.8 -1.6 -115.6 -6 1 3 12180 19 54 45 19 55 01 --- 00 46 13 72.3 44.7 -1.6 -115.7 10 F 2 12393 19 55 01 KR143 00 46 13 72.3 44.0 -1.6 -116.4 -6 1 3 12393 19 55 01 19 55 21 --- 00 46 33 72.3 43.9 -1.6 -116.5 14 F 2 12659 Schedule for VLBA_BR (Code Br ) Page 27 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 55 21 S_PER 00 46 33 72.4 44.6 -1.6 -115.8 -6 1 3 12659 19 55 21 19 55 37 --- 00 46 49 72.4 44.6 -1.6 -115.9 10 F 2 12871 19 55 37 KR143 00 46 49 72.3 43.9 -1.6 -116.6 -6 1 3 12871 19 55 37 19 55 57 --- 00 47 09 72.4 43.8 -1.6 -116.8 14 F 2 13137 19 55 57 S_PER 00 47 09 72.4 44.5 -1.6 -116.0 -6 1 3 13137 19 55 57 19 56 13 --- 00 47 25 72.5 44.5 -1.6 -116.1 10 F 2 13350 19 56 13 KR143 00 47 25 72.4 43.8 -1.6 -116.9 -6 1 3 13350 19 56 13 19 56 33 --- 00 47 45 72.4 43.7 -1.6 -117.0 14 F 2 13616 19 56 33 S_PER 00 47 45 72.5 44.4 -1.6 -116.3 -6 1 3 13616 19 56 33 19 56 49 --- 00 48 01 72.5 44.4 -1.6 -116.4 10 F 2 13829 19 56 49 KR143 00 48 01 72.5 43.7 -1.6 -117.1 -6 1 3 13829 19 56 49 19 57 09 --- 00 48 21 72.5 43.6 -1.6 -117.3 14 F 2 14095 19 57 09 S_PER 00 48 21 72.6 44.3 -1.6 -116.5 -6 1 3 14095 19 57 09 19 57 25 --- 00 48 37 72.6 44.2 -1.6 -116.6 10 F 2 14307 19 57 25 KR143 00 48 37 72.5 43.5 -1.6 -117.4 -6 1 3 14307 19 57 25 19 57 45 --- 00 48 57 72.6 43.5 -1.6 -117.5 14 F 2 14573 19 57 45 S_PER 00 48 57 72.6 44.2 -1.6 -116.8 -6 1 3 14573 19 57 45 19 58 00 --- 00 49 13 72.7 44.1 -1.6 -116.9 10 F 2 14786 19 58 00 KR143 00 49 13 72.6 43.4 -1.6 -117.6 -6 1 3 14786 19 58 00 19 58 20 --- 00 49 33 72.6 43.4 -1.6 -117.7 14 F 2 15052 19 58 20 S_PER 00 49 33 72.7 44.1 -1.6 -117.0 -6 1 3 15052 19 58 20 19 58 36 --- 00 49 49 72.7 44.0 -1.6 -117.1 10 F 2 15265 19 58 36 KR143 00 49 49 72.7 43.3 -1.5 -117.8 -6 1 3 15265 19 58 36 19 58 56 --- 00 50 09 72.7 43.2 -1.5 -118.0 14 F 2 15531 19 58 56 S_PER 00 50 09 72.8 43.9 -1.5 -117.2 -6 1 3 15531 19 58 56 19 59 12 --- 00 50 25 72.8 43.9 -1.5 -117.3 10 F 2 15744 19 59 12 KR143 00 50 25 72.7 43.2 -1.5 -118.1 -6 1 3 15744 19 59 12 19 59 32 --- 00 50 45 72.8 43.1 -1.5 -118.2 14 F 2 16009 Schedule for VLBA_BR (Code Br ) Page 28 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 19 59 32 S_PER 00 50 45 72.8 43.8 -1.5 -117.5 -6 1 3 16009 19 59 32 19 59 48 --- 00 51 01 72.9 43.8 -1.5 -117.6 10 F 2 16222 19 59 48 KR143 00 51 01 72.8 43.1 -1.5 -118.3 -6 1 3 16222 19 59 48 20 00 08 --- 00 51 21 72.8 43.0 -1.5 -118.5 14 F 2 16488 20 00 08 S_PER 00 51 21 72.9 43.7 -1.5 -117.7 -6 1 3 16488 20 00 08 20 00 24 --- 00 51 37 72.9 43.6 -1.5 -117.8 10 F 2 16701 20 00 24 KR143 00 51 37 72.9 42.9 -1.5 -118.6 -6 1 3 16701 20 00 24 20 00 44 --- 00 51 57 72.9 42.9 -1.5 -118.7 14 F 2 16967 20 00 44 S_PER 00 51 57 73.0 43.6 -1.5 -118.0 -6 1 3 16967 20 00 44 20 01 00 --- 00 52 13 73.0 43.5 -1.5 -118.1 10 F 2 17180 20 01 00 KR143 00 52 13 72.9 42.8 -1.5 -118.8 -6 1 4 17180 20 01 00 20 01 20 --- 00 52 33 73.0 42.7 -1.5 -119.0 14 R 2 16914 20 01 20 S_PER 00 52 33 73.0 43.4 -1.5 -118.2 -6 1 4 16914 20 01 20 20 01 36 --- 00 52 49 73.1 43.4 -1.5 -118.3 10 R 2 16701 20 01 36 KR143 00 52 49 73.0 42.7 -1.5 -119.1 -6 1 4 16701 20 01 36 20 01 56 --- 00 53 09 73.0 42.6 -1.5 -119.2 14 R 2 16435 20 01 56 S_PER 00 53 09 73.1 43.3 -1.5 -118.5 -6 1 4 16435 20 01 56 20 02 12 --- 00 53 25 73.1 43.3 -1.5 -118.6 10 R 2 16222 20 02 12 KR143 00 53 25 73.1 42.5 -1.5 -119.3 -6 1 4 16222 20 02 12 20 02 32 --- 00 53 45 73.1 42.5 -1.5 -119.5 14 R 2 15956 20 02 32 S_PER 00 53 45 73.2 43.2 -1.5 -118.7 -6 1 4 15956 20 02 32 20 02 48 --- 00 54 01 73.2 43.1 -1.5 -118.8 10 R 2 15744 20 02 48 KR143 00 54 01 73.1 42.4 -1.5 -119.6 -6 1 4 15744 20 02 48 20 03 08 --- 00 54 21 73.2 42.3 -1.5 -119.7 14 R 2 15478 20 03 08 S_PER 00 54 21 73.3 43.1 -1.5 -119.0 -6 1 4 15478 20 03 08 20 03 24 --- 00 54 37 73.3 43.0 -1.5 -119.1 10 R 2 15265 20 03 24 KR143 00 54 37 73.2 42.3 -1.5 -119.9 -6 1 4 15265 20 03 24 20 03 44 --- 00 54 57 73.2 42.2 -1.5 -120.0 14 R 2 14999 Schedule for VLBA_BR (Code Br ) Page 29 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 03 44 S_PER 00 54 57 73.3 42.9 -1.5 -119.2 -6 1 4 14999 20 03 44 20 04 00 --- 00 55 13 73.4 42.9 -1.5 -119.3 10 R 2 14786 20 04 00 KR143 00 55 13 73.3 42.1 -1.5 -120.1 -6 1 4 14786 20 04 00 20 04 19 --- 00 55 33 73.3 42.1 -1.5 -120.3 14 R 2 14520 20 04 19 S_PER 00 55 33 73.4 42.8 -1.5 -119.5 -6 1 4 14520 20 04 19 20 04 35 --- 00 55 49 73.4 42.7 -1.5 -119.6 10 R 2 14307 20 04 35 KR143 00 55 49 73.3 42.0 -1.4 -120.4 -6 1 4 14307 20 04 35 20 04 55 --- 00 56 09 73.4 41.9 -1.4 -120.5 14 R 2 14042 20 04 55 S_PER 00 56 09 73.5 42.7 -1.4 -119.7 -6 1 4 14042 20 04 55 20 05 11 --- 00 56 25 73.5 42.6 -1.4 -119.9 10 R 2 13829 20 05 11 KR143 00 56 25 73.4 41.9 -1.4 -120.6 -6 1 4 13829 20 05 11 20 05 31 --- 00 56 45 73.4 41.8 -1.4 -120.8 14 R 2 13563 20 05 31 S_PER 00 56 45 73.5 42.5 -1.4 -120.0 -6 1 4 13563 20 05 31 20 05 47 --- 00 57 01 73.6 42.5 -1.4 -120.1 10 R 2 13350 20 05 47 KR143 00 57 01 73.5 41.7 -1.4 -120.9 -6 1 4 13350 20 05 47 20 06 07 --- 00 57 21 73.5 41.7 -1.4 -121.0 14 R 2 13084 20 06 07 S_PER 00 57 21 73.6 42.4 -1.4 -120.3 -6 1 4 13084 20 06 07 20 06 23 --- 00 57 37 73.6 42.3 -1.4 -120.4 10 R 2 12871 20 06 23 KR143 00 57 37 73.5 41.6 -1.4 -121.2 -6 1 4 12871 20 06 23 20 06 43 --- 00 57 57 73.6 41.5 -1.4 -121.3 14 R 2 12605 20 07 43 J0102+58 00 58 57 79.7 2.9 -0.1 -176.3 28 1 4 12605 20 07 43 20 10 42 --- 01 01 57 79.7 0.7 0.0 -179.1 180 R 2 10212 Next scan frequencies: 15360.00 15376.00 Next BBC frequencies: 760.00 776.00 20 11 42 NRAO150 01 02 57 61.6 67.4 -2.9 -78.2 9 1 4 10212 20 11 42 20 14 42 --- 01 05 57 62.1 67.6 -2.9 -78.6 180 R 2 7819 20 14 42 J0244+62 01 05 57 70.1 34.7 -1.7 -124.6 -28 1 4 7819 20 14 42 20 15 12 --- 01 06 27 70.1 34.6 -1.6 -124.8 2 R 2 7420 Schedule for VLBA_BR (Code Br ) Page 30 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 15 12 KR143 01 06 27 74.5 39.3 -1.3 -125.2 -15 1 4 7420 20 15 12 20 15 42 --- 01 06 57 74.6 39.2 -1.3 -125.5 15 R 2 7021 20 15 42 J0244+62 01 06 57 70.2 34.5 -1.6 -125.0 -15 1 4 7021 20 15 42 20 16 12 --- 01 07 27 70.2 34.4 -1.6 -125.2 15 R 2 6622 20 16 12 KR143 01 07 27 74.6 39.0 -1.3 -125.7 -15 1 4 6622 20 16 12 20 16 41 --- 01 07 57 74.7 38.9 -1.2 -126.0 15 R 2 6223 20 16 41 J0244+62 01 07 57 70.3 34.3 -1.6 -125.4 -15 1 4 6223 20 16 41 20 17 11 --- 01 08 27 70.3 34.2 -1.6 -125.6 15 R 2 5824 20 17 11 KR143 01 08 27 74.7 38.7 -1.2 -126.2 -15 1 4 5824 20 17 11 20 17 41 --- 01 08 57 74.8 38.6 -1.2 -126.5 15 R 2 5425 20 17 41 J0244+62 01 08 57 70.4 34.1 -1.6 -125.8 -15 1 4 5425 20 17 41 20 18 11 --- 01 09 27 70.4 34.0 -1.6 -126.0 15 R 2 5026 20 18 11 KR143 01 09 27 74.8 38.5 -1.2 -126.7 -15 1 4 5026 20 18 11 20 18 41 --- 01 09 57 74.9 38.3 -1.2 -127.0 15 R 2 4627 20 18 41 J0244+62 01 09 57 70.5 33.9 -1.6 -126.2 -15 1 4 4627 20 18 41 20 19 11 --- 01 10 27 70.5 33.8 -1.6 -126.4 15 R 2 4228 20 19 11 KR143 01 10 27 74.9 38.2 -1.2 -127.2 -15 1 4 4228 20 19 11 20 19 41 --- 01 10 57 75.0 38.0 -1.2 -127.5 15 R 2 3830 20 19 41 J0244+62 01 10 57 70.6 33.7 -1.6 -126.6 -15 1 4 3830 20 19 41 20 20 11 --- 01 11 27 70.6 33.6 -1.6 -126.9 15 R 2 3431 20 20 11 KR143 01 11 27 75.0 37.9 -1.2 -127.7 -15 1 4 3431 20 20 11 20 20 41 --- 01 11 57 75.1 37.7 -1.2 -128.0 15 R 2 3032 20 20 41 J0244+62 01 11 57 70.7 33.5 -1.6 -127.1 -15 1 4 3032 20 20 41 20 21 11 --- 01 12 27 70.7 33.4 -1.5 -127.3 15 R 2 2633 20 21 11 KR143 01 12 27 75.1 37.5 -1.2 -128.2 -15 1 4 2633 20 21 11 20 21 41 --- 01 12 57 75.2 37.4 -1.2 -128.5 15 R 2 2234 20 21 41 J0244+62 01 12 57 70.8 33.3 -1.5 -127.5 -15 1 4 2234 20 21 41 20 22 11 --- 01 13 27 70.8 33.2 -1.5 -127.7 15 R 2 1835 Schedule for VLBA_BR (Code Br ) Page 31 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 22 11 KR143 01 13 27 75.2 37.2 -1.2 -128.7 -15 1 4 1835 20 22 11 20 22 40 --- 01 13 57 75.3 37.1 -1.1 -129.0 15 R 2 1436 20 22 40 J0244+62 01 13 57 70.8 33.1 -1.5 -127.9 -15 1 4 1436 20 22 40 20 23 10 --- 01 14 27 70.9 33.0 -1.5 -128.1 15 R 2 1037 20 23 10 KR143 01 14 27 75.3 36.9 -1.1 -129.3 -15 1 4 1037 20 23 10 20 23 40 --- 01 14 57 75.4 36.7 -1.1 -129.5 15 R 2 638 20 23 40 J0244+62 01 14 57 70.9 32.9 -1.5 -128.3 -15 1 4 638 20 23 40 20 24 10 --- 01 15 27 71.0 32.8 -1.5 -128.6 15 R 2 239 20 24 10 KR143 01 15 27 75.4 36.6 -1.1 -129.8 -15 1 5 239 20 24 10 20 24 40 --- 01 15 57 75.5 36.4 -1.1 -130.1 15 F 1 638 20 24 40 J0244+62 01 15 57 71.0 32.7 -1.5 -128.8 -15 1 5 638 20 24 40 20 25 10 --- 01 16 27 71.1 32.5 -1.5 -129.0 15 F 1 1037 20 25 10 KR143 01 16 27 75.5 36.2 -1.1 -130.3 -15 1 5 1037 20 25 10 20 25 40 --- 01 16 57 75.6 36.1 -1.1 -130.6 15 F 1 1436 20 25 40 J0244+62 01 16 57 71.1 32.4 -1.5 -129.2 -15 1 5 1436 20 25 40 20 26 10 --- 01 17 27 71.2 32.3 -1.5 -129.4 15 F 1 1835 20 26 10 KR143 01 17 27 75.6 35.9 -1.1 -130.9 -15 1 5 1835 20 26 10 20 26 40 --- 01 17 57 75.7 35.7 -1.1 -131.1 15 F 1 2234 20 26 40 J0244+62 01 17 57 71.2 32.2 -1.5 -129.6 -15 1 5 2234 20 26 40 20 27 10 --- 01 18 27 71.2 32.1 -1.4 -129.9 15 F 1 2633 20 27 10 KR143 01 18 27 75.7 35.6 -1.1 -131.4 -15 1 5 2633 20 27 10 20 27 40 --- 01 18 57 75.8 35.4 -1.1 -131.7 15 F 1 3032 20 27 40 J0244+62 01 18 57 71.3 32.0 -1.4 -130.1 -15 1 5 3032 20 27 40 20 28 10 --- 01 19 27 71.3 31.9 -1.4 -130.3 15 F 1 3431 20 28 10 KR143 01 19 27 75.8 35.2 -1.1 -132.0 -15 1 5 3431 20 28 10 20 28 39 --- 01 19 57 75.9 35.0 -1.0 -132.2 15 F 1 3830 20 28 39 J0244+62 01 19 57 71.4 31.7 -1.4 -130.5 -15 1 5 3830 20 28 39 20 29 09 --- 01 20 27 71.4 31.6 -1.4 -130.7 15 F 1 4228 Schedule for VLBA_BR (Code Br ) Page 32 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 29 09 KR143 01 20 27 75.9 34.9 -1.0 -132.5 -15 1 5 4228 20 29 09 20 29 39 --- 01 20 57 76.0 34.7 -1.0 -132.8 15 F 1 4627 20 29 39 J0244+62 01 20 57 71.5 31.5 -1.4 -131.0 -15 1 5 4627 20 29 39 20 30 09 --- 01 21 27 71.5 31.4 -1.4 -131.2 15 F 1 5026 20 30 09 KR143 01 21 27 76.0 34.5 -1.0 -133.1 -15 1 5 5026 20 30 09 20 30 39 --- 01 21 57 76.1 34.3 -1.0 -133.4 15 F 1 5425 20 30 39 J0244+62 01 21 57 71.6 31.3 -1.4 -131.4 -15 1 5 5425 20 30 39 20 31 09 --- 01 22 27 71.6 31.1 -1.4 -131.6 15 F 1 5824 20 31 09 KR143 01 22 27 76.1 34.1 -1.0 -133.7 -15 1 5 5824 20 31 09 20 31 39 --- 01 22 57 76.1 33.9 -1.0 -134.0 15 F 1 6223 20 31 39 J0244+62 01 22 57 71.6 31.0 -1.4 -131.9 -15 1 5 6223 20 31 39 20 32 09 --- 01 23 27 71.7 30.9 -1.4 -132.1 15 F 1 6622 20 32 09 KR143 01 23 27 76.2 33.8 -1.0 -134.2 -15 1 5 6622 20 32 09 20 32 39 --- 01 23 57 76.2 33.6 -1.0 -134.5 15 F 1 7021 20 32 39 J0244+62 01 23 57 71.7 30.8 -1.4 -132.3 -15 1 5 7021 20 32 39 20 33 09 --- 01 24 27 71.8 30.7 -1.3 -132.6 15 F 1 7420 20 33 09 KR143 01 24 27 76.3 33.4 -1.0 -134.8 -15 1 5 7420 20 33 09 20 33 39 --- 01 24 57 76.3 33.2 -1.0 -135.1 15 F 1 7819 20 33 39 J0244+62 01 24 57 71.8 30.5 -1.3 -132.8 -15 1 5 7819 20 33 39 20 34 09 --- 01 25 27 71.9 30.4 -1.3 -133.0 15 F 1 8217 20 34 09 KR143 01 25 27 76.4 33.0 -1.0 -135.4 -15 1 5 8217 20 34 09 20 34 38 --- 01 25 57 76.4 32.8 -0.9 -135.7 15 F 1 8616 20 35 38 NRAO150 01 26 57 65.3 68.9 -2.5 -81.5 30 1 5 8616 20 35 38 20 38 38 --- 01 29 57 65.8 69.1 -2.5 -82.0 180 F 1 11010 Next scan frequencies: 22229.04 22244.02 Next BBC frequencies: 729.04 744.02 20 39 38 NRAO150 01 30 57 66.0 69.1 -2.5 -82.1 54 1 5 11010 20 39 38 20 42 37 --- 01 33 57 66.4 69.3 -2.4 -82.6 180 F 1 13403 Schedule for VLBA_BR (Code Br ) Page 33 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 42 37 S_PER 01 33 57 77.3 30.2 -0.8 -139.9 -32 1 5 13403 20 42 37 20 42 53 --- 01 34 13 77.3 30.1 -0.8 -140.1 -16 F 1 13616 20 42 53 KR143 01 34 13 77.1 29.3 -0.8 -140.9 -6 1 5 13616 20 42 53 20 43 13 --- 01 34 33 77.2 29.1 -0.8 -141.1 14 F 1 13882 20 43 13 S_PER 01 34 33 77.3 29.9 -0.8 -140.3 -6 1 5 13882 20 43 13 20 43 29 --- 01 34 49 77.3 29.8 -0.8 -140.5 10 F 1 14095 20 43 29 KR143 01 34 49 77.2 29.0 -0.8 -141.3 -6 1 5 14095 20 43 29 20 43 49 --- 01 35 09 77.2 28.9 -0.8 -141.5 14 F 1 14361 20 43 49 S_PER 01 35 09 77.4 29.6 -0.8 -140.7 -6 1 5 14361 20 43 49 20 44 05 --- 01 35 25 77.4 29.5 -0.8 -140.9 10 F 1 14573 20 44 05 KR143 01 35 25 77.2 28.7 -0.8 -141.7 -6 1 5 14573 20 44 05 20 44 25 --- 01 35 45 77.3 28.6 -0.8 -141.9 14 F 1 14839 20 44 25 S_PER 01 35 45 77.4 29.4 -0.8 -141.1 -6 1 5 14839 20 44 25 20 44 41 --- 01 36 01 77.4 29.2 -0.8 -141.3 10 F 1 15052 20 44 41 KR143 01 36 01 77.3 28.5 -0.8 -142.1 -6 1 5 15052 20 44 41 20 45 01 --- 01 36 21 77.3 28.3 -0.8 -142.3 14 F 1 15318 20 45 01 S_PER 01 36 21 77.5 29.1 -0.8 -141.5 -6 1 5 15318 20 45 01 20 45 17 --- 01 36 37 77.5 28.9 -0.8 -141.7 10 F 1 15531 20 45 17 KR143 01 36 37 77.3 28.2 -0.8 -142.5 -6 1 5 15531 20 45 17 20 45 37 --- 01 36 57 77.4 28.0 -0.8 -142.7 14 F 1 15797 20 45 37 S_PER 01 36 57 77.5 28.8 -0.8 -141.9 -6 1 5 15797 20 45 37 20 45 53 --- 01 37 13 77.5 28.7 -0.8 -142.1 10 F 1 16009 20 45 53 KR143 01 37 13 77.4 27.9 -0.8 -142.9 -6 1 5 16009 20 45 53 20 46 13 --- 01 37 33 77.4 27.8 -0.8 -143.1 14 F 1 16275 20 46 13 S_PER 01 37 33 77.6 28.5 -0.8 -142.3 -6 1 5 16275 20 46 13 20 46 29 --- 01 37 49 77.6 28.4 -0.8 -142.5 10 F 1 16488 20 46 29 KR143 01 37 49 77.4 27.6 -0.7 -143.3 -6 1 5 16488 20 46 29 20 46 48 --- 01 38 09 77.4 27.5 -0.7 -143.5 14 F 1 16754 Schedule for VLBA_BR (Code Br ) Page 34 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 46 48 S_PER 01 38 09 77.6 28.2 -0.7 -142.7 -6 1 5 16754 20 46 48 20 47 04 --- 01 38 25 77.6 28.1 -0.7 -142.9 10 F 1 16967 20 47 04 KR143 01 38 25 77.5 27.3 -0.7 -143.7 -6 1 5 16967 20 47 04 20 47 24 --- 01 38 45 77.5 27.2 -0.7 -143.9 14 F 1 17233 20 47 24 S_PER 01 38 45 77.6 27.9 -0.7 -143.1 -6 1 6 17233 20 47 24 20 47 40 --- 01 39 01 77.7 27.8 -0.7 -143.3 10 R 1 17020 20 47 40 KR143 01 39 01 77.5 27.0 -0.7 -144.1 -6 1 6 17020 20 47 40 20 48 00 --- 01 39 21 77.5 26.9 -0.7 -144.3 14 R 1 16754 20 48 00 S_PER 01 39 21 77.7 27.6 -0.7 -143.5 -6 1 6 16754 20 48 00 20 48 16 --- 01 39 37 77.7 27.5 -0.7 -143.7 10 R 1 16541 20 48 16 KR143 01 39 37 77.6 26.8 -0.7 -144.5 -6 1 6 16541 20 48 16 20 48 36 --- 01 39 57 77.6 26.6 -0.7 -144.8 14 R 1 16275 20 48 36 S_PER 01 39 57 77.7 27.3 -0.7 -144.0 -6 1 6 16275 20 48 36 20 48 52 --- 01 40 13 77.8 27.2 -0.7 -144.1 10 R 1 16063 20 48 52 KR143 01 40 13 77.6 26.5 -0.7 -144.9 -6 1 6 16063 20 48 52 20 49 12 --- 01 40 33 77.6 26.3 -0.7 -145.2 14 R 1 15797 20 49 12 S_PER 01 40 33 77.8 27.0 -0.7 -144.4 -6 1 6 15797 20 49 12 20 49 28 --- 01 40 49 77.8 26.9 -0.7 -144.6 10 R 1 15584 20 49 28 KR143 01 40 49 77.6 26.2 -0.7 -145.4 -6 1 6 15584 20 49 28 20 49 48 --- 01 41 09 77.7 26.0 -0.7 -145.6 14 R 1 15318 20 49 48 S_PER 01 41 09 77.8 26.7 -0.7 -144.8 -6 1 6 15318 20 49 48 20 50 04 --- 01 41 25 77.8 26.6 -0.7 -145.0 10 R 1 15105 20 50 04 KR143 01 41 25 77.7 25.9 -0.7 -145.8 -6 1 6 15105 20 50 04 20 50 24 --- 01 41 45 77.7 25.7 -0.7 -146.0 14 R 1 14839 20 50 24 S_PER 01 41 45 77.9 26.4 -0.7 -145.2 -6 1 6 14839 20 50 24 20 50 40 --- 01 42 01 77.9 26.3 -0.7 -145.4 10 R 1 14627 20 50 40 KR143 01 42 01 77.7 25.6 -0.7 -146.2 -6 1 6 14627 20 50 40 20 51 00 --- 01 42 21 77.8 25.4 -0.7 -146.4 14 R 1 14361 Schedule for VLBA_BR (Code Br ) Page 35 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 51 00 S_PER 01 42 21 77.9 26.1 -0.7 -145.7 -6 1 6 14361 20 51 00 20 51 16 --- 01 42 37 77.9 26.0 -0.7 -145.8 10 R 1 14148 20 51 16 KR143 01 42 37 77.8 25.3 -0.7 -146.6 -6 1 6 14148 20 51 16 20 51 36 --- 01 42 57 77.8 25.1 -0.7 -146.9 14 R 1 13882 20 51 36 S_PER 01 42 57 78.0 25.8 -0.7 -146.1 -6 1 6 13882 20 51 36 20 51 52 --- 01 43 13 78.0 25.7 -0.7 -146.3 10 R 1 13669 20 51 52 KR143 01 43 13 77.8 24.9 -0.7 -147.1 -6 1 6 13669 20 51 52 20 52 12 --- 01 43 33 77.8 24.8 -0.7 -147.3 14 R 1 13403 20 52 12 S_PER 01 43 33 78.0 25.5 -0.7 -146.5 -6 1 6 13403 20 52 12 20 52 28 --- 01 43 49 78.0 25.4 -0.7 -146.7 10 R 1 13191 20 52 28 KR143 01 43 49 77.9 24.6 -0.6 -147.5 -6 1 6 13191 20 52 28 20 52 47 --- 01 44 09 77.9 24.5 -0.6 -147.7 14 R 1 12925 20 52 47 S_PER 01 44 09 78.0 25.2 -0.6 -147.0 -6 1 6 12925 20 52 47 20 53 03 --- 01 44 25 78.1 25.0 -0.6 -147.2 10 R 1 12712 20 53 03 KR143 01 44 25 77.9 24.3 -0.6 -147.9 -6 1 6 12712 20 53 03 20 53 23 --- 01 44 45 77.9 24.2 -0.6 -148.2 14 R 1 12446 20 53 23 S_PER 01 44 45 78.1 24.9 -0.6 -147.4 -6 1 6 12446 20 53 23 20 53 39 --- 01 45 01 78.1 24.7 -0.6 -147.6 10 R 1 12233 20 53 39 KR143 01 45 01 77.9 24.0 -0.6 -148.4 -6 1 6 12233 20 53 39 20 53 59 --- 01 45 21 78.0 23.8 -0.6 -148.6 14 R 1 11967 20 53 59 S_PER 01 45 21 78.1 24.5 -0.6 -147.8 -6 1 6 11967 20 53 59 20 54 15 --- 01 45 37 78.2 24.4 -0.6 -148.0 10 R 1 11754 20 54 15 KR143 01 45 37 78.0 23.7 -0.6 -148.8 -6 1 6 11754 20 54 15 20 54 35 --- 01 45 57 78.0 23.5 -0.6 -149.0 14 R 1 11489 20 54 35 S_PER 01 45 57 78.2 24.2 -0.6 -148.3 -6 1 6 11489 20 54 35 20 54 51 --- 01 46 13 78.2 24.1 -0.6 -148.5 10 R 1 11276 20 54 51 KR143 01 46 13 78.0 23.4 -0.6 -149.2 -6 1 6 11276 20 54 51 20 55 11 --- 01 46 33 78.0 23.2 -0.6 -149.5 14 R 1 11010 Schedule for VLBA_BR (Code Br ) Page 36 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 55 11 S_PER 01 46 33 78.2 23.9 -0.6 -148.7 -6 1 6 11010 20 55 11 20 55 27 --- 01 46 49 78.2 23.8 -0.6 -148.9 10 R 1 10797 20 55 27 KR143 01 46 49 78.1 23.0 -0.6 -149.7 -6 1 6 10797 20 55 27 20 55 47 --- 01 47 09 78.1 22.9 -0.6 -149.9 14 R 1 10531 20 55 47 S_PER 01 47 09 78.3 23.6 -0.6 -149.2 -6 1 6 10531 20 55 47 20 56 03 --- 01 47 25 78.3 23.4 -0.6 -149.4 10 R 1 10318 20 56 03 KR143 01 47 25 78.1 22.7 -0.6 -150.1 -6 1 6 10318 20 56 03 20 56 23 --- 01 47 45 78.1 22.5 -0.6 -150.4 14 R 1 10052 20 56 23 S_PER 01 47 45 78.3 23.2 -0.6 -149.6 -6 1 6 10052 20 56 23 20 56 39 --- 01 48 01 78.3 23.1 -0.6 -149.8 10 R 1 9840 20 56 39 KR143 01 48 01 78.1 22.4 -0.6 -150.6 -6 1 6 9840 20 56 39 20 56 59 --- 01 48 21 78.2 22.2 -0.6 -150.8 14 R 1 9574 20 56 59 S_PER 01 48 21 78.3 22.9 -0.6 -150.1 -6 1 6 9574 20 56 59 20 57 15 --- 01 48 37 78.4 22.8 -0.6 -150.3 10 R 1 9361 20 57 15 KR143 01 48 37 78.2 22.1 -0.6 -151.0 -6 1 6 9361 20 57 15 20 57 35 --- 01 48 57 78.2 21.9 -0.6 -151.3 14 R 1 9095 20 57 35 S_PER 01 48 57 78.4 22.6 -0.6 -150.5 -6 1 6 9095 20 57 35 20 57 51 --- 01 49 13 78.4 22.4 -0.6 -150.7 10 R 1 8882 20 57 51 KR143 01 49 13 78.2 21.7 -0.6 -151.5 -6 1 6 8882 20 57 51 20 58 11 --- 01 49 33 78.2 21.5 -0.6 -151.7 14 R 1 8616 20 58 11 S_PER 01 49 33 78.4 22.2 -0.6 -151.0 -6 1 6 8616 20 58 11 20 58 27 --- 01 49 49 78.4 22.1 -0.6 -151.2 10 R 1 8404 20 58 27 KR143 01 49 49 78.3 21.4 -0.5 -151.9 -6 1 6 8404 20 58 27 20 58 47 --- 01 50 09 78.3 21.2 -0.5 -152.2 14 R 1 8138 20 58 47 S_PER 01 50 09 78.4 21.9 -0.5 -151.5 -6 1 6 8138 20 58 47 20 59 02 --- 01 50 25 78.5 21.7 -0.5 -151.7 10 R 1 7925 20 59 02 KR143 01 50 25 78.3 21.1 -0.5 -152.4 -6 1 6 7925 20 59 02 20 59 22 --- 01 50 45 78.3 20.9 -0.5 -152.7 14 R 1 7659 Schedule for VLBA_BR (Code Br ) Page 37 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 20 59 22 S_PER 01 50 45 78.5 21.5 -0.5 -151.9 -6 1 6 7659 20 59 22 20 59 38 --- 01 51 01 78.5 21.4 -0.5 -152.1 10 R 1 7446 20 59 38 KR143 01 51 01 78.3 20.7 -0.5 -152.9 -6 1 6 7446 20 59 38 20 59 58 --- 01 51 21 78.3 20.5 -0.5 -153.1 14 R 1 7180 20 59 58 S_PER 01 51 21 78.5 21.2 -0.5 -152.4 -6 1 6 7180 20 59 58 21 00 14 --- 01 51 37 78.5 21.0 -0.5 -152.6 10 R 1 6968 21 00 14 KR143 01 51 37 78.4 20.4 -0.5 -153.3 -6 1 6 6968 21 00 14 21 00 34 --- 01 51 57 78.4 20.2 -0.5 -153.6 14 R 1 6702 21 00 34 S_PER 01 51 57 78.6 20.9 -0.5 -152.9 -6 1 6 6702 21 00 34 21 00 50 --- 01 52 13 78.6 20.7 -0.5 -153.1 10 R 1 6489 21 00 50 KR143 01 52 13 78.4 20.0 -0.5 -153.8 -6 1 6 6489 21 00 50 21 01 10 --- 01 52 33 78.4 19.8 -0.5 -154.1 14 R 1 6223 21 01 10 S_PER 01 52 33 78.6 20.5 -0.5 -153.3 -6 1 6 6223 21 01 10 21 01 26 --- 01 52 49 78.6 20.3 -0.5 -153.6 10 R 1 6010 21 01 26 KR143 01 52 49 78.4 19.7 -0.5 -154.3 -6 1 6 6010 21 01 26 21 01 46 --- 01 53 09 78.4 19.5 -0.5 -154.5 14 R 1 5744 21 01 46 S_PER 01 53 09 78.6 20.1 -0.5 -153.8 -6 1 6 5744 21 01 46 21 02 02 --- 01 53 25 78.6 20.0 -0.5 -154.0 10 R 1 5532 21 02 02 KR143 01 53 25 78.5 19.3 -0.5 -154.7 -6 1 6 5532 21 02 02 21 02 22 --- 01 53 45 78.5 19.1 -0.5 -155.0 14 R 1 5266 21 02 22 S_PER 01 53 45 78.7 19.8 -0.5 -154.3 -6 1 6 5266 21 02 22 21 02 38 --- 01 54 01 78.7 19.6 -0.5 -154.5 10 R 1 5053 21 02 38 KR143 01 54 01 78.5 19.0 -0.5 -155.2 -6 1 6 5053 21 02 38 21 02 58 --- 01 54 21 78.5 18.8 -0.5 -155.5 14 R 1 4787 21 02 58 S_PER 01 54 21 78.7 19.4 -0.5 -154.8 -6 1 6 4787 21 02 58 21 03 14 --- 01 54 37 78.7 19.3 -0.5 -155.0 10 R 1 4574 21 03 14 KR143 01 54 37 78.5 18.6 -0.5 -155.7 -6 1 6 4574 21 03 14 21 03 34 --- 01 54 57 78.5 18.4 -0.5 -155.9 14 R 1 4308 Schedule for VLBA_BR (Code Br ) Page 38 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 21 03 34 S_PER 01 54 57 78.7 19.1 -0.5 -155.3 -6 1 6 4308 21 03 34 21 03 50 --- 01 55 13 78.7 18.9 -0.5 -155.5 10 R 1 4095 21 03 50 KR143 01 55 13 78.6 18.3 -0.5 -156.2 -6 1 6 4095 21 03 50 21 04 10 --- 01 55 33 78.6 18.1 -0.5 -156.4 14 R 1 3830 21 04 10 S_PER 01 55 33 78.8 18.7 -0.5 -155.7 -6 1 6 3830 21 04 10 21 04 26 --- 01 55 49 78.8 18.5 -0.5 -156.0 10 R 1 3617 21 04 26 KR143 01 55 49 78.6 17.9 -0.4 -156.6 -6 1 6 3617 21 04 26 21 04 46 --- 01 56 09 78.6 17.7 -0.4 -156.9 14 R 1 3351 21 04 46 S_PER 01 56 09 78.8 18.3 -0.4 -156.2 -6 1 6 3351 21 04 46 21 05 01 --- 01 56 25 78.8 18.2 -0.4 -156.4 10 R 1 3138 21 05 01 KR143 01 56 25 78.6 17.5 -0.4 -157.1 -6 1 6 3138 21 05 01 21 05 21 --- 01 56 45 78.6 17.3 -0.4 -157.4 14 R 1 2872 21 05 21 S_PER 01 56 45 78.8 18.0 -0.4 -156.7 -6 1 6 2872 21 05 21 21 05 37 --- 01 57 01 78.8 17.8 -0.4 -156.9 10 R 1 2659 21 05 37 KR143 01 57 01 78.7 17.2 -0.4 -157.6 -6 1 6 2659 21 05 37 21 05 57 --- 01 57 21 78.7 17.0 -0.4 -157.9 14 R 1 2393 21 05 57 S_PER 01 57 21 78.9 17.6 -0.4 -157.2 -6 1 6 2393 21 05 57 21 06 13 --- 01 57 37 78.9 17.4 -0.4 -157.4 10 R 1 2181 21 06 13 KR143 01 57 37 78.7 16.8 -0.4 -158.1 -6 1 6 2181 21 06 13 21 06 33 --- 01 57 57 78.7 16.6 -0.4 -158.4 14 R 1 1915 21 06 33 S_PER 01 57 57 78.9 17.2 -0.4 -157.7 -6 1 6 1915 21 06 33 21 06 49 --- 01 58 13 78.9 17.1 -0.4 -157.9 10 R 1 1702 21 06 49 KR143 01 58 13 78.7 16.5 -0.4 -158.6 -6 1 6 1702 21 06 49 21 07 09 --- 01 58 33 78.7 16.2 -0.4 -158.9 14 R 1 1436 21 07 09 S_PER 01 58 33 78.9 16.8 -0.4 -158.2 -6 1 6 1436 21 07 09 21 07 25 --- 01 58 49 78.9 16.7 -0.4 -158.4 10 R 1 1223 21 07 25 KR143 01 58 49 78.7 16.1 -0.4 -159.1 -6 1 6 1223 21 07 25 21 07 45 --- 01 59 09 78.8 15.9 -0.4 -159.4 14 R 1 957 Schedule for VLBA_BR (Code Br ) Page 39 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 21 07 45 S_PER 01 59 09 78.9 16.5 -0.4 -158.7 -6 1 6 957 21 07 45 21 08 01 --- 01 59 25 79.0 16.3 -0.4 -158.9 10 R 1 745 21 08 01 KR143 01 59 25 78.8 15.7 -0.4 -159.6 -6 1 6 745 21 08 01 21 08 21 --- 01 59 45 78.8 15.5 -0.4 -159.8 14 R 1 479 21 08 21 S_PER 01 59 45 79.0 16.1 -0.4 -159.2 -6 1 6 479 21 08 21 21 08 37 --- 02 00 01 79.0 15.9 -0.4 -159.4 10 R 1 266 21 08 37 KR143 02 00 01 78.8 15.3 -0.4 -160.1 -6 1 5 266 21 08 37 21 08 57 --- 02 00 21 78.8 15.1 -0.4 -160.3 14 F 2 532 21 08 57 S_PER 02 00 21 79.0 15.7 -0.4 -159.7 -6 1 5 532 21 08 57 21 09 13 --- 02 00 37 79.0 15.5 -0.4 -159.9 10 F 2 745 21 09 13 KR143 02 00 37 78.8 15.0 -0.4 -160.6 -6 1 5 745 21 09 13 21 09 33 --- 02 00 57 78.8 14.7 -0.4 -160.8 14 F 2 1011 21 09 33 S_PER 02 00 57 79.0 15.3 -0.4 -160.2 -6 1 5 1011 21 09 33 21 09 49 --- 02 01 13 79.0 15.1 -0.4 -160.4 10 F 2 1223 21 09 49 KR143 02 01 13 78.8 14.6 -0.4 -161.1 -6 1 5 1223 21 09 49 21 10 09 --- 02 01 33 78.9 14.4 -0.4 -161.3 14 F 2 1489 21 10 09 S_PER 02 01 33 79.1 14.9 -0.4 -160.7 -6 1 5 1489 21 10 09 21 10 25 --- 02 01 49 79.1 14.8 -0.4 -161.0 10 F 2 1702 21 10 25 KR143 02 01 49 78.9 14.2 -0.3 -161.6 -6 1 5 1702 21 10 25 21 10 45 --- 02 02 09 78.9 14.0 -0.3 -161.8 14 F 2 1968 21 10 45 S_PER 02 02 09 79.1 14.5 -0.3 -161.2 -6 1 5 1968 21 10 45 21 11 00 --- 02 02 25 79.1 14.4 -0.3 -161.5 10 F 2 2181 21 11 00 KR143 02 02 25 78.9 13.8 -0.3 -162.1 -6 1 5 2181 21 11 00 21 11 20 --- 02 02 45 78.9 13.6 -0.3 -162.3 14 F 2 2447 21 11 20 S_PER 02 02 45 79.1 14.1 -0.3 -161.7 -6 1 5 2447 21 11 20 21 11 36 --- 02 03 01 79.1 14.0 -0.3 -162.0 10 F 2 2659 21 11 36 KR143 02 03 01 78.9 13.4 -0.3 -162.6 -6 1 5 2659 21 11 36 21 11 56 --- 02 03 21 78.9 13.2 -0.3 -162.9 14 F 2 2925 Schedule for VLBA_BR (Code Br ) Page 40 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 21 12 56 NRAO150 02 04 21 71.2 70.5 -1.9 -87.4 16 1 5 2925 21 12 56 21 15 56 --- 02 07 21 71.7 70.5 -1.9 -87.9 180 F 2 5319 Next scan frequencies: 15360.00 15376.00 Next BBC frequencies: 760.00 776.00 21 17 55 NRAO150 02 09 21 72.0 70.5 -1.8 -88.3 113 1 5 5319 21 17 55 21 20 55 --- 02 12 21 72.4 70.6 -1.8 -88.8 180 F 2 7712 21 20 55 J0244+62 02 12 21 74.9 14.7 -0.5 -158.5 -43 1 5 7712 21 20 55 21 21 25 --- 02 12 51 74.9 14.5 -0.5 -158.8 -13 F 2 8111 21 21 25 KR143 02 12 51 79.2 6.9 -0.2 -171.1 -15 1 5 8111 21 21 25 21 21 55 --- 02 13 21 79.2 6.6 -0.2 -171.5 15 F 2 8510 21 21 55 J0244+62 02 13 21 75.0 14.3 -0.5 -159.1 -14 1 5 8510 21 21 55 21 22 25 --- 02 13 51 75.0 14.1 -0.5 -159.4 15 F 2 8909 21 22 25 KR143 02 13 51 79.2 6.2 -0.1 -172.0 -14 1 5 8909 21 22 25 21 22 55 --- 02 14 21 79.2 5.9 -0.1 -172.4 15 F 2 9308 21 22 55 J0244+62 02 14 21 75.0 13.9 -0.5 -159.7 -14 1 5 9308 21 22 55 21 23 24 --- 02 14 51 75.0 13.7 -0.5 -160.0 15 F 2 9707 21 23 24 KR143 02 14 51 79.2 5.5 -0.1 -172.9 -14 1 5 9707 21 23 24 21 23 54 --- 02 15 21 79.3 5.2 -0.1 -173.3 15 F 2 10106 21 23 54 J0244+62 02 15 21 75.1 13.5 -0.5 -160.3 -14 1 5 10106 21 23 54 21 24 24 --- 02 15 51 75.1 13.3 -0.5 -160.7 16 F 2 10505 21 24 24 KR143 02 15 51 79.3 4.8 -0.1 -173.8 -14 1 5 10505 21 24 24 21 24 54 --- 02 16 21 79.3 4.5 -0.1 -174.2 16 F 2 10904 21 24 54 J0244+62 02 16 21 75.1 13.0 -0.5 -161.0 -14 1 5 10904 21 24 54 21 25 24 --- 02 16 51 75.1 12.8 -0.5 -161.3 16 F 2 11302 21 25 24 KR143 02 16 51 79.3 4.1 -0.1 -174.7 -14 1 5 11302 21 25 24 21 25 54 --- 02 17 21 79.3 3.8 -0.1 -175.1 16 F 2 11701 21 25 54 J0244+62 02 17 21 75.1 12.6 -0.5 -161.6 -14 1 5 11701 21 25 54 21 26 24 --- 02 17 51 75.1 12.4 -0.5 -161.9 16 F 2 12100 Schedule for VLBA_BR (Code Br ) Page 41 BA068C: 1-cm line and 2-cm continuum observations (multi epoch) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sat 3 Apr 2004 Day 94 --- 21 26 24 KR143 02 17 51 79.3 3.5 -0.1 -175.5 -14 1 5 12100 21 26 24 21 26 54 --- 02 18 21 79.3 3.1 -0.1 -176.0 16 F 2 12499 21 26 54 J0244+62 02 18 21 75.2 12.2 -0.4 -162.2 -14 1 5 12499 21 26 54 21 27 24 --- 02 18 51 75.2 12.0 -0.4 -162.6 16 F 2 12898 21 27 24 KR143 02 18 51 79.3 2.8 -0.1 -176.4 -14 1 5 12898 21 27 24 21 27 54 --- 02 19 21 79.3 2.4 -0.1 -176.9 16 F 2 13297 21 27 54 J0244+62 02 19 21 75.2 11.8 -0.4 -162.9 -14 1 5 13297 21 27 54 21 28 24 --- 02 19 51 75.2 11.5 -0.4 -163.2 16 F 2 13696 21 28 24 KR143 02 19 51 79.3 2.1 0.0 -177.3 -14 1 5 13696 21 28 24 21 28 54 --- 02 20 21 79.3 1.7 0.0 -177.8 16 F 2 14095 21 28 54 J0244+62 02 20 21 75.2 11.3 -0.4 -163.5 -14 1 5 14095 21 28 54 21 29 23 --- 02 20 51 75.2 11.1 -0.4 -163.8 16 F 2 14494 21 29 23 KR143 02 20 51 79.3 1.4 0.0 -178.2 -14 1 5 14494 21 29 23 21 29 53 --- 02 21 21 79.3 1.0 0.0 -178.7 16 F 2 14893 21 29 53 J0244+62 02 21 21 75.3 10.9 -0.4 -164.2 -14 1 5 14893 21 29 53 21 30 23 --- 02 21 51 75.3 10.7 -0.4 -164.5 16 F 2 15291 21 30 23 KR143 02 21 51 79.3 0.7 0.0 -179.1 -14 1 5 1529