COVER INFORMATION Station: VLBA_KP (Code Kp ) Experiment: BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST Exp. Code: BM171K Schedule Version: 1.00 Processed by SCHED version: Release of 02 July 2002 PI: Alan P. Marscher Address: Dept. of Astronomy, Boston University 725 Commonwealth Ave. Boston, MA 02215 Phone: (617)353-5029 (office) or (508)788-8317 (home) EMAIL: marscher@bu.edu Fax: (617)353-5704 Phone during observation: (617)353-5029 (office) or (508)788-8317 (home) Observing mode: continuum Notes: Use all available antennas Fringe finders: 3C273 and 3C279 These are also program sources Schedule for VLBA_KP (Code Kp ) Page 2 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- Next scan frequencies: 43201.49 43201.49 43209.49 43209.49 43217.49 43217.49 43225.49 43225.49 Next BBC frequencies: 801.49 801.49 809.49 809.49 817.49 817.49 825.49 825.49 Next scan bandwidths: 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 19 46 08 0420-014 01 46 02 40.1 124.1 -2.6 -44.7 0 1 1 0 19 46 08 19 50 07 --- 01 50 02 40.8 125.0 -2.6 -44.0 239 F 1 1596 19 50 07 3C120 01 50 02 43.5 116.1 -2.7 -49.9 -12 1 1 1596 19 50 07 19 50 27 --- 01 50 22 43.6 116.2 -2.7 -49.9 8 F 1 1729 19 50 27 J0426+0518 01 50 22 44.8 117.8 -2.6 -48.9 -8 1 1 1729 19 50 27 19 50 47 --- 01 50 42 44.9 117.8 -2.6 -48.9 12 F 1 1862 19 50 47 3C120 01 50 42 43.7 116.3 -2.7 -49.8 -8 1 1 1862 19 50 47 19 51 07 --- 01 51 02 43.7 116.4 -2.7 -49.8 12 F 1 1995 19 51 07 J0426+0518 01 51 02 44.9 117.9 -2.6 -48.9 -8 1 1 1995 19 51 07 19 51 27 --- 01 51 22 45.0 118.0 -2.6 -48.8 12 F 1 2128 19 51 27 3C120 01 51 22 43.8 116.4 -2.7 -49.7 -8 1 1 2128 19 51 27 19 51 47 --- 01 51 42 43.8 116.5 -2.7 -49.7 12 F 1 2260 19 51 47 J0426+0518 01 51 42 45.0 118.1 -2.6 -48.8 -8 1 1 2260 19 51 47 19 52 07 --- 01 52 02 45.1 118.1 -2.6 -48.7 12 F 1 2393 19 52 07 3C120 01 52 02 43.9 116.6 -2.7 -49.6 -8 1 1 2393 19 52 07 19 52 27 --- 01 52 22 44.0 116.7 -2.7 -49.6 12 F 1 2526 19 52 27 J0426+0518 01 52 22 45.2 118.2 -2.6 -48.7 -8 1 1 2526 19 52 27 19 52 47 --- 01 52 42 45.2 118.3 -2.6 -48.6 12 F 1 2659 19 52 47 3C120 01 52 42 44.0 116.7 -2.7 -49.6 -8 1 1 2659 19 52 47 19 53 07 --- 01 53 02 44.1 116.8 -2.7 -49.5 12 F 1 2792 19 53 07 J0426+0518 01 53 02 45.3 118.4 -2.6 -48.6 -8 1 1 2792 19 53 07 19 53 27 --- 01 53 22 45.4 118.5 -2.6 -48.5 12 F 1 2925 19 53 27 3C120 01 53 22 44.2 116.9 -2.7 -49.5 -8 1 1 2925 19 53 27 19 53 47 --- 01 53 42 44.2 117.0 -2.7 -49.4 12 F 1 3058 Schedule for VLBA_KP (Code Kp ) Page 3 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 19 53 47 J0426+0518 01 53 42 45.4 118.5 -2.6 -48.5 -8 1 1 3058 19 53 47 19 54 07 --- 01 54 02 45.5 118.6 -2.5 -48.4 12 F 1 3191 19 54 07 3C120 01 54 02 44.3 117.0 -2.7 -49.4 -8 1 1 3191 19 54 07 19 54 27 --- 01 54 22 44.3 117.1 -2.6 -49.3 12 F 1 3324 19 54 27 J0426+0518 01 54 22 45.5 118.7 -2.5 -48.4 -8 1 1 3324 19 54 27 19 54 47 --- 01 54 42 45.6 118.8 -2.5 -48.3 12 F 1 3457 19 54 47 3C120 01 54 42 44.4 117.2 -2.6 -49.3 -8 1 1 3457 19 54 47 19 55 07 --- 01 55 02 44.5 117.3 -2.6 -49.2 12 F 1 3590 19 55 07 J0426+0518 01 55 02 45.7 118.8 -2.5 -48.3 -8 1 1 3590 19 55 07 19 55 27 --- 01 55 22 45.7 118.9 -2.5 -48.2 12 F 1 3723 19 55 27 3C120 01 55 22 44.5 117.3 -2.6 -49.2 -8 1 1 3723 19 55 27 19 55 47 --- 01 55 42 44.6 117.4 -2.6 -49.2 12 F 1 3856 19 55 47 J0426+0518 01 55 42 45.8 119.0 -2.5 -48.2 -8 1 1 3856 19 55 47 19 56 07 --- 01 56 02 45.9 119.1 -2.5 -48.1 12 F 1 3989 19 56 07 3C120 01 56 02 44.7 117.5 -2.6 -49.1 -8 1 1 3989 19 56 07 19 56 26 --- 01 56 22 44.7 117.6 -2.6 -49.1 12 F 1 4122 19 56 26 J0426+0518 01 56 22 45.9 119.2 -2.5 -48.1 -8 1 1 4122 19 56 26 19 56 46 --- 01 56 42 46.0 119.2 -2.5 -48.0 12 F 1 4255 19 56 46 3C120 01 56 42 44.8 117.6 -2.6 -49.0 -8 1 1 4255 19 56 46 19 57 06 --- 01 57 02 44.8 117.7 -2.6 -49.0 12 F 1 4388 19 57 06 J0426+0518 01 57 02 46.0 119.3 -2.5 -48.0 -8 1 1 4388 19 57 06 19 57 26 --- 01 57 22 46.1 119.4 -2.5 -47.9 12 F 1 4521 19 57 26 3C120 01 57 22 44.9 117.8 -2.6 -48.9 -8 1 1 4521 19 57 26 19 57 46 --- 01 57 42 45.0 117.9 -2.6 -48.9 12 F 1 4654 19 57 46 J0426+0518 01 57 42 46.2 119.5 -2.5 -47.9 -8 1 1 4654 19 57 46 19 58 06 --- 01 58 02 46.2 119.6 -2.5 -47.8 12 F 1 4787 19 58 06 3C120 01 58 02 45.0 118.0 -2.6 -48.8 -8 1 1 4787 19 58 06 19 58 26 --- 01 58 22 45.1 118.0 -2.6 -48.8 12 F 1 4920 Schedule for VLBA_KP (Code Kp ) Page 4 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 19 58 26 J0426+0518 01 58 22 46.3 119.6 -2.5 -47.8 -8 1 1 4920 19 58 26 19 58 46 --- 01 58 42 46.3 119.7 -2.5 -47.7 12 F 1 5053 19 58 46 3C120 01 58 42 45.2 118.1 -2.6 -48.7 -8 1 1 5053 19 58 46 19 59 06 --- 01 59 02 45.2 118.2 -2.6 -48.7 12 F 1 5186 19 59 06 J0426+0518 01 59 02 46.4 119.8 -2.5 -47.7 -8 1 1 5186 19 59 06 19 59 26 --- 01 59 22 46.5 119.9 -2.5 -47.6 12 F 1 5319 19 59 26 3C120 01 59 22 45.3 118.3 -2.6 -48.6 -8 1 1 5319 19 59 26 19 59 46 --- 01 59 42 45.3 118.3 -2.6 -48.6 12 F 1 5452 19 59 46 J0426+0518 01 59 42 46.5 120.0 -2.5 -47.6 -8 1 1 5452 19 59 46 20 00 06 --- 02 00 02 46.6 120.0 -2.4 -47.5 12 F 1 5585 20 00 06 3C120 02 00 02 45.4 118.4 -2.6 -48.5 -8 1 1 5585 20 00 06 20 01 06 --- 02 01 02 45.6 118.7 -2.5 -48.4 51 F 1 5984 20 01 06 0420-014 02 01 02 42.6 127.7 -2.4 -42.2 -12 1 1 5984 20 01 06 20 03 05 --- 02 03 02 43.0 128.2 -2.3 -41.8 108 F 1 6781 20 03 05 3C120 02 03 02 46.0 119.1 -2.5 -48.1 -12 1 1 6781 20 03 05 20 03 25 --- 02 03 22 46.0 119.2 -2.5 -48.1 8 F 1 6914 20 03 25 J0426+0518 02 03 22 47.2 120.9 -2.4 -47.0 -8 1 1 6914 20 03 25 20 03 45 --- 02 03 42 47.3 121.0 -2.4 -46.9 12 F 1 7047 20 03 45 3C120 02 03 42 46.1 119.3 -2.5 -48.0 -8 1 1 7047 20 03 45 20 04 05 --- 02 04 02 46.2 119.4 -2.5 -48.0 12 F 1 7180 20 04 05 J0426+0518 02 04 02 47.3 121.0 -2.4 -46.9 -8 1 1 7180 20 04 05 20 04 25 --- 02 04 22 47.4 121.1 -2.4 -46.8 12 F 1 7313 20 04 25 3C120 02 04 22 46.2 119.5 -2.5 -47.9 -8 1 1 7313 20 04 25 20 04 45 --- 02 04 42 46.3 119.5 -2.5 -47.9 12 F 1 7446 20 04 45 J0426+0518 02 04 42 47.4 121.2 -2.4 -46.8 -8 1 1 7446 20 04 45 20 05 05 --- 02 05 02 47.5 121.3 -2.4 -46.7 12 F 1 7579 20 05 05 3C120 02 05 02 46.3 119.6 -2.5 -47.8 -8 1 1 7579 20 05 05 20 05 25 --- 02 05 22 46.4 119.7 -2.5 -47.8 12 F 1 7712 Schedule for VLBA_KP (Code Kp ) Page 5 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 05 25 J0426+0518 02 05 22 47.6 121.4 -2.4 -46.7 -8 1 1 7712 20 05 25 20 05 45 --- 02 05 42 47.6 121.5 -2.4 -46.6 12 F 1 7845 20 05 45 3C120 02 05 42 46.5 119.8 -2.5 -47.7 -8 1 1 7845 20 05 45 20 06 05 --- 02 06 02 46.5 119.9 -2.5 -47.7 12 F 1 7978 20 06 05 J0426+0518 02 06 02 47.7 121.5 -2.3 -46.6 -8 1 1 7978 20 06 05 20 06 25 --- 02 06 22 47.7 121.6 -2.3 -46.5 12 F 1 8111 20 06 25 3C120 02 06 22 46.6 119.9 -2.4 -47.6 -8 1 1 8111 20 06 25 20 06 45 --- 02 06 42 46.6 120.0 -2.4 -47.5 12 F 1 8244 20 06 45 J0426+0518 02 06 42 47.8 121.7 -2.3 -46.5 -8 1 1 8244 20 06 45 20 07 05 --- 02 07 02 47.9 121.8 -2.3 -46.4 12 F 1 8377 20 07 05 3C120 02 07 02 46.7 120.1 -2.4 -47.5 -8 1 1 8377 20 07 05 20 07 25 --- 02 07 22 46.8 120.2 -2.4 -47.4 12 F 1 8510 20 07 25 J0426+0518 02 07 22 47.9 121.9 -2.3 -46.3 -8 1 1 8510 20 07 25 20 07 45 --- 02 07 42 48.0 122.0 -2.3 -46.3 12 F 1 8643 20 07 45 3C120 02 07 42 46.8 120.3 -2.4 -47.4 -8 1 1 8643 20 07 45 20 08 05 --- 02 08 02 46.9 120.3 -2.4 -47.3 12 F 1 8776 20 08 05 J0426+0518 02 08 02 48.0 122.1 -2.3 -46.2 -8 1 1 8776 20 08 05 20 08 24 --- 02 08 22 48.1 122.1 -2.3 -46.2 12 F 1 8909 20 08 24 3C120 02 08 22 46.9 120.4 -2.4 -47.3 -8 1 1 8909 20 08 24 20 08 44 --- 02 08 42 47.0 120.5 -2.4 -47.2 12 F 1 9042 20 08 44 J0426+0518 02 08 42 48.2 122.2 -2.3 -46.1 -8 1 1 9042 20 08 44 20 09 04 --- 02 09 02 48.2 122.3 -2.3 -46.1 12 F 1 9175 20 09 04 3C120 02 09 02 47.1 120.6 -2.4 -47.2 -8 1 1 9175 20 09 04 20 09 24 --- 02 09 22 47.1 120.7 -2.4 -47.1 12 F 1 9308 20 09 24 J0426+0518 02 09 22 48.3 122.4 -2.3 -46.0 -8 1 1 9308 20 09 24 20 09 44 --- 02 09 42 48.3 122.5 -2.3 -46.0 12 F 1 9441 20 09 44 3C120 02 09 42 47.2 120.8 -2.4 -47.1 -8 1 1 9441 20 09 44 20 10 04 --- 02 10 02 47.3 120.8 -2.4 -47.0 12 F 1 9574 Schedule for VLBA_KP (Code Kp ) Page 6 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 10 04 J0426+0518 02 10 02 48.4 122.6 -2.3 -45.9 -8 1 1 9574 20 10 04 20 10 24 --- 02 10 22 48.5 122.7 -2.3 -45.8 12 F 1 9707 20 10 24 3C120 02 10 22 47.3 120.9 -2.4 -47.0 -8 1 1 9707 20 10 24 20 10 44 --- 02 10 42 47.4 121.0 -2.4 -46.9 12 F 1 9840 20 10 44 J0426+0518 02 10 42 48.5 122.8 -2.3 -45.8 -8 1 1 9840 20 10 44 20 11 04 --- 02 11 02 48.6 122.8 -2.3 -45.7 12 F 1 9973 20 11 04 3C120 02 11 02 47.4 121.1 -2.4 -46.9 -8 1 1 9973 20 11 04 20 11 24 --- 02 11 22 47.5 121.2 -2.4 -46.8 12 F 1 10106 20 11 24 J0426+0518 02 11 22 48.6 122.9 -2.3 -45.7 -8 1 1 10106 20 11 24 20 11 44 --- 02 11 42 48.7 123.0 -2.3 -45.6 12 F 1 10239 20 11 44 3C120 02 11 42 47.6 121.3 -2.4 -46.8 -8 1 1 10239 20 11 44 20 12 04 --- 02 12 02 47.6 121.3 -2.4 -46.7 12 F 1 10372 20 12 04 J0426+0518 02 12 02 48.8 123.1 -2.2 -45.5 -8 1 1 10372 20 12 04 20 12 24 --- 02 12 22 48.8 123.2 -2.2 -45.5 12 F 1 10505 20 12 24 3C120 02 12 22 47.7 121.4 -2.3 -46.6 -8 1 1 10505 20 12 24 20 12 44 --- 02 12 42 47.7 121.5 -2.3 -46.6 12 F 1 10638 20 12 44 J0426+0518 02 12 42 48.9 123.3 -2.2 -45.4 -8 1 1 10638 20 12 44 20 13 04 --- 02 13 02 48.9 123.4 -2.2 -45.4 12 F 1 10771 20 13 04 3C120 02 13 02 47.8 121.6 -2.3 -46.5 -8 1 1 10771 20 13 04 20 13 24 --- 02 13 22 47.9 121.7 -2.3 -46.5 12 F 1 10903 20 13 24 J0426+0518 02 13 22 49.0 123.5 -2.2 -45.3 -8 1 1 10903 20 13 24 20 13 44 --- 02 13 42 49.1 123.5 -2.2 -45.3 12 F 1 11036 20 13 44 3C120 02 13 42 47.9 121.8 -2.3 -46.4 -8 1 1 11036 20 13 44 20 14 04 --- 02 14 02 48.0 121.9 -2.3 -46.4 12 F 1 11169 20 14 04 J0426+0518 02 14 02 49.1 123.6 -2.2 -45.2 -8 1 1 11169 20 14 04 20 14 24 --- 02 14 22 49.2 123.7 -2.2 -45.1 12 F 1 11302 20 14 24 3C120 02 14 22 48.0 121.9 -2.3 -46.3 -8 1 1 11302 20 14 24 20 14 43 --- 02 14 42 48.1 122.0 -2.3 -46.3 12 F 1 11435 Schedule for VLBA_KP (Code Kp ) Page 7 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 14 43 J0426+0518 02 14 42 49.2 123.8 -2.2 -45.1 -8 1 1 11435 20 14 43 20 15 03 --- 02 15 02 49.3 123.9 -2.2 -45.0 12 F 1 11568 20 15 03 3C120 02 15 02 48.2 122.1 -2.3 -46.2 -8 1 1 11568 20 15 03 20 16 03 --- 02 16 02 48.3 122.4 -2.3 -46.0 52 F 1 11967 20 16 03 0420-014 02 16 02 45.1 131.7 -2.1 -39.3 -12 1 1 11967 20 16 03 20 18 03 --- 02 18 02 45.4 132.2 -2.1 -38.9 107 F 1 12765 20 18 03 3C120 02 18 02 48.7 122.9 -2.3 -45.7 -13 1 1 12765 20 18 03 20 18 23 --- 02 18 22 48.8 123.0 -2.2 -45.6 7 F 1 12898 20 18 23 J0426+0518 02 18 22 49.9 124.8 -2.1 -44.4 -8 1 1 12898 20 18 23 20 18 43 --- 02 18 42 49.9 124.9 -2.1 -44.3 12 F 1 13031 20 18 43 3C120 02 18 42 48.8 123.1 -2.2 -45.6 -8 1 1 13031 20 18 43 20 19 03 --- 02 19 02 48.9 123.2 -2.2 -45.5 12 F 1 13164 20 19 03 J0426+0518 02 19 02 50.0 125.0 -2.1 -44.3 -8 1 1 13164 20 19 03 20 19 23 --- 02 19 22 50.1 125.1 -2.1 -44.2 12 F 1 13297 20 19 23 3C120 02 19 22 48.9 123.3 -2.2 -45.5 -8 1 1 13297 20 19 23 20 19 43 --- 02 19 42 49.0 123.3 -2.2 -45.4 12 F 1 13430 20 19 43 J0426+0518 02 19 42 50.1 125.2 -2.1 -44.1 -8 1 1 13430 20 19 43 20 20 03 --- 02 20 02 50.2 125.3 -2.1 -44.1 12 F 1 13563 20 20 03 3C120 02 20 02 49.0 123.4 -2.2 -45.3 -8 1 1 13563 20 20 03 20 20 23 --- 02 20 22 49.1 123.5 -2.2 -45.3 12 F 1 13696 20 20 23 J0426+0518 02 20 22 50.2 125.4 -2.1 -44.0 -8 1 1 13696 20 20 23 20 20 42 --- 02 20 42 50.3 125.5 -2.1 -44.0 12 F 1 13829 20 20 42 3C120 02 20 42 49.2 123.6 -2.2 -45.2 -8 1 1 13829 20 20 42 20 21 02 --- 02 21 02 49.2 123.7 -2.2 -45.2 12 F 1 13962 20 21 02 J0426+0518 02 21 02 50.3 125.6 -2.1 -43.9 -8 1 1 13962 20 21 02 20 21 22 --- 02 21 22 50.4 125.6 -2.1 -43.8 12 F 1 14095 20 21 22 3C120 02 21 22 49.3 123.8 -2.2 -45.1 -8 1 1 14095 20 21 22 20 21 42 --- 02 21 42 49.3 123.9 -2.2 -45.0 12 F 1 14228 Schedule for VLBA_KP (Code Kp ) Page 8 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 21 42 J0426+0518 02 21 42 50.5 125.7 -2.1 -43.8 -8 1 1 14228 20 21 42 20 22 02 --- 02 22 02 50.5 125.8 -2.1 -43.7 12 F 1 14361 20 22 02 3C120 02 22 02 49.4 124.0 -2.2 -45.0 -8 1 1 14361 20 22 02 20 22 22 --- 02 22 22 49.5 124.1 -2.2 -44.9 12 F 1 14494 20 22 22 J0426+0518 02 22 22 50.6 125.9 -2.1 -43.6 -8 1 1 14494 20 22 22 20 22 42 --- 02 22 42 50.6 126.0 -2.1 -43.6 12 F 1 14627 20 22 42 3C120 02 22 42 49.5 124.1 -2.2 -44.9 -8 1 1 14627 20 22 42 20 23 02 --- 02 23 02 49.6 124.2 -2.2 -44.8 12 F 1 14760 20 23 02 J0426+0518 02 23 02 50.7 126.1 -2.1 -43.5 -8 1 1 14760 20 23 02 20 23 22 --- 02 23 22 50.7 126.2 -2.1 -43.4 12 F 1 14893 20 23 22 3C120 02 23 22 49.6 124.3 -2.2 -44.7 -8 1 1 14893 20 23 22 20 23 42 --- 02 23 42 49.7 124.4 -2.2 -44.7 12 F 1 15026 20 23 42 J0426+0518 02 23 42 50.8 126.3 -2.1 -43.4 -8 1 1 15026 20 23 42 20 24 02 --- 02 24 02 50.9 126.4 -2.0 -43.3 12 F 1 15159 20 24 02 3C120 02 24 02 49.8 124.5 -2.2 -44.6 -8 1 1 15159 20 24 02 20 24 22 --- 02 24 22 49.8 124.6 -2.1 -44.5 12 F 1 15291 20 24 22 J0426+0518 02 24 22 50.9 126.5 -2.0 -43.2 -8 1 1 15291 20 24 22 20 24 42 --- 02 24 42 51.0 126.6 -2.0 -43.2 12 F 1 15424 20 24 42 3C120 02 24 42 49.9 124.7 -2.1 -44.5 -8 1 1 15424 20 24 42 20 25 02 --- 02 25 02 49.9 124.8 -2.1 -44.4 12 F 1 15557 20 25 02 J0426+0518 02 25 02 51.0 126.7 -2.0 -43.1 -8 1 1 15557 20 25 02 20 25 22 --- 02 25 22 51.1 126.8 -2.0 -43.0 12 F 1 15690 20 25 22 3C120 02 25 22 50.0 124.9 -2.1 -44.4 -8 1 1 15690 20 25 22 20 25 42 --- 02 25 42 50.0 125.0 -2.1 -44.3 12 F 1 15823 20 25 42 J0426+0518 02 25 42 51.1 126.9 -2.0 -43.0 -8 1 1 15823 20 25 42 20 26 02 --- 02 26 02 51.2 127.0 -2.0 -42.9 12 F 1 15956 20 26 02 3C120 02 26 02 50.1 125.1 -2.1 -44.2 -8 1 1 15956 20 26 02 20 26 22 --- 02 26 22 50.2 125.2 -2.1 -44.2 12 F 1 16089 Schedule for VLBA_KP (Code Kp ) Page 9 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 26 22 J0426+0518 02 26 22 51.3 127.1 -2.0 -42.8 -8 1 1 16089 20 26 22 20 26 41 --- 02 26 42 51.3 127.2 -2.0 -42.8 12 F 1 16222 20 26 41 3C120 02 26 42 50.2 125.2 -2.1 -44.1 -8 1 1 16222 20 26 41 20 27 01 --- 02 27 02 50.3 125.3 -2.1 -44.0 12 F 1 16355 20 27 01 J0426+0518 02 27 02 51.4 127.3 -2.0 -42.7 -8 1 1 16355 20 27 01 20 27 21 --- 02 27 22 51.4 127.4 -2.0 -42.6 12 F 1 16488 20 27 21 3C120 02 27 22 50.3 125.4 -2.1 -44.0 -8 1 1 16488 20 27 21 20 27 41 --- 02 27 42 50.4 125.5 -2.1 -43.9 12 F 1 16621 20 27 41 J0426+0518 02 27 42 51.5 127.5 -2.0 -42.6 -8 1 1 16621 20 27 41 20 28 01 --- 02 28 02 51.5 127.6 -2.0 -42.5 12 F 1 16754 20 28 01 3C120 02 28 02 50.4 125.6 -2.1 -43.8 -8 1 1 16754 20 28 01 20 28 21 --- 02 28 22 50.5 125.7 -2.1 -43.8 12 F 1 16887 20 28 21 J0426+0518 02 28 22 51.6 127.7 -2.0 -42.4 -8 1 1 16887 20 28 21 20 28 41 --- 02 28 42 51.6 127.8 -2.0 -42.3 12 F 1 17020 20 28 41 3C120 02 28 42 50.6 125.8 -2.1 -43.7 -8 1 1 17020 20 28 41 20 29 01 --- 02 29 02 50.6 125.9 -2.1 -43.7 12 F 1 17153 20 29 01 J0426+0518 02 29 02 51.7 127.9 -2.0 -42.3 -8 1 2 17153 20 29 01 20 29 21 --- 02 29 22 51.8 128.0 -2.0 -42.2 12 R 1 17020 20 29 21 3C120 02 29 22 50.7 126.0 -2.1 -43.6 -8 1 2 17020 20 29 21 20 29 41 --- 02 29 42 50.7 126.1 -2.1 -43.5 12 R 1 16887 20 29 41 J0426+0518 02 29 42 51.8 128.1 -2.0 -42.1 -8 1 2 16887 20 29 41 20 30 01 --- 02 30 02 51.9 128.2 -1.9 -42.1 12 R 1 16754 20 30 01 3C120 02 30 02 50.8 126.2 -2.1 -43.5 -8 1 2 16754 20 30 01 20 31 01 --- 02 31 02 51.0 126.5 -2.0 -43.3 52 R 1 16355 20 31 01 0420-014 02 31 02 47.4 135.9 -1.9 -36.2 -13 1 2 16355 20 31 01 20 33 00 --- 02 33 02 47.7 136.5 -1.8 -35.7 107 R 1 15557 20 33 00 3C120 02 33 02 51.3 127.1 -2.0 -42.8 -13 1 2 15557 20 33 00 20 33 20 --- 02 33 22 51.4 127.2 -2.0 -42.8 7 R 1 15424 Schedule for VLBA_KP (Code Kp ) Page 10 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 33 20 J0426+0518 02 33 22 52.4 129.2 -1.9 -41.3 -8 1 2 15424 20 33 20 20 33 40 --- 02 33 42 52.5 129.3 -1.9 -41.3 12 R 1 15291 20 33 40 3C120 02 33 42 51.4 127.3 -2.0 -42.7 -8 1 2 15291 20 33 40 20 34 00 --- 02 34 02 51.5 127.3 -2.0 -42.6 12 R 1 15159 20 34 00 J0426+0518 02 34 02 52.5 129.4 -1.9 -41.2 -8 1 2 15159 20 34 00 20 34 20 --- 02 34 22 52.6 129.5 -1.9 -41.1 12 R 1 15026 20 34 20 3C120 02 34 22 51.5 127.4 -2.0 -42.6 -8 1 2 15026 20 34 20 20 34 40 --- 02 34 42 51.6 127.5 -2.0 -42.5 12 R 1 14893 20 34 40 J0426+0518 02 34 42 52.6 129.6 -1.9 -41.0 -8 1 2 14893 20 34 40 20 35 00 --- 02 35 02 52.7 129.7 -1.9 -41.0 12 R 1 14760 20 35 00 3C120 02 35 02 51.6 127.6 -2.0 -42.4 -8 1 2 14760 20 35 00 20 35 20 --- 02 35 22 51.7 127.7 -2.0 -42.4 12 R 1 14627 20 35 20 J0426+0518 02 35 22 52.7 129.8 -1.9 -40.9 -8 1 2 14627 20 35 20 20 35 40 --- 02 35 42 52.8 129.9 -1.9 -40.8 12 R 1 14494 20 35 40 3C120 02 35 42 51.8 127.8 -2.0 -42.3 -8 1 2 14494 20 35 40 20 36 00 --- 02 36 02 51.8 127.9 -2.0 -42.2 12 R 1 14361 20 36 00 J0426+0518 02 36 02 52.9 130.0 -1.8 -40.7 -8 1 2 14361 20 36 00 20 36 20 --- 02 36 22 52.9 130.1 -1.8 -40.7 12 R 1 14228 20 36 20 3C120 02 36 22 51.9 128.0 -1.9 -42.2 -8 1 2 14228 20 36 20 20 36 40 --- 02 36 42 51.9 128.1 -1.9 -42.1 12 R 1 14095 20 36 40 J0426+0518 02 36 42 53.0 130.2 -1.8 -40.6 -8 1 2 14095 20 36 40 20 37 00 --- 02 37 02 53.0 130.3 -1.8 -40.5 12 R 1 13962 20 37 00 3C120 02 37 02 52.0 128.2 -1.9 -42.0 -8 1 2 13962 20 37 00 20 37 20 --- 02 37 22 52.0 128.3 -1.9 -41.9 12 R 1 13829 20 37 20 J0426+0518 02 37 22 53.1 130.4 -1.8 -40.4 -8 1 2 13829 20 37 20 20 37 40 --- 02 37 42 53.1 130.5 -1.8 -40.4 12 R 1 13696 20 37 40 3C120 02 37 42 52.1 128.4 -1.9 -41.9 -8 1 2 13696 20 37 40 20 38 00 --- 02 38 02 52.1 128.5 -1.9 -41.8 12 R 1 13563 Schedule for VLBA_KP (Code Kp ) Page 11 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 38 00 J0426+0518 02 38 02 53.2 130.6 -1.8 -40.3 -8 1 2 13563 20 38 00 20 38 20 --- 02 38 22 53.2 130.7 -1.8 -40.2 12 R 1 13430 20 38 20 3C120 02 38 22 52.2 128.6 -1.9 -41.7 -8 1 2 13430 20 38 20 20 38 40 --- 02 38 42 52.3 128.7 -1.9 -41.7 12 R 1 13297 20 38 40 J0426+0518 02 38 42 53.3 130.8 -1.8 -40.1 -8 1 2 13297 20 38 40 20 38 59 --- 02 39 02 53.3 130.9 -1.8 -40.1 12 R 1 13164 20 38 59 3C120 02 39 02 52.3 128.8 -1.9 -41.6 -8 1 2 13164 20 38 59 20 39 19 --- 02 39 22 52.4 128.9 -1.9 -41.5 12 R 1 13031 20 39 19 J0426+0518 02 39 22 53.4 131.1 -1.8 -40.0 -8 1 2 13031 20 39 19 20 39 39 --- 02 39 42 53.4 131.2 -1.8 -39.9 12 R 1 12898 20 39 39 3C120 02 39 42 52.4 129.0 -1.9 -41.4 -8 1 2 12898 20 39 39 20 39 59 --- 02 40 02 52.5 129.2 -1.9 -41.4 12 R 1 12765 20 39 59 J0426+0518 02 40 02 53.5 131.3 -1.8 -39.8 -8 1 2 12765 20 39 59 20 40 19 --- 02 40 22 53.6 131.4 -1.8 -39.7 12 R 1 12632 20 40 19 3C120 02 40 22 52.5 129.3 -1.9 -41.3 -8 1 2 12632 20 40 19 20 40 39 --- 02 40 42 52.6 129.4 -1.9 -41.2 12 R 1 12499 20 40 39 J0426+0518 02 40 42 53.6 131.5 -1.8 -39.7 -8 1 2 12499 20 40 39 20 40 59 --- 02 41 02 53.7 131.6 -1.8 -39.6 12 R 1 12366 20 40 59 3C120 02 41 02 52.6 129.5 -1.9 -41.1 -8 1 2 12366 20 40 59 20 41 19 --- 02 41 22 52.7 129.6 -1.9 -41.1 12 R 1 12233 20 41 19 J0426+0518 02 41 22 53.7 131.7 -1.8 -39.5 -8 1 2 12233 20 41 19 20 41 39 --- 02 41 42 53.8 131.8 -1.8 -39.4 12 R 1 12100 20 41 39 3C120 02 41 42 52.7 129.7 -1.9 -41.0 -8 1 2 12100 20 41 39 20 41 59 --- 02 42 02 52.8 129.8 -1.9 -40.9 12 R 1 11967 20 41 59 J0426+0518 02 42 02 53.8 131.9 -1.7 -39.4 -8 1 2 11967 20 41 59 20 42 19 --- 02 42 22 53.9 132.0 -1.7 -39.3 12 R 1 11834 20 42 19 3C120 02 42 22 52.9 129.9 -1.8 -40.8 -8 1 2 11834 20 42 19 20 42 39 --- 02 42 42 52.9 130.0 -1.8 -40.8 12 R 1 11701 Schedule for VLBA_KP (Code Kp ) Page 12 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 42 39 J0426+0518 02 42 42 53.9 132.1 -1.7 -39.2 -8 1 2 11701 20 42 39 20 42 59 --- 02 43 02 54.0 132.2 -1.7 -39.1 12 R 1 11568 20 42 59 3C120 02 43 02 53.0 130.1 -1.8 -40.7 -8 1 2 11568 20 42 59 20 43 19 --- 02 43 22 53.0 130.2 -1.8 -40.6 12 R 1 11435 20 43 19 J0426+0518 02 43 22 54.0 132.4 -1.7 -39.0 -8 1 2 11435 20 43 19 20 43 39 --- 02 43 42 54.1 132.5 -1.7 -38.9 12 R 1 11302 20 43 39 3C120 02 43 42 53.1 130.3 -1.8 -40.5 -8 1 2 11302 20 43 39 20 43 59 --- 02 44 02 53.1 130.4 -1.8 -40.5 12 R 1 11169 20 43 59 J0426+0518 02 44 02 54.1 132.6 -1.7 -38.9 -8 1 2 11169 20 43 59 20 44 19 --- 02 44 22 54.2 132.7 -1.7 -38.8 12 R 1 11036 20 44 19 3C120 02 44 22 53.2 130.5 -1.8 -40.4 -8 1 2 11036 20 44 19 20 44 39 --- 02 44 42 53.2 130.6 -1.8 -40.3 12 R 1 10904 20 44 39 J0426+0518 02 44 42 54.2 132.8 -1.7 -38.7 -8 1 2 10904 20 44 39 20 44 58 --- 02 45 02 54.3 132.9 -1.7 -38.6 12 R 1 10771 20 44 58 3C120 02 45 02 53.3 130.7 -1.8 -40.2 -8 1 2 10771 20 44 58 20 45 58 --- 02 46 02 53.4 131.0 -1.8 -40.0 52 R 1 10372 20 45 58 0420-014 02 46 02 49.5 140.6 -1.6 -32.6 -14 1 2 10372 20 45 58 20 47 58 --- 02 48 02 49.8 141.3 -1.6 -32.1 106 R 1 9574 20 47 58 3C120 02 48 02 53.8 131.7 -1.8 -39.5 -14 1 2 9574 20 47 58 20 48 18 --- 02 48 22 53.8 131.8 -1.7 -39.5 6 R 1 9441 20 48 18 J0426+0518 02 48 22 54.8 134.0 -1.6 -37.8 -8 1 2 9441 20 48 18 20 48 38 --- 02 48 42 54.9 134.1 -1.6 -37.7 12 R 1 9308 20 48 38 3C120 02 48 42 53.9 131.9 -1.7 -39.4 -8 1 2 9308 20 48 38 20 48 58 --- 02 49 02 53.9 132.0 -1.7 -39.3 12 R 1 9175 20 48 58 J0426+0518 02 49 02 54.9 134.3 -1.6 -37.6 -8 1 2 9175 20 48 58 20 49 18 --- 02 49 22 55.0 134.4 -1.6 -37.5 12 R 1 9042 20 49 18 3C120 02 49 22 54.0 132.1 -1.7 -39.2 -8 1 2 9042 20 49 18 20 49 38 --- 02 49 42 54.0 132.2 -1.7 -39.1 12 R 1 8909 Schedule for VLBA_KP (Code Kp ) Page 13 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 49 38 J0426+0518 02 49 42 55.0 134.5 -1.6 -37.4 -8 1 2 8909 20 49 38 20 49 58 --- 02 50 02 55.1 134.6 -1.6 -37.4 12 R 1 8776 20 49 58 3C120 02 50 02 54.1 132.3 -1.7 -39.0 -8 1 2 8776 20 49 58 20 50 18 --- 02 50 22 54.1 132.4 -1.7 -39.0 12 R 1 8643 20 50 18 J0426+0518 02 50 22 55.1 134.7 -1.6 -37.3 -8 1 2 8643 20 50 18 20 50 38 --- 02 50 42 55.2 134.8 -1.6 -37.2 12 R 1 8510 20 50 38 3C120 02 50 42 54.2 132.6 -1.7 -38.9 -8 1 2 8510 20 50 38 20 50 58 --- 02 51 02 54.2 132.7 -1.7 -38.8 12 R 1 8377 20 50 58 J0426+0518 02 51 02 55.2 134.9 -1.6 -37.1 -8 1 2 8377 20 50 58 20 51 17 --- 02 51 22 55.3 135.1 -1.6 -37.0 12 R 1 8244 20 51 17 3C120 02 51 22 54.3 132.8 -1.7 -38.7 -8 1 2 8244 20 51 17 20 51 37 --- 02 51 42 54.3 132.9 -1.7 -38.6 12 R 1 8111 20 51 37 J0426+0518 02 51 42 55.3 135.2 -1.6 -36.9 -8 1 2 8111 20 51 37 20 51 57 --- 02 52 02 55.4 135.3 -1.6 -36.8 12 R 1 7978 20 51 57 3C120 02 52 02 54.4 133.0 -1.7 -38.6 -8 1 2 7978 20 51 57 20 52 17 --- 02 52 22 54.4 133.1 -1.7 -38.5 12 R 1 7845 20 52 17 J0426+0518 02 52 22 55.4 135.4 -1.6 -36.7 -8 1 2 7845 20 52 17 20 52 37 --- 02 52 42 55.5 135.5 -1.6 -36.7 12 R 1 7712 20 52 37 3C120 02 52 42 54.5 133.2 -1.7 -38.4 -8 1 2 7712 20 52 37 20 52 57 --- 02 53 02 54.5 133.3 -1.7 -38.3 12 R 1 7579 20 52 57 J0426+0518 02 53 02 55.5 135.6 -1.6 -36.6 -8 1 2 7579 20 52 57 20 53 17 --- 02 53 22 55.6 135.8 -1.6 -36.5 12 R 1 7446 20 53 17 3C120 02 53 22 54.6 133.4 -1.7 -38.2 -8 1 2 7446 20 53 17 20 53 37 --- 02 53 42 54.6 133.6 -1.7 -38.1 12 R 1 7313 20 53 37 J0426+0518 02 53 42 55.6 135.9 -1.6 -36.4 -8 1 2 7313 20 53 37 20 53 57 --- 02 54 02 55.6 136.0 -1.5 -36.3 12 R 1 7180 20 53 57 3C120 02 54 02 54.7 133.7 -1.7 -38.1 -8 1 2 7180 20 53 57 20 54 17 --- 02 54 22 54.7 133.8 -1.6 -38.0 12 R 1 7047 Schedule for VLBA_KP (Code Kp ) Page 14 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 54 17 J0426+0518 02 54 22 55.7 136.1 -1.5 -36.2 -8 1 2 7047 20 54 17 20 54 37 --- 02 54 42 55.7 136.2 -1.5 -36.1 12 R 1 6914 20 54 37 3C120 02 54 42 54.8 133.9 -1.6 -37.9 -8 1 2 6914 20 54 37 20 54 57 --- 02 55 02 54.9 134.0 -1.6 -37.8 12 R 1 6781 20 54 57 J0426+0518 02 55 02 55.8 136.4 -1.5 -36.0 -8 1 2 6781 20 54 57 20 55 17 --- 02 55 22 55.8 136.5 -1.5 -35.9 12 R 1 6649 20 55 17 3C120 02 55 22 54.9 134.1 -1.6 -37.7 -8 1 2 6649 20 55 17 20 55 37 --- 02 55 42 55.0 134.2 -1.6 -37.6 12 R 1 6516 20 55 37 J0426+0518 02 55 42 55.9 136.6 -1.5 -35.8 -8 1 2 6516 20 55 37 20 55 57 --- 02 56 02 55.9 136.7 -1.5 -35.7 12 R 1 6383 20 55 57 3C120 02 56 02 55.0 134.4 -1.6 -37.5 -8 1 2 6383 20 55 57 20 56 17 --- 02 56 22 55.1 134.5 -1.6 -37.5 12 R 1 6250 20 56 17 J0426+0518 02 56 22 56.0 136.8 -1.5 -35.7 -8 1 2 6250 20 56 17 20 56 37 --- 02 56 42 56.0 137.0 -1.5 -35.6 12 R 1 6117 20 56 37 3C120 02 56 42 55.1 134.6 -1.6 -37.4 -8 1 2 6117 20 56 37 20 56 57 --- 02 57 02 55.2 134.7 -1.6 -37.3 12 R 1 5984 20 56 57 J0426+0518 02 57 02 56.1 137.1 -1.5 -35.5 -8 1 2 5984 20 56 57 20 57 16 --- 02 57 22 56.1 137.2 -1.5 -35.4 12 R 1 5851 20 57 16 3C120 02 57 22 55.2 134.8 -1.6 -37.2 -8 1 2 5851 20 57 16 20 57 36 --- 02 57 42 55.3 134.9 -1.6 -37.1 12 R 1 5718 20 57 36 J0426+0518 02 57 42 56.2 137.3 -1.5 -35.3 -8 1 2 5718 20 57 36 20 57 56 --- 02 58 02 56.2 137.4 -1.5 -35.2 12 R 1 5585 20 57 56 3C120 02 58 02 55.3 135.0 -1.6 -37.0 -8 1 2 5585 20 57 56 20 58 16 --- 02 58 22 55.4 135.2 -1.6 -36.9 12 R 1 5452 20 58 16 J0426+0518 02 58 22 56.3 137.6 -1.5 -35.1 -8 1 2 5452 20 58 16 20 58 36 --- 02 58 42 56.3 137.7 -1.5 -35.0 12 R 1 5319 20 58 36 3C120 02 58 42 55.4 135.3 -1.6 -36.8 -8 1 2 5319 20 58 36 20 58 56 --- 02 59 02 55.5 135.4 -1.6 -36.8 12 R 1 5186 Schedule for VLBA_KP (Code Kp ) Page 15 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 20 58 56 J0426+0518 02 59 02 56.4 137.8 -1.5 -34.9 -8 1 2 5186 20 58 56 20 59 16 --- 02 59 22 56.4 137.9 -1.5 -34.8 12 R 1 5053 20 59 16 3C120 02 59 22 55.5 135.5 -1.6 -36.7 -8 1 2 5053 20 59 16 20 59 36 --- 02 59 42 55.6 135.6 -1.6 -36.6 12 R 1 4920 20 59 36 J0426+0518 02 59 42 56.5 138.1 -1.5 -34.7 -8 1 2 4920 20 59 36 20 59 56 --- 03 00 02 56.5 138.2 -1.4 -34.6 12 R 1 4787 20 59 56 3C120 03 00 02 55.6 135.7 -1.6 -36.5 -8 1 2 4787 20 59 56 21 00 56 --- 03 01 02 55.8 136.1 -1.5 -36.2 52 R 1 4388 21 00 56 0420-014 03 01 02 51.4 145.7 -1.4 -28.6 -15 1 2 4388 21 00 56 21 02 56 --- 03 03 02 51.7 146.4 -1.3 -28.0 105 R 1 3590 21 02 56 3C120 03 03 02 56.0 136.8 -1.5 -35.7 -15 1 2 3590 21 02 56 21 03 15 --- 03 03 22 56.1 136.9 -1.5 -35.6 5 R 1 3457 21 03 15 J0426+0518 03 03 22 57.0 139.4 -1.4 -33.7 -8 1 2 3457 21 03 15 21 03 35 --- 03 03 42 57.0 139.6 -1.4 -33.6 12 R 1 3324 21 03 35 3C120 03 03 42 56.1 137.1 -1.5 -35.5 -8 1 2 3324 21 03 35 21 03 55 --- 03 04 02 56.2 137.2 -1.5 -35.4 12 R 1 3191 21 03 55 J0426+0518 03 04 02 57.1 139.7 -1.4 -33.5 -8 1 2 3191 21 03 55 21 04 15 --- 03 04 22 57.1 139.8 -1.4 -33.4 12 R 1 3058 21 04 15 3C120 03 04 22 56.2 137.3 -1.5 -35.3 -8 1 2 3058 21 04 15 21 04 35 --- 03 04 42 56.3 137.4 -1.5 -35.2 12 R 1 2925 21 04 35 J0426+0518 03 04 42 57.2 139.9 -1.4 -33.3 -8 1 2 2925 21 04 35 21 04 55 --- 03 05 02 57.2 140.1 -1.4 -33.2 12 R 1 2792 21 04 55 3C120 03 05 02 56.3 137.6 -1.5 -35.1 -8 1 2 2792 21 04 55 21 05 15 --- 03 05 22 56.4 137.7 -1.5 -35.0 12 R 1 2659 21 05 15 J0426+0518 03 05 22 57.3 140.2 -1.4 -33.1 -8 1 2 2659 21 05 15 21 05 35 --- 03 05 42 57.3 140.3 -1.4 -33.0 12 R 1 2526 21 05 35 3C120 03 05 42 56.4 137.8 -1.5 -34.9 -8 1 2 2526 21 05 35 21 05 55 --- 03 06 02 56.5 137.9 -1.5 -34.8 12 R 1 2394 Schedule for VLBA_KP (Code Kp ) Page 16 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 05 55 J0426+0518 03 06 02 57.3 140.5 -1.3 -32.9 -8 1 2 2394 21 05 55 21 06 15 --- 03 06 22 57.4 140.6 -1.3 -32.8 12 R 1 2261 21 06 15 3C120 03 06 22 56.5 138.0 -1.4 -34.7 -8 1 2 2261 21 06 15 21 06 35 --- 03 06 42 56.6 138.2 -1.4 -34.6 12 R 1 2128 21 06 35 J0426+0518 03 06 42 57.4 140.7 -1.3 -32.6 -8 1 2 2128 21 06 35 21 06 55 --- 03 07 02 57.5 140.8 -1.3 -32.5 12 R 1 1995 21 06 55 3C120 03 07 02 56.6 138.3 -1.4 -34.5 -8 1 2 1995 21 06 55 21 07 15 --- 03 07 22 56.7 138.4 -1.4 -34.4 12 R 1 1862 21 07 15 J0426+0518 03 07 22 57.5 141.0 -1.3 -32.4 -8 1 2 1862 21 07 15 21 07 35 --- 03 07 42 57.6 141.1 -1.3 -32.3 12 R 1 1729 21 07 35 3C120 03 07 42 56.7 138.5 -1.4 -34.3 -8 1 2 1729 21 07 35 21 07 55 --- 03 08 02 56.8 138.7 -1.4 -34.3 12 R 1 1596 21 07 55 J0426+0518 03 08 02 57.6 141.2 -1.3 -32.2 -8 1 2 1596 21 07 55 21 08 15 --- 03 08 22 57.7 141.4 -1.3 -32.1 12 R 1 1463 21 08 15 3C120 03 08 22 56.8 138.8 -1.4 -34.2 -8 1 2 1463 21 08 15 21 08 35 --- 03 08 42 56.8 138.9 -1.4 -34.1 12 R 1 1330 21 08 35 J0426+0518 03 08 42 57.7 141.5 -1.3 -32.0 -8 1 2 1330 21 08 35 21 08 55 --- 03 09 02 57.7 141.6 -1.3 -31.9 12 R 1 1197 21 08 55 3C120 03 09 02 56.9 139.0 -1.4 -34.0 -8 1 2 1197 21 08 55 21 09 14 --- 03 09 22 56.9 139.2 -1.4 -33.9 12 R 1 1064 21 09 14 J0426+0518 03 09 22 57.8 141.8 -1.3 -31.8 -8 1 2 1064 21 09 14 21 09 34 --- 03 09 42 57.8 141.9 -1.3 -31.7 12 R 1 931 21 09 34 3C120 03 09 42 57.0 139.3 -1.4 -33.8 -8 1 2 931 21 09 34 21 09 54 --- 03 10 02 57.0 139.4 -1.4 -33.7 12 R 1 798 21 09 54 J0426+0518 03 10 02 57.9 142.0 -1.3 -31.6 -8 1 2 798 21 09 54 21 10 14 --- 03 10 22 57.9 142.2 -1.3 -31.5 12 R 1 665 21 10 14 3C120 03 10 22 57.1 139.5 -1.4 -33.6 -8 1 2 665 21 10 14 21 10 34 --- 03 10 42 57.1 139.7 -1.4 -33.5 12 R 1 532 Schedule for VLBA_KP (Code Kp ) Page 17 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 10 34 J0426+0518 03 10 42 58.0 142.3 -1.3 -31.4 -8 1 2 532 21 10 34 21 10 54 --- 03 11 02 58.0 142.4 -1.3 -31.3 12 R 1 399 21 10 54 3C120 03 11 02 57.2 139.8 -1.4 -33.4 -8 1 3 399 21 10 54 21 11 14 --- 03 11 22 57.2 139.9 -1.4 -33.3 12 F 1 532 21 11 14 J0426+0518 03 11 22 58.0 142.6 -1.3 -31.2 -8 1 3 532 21 11 14 21 11 34 --- 03 11 42 58.1 142.7 -1.3 -31.1 12 F 1 665 21 11 34 3C120 03 11 42 57.3 140.1 -1.4 -33.2 -8 1 3 665 21 11 34 21 11 54 --- 03 12 02 57.3 140.2 -1.4 -33.1 12 F 1 798 21 11 54 J0426+0518 03 12 02 58.1 142.8 -1.2 -31.0 -8 1 3 798 21 11 54 21 12 14 --- 03 12 22 58.2 143.0 -1.2 -30.9 12 F 1 931 21 12 14 3C120 03 12 22 57.4 140.3 -1.3 -33.0 -8 1 3 931 21 12 14 21 12 34 --- 03 12 42 57.4 140.4 -1.3 -32.9 12 F 1 1064 21 12 34 J0426+0518 03 12 42 58.2 143.1 -1.2 -30.8 -8 1 3 1064 21 12 34 21 12 54 --- 03 13 02 58.3 143.2 -1.2 -30.7 12 F 1 1197 21 12 54 3C120 03 13 02 57.4 140.6 -1.3 -32.8 -8 1 3 1197 21 12 54 21 13 14 --- 03 13 22 57.5 140.7 -1.3 -32.7 12 F 1 1330 21 13 14 J0426+0518 03 13 22 58.3 143.4 -1.2 -30.6 -8 1 3 1330 21 13 14 21 13 34 --- 03 13 42 58.3 143.5 -1.2 -30.4 12 F 1 1463 21 13 34 3C120 03 13 42 57.5 140.8 -1.3 -32.6 -8 1 3 1463 21 13 34 21 13 54 --- 03 14 02 57.6 141.0 -1.3 -32.5 12 F 1 1596 21 13 54 J0426+0518 03 14 02 58.4 143.6 -1.2 -30.3 -8 1 3 1596 21 13 54 21 14 14 --- 03 14 22 58.4 143.8 -1.2 -30.2 12 F 1 1729 21 14 14 3C120 03 14 22 57.6 141.1 -1.3 -32.4 -8 1 3 1729 21 14 14 21 14 34 --- 03 14 42 57.7 141.2 -1.3 -32.3 12 F 1 1862 21 14 34 J0426+0518 03 14 42 58.5 143.9 -1.2 -30.1 -8 1 3 1862 21 14 34 21 14 54 --- 03 15 02 58.5 144.1 -1.2 -30.0 12 F 1 1995 21 14 54 3C120 03 15 02 57.7 141.4 -1.3 -32.2 -8 1 3 1995 21 14 54 21 15 53 --- 03 16 02 57.8 141.8 -1.3 -31.8 52 F 1 2394 Schedule for VLBA_KP (Code Kp ) Page 18 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 15 53 0420-014 03 16 02 53.1 151.2 -1.1 -24.2 -16 1 3 2394 21 15 53 21 17 53 --- 03 18 02 53.3 151.9 -1.1 -23.5 104 F 1 3191 21 17 53 3C120 03 18 02 58.1 142.6 -1.3 -31.2 -16 1 3 3191 21 17 53 21 18 13 --- 03 18 22 58.1 142.7 -1.2 -31.1 4 F 1 3324 21 18 13 J0426+0518 03 18 22 58.9 145.5 -1.1 -28.9 -8 1 3 3324 21 18 13 21 18 33 --- 03 18 42 59.0 145.6 -1.1 -28.8 12 F 1 3457 21 18 33 3C120 03 18 42 58.2 142.8 -1.2 -31.0 -8 1 3 3457 21 18 33 21 18 53 --- 03 19 02 58.2 143.0 -1.2 -30.9 12 F 1 3590 21 18 53 J0426+0518 03 19 02 59.0 145.7 -1.1 -28.7 -8 1 3 3590 21 18 53 21 19 13 --- 03 19 22 59.0 145.9 -1.1 -28.6 12 F 1 3723 21 19 13 3C120 03 19 22 58.3 143.1 -1.2 -30.8 -8 1 3 3723 21 19 13 21 19 33 --- 03 19 42 58.3 143.2 -1.2 -30.7 12 F 1 3856 21 19 33 J0426+0518 03 19 42 59.1 146.0 -1.1 -28.4 -8 1 3 3856 21 19 33 21 19 53 --- 03 20 02 59.1 146.2 -1.1 -28.3 12 F 1 3989 21 19 53 3C120 03 20 02 58.4 143.4 -1.2 -30.6 -8 1 3 3989 21 19 53 21 20 13 --- 03 20 22 58.4 143.5 -1.2 -30.5 12 F 1 4122 21 20 13 J0426+0518 03 20 22 59.2 146.3 -1.1 -28.2 -8 1 3 4122 21 20 13 21 20 33 --- 03 20 42 59.2 146.4 -1.1 -28.1 12 F 1 4255 21 20 33 3C120 03 20 42 58.4 143.6 -1.2 -30.3 -8 1 3 4255 21 20 33 21 20 53 --- 03 21 02 58.5 143.8 -1.2 -30.2 12 F 1 4388 21 20 53 J0426+0518 03 21 02 59.2 146.6 -1.1 -28.0 -8 1 3 4388 21 20 53 21 21 13 --- 03 21 22 59.3 146.7 -1.1 -27.9 12 F 1 4521 21 21 13 3C120 03 21 22 58.5 143.9 -1.2 -30.1 -8 1 3 4521 21 21 13 21 21 32 --- 03 21 42 58.6 144.1 -1.2 -30.0 12 F 1 4654 21 21 32 J0426+0518 03 21 42 59.3 146.9 -1.1 -27.8 -8 1 3 4654 21 21 32 21 21 52 --- 03 22 02 59.4 147.0 -1.1 -27.6 12 F 1 4787 21 21 52 3C120 03 22 02 58.6 144.2 -1.2 -29.9 -8 1 3 4787 21 21 52 21 22 12 --- 03 22 22 58.7 144.3 -1.2 -29.8 12 F 1 4920 Schedule for VLBA_KP (Code Kp ) Page 19 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 22 12 J0426+0518 03 22 22 59.4 147.2 -1.1 -27.5 -8 1 3 4920 21 22 12 21 22 32 --- 03 22 42 59.4 147.3 -1.1 -27.4 12 F 1 5053 21 22 32 3C120 03 22 42 58.7 144.5 -1.2 -29.7 -8 1 3 5053 21 22 32 21 22 52 --- 03 23 02 58.7 144.6 -1.2 -29.6 12 F 1 5186 21 22 52 J0426+0518 03 23 02 59.5 147.5 -1.1 -27.3 -8 1 3 5186 21 22 52 21 23 12 --- 03 23 22 59.5 147.6 -1.1 -27.2 12 F 1 5319 21 23 12 3C120 03 23 22 58.8 144.7 -1.2 -29.5 -8 1 3 5319 21 23 12 21 23 32 --- 03 23 42 58.8 144.9 -1.2 -29.4 12 F 1 5452 21 23 32 J0426+0518 03 23 42 59.5 147.7 -1.1 -27.1 -8 1 3 5452 21 23 32 21 23 52 --- 03 24 02 59.6 147.9 -1.0 -26.9 12 F 1 5585 21 23 52 3C120 03 24 02 58.9 145.0 -1.2 -29.2 -8 1 3 5585 21 23 52 21 24 12 --- 03 24 22 58.9 145.2 -1.1 -29.1 12 F 1 5718 21 24 12 J0426+0518 03 24 22 59.6 148.0 -1.0 -26.8 -8 1 3 5718 21 24 12 21 24 32 --- 03 24 42 59.7 148.2 -1.0 -26.7 12 F 1 5851 21 24 32 3C120 03 24 42 58.9 145.3 -1.1 -29.0 -8 1 3 5851 21 24 32 21 24 52 --- 03 25 02 59.0 145.4 -1.1 -28.9 12 F 1 5984 21 24 52 J0426+0518 03 25 02 59.7 148.3 -1.0 -26.6 -8 1 3 5984 21 24 52 21 25 12 --- 03 25 22 59.7 148.5 -1.0 -26.5 12 F 1 6117 21 25 12 3C120 03 25 22 59.0 145.6 -1.1 -28.8 -8 1 3 6117 21 25 12 21 25 32 --- 03 25 42 59.1 145.7 -1.1 -28.7 12 F 1 6250 21 25 32 J0426+0518 03 25 42 59.8 148.6 -1.0 -26.3 -8 1 3 6250 21 25 32 21 25 52 --- 03 26 02 59.8 148.8 -1.0 -26.2 12 F 1 6383 21 25 52 3C120 03 26 02 59.1 145.9 -1.1 -28.6 -8 1 3 6383 21 25 52 21 26 12 --- 03 26 22 59.1 146.0 -1.1 -28.5 12 F 1 6516 21 26 12 J0426+0518 03 26 22 59.8 148.9 -1.0 -26.1 -8 1 3 6516 21 26 12 21 26 32 --- 03 26 42 59.9 149.1 -1.0 -26.0 12 F 1 6649 21 26 32 3C120 03 26 42 59.2 146.2 -1.1 -28.3 -8 1 3 6649 21 26 32 21 26 52 --- 03 27 02 59.2 146.3 -1.1 -28.2 12 F 1 6781 Schedule for VLBA_KP (Code Kp ) Page 20 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 26 52 J0426+0518 03 27 02 59.9 149.2 -1.0 -25.9 -8 1 3 6781 21 26 52 21 27 12 --- 03 27 22 60.0 149.4 -1.0 -25.7 12 F 1 6914 21 27 12 3C120 03 27 22 59.3 146.4 -1.1 -28.1 -8 1 3 6914 21 27 12 21 27 31 --- 03 27 42 59.3 146.6 -1.1 -28.0 12 F 1 7047 21 27 31 J0426+0518 03 27 42 60.0 149.5 -1.0 -25.6 -8 1 3 7047 21 27 31 21 27 51 --- 03 28 02 60.0 149.7 -1.0 -25.5 12 F 1 7180 21 27 51 3C120 03 28 02 59.3 146.7 -1.1 -27.9 -8 1 3 7180 21 27 51 21 28 11 --- 03 28 22 59.4 146.9 -1.1 -27.8 12 F 1 7313 21 28 11 J0426+0518 03 28 22 60.1 149.8 -1.0 -25.4 -8 1 3 7313 21 28 11 21 28 31 --- 03 28 42 60.1 150.0 -1.0 -25.2 12 F 1 7446 21 28 31 3C120 03 28 42 59.4 147.0 -1.1 -27.6 -8 1 3 7446 21 28 31 21 28 51 --- 03 29 02 59.4 147.2 -1.1 -27.5 12 F 1 7579 21 28 51 J0426+0518 03 29 02 60.1 150.1 -1.0 -25.1 -8 1 3 7579 21 28 51 21 29 11 --- 03 29 22 60.2 150.3 -1.0 -25.0 12 F 1 7712 21 29 11 3C120 03 29 22 59.5 147.3 -1.1 -27.4 -8 1 3 7712 21 29 11 21 29 31 --- 03 29 42 59.5 147.4 -1.1 -27.3 12 F 1 7845 21 29 31 J0426+0518 03 29 42 60.2 150.4 -1.0 -24.9 -8 1 3 7845 21 29 31 21 29 51 --- 03 30 02 60.2 150.6 -0.9 -24.8 12 F 1 7978 21 29 51 3C120 03 30 02 59.6 147.6 -1.1 -27.2 -8 1 3 7978 21 29 51 21 30 51 --- 03 31 02 59.7 148.0 -1.0 -26.8 52 F 1 8377 21 30 51 0420-014 03 31 02 54.5 157.1 -0.9 -19.3 -16 1 3 8377 21 30 51 21 32 51 --- 03 33 02 54.6 157.9 -0.8 -18.6 103 F 1 9175 21 32 51 3C120 03 33 02 59.9 148.9 -1.0 -26.1 -17 1 3 9175 21 32 51 21 33 11 --- 03 33 22 59.9 149.1 -1.0 -26.0 3 F 1 9308 21 33 11 J0426+0518 03 33 22 60.6 152.1 -0.9 -23.5 -8 1 3 9308 21 33 11 21 33 31 --- 03 33 42 60.6 152.3 -0.9 -23.4 12 F 1 9441 21 33 31 3C120 03 33 42 60.0 149.2 -1.0 -25.9 -8 1 3 9441 21 33 31 21 33 50 --- 03 34 02 60.0 149.4 -1.0 -25.7 12 F 1 9574 Schedule for VLBA_KP (Code Kp ) Page 21 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 33 50 J0426+0518 03 34 02 60.6 152.4 -0.9 -23.2 -8 1 3 9574 21 33 50 21 34 10 --- 03 34 22 60.7 152.6 -0.9 -23.1 12 F 1 9707 21 34 10 3C120 03 34 22 60.0 149.5 -1.0 -25.6 -8 1 3 9707 21 34 10 21 34 30 --- 03 34 42 60.1 149.7 -1.0 -25.5 12 F 1 9840 21 34 30 J0426+0518 03 34 42 60.7 152.7 -0.9 -23.0 -8 1 3 9840 21 34 30 21 34 50 --- 03 35 02 60.7 152.9 -0.9 -22.9 12 F 1 9973 21 34 50 3C120 03 35 02 60.1 149.8 -1.0 -25.4 -8 1 3 9973 21 34 50 21 35 10 --- 03 35 22 60.1 150.0 -1.0 -25.2 12 F 1 10106 21 35 10 J0426+0518 03 35 22 60.8 153.0 -0.9 -22.7 -8 1 3 10106 21 35 10 21 35 30 --- 03 35 42 60.8 153.2 -0.9 -22.6 12 F 1 10239 21 35 30 3C120 03 35 42 60.2 150.1 -1.0 -25.1 -8 1 3 10239 21 35 30 21 35 50 --- 03 36 02 60.2 150.3 -1.0 -25.0 12 F 1 10372 21 35 50 J0426+0518 03 36 02 60.8 153.4 -0.8 -22.5 -8 1 3 10372 21 35 50 21 36 10 --- 03 36 22 60.9 153.5 -0.8 -22.3 12 F 1 10505 21 36 10 3C120 03 36 22 60.3 150.4 -0.9 -24.9 -8 1 3 10505 21 36 10 21 36 30 --- 03 36 42 60.3 150.6 -0.9 -24.8 12 F 1 10638 21 36 30 J0426+0518 03 36 42 60.9 153.7 -0.8 -22.2 -8 1 3 10638 21 36 30 21 36 50 --- 03 37 02 60.9 153.8 -0.8 -22.1 12 F 1 10771 21 36 50 3C120 03 37 02 60.3 150.7 -0.9 -24.6 -8 1 3 10771 21 36 50 21 37 10 --- 03 37 22 60.4 150.9 -0.9 -24.5 12 F 1 10904 21 37 10 J0426+0518 03 37 22 61.0 154.0 -0.8 -21.9 -8 1 3 10904 21 37 10 21 37 30 --- 03 37 42 61.0 154.1 -0.8 -21.8 12 F 1 11036 21 37 30 3C120 03 37 42 60.4 151.0 -0.9 -24.4 -8 1 3 11036 21 37 30 21 37 50 --- 03 38 02 60.4 151.2 -0.9 -24.3 12 F 1 11169 21 37 50 J0426+0518 03 38 02 61.0 154.3 -0.8 -21.7 -8 1 3 11169 21 37 50 21 38 10 --- 03 38 22 61.0 154.5 -0.8 -21.6 12 F 1 11302 21 38 10 3C120 03 38 22 60.5 151.3 -0.9 -24.1 -8 1 3 11302 21 38 10 21 38 30 --- 03 38 42 60.5 151.5 -0.9 -24.0 12 F 1 11435 Schedule for VLBA_KP (Code Kp ) Page 22 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 38 30 J0426+0518 03 38 42 61.1 154.6 -0.8 -21.4 -8 1 3 11435 21 38 30 21 38 50 --- 03 39 02 61.1 154.8 -0.8 -21.3 12 F 1 11568 21 38 50 3C120 03 39 02 60.5 151.6 -0.9 -23.9 -8 1 3 11568 21 38 50 21 39 10 --- 03 39 22 60.6 151.8 -0.9 -23.7 12 F 1 11701 21 39 10 J0426+0518 03 39 22 61.1 154.9 -0.8 -21.2 -8 1 3 11701 21 39 10 21 39 30 --- 03 39 42 61.2 155.1 -0.8 -21.0 12 F 1 11834 21 39 30 3C120 03 39 42 60.6 152.0 -0.9 -23.6 -8 1 3 11834 21 39 30 21 39 49 --- 03 40 02 60.6 152.1 -0.9 -23.5 12 F 1 11967 21 39 49 J0426+0518 03 40 02 61.2 155.3 -0.8 -20.9 -8 1 3 11967 21 39 49 21 40 09 --- 03 40 22 61.2 155.4 -0.8 -20.8 12 F 1 12100 21 40 09 3C120 03 40 22 60.7 152.3 -0.9 -23.4 -8 1 3 12100 21 40 09 21 40 29 --- 03 40 42 60.7 152.4 -0.9 -23.2 12 F 1 12233 21 40 29 J0426+0518 03 40 42 61.3 155.6 -0.8 -20.6 -8 1 3 12233 21 40 29 21 40 49 --- 03 41 02 61.3 155.7 -0.8 -20.5 12 F 1 12366 21 40 49 3C120 03 41 02 60.7 152.6 -0.9 -23.1 -8 1 3 12366 21 40 49 21 41 09 --- 03 41 22 60.8 152.7 -0.9 -23.0 12 F 1 12499 21 41 09 J0426+0518 03 41 22 61.3 155.9 -0.8 -20.4 -8 1 3 12499 21 41 09 21 41 29 --- 03 41 42 61.3 156.1 -0.8 -20.2 12 F 1 12632 21 41 29 3C120 03 41 42 60.8 152.9 -0.9 -22.9 -8 1 3 12632 21 41 29 21 41 49 --- 03 42 02 60.8 153.0 -0.9 -22.7 12 F 1 12765 21 41 49 J0426+0518 03 42 02 61.4 156.2 -0.7 -20.1 -8 1 3 12765 21 41 49 21 42 09 --- 03 42 22 61.4 156.4 -0.7 -20.0 12 F 1 12898 21 42 09 3C120 03 42 22 60.9 153.2 -0.8 -22.6 -8 1 3 12898 21 42 09 21 42 29 --- 03 42 42 60.9 153.4 -0.8 -22.5 12 F 1 13031 21 42 29 J0426+0518 03 42 42 61.4 156.6 -0.7 -19.8 -8 1 3 13031 21 42 29 21 42 49 --- 03 43 02 61.5 156.7 -0.7 -19.7 12 F 1 13164 21 42 49 3C120 03 43 02 60.9 153.5 -0.8 -22.3 -8 1 3 13164 21 42 49 21 43 09 --- 03 43 22 60.9 153.7 -0.8 -22.2 12 F 1 13297 Schedule for VLBA_KP (Code Kp ) Page 23 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 43 09 J0426+0518 03 43 22 61.5 156.9 -0.7 -19.5 -8 1 3 13297 21 43 09 21 43 29 --- 03 43 42 61.5 157.0 -0.7 -19.4 12 F 1 13430 21 43 29 3C120 03 43 42 61.0 153.8 -0.8 -22.1 -8 1 3 13430 21 43 29 21 43 49 --- 03 44 02 61.0 154.0 -0.8 -21.9 12 F 1 13563 21 43 49 J0426+0518 03 44 02 61.5 157.2 -0.7 -19.3 -8 1 3 13563 21 43 49 21 44 09 --- 03 44 22 61.6 157.4 -0.7 -19.1 12 F 1 13696 21 44 09 3C120 03 44 22 61.0 154.1 -0.8 -21.8 -8 1 3 13696 21 44 09 21 44 29 --- 03 44 42 61.1 154.3 -0.8 -21.7 12 F 1 13829 21 44 29 J0426+0518 03 44 42 61.6 157.5 -0.7 -19.0 -8 1 3 13829 21 44 29 21 44 49 --- 03 45 02 61.6 157.7 -0.7 -18.9 12 F 1 13962 21 44 49 3C120 03 45 02 61.1 154.5 -0.8 -21.5 -8 1 3 13962 21 44 49 21 45 48 --- 03 46 02 61.2 154.9 -0.8 -21.2 52 F 1 14361 21 47 48 0420-014 03 48 02 55.7 164.2 -0.6 -13.4 103 1 3 14361 21 47 48 21 49 48 --- 03 50 02 55.8 165.1 -0.6 -12.6 120 F 1 15159 21 49 48 3C120 03 50 02 61.5 156.9 -0.7 -19.5 -18 1 3 15159 21 49 48 21 50 08 --- 03 50 22 61.6 157.1 -0.7 -19.4 2 F 1 15291 21 50 08 J0426+0518 03 50 22 62.0 160.4 -0.6 -16.6 -8 1 3 15291 21 50 08 21 50 28 --- 03 50 42 62.1 160.6 -0.6 -16.5 12 F 1 15424 21 50 28 3C120 03 50 42 61.6 157.2 -0.7 -19.3 -8 1 3 15424 21 50 28 21 50 48 --- 03 51 02 61.6 157.4 -0.7 -19.1 12 F 1 15557 21 50 48 J0426+0518 03 51 02 62.1 160.7 -0.6 -16.3 -8 1 3 15557 21 50 48 21 51 08 --- 03 51 22 62.1 160.9 -0.6 -16.2 12 F 1 15690 21 51 08 3C120 03 51 22 61.6 157.6 -0.7 -19.0 -8 1 3 15690 21 51 08 21 51 28 --- 03 51 42 61.7 157.7 -0.7 -18.8 12 F 1 15823 21 51 28 J0426+0518 03 51 42 62.1 161.1 -0.6 -16.1 -8 1 3 15823 21 51 28 21 51 48 --- 03 52 02 62.1 161.2 -0.6 -15.9 12 F 1 15956 21 51 48 3C120 03 52 02 61.7 157.9 -0.7 -18.7 -8 1 3 15956 21 51 48 21 52 07 --- 03 52 22 61.7 158.1 -0.7 -18.6 12 F 1 16089 Schedule for VLBA_KP (Code Kp ) Page 24 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 52 07 J0426+0518 03 52 22 62.2 161.4 -0.6 -15.8 -8 1 3 16089 21 52 07 21 52 27 --- 03 52 42 62.2 161.6 -0.6 -15.6 12 F 1 16222 21 52 27 3C120 03 52 42 61.8 158.2 -0.7 -18.4 -8 1 3 16222 21 52 27 21 52 47 --- 03 53 02 61.8 158.4 -0.7 -18.3 12 F 1 16355 21 52 47 J0426+0518 03 53 02 62.2 161.8 -0.6 -15.5 -8 1 3 16355 21 52 47 21 53 07 --- 03 53 22 62.2 161.9 -0.6 -15.3 12 F 1 16488 21 53 07 3C120 03 53 22 61.8 158.6 -0.7 -18.2 -8 1 3 16488 21 53 07 21 53 27 --- 03 53 42 61.8 158.7 -0.7 -18.0 12 F 1 16621 21 53 27 J0426+0518 03 53 42 62.3 162.1 -0.6 -15.2 -8 1 3 16621 21 53 27 21 53 47 --- 03 54 02 62.3 162.3 -0.5 -15.0 12 F 1 16754 21 53 47 3C120 03 54 02 61.9 158.9 -0.7 -17.9 -8 1 3 16754 21 53 47 21 54 07 --- 03 54 22 61.9 159.1 -0.6 -17.7 12 F 1 16887 21 54 07 J0426+0518 03 54 22 62.3 162.4 -0.5 -14.9 -8 1 3 16887 21 54 07 21 54 27 --- 03 54 42 62.3 162.6 -0.5 -14.8 12 F 1 17020 21 54 27 3C120 03 54 42 61.9 159.2 -0.6 -17.6 -8 1 3 17020 21 54 27 21 54 47 --- 03 55 02 61.9 159.4 -0.6 -17.5 12 F 1 17153 21 54 47 J0426+0518 03 55 02 62.3 162.8 -0.5 -14.6 -8 1 4 17153 21 54 47 21 55 07 --- 03 55 22 62.4 163.0 -0.5 -14.5 12 R 1 17020 21 55 07 3C120 03 55 22 62.0 159.6 -0.6 -17.3 -8 1 4 17020 21 55 07 21 55 27 --- 03 55 42 62.0 159.7 -0.6 -17.2 12 R 1 16887 21 55 27 J0426+0518 03 55 42 62.4 163.1 -0.5 -14.3 -8 1 4 16887 21 55 27 21 55 47 --- 03 56 02 62.4 163.3 -0.5 -14.2 12 R 1 16754 21 55 47 3C120 03 56 02 62.0 159.9 -0.6 -17.0 -8 1 4 16754 21 55 47 21 56 07 --- 03 56 22 62.0 160.1 -0.6 -16.9 12 R 1 16621 21 56 07 J0426+0518 03 56 22 62.4 163.5 -0.5 -14.0 -8 1 4 16621 21 56 07 21 56 27 --- 03 56 42 62.4 163.7 -0.5 -13.9 12 R 1 16488 21 56 27 3C120 03 56 42 62.1 160.2 -0.6 -16.7 -8 1 4 16488 21 56 27 21 56 47 --- 03 57 02 62.1 160.4 -0.6 -16.6 12 R 1 16355 Schedule for VLBA_KP (Code Kp ) Page 25 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 21 56 47 J0426+0518 03 57 02 62.5 163.8 -0.5 -13.7 -8 1 4 16355 21 56 47 21 57 07 --- 03 57 22 62.5 164.0 -0.5 -13.6 12 R 1 16222 21 57 07 3C120 03 57 22 62.1 160.6 -0.6 -16.5 -8 1 4 16222 21 57 07 21 57 27 --- 03 57 42 62.1 160.7 -0.6 -16.3 12 R 1 16089 21 57 27 J0426+0518 03 57 42 62.5 164.2 -0.5 -13.4 -8 1 4 16089 21 57 27 21 57 47 --- 03 58 02 62.5 164.4 -0.5 -13.3 12 R 1 15956 21 57 47 3C120 03 58 02 62.2 160.9 -0.6 -16.2 -8 1 4 15956 21 57 47 21 58 06 --- 03 58 22 62.2 161.1 -0.6 -16.0 12 R 1 15823 21 58 06 J0426+0518 03 58 22 62.5 164.5 -0.5 -13.1 -8 1 4 15823 21 58 06 21 58 26 --- 03 58 42 62.6 164.7 -0.5 -13.0 12 R 1 15690 21 58 26 3C120 03 58 42 62.2 161.3 -0.6 -15.9 -8 1 4 15690 21 58 26 21 58 46 --- 03 59 02 62.2 161.4 -0.6 -15.7 12 R 1 15557 21 58 46 J0426+0518 03 59 02 62.6 164.9 -0.5 -12.8 -8 1 4 15557 21 58 46 21 59 06 --- 03 59 22 62.6 165.1 -0.5 -12.7 12 R 1 15424 21 59 06 3C120 03 59 22 62.2 161.6 -0.6 -15.6 -8 1 4 15424 21 59 06 21 59 26 --- 03 59 42 62.3 161.8 -0.6 -15.5 12 R 1 15291 21 59 26 J0426+0518 03 59 42 62.6 165.2 -0.5 -12.5 -8 1 4 15291 21 59 26 21 59 46 --- 04 00 02 62.6 165.4 -0.4 -12.4 12 R 1 15159 21 59 46 3C120 04 00 02 62.3 161.9 -0.6 -15.3 -8 1 4 15159 21 59 46 22 00 46 --- 04 01 02 62.4 162.5 -0.5 -14.9 52 R 1 14760 22 00 46 0420-014 04 01 02 56.3 169.9 -0.4 -8.6 -18 1 4 14760 22 00 46 22 02 46 --- 04 03 02 56.4 170.8 -0.3 -7.8 102 R 1 13962 22 02 46 3C120 04 03 02 62.5 163.5 -0.5 -14.0 -18 1 4 13962 22 02 46 22 03 06 --- 04 03 22 62.5 163.7 -0.5 -13.9 2 R 1 13829 22 03 06 J0426+0518 04 03 22 62.8 167.2 -0.4 -10.9 -8 1 4 13829 22 03 06 22 03 26 --- 04 03 42 62.8 167.4 -0.4 -10.8 12 R 1 13696 22 03 26 3C120 04 03 42 62.5 163.8 -0.5 -13.7 -8 1 4 13696 22 03 26 22 03 46 --- 04 04 02 62.5 164.0 -0.5 -13.6 12 R 1 13563 Schedule for VLBA_KP (Code Kp ) Page 26 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 03 46 J0426+0518 04 04 02 62.8 167.5 -0.4 -10.6 -8 1 4 13563 22 03 46 22 04 05 --- 04 04 22 62.8 167.7 -0.4 -10.4 12 R 1 13430 22 04 05 3C120 04 04 22 62.6 164.2 -0.5 -13.4 -8 1 4 13430 22 04 05 22 04 25 --- 04 04 42 62.6 164.4 -0.5 -13.3 12 R 1 13297 22 04 25 J0426+0518 04 04 42 62.9 167.9 -0.4 -10.3 -8 1 4 13297 22 04 25 22 04 45 --- 04 05 02 62.9 168.1 -0.4 -10.1 12 R 1 13164 22 04 45 3C120 04 05 02 62.6 164.5 -0.5 -13.1 -8 1 4 13164 22 04 45 22 05 05 --- 04 05 22 62.6 164.7 -0.5 -13.0 12 R 1 13031 22 05 05 J0426+0518 04 05 22 62.9 168.2 -0.4 -10.0 -8 1 4 13031 22 05 05 22 05 25 --- 04 05 42 62.9 168.4 -0.4 -9.8 12 R 1 12898 22 05 25 3C120 04 05 42 62.6 164.9 -0.5 -12.8 -8 1 4 12898 22 05 25 22 05 45 --- 04 06 02 62.6 165.1 -0.5 -12.7 12 R 1 12765 22 05 45 J0426+0518 04 06 02 62.9 168.6 -0.3 -9.7 -8 1 4 12765 22 05 45 22 06 05 --- 04 06 22 62.9 168.8 -0.3 -9.5 12 R 1 12632 22 06 05 3C120 04 06 22 62.7 165.3 -0.4 -12.5 -8 1 4 12632 22 06 05 22 06 25 --- 04 06 42 62.7 165.4 -0.4 -12.4 12 R 1 12499 22 06 25 J0426+0518 04 06 42 62.9 169.0 -0.3 -9.4 -8 1 4 12499 22 06 25 22 06 45 --- 04 07 02 63.0 169.1 -0.3 -9.2 12 R 1 12366 22 06 45 3C120 04 07 02 62.7 165.6 -0.4 -12.2 -8 1 4 12366 22 06 45 22 07 05 --- 04 07 22 62.7 165.8 -0.4 -12.1 12 R 1 12233 22 07 05 J0426+0518 04 07 22 63.0 169.3 -0.3 -9.1 -8 1 4 12233 22 07 05 22 07 25 --- 04 07 42 63.0 169.5 -0.3 -8.9 12 R 1 12100 22 07 25 3C120 04 07 42 62.7 166.0 -0.4 -11.9 -8 1 4 12100 22 07 25 22 07 45 --- 04 08 02 62.8 166.1 -0.4 -11.8 12 R 1 11967 22 07 45 J0426+0518 04 08 02 63.0 169.7 -0.3 -8.8 -8 1 4 11967 22 07 45 22 08 05 --- 04 08 22 63.0 169.9 -0.3 -8.6 12 R 1 11834 22 08 05 3C120 04 08 22 62.8 166.3 -0.4 -11.6 -8 1 4 11834 22 08 05 22 08 25 --- 04 08 42 62.8 166.5 -0.4 -11.5 12 R 1 11701 Schedule for VLBA_KP (Code Kp ) Page 27 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 08 25 J0426+0518 04 08 42 63.0 170.1 -0.3 -8.5 -8 1 4 11701 22 08 25 22 08 45 --- 04 09 02 63.0 170.2 -0.3 -8.3 12 R 1 11568 22 08 45 3C120 04 09 02 62.8 166.7 -0.4 -11.3 -8 1 4 11568 22 08 45 22 09 05 --- 04 09 22 62.8 166.8 -0.4 -11.2 12 R 1 11435 22 09 05 J0426+0518 04 09 22 63.0 170.4 -0.3 -8.2 -8 1 4 11435 22 09 05 22 09 25 --- 04 09 42 63.1 170.6 -0.3 -8.0 12 R 1 11302 22 09 25 3C120 04 09 42 62.8 167.0 -0.4 -11.0 -8 1 4 11302 22 09 25 22 09 45 --- 04 10 02 62.9 167.2 -0.4 -10.9 12 R 1 11169 22 09 45 J0426+0518 04 10 02 63.1 170.8 -0.3 -7.9 -8 1 4 11169 22 09 45 22 10 05 --- 04 10 22 63.1 171.0 -0.3 -7.7 12 R 1 11036 22 10 05 3C120 04 10 22 62.9 167.4 -0.4 -10.7 -8 1 4 11036 22 10 05 22 10 24 --- 04 10 42 62.9 167.6 -0.4 -10.6 12 R 1 10904 22 10 24 J0426+0518 04 10 42 63.1 171.1 -0.3 -7.5 -8 1 4 10904 22 10 24 22 10 44 --- 04 11 02 63.1 171.3 -0.3 -7.4 12 R 1 10771 22 10 44 3C120 04 11 02 62.9 167.7 -0.4 -10.4 -8 1 4 10771 22 10 44 22 11 04 --- 04 11 22 62.9 167.9 -0.4 -10.3 12 R 1 10638 22 11 04 J0426+0518 04 11 22 63.1 171.5 -0.3 -7.2 -8 1 4 10638 22 11 04 22 11 24 --- 04 11 42 63.1 171.7 -0.3 -7.1 12 R 1 10505 22 11 24 3C120 04 11 42 62.9 168.1 -0.4 -10.1 -8 1 4 10505 22 11 24 22 11 44 --- 04 12 02 62.9 168.3 -0.4 -10.0 12 R 1 10372 22 11 44 J0426+0518 04 12 02 63.1 171.9 -0.2 -6.9 -8 1 4 10372 22 11 44 22 12 04 --- 04 12 22 63.1 172.0 -0.2 -6.8 12 R 1 10239 22 12 04 3C120 04 12 22 63.0 168.5 -0.3 -9.8 -8 1 4 10239 22 12 04 22 12 24 --- 04 12 42 63.0 168.6 -0.3 -9.7 12 R 1 10106 22 12 24 J0426+0518 04 12 42 63.2 172.2 -0.2 -6.6 -8 1 4 10106 22 12 24 22 12 44 --- 04 13 02 63.2 172.4 -0.2 -6.5 12 R 1 9973 22 12 44 3C120 04 13 02 63.0 168.8 -0.3 -9.5 -8 1 4 9973 22 12 44 22 13 04 --- 04 13 22 63.0 169.0 -0.3 -9.4 12 R 1 9840 Schedule for VLBA_KP (Code Kp ) Page 28 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 13 04 J0426+0518 04 13 22 63.2 172.6 -0.2 -6.3 -8 1 4 9840 22 13 04 22 13 24 --- 04 13 42 63.2 172.8 -0.2 -6.1 12 R 1 9707 22 13 24 3C120 04 13 42 63.0 169.2 -0.3 -9.2 -8 1 4 9707 22 13 24 22 13 44 --- 04 14 02 63.0 169.4 -0.3 -9.1 12 R 1 9574 22 13 44 J0426+0518 04 14 02 63.2 173.0 -0.2 -6.0 -8 1 4 9574 22 13 44 22 14 04 --- 04 14 22 63.2 173.1 -0.2 -5.8 12 R 1 9441 22 14 04 3C120 04 14 22 63.0 169.5 -0.3 -8.9 -8 1 4 9441 22 14 04 22 14 24 --- 04 14 42 63.0 169.7 -0.3 -8.7 12 R 1 9308 22 14 24 J0426+0518 04 14 42 63.2 173.3 -0.2 -5.7 -8 1 4 9308 22 14 24 22 14 44 --- 04 15 02 63.2 173.5 -0.2 -5.5 12 R 1 9175 22 14 44 3C120 04 15 02 63.1 169.9 -0.3 -8.6 -8 1 4 9175 22 14 44 22 15 44 --- 04 16 02 63.1 170.4 -0.3 -8.1 51 R 1 8776 22 15 44 0420-014 04 16 02 56.7 176.6 -0.1 -2.8 -19 1 4 8776 22 15 44 22 17 43 --- 04 18 02 56.7 177.6 -0.1 -2.1 101 R 1 7978 22 17 43 3C120 04 18 02 63.2 171.5 -0.3 -7.2 -19 1 4 7978 22 17 43 22 18 03 --- 04 18 22 63.2 171.7 -0.2 -7.0 1 R 1 7845 22 18 03 J0426+0518 04 18 22 63.3 175.3 -0.1 -4.0 -8 1 4 7845 22 18 03 22 18 23 --- 04 18 42 63.3 175.5 -0.1 -3.8 12 R 1 7712 22 18 23 3C120 04 18 42 63.2 171.9 -0.2 -6.9 -8 1 4 7712 22 18 23 22 18 43 --- 04 19 02 63.2 172.1 -0.2 -6.7 12 R 1 7579 22 18 43 J0426+0518 04 19 02 63.3 175.7 -0.1 -3.6 -8 1 4 7579 22 18 43 22 19 03 --- 04 19 22 63.3 175.9 -0.1 -3.5 12 R 1 7446 22 19 03 3C120 04 19 22 63.2 172.3 -0.2 -6.6 -8 1 4 7446 22 19 03 22 19 23 --- 04 19 42 63.2 172.5 -0.2 -6.4 12 R 1 7313 22 19 23 J0426+0518 04 19 42 63.3 176.1 -0.1 -3.3 -8 1 4 7313 22 19 23 22 19 43 --- 04 20 02 63.3 176.3 -0.1 -3.2 12 R 1 7180 22 19 43 3C120 04 20 02 63.2 172.6 -0.2 -6.3 -8 1 4 7180 22 19 43 22 20 03 --- 04 20 22 63.2 172.8 -0.2 -6.1 12 R 1 7047 Schedule for VLBA_KP (Code Kp ) Page 29 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 20 03 J0426+0518 04 20 22 63.3 176.5 -0.1 -3.0 -8 1 4 7047 22 20 03 22 20 23 --- 04 20 42 63.3 176.6 -0.1 -2.9 12 R 1 6914 22 20 23 3C120 04 20 42 63.2 173.0 -0.2 -6.0 -8 1 4 6914 22 20 23 22 20 43 --- 04 21 02 63.2 173.2 -0.2 -5.8 12 R 1 6781 22 20 43 J0426+0518 04 21 02 63.3 176.8 -0.1 -2.7 -8 1 4 6781 22 20 43 22 21 03 --- 04 21 22 63.3 177.0 -0.1 -2.5 12 R 1 6649 22 21 03 3C120 04 21 22 63.3 173.4 -0.2 -5.6 -8 1 4 6649 22 21 03 22 21 23 --- 04 21 42 63.3 173.6 -0.2 -5.5 12 R 1 6516 22 21 23 J0426+0518 04 21 42 63.3 177.2 -0.1 -2.4 -8 1 4 6516 22 21 23 22 21 43 --- 04 22 02 63.3 177.4 -0.1 -2.2 12 R 1 6383 22 21 43 3C120 04 22 02 63.3 173.7 -0.2 -5.3 -8 1 4 6383 22 21 43 22 22 03 --- 04 22 22 63.3 173.9 -0.2 -5.2 12 R 1 6250 22 22 03 J0426+0518 04 22 22 63.3 177.6 -0.1 -2.1 -8 1 4 6250 22 22 03 22 22 22 --- 04 22 42 63.3 177.7 -0.1 -1.9 12 R 1 6117 22 22 22 3C120 04 22 42 63.3 174.1 -0.2 -5.0 -8 1 4 6117 22 22 22 22 22 42 --- 04 23 02 63.3 174.3 -0.2 -4.9 12 R 1 5984 22 22 42 J0426+0518 04 23 02 63.3 177.9 -0.1 -1.8 -8 1 4 5984 22 22 42 22 23 02 --- 04 23 22 63.3 178.1 -0.1 -1.6 12 R 1 5851 22 23 02 3C120 04 23 22 63.3 174.5 -0.2 -4.7 -8 1 4 5851 22 23 02 22 23 22 --- 04 23 42 63.3 174.7 -0.2 -4.6 12 R 1 5718 22 23 22 J0426+0518 04 23 42 63.3 178.3 -0.1 -1.4 -8 1 4 5718 22 23 22 22 23 42 --- 04 24 02 63.3 178.5 0.0 -1.3 12 R 1 5585 22 23 42 3C120 04 24 02 63.3 174.8 -0.2 -4.4 -8 1 4 5585 22 23 42 22 24 02 --- 04 24 22 63.3 175.0 -0.1 -4.2 12 R 1 5452 22 24 02 J0426+0518 04 24 22 63.3 178.7 0.0 -1.1 -8 1 4 5452 22 24 02 22 24 22 --- 04 24 42 63.4 178.9 0.0 -1.0 12 R 1 5319 22 24 22 3C120 04 24 42 63.3 175.2 -0.1 -4.1 -8 1 4 5319 22 24 22 22 24 42 --- 04 25 02 63.3 175.4 -0.1 -3.9 12 R 1 5186 Schedule for VLBA_KP (Code Kp ) Page 30 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 24 42 J0426+0518 04 25 02 63.4 179.0 0.0 -0.8 -8 1 4 5186 22 24 42 22 25 02 --- 04 25 22 63.4 179.2 0.0 -0.7 12 R 1 5053 22 25 02 3C120 04 25 22 63.3 175.6 -0.1 -3.8 -8 1 4 5053 22 25 02 22 25 22 --- 04 25 42 63.3 175.8 -0.1 -3.6 12 R 1 4920 22 25 22 J0426+0518 04 25 42 63.4 179.4 0.0 -0.5 -8 1 4 4920 22 25 22 22 25 42 --- 04 26 02 63.4 179.6 0.0 -0.3 12 R 1 4787 22 25 42 3C120 04 26 02 63.3 175.9 -0.1 -3.5 -8 1 4 4787 22 25 42 22 26 02 --- 04 26 22 63.4 176.1 -0.1 -3.3 12 R 1 4654 22 26 02 J0426+0518 04 26 22 63.4 179.8 0.0 -0.2 -8 1 4 4654 22 26 02 22 26 22 --- 04 26 42 63.4 180.0 0.0 0.0 12 R 1 4521 22 26 22 3C120 04 26 42 63.4 176.3 -0.1 -3.1 -8 1 4 4521 22 26 22 22 26 42 --- 04 27 02 63.4 176.5 -0.1 -3.0 12 R 1 4388 22 26 42 J0426+0518 04 27 02 63.4 180.2 0.0 0.1 -8 1 4 4388 22 26 42 22 27 02 --- 04 27 22 63.4 180.3 0.0 0.3 12 R 1 4255 22 27 02 3C120 04 27 22 63.4 176.7 -0.1 -2.8 -8 1 4 4255 22 27 02 22 27 22 --- 04 27 42 63.4 176.9 -0.1 -2.7 12 R 1 4122 22 27 22 J0426+0518 04 27 42 63.4 180.5 0.0 0.4 -8 1 4 4122 22 27 22 22 27 42 --- 04 28 02 63.4 180.7 0.0 0.6 12 R 1 3989 22 27 42 3C120 04 28 02 63.4 177.1 -0.1 -2.5 -8 1 4 3989 22 27 42 22 28 02 --- 04 28 22 63.4 177.2 -0.1 -2.4 12 R 1 3856 22 28 02 J0426+0518 04 28 22 63.4 180.9 0.0 0.8 -8 1 4 3856 22 28 02 22 28 22 --- 04 28 42 63.4 181.1 0.0 0.9 12 R 1 3723 22 28 22 3C120 04 28 42 63.4 177.4 -0.1 -2.2 -8 1 4 3723 22 28 22 22 28 41 --- 04 29 02 63.4 177.6 -0.1 -2.0 12 R 1 3590 22 28 41 J0426+0518 04 29 02 63.3 181.3 0.0 1.1 -8 1 4 3590 22 28 41 22 29 01 --- 04 29 22 63.3 181.4 0.0 1.2 12 R 1 3457 22 29 01 3C120 04 29 22 63.4 177.8 -0.1 -1.9 -8 1 4 3457 22 29 01 22 29 21 --- 04 29 42 63.4 178.0 -0.1 -1.7 12 R 1 3324 Schedule for VLBA_KP (Code Kp ) Page 31 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 29 21 J0426+0518 04 29 42 63.3 181.6 0.0 1.4 -8 1 4 3324 22 29 21 22 29 41 --- 04 30 02 63.3 181.8 0.1 1.5 12 R 1 3191 22 29 41 3C120 04 30 02 63.4 178.2 -0.1 -1.6 -8 1 4 3191 22 29 41 22 30 41 --- 04 31 02 63.4 178.7 0.0 -1.1 51 R 1 2792 22 30 41 0420-014 04 31 02 56.7 183.5 0.1 2.9 -19 1 4 2792 22 30 41 22 32 41 --- 04 33 02 56.6 184.4 0.2 3.7 100 R 1 1995 22 32 41 3C120 04 33 02 63.4 179.8 0.0 -0.1 -20 1 4 1995 22 32 41 22 33 01 --- 04 33 22 63.4 180.0 0.0 0.0 0 R 1 1862 22 33 01 J0426+0518 04 33 22 63.3 183.7 0.1 3.1 -8 1 4 1862 22 33 01 22 33 21 --- 04 33 42 63.3 183.8 0.1 3.3 12 R 1 1729 22 33 21 3C120 04 33 42 63.4 180.2 0.0 0.2 -8 1 4 1729 22 33 21 22 33 41 --- 04 34 02 63.4 180.4 0.0 0.3 12 R 1 1596 22 33 41 J0426+0518 04 34 02 63.3 184.0 0.1 3.4 -8 1 4 1596 22 33 41 22 34 01 --- 04 34 22 63.3 184.2 0.1 3.6 12 R 1 1463 22 34 01 3C120 04 34 22 63.4 180.6 0.0 0.5 -8 1 4 1463 22 34 01 22 34 21 --- 04 34 42 63.4 180.8 0.0 0.6 12 R 1 1330 22 34 21 J0426+0518 04 34 42 63.3 184.4 0.1 3.7 -8 1 4 1330 22 34 21 22 34 40 --- 04 35 02 63.3 184.6 0.1 3.9 12 R 1 1197 22 34 40 3C120 04 35 02 63.4 180.9 0.0 0.8 -8 1 4 1197 22 34 40 22 35 00 --- 04 35 22 63.4 181.1 0.0 1.0 12 R 1 1064 22 35 00 J0426+0518 04 35 22 63.3 184.8 0.1 4.1 -8 1 4 1064 22 35 00 22 35 20 --- 04 35 42 63.3 185.0 0.1 4.2 12 R 1 931 22 35 20 3C120 04 35 42 63.4 181.3 0.0 1.1 -8 1 4 931 22 35 20 22 35 40 --- 04 36 02 63.4 181.5 0.0 1.3 12 R 1 798 22 35 40 J0426+0518 04 36 02 63.3 185.1 0.2 4.4 -8 1 4 798 22 35 40 22 36 00 --- 04 36 22 63.3 185.3 0.2 4.5 12 R 1 665 22 36 00 3C120 04 36 22 63.4 181.7 0.1 1.4 -8 1 4 665 22 36 00 22 36 20 --- 04 36 42 63.4 181.9 0.1 1.6 12 R 1 532 Schedule for VLBA_KP (Code Kp ) Page 32 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 36 20 J0426+0518 04 36 42 63.3 185.5 0.2 4.7 -8 1 4 532 22 36 20 22 36 40 --- 04 37 02 63.2 185.7 0.2 4.8 12 R 1 399 22 36 40 3C120 04 37 02 63.4 182.1 0.1 1.8 -8 1 5 399 22 36 40 22 37 00 --- 04 37 22 63.4 182.2 0.1 1.9 12 F 1 532 22 37 00 J0426+0518 04 37 22 63.2 185.9 0.2 5.0 -8 1 5 532 22 37 00 22 37 20 --- 04 37 42 63.2 186.1 0.2 5.2 12 F 1 665 22 37 20 3C120 04 37 42 63.4 182.4 0.1 2.1 -8 1 5 665 22 37 20 22 37 40 --- 04 38 02 63.4 182.6 0.1 2.2 12 F 1 798 22 37 40 J0426+0518 04 38 02 63.2 186.2 0.2 5.3 -8 1 5 798 22 37 40 22 38 00 --- 04 38 22 63.2 186.4 0.2 5.5 12 F 1 931 22 38 00 3C120 04 38 22 63.4 182.8 0.1 2.4 -8 1 5 931 22 38 00 22 38 20 --- 04 38 42 63.4 183.0 0.1 2.5 12 F 1 1064 22 38 20 J0426+0518 04 38 42 63.2 186.6 0.2 5.6 -8 1 5 1064 22 38 20 22 38 40 --- 04 39 02 63.2 186.8 0.2 5.8 12 F 1 1197 22 38 40 3C120 04 39 02 63.4 183.2 0.1 2.7 -8 1 5 1197 22 38 40 22 39 00 --- 04 39 22 63.4 183.4 0.1 2.9 12 F 1 1330 22 39 00 J0426+0518 04 39 22 63.2 187.0 0.2 5.9 -8 1 5 1330 22 39 00 22 39 20 --- 04 39 42 63.2 187.2 0.2 6.1 12 F 1 1463 22 39 20 3C120 04 39 42 63.4 183.5 0.1 3.0 -8 1 5 1463 22 39 20 22 39 40 --- 04 40 02 63.4 183.7 0.1 3.2 12 F 1 1596 22 39 40 J0426+0518 04 40 02 63.2 187.3 0.2 6.2 -8 1 5 1596 22 39 40 22 40 00 --- 04 40 22 63.2 187.5 0.2 6.4 12 F 1 1729 22 40 00 3C120 04 40 22 63.4 183.9 0.1 3.3 -8 1 5 1729 22 40 00 22 40 20 --- 04 40 42 63.3 184.1 0.1 3.5 12 F 1 1862 22 40 20 J0426+0518 04 40 42 63.2 187.7 0.2 6.6 -8 1 5 1862 22 40 20 22 40 39 --- 04 41 02 63.1 187.9 0.2 6.7 12 F 1 1995 22 40 39 3C120 04 41 02 63.3 184.3 0.1 3.6 -8 1 5 1995 22 40 39 22 40 59 --- 04 41 22 63.3 184.5 0.1 3.8 12 F 1 2128 Schedule for VLBA_KP (Code Kp ) Page 33 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 40 59 J0426+0518 04 41 22 63.1 188.1 0.2 6.9 -8 1 5 2128 22 40 59 22 41 19 --- 04 41 42 63.1 188.3 0.2 7.0 12 F 1 2261 22 41 19 3C120 04 41 42 63.3 184.6 0.1 4.0 -8 1 5 2261 22 41 19 22 41 39 --- 04 42 02 63.3 184.8 0.1 4.1 12 F 1 2394 22 41 39 J0426+0518 04 42 02 63.1 188.4 0.3 7.2 -8 1 5 2394 22 41 39 22 41 59 --- 04 42 22 63.1 188.6 0.3 7.3 12 F 1 2526 22 41 59 3C120 04 42 22 63.3 185.0 0.2 4.3 -8 1 5 2526 22 41 59 22 42 19 --- 04 42 42 63.3 185.2 0.2 4.4 12 F 1 2659 22 42 19 J0426+0518 04 42 42 63.1 188.8 0.3 7.5 -8 1 5 2659 22 42 19 22 42 39 --- 04 43 02 63.1 189.0 0.3 7.6 12 F 1 2792 22 42 39 3C120 04 43 02 63.3 185.4 0.2 4.6 -8 1 5 2792 22 42 39 22 42 59 --- 04 43 22 63.3 185.6 0.2 4.7 12 F 1 2925 22 42 59 J0426+0518 04 43 22 63.1 189.2 0.3 7.8 -8 1 5 2925 22 42 59 22 43 19 --- 04 43 42 63.1 189.3 0.3 8.0 12 F 1 3058 22 43 19 3C120 04 43 42 63.3 185.7 0.2 4.9 -8 1 5 3058 22 43 19 22 43 39 --- 04 44 02 63.3 185.9 0.2 5.1 12 F 1 3191 22 43 39 J0426+0518 04 44 02 63.1 189.5 0.3 8.1 -8 1 5 3191 22 43 39 22 43 59 --- 04 44 22 63.0 189.7 0.3 8.3 12 F 1 3324 22 43 59 3C120 04 44 22 63.3 186.1 0.2 5.2 -8 1 5 3324 22 43 59 22 44 19 --- 04 44 42 63.3 186.3 0.2 5.4 12 F 1 3457 22 44 19 J0426+0518 04 44 42 63.0 189.9 0.3 8.4 -8 1 5 3457 22 44 19 22 44 39 --- 04 45 02 63.0 190.1 0.3 8.6 12 F 1 3590 22 44 39 3C120 04 45 02 63.3 186.5 0.2 5.5 -8 1 5 3590 22 44 39 22 45 39 --- 04 46 02 63.2 187.0 0.2 6.0 51 F 1 3989 22 45 39 0420-014 04 46 02 56.3 190.2 0.4 8.7 -20 1 5 3989 22 45 39 22 47 38 --- 04 48 02 56.2 191.1 0.4 9.4 100 F 1 4787 22 47 38 3C120 04 48 02 63.2 188.1 0.2 6.9 -20 1 5 4787 22 47 38 22 47 58 --- 04 48 22 63.2 188.3 0.3 7.1 0 F 1 4920 Schedule for VLBA_KP (Code Kp ) Page 34 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 47 58 J0426+0518 04 48 22 62.9 191.9 0.4 10.1 -8 1 5 4920 22 47 58 22 48 18 --- 04 48 42 62.9 192.0 0.4 10.2 12 F 1 5053 22 48 18 3C120 04 48 42 63.2 188.5 0.3 7.2 -8 1 5 5053 22 48 18 22 48 38 --- 04 49 02 63.2 188.7 0.3 7.4 12 F 1 5186 22 48 38 J0426+0518 04 49 02 62.9 192.2 0.4 10.4 -8 1 5 5186 22 48 38 22 48 58 --- 04 49 22 62.8 192.4 0.4 10.5 12 F 1 5319 22 48 58 3C120 04 49 22 63.1 188.9 0.3 7.5 -8 1 5 5319 22 48 58 22 49 18 --- 04 49 42 63.1 189.0 0.3 7.7 12 F 1 5452 22 49 18 J0426+0518 04 49 42 62.8 192.6 0.4 10.7 -8 1 5 5452 22 49 18 22 49 38 --- 04 50 02 62.8 192.8 0.4 10.8 12 F 1 5585 22 49 38 3C120 04 50 02 63.1 189.2 0.3 7.9 -8 1 5 5585 22 49 38 22 49 58 --- 04 50 22 63.1 189.4 0.3 8.0 12 F 1 5718 22 49 58 J0426+0518 04 50 22 62.8 192.9 0.4 11.0 -8 1 5 5718 22 49 58 22 50 18 --- 04 50 42 62.8 193.1 0.4 11.1 12 F 1 5851 22 50 18 3C120 04 50 42 63.1 189.6 0.3 8.2 -8 1 5 5851 22 50 18 22 50 38 --- 04 51 02 63.1 189.8 0.3 8.3 12 F 1 5984 22 50 38 J0426+0518 04 51 02 62.8 193.3 0.4 11.3 -8 1 5 5984 22 50 38 22 50 58 --- 04 51 22 62.7 193.5 0.4 11.5 12 F 1 6117 22 50 58 3C120 04 51 22 63.1 190.0 0.3 8.5 -8 1 5 6117 22 50 58 22 51 18 --- 04 51 42 63.1 190.1 0.3 8.6 12 F 1 6250 22 51 18 J0426+0518 04 51 42 62.7 193.6 0.4 11.6 -8 1 5 6250 22 51 18 22 51 38 --- 04 52 02 62.7 193.8 0.4 11.8 12 F 1 6383 22 51 38 3C120 04 52 02 63.0 190.3 0.3 8.8 -8 1 5 6383 22 51 38 22 51 58 --- 04 52 22 63.0 190.5 0.3 8.9 12 F 1 6516 22 51 58 J0426+0518 04 52 22 62.7 194.0 0.4 11.9 -8 1 5 6516 22 51 58 22 52 18 --- 04 52 42 62.7 194.2 0.4 12.0 12 F 1 6649 22 52 18 3C120 04 52 42 63.0 190.7 0.3 9.1 -8 1 5 6649 22 52 18 22 52 38 --- 04 53 02 63.0 190.9 0.3 9.2 12 F 1 6781 Schedule for VLBA_KP (Code Kp ) Page 35 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 52 38 J0426+0518 04 53 02 62.7 194.4 0.4 12.2 -8 1 5 6781 22 52 38 22 52 57 --- 04 53 22 62.6 194.5 0.4 12.3 12 F 1 6914 22 52 57 3C120 04 53 22 63.0 191.0 0.3 9.4 -8 1 5 6914 22 52 57 22 53 17 --- 04 53 42 63.0 191.2 0.3 9.5 12 F 1 7047 22 53 17 J0426+0518 04 53 42 62.6 194.7 0.4 12.5 -8 1 5 7047 22 53 17 22 53 37 --- 04 54 02 62.6 194.9 0.5 12.6 12 F 1 7180 22 53 37 3C120 04 54 02 63.0 191.4 0.3 9.7 -8 1 5 7180 22 53 37 22 53 57 --- 04 54 22 63.0 191.6 0.4 9.8 12 F 1 7313 22 53 57 J0426+0518 04 54 22 62.6 195.1 0.5 12.8 -8 1 5 7313 22 53 57 22 54 17 --- 04 54 42 62.6 195.2 0.5 12.9 12 F 1 7446 22 54 17 3C120 04 54 42 62.9 191.8 0.4 10.0 -8 1 5 7446 22 54 17 22 54 37 --- 04 55 02 62.9 191.9 0.4 10.1 12 F 1 7579 22 54 37 J0426+0518 04 55 02 62.5 195.4 0.5 13.1 -8 1 5 7579 22 54 37 22 54 57 --- 04 55 22 62.5 195.6 0.5 13.2 12 F 1 7712 22 54 57 3C120 04 55 22 62.9 192.1 0.4 10.3 -8 1 5 7712 22 54 57 22 55 17 --- 04 55 42 62.9 192.3 0.4 10.5 12 F 1 7845 22 55 17 J0426+0518 04 55 42 62.5 195.8 0.5 13.4 -8 1 5 7845 22 55 17 22 55 37 --- 04 56 02 62.5 195.9 0.5 13.5 12 F 1 7978 22 55 37 3C120 04 56 02 62.9 192.5 0.4 10.6 -8 1 5 7978 22 55 37 22 55 57 --- 04 56 22 62.9 192.7 0.4 10.8 12 F 1 8111 22 55 57 J0426+0518 04 56 22 62.5 196.1 0.5 13.7 -8 1 5 8111 22 55 57 22 56 17 --- 04 56 42 62.4 196.3 0.5 13.8 12 F 1 8244 22 56 17 3C120 04 56 42 62.8 192.8 0.4 10.9 -8 1 5 8244 22 56 17 22 56 37 --- 04 57 02 62.8 193.0 0.4 11.1 12 F 1 8377 22 56 37 J0426+0518 04 57 02 62.4 196.5 0.5 14.0 -8 1 5 8377 22 56 37 22 56 57 --- 04 57 22 62.4 196.6 0.5 14.1 12 F 1 8510 22 56 57 3C120 04 57 22 62.8 193.2 0.4 11.2 -8 1 5 8510 22 56 57 22 57 17 --- 04 57 42 62.8 193.4 0.4 11.4 12 F 1 8643 Schedule for VLBA_KP (Code Kp ) Page 36 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 22 57 17 J0426+0518 04 57 42 62.4 196.8 0.5 14.3 -8 1 5 8643 22 57 17 22 57 37 --- 04 58 02 62.4 197.0 0.5 14.4 12 F 1 8776 22 57 37 3C120 04 58 02 62.8 193.5 0.4 11.5 -8 1 5 8776 22 57 37 22 57 57 --- 04 58 22 62.8 193.7 0.4 11.7 12 F 1 8909 22 57 57 J0426+0518 04 58 22 62.3 197.2 0.5 14.6 -8 1 5 8909 22 57 57 22 58 17 --- 04 58 42 62.3 197.3 0.5 14.7 12 F 1 9042 22 58 17 3C120 04 58 42 62.7 193.9 0.4 11.8 -8 1 5 9042 22 58 17 22 58 37 --- 04 59 02 62.7 194.1 0.4 12.0 12 F 1 9175 22 58 37 J0426+0518 04 59 02 62.3 197.5 0.5 14.8 -8 1 5 9175 22 58 37 22 58 56 --- 04 59 22 62.3 197.7 0.5 15.0 12 F 1 9308 22 58 56 3C120 04 59 22 62.7 194.3 0.4 12.1 -8 1 5 9308 22 58 56 22 59 16 --- 04 59 42 62.7 194.4 0.4 12.3 12 F 1 9441 22 59 16 J0426+0518 04 59 42 62.3 197.8 0.5 15.1 -8 1 5 9441 22 59 16 22 59 36 --- 05 00 02 62.2 198.0 0.6 15.3 12 F 1 9574 22 59 36 3C120 05 00 02 62.7 194.6 0.4 12.4 -8 1 5 9574 22 59 36 23 00 36 --- 05 01 02 62.6 195.1 0.5 12.9 52 F 1 9973 23 00 36 0420-014 05 01 02 55.5 196.8 0.6 14.2 -20 1 5 9973 23 00 36 23 02 36 --- 05 03 02 55.4 197.6 0.7 14.9 99 F 1 10771 23 02 36 3C120 05 03 02 62.5 196.2 0.5 13.7 -20 1 5 10771 23 02 36 23 02 56 --- 05 03 22 62.5 196.4 0.5 13.9 0 F 1 10904 23 02 56 J0426+0518 05 03 22 62.0 199.7 0.6 16.7 -8 1 5 10904 23 02 56 23 03 16 --- 05 03 42 62.0 199.9 0.6 16.9 12 F 1 11036 23 03 16 3C120 05 03 42 62.5 196.5 0.5 14.0 -8 1 5 11036 23 03 16 23 03 36 --- 05 04 02 62.5 196.7 0.5 14.2 12 F 1 11169 23 03 36 J0426+0518 05 04 02 62.0 200.1 0.6 17.0 -8 1 5 11169 23 03 36 23 03 56 --- 05 04 22 61.9 200.2 0.6 17.1 12 F 1 11302 23 03 56 3C120 05 04 22 62.4 196.9 0.5 14.3 -8 1 5 11302 23 03 56 23 04 16 --- 05 04 42 62.4 197.1 0.5 14.5 12 F 1 11435 Schedule for VLBA_KP (Code Kp ) Page 37 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 23 04 16 J0426+0518 05 04 42 61.9 200.4 0.6 17.3 -8 1 5 11435 23 04 16 23 04 36 --- 05 05 02 61.9 200.6 0.6 17.4 12 F 1 11568 23 04 36 3C120 05 05 02 62.4 197.2 0.5 14.6 -8 1 5 11568 23 04 36 23 04 55 --- 05 05 22 62.4 197.4 0.5 14.8 12 F 1 11701 23 04 55 J0426+0518 05 05 22 61.9 200.7 0.6 17.6 -8 1 5 11701 23 04 55 23 05 15 --- 05 05 42 61.8 200.9 0.6 17.7 12 F 1 11834 23 05 15 3C120 05 05 42 62.3 197.6 0.5 14.9 -8 1 5 11834 23 05 15 23 05 35 --- 05 06 02 62.3 197.7 0.5 15.1 12 F 1 11967 23 05 35 J0426+0518 05 06 02 61.8 201.1 0.7 17.8 -8 1 5 11967 23 05 35 23 05 55 --- 05 06 22 61.8 201.2 0.7 18.0 12 F 1 12100 23 05 55 3C120 05 06 22 62.3 197.9 0.6 15.2 -8 1 5 12100 23 05 55 23 06 15 --- 05 06 42 62.3 198.1 0.6 15.3 12 F 1 12233 23 06 15 J0426+0518 05 06 42 61.8 201.4 0.7 18.1 -8 1 5 12233 23 06 15 23 06 35 --- 05 07 02 61.7 201.6 0.7 18.3 12 F 1 12366 23 06 35 3C120 05 07 02 62.3 198.3 0.6 15.5 -8 1 5 12366 23 06 35 23 06 55 --- 05 07 22 62.2 198.4 0.6 15.6 12 F 1 12499 23 06 55 J0426+0518 05 07 22 61.7 201.7 0.7 18.4 -8 1 5 12499 23 06 55 23 07 15 --- 05 07 42 61.7 201.9 0.7 18.5 12 F 1 12632 23 07 15 3C120 05 07 42 62.2 198.6 0.6 15.8 -8 1 5 12632 23 07 15 23 07 35 --- 05 08 02 62.2 198.8 0.6 15.9 12 F 1 12765 23 07 35 J0426+0518 05 08 02 61.7 202.1 0.7 18.7 -8 1 5 12765 23 07 35 23 07 55 --- 05 08 22 61.6 202.2 0.7 18.8 12 F 1 12898 23 07 55 3C120 05 08 22 62.2 198.9 0.6 16.1 -8 1 5 12898 23 07 55 23 08 15 --- 05 08 42 62.1 199.1 0.6 16.2 12 F 1 13031 23 08 15 J0426+0518 05 08 42 61.6 202.4 0.7 18.9 -8 1 5 13031 23 08 15 23 08 35 --- 05 09 02 61.6 202.6 0.7 19.1 12 F 1 13164 23 08 35 3C120 05 09 02 62.1 199.3 0.6 16.4 -8 1 5 13164 23 08 35 23 08 55 --- 05 09 22 62.1 199.5 0.6 16.5 12 F 1 13297 Schedule for VLBA_KP (Code Kp ) Page 38 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 23 08 55 J0426+0518 05 09 22 61.6 202.7 0.7 19.2 -8 1 5 13297 23 08 55 23 09 15 --- 05 09 42 61.5 202.9 0.7 19.4 12 F 1 13430 23 09 15 3C120 05 09 42 62.1 199.6 0.6 16.6 -8 1 5 13430 23 09 15 23 09 35 --- 05 10 02 62.1 199.8 0.6 16.8 12 F 1 13563 23 09 35 J0426+0518 05 10 02 61.5 203.1 0.7 19.5 -8 1 5 13563 23 09 35 23 09 55 --- 05 10 22 61.5 203.2 0.7 19.6 12 F 1 13696 23 09 55 3C120 05 10 22 62.0 200.0 0.6 16.9 -8 1 5 13696 23 09 55 23 10 15 --- 05 10 42 62.0 200.1 0.6 17.1 12 F 1 13829 23 10 15 J0426+0518 05 10 42 61.4 203.4 0.7 19.8 -8 1 5 13829 23 10 15 23 10 35 --- 05 11 02 61.4 203.5 0.7 19.9 12 F 1 13962 23 10 35 3C120 05 11 02 62.0 200.3 0.6 17.2 -8 1 5 13962 23 10 35 23 10 55 --- 05 11 22 62.0 200.5 0.6 17.3 12 F 1 14095 23 10 55 J0426+0518 05 11 22 61.4 203.7 0.7 20.0 -8 1 5 14095 23 10 55 23 11 14 --- 05 11 42 61.4 203.9 0.7 20.2 12 F 1 14228 23 11 14 3C120 05 11 42 61.9 200.6 0.6 17.5 -8 1 5 14228 23 11 14 23 11 34 --- 05 12 02 61.9 200.8 0.6 17.6 12 F 1 14361 23 11 34 J0426+0518 05 12 02 61.3 204.0 0.8 20.3 -8 1 5 14361 23 11 34 23 11 54 --- 05 12 22 61.3 204.2 0.8 20.4 12 F 1 14494 23 11 54 3C120 05 12 22 61.9 201.0 0.7 17.8 -8 1 5 14494 23 11 54 23 12 14 --- 05 12 42 61.9 201.1 0.7 17.9 12 F 1 14627 23 12 14 J0426+0518 05 12 42 61.3 204.4 0.8 20.6 -8 1 5 14627 23 12 14 23 12 34 --- 05 13 02 61.2 204.5 0.8 20.7 12 F 1 14760 23 12 34 3C120 05 13 02 61.8 201.3 0.7 18.0 -8 1 5 14760 23 12 34 23 12 54 --- 05 13 22 61.8 201.5 0.7 18.2 12 F 1 14893 23 12 54 J0426+0518 05 13 22 61.2 204.7 0.8 20.8 -8 1 5 14893 23 12 54 23 13 14 --- 05 13 42 61.2 204.8 0.8 21.0 12 F 1 15026 23 13 14 3C120 05 13 42 61.8 201.6 0.7 18.3 -8 1 5 15026 23 13 14 23 13 34 --- 05 14 02 61.8 201.8 0.7 18.5 12 F 1 15159 Schedule for VLBA_KP (Code Kp ) Page 39 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 23 13 34 J0426+0518 05 14 02 61.2 205.0 0.8 21.1 -8 1 5 15159 23 13 34 23 13 54 --- 05 14 22 61.1 205.2 0.8 21.2 12 F 1 15291 23 13 54 3C120 05 14 22 61.7 202.0 0.7 18.6 -8 1 5 15291 23 13 54 23 14 14 --- 05 14 42 61.7 202.1 0.7 18.7 12 F 1 15424 23 14 14 J0426+0518 05 14 42 61.1 205.3 0.8 21.4 -8 1 5 15424 23 14 14 23 14 34 --- 05 15 02 61.1 205.5 0.8 21.5 12 F 1 15557 23 14 34 3C120 05 15 02 61.7 202.3 0.7 18.9 -8 1 5 15557 23 14 34 23 15 34 --- 05 16 02 61.6 202.8 0.7 19.3 52 F 1 15956 23 15 34 0420-014 05 16 02 54.4 203.0 0.9 19.4 -20 1 5 15956 23 15 34 23 17 33 --- 05 18 02 54.3 203.8 0.9 20.1 99 F 1 16754 23 17 33 3C120 05 18 02 61.4 203.8 0.7 20.1 -20 1 5 16754 23 17 33 23 17 53 --- 05 18 22 61.4 204.0 0.8 20.2 0 F 1 16887 23 17 53 J0426+0518 05 18 22 60.7 207.1 0.9 22.8 -8 1 5 16887 23 17 53 23 18 13 --- 05 18 42 60.7 207.2 0.9 22.9 12 F 1 17020 23 18 13 3C120 05 18 42 61.4 204.1 0.8 20.4 -8 1 5 17020 23 18 13 23 18 33 --- 05 19 02 61.3 204.3 0.8 20.5 12 F 1 17153 23 18 33 J0426+0518 05 19 02 60.7 207.4 0.9 23.1 -8 1 6 17153 23 18 33 23 18 53 --- 05 19 22 60.7 207.5 0.9 23.2 12 R 1 17020 23 18 53 3C120 05 19 22 61.3 204.4 0.8 20.6 -8 1 6 17020 23 18 53 23 19 13 --- 05 19 42 61.3 204.6 0.8 20.8 12 R 1 16887 23 19 13 J0426+0518 05 19 42 60.6 207.7 0.9 23.3 -8 1 6 16887 23 19 13 23 19 33 --- 05 20 02 60.6 207.8 0.9 23.5 12 R 1 16754 23 19 33 3C120 05 20 02 61.2 204.8 0.8 20.9 -8 1 6 16754 23 19 33 23 19 53 --- 05 20 22 61.2 204.9 0.8 21.0 12 R 1 16621 23 19 53 J0426+0518 05 20 22 60.6 208.0 0.9 23.6 -8 1 6 16621 23 19 53 23 20 13 --- 05 20 42 60.5 208.2 0.9 23.7 12 R 1 16488 23 20 13 3C120 05 20 42 61.2 205.1 0.8 21.2 -8 1 6 16488 23 20 13 23 20 33 --- 05 21 02 61.2 205.2 0.8 21.3 12 R 1 16355 Schedule for VLBA_KP (Code Kp ) Page 40 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 23 20 33 J0426+0518 05 21 02 60.5 208.3 0.9 23.8 -8 1 6 16355 23 20 33 23 20 53 --- 05 21 22 60.5 208.5 0.9 24.0 12 R 1 16222 23 20 53 3C120 05 21 22 61.1 205.4 0.8 21.4 -8 1 6 16222 23 20 53 23 21 13 --- 05 21 42 61.1 205.6 0.8 21.6 12 R 1 16089 23 21 13 J0426+0518 05 21 42 60.4 208.6 0.9 24.1 -8 1 6 16089 23 21 13 23 21 33 --- 05 22 02 60.4 208.8 0.9 24.2 12 R 1 15956 23 21 33 3C120 05 22 02 61.1 205.7 0.8 21.7 -8 1 6 15956 23 21 33 23 21 53 --- 05 22 22 61.0 205.9 0.8 21.8 12 R 1 15823 23 21 53 J0426+0518 05 22 22 60.3 208.9 0.9 24.3 -8 1 6 15823 23 21 53 23 22 13 --- 05 22 42 60.3 209.1 0.9 24.5 12 R 1 15690 23 22 13 3C120 05 22 42 61.0 206.0 0.8 22.0 -8 1 6 15690 23 22 13 23 22 33 --- 05 23 02 61.0 206.2 0.8 22.1 12 R 1 15557 23 22 33 J0426+0518 05 23 02 60.3 209.2 0.9 24.6 -8 1 6 15557 23 22 33 23 22 53 --- 05 23 22 60.2 209.4 0.9 24.7 12 R 1 15424 23 22 53 3C120 05 23 22 60.9 206.4 0.8 22.2 -8 1 6 15424 23 22 53 23 23 12 --- 05 23 42 60.9 206.5 0.8 22.4 12 R 1 15291 23 23 12 J0426+0518 05 23 42 60.2 209.5 0.9 24.8 -8 1 6 15291 23 23 12 23 23 32 --- 05 24 02 60.2 209.7 1.0 25.0 12 R 1 15159 23 23 32 3C120 05 24 02 60.9 206.7 0.8 22.5 -8 1 6 15159 23 23 32 23 23 52 --- 05 24 22 60.8 206.8 0.9 22.6 12 R 1 15026 23 23 52 J0426+0518 05 24 22 60.1 209.8 1.0 25.1 -8 1 6 15026 23 23 52 23 24 12 --- 05 24 42 60.1 210.0 1.0 25.2 12 R 1 14893 23 24 12 3C120 05 24 42 60.8 207.0 0.9 22.8 -8 1 6 14893 23 24 12 23 24 32 --- 05 25 02 60.8 207.1 0.9 22.9 12 R 1 14760 23 24 32 J0426+0518 05 25 02 60.1 210.1 1.0 25.3 -8 1 6 14760 23 24 32 23 24 52 --- 05 25 22 60.0 210.3 1.0 25.4 12 R 1 14627 23 24 52 3C120 05 25 22 60.8 207.3 0.9 23.0 -8 1 6 14627 23 24 52 23 25 12 --- 05 25 42 60.7 207.5 0.9 23.1 12 R 1 14494 Schedule for VLBA_KP (Code Kp ) Page 41 BM171 VLBA format 0.7 and 1.3 cm 2001 0700-1900 LST UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. TPStart: Tape motion start time. Frequencies are LO sum (band edge). Automatic tape allocation specified. Tape positions are just estimates. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) ---------------------------------------------------------------------------------------- --- Sun 13 Apr 2003 Day 103 --- 23 25 12 J0426+0518 05 25 42 60.0 210.4 1.0 25.6 -8 1 6 14494 23 25 12 23 25 32 --- 05 26 02 60.0 210.6 1.0 25.7 12 R 1 14361 23 25 32 3C120 05 26 02 60.7 207.6 0.9 23.3 -8 1 6 14361 23 25 32 23 25 52 --- 05 26 22 60.7 207.8 0.9 23.4 12 R 1 14228 23 25 52 J0426+0518 05 26 22 59.9 210.7 1.0 25.8 -8 1 6 14228 23 25 52 23 26 12 --- 05 26 42 59.9 210.9 1.0 25.9 12 R 1 14095 23 26 12 3C120 05 26 42 60.6 207.9 0.9 23.5 -8 1 6 14095 23 26 12 23 26 32 --- 05 27 02 60.6 208.1 0.9 23.6 12 R 1 13962 23 26 32 J0426+0518 05 27 02 59.9 211.0 1.0 26.1 -8 1 6 13962 23 26 32 23 26 52 --- 05 27 22 59.8 211.2 1.0 26.2 12 R 1 13829 23 26 52 3C120 05 27 22 60.6 208.2 0.9 23.8 -8 1 6 13829 23 26 52 23 27 12 --- 05 27 42 60.5 208.4 0.9 23.9 12 R 1 13696 23 27 12 J0426+0518 05 27 42 59.8 211.3 1.0 26.3 -8 1 6 13696 23 27 12 23 27 32 --- 05 28 02 59.7 211.5 1.0 26.4 12 R 1 13563 23 27 32 3C120 05 28 02 60.5 208.5