COVER INFORMATION Station: VLBA_PT (Code Pt ) Experiment: Continuum and 21cm HI Absorption toward Arp193 Exp. Code: bm176b Schedule Version: 2.00 Processed by SCHED version: Release of 02 July 2002 PI: E. Momjian Address: NRAO / AOC P.O. Box O Socorro, NM 87801, USA Phone: 505-835-7457 EMAIL: emomjian@nrao.edu Fax: 505-835-7027 Phone during observation: Observing mode: 21cm 128-4-2 Notes: Schedule for VLBA_PT (Code Pt ) Page 2 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- Next scan frequencies: 1384.05 1384.05 1391.87 1391.87 Next BBC frequencies: 715.95 715.95 708.13 708.13 Next scan bandwidths: 8.00 8.00 8.00 8.00 03 00 15 3C286 08 27 59 27.4 70.2 -5.1 -64.4 0 1 1 0 03 00 15 03 08 35 --- 08 36 21 29.0 71.1 -4.9 -65.1 500 F 1 3333 03 08 35 J1329+31 08 36 21 29.9 69.8 -4.9 -65.9 -8 1 1 3333 03 08 35 03 13 00 --- 08 40 47 30.7 70.2 -4.8 -66.3 257 F 1 5100 03 13 00 J1317+34 08 40 47 34.0 68.6 -4.6 -68.8 -13 1 1 5100 03 13 00 03 14 30 --- 08 42 17 34.3 68.8 -4.6 -68.9 77 F 1 5700 03 14 30 ARP193 08 42 17 33.7 68.8 -4.6 -68.5 -7 1 1 5700 03 14 30 03 17 30 --- 08 45 17 34.2 69.1 -4.6 -68.8 173 F 1 6900 03 17 30 J1317+34 08 45 17 34.9 69.0 -4.5 -69.2 -7 1 1 6900 03 17 30 03 18 30 --- 08 46 17 35.1 69.1 -4.5 -69.3 53 F 1 7300 03 18 30 ARP193 08 46 17 34.4 69.2 -4.6 -68.9 -7 1 1 7300 03 18 30 03 21 30 --- 08 49 18 35.0 69.4 -4.5 -69.1 173 F 1 8500 03 21 30 J1317+34 08 49 18 35.7 69.4 -4.5 -69.6 -7 1 1 8500 03 21 30 03 22 30 --- 08 50 18 35.9 69.5 -4.5 -69.7 53 F 1 8900 03 22 30 ARP193 08 50 18 35.2 69.5 -4.5 -69.2 -7 1 1 8900 03 22 30 03 25 30 --- 08 53 19 35.8 69.8 -4.5 -69.5 173 F 1 10100 03 25 30 J1317+34 08 53 19 36.5 69.7 -4.4 -69.9 -7 1 1 10100 03 25 30 03 26 30 --- 08 54 19 36.7 69.8 -4.4 -70.0 53 F 1 10500 03 26 30 ARP193 08 54 19 36.0 69.9 -4.4 -69.6 -7 1 1 10500 03 26 30 03 29 30 --- 08 57 19 36.6 70.2 -4.4 -69.8 173 F 1 11700 03 29 30 J1317+34 08 57 19 37.2 70.1 -4.3 -70.3 -7 1 1 11700 03 29 30 03 30 30 --- 08 58 19 37.4 70.2 -4.3 -70.4 53 F 1 12100 03 30 30 ARP193 08 58 19 36.8 70.2 -4.4 -69.9 -7 1 1 12100 03 30 30 03 33 30 --- 09 01 20 37.4 70.5 -4.3 -70.2 173 F 1 13300 03 33 30 J1317+34 09 01 20 38.0 70.4 -4.3 -70.6 -7 1 1 13300 03 33 30 03 34 30 --- 09 02 20 38.2 70.5 -4.3 -70.7 53 F 1 13700 Schedule for VLBA_PT (Code Pt ) Page 3 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 03 34 30 ARP193 09 02 20 37.5 70.6 -4.3 -70.3 -7 1 1 13700 03 34 30 03 37 30 --- 09 05 21 38.1 70.9 -4.3 -70.5 173 F 1 14900 03 37 30 J1317+34 09 05 21 38.8 70.8 -4.2 -71.0 -7 1 1 14900 03 37 30 03 38 30 --- 09 06 21 39.0 70.9 -4.2 -71.1 53 F 1 15300 03 38 30 ARP193 09 06 21 38.3 71.0 -4.2 -70.6 -7 1 1 15300 03 38 30 03 41 30 --- 09 09 21 38.9 71.2 -4.2 -70.9 173 F 1 16500 03 41 30 J1317+34 09 09 21 39.6 71.1 -4.1 -71.3 -7 1 1 16500 03 41 30 03 42 30 --- 09 10 21 39.8 71.2 -4.1 -71.4 53 F 1 16900 03 42 30 ARP193 09 10 21 39.1 71.3 -4.2 -70.9 -7 1 2 16900 03 42 30 03 45 30 --- 09 13 22 39.7 71.6 -4.1 -71.2 173 R 1 17100 03 45 30 J1317+34 09 13 22 40.4 71.5 -4.1 -71.7 -7 1 2 17100 03 45 30 03 46 30 --- 09 14 22 40.6 71.6 -4.1 -71.8 53 R 1 16700 03 46 30 ARP193 09 14 22 39.9 71.7 -4.1 -71.3 -7 1 2 16700 03 46 30 03 49 30 --- 09 17 23 40.5 71.9 -4.1 -71.5 173 R 1 15500 03 49 30 J1317+34 09 17 23 41.2 71.8 -4.0 -72.0 -7 1 2 15500 03 49 30 03 50 30 --- 09 18 23 41.4 71.9 -4.0 -72.1 53 R 1 15100 03 50 30 ARP193 09 18 23 40.7 72.0 -4.0 -71.6 -7 1 2 15100 03 50 30 03 53 30 --- 09 21 23 41.3 72.3 -4.0 -71.9 173 R 1 13900 03 53 30 J1317+34 09 21 23 41.9 72.2 -3.9 -72.4 -7 1 2 13900 03 53 30 03 54 30 --- 09 22 23 42.1 72.2 -3.9 -72.5 53 R 1 13500 03 54 30 ARP193 09 22 23 41.5 72.3 -4.0 -72.0 -7 1 2 13500 03 54 30 03 57 30 --- 09 25 24 42.1 72.6 -3.9 -72.2 173 R 1 12300 03 57 30 J1317+34 09 25 24 42.7 72.5 -3.9 -72.7 -7 1 2 12300 03 57 30 03 58 30 --- 09 26 24 42.9 72.6 -3.9 -72.8 53 R 1 11900 03 58 30 ARP193 09 26 24 42.3 72.7 -3.9 -72.3 -7 1 2 11900 03 58 30 04 01 30 --- 09 29 25 42.9 72.9 -3.9 -72.5 173 R 1 10700 04 01 30 J1317+34 09 29 25 43.5 72.8 -3.8 -73.0 -7 1 2 10700 04 01 30 04 02 30 --- 09 30 25 43.7 72.9 -3.8 -73.1 53 R 1 10300 Schedule for VLBA_PT (Code Pt ) Page 4 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 04 02 30 ARP193 09 30 25 43.1 73.0 -3.8 -72.6 -7 1 2 10300 04 02 30 04 05 30 --- 09 33 25 43.7 73.3 -3.8 -72.9 173 R 1 9100 04 05 30 J1317+34 09 33 25 44.3 73.2 -3.7 -73.4 -7 1 2 9100 04 05 30 04 06 30 --- 09 34 25 44.5 73.2 -3.7 -73.5 53 R 1 8700 04 06 30 ARP193 09 34 25 43.8 73.4 -3.8 -73.0 -7 1 2 8700 04 06 30 04 09 30 --- 09 37 26 44.4 73.6 -3.7 -73.2 173 R 1 7500 04 09 30 J1317+34 09 37 26 45.1 73.5 -3.7 -73.7 -7 1 2 7500 04 09 30 04 10 30 --- 09 38 26 45.3 73.6 -3.7 -73.8 53 R 1 7100 04 10 30 ARP193 09 38 26 44.6 73.7 -3.7 -73.3 -7 1 2 7100 04 10 30 04 13 30 --- 09 41 27 45.2 74.0 -3.7 -73.5 173 R 1 5900 04 13 30 J1317+34 09 41 27 45.9 73.8 -3.6 -74.1 -7 1 2 5900 04 13 30 04 14 30 --- 09 42 27 46.1 73.9 -3.6 -74.1 53 R 1 5500 04 14 30 J1329+31 09 42 27 42.9 76.2 -3.8 -70.9 -12 1 2 5500 04 14 30 04 18 10 --- 09 46 07 43.6 76.5 -3.7 -71.1 208 R 1 4033 04 18 10 J1317+34 09 46 07 46.8 74.2 -3.5 -74.4 -12 1 2 4033 04 18 10 04 19 10 --- 09 47 07 47.0 74.3 -3.5 -74.5 48 R 1 3633 04 19 10 ARP193 09 47 07 46.4 74.4 -3.6 -74.0 -7 1 2 3633 04 19 10 04 22 10 --- 09 50 08 47.0 74.7 -3.5 -74.2 173 R 1 2433 04 22 10 J1317+34 09 50 08 47.6 74.5 -3.5 -74.8 -7 1 2 2433 04 22 10 04 23 10 --- 09 51 08 47.8 74.6 -3.4 -74.9 53 R 1 2033 04 23 10 ARP193 09 51 08 47.2 74.8 -3.5 -74.3 -7 1 2 2033 04 23 10 04 26 10 --- 09 54 09 47.8 75.0 -3.4 -74.6 173 R 1 833 04 26 10 J1317+34 09 54 09 48.4 74.8 -3.4 -75.1 -7 1 2 833 04 26 10 04 27 10 --- 09 55 09 48.6 74.9 -3.4 -75.2 53 R 1 433 04 27 10 ARP193 09 55 09 48.0 75.1 -3.4 -74.6 -7 1 3 433 04 27 10 04 30 10 --- 09 58 09 48.6 75.3 -3.4 -74.9 173 F 1 1633 04 30 10 J1317+34 09 58 09 49.2 75.2 -3.3 -75.4 -7 1 3 1633 04 30 10 04 31 10 --- 09 59 09 49.4 75.2 -3.3 -75.5 53 F 1 2033 Schedule for VLBA_PT (Code Pt ) Page 5 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 04 31 10 ARP193 09 59 09 48.8 75.4 -3.4 -75.0 -7 1 3 2033 04 31 10 04 34 10 --- 10 02 10 49.4 75.7 -3.3 -75.2 173 F 1 3233 04 34 10 J1317+34 10 02 10 50.0 75.5 -3.3 -75.7 -7 1 3 3233 04 34 10 04 35 10 --- 10 03 10 50.2 75.6 -3.2 -75.8 53 F 1 3633 04 35 10 ARP193 10 03 10 49.6 75.7 -3.3 -75.3 -7 1 3 3633 04 35 10 04 38 10 --- 10 06 11 50.2 76.0 -3.2 -75.5 173 F 1 4833 04 38 10 J1317+34 10 06 11 50.8 75.8 -3.2 -76.1 -7 1 3 4833 04 38 10 04 39 10 --- 10 07 11 51.0 75.9 -3.2 -76.1 53 F 1 5233 04 39 10 ARP193 10 07 11 50.4 76.1 -3.2 -75.6 -7 1 3 5233 04 39 10 04 42 10 --- 10 10 11 51.0 76.3 -3.2 -75.8 173 F 1 6433 04 42 10 J1317+34 10 10 11 51.6 76.1 -3.1 -76.4 -7 1 3 6433 04 42 10 04 43 10 --- 10 11 11 51.8 76.2 -3.1 -76.5 53 F 1 6833 04 43 10 ARP193 10 11 11 51.2 76.4 -3.2 -75.9 -7 1 3 6833 04 43 10 04 46 10 --- 10 14 12 51.8 76.6 -3.1 -76.1 173 F 1 8033 04 46 10 J1317+34 10 14 12 52.4 76.4 -3.1 -76.7 -7 1 3 8033 04 46 10 04 47 10 --- 10 15 12 52.6 76.5 -3.0 -76.8 53 F 1 8433 04 47 10 ARP193 10 15 12 52.0 76.7 -3.1 -76.2 -7 1 3 8433 04 47 10 04 50 10 --- 10 18 13 52.6 76.9 -3.0 -76.4 173 F 1 9633 04 50 10 J1317+34 10 18 13 53.3 76.7 -3.0 -77.0 -7 1 3 9633 04 50 10 04 51 10 --- 10 19 13 53.5 76.8 -3.0 -77.1 53 F 1 10033 04 51 10 ARP193 10 19 13 52.8 77.0 -3.0 -76.5 -7 1 3 10033 04 51 10 04 54 10 --- 10 22 13 53.4 77.3 -3.0 -76.7 173 F 1 11233 04 54 10 J1317+34 10 22 13 54.1 77.0 -2.9 -77.3 -7 1 3 11233 04 54 10 04 55 10 --- 10 23 13 54.3 77.1 -2.9 -77.4 53 F 1 11633 04 55 10 ARP193 10 23 13 53.6 77.3 -3.0 -76.8 -7 1 3 11633 04 55 10 04 58 00 --- 10 26 04 54.2 77.6 -2.9 -77.0 163 F 1 12767 04 58 40 J1317+34 10 26 44 55.0 77.4 -2.9 -77.7 32 1 3 12767 04 58 40 04 59 30 --- 10 27 34 55.1 77.4 -2.8 -77.8 50 F 1 13100 Schedule for VLBA_PT (Code Pt ) Page 6 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 05 01 30 J1310 10 29 34 56.5 81.8 -2.7 -75.4 111 1 3 13100 05 01 30 05 05 50 --- 10 33 55 57.4 82.3 -2.6 -75.6 260 F 1 14833 05 05 50 J1329+31 10 33 55 53.3 81.1 -2.9 -74.0 -14 1 3 14833 05 05 50 05 09 30 --- 10 37 36 54.1 81.5 -2.9 -74.2 206 F 1 16300 05 09 30 J1317+34 10 37 36 57.2 78.2 -2.7 -78.5 -12 1 3 16300 05 09 30 05 10 50 --- 10 38 56 57.4 78.3 -2.6 -78.7 68 F 1 16833 05 10 50 ARP193 10 38 56 56.8 78.6 -2.7 -78.0 -7 1 4 16833 05 10 50 05 13 50 --- 10 41 56 57.4 78.8 -2.6 -78.2 173 R 1 17167 05 13 50 J1317+34 10 41 56 58.0 78.5 -2.6 -78.9 -7 1 4 17167 05 13 50 05 14 50 --- 10 42 57 58.2 78.6 -2.6 -79.0 53 R 1 16767 05 14 50 ARP193 10 42 57 57.6 78.9 -2.6 -78.3 -7 1 4 16767 05 14 50 05 17 50 --- 10 45 57 58.2 79.1 -2.6 -78.5 173 R 1 15567 05 17 50 J1317+34 10 45 57 58.9 78.8 -2.5 -79.2 -7 1 4 15567 05 17 50 05 18 50 --- 10 46 57 59.1 78.9 -2.5 -79.3 53 R 1 15167 05 18 50 ARP193 10 46 57 58.4 79.2 -2.6 -78.6 -7 1 4 15167 05 18 50 05 21 50 --- 10 49 58 59.0 79.5 -2.5 -78.8 173 R 1 13967 05 21 50 J1317+34 10 49 58 59.7 79.1 -2.5 -79.5 -7 1 4 13967 05 21 50 05 22 50 --- 10 50 58 59.9 79.2 -2.4 -79.6 53 R 1 13567 05 22 50 ARP193 10 50 58 59.2 79.5 -2.5 -78.9 -7 1 4 13567 05 22 50 05 25 50 --- 10 53 58 59.8 79.8 -2.4 -79.1 173 R 1 12367 05 25 50 J1317+34 10 53 58 60.5 79.4 -2.4 -79.8 -7 1 4 12367 05 25 50 05 26 50 --- 10 54 59 60.7 79.5 -2.4 -79.9 53 R 1 11967 05 26 50 ARP193 10 54 59 60.0 79.8 -2.4 -79.2 -7 1 4 11967 05 26 50 05 29 50 --- 10 57 59 60.6 80.1 -2.4 -79.4 173 R 1 10767 05 29 50 J1317+34 10 57 59 61.3 79.7 -2.3 -80.1 -7 1 4 10767 05 29 50 05 30 50 --- 10 58 59 61.5 79.8 -2.3 -80.2 53 R 1 10367 05 30 50 ARP193 10 58 59 60.8 80.2 -2.4 -79.5 -7 1 4 10367 05 30 50 05 33 50 --- 11 02 00 61.5 80.4 -2.3 -79.7 173 R 1 9167 Schedule for VLBA_PT (Code Pt ) Page 7 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 05 33 50 J1317+34 11 02 00 62.1 80.0 -2.3 -80.4 -7 1 4 9167 05 33 50 05 34 50 --- 11 03 00 62.3 80.1 -2.2 -80.5 53 R 1 8767 05 34 50 ARP193 11 03 00 61.7 80.5 -2.3 -79.8 -7 1 4 8767 05 34 50 05 37 50 --- 11 06 00 62.3 80.7 -2.2 -80.0 173 R 1 7567 05 37 50 J1317+34 11 06 00 62.9 80.3 -2.2 -80.7 -7 1 4 7567 05 37 50 05 38 50 --- 11 07 01 63.1 80.4 -2.2 -80.8 53 R 1 7167 05 38 50 ARP193 11 07 01 62.5 80.8 -2.2 -80.1 -7 1 4 7167 05 38 50 05 41 50 --- 11 10 01 63.1 81.0 -2.2 -80.3 173 R 1 5967 05 41 50 J1317+34 11 10 01 63.7 80.6 -2.1 -81.0 -7 1 4 5967 05 41 50 05 42 50 --- 11 11 01 63.9 80.7 -2.1 -81.1 53 R 1 5567 05 43 30 ARP193 11 11 41 63.4 81.1 -2.2 -80.4 33 1 4 5567 05 43 30 05 46 30 --- 11 14 42 64.0 81.4 -2.1 -80.6 180 R 1 4367 05 46 30 J1317+34 11 14 42 64.7 81.0 -2.1 -81.4 -7 1 4 4367 05 46 30 05 47 30 --- 11 15 42 64.9 81.0 -2.0 -81.5 53 R 1 3967 05 47 30 ARP193 11 15 42 64.2 81.4 -2.1 -80.7 -7 1 4 3967 05 47 30 05 50 30 --- 11 18 42 64.9 81.7 -2.0 -80.9 173 R 1 2767 05 50 30 J1317+34 11 18 42 65.5 81.2 -2.0 -81.7 -7 1 4 2767 05 50 30 05 51 30 --- 11 19 43 65.7 81.3 -2.0 -81.8 53 R 1 2367 05 51 30 ARP193 11 19 43 65.1 81.8 -2.0 -81.0 -7 1 4 2367 05 51 30 05 54 30 --- 11 22 43 65.7 82.0 -2.0 -81.2 173 R 1 1167 05 54 30 J1317+34 11 22 43 66.3 81.5 -1.9 -82.0 -7 1 4 1167 05 54 30 05 55 30 --- 11 23 43 66.5 81.6 -1.9 -82.1 53 R 1 767 05 55 30 J1329+31 11 23 43 63.5 86.3 -2.1 -76.1 -12 1 5 767 05 55 30 05 59 30 --- 11 27 44 64.4 86.8 -2.0 -76.2 228 F 1 833 05 59 30 J1317+34 11 27 44 67.4 81.9 -1.8 -82.4 -12 1 5 833 05 59 30 06 00 30 --- 11 28 44 67.6 82.0 -1.8 -82.5 48 F 1 1233 06 00 30 ARP193 11 28 44 66.9 82.5 -1.9 -81.6 -7 1 5 1233 06 00 30 06 03 30 --- 11 31 45 67.5 82.7 -1.8 -81.8 173 F 1 2433 Schedule for VLBA_PT (Code Pt ) Page 8 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 06 03 30 J1317+34 11 31 45 68.2 82.2 -1.8 -82.7 -7 1 5 2433 06 03 30 06 04 30 --- 11 32 45 68.4 82.2 -1.8 -82.8 53 F 1 2833 06 04 30 ARP193 11 32 45 67.7 82.8 -1.8 -81.9 -7 1 5 2833 06 04 30 06 07 30 --- 11 35 45 68.4 83.0 -1.7 -82.1 173 F 1 4033 06 07 30 J1317+34 11 35 45 69.0 82.4 -1.7 -83.0 -7 1 5 4033 06 07 30 06 08 30 --- 11 36 45 69.2 82.5 -1.7 -83.1 53 F 1 4433 06 08 30 ARP193 11 36 45 68.6 83.1 -1.7 -82.1 -7 1 5 4433 06 08 30 06 11 30 --- 11 39 46 69.2 83.3 -1.7 -82.3 173 F 1 5633 06 11 30 J1317+34 11 39 46 69.8 82.7 -1.6 -83.3 -7 1 5 5633 06 11 30 06 12 30 --- 11 40 46 70.0 82.8 -1.6 -83.4 53 F 1 6033 06 12 30 ARP193 11 40 46 69.4 83.4 -1.7 -82.4 -7 1 5 6033 06 12 30 06 15 30 --- 11 43 47 70.0 83.6 -1.6 -82.6 173 F 1 7233 06 15 30 J1317+34 11 43 47 70.6 83.0 -1.6 -83.6 -7 1 5 7233 06 15 30 06 16 30 --- 11 44 47 70.8 83.1 -1.5 -83.7 53 F 1 7633 06 16 30 ARP193 11 44 47 70.2 83.7 -1.6 -82.7 -7 1 5 7633 06 16 30 06 19 30 --- 11 47 47 70.8 83.9 -1.5 -82.9 173 F 1 8833 06 19 30 J1317+34 11 47 47 71.5 83.3 -1.5 -83.9 -7 1 5 8833 06 19 30 06 20 30 --- 11 48 47 71.7 83.4 -1.5 -84.0 53 F 1 9233 06 20 30 ARP193 11 48 47 71.0 84.0 -1.5 -82.9 -7 1 5 9233 06 20 30 06 23 30 --- 11 51 48 71.6 84.2 -1.5 -83.1 173 F 1 10433 06 23 30 J1317+34 11 51 48 72.3 83.6 -1.4 -84.2 -7 1 5 10433 06 23 30 06 24 30 --- 11 52 48 72.5 83.6 -1.4 -84.3 53 F 1 10833 06 24 30 ARP193 11 52 48 71.9 84.3 -1.5 -83.2 -7 1 5 10833 06 24 30 06 27 30 --- 11 55 49 72.5 84.6 -1.4 -83.4 173 F 1 12033 06 27 30 J1317+34 11 55 49 73.1 83.8 -1.4 -84.5 -7 1 5 12033 06 27 30 06 28 30 --- 11 56 49 73.3 83.9 -1.3 -84.6 53 F 1 12433 06 28 30 ARP193 11 56 49 72.7 84.6 -1.4 -83.5 -7 1 5 12433 06 28 30 06 31 30 --- 11 59 49 73.3 84.9 -1.3 -83.7 173 F 1 13633 Schedule for VLBA_PT (Code Pt ) Page 9 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 06 31 30 J1317+34 11 59 49 73.9 84.1 -1.3 -84.8 -7 1 5 13633 06 31 30 06 32 30 --- 12 00 49 74.1 84.2 -1.3 -84.9 53 F 1 14033 06 32 30 ARP193 12 00 49 73.5 85.0 -1.3 -83.7 -7 1 5 14033 06 32 30 06 35 30 --- 12 03 50 74.1 85.2 -1.3 -83.9 173 F 1 15233 06 35 30 J1317+34 12 03 50 74.8 84.4 -1.2 -85.1 -7 1 5 15233 06 35 30 06 36 30 --- 12 04 50 75.0 84.4 -1.2 -85.2 53 F 1 15633 06 36 30 ARP193 12 04 50 74.3 85.3 -1.3 -84.0 -7 1 5 15633 06 36 30 06 39 30 --- 12 07 51 74.9 85.5 -1.2 -84.2 173 F 1 16833 06 39 30 J1317+34 12 07 51 75.6 84.6 -1.2 -85.4 -7 1 5 16833 06 39 30 06 40 30 --- 12 08 51 75.8 84.7 -1.1 -85.5 53 F 1 17233 06 40 30 ARP193 12 08 51 75.2 85.6 -1.2 -84.2 -7 1 6 17233 06 40 30 06 43 30 --- 12 11 51 75.8 85.8 -1.1 -84.4 173 R 1 16033 06 43 30 J1317+34 12 11 51 76.4 84.9 -1.1 -85.8 -7 1 6 16033 06 43 30 06 44 30 --- 12 12 51 76.6 85.0 -1.1 -85.8 53 R 1 15633 06 44 30 ARP193 12 12 51 76.0 85.9 -1.1 -84.5 -7 1 6 15633 06 44 30 06 47 30 --- 12 15 52 76.6 86.2 -1.1 -84.7 173 R 1 14433 06 47 30 J1317+34 12 15 52 77.2 85.2 -1.0 -86.1 -7 1 6 14433 06 47 30 06 48 30 --- 12 16 52 77.4 85.2 -1.0 -86.1 53 R 1 14033 06 50 30 J1329+31 12 18 52 74.9 94.2 -1.2 -76.0 108 1 6 14033 06 50 30 06 54 30 --- 12 22 53 75.7 95.1 -1.1 -75.7 240 R 1 12433 06 54 30 J1317+34 12 22 53 78.7 85.6 -0.9 -86.6 -12 1 6 12433 06 54 30 06 55 30 --- 12 23 53 78.9 85.7 -0.9 -86.7 48 R 1 12033 06 55 30 ARP193 12 23 53 78.3 86.9 -0.9 -85.1 -7 1 6 12033 06 55 30 06 58 25 --- 12 26 49 78.9 87.1 -0.9 -85.3 168 R 1 10867 06 58 25 J1317+34 12 26 49 79.5 85.8 -0.8 -86.9 -7 1 6 10867 06 58 25 06 59 20 --- 12 27 44 79.7 85.9 -0.8 -87.0 48 R 1 10500 06 59 20 ARP193 12 27 44 79.0 87.2 -0.9 -85.3 -7 1 6 10500 06 59 20 07 02 15 --- 12 30 39 79.6 87.5 -0.8 -85.5 168 R 1 9333 Schedule for VLBA_PT (Code Pt ) Page 10 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 07 02 15 J1317+34 12 30 39 80.3 86.1 -0.8 -87.3 -7 1 6 9333 07 02 15 07 03 10 --- 12 31 34 80.5 86.1 -0.8 -87.3 48 R 1 8967 07 03 10 ARP193 12 31 34 79.8 87.5 -0.8 -85.5 -7 1 6 8967 07 03 10 07 06 05 --- 12 34 30 80.4 87.8 -0.8 -85.7 168 R 1 7800 07 06 05 J1317+34 12 34 30 81.1 86.3 -0.7 -87.6 -7 1 6 7800 07 06 05 07 07 00 --- 12 35 25 81.3 86.3 -0.7 -87.7 48 R 1 7433 07 07 00 ARP193 12 35 25 80.6 87.9 -0.8 -85.7 -7 1 6 7433 07 07 00 07 09 55 --- 12 38 21 81.2 88.2 -0.7 -85.8 168 R 1 6267 07 09 55 J1317+34 12 38 21 81.9 86.5 -0.7 -87.9 -7 1 6 6267 07 09 55 07 10 50 --- 12 39 16 82.1 86.5 -0.6 -88.0 48 R 1 5900 07 10 50 ARP193 12 39 16 81.4 88.3 -0.7 -85.9 -7 1 6 5900 07 10 50 07 13 45 --- 12 42 11 82.0 88.6 -0.6 -86.0 168 R 1 4733 07 13 45 J1317+34 12 42 11 82.7 86.7 -0.6 -88.3 -7 1 6 4733 07 13 45 07 14 40 --- 12 43 06 82.8 86.7 -0.6 -88.4 48 R 1 4367 07 14 40 ARP193 12 43 06 82.2 88.7 -0.6 -86.0 -7 1 6 4367 07 14 40 07 17 35 --- 12 46 02 82.8 89.0 -0.6 -86.1 168 R 1 3200 07 17 35 J1317+34 12 46 02 83.4 86.9 -0.5 -88.6 -7 1 6 3200 07 17 35 07 18 30 --- 12 46 57 83.6 86.9 -0.5 -88.7 48 R 1 2833 07 18 30 ARP193 12 46 57 83.0 89.1 -0.6 -86.2 -7 1 6 2833 07 18 30 07 21 25 --- 12 49 52 83.6 89.4 -0.5 -86.2 168 R 1 1667 07 21 25 J1317+34 12 49 52 84.2 87.0 -0.5 -89.0 -8 1 6 1667 07 21 25 07 22 20 --- 12 50 48 84.4 87.0 -0.4 -89.1 47 R 1 1300 07 22 20 ARP193 12 50 48 83.8 89.6 -0.5 -86.2 -8 1 6 1300 07 22 20 07 25 15 --- 12 53 43 84.4 89.9 -0.5 -86.3 167 R 1 133 07 25 15 J1317+34 12 53 43 85.0 87.1 -0.4 -89.5 -8 1 7 133 07 25 15 07 26 10 --- 12 54 38 85.2 87.1 -0.4 -89.6 47 F 1 500 07 26 10 ARP193 12 54 38 84.6 90.1 -0.4 -86.3 -8 1 7 500 07 26 10 07 29 05 --- 12 57 34 85.2 90.5 -0.4 -86.2 167 F 1 1667 Schedule for VLBA_PT (Code Pt ) Page 11 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 07 29 05 J1317+34 12 57 34 85.8 87.2 -0.3 -90.0 -8 1 7 1667 07 29 05 07 30 00 --- 12 58 29 86.0 87.2 -0.3 -90.1 47 F 1 2033 07 30 00 ARP193 12 58 29 85.4 90.7 -0.4 -86.2 -8 1 7 2033 07 30 00 07 32 55 --- 13 01 24 86.0 91.2 -0.3 -86.1 167 F 1 3200 07 32 55 J1317+34 13 01 24 86.6 87.1 -0.3 -90.6 -9 1 7 3200 07 32 55 07 33 50 --- 13 02 19 86.8 87.1 -0.3 -90.7 46 F 1 3567 07 33 50 ARP193 13 02 19 86.2 91.4 -0.3 -86.0 -9 1 7 3567 07 33 50 07 36 45 --- 13 05 15 86.8 92.1 -0.3 -85.7 166 F 1 4733 07 36 45 J1317+34 13 05 15 87.4 86.9 -0.2 -91.4 -10 1 7 4733 07 36 45 07 37 40 --- 13 06 10 87.6 86.7 -0.2 -91.6 45 F 1 5100 07 37 40 ARP193 13 06 10 87.0 92.4 -0.2 -85.6 -10 1 7 5100 07 37 40 07 40 35 --- 13 09 06 87.6 93.4 -0.2 -84.9 165 F 1 6267 07 40 35 J1317+34 13 09 06 88.2 86.1 -0.1 -92.6 -11 1 7 6267 07 40 35 07 41 30 --- 13 10 01 88.4 85.8 -0.1 -93.1 44 F 1 6633 07 41 30 ARP193 13 10 01 87.8 93.9 -0.2 -84.6 -11 1 7 6633 07 41 30 07 44 25 --- 13 12 56 88.4 95.8 -0.1 -83.1 164 F 1 7800 07 44 25 J1317+34 13 12 56 89.0 83.8 -0.1 -95.5 -14 1 7 7800 07 44 25 07 45 50 --- 13 14 21 89.3 81.5 -0.1 -98.0 71 F 1 8367 07 48 30 3C147 13 17 02 12.6 -37.3 7.6 50.9 1 1 7 8367 07 48 30 07 53 50 --- 13 22 23 11.9 -36.7 7.7 50.0 320 F 1 10500 07 56 50 J1310 13 25 23 86.3 238.4 0.2 56.3 -9 1 7 10500 07 56 50 08 04 50 --- 13 33 25 84.9 249.0 0.4 65.9 471 F 1 13700 08 04 50 J1317+34 13 33 25 86.8 272.9 0.3 90.7 -22 1 7 13700 08 04 50 08 06 50 --- 13 35 25 86.4 272.8 0.3 90.4 98 F 1 14500 08 06 50 ARP193 13 35 25 87.0 267.6 0.2 85.6 -9 1 7 14500 08 06 50 08 09 50 --- 13 38 25 86.3 268.4 0.3 85.9 171 F 1 15700 08 09 50 J1317+34 13 38 25 85.7 272.8 0.3 89.9 -9 1 7 15700 08 09 50 08 10 50 --- 13 39 26 85.5 272.8 0.4 89.8 51 F 1 16100 Schedule for VLBA_PT (Code Pt ) Page 12 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 08 10 50 ARP193 13 39 26 86.1 268.7 0.3 86.0 -9 1 7 16100 08 10 50 08 13 50 --- 13 42 26 85.5 269.2 0.4 86.2 171 F 1 17300 08 13 50 J1317+34 13 42 26 84.9 272.9 0.4 89.4 -8 1 8 17300 08 13 50 08 14 50 --- 13 43 26 84.7 272.9 0.4 89.3 52 R 1 16900 08 14 50 ARP193 13 43 26 85.3 269.4 0.4 86.2 -8 1 8 16900 08 14 50 08 17 50 --- 13 46 27 84.7 269.9 0.4 86.3 172 R 1 15700 08 17 50 J1317+34 13 46 27 84.1 273.0 0.5 89.0 -8 1 8 15700 08 17 50 08 18 50 --- 13 47 27 83.9 273.0 0.5 88.9 52 R 1 15300 08 18 50 ARP193 13 47 27 84.5 270.0 0.4 86.3 -8 1 8 15300 08 18 50 08 21 50 --- 13 50 27 83.9 270.4 0.5 86.2 172 R 1 14100 08 21 50 J1317+34 13 50 27 83.3 273.2 0.5 88.6 -8 1 8 14100 08 21 50 08 22 50 --- 13 51 27 83.0 273.2 0.6 88.5 52 R 1 13700 08 22 50 ARP193 13 51 27 83.7 270.5 0.5 86.2 -8 1 8 13700 08 22 50 08 25 50 --- 13 54 28 83.0 270.9 0.6 86.2 172 R 1 12500 08 25 50 J1317+34 13 54 28 82.4 273.4 0.6 88.2 -8 1 8 12500 08 25 50 08 26 50 --- 13 55 28 82.2 273.4 0.6 88.1 52 R 1 12100 08 26 50 ARP193 13 55 28 82.8 271.0 0.6 86.1 -8 1 8 12100 08 26 50 08 29 50 --- 13 58 29 82.2 271.3 0.6 86.0 172 R 1 10900 08 29 50 J1317+34 13 58 29 81.6 273.6 0.7 87.8 -7 1 8 10900 08 29 50 08 30 50 --- 13 59 29 81.4 273.6 0.7 87.7 53 R 1 10500 08 30 50 ARP193 13 59 29 82.0 271.4 0.6 86.0 -7 1 8 10500 08 30 50 08 33 50 --- 14 02 29 81.4 271.7 0.7 85.9 173 R 1 9300 08 33 50 J1317+34 14 02 29 80.8 273.8 0.7 87.5 -7 1 8 9300 08 33 50 08 34 50 --- 14 03 29 80.6 273.8 0.8 87.4 53 R 1 8900 08 34 50 ARP193 14 03 29 81.2 271.8 0.7 85.8 -7 1 8 8900 08 34 50 08 37 50 --- 14 06 30 80.5 272.1 0.8 85.7 173 R 1 7700 08 37 50 J1317+34 14 06 30 79.9 274.0 0.8 87.1 -7 1 8 7700 08 37 50 08 38 50 --- 14 07 30 79.7 274.1 0.8 87.0 53 R 1 7300 Schedule for VLBA_PT (Code Pt ) Page 13 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 08 38 50 ARP193 14 07 30 80.3 272.2 0.8 85.6 -7 1 8 7300 08 38 50 08 41 50 --- 14 10 31 79.7 272.5 0.8 85.5 173 R 1 6100 08 41 50 J1317+34 14 10 31 79.1 274.3 0.9 86.8 -7 1 8 6100 08 41 50 08 42 50 --- 14 11 31 78.9 274.3 0.9 86.7 53 R 1 5700 08 42 50 ARP193 14 11 31 79.5 272.6 0.8 85.4 -7 1 8 5700 08 42 50 08 45 50 --- 14 14 31 78.9 272.9 0.9 85.3 173 R 1 4500 08 45 50 J1317+34 14 14 31 78.3 274.5 0.9 86.5 -7 1 8 4500 08 45 50 08 46 50 --- 14 15 31 78.1 274.6 1.0 86.4 53 R 1 4100 08 46 50 ARP193 14 15 31 78.7 273.0 0.9 85.2 -7 1 8 4100 08 46 50 08 49 50 --- 14 18 32 78.1 273.2 1.0 85.1 173 R 1 2900 08 49 50 J1317+34 14 18 32 77.5 274.8 1.0 86.2 -7 1 8 2900 08 49 50 08 50 50 --- 14 19 32 77.3 274.8 1.0 86.1 53 R 1 2500 08 50 50 ARP193 14 19 32 77.9 273.3 1.0 85.0 -7 1 8 2500 08 50 50 08 53 50 --- 14 22 33 77.2 273.6 1.0 84.8 173 R 1 1300 08 53 50 J1317+34 14 22 33 76.6 275.0 1.1 85.8 -7 1 8 1300 08 53 50 08 54 50 --- 14 23 33 76.4 275.1 1.1 85.8 53 R 1 900 08 54 50 J1329+31 14 23 33 78.5 261.6 0.9 74.2 -15 1 9 900 08 54 50 08 58 50 --- 14 27 33 77.7 262.7 1.0 74.8 225 F 1 700 08 58 50 J1317+34 14 27 33 75.6 275.4 1.2 85.5 -14 1 9 700 08 58 50 08 59 50 --- 14 28 34 75.4 275.4 1.2 85.4 46 F 1 1100 08 59 50 ARP193 14 28 34 76.0 274.1 1.1 84.5 -7 1 9 1100 08 59 50 09 02 50 --- 14 31 34 75.4 274.3 1.2 84.3 173 F 1 2300 09 02 50 J1317+34 14 31 34 74.8 275.6 1.2 85.1 -7 1 9 2300 09 02 50 09 03 50 --- 14 32 34 74.6 275.7 1.2 85.1 53 F 1 2700 09 03 50 ARP193 14 32 34 75.2 274.4 1.2 84.2 -7 1 9 2700 09 03 50 09 06 50 --- 14 35 35 74.6 274.6 1.2 84.0 173 F 1 3900 09 06 50 J1317+34 14 35 35 74.0 275.9 1.3 84.8 -7 1 9 3900 09 06 50 09 07 50 --- 14 36 35 73.8 276.0 1.3 84.8 53 F 1 4300 Schedule for VLBA_PT (Code Pt ) Page 14 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 09 07 50 ARP193 14 36 35 74.3 274.7 1.3 84.0 -7 1 9 4300 09 07 50 09 10 50 --- 14 39 35 73.7 275.0 1.3 83.8 173 F 1 5500 09 10 50 J1317+34 14 39 35 73.1 276.2 1.4 84.5 -7 1 9 5500 09 10 50 09 11 50 --- 14 40 36 72.9 276.2 1.4 84.5 53 F 1 5900 09 11 50 ARP193 14 40 36 73.5 275.0 1.3 83.7 -7 1 9 5900 09 11 50 09 14 50 --- 14 43 36 72.9 275.3 1.4 83.5 173 F 1 7100 09 14 50 J1317+34 14 43 36 72.3 276.4 1.4 84.2 -7 1 9 7100 09 14 50 09 15 50 --- 14 44 36 72.1 276.5 1.4 84.1 53 F 1 7500 09 15 50 ARP193 14 44 36 72.7 275.4 1.4 83.5 -7 1 9 7500 09 15 50 09 18 50 --- 14 47 37 72.1 275.6 1.4 83.3 173 F 1 8700 09 18 50 J1317+34 14 47 37 71.5 276.7 1.5 83.9 -7 1 9 8700 09 18 50 09 19 50 --- 14 48 37 71.3 276.8 1.5 83.8 53 F 1 9100 09 19 50 ARP193 14 48 37 71.9 275.7 1.5 83.2 -7 1 9 9100 09 19 50 09 22 50 --- 14 51 37 71.3 275.9 1.5 83.0 173 F 1 10300 09 22 50 J1317+34 14 51 37 70.7 277.0 1.6 83.6 -7 1 9 10300 09 22 50 09 23 50 --- 14 52 38 70.5 277.1 1.6 83.5 53 F 1 10700 09 23 50 ARP193 14 52 38 71.0 276.0 1.5 82.9 -7 1 9 10700 09 23 50 09 26 50 --- 14 55 38 70.4 276.2 1.6 82.7 173 F 1 11900 09 26 50 J1317+34 14 55 38 69.9 277.3 1.6 83.3 -7 1 9 11900 09 26 50 09 27 50 --- 14 56 38 69.6 277.3 1.6 83.2 53 F 1 12300 09 27 50 ARP193 14 56 38 70.2 276.3 1.6 82.7 -7 1 9 12300 09 27 50 09 30 50 --- 14 59 39 69.6 276.5 1.6 82.5 173 F 1 13500 09 30 50 J1317+34 14 59 39 69.0 277.5 1.7 83.0 -7 1 9 13500 09 30 50 09 31 50 --- 15 00 39 68.8 277.6 1.7 82.9 53 F 1 13900 09 31 50 ARP193 15 00 39 69.4 276.6 1.7 82.4 -7 1 9 13900 09 31 50 09 34 50 --- 15 03 39 68.8 276.8 1.7 82.2 173 F 1 15100 09 34 50 J1317+34 15 03 39 68.2 277.8 1.8 82.7 -7 1 9 15100 09 34 50 09 35 50 --- 15 04 39 68.0 277.9 1.8 82.6 53 F 1 15500 Schedule for VLBA_PT (Code Pt ) Page 15 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 09 35 50 ARP193 15 04 39 68.6 276.9 1.7 82.1 -7 1 9 15500 09 35 50 09 38 50 --- 15 07 40 68.0 277.2 1.8 81.9 173 F 1 16700 09 38 50 J1317+34 15 07 40 67.4 278.1 1.8 82.4 -7 1 9 16700 09 38 50 09 39 50 --- 15 08 40 67.2 278.2 1.8 82.3 53 F 1 17100 09 39 50 ARP193 15 08 40 67.8 277.2 1.8 81.9 -7 1 10 17100 09 39 50 09 42 50 --- 15 11 41 67.1 277.5 1.8 81.7 173 R 1 16900 09 42 50 J1317+34 15 11 41 66.6 278.4 1.9 82.1 -7 1 10 16900 09 42 50 09 43 50 --- 15 12 41 66.4 278.5 1.9 82.0 53 R 1 16500 09 43 50 ARP193 15 12 41 66.9 277.5 1.9 81.6 -7 1 10 16500 09 43 50 09 46 50 --- 15 15 41 66.3 277.8 1.9 81.4 173 R 1 15300 09 46 50 J1317+34 15 15 41 65.7 278.7 2.0 81.8 -7 1 10 15300 09 46 50 09 47 50 --- 15 16 41 65.5 278.8 2.0 81.7 53 R 1 14900 09 49 50 J1329+31 15 18 42 67.2 271.6 1.8 76.5 109 1 10 14900 09 49 50 09 53 50 --- 15 22 42 66.4 272.1 1.9 76.5 240 R 1 13300 09 53 50 J1317+34 15 22 42 64.3 279.2 2.1 81.3 -11 1 10 13300 09 53 50 09 54 50 --- 15 23 43 64.1 279.3 2.1 81.2 49 R 1 12900 09 54 50 ARP193 15 23 43 64.7 278.4 2.0 80.8 -7 1 10 12900 09 54 50 09 57 50 --- 15 26 43 64.1 278.6 2.1 80.6 173 R 1 11700 09 57 50 J1317+34 15 26 43 63.5 279.5 2.1 81.0 -7 1 10 11700 09 57 50 09 58 50 --- 15 27 43 63.3 279.5 2.2 80.9 53 R 1 11300 09 58 50 ARP193 15 27 43 63.9 278.7 2.1 80.5 -7 1 10 11300 09 58 50 10 01 50 --- 15 30 44 63.2 278.9 2.2 80.3 173 R 1 10100 10 01 50 J1317+34 15 30 44 62.7 279.8 2.2 80.6 -7 1 10 10100 10 01 50 10 02 50 --- 15 31 44 62.5 279.8 2.2 80.6 53 R 1 9700 10 02 50 ARP193 15 31 44 63.0 279.0 2.2 80.3 -7 1 10 9700 10 02 50 10 05 50 --- 15 34 44 62.4 279.2 2.2 80.0 173 R 1 8500 10 05 50 J1317+34 15 34 44 61.9 280.1 2.3 80.3 -7 1 10 8500 10 05 50 10 06 50 --- 15 35 45 61.7 280.1 2.3 80.3 53 R 1 8100 Schedule for VLBA_PT (Code Pt ) Page 16 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 10 06 50 ARP193 15 35 45 62.2 279.3 2.2 80.0 -7 1 10 8100 10 06 50 10 09 50 --- 15 38 45 61.6 279.6 2.3 79.7 173 R 1 6900 10 09 50 J1317+34 15 38 45 61.1 280.4 2.3 80.0 -7 1 10 6900 10 09 50 10 10 50 --- 15 39 45 60.8 280.4 2.4 80.0 53 R 1 6500 10 10 50 ARP193 15 39 45 61.4 279.6 2.3 79.7 -7 1 10 6500 10 10 50 10 13 50 --- 15 42 46 60.8 279.9 2.4 79.5 173 R 1 5300 10 13 50 J1317+34 15 42 46 60.2 280.7 2.4 79.7 -7 1 10 5300 10 13 50 10 14 50 --- 15 43 46 60.0 280.7 2.4 79.6 53 R 1 4900 10 14 50 ARP193 15 43 46 60.6 279.9 2.4 79.4 -7 1 10 4900 10 14 50 10 17 50 --- 15 46 46 60.0 280.2 2.4 79.2 173 R 1 3700 10 17 50 J1317+34 15 46 46 59.4 281.0 2.5 79.4 -7 1 10 3700 10 17 50 10 18 50 --- 15 47 47 59.2 281.0 2.5 79.3 53 R 1 3300 10 18 50 ARP193 15 47 47 59.8 280.3 2.5 79.1 -7 1 10 3300 10 18 50 10 21 50 --- 15 50 47 59.2 280.5 2.5 78.9 173 R 1 2100 10 21 50 J1317+34 15 50 47 58.6 281.3 2.6 79.1 -7 1 10 2100 10 21 50 10 22 50 --- 15 51 47 58.4 281.3 2.6 79.0 53 R 1 1700 10 22 50 ARP193 15 51 47 59.0 280.6 2.5 78.8 -7 1 10 1700 10 22 50 10 25 50 --- 15 54 48 58.3 280.8 2.6 78.6 173 R 1 500 10 25 50 J1317+34 15 54 48 57.8 281.6 2.6 78.8 -7 1 10 500 10 25 50 10 26 50 --- 15 55 48 57.6 281.6 2.6 78.7 53 R 1 100 10 26 50 ARP193 15 55 48 58.1 280.9 2.6 78.5 -7 1 11 100 10 26 50 10 29 50 --- 15 58 48 57.5 281.1 2.6 78.3 173 F 1 1300 10 29 50 J1317+34 15 58 48 57.0 281.9 2.7 78.5 -7 1 11 1300 10 29 50 10 30 50 --- 15 59 49 56.8 281.9 2.7 78.4 53 F 1 1700 10 30 50 ARP193 15 59 49 57.3 281.2 2.7 78.2 -7 1 11 1700 10 30 50 10 33 50 --- 16 02 49 56.7 281.4 2.7 78.0 173 F 1 2900 10 33 50 J1317+34 16 02 49 56.2 282.2 2.8 78.2 -7 1 11 2900 10 33 50 10 34 50 --- 16 03 49 56.0 282.2 2.8 78.1 53 F 1 3300 Schedule for VLBA_PT (Code Pt ) Page 17 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 10 34 50 ARP193 16 03 49 56.5 281.5 2.7 77.9 -7 1 11 3300 10 34 50 10 37 50 --- 16 06 50 55.9 281.7 2.8 77.7 173 F 1 4500 10 37 50 J1317+34 16 06 50 55.4 282.5 2.8 77.9 -7 1 11 4500 10 37 50 10 38 50 --- 16 07 50 55.2 282.5 2.8 77.8 53 F 1 4900 10 38 50 ARP193 16 07 50 55.7 281.8 2.8 77.6 -7 1 11 4900 10 38 50 10 41 50 --- 16 10 50 55.1 282.1 2.8 77.4 173 F 1 6100 10 41 50 J1317+34 16 10 50 54.6 282.8 2.9 77.5 -7 1 11 6100 10 41 50 10 42 50 --- 16 11 50 54.4 282.8 2.9 77.5 53 F 1 6500 10 42 50 J1329+31 16 11 50 56.2 277.5 2.7 74.7 -10 1 11 6500 10 42 50 10 46 50 --- 16 15 51 55.4 277.9 2.8 74.5 230 F 1 8100 10 46 50 J1317+34 16 15 51 53.6 283.2 3.0 77.1 -10 1 11 8100 10 46 50 10 47 50 --- 16 16 51 53.3 283.2 3.0 77.1 50 F 1 8500 10 47 50 ARP193 16 16 51 53.9 282.5 2.9 76.9 -7 1 11 8500 10 47 50 10 50 50 --- 16 19 52 53.3 282.8 3.0 76.7 173 F 1 9700 10 50 50 J1317+34 16 19 52 52.7 283.5 3.0 76.8 -7 1 11 9700 10 50 50 10 51 50 --- 16 20 52 52.5 283.5 3.1 76.7 53 F 1 10100 10 51 50 ARP193 16 20 52 53.1 282.9 3.0 76.6 -7 1 11 10100 10 51 50 10 54 50 --- 16 23 52 52.5 283.1 3.1 76.4 173 F 1 11300 10 54 50 J1317+34 16 23 52 51.9 283.8 3.1 76.5 -7 1 11 11300 10 54 50 10 55 50 --- 16 24 53 51.7 283.9 3.1 76.4 53 F 1 11700 10 55 50 ARP193 16 24 53 52.3 283.2 3.1 76.3 -7 1 11 11700 10 55 50 10 58 50 --- 16 27 53 51.7 283.4 3.1 76.1 173 F 1 12900 10 58 50 J1317+34 16 27 53 51.1 284.1 3.2 76.2 -7 1 11 12900 10 58 50 10 59 50 --- 16 28 53 50.9 284.2 3.2 76.1 53 F 1 13300 10 59 50 ARP193 16 28 53 51.5 283.5 3.1 76.0 -7 1 11 13300 10 59 50 11 02 50 --- 16 31 54 50.9 283.7 3.2 75.8 173 F 1 14500 11 02 50 J1317+34 16 31 54 50.3 284.4 3.2 75.9 -7 1 11 14500 11 02 50 11 03 50 --- 16 32 54 50.1 284.5 3.3 75.8 53 F 1 14900 Schedule for VLBA_PT (Code Pt ) Page 18 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 11 03 50 ARP193 16 32 54 50.7 283.8 3.2 75.7 -7 1 11 14900 11 03 50 11 06 50 --- 16 35 54 50.1 284.1 3.3 75.5 173 F 1 16100 11 06 50 J1317+34 16 35 54 49.5 284.7 3.3 75.5 -7 1 11 16100 11 06 50 11 07 50 --- 16 36 55 49.3 284.8 3.3 75.5 53 F 1 16500 11 07 50 ARP193 16 36 55 49.9 284.1 3.3 75.4 -7 1 12 16500 11 07 50 11 10 50 --- 16 39 55 49.3 284.4 3.3 75.1 173 R 1 17500 11 10 50 J1317+34 16 39 55 48.7 285.0 3.4 75.2 -7 1 12 17500 11 10 50 11 11 50 --- 16 40 55 48.5 285.1 3.4 75.1 53 R 1 17100 11 11 50 ARP193 16 40 55 49.1 284.5 3.3 75.1 -7 1 12 17100 11 11 50 11 14 50 --- 16 43 56 48.5 284.7 3.4 74.8 173 R 1 15900 11 14 50 J1317+34 16 43 56 47.9 285.4 3.4 74.9 -7 1 12 15900 11 14 50 11 15 50 --- 16 44 56 47.7 285.4 3.5 74.8 53 R 1 15500 11 15 50 ARP193 16 44 56 48.3 284.8 3.4 74.7 -7 1 12 15500 11 15 50 11 18 50 --- 16 47 56 47.7 285.0 3.5 74.5 173 R 1 14300 11 18 50 J1317+34 16 47 56 47.1 285.7 3.5 74.6 -7 1 12 14300 11 18 50 11 19 50 --- 16 48 57 46.9 285.8 3.5 74.5 53 R 1 13900 11 19 50 ARP193 16 48 57 47.5 285.1 3.5 74.4 -7 1 12 13900 11 19 50 11 22 50 --- 16 51 57 46.9 285.4 3.5 74.2 173 R 1 12700 11 22 50 J1317+34 16 51 57 46.3 286.0 3.6 74.2 -7 1 12 12700 11 22 50 11 23 50 --- 16 52 57 46.1 286.1 3.6 74.1 53 R 1 12300 11 23 50 ARP193 16 52 57 46.7 285.5 3.5 74.1 -7 1 12 12300 11 23 50 11 26 50 --- 16 55 58 46.1 285.7 3.6 73.9 173 R 1 11100 11 26 50 J1317+34 16 55 58 45.5 286.3 3.6 73.9 -7 1 12 11100 11 26 50 11 27 50 --- 16 56 58 45.3 286.4 3.7 73.8 53 R 1 10700 11 27 50 ARP193 16 56 58 45.9 285.8 3.6 73.8 -7 1 12 10700 11 27 50 11 30 50 --- 16 59 58 45.3 286.0 3.7 73.5 173 R 1 9500 11 30 50 J1317+34 16 59 58 44.7 286.7 3.7 73.6 -7 1 12 9500 11 30 50 11 31 50 --- 17 00 59 44.5 286.8 3.7 73.5 53 R 1 9100 Schedule for VLBA_PT (Code Pt ) Page 19 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 11 31 50 ARP193 17 00 59 45.1 286.1 3.7 73.5 -7 1 12 9100 11 31 50 11 34 50 --- 17 03 59 44.5 286.4 3.7 73.2 173 R 1 7900 11 34 50 J1317+34 17 03 59 44.0 287.0 3.8 73.2 -7 1 12 7900 11 34 50 11 35 50 --- 17 04 59 43.8 287.1 3.8 73.1 53 R 1 7500 11 37 50 J1329+31 17 07 00 45.0 282.8 3.6 71.6 111 1 12 7500 11 37 50 11 40 50 --- 17 10 00 44.4 283.1 3.7 71.4 180 R 1 6300 11 40 50 J1317+34 17 10 00 42.8 287.5 3.9 72.7 -9 1 12 6300 11 40 50 11 41 50 --- 17 11 00 42.6 287.6 3.9 72.6 51 R 1 5900 11 41 50 ARP193 17 11 00 43.1 287.0 3.8 72.6 -7 1 12 5900 11 41 50 11 44 50 --- 17 14 01 42.5 287.2 3.9 72.4 173 R 1 4700 11 44 50 J1317+34 17 14 01 42.0 287.8 3.9 72.4 -7 1 12 4700 11 44 50 11 45 50 --- 17 15 01 41.8 287.9 4.0 72.3 53 R 1 4300 11 45 50 ARP193 17 15 01 42.3 287.3 3.9 72.3 -7 1 12 4300 11 45 50 11 48 50 --- 17 18 01 41.7 287.6 4.0 72.1 173 R 1 3100 11 48 50 J1317+34 17 18 01 41.2 288.2 4.0 72.0 -7 1 12 3100 11 48 50 11 49 50 --- 17 19 01 41.0 288.3 4.0 72.0 53 R 1 2700 11 49 50 ARP193 17 19 01 41.5 287.6 4.0 72.0 -7 1 12 2700 11 49 50 11 52 50 --- 17 22 02 40.9 287.9 4.0 71.7 173 R 1 1500 11 52 50 J1317+34 17 22 02 40.4 288.5 4.1 71.7 -7 1 12 1500 11 52 50 11 53 50 --- 17 23 02 40.2 288.6 4.1 71.6 53 R 1 1100 11 53 50 ARP193 17 23 02 40.7 288.0 4.0 71.6 -7 1 13 1100 11 53 50 11 56 50 --- 17 26 03 40.1 288.3 4.1 71.4 173 F 1 100 11 56 50 J1317+34 17 26 03 39.6 288.9 4.1 71.3 -7 1 13 100 11 56 50 11 57 50 --- 17 27 03 39.4 288.9 4.2 71.3 53 F 1 500 11 57 50 ARP193 17 27 03 39.9 288.3 4.1 71.3 -7 1 13 500 11 57 50 12 00 50 --- 17 30 03 39.3 288.6 4.2 71.0 173 F 1 1700 12 00 50 J1317+34 17 30 03 38.8 289.2 4.2 71.0 -7 1 13 1700 12 00 50 12 01 50 --- 17 31 03 38.6 289.3 4.2 70.9 53 F 1 2100 Schedule for VLBA_PT (Code Pt ) Page 20 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 12 01 50 ARP193 17 31 03 39.1 288.7 4.2 71.0 -7 1 13 2100 12 01 50 12 04 50 --- 17 34 04 38.5 288.9 4.2 70.7 173 F 1 3300 12 04 50 J1317+34 17 34 04 38.1 289.5 4.3 70.7 -7 1 13 3300 12 04 50 12 05 50 --- 17 35 04 37.9 289.6 4.3 70.6 53 F 1 3700 12 05 50 ARP193 17 35 04 38.3 289.0 4.2 70.6 -7 1 13 3700 12 05 50 12 08 50 --- 17 38 05 37.8 289.3 4.3 70.4 173 F 1 4900 12 08 50 J1317+34 17 38 05 37.3 289.9 4.3 70.3 -7 1 13 4900 12 08 50 12 09 50 --- 17 39 05 37.1 290.0 4.4 70.2 53 F 1 5300 12 09 50 ARP193 17 39 05 37.6 289.4 4.3 70.3 -7 1 13 5300 12 09 50 12 12 50 --- 17 42 05 37.0 289.7 4.4 70.0 173 F 1 6500 12 12 50 J1317+34 17 42 05 36.5 290.2 4.4 69.9 -7 1 13 6500 12 12 50 12 13 50 --- 17 43 05 36.3 290.3 4.4 69.9 53 F 1 6900 12 13 50 ARP193 17 43 05 36.8 289.7 4.4 69.9 -7 1 13 6900 12 13 50 12 16 50 --- 17 46 06 36.2 290.0 4.4 69.7 173 F 1 8100 12 16 50 J1317+34 17 46 06 35.7 290.6 4.5 69.6 -7 1 13 8100 12 16 50 12 17 50 --- 17 47 06 35.5 290.7 4.5 69.5 53 F 1 8500 12 17 50 ARP193 17 47 06 36.0 290.1 4.4 69.6 -7 1 13 8500 12 17 50 12 20 50 --- 17 50 07 35.4 290.4 4.5 69.3 173 F 1 9700 12 20 50 J1317+34 17 50 07 34.9 291.0 4.5 69.2 -7 1 13 9700 12 20 50 12 21 50 --- 17 51 07 34.8 291.0 4.6 69.1 53 F 1 10100 12 21 50 ARP193 17 51 07 35.2 290.5 4.5 69.2 -7 1 13 10100 12 21 50 12 24 50 --- 17 54 07 34.6 290.7 4.6 68.9 173 F 1 11300 12 24 50 J1317+34 17 54 07 34.2 291.3 4.6 68.9 -7 1 13 11300 12 24 50 12 25 50 --- 17 55 07 34.0 291.4 4.6 68.8 53 F 1 11700 12 25 50 ARP193 17 55 07 34.5 290.8 4.6 68.9 -7 1 13 11700 12 25 50 12 28 50 --- 17 58 08 33.9 291.1 4.6 68.6 173 F 1 12900 12 28 50 J1317+34 17 58 08 33.4 291.7 4.7 68.5 -7 1 13 12900 12 28 50 12 29 50 --- 17 59 08 33.2 291.8 4.7 68.4 53 F 1 13300 Schedule for VLBA_PT (Code Pt ) Page 21 Continuum and 21cm HI Absorption toward Arp193 UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Wed 2 Apr 2003 Day 92 --- 12 29 50 J1329+31 17 59 08 34.7 287.8 4.5 67.9 -9 1 13 13300 12 29 50 12 33 50 --- 18 03 09 33.9 288.2 4.6 67.6 231 F 1 14900 12 33 50 J1317+34 18 03 09 32.4 292.1 4.8 68.0 -9 1 13 14900 12 33 50 12 34 54 --- 18 04 13 32.2 292.2 4.8 67.9 55 F 1 15327 12 34 54 ARP193 18 04 13 32.7 291.7 4.7 68.0 -7 1 13 15327 12 34 54 12 37 54 --- 18 07 13 32.1 291.9 4.8 67.8 173 F 1 16527 12 37 54 J1317+34 18 07 13 31.7 292.5 4.8 67.7 -7 1 13 16527 12 37 54 12 38 51 --- 18 08 11 31.5 292.6 4.8 67.6 50 F 1 16907 12 38 51 ARP193 18 08 11 31.9 292.0 4.8 67.7 -7 1 14 16907 12 38 51 12 41 51 --- 18 11 11 31.4 292.3 4.8 67.4 173 R 1 17093 12 41 51 J1317+34 18 11 11 30.9 292.9 4.9 67.3 -7 1 14 17093 12 41 51 12 42 48 --- 18 12 08 30.7 293.0 4.9 67.2 50 R 1 16713 12 42 48 ARP193 18 12 08 31.2 292.4 4.9 67.3 -7 1 14 16713 12 42 48 12 45 48 --- 18 15 09 30.6 292.7 4.9 67.0 173 R 1 15513 12 45 48 J1317+34 18 15 09 30.2 293.2 5.0 66.9 -7 1 14 15513 12 45 48 12 46 45 --- 18 16 06 30.0 293.3 5.0 66.8 50 R 1 15133 12 46 45 ARP193 18 16 06 30.4 292.8 4.9 67.0 -7 1 14 15133 12 46 45 12 49 45 --- 18 19 06 29.9 293.0 5.0 66.7 173 R 1 13933 12 49 45 J1317+34 18 19 06 29.4 293.6 5.0 66.5 -7 1 14 13933 12 49 45 12 50 42 --- 18 20 03 29.2 293.7 5.0 66.5 50 R 1 13553 12 50 42 ARP193 18 20 03 29.7 293.1 5.0 66.6 -7 1 14 13553 12 50 42 12 53 42 --- 18 23 04 29.1 293.4 5.0 66.3 173 R 1 12353 12 53 42 J1317+34 18 23 04 28.7 294.0 5.1 66.2 -7 1 14 12353 12 53 42 12 54 39 --- 18 24 01 28.5 294.1 5.1 66.1 50 R 1 11973 12 54 39 ARP193 18 24 01 28.9 293.5 5.1 66.2 -7 1 14 11973 12 54 39 12 57 39 --- 18 27 02 28.4 293.8 5.1 65.9 173 R 1 10773 12 57 39 J1317+34 18 27 02 27.9 294.4 5.2 65.8 -7 1 14 10773 12 57 39 12 58 36 --- 18 27 59 27.7 294.5 5.2 65.7 50 R 1 10393 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: bm176b.set Matches group v20cm_1 in /home/arana/cwalker/sched/catalogs/freq.dat FD and KP filtered below 1330. SC filtered above 1440 Setup group: 1 Station: VLBA Total bit rate: 128 Format: VLBA1:4 Bits per sample: 2 Sample rate: 16.000 Number of channels: 4 Passes/head pos: 1 Speedup factor: 2.00 Tape speeds: Low density - 133.330 ips, High density - 80.00 ips Time per pass for 17600 ft, High density tapes is: 00:44:00 1st LO= 2100.00 2100.00 2100.00 2100.00 Net SB= U U U U Pol. = RCP LCP RCP LCP BBC = 1 2 3 4 BBC SB= L L L L IF = A C A C VLBA FE= 20cm omit 20cm omit VLBA Synth= 15.4 2.1 15.4 The following frequency sets based on this setup were used. Frequency Set: 1 Based on FREQ, BW, and/or DOPPLER in schedule. Used pcal sets: 1 LO sum= 1384.05 1384.05 1391.87 1391.87 BBC fr= 715.95 715.95 708.13 708.13 Bandwd= 8.000 8.000 8.000 8.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = OFF PCALXB1= S1 S2 S3 S4 OFF OFF OFF OFF PCALXB2= M1 M2 M3 M4 OFF OFF OFF OFF PCALFR1= 0 0 0 0 0 0 0 0 PCALFR2= 0 0 0 0 0 0 0 0 Track assignments are: track1= 2, 18, 3, 19 barrel=roll_auto SOURCE LIST -- Continuum and 21cm HI Absorption toward Arp193 Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Source Source position (RA/Dec) (B1950) (J2000) (Date) * ARP193 * 13 18 17.011290 13 20 35.316002 13 20 45.154476 * 34 24 04.69840 34 08 22.37685 34 07 17.19504 From catalog imbedded in main SCHED input file. * J1317+34 13 15 17.789380 * 13 17 36.494190 13 17 46.366827 34 41 02.60455 * 34 25 15.93266 34 24 10.70062 From catalog imbedded in main SCHED input file. * J1329+31 13 27 34.876224 * 13 29 52.864929 13 30 02.618562 32 09 38.80991 * 31 54 11.05501 31 53 06.07392 From catalog imbedded in main SCHED input file. * J1310 13 08 07.560126 * 13 10 28.663845 13 10 38.633246 32 36 40.23888 * 32 20 43.78295 32 19 38.34084 From catalog imbedded in main SCHED input file. * 3C147 05 38 43.517505 * 05 42 36.137882 05 42 49.248346 49 49 42.83696 * 49 51 07.23360 49 51 25.30906 From catalog imbedded in main SCHED input file. * 3C286 13 28 49.657692 * 13 31 08.287984 13 31 18.046522 30 45 58.64021 * 30 30 32.95885 30 29 27.99629 From catalog imbedded in main SCHED input file. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) ARP193 140.2 J1317+34 140.0 J1329+31 141.8 J1310 142.4 3C147 76.4 3C286 143.0 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg